: - F: PRD: 7509
Issue Date 15/09/08 Revision No. 1 Revision Date 1/3/2013 Manpower deployment Columns Added Resp.: Engg. Prod.
Target Execution
INPROCESS / PLANNED
PURCHASE STORE/ POWER FAILURE MAINT PED QA MAN POWER STOPPAGE
FIXT /Mc SETTING
Difference (+/-)
Time
Cum-ulative Actual Pieces / Actual Cum- Hourly Target
Rework Scrap Description of Issue, Actions & Root Cause
Hourly Target
Target Hour ulative LOSS LOSS LOSS LOSS LOSS LOSS LOSS LOSS
INITIAL INITIAL INITIAL INITIAL INITIAL INITIAL INITIAL INITIAL TIME
TIME TIME TIME TIME TIME TIME TIME TIME
3.30
– 300 300
4.30
4.30
273 573
5.30
5.30
– 327 900
6.30
6.30
– 327 1227
7.30
7.30
164 1391
8.30
8.30
– 327 1718
9.30
9.30
– 327 2045
10.30
10.30
– 273 2318
11.30
11.30
– 327 2645
12.30
12.30
137 2782
1.00
TOTAL
2782 2782 TOTAL BREAKDOWN
TOTAL PLANNED OPERATOR BOTTELNECK OPERATION PLANNED NO. OF CHANGEOVER CHANGEOVER TARGET TIME Min.
ACTUAL NO. OF OPERATOR BOTTELNECK CYCLE TIME ACTUAL NO. OF CHANGEOVER ACTUAL CHANGEOVER TIME Min. TOTAL SUM BREAKDOWN MANPOWER DEPLOYMENT
MACHINE NAME PROBLEM REPORTED TO Machine Name OPERATOR Ref No. : - F: PRD: 7507
S. No. MODEL PLANNED TOTAL BUILT QA TEST REJECTION BUILT OK FOR SAP
SPATTER REMOVAL
Total
Production Shift Report Ref No. : - F: PRD: 7509
Issue Date 15/09/08 Revision No. 1 Revision Date 1/3/2013 Manpower deployment columns Added Resp.: Engg. Prod.
Target Execution
POWER INPROCESS / FIXT PLANNED
PURCHASE STORE MAINT PED QA MAN POWER
FAILURE /Mc SETTING STOPPAGE
Difference (+/-)
Time
Cum-ulative Actual Pieces / Actual Cum- Hourly Target
Rework Scrap Description of Issue, Actions & Root Cause
Hourly Target
Target Hour ulative LOSS LOSS LOSS
LOSS TIME INITIAL LOSS TIME INITIAL LOSS TIME LOSS TIME INITIAL INITIAL LOSS TIME INITIAL INITIAL INITIAL TIME
TIME TIME TIME
3.30
– 157 157
4.30
4.30
– 171 329
5.30
5.30
– 143 471
6.30
6.30
– 171 643
7.30
7.30
171 814
8.30
8.30
– 86 900
9.30
9.30
– 171 1071
10.30
10.30
– 143 1214
11.30
11.30
– 171 1386
12.30
12.30
– 71 1457
1.00
TOTAL PLANNED OPERATOR BOTTELNECK OPERATION PLANNED NO. OF CHANGEOVER CHANGEOVER TARGET TIME Min.
ACTUAL NO. OF OPERATOR BOTTELNECK CYCLE TIME ACTUAL NO. OF CHANGEOVER ACTUAL CHANGEOVER TIME Min. TOTAL SUM BREAKDOWN MANPOWER DEPLOYMENT
MACHINE NAME PROBLEM REPORTED TO MANPOWER DEPLOYMENT
S. No. MODEL PLANNED TOTAL BUILT QA TEST REJECTION BUILT OK FOR SAP
MACHINE NAME OPERATOR NAME Ref No. : - F: PRD: 7507
3 601 REWORK
4 701
5 YP8 D LH
6 YP8 D RH
7 YP8 D LH (NB)
8 YP8 D RH(NB)
9 YP8 P LH
10 YP8 P RH
TOTAL
Daily Production Shift Report Ref. No. : - F:PRD:8501E
Std.Issue Date :01/07/2017 Revision No. 0 Revision Date 00/00/00 Manpower Deployment columns added Resp. : TL - Production
BOTTEL NECK CT AND
Cell: DAMPER REAR TEAM LEADER:- DATE:- SHIFT:B PROCESS NAME
CHANGEOVER TARGET
TIME IATF 16949 : 2016
Target Execution
p
ACTUAL
ra
PLANNED OPERATOR
Difference OPERATOR
Sc
NEW PARTS
Time Cum- Actual Actual (+/-) Hourly Description of Issue, Actions & Root Cause LOSS TIME PURCHASE STORE
POWER
MAINT PED
INPROCESS
SETUP & C/O MANPOWER
TRAINING /
Q.A
OTHER
Details
Hourly FAILURE SETTING AUDIT LOSS TIME
ulative Pieces / Cum- Target LOSS TIME
k
Target PROCESS NAME NAME / SAP CODE LEVEL
or
Target Hour ulative
w
Re
2:30 CYLINDER WASHING
4:00
5:00
5:00 GREASING
NUT TIGHTENING
6:00 VERIFICATION
- 150 1425
9:00 GASFILLING
11:00
TOTAL 2250
REJECTIO
S. No. MODEL PLAN BUILT QA TEST
N
REWORK FOR SAP SAP DOC. NO EHS DETAIL CONSUMABLE DETAILS NEW DOVELOPMENT DETAILS
LEVEL 4
9
10
11
KAIZENS DETAILS
12
13
14
TOTAL
DEFECT MATRIX
Dent / Damage miss print issue
Ot
wrong sticker role
Washing
Dent / Damage wrong part number selected
CV Assy.
Spring Damage
Q.A Testing
dent/scrach passon
teflone damage
part mixup
disc mixup
Std.Issue Date :01/07/2017 Revision No. 0 Revision Date 00/00/00 Manpower Deployment columns added Resp. : TL - Production
BOTTEL NECK CT AND
Cell: DAMPER REAR TEAM LEADER:- DATE:- SHIFT:A PROCESS NAME
CHANGEOVER TARGET
TIME IATF 16949 : 2016
Target Execution
p
ACTUAL
ra
PLANNED OPERATOR
Difference OPERATOR
Sc
NEW PARTS
Time Cum- Actual Actual (+/-) Hourly Description of Issue, Actions & Root Cause LOSS TIME PURCHASE STORE
POWER
MAINT PED
INPROCESS
SETUP & C/O MANPOWER
TRAINING /
Q.A
OTHER
Details
Hourly FAILURE SETTING AUDIT LOSS TIME
ulative Pieces / Cum- Target LOSS TIME
k
Target PROCESS NAME NAME / SAP CODE LEVEL
or
Target Hour ulative
w
Re
6:00 CYLINDER WASHING
8:00
9:00
9:00 GREASING
NUT TIGHTENING
10:00 VERIFICATION
- 150 1575
13:00 GASFILLING
14:30
TOTAL 2250
REJECTIO
S. No. MODEL PLAN BUILT QA TEST
N
REWORK FOR SAP SAP DOC. NO EHS DETAIL CONSUMABLE DETAILS NEW DOVELOPMENT DETAILS
LEVEL 4
9
10
11
KAIZENS DETAILS
12
13
14
TOTAL
DEFECT MATRIX
Dent / Damage miss print issue
Ot
wrong sticker role
Washing
Dent / Damage wrong part number selected
CV Assy.
