INSTRUMENT CLOSE LOOP CHECK

I11-C
NON FIELDBUS FIELDBUS
Project No.
Project Title
Facilities
INFORMATION
Platform/
Plant name

System Number System Description

INSTRUMENT DATA
Controller Tag
Signal Range Manufacturer
Number
Initiator Tag
Dial/Chart Range Model Number
Number
Service Data Sheet Serial Number
Loop Line of Equip Loop Diag No
□Direct □Direct Final Element Tag
Controller Action Valve Action
□Reverse □Reverse number
COMMISSIONING CHECK OK N/A P/L
Verify to ensure that all the pre commissioning activities have been completed and all punch
1
list closed as per I11-B

Verify each Instrument Equipment is calibrated and confirm the duration of the calibration
2
certificate from vendor are still valid

Test and ensure that loop is configured and functioning as per Control Narrative (Controller
3
Action Auto Manual changeover, split range etc.)

4 Verify no dust inside Enclosure /Cabinet / Panel and insulation surfaces are clean.

5 Verify Instruments & its Accessories /Electrical equipment/Panel externally clean.

Note: If functional test of the full loop has been successfully completed during onshore pre-commissioning, loop verification with
current injection can be done to complete the loop check for offshore commissioning

TEST EQUIPMENT
Type Manufacturer Model Serial Number Callibration Expiry Date