Sei sulla pagina 1di 51

STANDARD STP - TYPE B

Project Title:

Developer:

Consultant:

Declaration:
I hereby declare in accordance with the TS 1402:2016 that the
information given are complete, true and accurate and I have fully
complied with the design requirement and specification as
declared in the above schedule.

Signature & Endorsement:


PROJECT TITTLE:

Annex C
STANDARD STP - DESIGN CALCULATION
TYPE B

Page 2 of 51
PROJECT TITTLE:

LEGEND

Variables (Cell to be filled in by designer)

Cell is locked & auto generate by formula

Summary of the design tank/chamber (auto generate)

Page 3 of 51
TABLE OF CONTENTS

Content Pages

1.0 SEWAGE CHARACTERISTICS SC 1


2.0 HYDRAULIC CALCULATION HC 1
2.1 PRIMARY SCREEN CHAMBER PSC 1 - 2
2.2 SECONDARY SCREEN CHAMBER SSC 1 -2
2.3 PRIMARY TREATMENT PT 1 - 2
2.4 V-NOTCH CALCULATION V-N 1
2.5 RECTANGULAR WEIR CALCULATION RWC 1
2.6 PROCESS HYDRAULIC CALCULATION PHC 1
2.7 HYDRAULIC PROFILE HP 1
2.8 GRAPH HYDRAULIC PROFILE GHP 1
3.0 BIOLOGICAL TREATMENT BT 1
3.1 ANOXIC TANK AX 1

3.2 AERATION TANK AT 1 - 3


3.3 CLARIFIER TANK CL 2
3.4 SLUDGE HOLDING TANK SHT 1
4.0 FACILITIES TREATMENT FT 1
4.1 CHLORINATION TANK CT 1

4.2 SAND DRYING BED SDB 1


5.0 MASS BALANCE MB 1
6.0 MECHANICAL WORKS MW 1

6.1.1a RAW SEWAGE PUMP RSP(a) 1 - 3


6.1.1b RAW SEWAGE PUMP RSP(b) 1 - 3
6.1.2 IR PUMP IRP 1 - 3
6.1.3 RAS PUMP RAS 1 - 2
6.1.4 SLUDGE TRANSFER PUMP ST 1 - 2

6.2 PIPE SIZING PP 1


6.3 AIR PIPE LOSSES APL 1 -5
6.4 BLOWER SELECTION BWL 1
7.0 ELECTRICAL WORKS EW 1

7.1 ELECTRICAL LOAD EL 1

ii
PROJECT TITTLE:

1.0 SEWAGE CHARACTERISTICS

[A] Population Equivalent, PE = 1500 PE

[B[ Ultimate Average Daily Flow, Qave = 0.225 m3/PE-day * PE


= 337.50 m3/day
= 14.06 m3/h
= 0.23 m3/min
= 0.0039 m3/s

[C] Peak Flow Factor, PFF = 4.7*(PE/1000)-0.11


= 4.49

[D] Ultimate Peak Flow, Qpeak = PFF*Qave


= 1517.06 m3/day
= 63.21 m3/h
= 1.05 m3/min
= 0.018 m3/s

[E] Influent Characteristic


BOD = 250 mg/L
Suspended solid (SS) = 300 mg/L
Total Nitrogen (TKN) = 50 mg/L
AMN = 30 mg/L
Oil and Grease = 50 mg/L
Total BOD Load = QavexBOD5 Con./1000
= 84.38 kg/day
Total Suspended Solid = QavexSS/1000
= 101.25 kg/day
Total TN Load = Qave*Total TKN/1000
= 16.88 kg/day
Total AMN Load = Qave*Total AMN/1000
= 10.13 kg/day

[F] Effluent Quality : Standard A


BOD5 = 20 mg/L
SS = 50 mg/L
TKNeff / Nitrate, Ne = 20 mg/L
AMN = 10 mg/L
Oil & Grease = 5 mg/L

[G] Adopted for Design :


BOD, S = 10 mg/L
SSeff = 20 mg/L
TKNeff / Nitrate, Ne = 10 mg/L
AMNe = 5 mg/L
Oil & Grease = 2 mg/L

Date of Printing:
Page SC 1 of 51
"12/07/2019"
PROJECT TITTLE:

2.0 HYDRAULIC CALCULATION

Page 6 of 51
PROJECT TITTLE:

2.1 PRIMARY SCREEN CHAMBER

[A] Design of screen

Dia. Incoming pipe : = m


Max. velocity through screen = 1.00 m/s
Qpeak = 0.018 m³/s
Bar size, thk = 10 mm
Bar width = 25 mm
Clear spacing = 25 mm
Slope from Horizontal = 45 deg

Top concrete level = m


Working platform level = m
Chamber depth = 0.00 m
Length = m
Total length = m

Nos of screen = = 2 nos (2 duty)

[B] Screen chamber width

Cross-sectional area = 0.018 m²


Assume water depth = m > #DIV/0! m (To be counter check with y2 below)
Clear width chamber required = #DIV/0! m

Nos of clear space = 0.00


= 0 nos
Frame thickness = m
Total clear width = 0.00 m
Total width chamber = 0.01 m
Witdh chamber provided = m

[C] Vol. of solid collection bin

Flow rate capacity = 337.50 m³/day


Screening capacity, based on guideline is 20 m³/106 m³ of wastewater (Refer to TS)
Volume of screening = 0.007 m³
Volume of 7 days storage = 0.05 m³

Size collection bin provided:


Width = m Nos of bin provided = nos
Height = m Total volume provided = 0 m³
Length = m
Volume provided = 0 m³

[D] Calculate Actual Depth and Flow Through Screen

Actual water depth and flow through screen is check by using energy equation as follow:

incoming sewer
min. clearance Cinc static screen - 60o to horizontal

y2 = y1 + hL hL
y1 = yc /0.7

nappe

yc

air

wet well

Date of Printing:
Page PSC 7 of 51
"12/07/2019"
PROJECT TITTLE:

Open channel flow with outlet control - free fall


Opening outlet to wet well = m

Qpeak/m width, q = #DIV/0! m3/m/s

compute approximate y1 by Francis Formula/critical depth


yc = (q^2/g)^0.333
= #DIV/0! m
y1 = #DIV/0! established flow profile

approx screen through velocity, conservative = 1.0 m/s (Refer to TS)


hL = v2/2g
= 0.051 m
y2 = #DIV/0! m

Check Flow through velocity

no of opening required = 0
nos of opening provided =
opening area = #DIV/0! m2
flow through velocity = #DIV/0! m/s < 1.0m/s #DIV/0!

approx. velocity when 50% chocked x 2 = #DIV/0! m/s

Check screen approach velocity


Actual clear width = 0.00 m

Approach velocity = #DIV/0! m/s >0.2m/s, prevent SS settling; #DIV/0!

Set incoming sewer invert = cinc


= mm Allowable drop from inlet chamber to TWL
higher than PSC TWL by
Incoming sewer invert = RL.m Refer to the last manhole and added with the gradient from last
manhole to the inlet chamber using of negative value.
PSC invert
Set Alarm level at the pump = #DIV/0!
sump = mm
Wastewater alarm level set = #DIV/0!

note :
150mm is assume water depth used as a standard clearance for Cinc which is sufficient. However, it need to adjust and calculated
for verification purposes.