Spring Damage
Q.A Testing
dent/scrach passon
teflone damage
part mixup
disc mixup
Std.Issue Date :01/07/2017 Revision No. 0 Revision Date 00/00/00 Manpower Deployment columns added Resp. : TL - Production
BOTTEL NECK CT AND
Cell:NEW BASE FRONT TEAM LEADER:- DATE:- SHIFT:A PROCESS NAME
CHANGEOVER TARGET
TIME IATF 16949 : 2016
Target Execution PLANNED ACTUAL
p
ra
Difference OPERATOR OPERATOR
Sc
NEW PARTS
Time Cum- Actual Actual (+/-) Hourly Description of Issue, Actions & Root Cause LOSS TIME PURCHASE STORE
POWER
MAINT PED
INPROCESS
SETUP & C/O MANPOWER
TRAINING /
Q.A
OTHER
Details
Hourly FAILURE SETTING AUDIT LOSS TIME
ulative Pieces / Cum- Target LOSS TIME PROCESS
k
Target NAME SAP CODE LEVEL
or
Target Hour ulative NAME
w
Re
6:00 NOTCHINE
7:00 HORIZENTEL 1
7:00 HORZINTEL 2
8:00 APEENA 1
8:00 APEENA 2
9:00 PIERCING
10:00 STABI
10:00 TAG 1
11:00 TAG 3
12:00 OILING
12:00
13:00 LEVEL 1
13:00 LEVEL 2
14:00 LEVEL 4
14:00
QTY.(IN PCS.)
- 150 2834 REWORK
14:30 SCRAP
TOTAL 2834
REJECTIO
S. No. MODEL PLAN BUILT QA TEST
N
REWORK FOR SAP SAP DOC. NO EHS DETAIL CONSUMABLE DETAILS NEW DOVELOPMENT DETAILS
SILICON SPRAY/PCS.
9
WELDING NOZZEL 24 KD/PCS.
RUSTLICK/PCS.
12
WELDING NOZZEL 36KD/PCS.
MANUAL WELDING
without name rolling puncher
half name rolling gas fault
double name rolling sapatter on hole of piercing abd bhb
NAME ROLLING
reverse name rolling {block wrong over weld
fitment or wrong tubr fitt}
date fall down then date and shift print weld miss
miss
dent mark problem stabi cut
low impression
dimension out of spec.
