Design projects as a Design Engineer execute following responsibilities:

 Execution of project need to be completed with Quality, Timely & Technically


characteristics with banch Parameter.
 1. In depth knowledge on Electrical / HVAC / Fire / Plumbing designing.
Understanding of sizing various applications:
 Electrical - Distribution systems involving, Substations, Transformers,
HV/LV Switchgear Panels, Lightning Arresters, Protection System, PCC, MCC,
Diesel Generators etc. including Protection and relay coordination, Short circuit
study and voltage drop calculations on cables, bus ducts by conventional method
and also by software.
 Lighting requirement calculations conventional and by special software
such as Dialux, etc. using AutoCAD drawings.
 Earthing calculations for electrical system and for lightning protection.
 b. HVAC ? Understanding of Ducting, Piping, VRV, Chillers, Split
Systems, Chilled water, Cooling towers, Radiant Cooling, AHU?s FCU?s,
Pumps, Exhaust Fans, Smoke Ventilation, basement Ventilation, Fresh Air, etc.
Understanding of HVAC design software?s for HEAT load / Duct sizing.
 c. Fire ? Fire Hydrants Sprinklers, Fire Pumps, Fire Piping, Hose reels,
Fire detection systems, Fire extinguishers, Gas based systems, Fire Curtains, etc.
 d. Plumbing ? Water Distribution systems, RWH system, Water
Purification ? WTP, STP, Storage Tanks, Hydro-pneumatic Systems, Irrigation
Systems, Water fixtures, etc.
 e. BMS / PLC IO calculations, SCADA System integration / interfacing
with other services such as HVAC, Fire Alarm, Security, CCTV Cameras,
Lighting, Electrical, Data, Voice and other communication Systems etc.

 2. Preparation of technical specifications, data sheets, schedules, material take off


BOQ for all above.
 3. Sizing of support systems for all above etc.
 4. Understanding of Design standards local codes.
 5. Load analysis for structural loading or slab strengthening.
 6. Prepare Head load / Electrical load list indicating critical loads, MD
calculations and single line diagrams / HVAC schematics.
 7. Prepare DBR Concept design reports for MEP Systems.
 8. Design and prepare circuitries and layouts for large power, small power,
lighting, Ducting layout, Diffuser layouts, FAPA, Sprinklers, Plumbing etc.
 9. Coordinating MEP Systems.
 10. Review technical submittals and provide comments as necessary on time.
 11. Preparing RCP layouts
 12. Attend necessary design meetings with the client
 13. Carryout necessary site visits for addressing any design / co-ordination issues.
 14. Witness Testing Commissioning of MEP systems.
 15. Identify quality issues prepare site quality reports
 16. Prepare Maintain all the records of Design Development
 17. Check all the as fitted layouts documents. 1
 8. Prepare final list of Sign off on Project closure reports.