Design Dimension of Primary Screen Chamber

Length (L) Width (W) Chamber Depth (CD)


0.00 0.00 0.00

Date of Printing:
Page PSC 8 of 51
"12/07/2019"
PROJECT TITTLE:

2.2 SECONDARY SCREEN CHAMBER

[A] Design of screen

Dia. Incoming pipe : = m


Max. velocity through screen = 1.00 m/s
Qpeak or Qpump = 0.017559 m³/s (Using Qpeak or Qpump whichever higher)
Bar size, thk = 10 mm
Bar width = 25 mm
Clear spacing = 12 mm
Slope fr. Horizontal = 45 deg

Platform level = m
Ground level = m
Chamber depth = m
Length = m
Total length = m

Nos of screen = = 2 nos (2 duty)

[B] Screen chamber width

Cross-sectional area = 0.018 m²


Assume depth = m > #DIV/0! m (To be counter check with y2 below)
Clear width chamber required = #DIV/0! m

Nos of clear space = 0.00


= 0 nos
Frame thickness = m
Total clear width = 0.00 m
Total width chamber = 0.01 m
Chamber width provided = m

[C] Vol of solid collection bin

Flow rate capacity = 337.50 m³/day


Screening capacity, based on TS is 37 m³/106 m³ of wastewater
= (Screenings at 12mm bar spacing - 25mm bar spacing)
vol of screening = 0.012 m³
vol of 7 days storage = 0.09 m³

size collection bin provided


width = m Nos of bin provided = nos
Height = m Total volume provided = 0.00 m3
length = m
Vol provided = 0.000 m3

Note: To provide a storage bin of size 1m x 1m x1m or to IWK standard rubbish bin size.

[D] Calculate Actual Depth and Flow Through Screen


Actual water depth and flow through screen is check by using energy equation as follow:

incoming sewer min. clearance Cinc static screen - 60o to horizontal

y2 = y1 + hL hL
y1 = yc /0.7

nappe

yc

air

Grit chamber

Page 9 of 51
PROJECT TITTLE:

Open channel flow with outlet control - free fall


Opening outlet to wet well = m

Qpeak/m width, q = #DIV/0! m3/m/s

compute approximate y1 by Francis Formula/critical depth


yc = (q^2/g)^0.333
= #DIV/0! m
y1 = #DIV/0! established flow profile

approx screen through velocity, conservative = 1.0 m/s (Refer to TS)


hL = v2/2g
= 0.051 m
y2 = #DIV/0! m

Check Flow through velocity

no of opening required = 0
nos of opening provided =
opening area = #DIV/0! m2
flow through velocity = #DIV/0! m/s < 1.0m/s #DIV/0!

approx. velocity when 50% chocked x 2 = #DIV/0! m/s

Check screen approach velocity


Actual clear width = 0.00 m

Approach velocity = #DIV/0! m/s >0.2m/s, prevent SS settli #DIV/0!

Set feeding of the pump force = cinc


main is higher than TWL = mm Allowable distance from TWL to forcemain outlet.

Design Dimension of Primary Screen Chamber

Length (L) Width (W) Chamber Depth (CD)


0.00 0.00 0.00

Page 10 of 51
PROJECT TITTLE:

2.3 PRIMARY TREATMENT

[A] Horizontal Grit Removal

Design
Retention time = 3 mins
Volume required = 3.16 m³

Size of tank
Length = m
Width = m
Check for ratio of Length to Width = #DIV/0! (TS, 2:1)
Nos of unit = nos (1 duty, 1 standby)
Free board = m

Small Channel Calculation


Slope degree provided = 30 deg
Small Channel width = m
Height of small triangle = 0.00 m
Volume of small channel = 0.00 m³

Slope in length for grit chamber


Drop in length = deg
Height of drop = 0.00 m
Volume of the slope = 0.00 m3

Side water depth required = #DIV/0!


Side water depth provided =

Total water depth = 0.00


Check for ratio of Depth to Width = #DIV/0! (TS, 1:2)
Total Volume provided per tank = 0.00 m³

Retention time provided = 0.00 mins

Estimated grit quantity = 0.03 m3/103 m3 of sewage


= 0.010 m3/day of grit

Maximun gravity flow through velocity

Surface flow through, Sf = side water depth


x width
= 0
Gravity flow through = Qpeak / Sf
= #DIV/0! m/s

Check for maximun gravity flow = #DIV/0! (TS, < 0.2m/s)


through velocity

[B] Grease Chamber

Retention time = 3 mins


Volume required = 3.16 m³

Size of tank
Length = m

Date of Printing:
Page PT 11 of 51
"12/07/2019"
PROJECT TITTLE:

Width = m
Depth = m
Nos of unit = nos (1 duty, 1 standby)
Free board = m

Volume provided per tank = 0.00 m³


Retention time provided = 0.00 mins

Concentration of grease in the water = 0.10 kg/m³


Total grease collected = 33.75 kg/day
Specific of grease = 0.85 /1000kg/m³
Grease collected = 0.040 m³/day

[C] Grit and Grease Sand Bed

Retention time for both grit and grease collection = 30 days


Volume of Grit collected = 0.304 m³
Volume of Grease collected = 1.19 m³
Total volume of grit and grease = 1.49 m³
Area required = 4.27 m²

Note:
Depth of grit and grease feeding = 350.00 mm (refer to TS)

Dimension
i - Nos of SDB = nos
ii - Width = m
ii - Length = m
Iv - Depth = 0.35 m

Volume provided = 0.00 m³


Area provided = 0.00 m²

Design Dimension of Grit Removal

Length (L) Width (W) Water Depth (WD)


0.00 0.00 0.00

Design Dimension of Grease Chamber

Length (L) Width (W) Water Depth (WD)


0.00 0.00 0.00

Date of Printing:
Page PT 12 of 51
"12/07/2019"
PROJECT TITTLE:

2.4 V-NOTCH CALCULATION

[B] Clarifier Effluent Weir

Using the equation of V-Notch

5
8 θ 2
Q=C d √ 2 g tan H
15 2
Hence, Q = Peak flow, m³/s
Cd = Coefficient of discharge, minimum value
= 0.581
g = acceleration due to gravity, m/s²
H = Head on weir

Qpeak per tank = 0.0087792589 m³/s


Qpeak / tank / effluent channel = 0.0021948147 m³/s

0.0022 m³/s = 1.37 H2.5


H2.5 = 0.0016
H = 0.076 m
= 7.61 cm
Head on weir/effluent channel/tank = 76.13 mm

T.W.L

76.13

Page 13 of 51
PROJECT TITTLE:

2.5 RECTANGULAR WEIR CALCULATION

[A] Anoxic Tank to Aeration Tank

Proposed top overflow


Francis formula is being used for a opening calculation
3
2
Q=1 . 84 ( L−0 .1 nH ) H
Where, Q =' peak flow of incoming
L = Total Length of weir
n = Nos of end contractions
H = Head over the sill

In this condition
Q = 0.033 m3/s
L = m
n = ___x___opening
= nos

Based on Francis Formula

0.033 = 1.84 x (___ - 0.1(__)H) x H3/2


0.018 = ( 0.00 - 0 H)x H3/2
H = m (Solven of formula by CP)
= 0.00 mm

Hence allow opening size


Nos of opening = 0 nos
W Required = #DIV/0! m
W provided = mm
Head of water overflow= 0.00 mm

Page 14 of 51
PROJECT TITTLE:

2.6 PROCESS HYDRAULIC CALCULATION

V' notch calculation Q=(8/15)*Cd*√2g*Tan(θ/2)*H5/2

nos of Each no of
Process unit Total Flowrate tank flowrate weir Cd θ H5/2 H (m) H (mm)

