Sei sulla pagina 1di 17
Tr FIRE PREVENTION DEPARTMENT GENERAL DIRECTORATE OF CIVIL DEFENCE MINISTRY OF THE INTERIOR, STATE OF QATAR | GUIDELINES FOR FIRE FIGHTING & FIRE ALARM PLAN SUBMISSIONS | _FP-01-2013 | Note: For Strict Compliance Each item is checked for completeness and compliance to NFPA Standards and General tamaneer ofl Defence Gene Renae oo Check the applicable/required item/s and attached this document to each plan Peter eeretnereors os ma DEScRPTION os ae te eee | be sbred rough WO Online Peni Sm Poa must be n ACAD Me omet pure, bonded with covesponing model See | | | 1.2 | Drawing layouts shall follow the standard format for Title Block 1.3 | All drawings, calculations & related design reports shall be signed and endorsed by the designated Consultant Engineer, attested by the Engineering Company to where he/she is employed. ‘The consultant shall cortty on every drawing layout that the fire safety plan submission is designed with the provision of NFPA 10, 13, 14, 20, 70, 72, 101, 170, 5000, other applicable NFPA standards and Qatar Civil Defence requirements. 20 PLANS AND DOCUMENTS TO BE SUBMITTED 24 | Detailed Design Report - A narrative report that provides the following, (where applicable): = Description ofthe building, uses and occupancies of each spaces, passive and active fire protection system that will work together ‘with the smoke control system. = Design criteria and objectives. | © Fite Fighting System — automatic fio cprinkler:, ctandpipes and ‘other extinguishing systems. © Fire Alarm System — Alarm Initiating/Notification/Indicating Devices, Mass Notification, Emergency Lighting and Signages, ‘Two-way Communication System, Type of Fire Alarm System (Addressable, Conventional or Analogue/Addressable), Type of | __ nn nates per nr 7. rhc 2.2 | Floor Plans, Elevation, Sectional Drawings and Details | 23 | Policy Plan (Indicating Location, PIN, & QARS (Areas/Street/Plot | Numbers) Urban Planning & Development Authority (UPDA) latest and updated | | | registration of the Consultant & the Engineering Consulting Company. | 25 | This document, the Guidelines for plan submission to serve as review checklist. 26 | Fire Safety provision shall be tn accordance with the miaimars Prova Pat em FIRE PREVENTION DEPARTMENT GENERAL DIRECTORATE OF CIVIL DEFENCE MINISTRY OF THE INTERIOR, STATE OF QATAR: GUIDELINES FOR FIRE FIGHTING & FIRE ALARM PLAN SUBMISSIONS | FP-01-2013 ‘Note: For Strict Compliance = T Each item is checked for completeness and compliance to NFPA Standards and General Directorate of Civil Defence, General Requirements Ps__-FP | Check the applicable/required item/s and attached this document to each plan | submission/re-submissions made. | Provisions Item DESCRIPTION tepw [wa] | | eairmenis as prescribed by HEPA Standards and GACD Genera | | Requirements | | | Provisions in excess ofthe minimum requirements shall confirmed 1 by the design consultant with a letter from the owner/client. 3 .0 DETAILS TO BE SHOWN ON PLANS be provided. ) List applicable codes used in the design of the project shall be | indicated with complete editions & date. €)_ Logo & stamp of the consultant/contractor firm complete with address and contact information shall be properly placed. 4) Owner's name & other details such as address and contact nos. shall be indicated. | Complete adres ofthe projec, in, area plot & street nos, must | | | 32 | a) Proper endorsement, drawing title & GACD space for stamps shall | | | be clearly provided. | A). Indicate correct plan scale in each drawing page. Complete name of designer / engineer, checkers, draftsmen, etc. | shall be clearly shown, hh) History of revisions must be provided. | | i) Sheet number and content title must be consistent with the | _drawingmaen 3.2 | COVER/ FRONT PAGE Declaring, enumerating or tabulation of all the fire safety provisions ___ required for the project. oe 3.2.1 | a). Drawing index with corresponding paper size and scale must be provided clearly and consistent with each page of the drawings. | b) Area statement of every floor, level, room, area and/or occupancy. )_ Project description shall be provided to indicate the intent and purpose of the submission, building classification, construction | type, building occupancy and hazard classification, type of ‘commodities and storage arrangement shall be included in the description. Such description shall be concistent with the design report. |° Scope of work: A summarized design intent (based from design report), proposed project details/activity must be clearly indicated. Forza Pose? = FIRE PREVENTION DEPARTMENT GENERAL DIRECTORATE OF CIVIL DEFENCE