Sei sulla pagina 1di 6

AREA

ITEM DESCRIPCIÓN N° TECHADA


(M2/w)
ILUM/TOMAC. 24 -
ASCENSOR 4 -
T-SG
BOMBA HIDRAULICA 2 -
PORTÓN SECCIONAL 2 -
T-D01 ILUM/TOMAC. - 246.5
T-D1 (REST.) ILUM/TOMAC. - 316.6
T-D2 ILUM/TOMAC. - 827.6
ILUM/TOMAC. - 947.5
T-D3
COMPUTADORAS 5 -
T-D5 ILUM/TOMAC. - 746
ILUM/TOMAC. - 788
T-D4
THERMA 1 -
(AUDITORIO)
COMPUTADORAS 2 -
T-D6 EST.) ILUM/TOMAC. - 3491

T-D7 ILUM/TOMAC. 350


ILUM/TOMAC. 514
T-D10
MAQUINA DE TALLER 21 -
T-D8 ILUM/TOMAC. 907
T-D9 COMPUTADORAS 60
ILUM/TOMAC. 880
Segun el CNE la seccipon mínima de cable para alimentadores debe ser de 4mm

CALCULO ASCENSOR BOMBA HIDRAULICA


((𝐶𝐴𝑅𝐺𝐴) 𝑥 𝑣 )/(102 𝑥 𝑚) 𝑥 0.6𝑚/𝑠 )/(102 𝑥 0.6)
((10𝑝𝑥75𝑘) 1 Hp = 746 W
1.31 = 976.86
RESULTADO 7.35 Kw = 7352.94 W

FACTOR DE DEMANDA
1° AL 100% 11843.75
2°Y3° AL 65% 14519.375
4°y5° al 40% 8250
15 Sig. Al 30% 13963.14
CARGAS FIJAS 22101.5
TOTAL 70677.765
3 - 10mm2 N2XOH + 10mm2
N2XOH (N) + 10 (T) mm2
3 - 10mm2 N2XOH + 10mm2
N2XOH (N) + 10 (T) mm2
CUADRO DE MAXIMA DEMANDA
CARGA FACTOR DE MAXIMA MAXIMA
CARGA
INDIVIDUAL DEMANDA DEMANDA DEMANDA In (A)
UNITARIA (W)
(W) (%) (P) (T)
400 9600 100%
CALCULADO 7353 50% 3676.5
6376.5 10.76
CALCULADO 1954 100% 1954
CALCULADO 1492 50% 746
25 6162.5 100% 6162.5 6162.5 10.40
18 5698.8 100% 5698.8 5698.8 9.62
25 20690 50% 10345 10345 17.46
25 23687.5 50% 11843.75
13593.75 22.95
350 1750 100% 1750
25 18650 50% 9325 9325 15.74
10 7880 100% 7880
500 500 100% 500 8730 14.74
350 700 50% 350
5 17455 50% 8727.5 8727.5 14.73

25 8750 100% 8750 8750 14.77


20 10280 100% 10280
12905 21.79
250 5250 50% 2625
25 22675 50% 11337.5 11337 19.14
350 21000 50% 10500
21500 36.30
25 22000 50% 11000
ntadores debe ser de 4mm2

BOMBA HIDRAULICA PORTON SECCIONAL


1 Hp = 746 W 1 Hp = 746 W
1.31 = 976.86 1P = 746 W
NDA
Id (A) If (A) It (A) Ic (A) ALIMENTADOR L (m)

3-4 mm2 N2XOH + 1-4 mm2 N2XOH


13.46 16.15 15 55 (N) + 1-4 mm2 N2XOH (T) 7.8

3-4 mm2 N2XOH + 1-4 mm2 N2XOH


13.00 15.60 15 55 (N) + 1-4 mm2 N2XOH (T) 7.2
3-4 mm2 N2XOH + 1-4 mm2 N2XOH
12.03 14.43 15 55 (N) + 1-4 mm2 N2XOH (T) 9.2
3-4 mm2 N2XOH + 1-4 mm2 N2XOH
21.83 26.20 25 55 (N) + 1-4 mm2 N2XOH (T) 41.6
3-10 mm2 N2XOH + 1-10 mm2
28.69 34.42 30 95 N2XOH (N) + 1-10 mm2 N2XOH (T) 75
3-4 mm2 N2XOH + 1-4 mm2 N2XOH
19.68 23.61 20 55 (N) + 1-4 mm2 N2XOH (T) 52.5

3-4 mm2 N2XOH + 1-4 mm2 N2XOH


18.42 22.11 20 55 (N) + 1-4 mm2 N2XOH (T) 10

3-4 mm2 N2XOH + 1-4 mm2 N2XOH


18.42 22.10 20 55 (N) + 1-4 mm2 N2XOH (T) 10
3-4 mm2 N2XOH + 1-4 mm2 N2XOH
18.46 22.16 20 55 (N) + 1-4 mm2 N2XOH (T) 52.5
3-4 mm2 N2XOH + 1-4 mm2 N2XOH
27.23 32.68 30 55 (N) + 1-4 mm2 N2XOH (T) 5
3-4 mm2 N2XOH + 1-4 mm2 N2XOH
23.92 28.71 25 55 (N) + 1-4 mm2 N2XOH (T) 43.6
3-4 mm2 N2XOH + 1-4 mm2 N2XOH
45.37 54.44 50 55 (N) + 1-4 mm2 N2XOH (T) 10
Δ_𝐴 OK

0.71 SI

0.64 SI
0.75 SI
6.19 SI

5.86 SI

7.04 SI

1.25 SI

1.25 SI

6.60 SI

0.93 SI

7.11 SI

3.09 SI
CALCULO DE ASCENSOR

Potrebbero piacerti anche