Clarifier effluent weir 0.018 2 #DIV/0! 0.581 90 0.00160 0.076 76.13

Rectangular Weir Calculation Q = 1.84 (L-0.1nH)H3/2

nos of Each
Process unit Total Flowrate n L Cd H (m) H (mm)
opening flowrate

Anoxic Tank to Aeration Tank 0.033 0 0 0.017 0.0 0.581 0.000 0.0

Page 15 of 51
PROJECT TITTLE:

2.7 HYDRAULIC PROFILE

Process Unit Top Water Level (TWL) m Ground Level


Inlet Chamber 0
Primary Screen Chamber 0
Pump Sump 0
Secondary Screen Chamber 0
Grit Chamber 0
Grease Chamber 0
Anoxic Tank 0
Aeration Tank 0
Clarifier Tank 0
Chlorination Chamber 0
Sludge Holding Tank 0
0
To be indicated by Designer:
Ground Level

Page 16 of 51
PROJECT TITTLE:

HYDRAULIC PROFILE
Ground Level
1 0
0
0
0.9
0
0
0.8 0

Top Water Level (m)


0
0.7 0
0
0
0.6
0
0
0.5

0.4

0.3

0.2

0.1

0
r r p r r r k k k r k
be be m be be be Ta
n n n be Ta
n
am am Su am m am Ta Ta am
p ha ic on er ng
t Ch Ch m Ch tC Ch ox t ri f Ch ld
i
le n Pu n i se An ra on
In re
e
re
e Gr ea Ae Cl
a
t Ho
Sc Sc Gr i na ge
ar
y
ar
y
l or ud
d Ch Sl
im on
Pr ec
S

Process Unit
Top Water Level (TWL) m Ground Level

Signature & Endorsement: Company Stamp:

Date of Printing:
Page GHP 17 of 51
"12/07/2019"
PROJECT TITTLE:

3.0 BIOLOGICAL TREATMENT

Date of Printing:
Page BT 18 of 51
"12/07/2019"
PROJECT TITTLE:

3.1 ANOXIC TANK

Anoxic tank is provided to be used for denitrification. Therefore the DO provided in the anoxic zone shall be
less then 0.5 mg/l

AMN influent, So = 30 mg/L (Based on Ammoniacal Nitrogen)


Nitrogen loading = 10.13 kg/d (Based on Ammoniacal Nitrogen)
Operating Temperature, T = 28 Deg
Effluent ammonia, AMN = 5.00 mg/L
Effluent nitrate Nitrogen, N = 10.00 mg/L (Guideline Vol 4)
MLVSS/MLSS, fi = 0.80
NO3-N to be denitrified, Ne = 15.00 (So-S-N) mg/L
Specific denitrification rate, Udn = 0.035 /d
Dissolved oxygen, DO = 0.20 mg/l
Overall denitrification rate, U'dn = 0.056 Udn x 1.09 (T-20) (1-DO)
Anoxic retention time, HRTdn = #DIV/0! /d (NO3-N /(0.8xMLSSxU'dn)
= #DIV/0! hrs
Anoxic volume required = #DIV/0! m³

[A] Dimension
i Nos of unit = 2 nos
ii Length = 0.00 m
iii Width = m
iv Depth = 0.00 m

Note:
Total length of anoxic tanks is governed by width of aeration tank.

Volume provided = 0.00 m³


Volume of chamfer = m³

Total volume = 0.00 m³

Check:
Detention time provided = 0.00 hrs

[B] Mixing power for Anoxic Zone = 3 Watt/m³ - 8 Watt/m³ (Metcalf & Eddy, Fifth Edition, Vol 1, pg. 804)
(proposed mixing intensity at Anoxic zone for complete mixing)

Minimum power selection = Watt/m³

The selection of mixer shall also refering to the thrust which refering to the geometry of the tank.

Hence, Minimum mixing power for Anoxic Zone


= 0.00 W
= 0.00 kW

Mixing power from selected submersible mixer


= 0.00 kW (min)

Design Dimension of Anoxic Tank

Length (L) Width (W) Water Depth (WD)


0.00 0.00 0.00

Date of Printing:
Page AX 19 of 51
"12/07/2019"
PROJECT TITTLE:

3.2 AERATION TANK

MLSS = (TS = 2000 ~ 4000)


MLVSS = 0 (MLVSS = MLSS * 0.8)
BOD5/BODL = 0.68
BOD5 loading/day = 84.38 kg
BOD5 required to remove/day = 81.00 kg
TSS loading/day = 101.25 kg
SS required to remove/day = 94.16 kg
Qc = 25 days (TS = > 20days)
(proposed 25 days sludge age)
Kd = 0.06
observed Yield = 0.60 (TS = 0.4 ~ 0.6, typical = 0.5)
F/M ratio = 0.10 d-1 (TS = 0.05 ~ 0.1)
Xr = 8

Design result

V = #DIV/0! m³

V = #DIV/0! m³ (use BOD5 required to removed)

If retention time = 18 hrs


Volume required = 253.13 m³

Tank provided
Length = m (TS; L:W = 3:1)
Width = m
Liquid depth = m (TS; Minimum water depth = 3.5 m)
Free board = 0.50 m
Nos of tank = 2 nos

Volume provided = 0.00 m³

= V/q
= 0.00 day
= 0.00 hrs (TS = 18 ~ 24 hrs)

Check F/M ratio


F/M = #DIV/0! (TS = 0.05 ~ 0.1)

#DIV/0! kg BOD5/m .day


3
Check organic loading = (TS = 0.16 ~ 0.4)

Sludge Age Estimation


Sludge Age Estimation = Total solids in aeration tank
Sludge yield - Solid in effluent
Total solids in aeration tank = BOD5 to be removed
F/M Ratio
= #DIV/0! kg/day
Sludge Yield = Sludge yield, Y x BOD to be removed
Sludge Yield, Y = 1.20 (MSIG, 0.4 for 24 hrs, 0.6 for 18 hrs)
Sludge Yield = 97.20 kg/day
Solids in effluent = = 6.75 kg/day

Sludge Age = #DIV/0! days (TSreq > 20 days

[A] Estimate WAS

V T ×MLSS

QW =
( θ Sludge
−( Q Ave ×SS eff )
)
Cu
Qw = #DIV/0! m³/day

Date of Printing:
Page AT 20 of 51
"12/07/2019"
PROJECT TITTLE:

[B] O2 Requirement

O2 required
BOD5 removed = 81 kg/day
O2 / BOD removed (kgO2/kgBOD5 loading) = 1.5 to 2.0 (Typical 1.5 )(Guideline)
O2 requirement, N = 121.50 kg/day
O2 required for nitrification, O2-N = 4.60 kgO2/kgN
= 46.58 kg/day
(O2-N x N loading)
Total AOR = 168.08 kg/day

O2 / BOD removed (kg O2/kgBOD5 loading) = 2.00 mg/l


(Base on guideline)
Total AOR = 162.00 kg/day < 168.08 kg/day

Thus, use O2 required = 168.08 kg/day

Std Oxygen requirement SOR = AOR x Cs20


(βCs,T,H - CL) θ (T-20) α
AOR = 168.0750 kgO2/d
Cs20 = 9.0800 mg/l
Cs,T,H = 8.2400 mg/l
CL = 2.0000 mg/l
α = 1.0000
β = 1.0000
Temperature correction coefficient θ = 1.0240
T = 28.0000 o
C
SOR = 202.30 kgO2/day
Safety factor = 1.1
STOR + Safety factor = 222.53 kgO2/day
Volumetric air flow requirement = 939.47 m3 air/day
Air required Qair = SOR/Ci x SOTE m3/day
Standard Oxygen Transfer Efficiency SOTE = 22 %
Oxygen content of air Ci = 23.20 %
(Weight fraction of oxygen in air at 20oC, atm pressure)
Sp weight of air ρ = 1.20 kgO2/m3
Qair = 3621.26 m3/day
Air required for 24 hrs = 150.89 m3/hr
Air required = 2.51 m3/min
(decrease due to increase of SOTE from 15% to 22%)
Air flow per diffuser = 0.10 m3/min
(choose 0.1 m /min to reduce wear & tear of EDPM membrane)
3