MINISTRY OF THE INTERIOR, STATE OF QATAR | GUIDELINES FOR FIRE FIGHTING & FIRE ALARM PLAN SUBMISSIONS | FP-01-2013 ach item is checked for completeness and compliance to NFPA Standards and General Directorate of civil Defence, General Requirements Ps___-FP Check the applicable/required item/s and attached this document to each plan submiesion/ro-eobmiccione made. ] Provisions wr opeess rN : fy tn [na |e) Design parameters / criteria with complete description of the | system shall be properly declared and supported with engineering | calculations. (e.g. automatic fire sprinklers, standpipes or fire alarm system) | Equipment Schedule; sprinklers, standpipes, type of alarm initiating:indicating devices, controllers & panels schedule must be provided. (this may be provided on a separate sheet). 8) General notes applicable for the project shall be provided. h) Provide only the applicable legends & symbols making sure that all floor plan layouts shall be consistent with the schematic riser diagrams. |) Brief material specification for fre fighting and fire alarm related equipment/devices, etc. shall be provided. | 1) Specify all ire fighting pipes, cable trays for fire safety application penetrating thru walls and slabs shall be sealed with fire retardant ‘material with rating of not less than the fire rating of the wall or | slab being penetrated. 3.3 | SITE PLAN Site Plan scaled to fit an AO or Al drawing sheet and shall indicate the IMeans of access to the site and to the perimeter of each building for fire fighting vehicle and equipment. é 3.3.2 | Fire Fighting - For multiple buildings being served by a single fre water source, show in the site plan the fire water pipe network including the | interfacing of the buildings and location of the fire pump room. For | stand alone, declaration on the location of the fire pump and fire water Fire Alarm - For multiple buildings being served by a main fire alarm | ‘control panel, external cable routing with supervising station shall be | shown in the site plan, For stand alone, declaration on the location of the fire alarm control unit/panel. oe al ER TIRE PREVENTION DEPARTMENT GENERAL DIRECTORATE OF CIVIL DEFENCE MINISTRY OF THE INTERIOR, STATE OF QATAR GUIDELINES FOR FIRE FIGHTING & FIRE ALARM PLAN SUBMISSIONS "Note: For Strict Compliance Each item is checked for completeness and compliance to NFPA Standards and General Directorate of Civil Defence, General Requirements (Check the applicable/required item/s and attached this document to each plan DESCRIPTION. | 4.1 | The proposed, existing use of every part or modified portions of the | plan clearly identified and provided with a narrative description of the | scope of work/act | 42 [Fire rightingsystem, a) Provision of sprinklers on the lowest point of the elevator shaft (elevator pit 'b) Provision of sprinklers inside the fire pump room (installed below ‘ground level) and shall be rated as Extra Hazard Grp 2 Identification ofthe floor/zone control valve assembly including total area and total sprinkler being supplied 4) Cloud/shade those remotest/demanding sprinklers with reference nodes corresponding to the hydraulic calculation/analysis report as required by NFPA 13 €) Location and size of Riser Nipple and flushing provision. 4) Legend and symbols used inthe plan to verify the type of fire | fighting equipment being installed and shall be consistent with the mounting details Fire Alarm System, a) Provision for alarm initiating/notification/indicating devices complete with witmg/canndit end lets tu eve wanaistey wit | the fre alarm schematic diagram 'b) Interfacing modules shall be shown and identified for mechanical ventilation, fire fighting and related emergency service purpose. c) Conduit layout shall show the starting and ending points and location of the upfeed and downfeed risers from and to the fire alarm control panel (pathway survivability). d) Location of the audible and visible notification devices (installation inside the staircase and at exit doors shall not be permitted-visual __impairment 5.0 | ELEVATION, SECTIONAL DRAWINGS, SCHEMATIC DIAGRAMS AND | bevans, | Drawings shal be scaled to fit an AO or Al drawing sheet and shall indicate the following: Ls 5.1 | Full height of each floor/storey and the depth of void spaces (raised - | { Fp-01-2013 Ps__-P. Provisions YN [NA FIRE PREVENTION DEPARTMENT GENERAL DIRECTORATE OF CIVIL DEFENCE MINISTRY OF THE INTERIOR, STATE OF QATAR | GUIDELINES FOR FIRE FIGHTING & FIRE ALARM PLAN SUBMISSIONS | FP-01-2013 "Note: For Striet Compliance Each item is checked for completeness and compliance to NFPA Standards and General Directorate of Civil Defence, General Requirements Ps.