Sei sulla pagina 1di 18

Query No Section/Reference

1 Cl. 8 LOT 3
FAT

2 Cl. 9 LOT 4
Schedules & Rates
Schedule No 7
3 Cl. 10 LOT 5
Schedules & Rates
Schedule No 7

4 Cl. 11 LOT 6
Schedules & Rates
Schedule No 7
As per the price schedules, the
following equipment shall be FAT.
a, Power Transformers and
Reactors,
b, Circuit Breakers &
Disconnectors,
c, Instrument transformers &
Surge arresters,
d, Protection, Control &
Automation Equipment
e, 132kV GIS and 33kV AIS Metal
clad Switchgear.
Bidders’ Clarification Request

As per the price schedules (schedule No. 7), the


following equipment shall be FAT.
a, Power Transformers and Reactors,
b, Circuit Breakers & Disconnectors,
c, Instrument transformers & Surge arresters,
d, Protection, Control & Automation Equipment.
As per Part 2-Employer's Requirements, the
following equipment also shall be FAT.
Earthing Transformers, AC & DC panels, Batteries
& Chargers, LV & MV Cables, Telecommunication
System.
Which equipment shall be FAT. Please kindly clarify.

As per the price schedules, the following


Equipment shall be FAT.
a, Power Transformers and Reactors,
b, Circuit Breakers & Disconnectors,
c, Instrument transformers & Surge arresters,
d, Protection, Control & Automation Equipment,
e, 132kV GIS and 33kV AIS Metal clad
Switchgear.
As per Part 2-Employer's Requirements, the
following equipment also shall be FAT.
Earthing Transformers, AC & DC panels, Diesel
Generator Set, Batteries & Chargers, Low Voltage &
Medium Voltage Power and Control Cables.
Which equipment shall be FAT?
Please kindly clarify
As per the price schedules, the following
equipment shall be FAT.
a, Circuit Breakers & Disconnectors,
b, Instrument transformer
c, Control/Protection panels and SCADA system.
As per Part 2-Employer's Requirements, the
following equipment also shall be FAT.
Surge arresters, Power Transformers, Earthing
Transformers, AC & DC panels, Batteries &
Chargers, Diesel Generator Set, and Substation
Telecommunication System
Which equipment shall be FAT?
Please kindly clarify.

As per Part 2-Employer's Requirements, the


following equipment also shall be FAT.
Steel Structures, Earthing Transformer, Low
Voltage Substation Service Switchgear, Diesel
Generator Sets, Battery and Chargers,
Telecommunication System.
Which equipment shall be FAT?
Please kindly clarify.
Employer’s Response

Bidders are advised to comply with Schedule No. 7.


The earthing transformer shall be tested along with
the Power transformer and reactors; AC & DC panels,
Batteries & Chargers, LV & MV Cables,
Telecommunication System (SDH) shall be tested
along with Protection Control and Automation
equipment.

Bidders are advised to comply with Schedule No. 7.


The earthing transformer shall be tested along with
the Power transformer and reactors; AC & DC panels,
Batteries & Chargers, LV & MV Cables,
Telecommunication System (SDH) shall be tested
along with Protection Control and Automation
equipment.
Diesel generator shall be procured onshore and
shall be tested only during pre-commissioning.
Bidders are advised to comply with Schedule No. 7.
The earthing transformer shall be tested along with
the Power transformer and reactors; AC & DC panels,
Batteries & Chargers, LV & MV Cables,
Telecommunication System (SDH) shall be tested
along with Protection Control and Automation
equipment.
Diesel generator shall be procured onshore and shall
be tested only during pre-commissioning

Bidders are advised to comply with Schedule No. 7.


The earthing transformer shall be tested along with
the Power transformer and reactors; AC & DC panels,
Batteries & Chargers, LV & MV Cables,
Telecommunication System (SDH) shall be tested
along with Protection Control and Automation
equipment.
Diesel generator shall be procured onshore and shall
be tested only during pre-commissioning.
Query No Section/Reference

1 Cl. 20 PART1: Bidding procedure


Bidders’ Clarification Request

SECTION III: 2.5 Subcontractors/Manufacturers


DCS in the table ---Manufacturer must demonstrate
track record of volume production over a period of
five (10) years.
Please kindly confirm whether 5 years or 10 years.
Employer’s Response

Ten (10) years is applicable.