Nos of diffuser required = 25.15 nos


Nos of diffuser provided = 0 nos
Air provided at dicharge point = 0.00 m3/min
#DIV/0!
Re-check of O2 /BOD removed

SOR = AOR x Cs20


(βCs,T,H - CL) θ (T-20) α
Hence, AOR = SOR x (βCs,T,H - CL) θ (T-20) α
Cs20
= 184.88 kg/day

Therefore, O2 /BOD removed provided = AOR / BOD loading


= 2.28 kgO2/BOD5 loading
(> Guideline of 2.0kgO2/BOD5 loading)

Date of Printing:
Page AT 21 of 51
"12/07/2019"
PROJECT TITTLE:

Air provided = 0.00 m3/min


Air suction required Qs = Qd x (1.0332+Pd) / 1.0332
(Pd in mmAq/1000mm)
Pd = (Diffuser submergence) x (1+0.2) psi
2.31 x 0.30
Diffuser Submergence = -0.30
(diffuser to be install 0.30m above tank floor)
Pd = -0.43 psi
= -0.32 mmAq/1000mm
Pd = 0.29 atm
Using P1V1/T1 = P2V2/T2
Under standard condition P1 = 1 atm
V1 = Qs
T1 = 273 degree celcuis
P2 = Pd = 1.29 atm
T2 = 301 Degree celcius
(assume water temperature at 28 Deg)
V2 = 0.00 m3/min
Qs = 0.00 m3/min

[C] Mixing Requirement

Mixing rate for grid aeration = 10 to 15 m3/103m3.min


Tank volume provided = 0.00 m³
Mixing rate for grid selected = m3/103m3.min
Mixing rate required = 0.00 m3/min

Design Dimension of Aeration Tank

Length (L) Width (W) Water Depth (WD)


0.00 0.00 0.00

Date of Printing:
Page AT 22 of 51
"12/07/2019"
PROJECT TITTLE:

3.3 CLARIFIER TANK

The volume require shall based on 2hours retention time at Qpeak

Volume required = 126.42 m3 (TS = 2 hours of peak flow)

Surface area required = 50.57 m² (TS = 30 m3/m2.day at peak flow)

[A] Square Tank With Hopper

Nos of tank provided = 2 nos

Length required = 5.03 m

Top surface = x 0 m2
= 0.00 m2

Base of hopper = x 0 m2 (1.0 m - 1.5 m)

Volume of pyramid = 0.00 - 0.00


= 0.00 m3

Side water depth required = #DIV/0! m

Side water depth = m


0.00 0.00 126.42 63.21
Volume provided = 0.00 m 3

Total side water depth 0.00 m

[B] Checking of Design Size

a) Volume = 0.00 m3 > Volume Req = 126.42 m3

b) Surface provided = 0.00 m2 > Surface Req = 50.57 m2

c) Surface loading provided = #DIV/0! m3/d/m2 < TS req < 30 m3/d/m2

d) Solids loading rate at Qpeak = #DIV/0! kg/d/m2 < TS req < 150 kg/d/m2

e) Solids loading rate at Qave = #DIV/0! kg/d/m2 < TS req < 50 kg/d/m2

f) Weir loading rate at peak flow required; TS req < 180 m3/d/m

Qpeak = 1,517.06 m3/day

Total weir length required = 8.43 m

Total number of effluent channel = 4.00 nos

Weir length/ side/ tank required = 1.05 m

Weir length/ side/ tank provided = m

Head on weir / effluent channel /


= 76.13 mm
tank required

Width of v-notch required = 228.39 mm

Width of v-notch provided = mm

Date of Printing:
Page CL 23 of 51
"12/07/2019"
PROJECT TITTLE:

= 0.00 m

Date of Printing:
Page CL 24 of 51
"12/07/2019"
PROJECT TITTLE:

Nos of v-notch required = #DIV/0! nos

Nos of v-notch provided = nos

conter check of weir loading rate

Total weir length provided = 0.00 m

Actual weir loading rate = #DIV/0! m3/d/m < 180 m3/d/m


Compliance check for weir loading= #DIV/0!

[C] To check Effluent Drain Velocity During Qpeak

Q per tank = 0.0087793 m³/s

Drain Size Provided = mm HRPC drain

Allow liquid height in drain = m

Cross section of drain, A = 0 m2

Velocity = #DIV/0! m/s (0.8 m/s - 4.0 m/s)

[D] Estimate the return sludge rate

Estimated Return Sludge Rate


MLSS (Q + Qr) = Xr x Q r
Assume, Xr = 8000 mg/l
(Xr assume; allow = 6,000 ~ 10,000mg/l)
Qr = 0.00 m3/day
(no safety factor is provided since the MLSS design level is conservative)
= 0.00 m3/min
Qr required = 0.0000 m3/s

Ratio of Qr : Q = 0 (Normally = 0.6 ~ 1.0)

Design Dimension of Clarifier Tank

Length (L) Width (W) Water Depth (WD)


0.00 0.00 0.00

Date of Printing:
Page CL 25 of 51
"12/07/2019"
PROJECT TITTLE:

3.4 SLUDGE HOLDING TANK

Qw = #DIV/0! m3/day
Retention Time Required = 30 days
Volume required = #DIV/0! m3

Dimension
i - Nos of unit = 1 nos
ii - Length = 0.00 m
iii - Width = -0.60 m
iv - Depth = 0.00 m
Assume wall thickness = 0.3 m

Volume provided = 0.00 m³

Air required
Mixing using coarse bubble diffuser
(20 or 30 m3 air /1000m3 tank
Air required = volume/min)
Air supply requirement = 0.00 m3/min
Air flow per diffuser = 0.20 m3/min
Nos of diffuser required = 0.00 nos
Nos of diffuser provided =
Air provided = 0.00 m3/min
Air suction required Qs = Qd x (1.0332+Pd) / 1.0332
(Pd in mmAq/1000mm)
Pd = (Diffuser submergence) x (1+0.2) psi
2.31 x 0.3048
Diffuser Submergence = -0.30
(diffuser to be install 0.30m above tank floor)
Pd = -0.43 psi
= -0.32 mmAq/1000mm
Pd = 0.29 atm
Using P1V1/T1 = P V
2 2
/T 2

Under standard condition P1 = 1 atm


V1 = Qs
T1 = 273 degree celcuis
P2 = P d
= 1.29 atm
T2 = 301 Degree celcius
(assume water temperature at 28 Deg)
V2 = 0.00 m3/min
Qs = 0.00 m3/min

Design Dimension of Sludge Holding Tank

Length (L) Width (W) Water Depth (WD)


0.00 -0.60 0.00

Date of Printing:
Page SHT 26 of 51
"12/07/2019"
PROJECT TITTLE:

4.0 FACILITIES TREATMENT

Date of Printing:
Page FT 27 of 51
"12/07/2019"
PROJECT TITTLE:

4.1 CHLORINATION TANK

[A] Chlorination Facilities


Retention time = 15 mins
(As per Guideline of 15 min Qpeak)
Volume required = 15.80 m³

Dimension
i - Nos of unit = 1 nos
ii - Width = m
iii - Length = m
iv - Depth = m
vvi -- No. passes
Width of each = nos
passes = #DIV/0! m #DIV/0!