other model tube name rolling pin hole
weld miss
penetration high gas fault
under cut half welding
HORIZONTAL WELDING
pin hole
weld miss
gas fault reverse notching in yl8
half welding
NOTCHING
k.bkt cut
weld shift
low and high penertation
thin beed of weld
spatter on k.bkt
lss fall down loose
leakage
welding out due to run out
flatness not ok
concntricicty out
46 dim out
PIERCING
nugget issue
spark mark on bkt
child part wrong weld
PROJECTION
14:30 NOTCHING
- 150 150 NAME ROLLING
15:00 HORIZONTAL 1
15:00 HORIZONTAL 2
- 360 510 PRESSING
16:00 APEENA 1
16:00 APEENA 2
- 300 810 SIZING
17:00 PIERCING
17:00 SENSOR PROJ
- 360 1170 BHB PROJ
18:00 STABI
18:00 TAG 1
- 300 1470 TAG 2
19:00 TAG 3
19:00 LEAK TESTING
- 360 1830 FINAL INSPECTION
20:00 OILING
20:00
- 180 2010 SKILL ACTION
21:00 LEVEL 1
21:00 LEVEL 2
22:00 LEVEL 4
23:00 SCRAP
TOTAL 2700
REWORK SAP
Sr. No. MODEL PLAN BUILT QA TEST REJECTION FOR SAP
DOC. NO
EHS DETAIL CONSUMABLE DETAILS NEW DEVELOPMENT DETAILS
5 SILICON SPRAY/PCS.
9
6 WELDING NOZZEL 24 KD/PCS.
concntricicty out
46 dim out
total length dim out
PIERCING
burr
flatness not ok
coining not ok
nugget issue
spark mark on bkt
child part wrong weld
gauage not qualify
dimensions not ok
PROJECTION
gap issue
part melt
child part nut miss
Daily Production Shift Report Ref. No. : - F:PRD:8501A
Std.Issue Date :01/07/2017 Formate Revision No. 0 Revision Date 00/00/00 BOTTEL Manpower Deployment columns added Resp. : TL - Production
NECK CT
Cell:NEW BASE FRONT TEAM LEADER:- DATE:- SHIFT C AND CHANGEOVER TARGET TIME IATF 16949 : 2016
PROCESS
Target Execution r ap PLANNED OPERAT ACTUAL OPERATOR
Difference (+/-) Sc NAME PURCHAS POWER INPROCESS
NEW PARTS
MANPOWE TRAINING / OTHER
Time
Hourly Target
Cum-ulative Actual Pieces / Actual Cum-
Hourly Target k
Description of Issue, Actions & Root Cause LOSS TIME
E
STORE
FAILURE
MAINT PED
SETTING
SETUP & C/O
R AUDIT
Q.A
LOSS TIME Details
Target Hour ulative w or LOSS TIME PROCESS NAME SAP CODE LEVEL
Re
23:00 NOTCHINE
0:00 HORIZENTEL 1
0:00 HORZINTEL 2
1:00 APEENA 1
1:00 APEENA 2
2:00 PIERCING
3:00 STABI
3:00 TAG 1
4:00 TAG 3
5:00 OILING
6:00 LEVEL2
LEVEL3
TOTAL 2370
LEVEL 4
SAP
S. No. MODEL PLAN BUILT QA TEST REJECTION REWORK FOR SAP DOC. EHS DETAIL CONSUMABLE DETAILS NEW DOVELOPMENT DETAILS
NO
NEAR
MISS COTTON HAND GLOVES/PAIR MODEL NAME
1
TIR COTTON ARM SLEEVE/PCS. START TIME
TCR COTTON OLD DHOTI/PCS. C/O ISSUE
2
STOP CA SURGICAL HAND GLOVES/PAIR MACHINE SPECIFIC ISSUE
MANUAL WELDING
half name rolling gas fault
NAME ROLLING
k.bkt cut
weld shift
low and high penertation
thin beed of weld
spatter on k.bkt
lss fall down loose
leakage
welding out due to run out
size not maintain
SIZING
dent mark
flatness not ok
concntricicty out
PIERCING
46 dim out
total length dim out
burr
flatness not ok
coining not ok
nugget issue
spark mark on bkt
child part wrong weld
gauage not qualify
PROJECTION
dimensions not ok
gap issue
part melt
child part nut miss
Daily Production Shift Report Ref. No. : - F:PRD:8501B
Std.Issue Date :01/07/2017 Revision No. 0 Revision Date 00/00/00 Manpower Deployment columns added Resp. : TL - Production
Cell :OLD BASE FRONT TEAM LEADER: DATE: SHIFT: BOTTEL NECK CT
PROCESS NAME
AND
CHANGEOVER TARGET TIME IATF 16949 : 2016
Target Execution PLANNED OPERATOR ACTUAL OPERATOR
6:00 NOTCHINE
7:00 HORIZENTEL 1
7:00 HORZINTEL 2
8:00 APEENA 1
8:00 APEENA 2
9:00 PIERCING
10:00 STABI
10:00 TAG 1
11:00 TAG 3
12:00 OILING
12:00
ROBOTIC
WELDING
- 300 1875
13:00
13:00
- 250 2125
14:00 SKILL
ACTION
14:00 LEVEL 1
14:30 LEVEL 3
REWORK
S. No. MODEL PLAN BUILT QA TEST REJECTION FOR SAP SAP DOC. NO EHS DETAIL CONSUMABLE DETAILS NEW DOVELOPMENT DETAILS
concntricicty out
46 dim out
PIERCING
total length dim out
burr
flatness not ok
coining not ok
nugget issue
spark mark on bkt
child part wrong weld
gauage not qualify
dimensions not ok
PROJECTION
gap issue
part melt
child part nut miss
Bottleneck CT & Process Changeover
Cell : NEW BASE FRONT TEAM LEADER:- DATE:- SHIFT B
Name Target Time
Target Execution PLANNED OPERATOR ACTUAL OPERATOR
OTHER
Difference (+/-)
Time Hourly Cumulative Actual Pieces / Actual Cum- Hourly Target Description of Issue, Actions & Root Cause Total Loss
Time
PUR STR
POWER
CUT
MAINT PED
SETTING
& ADJ.
NPD C/O
MANPOW TRAINING
ER / AUDIT
Q.A LOSS
TIME
Target Target Hour ulative PROCESS NAME SAP CODE LEVEL
14:30 NOTCHING
- 125 125 NAME ROLLING
15:00 HORIZONTAL 1
15:00 HORIZONTAL 2
- 300 425 PRESSING
16:00 APEENA 1
16:00 APEENA 2
- 250 675 SIZING
17:00 PIERCING
17:00 SENSOR PROJ
- 300 975 BHB PROJ
18:00 STABI
18:00 TAG 1
- 300 1275 TAG 2
19:00 TAG 3
19:00 LEAK TESTING
- 300 1575 FINAL INSPECTION
20:00 OILING
20:00 ROBOTIC WELDING
- 150 1725
21:00
21:00
- 300 2025
22:00 SKILL ACTION
22:00 LEVEL 1
- 225 2250 LEVEL 2
23:00 LEVEL 3
REWORK SAP
Sr. No. MODEL PLAN BUILT QA TEST REJECTION FOR SAP
DOC. NO
EHS DETAIL CONSUMABLE DETAILS NEW DEVELOPMENT DETAILS
5 SILICON SPRAY/PCS.
9
6 WELDING NOZZEL 24 KD/PCS.
concntricicty out
46 dim out
total length dim out
PIERCING
burr
flatness not ok
coining not ok
nugget issue
spark mark on bkt
child part wrong weld
gauage not qualify
dimensions not ok
PROJECTION
gap issue
part melt
child part nut miss
Daily Production Shift Report Ref. No. : - F:PRD:8501C
Std.Issue Date :01/07/2017 Revision No. 0 Revision Date 00/00/00 Manpower Deployment columns added Resp. : TL - Production
rap
NEW ACTUAL
INPRO OPERATOR OPERATOR
Sc
Difference POWER PARTS TRAINI OTHER
LOSS PURCH CESS MANPO
Time Cum- Actual Actual (+/-) Hourly Description of Issue, Actions & Root Cause STORE FAILUR MAINT PED SETUP C/O NG / Q.A LOSS Details
Hourly TIME ASE SETTIN WER
k
ulative Pieces / Cum- Target E & LOSS AUDIT TIME
or
Target G
w
Target Hour ulative TIME PROCESS NAME SAP CODE LEVEL
Re
6:00 FLARING
8:00 SWAGING
9:00 N/R-2
9:00 FLARING-2
10:00 OILING
10:00
- 427 2028
11:00
11:00
- 214 2242
12:00
12:00
- 427 2669
13:00
13:00
- 356 3025
14:00 SKILL ACTION
14:00 LEVEL 1
14:30 LEVEL 3
MACHINE SPECIFIC
4 STOP CALL WA SURGICAL HAND GLOVES/PAIR
ISSUE
CYCLE TIME
8 PAINT MARKER/PCS.
INCREASE ISSUE
LEATHER PAD/PAIR
Machine name
LATHER ARM SLEEVE/PAIR.
offset
puncher
weld miss
gas fault
under cut
loop cit
Loop welding pin hole
over weld
welding up and down
loop position shift
wrong loop weld
spatter
nugget fail
tube bend
tube dent
swaging dia over size
swaging id over size and under
Swaging size
swaging langhth dim. Not ok
runout
length short
Tube Crack
Daily Production Shift Report Ref. No. : - F:PRD:8501C
Std.Issue Date :01/07/2017 Revision No. 0 Revision Date 00/00/00 Manpower Deployment columns added Resp. : TL - Production
p
OPERAT
ra
Difference INPROCE PARTS TRAININ OTHER OPERATOR
Sc
LOSS PURCHA POWER MANPO OR
Time Actual
Hourly Cum-ulative Actual Cum- (+/-) Hourly Description of Issue, Actions & Root Cause
TIME SE
STORE
FAILURE
MAINT PED SS SETUP & C/O
WER
G/ Q.A LOSS Details
k
Pieces / Target SETTING LOSS AUDIT TIME
or
Target Target ulative
w
Hour TIME PROCESS NAME NAME / SAP CODE LEVEL
Re
14:30 FLARING
16:00 SWAGING
17:00 N/R-2
17:00 FLARING-2
18:00 OILING
18:00
- 400 1701
19:00
19:00
- 400 2101
20:00
20:00
- 200 2301
21:00
21:00
- 333 2634
22:00 SKILL
ACTION
22:00 LEVEL 1
23:00 LEVEL 3
SILICON SPRAY/PCS.