__-fp ‘Check the applicable/required item/s and attached this document to each plan | submission/re-submissions made. Item DESCRIPTION floor or ceiling void) with cespect tothe Level of Exit Discharge (LED) incorporating the necessary fre safety equipment. | | 5.2 _ | Fire Fighting System, | 2} Riser diagram showing the location ofthe fre pump room, fre water storage, breaching inlet connection, standpipes supplying the. landing valves, automatic fire sprinkler system and related fire | fighting equipment I | b) Pressure settings for each floor provided with Pressure Reducing/Restricting Valves as determined in the hydraulic calculation report/analysis. | ) Indicate the habitable height of each flor to be consistent with the bulking plan approve | 4) For both electric driven fire pumps load calculation and power | diagram shallbe shown/submitted to veriy compliance to | | | | | | ___secondary/emergency power supply per NFPA 70. | Fire Alarm System, a) Schematic diagram showing all the alarm initiating / notification / indicating devices with labels to have consistency with the wiring | layout for al the floors of the proposed building. ')Ventilation/Firefighter Control, Mass Notification and Two-Way Communication Diagrams integrated with the Fire Alarm Control | Schematic Diagram shall be shown as applicable. €)_ Block diagram for multiple buildings with supervising station being | served by a main fire alarm control pane (as applicable) | 5.3 | FIRE COMMAND CENTER (IF PROVIDED) = Location of the Main Fire Alarm Control Unit/Panel, Main Indicating | ‘Mimic (Graphic Annunciation) Panel, Two-way Fire Telephone Communication Systems, Mass Notification (Public Address) System and related fire emergency 5.4 | FIRE PUMP ROOM, FIRE WATER STORAGE & GENERATOR ROOM (AS REQUIRED) @) Adequate extinguishing system, if not provided with water ype extinguishing system b) Dimension of the room to verify adequate housing of the fire pump _and related fittings, valves, headers and related equipment Se aaEEIFnnEEEIE EERE EERIE Ente oeoeeeeoeeoeEEeEeEeerae Prova Pages ~~ FIRE PREVENTION DEPARTMENT GENERAL DIRECTORATE OF CIVIL DEFENCE MINISTRY OF THE INTERIOR, STATE OF QATAR | GUIDELINES FUR FIRE FIGHTING & FIRE ALARM PLAN SUBMISSIONS ‘Note: For Strict Compliance Each item is checked for completeness and compliance to NFPA Standards and General Directorate of Civil Defence, General Requirements CCheck the applicable/required item/s and attached this document to each plan -submission/re-submissions made. tem 38 Fron, DESCRIPTION complying to NFPA 20 & 22. |) Dimension of the fire water storage with section elevation details | (show effective height capacity) to verify with the discharge | duration |) Caleulation ofthe water and diesel fue (as applicable) capacities | based from the selected fire pump. |e) Fee Alam Stem heat detector sabe roted thee diesel driven fire pump; fire telephone directly connected to the |___ Fire Command Center or near the fire alarm control panel. | OTHER SUPPORTING DOCUMENTS ee 2a) Sequence of operations forthe fre pump and fire alarm system | (System Performance Input/Output Matrix) |b) Schedule of Equipment )_Fire Pumps equipment schedule indicating the type of pump, ‘capacity, head and power requirements 4) Battery Load Calculation of all the alarm initiating-indicating devices to verify fire alarm control panel capacity. €} Miscellaneous Details |= Details on the protection of pipes / cable trays or conduits penetrating walls. Submit only the required fire safety equipment details (sprinkles, fire hose reel, landing valves, floor/zone control valves, alarm initiating-indicating devices, etc) that will be | installed in the proposed building. ~ Fire pump details, pipe fittings and related equipment arrangement shall comply with the requirements of NFPA 20. 4) Caleulation Reports = Provide hydraulic caleuation reports/analyss for the building being protected by fre sprinkler system in relation to the hazards being declared (ordinary for parking, light for offices or residential fr top most floor and those considered as incidental storage) complying to NFPA 13 i ~ For those extinguishing systems other than water ____ extinguishing system, a separate drawing complete with FP-01-2013 Provisions y [nN [Na Poon pas FIRE PREVENTION DEPAR IMENT GENERAL DIRECTORATE OF CIVIL DEFENCE MINISTRY OF THE INTERIOR, STATE OF QATAR | GUIDELINES FOR FIRE FIGHTING & FIRE ALARM PLAN SUBMISSIONS __FP-01-2013 | Note: For Strict Compliance Each item is checked for completeness and compliance to NFPA Standards and General