Volume provided = 0.00 m³


Depth to Width ratio = #DIV/0! #DIV/0!
Length to Width ratio = #DIV/0! #DIV/0!

Design Dimension of Clorination Tank

Length (L) Width (W) Water Depth (WD)


0.00 0.00 0.00

Page 28 of 51
PROJECT TITTLE:

4.2 SAND DRYING BED

Sand bed is provided as an additional item to sludge holding tank.

This is to give a cheaper solution for dry sludge disposal using sand bed than wet sludge disposal
direct from sludge holding tank by using tanker.

The sand bed consist of a bottom layer of 250 mm depth consisting of course aggregate grated
from 28 mm to 40 mm topped with a 225 mm layer of fine course sand.

Total solid built up in SHT = #DIV/0! kg/day

Solid concentration at sand drying bed is thickened to 20 %.

Volume of sludge = #DIV/0!


1003 x 1.03 x 0.01

= #DIV/0! m3

Sludge blanket provided = 450 mm

sand drying bed is provided for 4 weeks/cycle to achieve 20 % solid concentration.

Provide 28 days capacity of covered sand drying bed

28 days x 2/3 #DIV/0! m3/day = #DIV/0! m3

Area required for sand drying bed = #DIV/0! m3


0.45 m

= #DIV/0! m2

Configuration of sand drying bed = m (W) x m (L)


= 0 m2

Provide 4 nos sand drying bed

4 nos x 0 m2 = 0 m2 > #DIV/0! m²

Date of Printing:
Page SDB 29 of 51
"12/07/2019"
PROJECT TITTLE:

5.0 MASS BALANCE

Nitrogen removed (kg/day) #DIV/0!

Qpeak (m³/day) 1517.06


BOD (kg/day) / (mg/L) 84.38 250.00
SS (kg/day) / mg/L 101.25 300.00
Total Nitrogen (kg/d)/ (mg/L) 16.88 50.00
AMN (kg/day) / (mg/L) 10.13 30.00 QIR (m3/day) 1350.00

Qeff (m3/day) #DIV/0!


BOD (kg/day) #DIV/0! 10
From secondary treatment Clarifier SS (kg/day) #DIV/0! 20
Aeration tank AMN (kg/day) #DIV/0! 5
Anoxic Tank Qave (m3/day) 1517.06 NO3-N (kg/day) #DIV/0! 10
BOD (kg/day) 84.38
SS (kg/day) 101.25
Q(m3/day) #DIV/0!
BOD (kg/day) #DIV/0!
SS (kg/day) #DIV/0!

Qr (m³/day) 0.00
BOD (kg/day) 0.00
SS (kg/day) 0.00 QWAS (m3/day) #DIV/0!
BOD (kg/day) #DIV/0!
SS (kg/day) #DIV/0!

VSS digested
Removed
by tanker
Sludge Holding Tank

Signature & Endorsement : Company Stamp :

Date of Printing:
Page MB 30 of 51
"12/07/2019"
PROJECT TITTLE:

6.0 MECHANICAL WORKS

Date of Printing:
Page MW 31 of 51
"12/07/2019"
PROJECT TITTLE:

6.1.1 RAW SEWAGE PUMP

[A] Raw Sewage Pump Selection

Design population equivalent = 1500 person


Average flowrate/person = 0.225 m³/day
Average influent flowrate = 1500 x 0.225 m³/day
= 337.50 m³/day ( 3.91 l/sec)
Peak factor = 4.7 (p)-0.11
(Where p = population equivalent in thousand)
Thus, peak factor = 4.7( 1.5 )-0.11
= 4.49
Peak flow = 337.50 x 4.49
= 1517.06 m³/day ( 17.56 l/sec)
1.05 m³/min
Peak flow = 17.56 l/sec
Velocity = 2.50 m/sec
Discharge pipe Area = 0.007 m²
Actual discharge pipe diameter required = 94.431 mm
Discharge pipe diameter provided = mm
Actual velocity = #DIV/0! m/sec
Enter friction factor, c = 130.00

Nos of pump duty = 1 nos


Safety Factor = 1
Capacity of each pump = 1517.06 m³/day
= 1.05 m³/min
= 0.018 m³/s = 17.56 l/sec

Individual pipe required = 94.56 mm


Individual pipe provided = mm
Velocity = #DIV/0! m/s

Suction pipe provided = mm = 0 m


Velocity = #DIV/0! m/s

Total Dynamic head = Static head + minor Losses +


Friction Losses
[B] Static Head

Level of discharge point of pump = m


Level of pump stop point = m
Thus, static head of pump = 0.00 m

Date of Printing:
Page RSP(a) 32 of 51
"12/07/2019"
PROJECT TITTLE:

I.L = 3.00

I.L = 2.00

3.00

G.L = 0.00

1.25

-3.60
I.L =-3.80 A.L = -4.10 5.15
C.L 2 = -4.25
C.L 1 = -4.40
0.45
L.L = -4.85
Degree x = 60 I.L = -5.15
1

[C] Sewage Retention Time and Pump Cycle Calculation

Volume of wet well required = 1.58 m³


(based on 10 start per stop)
Effective depth provided = m
Pump Sump provided = m x m
Benching in the tank = m
x degree = #DIV/0! degree
Width of Benching = m
Width of benching at the effec volume,
Lower width = #DIV/0! m
Upper width = #DIV/0! m
Volume of benching = #DIV/0! m³
Effective volume of pump sump = #DIV/0! m³

No. of start-stop per hour at average flow


Time to fill efective volume at DWF = #DIV/0! mins
Time to empty effective vol. at DWF = #DIV/0! mins
Thus, time cycle = #DIV/0! mins

No. of start-stop per hour = #DIV/0!


(Allowable 6 - 15 start stop per hour)

Nos of start-stop per hour at peak flow


T = 4V / Qout
= #DIV/0! mins
Nos of start stop = #DIV/0! nos

Date of Printing:
Page RSP(a) 33 of 51
"12/07/2019"
PROJECT TITTLE:

Level control = Float Switch


Quantity of float switch required = 5

Maximum retention time at Qave = 30 (Refer to TS)

Retention time of effective volume = #DIV/0! mins #DIV/0!

Note: OK when the retention time is less than 30 mins and FAIL when the retention
time is more than 30 mins.

