Sei sulla pagina 1di 1

stakeholdermap.

com
Project Management, project planning, templates and advice

Safety Method Statement


The Safety Method Statement sets out safe systems of work for hazardous operations. It should be included in the construction H & S plan together with any
subcontractors' safety method statements. It should clearly show how the work will be supervised, how it will be monitored and provide practical control measures.It
should include protective equipment requirements and explain first aid and emergency requirements. It should suitable for explaining the work method in a task talk.

Read more at Method Statements.


Work Activity/Task: Project Name/No:

Supervisor: Principal Contractor:

Prepared by: Date / Control Number:


For more tips on completing this template see Method Statement
Plant and Equipment Required Training Requirements

Job Step Potential Hazard Controls

Describe the job or Enter the potential hazard e.g. Electric Shock Enter the controls that will be put in place to manage the job step and
activity avoid the potential hazard.

Potrebbero piacerti anche