BHUBANESWAR SMART CITY

Type of Documents-Internal

Document No.: BBSR-SC-D1-CHEKLIST-STMS-1 Date:

Project Name: Selection of Master System Integrator for Implementation of smart solution in
Bhubaneswar City
CHECK LIST FOR: Pre-Commissioning/Quality – Visual Inspection Form No:
System: TVDS/SVDS/ATCC Rev. No : 0
Page : 1 of 1
SECTION OF WORK: ELV LOCATION:

ITEM Status Checked by


Sr.No Yes/No Remarks
Engineer
.
1 Installation Checklist Completed

2 Power availability (Permeant/Temporary)

3 Network availability (Connected to BOC)


Ensure that cables in the ODC, to the all devices are
4
to be properly arranged and dressed.
Ensure that all the cables tagging are available at
5
both end for all devices.
Ensure that distribution of cameras to Network
6
Switch is to be done as per approved drawing.

7 All Devices are installed as per approved drawing.


Focusing of the camera to be adjusted by proper
8 positioning to obtain optimum result/image as per
system Guidelines.
Ensure that the camera Enclosure and IR power
9
supply are connected properly.
Ensure that Power supply outlets for all Elements to
10
be fed by UPS only.
ODC to ODC Communication(LAN) and Power Cable
11
are laid and tagged properly
Earthing of all the Smart Elements and ODCs are
12
done properly
No. of Spare Cable(Power/Network) laying in same
13
route for any element.

14 No. of Spare Port in Switch

Drawings and SLD are available or not at Site


15
Earthing system effectively connected. (Neutral to
16 ground voltage should be less than 2 Volt)

All protective devices are functioned properly and


17 correctly set.

Suitable cable terminations provided


18
BHUBANESWAR SMART CITY

Type of Documents-Internal

All cables, flexible cords, switches, plugs and


socket outlets, accessories and equipment are found
19
to be in good working conditions.

Armored cables properly terminated to metal casing


20 or trunking by proper cable glands

Ensure SPD installed at proper location for each


21 Smart Elements wherever applicable, and make sure
Cable tagging are done at each end at SPD end.
All socket outlets connected with protective
conductors and live conductors terminated at
22 correct terminals. (All Power-Plug top should have 3
Pins)

For Date: For Date:


Project Manager Design and Commissioning

Name: Sign: Name: Sign: