SHRIRAM EPC LTD.

DAILY PROGRESS REPORT


i Project Start Date:- 04.12.2018 CLIENT :-
ii Project End Date:- 03.09.2021 CONSULTANT:-
iii Project Name :- Dhanbad Water Supply Scheme Phase-I REPORT DATE:
iv Weather Report :- Sunny & Cloudy HOLIDAY
MAN POWER - MACHINE - MATERIAL DESCRIPTION
Manpower Strength Machine Description Materi
Manpower Opening
No. of Labour Machine Description Qty Working Material
Balance
i Skilled 18 JCB 4 3 Cement (Bag) 1706
ii Un-Skilled 55 Hydra 2 1 Sand (m³) 92
iii Surveyor 16 JCB Breaker 3 0 Aggregate (m³) 32
iv - - Tractor 4 2 Steel (MT) 9.120
Truck 1 1
Mixer Machine 1 0
Total 89 Total 15 7
1.Rising & Gravity Mains.
Supply Details Laying Details
Sl No Description of Works Pipe Size BOQ Qty.
Previous Today Cumulative Previous Today
100 mm Dia 0 - - - - -
150 mm Dia 0 - - - - -
200 mm Dia 0 - - - - -
250 mm Dia 580 - - - - -
Supply, Laying,Testing and
Commissioning of Clear 300 mm Dia 5618 - - - - -
1 Water Rising and Gravity 350 mm Dia 1587 - - - - -
Main Pipelines(DI-K9)
400 mm Dia 8417 - - - - -
450 mm Dia 1839 - - - - -
500 mm Dia 3347 - - - - -
600 mm Dia 4,426 - - - - -
Total Length 25,814 0 0 0 0 0
SHRIRAM EPC LTD.
2. Distribution Pipelines(19 Zones)
Supply Details Laying Details
Sl No Description of Works Pipe Size BOQ Qty.
Previous Today Cumulative Previous Today
100 mm Dia 284712 173253.5 2500 175753.5 16590.16 1149.47
150 mm Dia 42521 - - - - -
200 mm Dia 19597 - - - - -
250 mm Dia 9897 - - - - -
Supply, Laying,Testing and 300 mm Dia 9443 - - - - -
Commissioning of 350 mm Dia 4523 - - - - -
1 Distribution Pipelines(DI-K7) 400 mm Dia 4469
Total Nos. of Zone- 19 - - - - -
450 mm Dia 1513 - - - - -
500 mm Dia 2854 - - - - -
600 mm Dia 295 - - - - -
Total Length 379824 173253.5 2500 175753.5 16590.16 1149.47
Earthwork in excavation (As per I.S 3114 /
1965 for laying of different
Description types and sizes
of Works BOQ Qty. Previous Today Cumulative
of pipes so as to give one meter average
cover over in theexcavation
socket of of pipe with disposal
2 Earthwork
Extra for earthwork in
foundation
all kinds oflead
soil for 220849.04 10451.8008 724.1661 11175.9669
of excavated
trenches earth within
of toewall, spillway, initial
head and
regulator
each
lift asadditional
intake per
wellspecificationlift of 1m
and outlet andordirection
etc.as part
per thereof
designof
3 over the initial
Engineer-in-Charge lift of
section in ordinary or soft rock(b)1.5m
As as
per per
classification
(vide 191.38
specification
of soil item -Band
classification of direction
soil item-C) ofand
Engineer-in-
disposal of
4 Charge. 24538.78
soil (beyond 50 M away from the edge of
the trenches)
Supplying toolswith andinitial
cutting leadroadofas150 wellMrestoring the same as
and initial lift of 1.5 m
per specification and direction of E/I. as per
specification
Pucca Road (Except and direction
black topofonly E/Itaken
(whereout
blasting
5 material is not
be required).
Water bound macadam road (takenasout
to used) for cutting road per 11245.47
Dismantling
requirement.
material will plain
be cementfor
used) or lime
cutting concrete
road
6 Providing
work coarsestacking
clean sand in filling in 17492.96
as perincluding
foundationrequirement
trenches and
or
serviceable
inmaking
plinth good the
including
materials in countable stacks within 15
7 same.
ramming and watering 1936.72 119 4 123
meter lead
Providing and
PCC disposalin
M-150 oflayers
inwith
nominal
not
un-serviceable mix of
exceeding
Providing 150mm
designation thick75A one all leads
brick and
flat
8 materials
(1:2:4) in with all leadswith
foundation all complete
approved as per 1811.77
lifts
solingincluding
directionjointof costwith
filled
E/I of all materials,
local sand labour,
including
9 quality
royalty
cost of stones
and taxes taxes,
of watering, chips
all 20 mm
complete
royalty, to
asallper 6 mm
complete 24156.94
size graded
Earthwork
building in and
back
specification clean
filling
and coarse
the
as per building specification and direction sand
trenches
direction of of
E/IFM
afterof
10 laying
2.5 todifferent
(mode
E/I. of3.0 including
measurementtypes and screening,
sizes ofshuttering,
compacted pipes with
volume) 3623.54
mixingremoved
earth cement concreteduring in mixer within
excavation and
11 initial
placingleadin position, vibrating, striking, and 225339.07 10305.47 714.03 11019.50
and lift as per specification
curing,
design of taxes and royalty
Engineer all complete
-in- charge (for as per
building specification
classification of soil item andAdirection
&B) of E/I
Providing coarse clean sand in filling in
foundation trenches or in plinth including
SHRIRAM EPC LTD.
ramming and watering in layers not
12 exceeding 150mm thick with all leads and 31335.48
lifts including cost of all materials, labour,
13 royalty
Fittings and taxes all complete as per
& Specials 429000.4 1735 260 1995
building specification and direction of E/I
(mode of measurement compacted volume)
SHRIRAM EPC LTD.
3. Consumer Survey
SL No. Description Units BOQ Quantity Previous Today Cumulative Remarks

