Sei sulla pagina 1di 1

Muhammad Galih Eko Saputro

171410043

AOFP/Qmax

Mid Perfo at : 2100-2112 m

Datum : 2100+2112 = 2106 m


2
st
SFL (1 fluid at) : 200 m

Swab :

Time Q (bbl) Depth (m)

07.00 50 200

08.00 20 300

09.00 15 400

10.00 10 600
11.00 5 600

Total 100
SFL : 200 m / 656.2 ft

DFL (last swab) : 600 m / 1968.6 ft

Qtotal : 100 bbl/5 jam = 20 bbl/jam = 480 BPD


𝟏.𝟎𝟐 ×(𝒅𝒂𝒕𝒖𝒎−𝑺𝑭𝑳)×𝟏𝟒.𝟐 𝟏.𝟎𝟐 ×(𝟐𝟏𝟎𝟔−𝟐𝟎𝟎)×𝟏𝟒.𝟐
Ps : = = 841.405 psi
𝟏𝟎 ×𝟑.𝟐𝟖𝟏 𝟏𝟎 ×𝟑.𝟐𝟖𝟏

𝟏.𝟎𝟐 ×(𝒅𝒂𝒕𝒖𝒎−𝑫𝑭𝑳)×𝟏𝟒.𝟐 𝟏.𝟎𝟐 ×(𝟐𝟏𝟎𝟔−𝟔𝟎𝟎)×𝟏𝟒.𝟐


Pwf : = = 664.825 psi
𝟏𝟎 ×𝟑.𝟐𝟖𝟏 𝟏𝟎 ×𝟑.𝟐𝟖𝟏

𝒒 𝟒𝟖𝟎
PI : = = 2.718
𝑷𝒔−𝑷𝒘𝒇 𝟖𝟒𝟏.𝟒𝟎𝟓−𝟔𝟔𝟒.𝟖𝟐𝟓

AOFP : 𝑃𝐼 × (𝑃𝑠 − 𝑃𝑤𝑓) = 2.718 × (841.405 − 0) = 2286.939 BOPD

If assumption that only 70% can produced = 2286.939 × 0.7 = 1600.857 BOPD

STAGES

Pump Stage Design : 50 ft/stages

Pressure Gradient : 0.465 psi/ft

If

Tekanan : 100 psi

DFL : 1968.6 ft

Number of stage needed to lift fluid up from the pump until wellhead (vertical) :
𝐷𝐹𝐿 1968.6
= = 39.3 ≈ 40 stages
𝑃𝑢𝑚𝑝 𝑆𝑡𝑎𝑔𝑒 𝐷𝑒𝑠𝑖𝑔𝑛 50

Number of stage needed to flow fluid from wellhead to separator (horizontal) :


𝑇𝑒𝑘𝑎𝑛𝑎𝑛 100
𝑻𝑯𝑷 = = = 215 ft
𝑃𝑟𝑒𝑠𝑠𝑢𝑟𝑒 𝐺𝑟𝑎𝑑𝑖𝑒𝑛𝑡 0.465

𝑇𝐻𝑃 215
= = 4.3 ≈ 5 Stages
𝑃𝑢𝑚𝑝 𝑆𝑡𝑎𝑔𝑒 𝐷𝑒𝑠𝑖𝑔𝑛 50

Total Stages : 40 + 5 = 45 Stages