NR – 13
BOILERS AND PRESSURE VESSELS
13.1.4 It constitutes a serious and eminent risk the lack of 13.1.6.1 When nonexistent or lost, the “Boiler Dossier”
any of the following items: shall be restored by the owner, with the
manufacturer or “Qualified Professional’s”
a) Safety valve with opening pressure set at or (summoned in 13.1.2) technical responsibility,
below the MAWP; being indispensable the restoration of the
b) Device that shows the accumulated steam functioning characteristics, safety devices data
pressure; and procedures for MAWP determination.
c) Injector or other means of feeding water,
independent from the main system, for boilers 13.1.6.2 When the boiler is sold or transferred to other
that are fired with solid fuel; site, the records mentioned in “a”, “d” and “c” in
d) Fast water drain system, in recovering alkali 13.1.6 shall follow it.
boilers;
e) Indicating system to control the level of water or 13.1.6.3 The owner of the boiler shall present when
other system that avoids superheating by requested by the appropriate authority of the
defective feeding. Regional Labor Department, the records
mentioned in 13.1.6.
13.1.5 Every boiler shall have attached on its body, in a
visible and of easy and accessible place, and enduring 13.1.7 The “Safety Record” shall be made up of a separate
identification plate with, at least the following book, with numbered pages, or other similar system
information: where the following will be recorded:
a) Manufacturer’s name; a) All the relevant events capable to influence on the boiler
b) Order number given by the boiler’s manufacturer; safety conditions;
c) Year of fabrication; b) The events of periodical and extraordinary safety
d) Maximum allowable working pressure; inspections, containing the legible name and signature of
e) Hydrostatic test pressure; the “Qualified Professional”, summoned in 13.1.2, and the
f) Capacity for steam production; boiler operator present in the event of the inspection.
g) Heating surface area; 13.1.7.1 In the event of the boiler is considered
h) Design Code and year of edition. inadequate for use, the “Safety Record” shall
contain such information and receive a formal
13.1.5.1 Besides the identification plate there shall be, in conclusion.
a visible place, the boiler category, in accordance
13.1.8 The records referred in the 13.1.6 shall be at all times a) Constitute a separate building, built of fire resistant
available for the examination of the operators, the material, being able to have only one wall close to
maintenance and inspection personnel and the other equipment of the enterprise, however with the
employee and employer representatives at the other walls distant, at least 3 (three) meters from
Accident Prevention Internal Commissions, and the
other equipment, from third party properties, from
owner shall endure complete access to these records.
the limit with public roads and fuel storage except
13.1.9 For the accomplishment of this Regulation Standard,
boilers are classified in three categories accordingly to
tanks for the startup with up to 2,000 (two
the following: thousand) liters of capacity.
b) Provide at least 2 (two) wide exits, permanently
a) Category “A” boilers are those which the operation unblocked and arranged in different directions;
pressure is 1960 kPa (19.98 Kgf/cm²) or higher; c) Provide permanent ventilation with air openings
b) Category “C” are those which the operation pressure is which cannot be blocked;
58.8 kPa (5.99 Kgf/cm²) or lower, and the internal volume d) Provide gas leakage detecting devices when the
is 100 liters or lower; boiler source of heat is a gaseous fuel;
c) Category “B” boilers are all boilers that are out of the e) Not be used to any other purpose;
previous categories; f) Provide and easy and safe access, necessary to the
boiler operation and maintenance, taking into
13.2 INSTALLATION OF STEAM BOILERS account that for vacant guard rails, the gaps shall
have dimensions to avoid personnel’s falls;
13.2.1 The authorship of the “Installation Design”, as g) Have captivation and discharging systems for gasses
far as this Regulation Standard is concerned, is and particle matters from combustion to send them
responsibility of the “Qualified Professional”, as out of the operation area, in accordance with the
summoned in 13.1.2, and shall obey the safety, prevailing environment standards;
health and environment aspects foreseen in the h) Provide illumination in accordance with the
Regulation Standards, agreements and legal prevailing official standards and have emergency
arrangements. illumination systems.