9
WELDING NOZZEL 24 KD/PCS.
LATHER SHOE GUARD/PAIR.
10
WELDING HELMET FRONT GLASS
RUSTLICK/PCS.
12
WELDING NOZZEL 36KD/PCS.
GAS NOZZEL 36KD CONOAL SPLIT PUSH FIT
13
WELDING CURTAIN/PCS.
WELDING FACE SHIELD INNER GLASS/PCS.
14
WELDING TORCH 24KD/PCS. (45⁰BEND)
LINNER 42.04001047 1.2LEN STEELINSD
TOTAL
CONTACT TIP 1.2*M₆ 42.0001.4464
DEFECT MATRIX
Machine name
offset
puncher
weld miss
gas fault
under cut
loop cit
Loop welding pin hole
over weld
welding up and down
loop position shift
wrong loop weld
spatter
nugget fail
tube bend
tube dent
swaging dia over size
swaging id over size and under size
Swaging
swaging langhth dim. Not ok
runout
length short
Tube Crack
Daily Production Shift Report Ref. No. : - F:PRD:24A
Std.Issue Date :01/11/2019 Revision No. 0 Revision Date 00/00/00 Manpower Deployment columns added Resp. : Production
p
ACTUAL
ra
PLANNED OPERATOR
Sc
Difference NEW PARTS OPERATOR
POWER INPROCES MANPOWE TRAINING / OTHER
Actual Description of Issue, Actions & Root Cause LOSS TIME PURCHASE STORE MAINT PED C/O Q.A Details
k
Time (+/-) Hourly SETUP &
or
Hourly Cum-ulative Actual Cum- FAILURE S SETTING R AUDIT LOSS TIME
w
Pieces / Target LOSS TIME
Re
Target Target ulative PROCESS NAME NAME / SAP CODE LEVEL
Hour
8:30 FLARING
- NAME ROLLING
- LEAK TESTING
10:30 SWAGING
- LSS WELDING
11:30 N/R-2
11:30 FLARING-2
- LEAK TESTING -2
12:30 OILING
13:00
-
14:00
14:00
-
15:00
15:00
16:00
16:00
17:00
17:00
18:00
18:00
19:00
19:00
SKILL ACTION
20:30 LEVEL 1
LEVEL 2
TOTAL 0 0 LEVEL 3
LEVEL 4
REJECTIO REWORK SAP DOC.
S. No. MODEL PLAN BUILT QA TEST
N
FOR SAP
NO
EHS DETAIL CONSUMABLE DETAILS NEW DOVELOPMENT DETAILS
NEAR MISS COTTON HAND GLOVES/PAIR MODEL NAME
1 TIR COTTON ARM SLEEVE/PCS. START TIME
TCR COTTON OLD DHOTI/PCS. C/O ISSUE
2 MACHINE SPECIFIC
STOP CALL WA SURGICAL HAND GLOVES/PAIR
ISSUE
BBS OBSERVATION DETAIL EAR PLUG/PAIR Q.A APPROVAL LATE
3
NAME NO.OF OBS. TIME TAKEN TIP 24KD/PCS. TOLLING ISSUE
TIP 36 KD/PCS. GAUGES ISSUE
4 CYCLE TIME INCREASE
PAINT MARKER/PCS.
ISSUE
GAS DEFUSER 36KD/PCS. SAFETY ISSUE
5
LATHER APRAN/PCS. OTHER ANY ISSUE
GAS DEFUSER 24KD/PCS. END TIME
6
4M CHANGE DETAILS TIP HOLDER 24KD (M₆ₓ₁)
SILICON SPRAY/PCS.
9
WELDING NOZZEL 24 KD/PCS.
RUSTLICK/PCS.
12
WELDING NOZZEL 36KD/PCS.
GAS NOZZEL 36KD CONOAL SPLIT PUSH FIT
13
WELDING CURTAIN/PCS.
WELDING FACE SHIELD INNER GLASS/PCS.
14
WELDING TORCH 24KD/PCS. (45⁰BEND)
LINNER 42.04001047 1.2LEN STEELINSD
TOTAL
CONTACT TIP 1.2*M₆ 42.0001.4464
DEFECT MATRIX
Machine name
offset
puncher
weld miss
gas fault
under cut
loop cit
Loop welding pin hole
over weld
welding up and down
loop position shift
wrong loop weld
spatter
nugget fail
tube bend
tube dent
swaging dia over size
swaging id over size and under
Swaging size
swaging langhth dim. Not ok
runout
length short
Tube Crack
Daily Production Shift Report Ref. No. : - F:PRD:8501D
Std.Issue Date :01/07/2017 Revision No. 0 Revision Date 00/00/00 Manpower Deployment columns added Resp. : TL - Production
BOTTEL NECK CT AND
Cell: DAMPER FRONT TEAM LEADER:- DATE:- SHIFT:A PROCESS NAME
CHANGEOVER TARGET
TIME IATF 16949 : 2016
Target Execution
p
ACTUAL
ra
PLANNED OPERATOR
Difference OPERATOR
Sc
NEW PARTS
Time Cum- Actual Actual (+/-) Hourly Description of Issue, Actions & Root Cause LOSS TIME PURCHASE STORE
POWER
MAINT PED
INPROCESS
SETUP & C/O MANPOWER
TRAINING /
Q.A
OTHER
Details
Hourly FAILURE SETTING AUDIT LOSS TIME
ulative Pieces / Cum- Target LOSS TIME
k
Target PROCESS NAME NAME / SAP CODE LEVEL
or
Target Hour ulative
w
Re
6:00 CYLINDER WASHING
8:00
9:00
9:00 GREASING
NUT TIGHTENING
10:00 VERIFICATION
- 191 2008
13:00 GASFILLING
14:30
TOTAL 2869
REJECTIO
S. No. MODEL PLAN BUILT QA TEST
N
REWORK FOR SAP SAP DOC. NO EHS DETAIL CONSUMABLE DETAILS NEW DOVELOPMENT DETAILS
LEVEL 4
9
10
11
KAIZENS DETAILS
12
13
14
TOTAL
DEFECT MATRIX
Dent / Damage miss print issue
Ot
wrong sticker role
Washing
Dent / Damage wrong part number selected
CV Assy.
