Project Commencement: 06 Jun 2016

MS 1 Track skeleton completion : 18 Nov


2019 (180 W) CTP 3R : IQBALGARH - MEHSANA PRIORTY SECTION 80 RKM (164 TKM) - NTC TILOS PLAN Report date: 03 Sep 2019
EOT: - 303 days Extended

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90
0

5
Chainage (RKM)

116,340

111,340

106,340

101,340
26,485

19,000

96,340

91,340

86,340

81,340

76,340

71,340

66,340

61,340

56,340

51,340

46,340
8,680
DFCC Ch.

Section Sec-9 Sec-8

Vadodara
58,860
101,870
13,748
Yards IQB Palanpur JS Malosana CS Mehsana JS

171(LHS)

(LHS)
(LHS)
155

158

161

162

165

172

174

177

179

193

199

204

202
Critical LC's

RUMI 180A
Tube wellPalanpur

Underground cable,

IR Mehsana Stn
Unjha Station,
IR Precast Box

RUBMI 154B
IR OHE Mast

IR OHE Mast
Jethi Station

RUMI 180A

PS-166A

LC 201,
LC 199
Track,
LC 166

MIB177
Temple

LC 165

LC 170

LC 171

LC 177

LC 179

LC 191

LC 206

LC 208
ERS,
LC169
Land/Utility Obs

RUBMI 862A,

RUBMI LC 171
GAIL Pipeline

FOB 843A
MJB 843,

FOB 851B

RUBMI 167
MIB 864,
MIB 862,

MIB 863,
PS 851A,

... 169

MIB 144
MIB 145
PS 864A

MIB 195
MIB 846

MIB 165
MIB 844

ERS CDP,

RUBMI
ERS CDP
MJB 839

MJB 848

169
MIB 861

LC 216

MIB 194

MIB 164

MIB 156

MIB 146
PS 843B

(LHS)

LC 177

LC 179
(LHS)

(LHS)

143,
Design issue
...

...

...

...

...
MIB
IR OHE Mast,MIB
218
...

...
Dec Zone 4 Zone 3 Zone 2 Zone 1 Zone 6 Dec

Jan Jan
To be filled To be filled 62/16/18/28 41/17/16/8 Minor Str (Scope/Done/WIP/YTS)
Feb Feb
To be filled To be filled 2/0/2/0 6/0/6/0 Major Str (Scope/Done/WIP/YTS)
Mar Mar

PS-105A
Apr Apr
Baseline - NTC Plan Date
31 Mar 2019
May May
856

218

Jun Start of NTC @ KM 75 in Jun


863

PS-189A
2019

2019
855

864

Baseline Plan
862

26 Aug 2019 Report Date


Jul Jul
PS-216A

03 Sep 19

109
866
857

212
865

107
PS-173A

108

105
Aug Aug
837

171A

PS-154A
838B 838

B
840
841

201

BNTC BNTC
B NTC BNTC
862A 861

BNTC BNTC
220
847A 846

BNTC BNTC

185
BNTC BNTC
848

866A,866B

BNTC
215

BNTC BNTC
837A

PS-843B

Sep BNTC BNTC Sep

177
860A

NTC BNTC

156
163
856A

NTC BNTC B
844

PS-851A

132
199A
NTC BNTC B

146
PS-200
207

NTC BNTC B
843

NTC BNTC B

144
839

B
204

BNTC BNTC
PS-864A

166
NTC
NTC BNTC B

167 169
NTC BNTC B

141
865A

148A
BNTC B
851C

190
216

Oct B NTC BNTC BNTC Oct


BNTC BNTC

154B
187
202

118
192
NTC BNTC BNTC

143
189
NTC BNTC B
NTC BNTC B

180A

PS-166A
BNTC B
194

164
BNTC BNTC
B BNTC BNTC
NTC
203

IMB 845 C BNT C BNTC


206

Nov BNTC B NT Nov

154A
199

BNTC BNTC

165
BNTC BNTC
193
200A

Balaram Bridge NTC BNTC BNTC


200

B
194A
195

BNTC BNTC
NTC BNTC BNTC

145
202A

Dec B0 B0 B0 B0 B0 B0 B0 Dec
B0
NTC HNTC H
NTC-P NTC B0 B0 B0 B0
NTC HNTC H
-P NTC-P NTC B0 B0 B0
B0 B0
-P NTC-P NTC B0 H B0
B0 HNTC HNTC B0 B0
-P NTC-P HNTC HNTC
B0 B0 B0
NTC-P NTC B0
NTC HNTC HNTC
B0 B0 B0 B0
-P NTC-P NTC
HNTC HNTC H
B0 B0 B0
B0
Jan -P NTC-P NTC B0
HNTC HNTC Jan