Directorate of Civil Defence, General Requirements PS._-#P ‘Check the applicable/required item/s and attached this decument to each plan ‘submisston/re submissions made, Item DESCRIPTION details capacity calculation shall be submitted and sequence of operation. ) Technical Requirements - Fire pump equipment design curve, to verify with the hhydraulic calculation report and selected fire pumps. - Fire Alarm Control Unit/Panel specification to verify allowable devices per loop or zone. ~ Provide calculation for audible and visible rating of devices. = Provide lux calculation for illumination requirements of emergency li system for exit access and staircase per NFPA 101. Provisions y_[w [ Na 1 Date Fora ane? re, FIRE PREVENTION DEPARTMENT <3 . GENERAL DIRECTORATE OF CIVIL DEFENCE MINISTRY OF THE INTERIOR, STATE OF QATAR wy | GUIDELINES FOR MECHANICAL VENTILATION PLAN SUBMISSIONS | mvo1zu1s ach items checked for completeness and compliance to NFPA Standards and General | Directorate of Civil Defence, General Requirements Ps__-mv | Check the appicable/required item/s and attached this document to each plan a resubmission mode. = Provisions item DESCRIPTION eee GENERAL | 1.1 | Drawings to be submitted through MOI Online Permit System Portal "must be in ACAD file format, purge, bonded with corresponding model | space & paper space layouts for review | }rawing layouts shall follow the standard format for Title Block 1.3 | All drawings, calculations & related design reports shall be signed and ‘endorsed by the designated Consultant Engineer, attested by the Engineering Company to where he/she is employed. The consultant shall certify on every drawing layout that the fire safety plan submission is designed with the provision of NFPA 92, 88, 101, '5000 other applicable NFPA standards and Qatar Civil Defence requirements. 20 PLANS AND DOCUMENTS TO BE SUBMITTED a led Design Report ~A narrative report that provides the fll (where applicable): | ~ Description of the building, uses and occupancies of each spaces, Passive and active fire protection system that will work together: ‘ith the smoke control sytem. ~ Design criteria and objectives. = Smoke control system rational analysis. ~ _ Type/s of smoke control system provided in the building: + Passive smoke control system (fire or smoke barrier construction). + Active smoke control systems. > Smoke containment system; e.g. pressurization sytem > Smoke management system; eg smoke-heat exnaust ventilation sytem, - Method of operation of each zone (how the system will be initiated in each zone and associated system responses. | - Event matrix relating to the methods of operation of the systems in the building. ~ CFD analysis and other calculations associated with smoke control system. ___| + Fire modeling and other performance based analysis where utlized Gas FIRE PREVENTION DEPARTMENT GENERAL DIRECTORATE OF CIVIL DEFENCE MINISTRY OF THE INTERIOR, STATE OF QATAR Item 22 23 24 25 26 GUIDELINES FOR MECHANICAL VENTILATION PLAN SUBMISSIONS. | Note: For Strict Compliance Each item is checked for completeness and compliance to NFPA Standards and General Directorate of Civil Defence, General Requirements | Check the applicable/required item/s and attached this document to each plan submission/re-submissions made. _ DESCRIPTION mv-o2.2012 Provisions y DN [NA “ithe dega af snake eonwal sie: ~ Design Fire: * Anticipated fuel load, type of fuel/s, fuel characteristics, fire behavior + Design of heat release assumption. * — Analysis on sprinkler effectiveness, its effect to the fire and smoke Floor Plans, Elevation, Sectional Drawings and Details — Policy Plan (Indicating Location, PIN, & QARS (Areas/Street/Plot Numbers) Urban Planning & Development Authority (UPDA) latest and updated registration of the Consultant & the Engineering Consulting Company. ‘This document, the Guidelines for plan submission to serve as review checklist. Fire Safety provision shall be in accordance with the minimum requirements as prescribed by NFPA Standards and GACD General Requirements. Provisions in excess of the minimum requirements shall be confirmed by the design consultant with a letter from the ownar/eliont. DETAILS TO BE SHOWN ON PLANS Ba ‘a) Proper endorsement, drawing title & GACD space for stamps shall be provided. 