Spring Damage
Q.A Testing
dent/scrach passon
teflone damage
part mixup
disc mixup
Std.Issue Date :01/07/2017 Revision No. 0 Revision Date 00/00/00 Manpower Deployment columns added Resp. : TL - Production
BOTTEL NECK CT AND
Cell: DAMPER FRONT TEAM LEADER:- DATE:- SHIFT:B PROCESS NAME
CHANGEOVER TARGET
TIME IATF 16949 : 2016
Target Execution
p
ACTUAL
ra
PLANNED OPERATOR
Difference OPERATOR
Sc
NEW PARTS
Time Actual Actual (+/-) Hourly Description of Issue, Actions & Root Cause LOSS TIME PURCHASE STORE
POWER
MAINT PED
INPROCESS
SETUP & C/O MANPOWER
TRAINING /
Q.A
OTHER
Details
Hourly Cum-ulative FAILURE SETTING AUDIT LOSS TIME
Pieces / Cum- Target LOSS TIME
k
Target Target PROCESS NAME NAME / SAP CODE LEVEL
or
Hour ulative
w
Re
2:30 CYLINDER WASHING
4:00
5:00
5:00 GREASING
NUT TIGHTENING
6:00 VERIFICATION
- 319 1944
9:00 GASFILLING
11:00
TOTAL 2869
REJECTIO
S. No. MODEL PLAN BUILT QA TEST
N
REWORK FOR SAP SAP DOC. NO EHS DETAIL CONSUMABLE DETAILS NEW DOVELOPMENT DETAILS
LEVEL 4
9
10
11
KAIZENS DETAILS
12
13
14
TOTAL
DEFECT MATRIX
Dent / Damage miss print issue
Ot
wrong sticker role
Washing
Dent / Damage wrong part number selected
Pressure Rust due component Fallen inside Sticker reverse/ wrinkle on sticker
Tube
damage sticker
Washing
Dent / Damage scaning problem
CV Assy.
Spring Damage
Q.A Testing
dent/scrach passon
teflone damage
part mixup
disc mixup
Std.Issue Date :01/07/2017 Revision No. 0 Revision Date 00/00/00 Manpower Deployment columns added Resp. : TL - Production
BOTTEL NECK CT AND
Cell: DAMPER FRONT TEAM LEADER:- DATE:- SHIFT:C PROCESS NAME
CHANGEOVER TARGET
TIME IATF 16949 : 2016
Target Execution
p
ACTUAL
ra
PLANNED OPERATOR
Difference OPERATOR
Sc
NEW PARTS
Time Cum- Actual Actual (+/-) Hourly Description of Issue, Actions & Root Cause LOSS TIME PURCHASE STORE
POWER
MAINT PED
INPROCESS
SETUP & C/O MANPOWER
TRAINING /
Q.A
OTHER
Details
Hourly FAILURE SETTING AUDIT LOSS TIME
ulative Pieces / Cum- Target LOSS TIME
k
Target PROCESS NAME NAME / SAP CODE LEVEL
or
Target Hour ulative
w
Re
11:00 CYLINDER WASHING
1:00
2:00
2:00 GREASING
NUT TIGHTENING
3:00 VERIFICATION
- 319 2136
GASFILLING
P.ROD PLAY
NOISE TESTING
TOTAL 2486 REWORK/TROLLEY
MOVEMENT
MARKING
REJECTIO
S. No. MODEL PLAN BUILT QA TEST
N
REWORK FOR SAP SAP DOC. NO EHS DETAIL CONSUMABLE DETAILS
NEW DOVELOPMENT DETAILS
10
11
KAIZENS DETAILS
12
13
14
TOTAL
DEFECT MATRIX
Dent / Damage miss print issue
Ot
wrong sticker role
Washing
Dent / Damage wrong part number selected
CV Assy.
Spring Damage
Q.A Testing
dent/scrach passon
teflone damage
part mixup
disc mixup
Std.Issue Date :01/07/2017 Revision No. 0 Revision Date 00/00/00 Manpower Deployment columns added Resp. : TL - Production
BOTTEL NECK CT AND
Cell: DAMPER REAR TEAM LEADER:- DATE:- SHIFT:A PROCESS NAME
CHANGEOVER TARGET
TIME IATF 16949 : 2016
Target Execution
p
ACTUAL
ra
PLANNED OPERATOR
Difference OPERATOR
Sc
NEW PARTS
Time Cum- Actual Actual (+/-) Hourly Description of Issue, Actions & Root Cause LOSS TIME PURCHASE STORE
POWER
MAINT PED
INPROCESS
SETUP & C/O MANPOWER
TRAINING /
Q.A
OTHER
Details
Hourly FAILURE SETTING AUDIT LOSS TIME
ulative Pieces / Cum- Target LOSS TIME
k
Target PROCESS NAME NAME / SAP CODE LEVEL
or
Target Hour ulative
w
Re
6:00 CYLINDER WASHING
8:00
9:00
9:00 GREASING
NUT TIGHTENING
10:00 VERIFICATION
- 240 2520
13:00 GASFILLING
14:30
TOTAL 3600
REJECTIO
S. No. MODEL PLAN BUILT QA TEST
N
REWORK FOR SAP SAP DOC. NO EHS DETAIL CONSUMABLE DETAILS NEW DOVELOPMENT DETAILS
LEVEL 4
9
10
11
KAIZENS DETAILS
12
13
14
TOTAL
DEFECT MATRIX
Dent / Damage miss print issue
Ot
wrong sticker role
Washing
Dent / Damage wrong part number selected
CV Assy.
Spring Damage
Q.A Testing
dent/scrach passon
teflone damage
part mixup
disc mixup
Std.Issue Date :01/07/2017 Revision No. 0 Revision Date 00/00/00 Manpower Deployment columns added Resp. : TL - Production
BOTTEL NECK CT AND
Cell: DAMPER REAR TEAM LEADER:- DATE:- SHIFT:C PROCESS NAME
CHANGEOVER TARGET
TIME IATF 16949 : 2016
Target Execution
p
ACTUAL
ra
PLANNED OPERATOR
Difference OPERATOR
Sc
NEW PARTS
Time Cum- Actual Actual (+/-) Hourly Description of Issue, Actions & Root Cause LOSS TIME PURCHASE STORE
POWER
MAINT PED
INPROCESS
SETUP & C/O MANPOWER
TRAINING /
Q.A
OTHER
Details
Hourly FAILURE SETTING AUDIT LOSS TIME
ulative Pieces / Cum- Target LOSS TIME
k
Target PROCESS NAME NAME / SAP CODE LEVEL
or
Target Hour ulative
w
Re
11:00 CYLINDER WASHING
1:00
2:00
2:00 GREASING
NUT TIGHTENING
3:00 VERIFICATION
- 240 2520
GASFILLING
P.ROD PLAY
NOISE TESTING
TOTAL 2960 REWORK/TROLLEY
MOVEMENT
MARKING
REJECTIO
S. No. MODEL PLAN BUILT QA TEST
N
REWORK FOR SAP SAP DOC. NO EHS DETAIL CONSUMABLE DETAILS
NEW DOVELOPMENT DETAILS
10
11
KAIZENS DETAILS
12
13
14
TOTAL
DEFECT MATRIX
Dent / Damage miss print issue
Ot
wrong sticker role
Washing
Dent / Damage wrong part number selected
CV Assy.
