Sei sulla pagina 1di 4

Automotive and transportation

Maruti Suzuki
3D factory modeling and simulation reduces errors, costs and project lead times

Product Leading automotive OEM


Tecnomatix in India validates plant
designs digitally using
Business challenges FactoryCAD in the
Growing demand requiring
Tecnomatix portfolio
expanded manufacturing
Maruti Suzuki India Limited (MSIL),
capacity
a subsidiary of Suzuki Motor
Design and construct of plant Corporation of Japan, is India’s
to meet startup schedule largest passenger car company.
Overall 3D view of assembly shop.
Inability to validate 2D-based Producing 1.2 million cars every
plant layouts year, Maruti Suzuki accounts for
around 43 percent of the car mar-
On-site factory installation
ket in India. The company offers
modifications increasing cost
14 brands and more than 150
and lead time
variants of these brands. Its prod-
uct line extends from practical to
Keys to success powerful, and from hatchback to
3D plant modeling with SUV. Maruti maintains its corpo-
FactoryCAD rate office in New Delhi and 16
regional offices across India,
Plant validation and interfer- employs more than 12,500
ence checking with FactoryCAD employees, and operates produc-
Overall 3D view of paint shop.

Better factory visualization tion facilities in Gurgaon and Manesar.


supported by Teamcenter
For more than three decades, the company To sustain its leadership in India, Maruti
has won the hearts of customers through has introduced new models at a rapid
Results high-quality products and services. pace, requiring expansion of its manufac-
Significantly reduced rework Customers vouch for the quality and low turing facilities. The company planned a
costs cost of ownership of its products, as evi- new plant at Manesar alongside its other
Overall utility length reduction, denced in independent studies like the J. D. two plants there. The key challenge facing
thus saving cost Power Asia Pacific Customer Satisfaction the company was to design and build the
Index, which has ranked Maruti Suzuki as plant in time for the schedule given by
On-time construction without
No. 1 for the last fifteen years in a row. This management for startup of the new
operational hindrances
unique achievement is unparalleled, across facility.
Reduced energy through bet- industries, as nowhere else in the world is
ter natural lighting the market leader also the leader in cus-
tomer satisfaction.

www.siemens.com/plm/tecnomatix
Detailed 3D view of assembly shop. Detailed 3D view inside paint shop.

2D layout of tire line. 3D model of tire line.

“ We wanted to prevent the Maruti Suzuki is a long-term, successful surfaced during construction could be
issues we faced at installa- customer of product lifecycle management attributed to the 2D process used in the
tion time on previous factory (PLM) specialist Siemens PLM Software. utility planning for the plant. All of the
projects. Virtual validation The company had already adopted Siemens ducting, piping, cabling, lighting and
with a 3D plant model would PLM Software’s NX™ software, Solid Edge® structural design for previous plants were
enable us to identify struc- software, Teamcenter® software and the accomplished using 2D layouts, which
tural and utility interfer- Tecnomatix® portfolio. These solutions are made it difficult or impossible to resolve
ences with plant facilities used for product design, tool design, digital issues or to optimize the building’s utilities
like conveyors at an earlier mockup, layout planning, manufacturing prior to installation. To shorten the lead
stage. We had to make cer- process planning and validation. time for the new factory and meet the
tain that the problems were project schedule, the company had
resolved before we made Improving factory design decided to utilize FactoryCAD, and take
the final construction The engineers wanted to use the knowl- advantage of virtual factory models to
drawings.” edge gained from previous plant design visualize the interferen-ces among struc-
and installation experience to take a step tural and utility elements.
Sudeep Raj
forward in their factory design methodol-
Senior Manager
ogy. On a previous factory project, the “We wanted to prevent the issues we faced
Production Engineering
company had encountered a number of at installation time on previous factory
Maruti Suzuki
unforeseen issues at the time of construc- projects,” says Sudeep Raj, senior manager
tion that required considerable rework. of production engineering, Maruti Suzuki.
“ We plan to re-use the 3D fac- Several modifications were needed to
“Virtual validation with a 3D plant model
tory data for our future accommodate actual conditions on the
would enable us to identify structural and
model and plant feasibility site, and these significantly increased the
utility interferences with plant facilities,
checks, thereby reducing cost and lead time of the project.
like conveyors, at an earlier stage. We had
rework and achieving better
to make certain that the problems were
quality from the beginning.” Maruti Suzuki had previously used
resolved before we made the final con-
FactoryCAD™ software in the Tecnomatix
Nitin Garg struction drawings.”
portfolio for 3D design of plant structures,
Senior Manager
but not for utilities. The problems that
Production Engineering
Maruti Suzuki
Interference of truss and air duct. Interference eliminated after modification of layout.