Date of Printing:
Page RSP(a) 34 of 51
"12/07/2019"
PROJECT TITTLE:

[D] Minor Losses

Fitting k value Suction Discharge Force Main


Qty k total Qty k total Qty k total
22.5 degree bend 0.20 - - -
45 degree bend 0.40 - - -
90 degree bend 0.29 - - -
Bell mouth 0.04 - - -
Tee (Flow in line) 1.20 - - -
Tee (Flow in branch) 0.35 - - -
Gate valve 0.19 - - -
Check valve 1.50 - - -
Taper 0.12 - - -
Air release valve 0.30 - - -
Scour valve 0.50 - - -
Total 0 0 0

H (minor) = k v2
2g

Individual line
Hs (suction) = #DIV/0! m
Hd (delivery) = #DIV/0! m

Force main
Hm = #DIV/0! m

Total of minor losses = #DIV/0! m

[E] Friction losses

Head loss in pipe on Hazen William Formula is

Hf = 6.82 x (V/C)1.85 x L/D1.167

Where Hf = Friction losses (m)


V = Velocity (m/s) = #DIV/0! m/s
L = Pipe length (m) = m
C = H.W constant =
[C Value = 130 (D.I pipe) & 150 ( mPVC pipe)]
D = Pipe diameter (m) = mm

Hf = #DIV/0! m

Hence
Total dynamic head = #DIV/0! m
Safety factor = 1.15
Total dynamic head (provided) = #DIV/0! m

[F] Pump selection : nos Submersible Sewage Pump


1 duty, 1 standby (100 % standby)

[G] Model : rpm < 1500 (for long lasting & less wear & tear)

[H] Pump capacity : 17.56 l/s at #DIV/0! m head

(1 duty, 1 standby at Qpeak (100 % standby)

Date of Printing:
Page RSP(b) 35 of 51
"12/07/2019"
PROJECT TITTLE:

6.1.2 INTERNAL RECIRCULATION (IR) PUMP

[A] Anoxic Return


Internal Recycle ratio IR = Nox / Ne - 1.0 - R
= 0.5
(pg 1004, Biological Wastewater Treatment
in Warm Climate Regions, Vol 2.)
Therefore, IR/Q = 0.50
IR = 168.75 m3/day
= 7.03 m3/hr
= 0.12 m3/min
= 0.00 m3/s
(Accepted = 1.0 ~ 4.0, typical = 2 ~ 3)
Safety factor of IR Required = 20.00 %
IR Require = 202.50 m3/day
= 8.44 m3/hr
= 0.14 m3/min
= 0.00 m3/s
IR/Q = 0.60

Required as MSIG, IR/Q = 4


(Required in MSIG = 4 to 6 times)
IR required= 1350 m3/day
= 0.94 m3/min
= 0.016 m3/s

Check Volume of anoxic tank


Flow rate to anoxic tank = IRQ + RQ
= 1350.00 m3/day
= 56.25 m3/hr
= 0.94 m3/min
[B] IR Pump Selection

According to the Qr previously,

IR = 1350.00 m³/day
For 1 no IR = 56.25 m3/hr
= 0.94 m³/min
= 0.016 m³/s
= 15.63 l/s

Velocity for force main = 2.50 m/sec


Discharge pipe Area 0.006 m2
Actual discharge pipe diameter required = 89.229 mm
Discharge pipe diameter provided = mm
Actual velocity = #DIV/0! m/sec
Enter friction factor, c = 130.00

Nos of pump duty = 2 nos


Safety Factor = 1
Capacity of each pump = 675.00 m³/day
= 0.47 m³/min
= 0.008 m³/s

Date of Printing:
Page IRP 36 of 51
"12/07/2019"
PROJECT TITTLE:

Individual pipe required = 63.08 mm


Individual pipe provided = mm
Velocity = #DIV/0! m/s

Suction pipe provided = mm


Velocity = #DIV/0! m/s

Total Dynamic head = Static head + minor Losses


+ Friction Losses

[C] Static Head

Level of discharge point of pump = m


Level of pump stop point = m
Thus, static head of pump = 0.00 m

[D] Minor Losses

Fitting k value Suction Discharge Force Main


Qty k total Qty k total Qty k total
22.5 degree bend 0.20 - - -
45 degree bend 0.40 - - -
90 degree bend 0.29 - - -
Bell mouth 0.04 - - -
Tee (Flow in line) 1.20 - - -
Tee (Flow in branch) 0.35 - - -
Gate valve 0.19 - - -
Check valve 1.50 - - -
Taper 0.12 - - -
Air release valve 0.30 - - -
Scour valve 0.50 - - -
Total 0 0 0

Date of Printing:
Page IRP 37 of 51
"12/07/2019"
PROJECT TITTLE:

H (minor) = k v2
2g

Individual line
Hs (suction) = #DIV/0! m
Hd (delivery) = #DIV/0! m

Force main
Hm = #DIV/0! m
Total of minor losses = #DIV/0! m

[E] Friction losses

Head loss in pipe on Hazen William Formula is

Hf = 6.82 x (V/C)1.85 x L/D1.167

Where Hf = Friction losses (m)


V = Velocity (m/s) = #DIV/0! m/s
L = Pipe length (m) = m
C = H.W constant =
[C Value = 130 (D.I pipe) & 150 ( mPVC pipe)]
D = Pipe diameter (m) = mm

Hf = #DIV/0! m

Hence
Total dynamic head = #DIV/0! m
Safety factor = 1.15
Total dynamic head (provided) = #DIV/0! m

[F] Pump selection : nos MLSS Pump


2 duty, 2 standby (100 % standby)

[G] Model : rpm < 1500 (for long lasting & less wear & tear)

[H] Pump capacity : 7.81 l/s at #DIV/0! m head

2 duty, 2 standby (100 % standby)

Date of Printing:
Page IRP 38 of 51
"12/07/2019"
PROJECT TITTLE:

6.1.3 RAS PUMP

[A] RAS Pump Selection


According to the Qr previously,

Qr = 0.00 m³/day
Design for 7 hrs running per day = 0.00 m³/hr
= 0.00 m³/min
= 0.000 m³/s
= 0.00 l/s

Velocity for force main = 2.50 m/sec


Discharge pipe Area 0.0000 m2
Actual discharge pipe diameter required = 0.000 mm
Discharge pipe diameter provided = mm
Actual velocity = ### m/sec
Enter friction factor, c = 130.00

Nos of pump duty = 2 nos


Safety Factor = 1
Capacity of each pump = 0.00 m³/hr
= 0.00 m³/min
= 0.000 m³/s

Individual pipe required = 0.00 mm


Individual pipe provided = mm
Velocity = ### m/s

Suction pipe provided = mm


Velocity = ### m/s

Total Dynamic head = Static head + minor Losses + Friction Losses

[B] Static Head

Level of discharge point of pump = m


Level of pump stop point = m
Thus, static head of pump = 0.00 m

[C] Minor Losses

Fitting k value Suction Discharge Force Main


Qty k total Qty k total Qty k total
22.5 degree bend 0.20 - - -
45 degree bend 0.40 - - -
90 degree bend 0.29 - - -
Bell mouth 0.04 - - -
Tee (Flow in line) 1.20 - - -
Tee (Flow in branch) 0.35 - - -
Gate valve 0.19 - - -
Check valve 1.50 - - -
Taper 0.12 - - -
Air release valve 0.30 - - -
Scour valve 0.50 - - -
Total 0 0 0

Date of Printing:
Page RAS 39 of 51
"12/07/2019"
PROJECT TITTLE:

H (minor) = k v2
2g

Individual line
Hs (suction) = #DIV/0! m
Hd (delivery) = #DIV/0! m

Force main
Hm = #DIV/0! m

Total of minor losses = #DIV/0! m

[D] Friction losses

Head loss in pipe on Hazen William Formula is

Hf = 6.82 x (V/C)1.85 x L/D1.167

Where Hf = Friction losses (m)


V = Velocity (m/s) = #DIV/0! m/s
L = Pipe length (m) = m
C = H.W constant =
[C Value = 130 (D.I pipe) & 150 ( mPVC pipe)]
D = Pipe diameter (m) = 0.00 mm

Hf = #DIV/0! m

Hence
Total dynamic head = #DIV/0! m
Safety factor = 1.15
Total dynamic head (provided) = #DIV/0! m

