1 soil analysis (SBC ) Job Completed Completed Completed Completed Completed Completed
10
C.I/D.I pipe fitting of inlet job - - - - - -
valve
SHRIRAM EPC LTD.
11
Fixing of C.I , D/F pipes job - - - - - -
specials and sluice valve
Fixing of MS Ladders ,
12 railling,lightning arrester, job - - - - - -
and water level indicator
16
Commissioning and Trail job - - - - - -
run
SHRIRAM EPC LTD.
5. Compound Wall
SL No. Description Units BOQ Quantity Previous Today Cumulative Rem
1 Excavation m 3
352.64 226.6 0.0 226.6
2 Removal of Unserviceable Soil m3 222.72 203.9 0.0 203.9
3 PCC-M 15 m3 68.05 23.6 0.0 23.6
4 RCC- M 20 work in foundation m3 163.95 20.6 0.0 20.6
5 Steel Consumption MT 16.39 3.73 0.0 3.73
6 Brick Work m3 197.97 70.3 0.0 70.3
7 Plaster m² 1741.55 232.3 0.0 232.3
6. House Service Connections
SL No. Description No of Quantity Previous Today Cumulative Rem
Laying Details
Remarks
Cumulative
-
-
-
-
-
-
-
-
-
-
0
AM EPC LTD.
Laying Details
Remarks
Cumulative
17739.63 -
-
-
-
-
-
-
-
-
-
17739.63
Cumulative
11175.9669
123
11019.50
AM EPC LTD.
1995
AM EPC LTD.
Remarks
ESR-7 ESR-8
(18 Lakh Litre) (20.5 Lakh Litre)
JMADA JMADA
Officer Colony Officer Colony
Completed Completed
- -
- -
- -
- -
- -
- -
- -
- -
- -
AM EPC LTD.
- -
- -
- -
- -
- -
- -
AM EPC LTD.
Remarks
Remarks
MATERIALS DETAILS FOR JUIDCO
SL. CEMENT SAND AGGREGATE 8 MM 10 MM
SITE
NO. PUR USED PUR USED PUR USED PUR USED PUR
1 Near Talab,Chattabad Masjid Road
2 Way to Lilori Sthal,Opposite Lilori Park 2400 704 140.28 61 98.44 82 1.5 0.8 3.5
2.05
2 8 4 5 4 4 2
1.7 3.3 1 2
Laying Details as on date
Date Today Cumulative Area
8/19/2019 16.5 16.5 Zone-1
8/20/2019 55 71.5 Zone-1
8/22/2019 82.5 154 Zone-1
8/23/2019 165 319 Zone-1
8/24/2019 38.5 357.5 Zone-1
8/26/2019 77 434.5 Zone-1
8/27/2019 148.5 583 Zone-1
8/28/2019 109.5 692.5 Zone-1