Spring Damage
Q.A Testing
dent/scrach passon
teflone damage
part mixup
disc mixup
Std.Issue Date :01/07/2017 Revision No. 0 Revision Date 00/00/00 Manpower Deployment columns added Resp. : TL - Production
BOTTEL NECK CT AND
Cell: DAMPER REAR TEAM LEADER:- DATE:- SHIFT:B PROCESS NAME
CHANGEOVER TARGET
TIME IATF 16949 : 2016
Target Execution
p
ACTUAL
ra
PLANNED OPERATOR
Difference OPERATOR
Sc
NEW PARTS
Time Cum- Actual Actual (+/-) Hourly Description of Issue, Actions & Root Cause LOSS TIME PURCHASE STORE
POWER
MAINT PED
INPROCESS
SETUP & C/O MANPOWER
TRAINING /
Q.A
OTHER
Details
Hourly FAILURE SETTING AUDIT LOSS TIME
ulative Pieces / Cum- Target LOSS TIME
k
Target PROCESS NAME NAME / SAP CODE LEVEL
or
Target Hour ulative
w
Re
2:30 CYLINDER WASHING
4:00
5:00
5:00 GREASING
NUT TIGHTENING
6:00 VERIFICATION
- 240 2280
9:00 GASFILLING
11:00
TOTAL 3600
REJECTIO
S. No. MODEL PLAN BUILT QA TEST
N
REWORK FOR SAP SAP DOC. NO EHS DETAIL CONSUMABLE DETAILS NEW DOVELOPMENT DETAILS
LEVEL 4
9
10
11
KAIZENS DETAILS
12
13
14
TOTAL
DEFECT MATRIX
Dent / Damage miss print issue
Ot
wrong sticker role
Washing
Dent / Damage wrong part number selected
CV Assy.
Spring Damage
Q.A Testing
dent/scrach passon
teflone damage
part mixup
disc mixup
Std.Issue Date :01/07/2017 Revision No. 0 Revision Date 00/00/00 Manpower Deployment columns added Resp. : TL - Production
BOTTEL NECK CT AND
Cell: MODULAR REAR TEAM LEADER:- DATE:- SHIFT:A PROCESS NAME
CHANGEOVER TARGET
TIME IATF 16949 : 2016
Target Execution
p
ACTUAL
ra
PLANNED OPERATOR
Difference OPERATOR
Sc
NEW PARTS
Time Cum- Actual Actual (+/-) Hourly Description of Issue, Actions & Root Cause LOSS TIME PURCHASE STORE
POWER
MAINT PED
INPROCESS
SETUP & C/O MANPOWER
TRAINING /
Q.A
OTHER
Details
Hourly FAILURE SETTING AUDIT LOSS TIME
ulative Pieces / Cum- Target LOSS TIME
k
Target PROCESS NAME NAME / SAP CODE LEVEL
or
Target Hour ulative
w
Re
6:00 BUSH FIXING
7:00
- 480 920
8:00
8:00
- 400 1320
9:00
9:00
- 480 1800
10:00
10:00
- 480 2280
11:00
11:00
- 480 2760
12:00
12:00
- 240 3000
13:00
13:00
- 480 3480
14:00
14:00
- 400 3880
14:30
TOTAL 3880
REJECTIO
S. No. MODEL PLAN BUILT QA TEST
N
REWORK FOR SAP SAP DOC. NO EHS DETAIL CONSUMABLE DETAILS NEW DOVELOPMENT DETAILS
LEVEL 4
9
10
11
KAIZENS DETAILS
12
13
14
TOTAL
DEFECT MATRIX
Bush Out
caulking loose
Polygon Damage
Std.Issue Date :01/07/2017 Revision No. 0 Revision Date 00/00/00 Manpower Deployment columns added Resp. : TL - Production
BOTTEL NECK CT AND
Cell: MODULAR REAR TEAM LEADER:- DATE:- SHIFT:B PROCESS NAME
CHANGEOVER TARGET
TIME IATF 16949 : 2016
Target Execution
p
ACTUAL
ra
PLANNED OPERATOR
Difference OPERATOR
Sc
NEW PARTS
Time Cum- Actual Actual (+/-) Hourly Description of Issue, Actions & Root Cause LOSS TIME PURCHASE STORE
POWER
MAINT PED
INPROCESS
SETUP & C/O MANPOWER
TRAINING /
Q.A
OTHER
Details
Hourly FAILURE SETTING AUDIT LOSS TIME
ulative Pieces / Cum- Target LOSS TIME
k
Target PROCESS NAME NAME / SAP CODE LEVEL
or
Target Hour ulative
w
Re
2:30 BUSH FIXING
3:00
- 480 680
4:00
4:00
- 400 1080
5:00
5:00
- 480 1560
6:00
6:00
- 480 2040
7:00
7:00
- 480 2520
8:00
8:00
- 480 3000
9:00
9:00
- 240 3240
10:00
10:00
- 400 3640
11:00
TOTAL 3640
REJECTIO
S. No. MODEL PLAN BUILT QA TEST
N
REWORK FOR SAP SAP DOC. NO EHS DETAIL CONSUMABLE DETAILS NEW DOVELOPMENT DETAILS
10
11
KAIZENS DETAILS
12
12
13
14
TOTAL
Daily Production Shift Report Ref. No. : - F:PRD:8501G
Std.Issue Date :01/07/2017 Revision No. 0 Revision Date 00/00/00 Manpower Deployment columns added Resp. : TL - Production
BOTTEL NECK CT AND
Cell: MODULAR REAR TEAM LEADER:- DATE:- SHIFT:C PROCESS NAME
CHANGEOVER TARGET
TIME IATF 16949 : 2016
Target Execution
p
ACTUAL
ra
PLANNED OPERATOR
Difference OPERATOR
Sc
NEW PARTS
Time Cum- Actual Actual (+/-) Hourly Description of Issue, Actions & Root Cause LOSS TIME PURCHASE STORE
POWER
MAINT PED
INPROCESS
SETUP & C/O MANPOWER
TRAINING /
Q.A
OTHER
Details
Hourly FAILURE SETTING AUDIT LOSS TIME
ulative Pieces / Cum- Target LOSS TIME
k
Target PROCESS NAME NAME / SAP CODE LEVEL
or
Target Hour ulative
w
Re
11:00 BUSH FIXING
12:00
- 480 920
1:00
1:00
- 400 1320
2:00
2:00
- 480 1800
3:00
3:00
- 480 2280
4:00
4:00
- 400 2680
5:00
5:00
- 440 3120
6:00
TOTAL 3120
p
REJECTIO
S. No. MODEL PLAN BUILT QA TEST
N
REWORK FOR SAP SAP DOC. NO EHS DETAIL CONSUMABLE DETAILS
NEW DOVELOPMENT DETAILS
10
11
KAIZENS DETAILS
12
13
14
TOTAL
DEFECT MATRIX
Bush Out
caulking loose
Polygon Damage
Std.Issue Date :01/07/2017 Revision No. 0 Revision Date 00/00/00 Manpower Deployment columns added Resp. : TL - Production
BOTTEL NECK CT AND
Cell: MODULAR FRONT TEAM LEADER:- DATE:- SHIFT:A PROCESS NAME
CHANGEOVER TARGET
TIME IATF 16949 : 2016
Target Execution
p
ACTUAL
ra
PLANNED OPERATOR
Difference OPERATOR
Sc
NEW PARTS
Time Cum- Actual Actual (+/-) Hourly Description of Issue, Actions & Root Cause LOSS TIME PURCHASE STORE
POWER
MAINT PED
INPROCESS
SETUP & C/O MANPOWER
TRAINING /
Q.A
OTHER
Details
Hourly FAILURE SETTING AUDIT LOSS TIME
ulative Pieces / Cum- Target LOSS TIME
k
Target PROCESS NAME NAME / SAP CODE LEVEL
or
Target Hour ulative
w
Re
6:00
MODULAR ASSY.