102
B0 B0
-P NTC-P NTC B0 B0 B0
HNTC HNTC
-P NTC-P
NTC
B0
B0 B0 B0
NTC HNTC HNTC HNTC
NTC BNTC B -P N B0
B0 B0
HNTC H
NTC BNTC B TC-P B0 B0 B0
HNTC HNTC Start of NTC @ KM 75 in
NTC BNTC BNTC NTC B0 B0
HNTC HNTC
NTC HNTC HNTC
B0
BNTC BNTC -P N B0 B0
HNTC HNTC H
B0 B0
BNTC BNTC TC-P B0 B0 B0

Feb
BNTC BNTC BNTC
BNTC BNTC
NTC-P NTC
-P NTC-P NTC
B0 B0
B0
B0 B0 B0 B0 B0
HNTC HNTC
HNTC HNTC current Plan Feb
B NTC -P NTC-P NTC B0 B0 B0
NTC HNTC HNTC HNTC
BNTC B0 H
Start of NTC @ KM 0 in BNTC
-P NTC-P
B0 B0 B0 B0
NTC HNTC H
NTC HNTC HNTC 01 Jan 2020
HNTC HNTC H
BNTC B0
B0 B0
B B0 HNTC HNTC
H HNTC HNTC
B0
C HNTCNTC
B0
current Plan B0 B0 B0
HNTC HNT
Mar KM 21 B0 B0 B0 B0 B0

HNTC HNTC
HNTC HNTC HNTC Mar
01 Jan 2020 B0 B0 B0 B0
HNTC HNTC
HNTC
HNTC HNTC
01 Mar 2020 NTC HNTC HNTC B0 B0 B0 B0 B0
NTC HNTC H B0 B0

Apr L=55 Tkm NTC HNTC HNTC


HNTC HNTC
B0 B0 B0 B0 B0 Apr
HNTC HNTC HNTC B0 B0 B0
HNTC H NTC
KM 21 ACHIEVEMENTS for CTP3R Full section: CONSTRAINTS for CTP3R Full section: HNTC HNTC
NTC Work Rate HNTC HNTC H
2020

2020
09 Apr 2020
May L=109 Tkm -Normal - 33 Tkm/month May
1. Rail - 36,848 MT (51%) received against 1)Unjha - IR ObstrucBon removed, Site ready for handover
-Monsoon Jul to Sep - 27 Tkm/month Start of NTC @ KM 78
scope of 72,154 MT 2)Palanpur Twin ROB - For track linking in the criBcal secBon of
Jun
NTC BNTC B
NTC BNTC B
NTC BNTC BNT
-Distance from Depot >100 TKM - 27 2. Sleeper - 7,74,046 nos (67%) produced IQB-Palanpur, completion of this ROB is required. GAD has been approved 15 Apr 2020 Jun
CB
Tkm/month against scope of 11,50,737 nos but the work is yet to start.
3. Ballast - 9,68,346 CUM (46%) received 3)Structure works stopped due to non-finalizaBon of variaBon
Jul Jul
against scope of 21,17,367 CUM 4)Mehsana - Land handover issue in exisBng IR Mehsana Yard - 1750m.
Ext. Palanpur Twin 5)Delay in mobilizaBon of NTC due to Unjha & ExisBng Mehsana StaBon
Aug ROB Land handover issue. Aug
6) 3 New LHS added Via. Letter No. L-NKC-SLTG-PMC-1908-08 Dated 2
Sep Sep

Blanketing CTP-3R NTC Plan (REV 4)

NTC Plan Date - 02 Sep 19


Earthwork Structure & Formation
Baseline - 28 Mar 19
10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90
0

Chainage (RKM) Structure & Formation


Zone 1 & 2- 17 Aug 19
NTC-P T2 DTS2 NTC Baseline Plan Date -
B0
NTC-P 2 T
2 T2
DTS2
Bridges Formation Baseline
B0
Initial Ballast-1100 CUM/TKM NTC-P NTC Plasser Track laying T2 T
Tamping Round 2 DTS2 DTS Round 2 31 Mar 19
B0
B0
NTC-P T2 T
2
DTS2

w w
1 DTS1 De
w w
1 DTS De
RFO Formation New Turnouts in yards w w
w w
Welding DTS
1 DTS DTS Round 1 De
De Destressing
NT C B
NTC B
B1 B2
NTC B
B1 B2
ROB Yard NTC B NTC Baseline B1
B1 Ballast round 1-1000 CUM/TKM B2
B2
Ballast round 2-400 CUM/TKM
NT C H
NTC H
1 T1 T3
1 T
NTC H T1 T T3
Critical LC's Depot N TC H NTC Harsco Track Laying T1 T
1 T
1 T1 Tamping Round 1 T3
T3
Tamping Round 3