13.2.2 The boilers of any enterprise shall be installed in
a “Boiler House” or in a specific site for this 13.2.5 It constitutes a serious and eminent risk the lack
purpose, called a “Boiler Area”, of any of the following:
13.2.3 When the boiler is installed outdoors, the “Boiler
Area” shall meet the following requirements: a) For all boilers installed outdoors, the items “b”, “d”
and “f” of 13.2.3 hereto;
a) Be at least 3 (three) meters away from: b) For the category “A: boilers installed indoors, the
♦ Other equipment of the enterprise; items “a”, “b”, “c”, “d”, “e”, “g” and “h” of 13.2.4
♦ Fuel storage, except tanks for the startup with hereto;
up to 2,000 (two thousand) liters of capacity; c) For the categories “B” and “C” boilers installed
♦ From the border of third party properties; indoors, the items “b”, “c”, “d”, “e”, “g” and “h” of
♦ From the border of public roads. 13.2.4 hereto.
b) Provide at least 2 (two) wide exits, permanently
unblocked and arranged in different directions; 13.2.6 When the enterprise can not meet what is
c) Provide an easy and safe access, necessary to the shown in 13.2.3 or 13.2.4 an “Alternative
boiler operation and maintenance, taking into Installation Design” shall be claborated, with
account that for vacant guard rails, the gaps shall complementary safety measures which allow the
have dimensions to avoid personnel’s falls; risk attenuation.
d) Have captivation and discharging systems for gasses
and particle matters from combustion to send them 13.2.6.1 The “Alternative Installation Design” shall be
out of the operation area, in accordance with the shown by the owner of the boiler to obtain
prevailing environment standard; and agreement with union representatives
e) Provide illumination in accordance with the of the prevailing professional category in the
prevailing official standards; enterprise.
f) Have emergency illumination systems in case of
operating at night. 13.2.6.2 In the event of reaching no agreement, as
13.2.4 When the boiler is installed indoors, the “Boiler foreseen in 13.2.6.1, the intermediation of
House” shall meet the following requirements: the Regional Labor Department can be
required by any of the parties and, Operation” is to have the Junior High School
continuing the deadlock, the decision shall certificate.
be taken by this Department.
13.3.7 The “Safety Training in Boiler Operation” shall
13.2.7 The boilers classified in the category “A: shall compulsorily:
have an instrumentation board installed in a
control room, built in accordance with prevailing a) Be technically supervised by a “Qualified
Regulation Standards. Professional”, summoned in 13.1.2;
b) Be ministered by skilled professionals qualified for
13.3 SAFETY IN BOILER OPERATION this propose;
c) Obey, at least the curriculum showed in the
13.3.1 Every boiler shall have an updated “Operational Appendix 1-A herein.
Manual”, in Portuguese, in an easy and
accessible place to the operators containing at 13.3.8 The responsible personnel for the “Safety
least: Training in Boiler Operation” performance shall
be restrained from ministering new courses, as
a) Startup and shutdown procedures; well as subjected to legal penalties, in case of
b) Routine operational parameters and procedures; noncompliance of what is required in 13.3.7.
c) Emergency situation procedures;
d) Safety, health and environment preservation general 13.3.9 Every boiler operation shall fulfill a practical
procedures; training, in the boiler he will operate, which it
shall be supervised, recorded and have the
13.3.2 The boiler devices and controls shall be minimum duration of:
maintained calibrated and in good operational
conditions, constituting a serious and eminent a) Category “A” boilers 80: (eighty) hours;
risk the use of tricks which neutralize control b) Category “B” boilers: 60 (sixty) hours;
and safety systems. c) Category “C” boilers: 40 (forty) hours.
13.3.3 The water quality shall be controlled and 13.3.10 The enterprise where the supervised practical
treatments shall be implemented, when training is performed shall inform in advance the
necessary, to adjust its physicochemical union representatives of the prevailing
properties to the boiler operational parameters. professional category in the enterprise:
a) The duration of training performance;
13.3.4 Every steam boiler shall be compulsorily under b) The responsible private group, company or
boiler operator’s operation and control, professional for the “Safety Training in Boiler
constituting a serious and eminent hazardous Operation”;
condition the lack of compliance of this request. c) The list of training applicants.