- 118 118
7:00 REWORK
8:00 TORQUING
8:00 GAUGING
- 107 354
9:00
9:00
- 129 482
10:00
10:00
- 129 611
11:00
11:00
- 64 675
12:00
12:00
- 129 804
13:00
13:00
- 107 911
14:00
14:00
- 54 964
14:30
TOTAL 964
REJECTIO
S. No. MODEL PLAN BUILT QA TEST
N
REWORK FOR SAP SAP DOC. NO EHS DETAIL CONSUMABLE DETAILS NEW DOVELOPMENT DETAILS
6 NAME NO.OF OBS. TIME TAKEN LINT FREE GLOVES TOLLING ISSUE
12 4M CHANGE DETAILS
SKILL LEVEL MATRIX
13 SKILL ACTION
14 LEVEL 1
15 LEVEL 2
LEVEL 3
LEVEL 4
KAIZENS DETAILS
TOTAL
DEFECT MATRIX
NUT DAMAGE
PAINT FAULT
STICKER REWORK
THREAD DAMAGE
WASHAR/NUT MIXUP
BEARING DAMAGE
SPRING MIXUP
DAMPER MIXUP
OVER WELDING
WELDING MISS
Std.Issue Date :01/07/2017 Revision No. 0 Revision Date 00/00/00 Manpower Deployment columns added Resp. : TL - Production
BOTTEL NECK CT AND
Cell: MODULAR FRONT TEAM LEADER:- DATE:- SHIFT:B PROCESS NAME
CHANGEOVER TARGET
TIME IATF 16949 : 2016
Target Execution
p
ACTUAL
ra
PLANNED OPERATOR
Difference OPERATOR
Sc
NEW PARTS
Time Cum- Actual Actual (+/-) Hourly Description of Issue, Actions & Root Cause LOSS TIME PURCHASE STORE
POWER
MAINT PED
INPROCESS
SETUP & C/O MANPOWER
TRAINING /
Q.A
OTHER
Details
Hourly FAILURE SETTING AUDIT LOSS TIME
ulative Pieces / Cum- Target LOSS TIME
k
Target PROCESS NAME NAME / SAP CODE LEVEL
or
Target Hour ulative
w
Re
2:30
MODULAR ASSY.
- 54 54
3:00 REWORK
4:00 TORQUING
4:00 GAUGING
- 107 289
5:00
5:00
- 129 418
6:00
6:00
- 129 546
7:00
7:00
- 64 611
8:00
8:00
- 129 739
9:00
9:00
- 107 846
10:00
10:00
- 118 964
11:00
TOTAL 964
REJECTIO
S. No. MODEL PLAN BUILT QA TEST
N
REWORK FOR SAP SAP DOC. NO EHS DETAIL CONSUMABLE DETAILS NEW DOVELOPMENT DETAILS
6 NAME NO.OF OBS. TIME TAKEN LINT FREE GLOVES TOLLING ISSUE
12 4M CHANGE DETAILS
SKILL LEVEL MATRIX
13 SKILL
ACTION
14 LEVEL 1
15 LEVEL 2
TOTAL LEVEL 3
LEVEL 4
KAIZENS DETAILS
DEFECT MATRIX
NUT DAMAGE
PAINT FAULT
STICKER REWORK
THREAD DAMAGE
TOP MOUNT
DAMAGE
WASHAR/NUT MIXUP
WASHAR/NUT MIXUP
WASHAR/NUT MIXUP
BEARING DAMAGE
BEARING DAMAGE
BEARING DAMAGE
Std.Issue Date :01/07/2017 Revision No. 0 Revision Date 00/00/00 Manpower Deployment columns added Resp. : TL - Production
BOTTEL NECK CT AND
Cell: MODULAR FRONT TEAM LEADER:- DATE:- SHIFT:C PROCESS NAME
CHANGEOVER TARGET
TIME IATF 16949 : 2016
Target Execution
p
ACTUAL
ra
PLANNED OPERATOR
Difference OPERATOR
Sc
NEW PARTS
Time Cum- Actual Actual (+/-) Hourly Description of Issue, Actions & Root Cause LOSS TIME PURCHASE STORE
POWER
MAINT PED
INPROCESS
SETUP & C/O MANPOWER
TRAINING /
Q.A
OTHER
Details
Hourly FAILURE SETTING AUDIT LOSS TIME
ulative Pieces / Cum- Target LOSS TIME
k
Target PROCESS NAME NAME / SAP CODE LEVEL
or
Target Hour ulative
w
Re
11:00
MODULAR ASSY.