[E] Pump selection : units RAS pump/tank

[F] Sludge Pump Selection

Q pump = 0.00 l/sec


= 0.00 m³/day

Qr = 0.00 m³/day/pump

[G] Operating time of sludge pump

Qr = Total running time of pumps/ day

Total running time of pump = ### hrs/day/pump


for recycle sludge

Date of Printing:
Page RAS 40 of 51
"12/07/2019"
PROJECT TITTLE:

6.1.4 SLUDGE TRANSFER PUMP

[A] Sludge Transfer Pump Selection


According to the Qw previously,

Qw = ### m³/day
Design for 7 hrs running per day = ### m³/hr
= ### m³/min
= ### m³/s
= ### l/s

Velocity for force main = 2.50 m/sec


Discharge pipe Area ### m2
Actual discharge pipe diameter required = ### mm
Discharge pipe diameter provided = mm
Actual velocity = ### m/sec
Enter friction factor, c = 130.00

Nos of pump duty = nos


Safety Factor = 1
Capacity of each pump = ### m³/hr
= ### m³/min
= ### m³/s

Individual pipe required = ### mm


Individual pipe provided = mm
Velocity = ### m/s

Suction pipe provided = mm


Velocity = ### m/s

Total Dynamic head = Static head + minor Losses + Friction Losses

[B] Static Head

Level of discharge point of pump = m


Level of pump stop point = m
Thus, static head of pump = 0.00 m

[C] Minor Losses

Fitting k value Suction Discharge Force Main


Qty k total Qty k total Qty k total
22.5 degree bend 0.20 - - -
45 degree bend 0.40 - - -
90 degree bend 0.29 - - -
Bell mouth 0.04 - - -
Tee (Flow in line) 1.20 - - -
Tee (Flow in branch) 0.35 - - -
Gate valve 0.19 - - -
Check valve 1.50 - - -
Taper 0.12 - - -
Air release valve 0.30 - - -
Scour valve 0.50 - - -
Total 0 0 0

Date of Printing:
Page ST 41 of 51
"12/07/2019"
PROJECT TITTLE:

H (minor) = k v2
2g

Individual line
Hs (suction) = #DIV/0! m
Hd (delivery) = #DIV/0! m

Force main
Hm = #DIV/0! m

Total of minor losses = #DIV/0! m

[D] Friction losses

Head loss in pipe on Hazen William Formula is

Hf = 6.82 x (V/C)1.85 x L/D1.167

Where Hf = Friction losses (m)


V = Velocity (m/s) = #DIV/0! m/s
L = Pipe length (m) = m
C = H.W constant =
[C Value = 130 (D.I pipe) & 150 ( mPVC pipe)]
D = Pipe diameter (m) = 0.00 mm

Hf = #DIV/0! m

Hence
Total dynamic head = #DIV/0! m
Safety factor = 1.15
Total dynamic head (provided) = #DIV/0! m

[E] Pump selection : units Sludge Transfer Pump/tank

[F] Sludge Pump Selection

Q pump = #DIV/0! l/sec


= #DIV/0! m³/day

Qw = #DIV/0! m³/day/pump

[G] Operating time of sludge pump

Qr = Total running time of pumps/ day

Total running time of pump = ### hrs/day/pump


for recycle sludge

Date of Printing:
Page ST 42 of 51
"12/07/2019"
PROJECT TITTLE:

6.2 PIPE SIZE CALCULATION

Velocity Range of Pipe Proposed pipe


Item Treatment unit Flow (m3/s) Area (m2) Velocity(m/s) material
required(m/s) Size (mm) size(mm)

1 Raw Sewage Transfer Pipe ≤ 2.5 0.018 0.000 #DIV/0! mPVC/D.I

2 RAS/WAS Pipe ≤ 2.5 0.000 0.0000 #DIV/0! mPVC/D.I

3 IR Pipe ≤ 2.5 0.008 0.0000 #DIV/0! mPVC/D.I

4 Sludge Transfer Pipe ≤ 2.5 #DIV/0! 0.0000 #DIV/0! mPVC/D.I

Air pipe

1 Main header pipe 9-15 100 - 250 0.00 0.000 #DIV/0! CLASS C G.I

2 Distribution to Aeration tank 9-15 100 - 250 0.000 0.0000 #DIV/0! CLASS C G.I

3 To Aeration drop pipe 9-15 100 - 250 0.000 0.0000 #DIV/0! HDGI

4 Distribution to Sludge Holding


Tank 9-15 100 - 250 0.00 0.0000 #DIV/0! HDGI

5 To SHT drop pipe 6-9 25 - 75 0.000 0.0000 #DIV/0! HDGI

6 Distribution to Scum Skimmer 6-9 25 - 75 0.000 0.0000 #DIV/0! HDGI

7 Aeration bottom looping pipe 6-9 25 - 75 0.000 0.0000 #DIV/0! HDGI

Date of Printing:
Page PP 43 of 51
"12/07/2019"
PROJECT TITTLE:

6.3 AIR PIPE LOSSES

[A] Air Header Losses

Friction factor f = 0.029(D)^0.027 / Q^0.148

Head loss in straight pipe hL = fL / hv


= 9.82x10^-8 (fLTQ^2/PD^5)m³/hr

Losses in pipe fittings = 55.4 C D^1.2

[B] Main Delivery Loss (From Blower)

i. Main delivery
air required Q = 0.00 m3/min
length L = m
diameter for main
header Dm = 0.00 m
velocity v = #DIV/0! m/s
friction loss fm = #DIV/0!

ambient temperature To = 293 K


ambient barometric
pressure Po = 1 atm
air supply pressure P = 1.59 atm
therefore T = To(P/Po)^0.283
= 334.09 K
head loss in main
header hL = 9.82X10^-8 (fLTQ^2/PD^5)
= #DIV/0! mmH2o
= #DIV/0! m

ii. Losses in pipe fittings


C value qty total C value
valves 0.25 0
elbow 0.33 0
tee 0.33 0
Total C value 0

L = 55.4 C D ^1.2
= 0m
therefore hL = 9.82X10^-8 (fLTQ^2/PD^5)
= #DIV/0! mmH2o
= #DIV/0! m
Total losses = #DIV/0! m

Date of Printing:
Page APL 44 of 51
"12/07/2019"
PROJECT TITTLE:

[C] Line to Aeration Tank

i. Main line - Head loss in straight pipe


air required Q = 0.00 m3/min
length L = m
diameter for main line Dm = 0.00 m
velocity v = #DIV/0! m/s
friction loss fm = #DIV/0!

ambient temperature To = 273 K


ambient barometric
pressure Po = 1 atm
air supply pressure P = 1.59 atm
therefore T = To(P/Po)^0.283
= 311.28 K
head loss in main line hL = 9.82X10^-8 (fLTQ^2/PD^5)
= #DIV/0! mmH2o
= #DIV/0! m

ii. Losses in pipe fittings


C value qty total C value
valves 0.25 0
elbow 0.33 0
tee 0.33 0
Total C value 0

L = 55.4 C D ^1.2
= 0m
therefore hL = 9.82X10^-8 (fLTQ^2/PD^5)
= #DIV/0! mmH2o
= #DIV/0! m
Total losses = #DIV/0! m

[D] Line to Diffuser Drop Pipe

i. Drop line - Head loss in drop pipe


air required Q = 0.00 m3/min
length L = m
diameter for drop line Dm = 0.00 m
velocity v = #DIV/0! m/s
friction loss fm = #DIV/0!