13.3.5 For the accomplishment of the Regulation 13.3.11 The knowledge refreshment of the operators
Standard, it is considered boiler operator the shall be continuous, by means of constant
one who satisfies at least one of the following (information of the physical and operational
conditions; conditions of the equipment, technical
refreshment, safety information, attendance in
a) To have the “Safety Training in Boiler Operation” courses, speeches and concerned events.
certificate and prove a practical training in
accordance with 13.3.11; 13.3.12 It constitutes a serious and eminent risk the
b) To have the “Safety Training in Boiler Operation” operation of any boiler in different conditions
certificate proclaimed herein and approve by foreseen in the original design, unless:
Brazilian Regulation number 02/84 on May 8, 1984;
c) To have corroboration of at least 3 (three) years of a) It is redesigned taking into account all the relevant
experience in this activity until May 8, 1984 variables contained in the new operational condition;
b) All the safety procedures shall be adopted arising
13.3.6 The minimum basic requirement to participate, from its new classification in respect of installation,
as a pupil in the “Safety Training in Boiler operation, maintenance and inspection.
being considered a serious and eminent
13.4 SAFETY IN THE BOILER MAINTENANCE hazardous condition the lack of compliance and
any of the deadlines established herein.
13.4.1 All repairs of changes in boilers shall respect the
corresponding construction design code and the 13.5.2 The initial safety inspection shall be made on
manufacturer’s direction in respect of: new boilers, prior to the startup, in the
operational site, having to be submitted to an
a) Materials; internal end external exam, hydrostatic and
b) Performance procedures; accumulation test.
c) Quality control procedures;
d) Personnel qualification and certification. 13.5.3 The periodic safety inspection, constituted by an
internal and external exam, shall be carried out
13.4.1.1 When the construction design code is in the maximum deadlines as follows:
unknown, the original concepts of the boiler
shall be respected, using the toughest a) 12 (twelve) months to categories “A”, “B” and “C”
control procedures written in the concerned boilers;
codes. b) 12 (twelve) months to recovering alkali boilers of
any category;
13.4.1.2 For the categories “A” and “B” boilers, by c) 24 (twenty-four) months to category “A: boilers,
the “Qualified Professional’s” judgment, provided that at 12 (twelve) months the safety
summoned in 13.1.2, calculus technologies valves opening pressures are tested;
or more advanced procedures shall be used, d) 40 (forty) months to special boilers in accordance
in exchange of the prevailing design with defined in 13.5.5.
standards.
13.5.4 Enterprise which have their “Own Service of
13.4.2 The “Modifying and Repair Design” shall be Equipment Inspection”, in accordance with the
admitted in advance in the following conditions: provisions established in Appendix II, may
postpone the period between safety inspections,
a) At all times that the design conditions have been respecting the following maximum deadlines:
changes;
b) At all times that repairs which compromise the a) 18 (eighteen) months to categories “B” and “C”
safety are performed. boilers;
b) 30 (thirty) months to category “A” boilers.
13.4.3 The “Modifying and Repair Designs” shall:
13.5.5 Boilers which operate in a continual way and use
a) Be authorized or approved by a “Qualified gases or residues from the process units, as
Professional”, summoned in 13.1.2; main fuel to take the advantage of the heat or
b) Determine material, execution, quality control and on purpose to environment control may be
personnel qualification procedures. considered special when all the following
conditions are satisfied:
13.4.4 All the performances that require broaching or
welding in parts that operate under pressure a) They are installed in enterprises which have their
shall be followed by a hydrostatic test, with “Own Service of Equipment Inspection”, summoned
characteristics defined by the “Qualified in Appendix II;
Professional”, summoned in 13.1.2. b) They have tested every 12 (twelve) months the
interlock system and opening pressure of every
13.4.5 The boiler safety control system shall be safety valve;
submitted to preventive or predictive c) They do not show unexpected variations in the
maintenance. gases and steam outlet temperature, during the
operation;
13.5 BOILER SAFETY INSPECTION d) There is water quality analysis and periodic control
there is material deterioration control of the boiler
13.5.1 The boilers shall be submitted to initial, main parts;
periodical and extraordinary safety inspections e) It is approved as special class by means of:
♦ Agreement between union representatives of b) When the boiler is submitted to important changes
the prevailing professional category in the or repairs able to alter its safety conditions.
enterprise and employer; c) Prior to the boiler startup, when it has been idle for
♦ The intrermediation of the Regional Labor more than 6 (six) months;
Department, required by any of the parties d) When there is a change in the boiler installation site.
when there is no agreement;
♦ Decision of the Regional Labor Department
when the deadlock continues. 13.5.10 The safety inspection shall be carried out by a
“Qualified Professional”, summoned in 13.1.2, or
13.5.6 After 25 (twenty-five) years of use, in their by “Own Service of Equipment Inspection”
following inspection, the boilers shall be summoned in Appendix II.
submitted to a strict integrity evaluation to
determine their reaming life and new maximum 13.5.11 Once the boiler is inspected, an “Inspection
inspection deadlines, in case of they are still in Report” shall be emitted, which shall belong to
condition of use. its records.