Interference between overhead crane hanger and duct. Interference between air duct and structure.

Maruti Suzuki’s engineers used FactoryCAD in significantly less time and with less “ We not only avoided the
to develop virtual 3D models of the new effort than by drawing the equipment costs and delays of on-site
plant, including the press, welding, paint- with traditional 2D CAD tools. modifications during the
ing and assembly shops. They used the plant’s installation, but also
software’s built-in library of intelligent With an accurate 3D plant model, the optimized the utility layouts
models of factory equipment and company had much more information for additional benefits.”
resources to accelerate creation of the fac- than was available in the 2D drawings,
Siddharth Garg
tory model. “Working from 2D layouts of enabling the company’s project specialists
Assistant Manager
the building structure, equipment and util- to better communicate and collaborate on
Production Engineering
ities, our team quickly built a virtual model the full factory design. Visualization in 3D
Maruti Suzuki
using the FactoryCAD tools,” says Dinesh assisted in identifying opportunities for
Babu M, assistant manager. ”We were then improvements. Because FactoryCAD can
able to readily visualize and validate the be used with non-CAD viewers, they were “ Working from 2D layouts of
plant in 3D.” able to share and collaborate with addi- the building structure,
tional team members using the visualiza- equipment and utilities, our
The plant design tools of FactoryCAD tion capabilities of Teamcenter. team quickly built a virtual
enabled quick modification of library model using the FactoryCAD
objects to build the model to full scale. In Throughout the design, the team used tools. We were then able to
addition to the extensive collection of pre- clearance checking to validate that the readily visualize and validate
defined factory equipment models in the new plant was free of interferences. The the plant in 3D.”
library, FactoryCAD also enables modeling plant model could also be engaged
Dinesh Babu M
of custom objects that can be saved to the directly for material flow analysis using
Assistant Manager
library for future use. These tools enabled FactoryFlow™ software in the Tecnomatix
Production Engineering
Maruti Suzuki to complete the plant model portfolio.
Maruti Suzuki
Solutions/Services
Tecnomatix Factory Design Optimizing factory layout
and Optimization The use of Tecnomatix for a 3D
www.siemens.com/plm/ model-based factory design and
tecnomatix planning process helped notably
reduce project lead time and
costs. “We not only avoided the
Customer’s primary business costs and delays of on-site modifi-
Maruti Suzuki India Limited, cations during the plant’s installa-
a subsidiary of Suzuki Motor tion, but also optimized the utility
Too many bends in subassembly area.
Corporation of Japan, is India’s layouts for additional benefits,”
largest passenger car com- says Siddharth Garg, assistant
pany, accounting for more manager, Maruti Suzuki.
than 40 percent of its domestic
market segment. One example is the design of air
www.marutisuzuki.com ducts for the factory. Maruti engi-
neers identified better locations
for the ducts, considerably reduc-
Customer location ing the number of bends as well
Gurgaon as the total air duct length. This
India resulted in substantial cost sav-
ings. The optimized design of the
ducts also increased natural light-
ing in the factory, enabling more
energy-efficient operation.
Number of bends reduced after modification of layout.

Maruti Suzuki’s engineers used FactoryCAD


to develop virtual 3D models of the new
plant, including the press, welding,
painting and assembly shops. Use of the
software helped notably reduce project lead
time and costs.

Siemens PLM Software

Americas +1 314 264 8287 © Siemens Product Lifecycle Management Software Inc. Siemens and the Siemens logo are registered trademarks of
Europe +44 (0) 1276 413200 Siemens AG. D-Cubed, Femap, Fibersim, Geolus, GO PLM, I-deas, J T, NX, Parasolid, Solid Edge, Syncrofit, Teamcenter and
Asia-Pacific +852 2230 3308 Tecnomatix are trademarks or registered trademarks of Siemens Product Lifecycle Management Software Inc. or its subsid-
iaries in the United States and in other countries. All other logos, trademarks, registered trademarks or service marks
belong to their respective holders.
www.siemens.com/plm 44836-Z10 3/15 H

Potrebbero piacerti anche