'b) List applicable codes used in the design of the project shall be indicated with complete editions & date. €) Logo & stamp of the consultant/contractor firm complete with address and contact information shall be properly placed. d) Owner's name & other details such as address and contact nos. shall be indicated. e) Complete address of the project, Pin, area, plot & street nos. must bbe clearly provided. Indicate correct plan scale in each drawing page. Complete name of designer / engineer, checkers, draftsmen, etc. shall be clearly shown. es Page? FIRE PREVENTION DEPARTMENT GENERAL DIRECTORATE OF CIVIL DEFENCE MINISTRY OF THE INTERIOR, STATE OF QATAR 324 GUIDELINES FOR MECHANICAL VENTILATION PLAN SUBMISSIONS | Note: For Strict Compliance = | Each item is checked for completeness and compliance to NFPA Standards and General Directorate of Civil Defence, General Requirements (Check the applicable/required item/s and attached this document to each plan DESCRIPTION my-o1.2012 ns must be provided. i) Sheet number and content title must be consistent with the Declaring, enumerating or tabulation of all the fire safety provisions required for the project. a) Drawing index with corresponding paper size and scale must be provided clearly and consistent with each page of the drawings. 'b) Project description shall be provided to indicate the intent and purpose of the submission, building classification, construction type, building occupancy and hazard classification, type of ‘commodities and storage arrangement shall be included in the description. Such description shall be consistent with the design report. ©), Scope of work: Proposed project details/activity must be clearly indicated. 4) Design parameters with complete description of the system shall be properly dectared and supported with engineering calculations. (e.g. Smoke management, pressurization & exhaust system) €) Equipment Schedule; fans, motors, controllers & panels schedule ‘must be provided. (this may be provided on a separate sheet). 4) General notes applicable for the project shal be provided. 8) Provide only the applicable legends & symbols. hh). Brief material specification for Fans and its enclosure, ducts, dampers, gauges, etc shall be provided. |) Specify on the pian that the emergency ventilation fans are connected to Emergency Power Supply System (EPSS) with a minimum 2-hour fire resistant cable. 1). Specify ducts that pass through a fire barrier wall shall be protected by sealing the opening around the duct with alisted or approved material, please specify Ly. Specify all ducts & pipes penetrating thru walle and slabs shall be sealed with fire retardant material with rating of not less than the fire rating of the wall or slab being penetrated. (Gar) FIRE PREVENTION DEPARTMENT GENERAL DIRECTORATE OF CIVIL DEFENCE MINISTRY OF THE INTERIOR, STATE OF QATAR GUIDELINES FOR MECHANICAL VENTILATION PLAN SUBMISSIONS mv-01-2013 ‘Note: For Strict Compliance a Each item is checked for completeness and compliance to NFPA Standards and General Directorate of Civil Defence, General Requirements CCheck the applicable/required item/s and attached this document to each plan ‘submission/re-submissions made. tem | DESCRIPTION oe eR ens Site Plan scaled to fit an AO or Al drawing sheet and shall indicate the following: 3.3.1 | Means of access to the site and to the perimeter of each building for fire fighting vehicle and equipment. 3.3.2 | Grid Line References (x, y) and shall be same with other floor plan or gs. EE 40 FLOOR PLANS (BASEMENT/S & CAR PARK BUILDINGS — as applicable) 4.1 _ | The proposed, existing use of every part or modified portions of the plan clearly identified and provided with a narrative description of the scope of work/activty 4.2 | a) Smoke compartmentation / zone shall be clearly shown in the plans. Supply air shall be drawn directly from the external with intake point not less than 5m from any exhaust discharge openings. ©). Please clearly indicate that all ducts used for ventilation in the basements shall be fire rated with minimum thickness of 1.2mm. d) Fans enclosure shall be able to withstand 250°C of fire rating, please specify. ©) Demonstrate on Ue plat at the enclosed parking structures shall, be ventilated by a mechanical system capable of providing a ‘minimum of 300 L/min per m2 of floor area (1 ft3/min per ft2 of floor area) or GACH during hours of normal operation. 