13.5.6.1 Enterprises which have their “own Service of 13.5.12 A copy of the “Inspection Report” shall be sent
Equipment Inspection”, summoned in by the “Qualified Professional”, summoned in
Appendix II, the 25 (twenty-five) year limit 13.1.2, in a time limit of 30 (thirty) days from
may be changed in terms of boiler the termination of the inspection, to the union
conditions, made by the referred representatives of the prevailing professional
department. category in the enterprise.
13.5.7 The safety valves installed in boilers shall be 13.5.13 The “Inspection Report”, summoned in 13.5.11,
periodically inspected as follows: shall contain at least:
a) At least once a month, by means of manual actions a) The recorded data in the boiler identification plate;
in operation to categories “B” and “C” boilers; b) Boiler category;
b) Demonstrating, inspecting and testing on a bench c) Type of boiler;
the flanged valves and, on site, the welded valves, d) Type of inspection carried out
recalibrating them in periods compatible with the e) starting and finishing date of inspection;
operational experience of themselves, but respecting f) Description of the realized inspections and test;
as a maximum limit the inspection period g) Result of the inspections and measures;
established in 13.5.3 or 13.5.4, if applied, to the h) List of items from this Regulation Standard or from
categories “A” and “B” boilers. other legal demands which are not satisfied;
i) Conclusions;
13.5.8 In addition to the prescribed test in 13.5.7, the j) Necessary recommendations and measures;
safety valves installed in the boilers shall be k) Foreseen date for the next boiler inspection;
submitted to accumulation tests, in the following l) Legible name, signature and the professional
opportunities: counsel recording number of the “Qualified
Professional”, summoned in 13.1.2, and legible
a) In the boiler initial inspection; name and signature of technicians who have
b) When they have been modified or have suffered attended the inspection.
significative reforms;
c) When there is a change in the boiler operational 13.5.14 At all times that the inspection results determine
parameters or a MAWP variation; changes on the identification plate data it shall
d) When there is a change in the inlet or outlet piping. be updated.
13.5.9 The extraordinary safety inspection shall be 13.6 PRESSURE VESSELS – GENERAL
carried out in the following opportunities:
13.6.1 Pressure Vessels are equipment, which contain
a) At all times that the boiler is damaged by accident or fluids under internal or external pressure.
other happening able to compromise its safety;
13.6.1.1 The application field of this Regulation e) “Inspection Reports”, in accordance with provisions
Standard, referred to pressure vessels, is of 13.10.8.
defined in Appendix III.
13.6.1.2 Pressure vessels included in this Regulation 13.6.4.1 When nonexistent or lost, the “Pressure
Standard are classified in categories in Vessel Dossier” shall be restored by the
accordance with Appendix IV. owner, with the manufacturer or “Qualified
13.6.2 It constitutes a serious and eminent risk the lack Professional’s” (summoned in 13.1.2)
of any of the following items: technical responsibility, being indispensable
the restoration of functioning characteristics,
a) A valve or other safety device with opening pressure safety devices data and procedures for
set at the MAWP or lower, installed directly on the MAWP determination.
vessel or in the system which includes it;
b) A safety device against a blockage without warning 13.6.5 The “Safety Record” shall be made up of a
of the valve when it is not installed directly on the separate book, with numbered pages, portfolios
vessel; or information retrieval or not, with similar
c) A device that indicates the operational pressure. reliability, where the following will be recorded:
13.6.3 Every pressure vessel shall have attached on its a) All the relevant events capable to influence on the
body, a visible and of easy and accessible place, pressure vessel safety condition;
and enduring identification plate with, at the, b) The events of safety inspections.
the following information:
13.6.6 The records referred in the 13.6.4 shall be at all
a) Manufacturer’s name; times available for the examination of the
b) Identification number; operators, the maintenance and inspection
c) Year of fabrication; personnel and the employee and employer
d) Maximum allowable working pressure; representatives at the Accident Prevention
e) Hydrostatic test pressure; Internal Commission, and the owner shall
f) Design code and year of edition. ensure complete access to these records,
inclusive the union representatives of the
13.6.3.1 Besides the identification plate there shall prevailing professional category in the
be, in a visible place, the pressure vessel enterprise, when formally requested.
category, in accordance with Appendix IV,
and its identification number of code. 13.7 INSTALLATION OF PRESSURE VESSELS
13.6.4 Every pressure vessel shall have, in site it has
been installed, the following records, duly 13.7.1 Every pressure vessel shall be installed in a way
updated: that all drains, vents, manholes and level,
a) A “Pressure Vessel Dossier”, to be supplied by the pressure and temperature indicators, when
manufacturer, having the following information: existing, are easily accessible.