Consumer Survey Sample 55245 36251 470 36721

4. ELEVATED SERVICE RESERVOIR


ESR-3
ESR-1 ESR-4 ESR-5 ESR-6
ESR-2 (13 Lakh Litre)
(18 Lakh Litre) (17 Lakh Litre) (24.5 Lakh Litre) (24 Lakh Litre)
Sl No Description Units (21 Lakh Litre) Tetulmari near
Chatabad near Jamia Jila Parishad Gadeyriya WTP JMADA
Liloro Asthan sarswati sisu
Masjid Bhandardih Plant Officer Colony
mandir

1 soil analysis (SBC ) Job Completed Completed Completed Completed Completed Completed

2 Excavation Job - Completed Completed - Completed -

3 Anti-termite Spray Job - Completed Completed - 6 Nos Completed -

4 PCC Job - Completed Completed - 6 Nos Completed -

5 RCC work in foundation Job - Completed - - - -

1st half of staging height 20% Completed


6 Job - (Backfilling ` - - -
including room roof slab Completed)

Balance staging botton


7 dome circular beam , head job - - - - - -
beam and conical wall

8 Vertical Side Wall job - - - - - -

9 Top dome job - - - - - -

10
C.I/D.I pipe fitting of inlet job - - - - - -
valve
SHRIRAM EPC LTD.
11
Fixing of C.I , D/F pipes job - - - - - -
specials and sluice valve

Fixing of MS Ladders ,
12 railling,lightning arrester, job - - - - - -
and water level indicator

Wood work, Brick work


13 and steel work in door and job - - - - - -
windows
Snowcem/painting ,white
14 washing, colour, washing job - - - - - -
etc
Testing of full hydraulic
15 structure of elevated water job - - - - - -
tank

16
Commissioning and Trail job - - - - - -
run
SHRIRAM EPC LTD.
5. Compound Wall
SL No. Description Units BOQ Quantity Previous Today Cumulative Rem
1 Excavation m 3
352.64 226.6 0.0 226.6
2 Removal of Unserviceable Soil m3 222.72 203.9 0.0 203.9
3 PCC-M 15 m3 68.05 23.6 0.0 23.6
4 RCC- M 20 work in foundation m3 163.95 20.6 0.0 20.6
5 Steel Consumption MT 16.39 3.73 0.0 3.73
6 Brick Work m3 197.97 70.3 0.0 70.3
7 Plaster m² 1741.55 232.3 0.0 232.3
6. House Service Connections
SL No. Description No of Quantity Previous Today Cumulative Rem

1 House Service Connections 55245


AM EPC LTD.
Date 11/14/2019
JUIDCO Ltd.
NJS Engineers India Pvt. Ltd.
11/15/2019
-
ACHINE - MATERIAL DESCRIPTION
Material Details
Received Issued Balance

2850 1144 1706


185 94 92
156 125 32
23.400 14.280 9.120

Laying Details
Remarks
Cumulative
-
-
-
-
-
-
-
-
-
-
0
AM EPC LTD.

Laying Details
Remarks
Cumulative
17739.63 -
-
-
-
-
-
-
-
-
-
17739.63
Cumulative

11175.9669

123

11019.50
AM EPC LTD.

1995
AM EPC LTD.

Remarks

ESR-7 ESR-8
(18 Lakh Litre) (20.5 Lakh Litre)
JMADA JMADA
Officer Colony Officer Colony

Completed Completed

- -

- -

- -

- -

- -

- -

- -

- -

- -
AM EPC LTD.
- -

- -

- -

- -

- -

- -
AM EPC LTD.

Remarks

Remarks
MATERIALS DETAILS FOR JUIDCO
SL. CEMENT SAND AGGREGATE 8 MM 10 MM
SITE
NO. PUR USED PUR USED PUR USED PUR USED PUR
1 Near Talab,Chattabad Masjid Road

2 Way to Lilori Sthal,Opposite Lilori Park 2400 704 140.28 61 98.44 82 1.5 0.8 3.5

Near Sarsawati Shisu Mandir,


3 70 5 3 8 7
Tetulmari(Baba Chowk)

4 Near Chetudih Malkera Road,Chhatabad

In & Around Gareriya Water Treatment


5 15 1 1
Plant

6 At Chottaputki near B.C.C.L Project office.

7 At Chottaputki near B.C.C.L Project office.

Proposed Sahid Bhagat Singh Colony,


8 Matkuriya
Near Sarsawati Shisu Mandir,
3 450 355 40 29 50 35 1.5 1.3 0.5
Tetulmari(Baba Chowk) Boundry Wall

TOTAL 2850 1144 185 94 156 125 3 2 4

BALANCE 1706 92 32 1.0 1.7


O
10 MM 12 MM 16 MM 20 MM
USED PUR USED PUR USED PUR USED

2 3.45 2.6 4.5 3.5 4 1.8

2.05

0.3 2.2 1.9 0.2 0.15 0 0

2 8 4 5 4 4 2

1.7 3.3 1 2
Laying Details as on date
Date Today Cumulative Area
8/19/2019 16.5 16.5 Zone-1
8/20/2019 55 71.5 Zone-1
8/22/2019 82.5 154 Zone-1
8/23/2019 165 319 Zone-1
8/24/2019 38.5 357.5 Zone-1
8/26/2019 77 434.5 Zone-1
8/27/2019 148.5 583 Zone-1
8/28/2019 109.5 692.5 Zone-1