4) For Fire Mode on any level/zone of enclosed parking structures demonstrate that the ventilation system shall operate with at least 10 ACH ventilation rate and the other level/zones of the Car Park shall be on normal condition to be ventilated by a mechanical system capable of providing a minimum of 300 L/min per m2 of floor area (1 ft3/min per ft2 of floor area) or at least 6 ACH. ea ‘STAIR & LORRY PRESSURIZATION (IF PROVIDED) 4) Multiple injection must be provided for more than four storey building. b) Indicate the criteria used in the design of stair & lobby I ex FIRE PREVENTION DEPARTMENT GENERAL DIRECTORATE OF CIVIL DEFENCE MINISTRY OF THE INTERIOR, STATE OF QATAR tem GUIDELINES FOR MECHANICAL VENTILATION PLAN SUBMISSIONS "Note: For Strict Compliance e Each item is checked for completeness and compliance to NFPA Standards and General Directorate of Civil Defence, General Requirements ‘Check the applicable/required item/s and attached this document to each plan submission/re-submissions made. DESCRIPTION pressurization such as pressure differential, ACH and other information in the front page. ‘c)_ Ensure that the pressure gradient/pressure at the exit staircase shall always be higher. 4d) Demonstrate the fire fighting lobby pressurization system in accordance with QCD FSS 2.2.13 & 6.6.13 Fire Safety Standards ‘Minimum Requirements. Clearly indicate on every floor plan layout the fire fighting lobby/fireman's lift. Indicate on the riser diagram to ‘match on every floor plan layout the fire fighting lobby pressurization system. Indicate the Staircase No. on firefighting, lobby pressurization system riser diagram to clearly check & verify the lobbies adjacent to that Staircase. ) Demonstrate the ventilation system in Fire Lift Machine Room. §) Provide Staircase shaft elevation section with dimensional details to show the configuration of staircase pressurization system. 8) Ensure that even air distribution of pressurizing air throughout the staircase shaft can be achieved. The pressurization system shall have injection points distributed throughout the shaft such that they are not more than 11m apart and not less than one injection points for every 3 level. hh) The pressurization system must be capable of 1 ving ane average air flow of not less than Im/s across 3 doors open simultaneously plus maintaining a minimum of pressure differentials 0.05 in. water column (12.5 Pa.) in sprinklered buildings, or 0.10 in. water column (25 Pa.) in non sprinklered buildings (partial) for the remaining closed doors. i) Provide pressure relief damper in each staircase to relieve excess pressures. Provide settings. mv-01-2013 | Provisions — N | NA) _ | 60 ‘ATRIUM, COMMUNICATING SPACES & VERTICAL OPENINGS (IF APPLICABLE) = Demonstrate the compliance of Vertical Opening in accordance to NEPA Standards, = ate PUMP ROOM AND GENERATOR ROOM VENTILATION SYSTEM (AS REQUIRED) __|a)_For the pump room ventilation, @ 10 ACH must also be provided FIRE PREVENTION DEPARTMENT GENERAL DIRECTORATE OF CIVIL DEFENCE MINISTRY OF THE INTERIOR, STATE OF QATAR GUIDELINES FOR MECHANICAL VENTILATION PLAN SUBMISSIONS ‘Note: For Strict Compliance mv 01 2013 ach item is checked for completeness and compliance to NFPA Standards and General Directorate of Civil Defence, General Requirements ‘Check the applicable/required item/s and attached this document to each plan submission/re-submissions made. Item (30 10.0 DESCRIPTION during operation of the pump/s. b) Emergency ventilation system shall be provided in fire pump room, generator room, fice lifts and other areas deemed necessary for fre 2 safety functions and shall be connected to Emergency Power Supply. oo REFUGE FLOOR FOR HIGH RISE BLDG. (WHERE APPLICABLE) - Demonstrate the compliance of Refuge Floor ventilation system to QCD FSS 1.5 Fire Safety Standards Minimum Requirements. SCHEMATICAND CONTROLDIAGRAM a) Please provide schematic diagram of the overall system showing clearly the key features and their functions, relative locations in the building, sizes, capacities and other essential information including the ar distribution design arrangement in mechanical ventilation systems. ) Provide riser dianram showing the emergency ventilation fans are connected by 2 hours fire resistant cables tothe Fire Fighter's Fan Control Panel. Indicate on the plan that the smoke control fan is provided with a rotary selector switch and indicating light for each fan/zone that indicates the following Manual-Yellow, Off-red, Automaticgreen ©) Clearly show the fre rated vertical air duct, fire vated hurcuntal it duct, smoke damper fire damper, FSD and MESD location. Provisions vy [nN [Na ‘TYPICAL FLOOR PLANS a) Please state the mode of ventilation for all rooms/space. All floor plan shall match with the approved building plans. Fire ratings of walls, doors, barriers and windows shall be clearly indicated for proper referencing. ‘c). Show that emergency supply air openings shall be drawn directly from the external with intake point not less than 5m from any exhaust discharge openings. 4) Show that any services openings (A/C ducts, piping conduits, cables, etc.) between fire rated walle & clah chall he

Potrebbero piacerti anche