♦ Design code and year edition; 13.7.2 When the pressure vessels are installed indoors,
♦ Materials specification; the installation shall meet the following
♦ Procedures used in the fabrication, assembly, requirements:
final inspection and determination of the MAWP. a) Provide at least 2 (two) wide exits, permanently
♦ A set of drawings and necessary data to follow unblocked and arranged in different directions;
its service life; b) Provide an easy and safe access to the maintenance
♦ Functioning characteristics; operation and inspection, taking into account that
♦ Safety devices data; for vacant guard rails, the gaps shall have
♦ Year of fabrication; dimensions to avoid personnel’s falls;
♦ Pressure vessel category. c) Provide permanent ventilation with air openings
b) “Safety Record”, in accordance with the provisions which cannot be blocked;
of 13.6.5; d) Provide illumination in accordance with the
c) “Installation Design”, in accordance with the prevailing official standards;
provisions of 13.7; e) Have emergency illumination systems.
d) “Changing or Repair Designs”, in accordance with
provisions of 13.9.2 and 13.9.3;
13.7.3 When the pressure vessels are installed Portuguese, in an easy access to the operators
outdoors, the installation shall meet the “a”, “b”, containing at least:
“d”, and “e” of 13.7.2 hereto.
a) Startup and shutdown procedures;
13.7.4 It constitutes a serious and eminent risk the lack b) Routine operational parameters and procedures;
of compliance of the following items of 13.7.2 c) Emergency situation procedures;
hereto: d) Safety, health and environment preservation general
procedures;
a) “a”, “c”, and “e” to pressure vessels installed
indoors; 13.8.2 The pressure vessel instruments and controls
b) “a” to pressure vessels installed outdoors; shall be maintained calibrated and in good
c) “c” to pressure vessels installed outdoors and operational conditions.
operate at night.
13.8.2.1 It constitutes a serious and eminent risk the
13.7.5 When the enterprise can not meet what is use of tricks which neutralize their control
shown in 13.7.2 and “Alternative Installation and safety systems.
Design” shall be elaborated, with
complementary safety measures which allow the 13.8.3 The operation of units which have pressure
risks attenuation. vessels of categories “I” and “II”, shall be done
by a professional with “Safety Training in
13.7.5.1 The “Alternative Installation Design” shall be Process unit Operation”, constituting a serious
shown by the owner of the pressure vessel and eminent hazardous condition the lack of
to obtain and agreement with union compliance of this request.
representatives of the prevailing
professional category in the enterprise. 13.8.4 For the accomplishment of this Standard, it is
considered professional with “Safety Training in
13.7.5.2 In the event of reaching no agreement, as Process Operation” the one who satisfies one of
foreseen in 13.7.5.1, the intermediation of the following conditions:
the Regional Labor Department can be
required by any of the parties and, a) To have the “Safety Training Process Unit
continuing the deadlock, the decision shall Operation” certificate dispatched by a competent
be taken by this Department. training constitution;
b) To have proved experience, in pressure vessel
13.7.6 The authorship of the pressure vessel operation in the categories “I” and “II”, of at least 2
“Installation Design” within the categories “I”, (two) years prior to the existence of this Regulation
“II” and “III”, in accordance with Appendix IV, Standard.
as far as this Regulating Standard is concerned, 13.8.5 The minimum basic requirement to participate
is responsibility of the “Qualified Professional”, as a pupil in the “Safety Training in Process Unit
as summoned in 13.1.2, and shall obey the Operation”, is to have the Junior High School
safety, health and environment aspects foreseen certificate.
in the Regulation Standards agreements and
applicable legal arrangements. 13.8.6 The “Safety Training in Process Unit Operation”
shall compulsorily:
13.7.7 The “Installation Design” shall contain at least
the enterprise’s plan, showing the position and a) Be technically supervised by a “Qualified
the category of each vessel and the safety Professional”, summoned in 13.1.2;
installations. b) Be ministered by skilled professionals qualified for
this purpose;
13.8 SAFETY IN PRESSURE VESSEL OPERATION c) Obey, at least, the curriculum showed in the
Appendix 1-B herein.
