Item Description of work Unit Rate

No. (Rs.)
MASONRY WORKS
4.1 BRICKWORK
4.1.1 Providing soiling in foundation and under floor with stone/best
quality picked jhama bricks, sand packed and laid to level
and in panel after preparing the subgrade as directed
including all labour and materials and if necessary
dewatering, complete.

(a) Brick on flat soiling Sq.m 286.37


(b) Brick on edge soiling Sq.m 424.01
(c ) Stone soiling of thickness 150mm Sq.m 282.42
4.1.2 Filling sunken floor with broken jhama brick bats including Cu.m 3521.93
compacting and supplying of materials complete as specified
and directed for all levels
4.1.3 Extra cost for lifting of brickbats and sand for filling of sdnk Cu.m 132.99
floor for each subsequent floors above the ground floor as
directed and specified.
4.1.4 Brick work in cement mortar with 1st class brick including
racking out joints and dewatering if necessary, and curing
complete as directed in substructure upto plinth level.

(a) In proportion 1:3 Cu.m 4752.45


(b) In proportion 1:4 Cu.m 4632.29
(c) In proportion 1:5 Cu.m 4423.20
(d) In proportion 1:6 Cu.m 4401.57
(c) In proportion 1:1:9 (1 cement:1 Lime:9 sand) Cu.m 4249.20
4.1.5 Brick work in cement mortar with 1st class brick including
racking out joints and curing complete as directed in
superstructure above plinth level upto 1st floor level.

(a) In proportion 1:3 (1 cement:3 sand) Cu.m 4901.50


(b) In proportion 1:4 (1 cement:4 sand) Cu.m 4734.21
(c) In proportion 1:5 (1 cement:5 sand) Cu.m 4508.30
(d) In proportion 1:6 (1 cement:6 sand) Cu.m 4445.81
(e) In proportion 1:1:6 (1 cement:1 Lime:6 sand) Cu.m 4552.05
(f) In proportion 1:1:9 (1 cement:1 Lime:9 sand) Cu.m 4398.24
4.1.6 Extra over item 4.1.5 above for brick work in each Cu.m 197.50
subsequent floor or part thereof above 1st floor level.
4.1.7 112mm thick 1st class brick nogged wall in cemnent mortar
including racking out joints and curing complete as directed in
super structure above plinth up to 1st floor level (protruding
M.S rod/Tor steel of column to be measured and paid
separately)

(a) In cement mortar in proportion 1:4 (1 cement:4 sand) Sq.m 518.62


(b) In cement mortar in proportion 1 : 5 (1 cement:5 sand) Sq.m 499.76
4.1.8 75 mm thick 1st class brick nogged wall in cement mortar
including racking out joints & curing complete as directed in
superstructure above plinth upto 1st floor level (Protruding
M.S. rod/ Tor steel of column to be embedded in cement
mortar and will be measured and paid separately)

(a) In cement mortar in proportion 1:3 (1 cement:3 sand) Sq.m 375.99


(b) In cement mortar in proportion 1:4 (1 cement:4 sand) Sq.m 357.54
(c) In cement mortar in proportion 1:5 (1 cement:5 sand) Sq.m 347.16
4.1.9 75 mm thick reinforced brick wall in prop. 1 : 5 reinforced with Sq.m 394.29
one line of M.S rod/ Tor steel as specified embedded in 28
mm thick concrete course in prop. 1 : 2 : 4 with coarse
aggregate 12 mm down at every third course embedded with
protruding rod in column complete as directed (M.S. rod/ Tor
steel shall be measured and paid separately) in
superstructure upto 1st floor level.

4.1.10 112 mm thick reinforced brick wall in prop. 1 : 5 reinforced Sq.m 589.71
with two lines of M.S. rod/ Tor steel as specified embedded in
38 mm thick concrete course in prop. 1 : 2 : 4 with coarse
aggregate 12 mm down at every fourth courses embedded
with protruding rod in column including curing etc. complete
as directed (M.S rod/Tor steel shall be measured and paid
separately) in superstructure above plinth upto 1st floor level.

4.1.11 112 mm thick brick wall in cement lime mortar in prop. 1 Sq.m 490.70
cement : 1 lime putty : 6 fine sand including racking out joints
and curing complete as directed in superstructure above
plinth upto 1st floor level ( protruding M.S. rod/ Tor steel of
column to be embedded in cement mortar and will be
measured and paid separately)

4.1.12 75 mm thick brick wall in cement lime mortar in prop. 1 Sq.m 355.97
cement : 1 lime putty : 6 fine sand including racking out joints
and curing complete as directed in superstructure above
plinth upto 1st floor level ( protruding M.S. rod/ Tor steel of
column to be embedded in cement mortar and will be
measured and paid separately)

4.1.13 1st class brick nogged wall 75 mm thick in lime mortar in Sq.m 342.37
prop. 1 lime : 2 fine sand including racking out joints and
curing etc. complete as directed ( protruding M.S. rod/ Tor
steel will be meausured and paid separately) in
superstructure upto 1st floor level.

4.1.14 1st class brick nogged wall 112 mm thick in lime mortar in Sq.m 465.30
prop. 1 lime : 2 fine sand including racking out joints and
curing etc. complete as directed ( protruding M.S. rod/ Tor
steel of column to be embedde in cement mortar and will be
measured and paid separately) in superstructure upto 1st
floor level.
4.1.15 R.B. walling in prop. 1 : 3 reinforced with H.B. wire netting
made of 20-Gauge G.I. wire (diamond shape) in walls,
railings, drop walls, parapet, fins, bands, mullions from
ground floor level in superstructure upto 1st floor level
including racking out joints and curing etc complete as
directed (Protruding rods of columns to be tied with H.B. wire
netting) .

(a) 112 mm thick walls reinforced with H.B. wire netting in Sq.m 803.03
every third course.
(b) 75 mm thick walls reinforced with H.B. wire netting in Sq.m 616.11
every alternate course.
4.1.16 (a) Extra for brick walling for each subsequent floor or part Sq.m
thereof above the 1st floor level as mentioned in item nos.
4.1.6, 4.1.7, 4.1.8, 4.1.9, 4.1.10, 4.1.11, 4.1.12, 4.1.13 and
4.1.14
(i) 112 mm thick brick/ R.B. wall. Sq.m 23.27
(ii) 75 mm thick/ R.B. wall. Sq.m 15.96
Item Description of work Unit Rate
No. (Rs.)
4.2 STONE MASONARY WORK Sq.m
4.2.1 Stone masonary work in retaining wall, wing wall,
abutment, foundation, steps, plinth etc. in cem,ent
mortar in prop 1:6 with levelling course of 1:6:12 with
both faces hammer dressed including bonding, providing
face stone, through stone and centering including
racking of joints, curing and supplying and all carriage of
stone as directed including payment of forest royalty and
saleas tax and carriage.

(i) Random Rubble Masonry Cu.m 2083.07


(ii) Course Rubble Masonry Cu.m 2245.29