Sei sulla pagina 1di 15

EPC GAS PIPELINE OF 275 MW FOR RIAU

GAS FIRED COMBINED CYCLE POWER


PLANT PROJECT

HAZOP HAZID FOR


CONSTRUCTION MRPR GAS
PIPELINE WORKSHOP
8 May 2019
AGENDA
1. SAFETY BRIEFING
2. PROJET DESCRIPTION
3. PROJECT OVERVIEW
4. SCOPE OF WORK
5. CONSTRUCTION SEQUENCES
6. PIPE INSTALLATION METHOD FOR DRY AREA
7. PIPE INSTALLATION METHOD FOR SWAMPY AREA
8. ROAD CROSSING WITH AUGHER BORING METHOD
9. HAZOP & HAZID CONSTUCTION WORKSHOP
10. CLOSING
1.SAFETY BRIEFING

1. BUILDING INDUCTION
2. SAFETY MOMENT
2.PROJECT DESCRIPTION
PROJECT NAME EPC GAS PIPELINE OF 275 MW FOR RIAU GAS FIRED COMBINED CYCLE
POWER PLANT PROJECT
OWNER - MEDCO RATCH POWER RIAU ( MRPR )

LOCATION - POWER PLAN: KELURAHAN INDUSTRI TENAYAN, KECAMATAN TENAYAN RAYA,


KOTA PEKANBARU, PROVINSI RIAU
- GAS PIPELINE: PIPELINE ALONG 38.3 KM THROUGH 6 SUB-DISTRICTS / VILLAGES,
3 IN RIAU PROVINCE FROM KOTO GASIB TO INDUSTRI TENAYAN RAYA
PIPELINE LENGTH 38.350 METERS
PIPELINE DESIGN 1150 PSIG (79 BARG)
PRESSURE
DESIGN TEMP. MAX : 149 ˚F MIN : 50˚F
PIPE SPECIFICATION ERW Pipe OD 12.75", WT 0.500", API 5L X-52, PSL2, 3LPE Coated

DESIGN FACTOR 0.6 ( LOCATION CLASS 2)

PIPELINE DESIGN LIFE 30 YEARS


3.PROJECT OVERVIEW
4.SCOPE OF WORK
5. CONSTRUCTION SEQUENCES
5.1 Pipeline Construction Sequences :
NDT
Fit-up and (Radiograp
Clearing & Stringing
Survey Welding hy) Trenching Lowering-in Backfilling Reinstatement
Grading Pipe
Pipe
& Coating
5.2 CIVIL WORKS
1. CONSTRUCTION CIVIL AT PIG LAUNCHER AREA
2. CONSTRUCTION CIVIL AT PIG RECEIVER AREA
3. CONSTRUCTION CIVIL AT ANCHOR BLOCK
4. CONSTRUCTION CIVIL AT SECTIONAL VALVE

5.3 MECHANICAL WORKS


1. INSTALL PIG LAUNCHER
2. INSTALL PIG RECEIVER
5.4 PIPING WORKS
1. PIPING WORKS AT PIG LAUNCHER AREA
2. PIPING WORK AT PIG RECEIVER AREA
3. PIPING WORK AT SECTIONAL VALVE
4. TIE-IN AT 1404 ( TP 01)
5. TIE-IN AT POWER PLANT AREA ( TP 02)
6. TIE-IN AT POWER PLANT AREA (TP 03)

5.5 E&I WORKS


1. INSTALL INSTRUMENT AT PIG LAUNCHER & RECEIVE
2. INSTALL ELECTRICAL AT PIG LAUNCHER & RECEIVER
6.PIPE INSTALLATION METHOD FOR DRY AREA
7. PIPE INSTALLATION METHOD FOR SWAMPY
AREA
8.ROAD CROSSING WITH AUGER BORING
METHOD
8.1.TRENCHING & SHORING INSTALLATION
8.2.FIT-UP , WELDING & BORING PIPE
9.HAZOP HAZID CONSTRUCTION WORKSHOP
THANK YOU !