13.8.1 Every pressure vessel within the categories “I”
and “II” shall have its “Operational Manual”, or 13.8.7 The responsible personnel for the “Safety
operational instructions contained in the unit Training in Process Unit Operation” performance
operational manual where it is installed, in shall be restrained from ministering new courses
as well as subjected to legal penalties, in case of
noncompliance of what is required in 13.8.6. 13.9.1.1 When the construction design code is
unknown, the original concepts for the
13.8.8 Every professional with “Safety Training in vessel shall be respected, using the
Process Unit Operation”, shall fulfill a supervised toughest control procedures written in the
practical training, in the operation of pressure concerned codes.
vessels, with the minimum duration of:
13.9.1.2 By the “Qualified Professional’s” judgement,
a) 300 (three hundred) hours to vessels of categories summoned in 13.1.2, calculus technologies
“I” or “II”; or more advanced procedures shall be used,
b) 100 (one hundred) hours to vessels of categories instead of prevailing design standards.
“III”, “IV”, or “V”.
13.9.2 The “Modifying and Repair Designs” shall be
13.8.9 The enterprise where the supervised practical performed in advance in the following
training is performed shall inform in advance the conditions:
union representatives of the prevailing
professional category in the enterprise: a) at all times that the design conditions have been
changes;
a) The duration of training performance; b) at all times that repairs which compromise the
b) The responsible private group, company or safety are performed
professional for the “Safety Training in Process Unit
Operation”; 13.9.3 The “Modifying and Repair Design” shall:
c) The list of training applicants.
a) Be performed or approved by a “Qualified
13.8.10 The knowledge refreshment of the operators Professional”, summoned in 13.1.2;
shall be continuous, by means of constant b) Determine materials, execution, quality control and
information of the physical and operational personnel qualification procedures;
condition of the equipment, technical c) Be proclaimed to the enterprise’s employees who
refreshment, safety information, attendance in may be concerned with the equipment.
courses, speeches and concerned events.
13.9.4 All the performances that require welding in
13.8.11 It constitutes a serious and eminent risk the parts that operate under pressure shall be
operation of any pressure vessel in different followed by a hydrostatic test, with
conditions foreseen in the original design, characteristics defined by the “Qualified
unless: Professional”, summoned in 13.1.2, taking into
consideration what is determined in 13.10.
a) It is redesigned taking into account all the relevant
variables contained in the new operational condition; 13.9.4.1 Small superficial performances may have the
b) All the safety procedures shall be adopted arising hydrostatic test dismissed, according to the
from its new classification in respect of installation, criteria of the “Qualified Professional”,
operation, maintenance and inspection. summoned in 13.1.2.
13.9 SAFETY IN THE PRESSURE VESSEL 13.9.5 The pressure vessel safety control systems shall
MAINTENANCE be submitted to preventive or predictive
maintenance.
13.9.1 All repairs or changes in pressure vessels shall
respect the corresponding construction design 13.10 PRESSURE VESSEL SAFETY INSPECTION
code and the manufacturer’s direction in respect
of: 13.10.1 The pressure vessels shall be submitted to
initial, periodical and extraordinary safety
a) Materials; inspections.
b) Performance procedures;
c) Quality control procedures; 13.10.2 The initial safety inspection shall be made on
d) Personnel qualification and certification. new vessels, prior to the startup, in the
definitive operational site, having to be 13.10.3.4 When technically impracticable and by
submitted to an internal and external exam and means of waiting on the “Safety Record” by
hydrostatic test, considering the limitations the “Qualified Professional”, summoned in
mentioned in 13.10.3.5. 13.1.2, the hydrostatic test may be replace
by other nondestructive technique or
13.10.3 The periodic safety inspection, constituted by an inspection which allows it to obtain similar
internal and external exam and hydrostatic test, safety.
