No Activity Trades Quantity Plant Labour Angkat AP


Concerete grade 25 steps and Cocrete
1 Concreter 2
staircase Mixer

Cocrete
2 Concrete grade 25 landing slabs Concreter 1
Mixer

Reinforcement bars MS 146, 10


3 Barbender 245 -
mm diameter; straight and bend

4 Formwork to soffits of staircases Carpenter 7 -

Formwork to soffits of landing


5 Carpenter 1 -
slab

6 Formwork to edges of slab Carpenter 23 -

Formwork to edges of staircase


7 Carpenter 12 -
flights

8 Mild steel railing 5

9 Timber handrail 6

Cement and sand backing screed


10 1
for 19 mm landing slab

Cement and sand backing screed


11 10
for 19 mm skirting

Cement and sand backing screed


12 24
for 19 mm riser

Cement and sand backing screed


13 23
for 19 mm thead

Cement and sand backing screed


14 23
for 19 mm nosing

Cocrete
15 Tiling for landing slab Tiler 1
Mixer

Cocrete
16 Tiling for skirting Tiler 10
Mixer
Cocrete
17 Tiling for riser Tiler 24
Mixer

Cocrete
18 Tiling to thread Tiler 23
Mixer

Cocrete
19 Extra over non slip nosing tile Tiler 23
Mixer

Skim coat to sloping concrete


20 7 Drywaller
soffit

21 Skim coat to concrete soffit 1 Drywaller

Skim coat to edges of staircase


22 4 Drywaller
flights

Plastered sloping soffit of Cocrete


23 Plasterer 7
staircase Mixer

Cocrete
24 Plastered soffit of landing slab Plasterer 1
Mixer

Plastered side of open raking Cocrete


25 Plasterer 4
open string staircase Mixer

Prepare and apply one coat


26 primer, one undercoats and two Painter 5
finishing coats to metal railing