Query No Section/Reference

1 Cl. 13 LOT 4 LOT 6


PART 2 – Employer’s
Requirements
B. Technical Specification
Section: 132 kV GIS
-INDOOR

2 Cl. 66 GIS - Switchgear


The switchgear shall be of single
phase Enclosure and enclosure.
Supports Pg 669

3 Cl. 67 Bid Drawings


132 kV Single Line Diagram - West
Main

4 Cl. 68 Bid Drawings


132 kV Single Line Diagram - West
Main
Bidders’ Clarification Request

As per Technical Specification: The switchgear shall


be of single phase enclosure.
As per the single line diagram, three phase enclosure
is required.
The 132kV GIS of three phase enclosure is
recommended.
Please kindly confirm.

We understand that as per subject specification, only


GIS with single phase enclosure design shall be
accepted. Please Confirm.

As per Single Line Diagram, Line traps, Capacitor


Voltage Transformer and Surge Arrester have been
shown as part of the GIS.
Please Confirm the limit of scope as Line Traps are
functional Air Insulated Switchgear type only and
confirm whether we shall include or not Earth &
Disconnector Switches as well as Surge Arrester for
Transformer feeder

As per Single Line Diagram, Capacitor Voltage


Transformer is required for the GIS Bays. We
understand that only Inductive Voltage
Transformer is required in place of Capacitor Voltage
Transformer for GIS Bays. Please confirm our
understanding.
Employer’s Response

Bidders are advised to comply with provisions of the


technical specification.

Not Confirmed. GIS design will be with THREE PHASE


ENCLOSURE.

The Surge Arresters, CVT and Line traps shall be


outdoor equipment

Confirm. Your understanding is correct but only for


the GIS Bay.
Query No Section/Reference

1 Cl. 45 OLD OPO TENDER SLD,


P4017.SS.WU-01 & OLD OP
LAYOUT DRAWING NO.
P4017.SS.WU-01

2 Cl. 61 330kV Single Line Diagram

3 Cl. 67 Bid Drawings


132 kV Single Line Diagram - West
Main

4 Cl. 68 Bid Drawings


132 kV Single Line Diagram - West
Main

5 Cl. 69 Bid Drawings


132 kV Single Line Diagram - West
Main

6 Cl. 70 Bid Drawing 132 kV Gwarimpa SS


SLD
7 Cl. 77 Bid Drawing 132 kV Gwarimpa SS
SLD
Bidders’ Clarification Request

In one and a half system, you have provided one bay


with double bus concept. However, in the tender
layout the same is shown as one and a half concept
only (132kV Karu). Please revise the layout and
provide the correct layout to analyze the actual
scope.

The bay configuration of 330kV system is considered


to one and a half CB scheme. However, the 362kV
Circuit breaker for shunt reactor bay is considered to
be double bus scheme. Please confirm if this remains
same or we have to propose a one and a half CB
scheme instead?

As per Single Line Diagram, Line traps, Capacitor


Voltage Transformer and Surge Arrester have been
shown as part of the GIS.
Please Confirm the limit of scope as Line Traps are
functional Air Insulated Switchgear type only and
confirm whether we shall include or not Earth &
Disconnector Switches as well as Surge Arrester for
Transformer feeder

As per Single Line Diagram, Capacitor Voltage


Transformer is required for the GIS Bays. We
understand that only Inductive Voltage
Transformer is required in place of Capacitor Voltage
Transformer for GIS Bays. Please confirm our
understanding.

As per Single Line Diagram, outgoing disconnectors


and Earth switches for OHL and transformers bays
are shown outside the scope of GIS. We propose to
include all outgoing Disconnectors & Earth Switches
within the GIS scope. Please confirm.

Please confirm if the line feeders need to be capable


of single pole operation?
Please confirm the type of interface: through Cable
or bushing or directly to Transformer
Employer’s Response

The SLD shows the scheme employed for Karu 132kV


Line. Quotation should be based on the SLD.

The arrangement for the shunt reactor bay shall


remain the same as stated in the Bidding Document.

The Surge Arresters, CVT and Line traps shall be


outdoor equipment

Confirm. Your understanding is correct but only for


the GIS Bay.

Bidders are advised to adhere to the Bidding


Document.

Bidders are advised to adhere to the Bidding


Document.
The type of interface shall be through cable for the
line and Bushings to the transformers.