shall obey the maximum deadlines as follows:
13.10.3.5 It is considered technically impracticable to
a) To enterprises which do not have their “Own Service perform the hydrostatic test when:
of Equipment Inspection”, in accordance with the
provisions established in Appendix II: a) The structural resistance of base or vessel support
are not compatible with the weight of the water that
Vessel External Internal Hydrostatic should be used in test;
Category Exam Exam Exam b) The testing fluid harms the internal parts of the
I 1 year 3 years 6 years vessel;
II 2 years 4 years 8 years c) It is technically impossible to blow down or dry the
III 3 years 6 years 12 years system;
IV 4 years 8 years 16 years d) There is an internal coating;
V 5 years 10 years 20 years e) The test brings about a harming influence on
subcritical defects.
b) To enterprises which have their “Own Service of
Equipment Inspection”, in accordance with the 13.10.3.6 Vessels which work with operational
provisions established in Appendix II. temperature under 0°C and operate in
conditions with which the experience shows
Vessel External Internal Hydrostatic that deterioration does not occur, are free
Category Exam Exam Exam from the periodical hydrostatic test, being
I 3 year 6 years 12 years required to perform an internal exam every
20 (twenty) years and external exam every
II 4 years 8 years 16 years
2 (two) years.
III 5 years 10 years Self criterion
IV 6 years 12 years Self criterion
13.10.3.7 When there is no other alternative, the
V 7 years Self criterion Self criterion
pneumatic test may be performed, provided
that it is supervised by the “Qualified
Professional”, summoned in 13.1.2, and
13.10.3.1 Pressure vessels which can not be internally
surrounded by special care, because it is a
inspected due to physical impossibility shall
highly risky activity.
be submitted to a hydrostatic test instead,
considering the foreseen considerations in
13.10.4 The safety valves of the pressure vessels shall
13.10.3.5.
be disassembled, inspected and recalibrated
when the periodic internal exam is due.
13.10.3.2 Vessels with internal filling or catalyst may
have the periodicity of the internal exam
13.10.5 The extraordinary safety inspection shall be
widen, in order to coincide with the
carried out in the following opportunities:
changing time of the filling or catalysts,
provided that this extension do not go
a) At all times that the vessel is damaged by accident
beyond 20% of the established deadline in
or other happening able to compromise its safety;
13.10.3 herein.
b) When the vessel is submitted to important changes
or repairs able to alter its safety conditions;
13.10.3.3 Vessels with hygroscopic internal coating,
c) Prior to the vessel startup, when it has been idle for
shall be hydrostatically tested prior to the
more than 12 (twelve) months;
application of it, being the forthcoming tests
d) When there is a change in the vessel installation
replaced by alternative techniques.
site.
13.10.6 The safety inspection shall be carried out by a 1.2.4 - Heat exchange at a constant
“Qualified Professional”, summoned in 13.1.2, or temperature
by “Own Service of Equipment Inspection”, 1.2.5 - Saturated steam and superheated steam
summoned in Appendix II. 1.2.6 - Saturated steam table
3 - BOILER OPERATION
APPENDIX I-A Length: 12 hours
1.2.1 - General knowledge: what’s heat, what’s 3.6 - Procedures in the event of emergency
temperature
1.2.2 - Means of heat exchange 4 - WATER TREATMENT AND BOILER MAINTENANCE
1.2.3 - Specific heat and sensible heat Length: 8 hours
2.4 - Turbines and ejectors
4.1 - Water impurities and their consequences 2.5 - Compressors
4.2 - Water treatment 2.6 - Towers, vessels, tanks and reactors
4.3 - Boiler maintenance 2.7 - Furnances
2.8 - Boilers
5 - PREVENTION AGAINST EXPLOSIONS AND OTHER
RISKS 3- ELECTRICITY
Length: 4 hours Length: 4 hours
1 2 3 4 5
FLUID CLASS P.V ≥ 100 P.V < 100 P.V < 30 P.V < 2.5 P.V. < 1
P.V ≥ 30 P.V ≥ 2.5 P.V ≥ 1
“A”
• Steam. I II III IV V
• Simple asphysiant gases.
• Compressed air.
“D”
Notes:
In a meeting held in Brazil on November 18, 1994, the WORKING GROUP FOR THE REVIEW
OF THIS NR-13 REGULATION STANDARD established the following time limits for the
enterprises to adapt themselves to the requirements of the standard hereto.
BOILERS
13.1.4 Adjustment of pressure gauges, safety valves, level control systems, etc.
180 (one hundred eighty) days
13.5 The time limits for the boiler safety inspection shall be immediately
adjusted, taking the date of the last periodical/extraordinary inspection as
the starting point.