ambient temperature To = 273 K


ambient barometric
pressure Po = 1 atm
air supply pressure P = 1.59 atm
therefore T = To(P/Po)^0.283
= 311.28 K
head loss in drop line hL = 9.82X10^-8 (fLTQ^2/PD^5)
= #DIV/0! mmH2o
= #DIV/0! m

Date of Printing:
Page APL 45 of 51
"12/07/2019"
PROJECT TITTLE:

ii. Losses in pipe fittings


C value qty total C value
valves 0.25 0
elbow 0.33 0
tee 0.33 0
Total C value 0

L = 55.4 C D ^1.2
= 0m
therefore hL = 9.82X10^-8 (fLTQ^2/PD^5)
= #DIV/0! mmH2o
= #DIV/0! m
Total losses = #DIV/0! m

[E] Line to Sludge Holding Tank

i. Main line - Head loss in straight pipe


air required Q = 0.00 m3/min
length L = m
diameter for main line Dm = 0.00 m
velocity v = #DIV/0! m/s
friction loss fm = #DIV/0!

ambient temperature To = 273 K


ambient barometric
pressure Po = 1 atm
air supply pressure P = 1.59 atm
therefore T = To(P/Po)^0.283
= 311.28 K
head loss in main line hL = 9.82X10^-8 (fLTQ^2/PD^5)
= #DIV/0! mmH2o
= #DIV/0! m

ii. Losses in pipe fittings


C value qty total C value
valves 0.25 0
elbow 0.33 0
tee 0.33 0
Total C value 0

L = 55.4 C D ^1.2
= 0m
therefore hL = 9.82X10^-8 (fLTQ^2/PD^5)
= #DIV/0! mmH2o
= #DIV/0! m
Total losses = #DIV/0! m

Date of Printing:
Page APL 46 of 51
"12/07/2019"
PROJECT TITTLE:

[F] Line to Sludge Holding Tank Drop Pipe

i. Drop line - Head loss in drop pipe


air required Q = 0.00 m3/min
length L = m
diameter for drop line Dm = 0.00 m
velocity v = #DIV/0! m/s
friction loss fm = #DIV/0!

ambient temperature To = 273 K


ambient barometric
pressure Po = 1 atm
air supply pressure P = 1.59 atm
therefore T = To(P/Po)^0.283
= 311.28 K
head loss in drop line hL = 9.82X10^-8 (fLTQ^2/PD^5)
= #DIV/0! mmH2o
= #DIV/0! m

ii. Losses in pipe fittings


C value qty total C value
gate valves 0.25 0
elbow 0.33 0
tee 0.33 0
Total C value 0

L = 55.4 C D ^1.2
= 0m
therefore hL = 9.82X10^-8 (fLTQ^2/PD^5)
= #DIV/0! mmH2o
= #DIV/0! m
Total losses = #DIV/0! m

[G] Line to Scum Skimmer

i. Main line - Head loss in straight pipe


air required Q = 0.00 m3/min
length L = m
diameter for main line Dm = 0.00 m
velocity v = #DIV/0! m/s
friction loss fm = #DIV/0!

ambient temperature To = 273 K


ambient barometric
pressure Po = 1 atm
air supply pressure P = 1.59 atm
therefore T = To(P/Po)^0.283
= 311.28 K
head loss in main line hL = 9.82X10^-8 (fLTQ^2/PD^5)
= #DIV/0! mmH2o
= #DIV/0! m

Date of Printing:
Page APL 47 of 51
"12/07/2019"
PROJECT TITTLE:

ii. Losses in pipe fittings


C value qty total C value
gate valves 0.25 0
elbow 0.33 0
tee 0.33 0
Total C value 0

L = 55.4 C D ^1.2
= #DIV/0! m
therefore hL = 9.82X10^-8 (fLTQ^2/PD^5)
= #DIV/0! mmH2o
= #DIV/0! m
Total losses = #DIV/0! m

[H] Aeration Bottom Loop Line

i. Head loss in loop pipe


air required Q = 0.00 m3/min
no. of grid lines at based of tank =
length L = m
diameter for loop pipe Dm = 0.00 m
velocity v = #DIV/0! m/s
friction loss fm = #DIV/0!

ambient temperature To = 273 K


ambient barometric pres Po = 1 atm
air supply pressure P = 1.59 atm
therefore T = To(P/Po)^0.283
= 311.28 K
Head loss in loop line hL = 9.82X10^-8 (fLTQ^2/PD^5)
= #DIV/0! mmH2o
= #DIV/0! m

Date of Printing:
Page APL 48 of 51
"12/07/2019"
PROJECT TITTLE:

6.4 BLOWER SELECTION

Air provided in AT = 0.00 m³/min


Air provided in SHT = 0.00 m³/min
Nos Scum Skimmer = x m³/min
Air provided in Scum
Skimmer = 0.00 m³/min
Total = 0 m³/min
Safety factor = 10%
Total air required = 0.00 m³/min

Total Pressure = mmAQ

Date of Printing:
Page BWL 49 of 51
"12/07/2019"
PROJECT TITTLE:

7.0 ELECTRICAL WORKS

Date of Printing:
Page EW 50 of 51
"12/07/2019"
PROJECT TITTLE:

7.1 ELECTRICAL LOAD CALCULATION

Electrical Board : DB-PP #REF! #REF! #REF! #REF!


Load per Connected
Diversity Max. Demand
Unit Type Qty Unit Load
Factor (kW)
(W) (kW)

1x26W Wall Mounted Vapour Light 26 0.00 #N/A #N/A


1x150W Vapour Floodlight 150 0.00 #N/A #N/A
13A Switch Socket Outlet 200 0.00 #N/A #N/A
Others to be insert by CP

Total 0.0 kW #N/A kW

Electrical Board : DB-BL 0 0.0 #N/A #REF!

1x18W Vapour Fluo. Light 18 0.00 #N/A #N/A


1x36W Vapour Fluo. Light 36 0.00 1.00 0.00
1x8W Emergency Light 8 0.00 #N/A #N/A
13A Switch Socket Outlet 200 0.00 #N/A #N/A
Others to be insert by CP

Total 0.0 kW #N/A kW

Electrical Board : DB-CL 0 0.0 0 #REF!

70W Street Lighting 70 0.00 #N/A #N/A


Others to be insert by CP

Total 0.00 kW #N/A kW

Electrical Board : MAIN SWITCHBOARD #REF! #REF! #REF! #REF!

Connected
Diversity Max. Demand
Unit Type Qty Load
Factor (kW)
(kW)

DB-CL 0.00 - #N/A


DB-BL 0.00 - #N/A
DB-PP 0.00 - #N/A
AIR BLOWER No.1 1 #N/A #N/A
AIR BLOWER No.2 1 0.00 0.00
RAS/WAS Pumps No.1 1 1.00 0.00
RAS/WAS Pumps No.2 1 0.00 0.00
RAS/WAS Pumps No.3 1 1.00 0.00
RAS/WAS Pumps No.4 1 0.00 0.00
Submersible Mixer No.1 1 1.00 0.00
Submersible Mixer No.2 1 0.00 0.00
Submersible Mixer No.3 1 1.00 0.00
Submersible Mixer No.4 1 0.00 0.00
IR Pump No.1 1 1.00 0.00
IR Pump No.2 1 0.00 0.00
IR Pump No.3 1 1.00 0.00
IR Pump No.4 1 0.00 0.00
Raw Sewage Pump No.1 1 1.00 0.00
Raw Sewage Pump No.2 1 1.00 0.00

Total 0.0 kW #N/A kW

Date of Printing:
Page EL 1 of 51
"12/07/2019"

Potrebbero piacerti anche