- 118 118
12:00 REWORK
1:00 TORQUING
1:00 GAUGING
- 107 354
2:00
2:00
- 129 482
3:00
3:00
- 129 611
4:00
4:00
- 107 718
5:00
5:00
- 118 836
6:00
TOTAL 836
REJECTIO
S. No. MODEL PLAN BUILT QA TEST
N
REWORK FOR SAP SAP DOC. NO EHS DETAIL CONSUMABLE DETAILS
NEW DOVELOPMENT DETAILS
9 SAFETY ISSUE
11 END TIME
12 4M CHANGE DETAILS
SKILL LEVEL MATRIX
13 SKILL ACTION
14 LEVEL 1
15 LEVEL 2
LEVEL 3
LEVEL 4
KAIZENS DETAILS
TOTAL
DEFECT MATRIX
NUT DAMAGE
PAINT FAULT
STICKER REWORK
THREAD DAMAGE
WASHAR/NUT MIXUP
BEARING DAMAGE
SPRING MIXUP
DAMPER MIXUP
OVER WELDING
WELDING MISS
Std.Issue Date :01/07/2017 Revision No. 0 Revision Date 00/00/00 Manpower Deployment columns added Resp. : TL - Production
BOTTEL NECK CT AND
Cell: DAMPER ARMSTRONG TEAM LEADER:- DATE:- SHIFT:B PROCESS NAME
CHANGEOVER TARGET
TIME IATF 16949 : 2016
Target Execution
p
ACTUAL
ra
PLANNED OPERATOR
Difference OPERATOR
Sc
NEW PARTS
Time Cum- Actual Actual (+/-) Hourly Description of Issue, Actions & Root Cause LOSS TIME PURCHASE STORE
POWER
MAINT PED
INPROCESS
SETUP & C/O MANPOWER
TRAINING /
Q.A
OTHER
Details
Hourly FAILURE SETTING AUDIT LOSS TIME
ulative Pieces / Cum- Target LOSS TIME
k
Target PROCESS NAME NAME / SAP CODE LEVEL
or
Target Hour ulative
w
Re
2:30 COMPONENT WASHING
3:00
ROD WASHING
3:00
4:00
PISTON VALVING
4:00
- 375 975
COMPRESSION
VALVING+COINNING
5:00
6:00 CV FIXING
7:00 DF TESTING
7:00 SEALING
REJECTIO
S. No. MODEL PLAN BUILT QA TEST
N
REWORK FOR SAP SAP DOC. NO EHS DETAIL CONSUMABLE DETAILS NEW DOVELOPMENT DETAILS
6 NAME NO.OF OBS. TIME TAKEN LINT FREE GLOVES TOLLING ISSUE
SKILL ACTION
LEVEL 1
LEVEL 2
LEVEL 3
LEVEL 4
Daily Production Shift Report Ref. No. : - F:PRD:8501E
Std.Issue Date :01/07/2017 Revision No. 0 Revision Date 00/00/00 Manpower Deployment columns added Resp. : TL - Production
BOTTEL NECK CT AND
Cell: DAMPER ARMSTRONG TEAM LEADER:- DATE:- SHIFT:A PROCESS NAME
CHANGEOVER TARGET
TIME IATF 16949 : 2016
Target Execution
p
ACTUAL
ra
PLANNED OPERATOR
Difference OPERATOR
Sc
NEW PARTS
Time Cum- Actual Actual (+/-) Hourly Description of Issue, Actions & Root Cause LOSS TIME PURCHASE STORE
POWER
MAINT PED
INPROCESS
SETUP & C/O MANPOWER
TRAINING /
Q.A
OTHER
Details
Hourly FAILURE SETTING AUDIT LOSS TIME
ulative Pieces / Cum- Target LOSS TIME
k
Target PROCESS NAME NAME / SAP CODE LEVEL
or
Target Hour ulative
w
Re
6:00 COMPONENT WASHING
7:00
ROD WASHING
7:00
8:00
PISTON VALVING
8:00
- 375 1238
COMPRESSION
VALVING+COINNING
9:00
10:00 CV FIXING
11:00 DF TESTING
11:00 SEALING
REJECTIO
S. No. MODEL PLAN BUILT QA TEST
N
REWORK FOR SAP SAP DOC. NO EHS DETAIL CONSUMABLE DETAILS NEW DOVELOPMENT DETAILS
6 NAME NO.OF OBS. TIME TAKEN LINT FREE GLOVES TOLLING ISSUE
INTRIM
SKILL ACTION
LEVEL 1
LEVEL 2
LEVEL 3
LEVEL 4
Daily Production Shift Report Ref. No. : - F:PRD:8501C
Std.Issue Date :01/07/2017 Revision No. 0 Revision Date 00/00/00 Manpower Deployment columns added Resp. : TL - Production
p
NEW PLANNED ACTUAL
ra
INPRO OPERATOR OPERATOR
Sc
Difference POWER PARTS TRAINI OTHER
LOSS PURCH CESS MANPO
Time Cum- Actual Actual (+/-) Hourly Description of Issue, Actions & Root Cause STORE FAILUR MAINT PED SETUP C/O NG / Q.A LOSS Details
Hourly TIME ASE SETTIN WER
k
ulative Pieces / Cum- Target E & LOSS AUDIT TIME
or
Target G
w
Target Hour ulative TIME PROCESS NAME SAP CODE LEVEL
Re
6:00 FLARING
8:00 P R MIG
8:00 P R LINER
P ROD CRIMPING
- 375 1238 AND PROJECTION
9:00
9:00
- 450 1688
10:00
10:00
- 450 2138
11:00
11:00
- 450 2588
12:00
12:00
- 225 2813
13:00
13:00
- 375 3188
14:00 SKILL ACTION
14:00 LEVEL 1
14:30 LEVEL 3
p RUSTLICK/PCS.
Daily Production Shift Report Ref. No. : - F:PRD:8501C
Std.Issue Date :01/07/2017 Revision No. 0 Revision Date 00/00/00 Manpower Deployment columns added Resp. : TL - Production
ap
PLANNED OPERATOR OPERAT
r
Difference INPROCE PARTS TRAININ OTHER
Sc
LOSS PURCHA POWER MANPO OR
Time Actual
Hourly Cum-ulative Actual Cum- (+/-) Hourly Description of Issue, Actions & Root Cause
TIME SE
STORE
FAILURE
MAINT PED SS SETUP & C/O
WER
G/ Q.A LOSS Details
k
Pieces / Target SETTING LOSS AUDIT TIME
or
Target Target ulative
ew
Hour TIME PROCESS NAME NAME / SAP CODE LEVEL
R
14:30 FLARING
OT PROJECTION AND
15:00 MIG
16:00 P R MIG
16:00 P R LINER
17:00
17:00
- 450 1425
18:00
18:00
- 450 1875
19:00
19:00
- 450 2325
20:00
20:00
- 450 2775
21:00
21:00
- 225 3000
22:00 SKILL
ACTION
22:00 LEVEL 1
23:00 LEVEL 3
Std.Issue Date :01/07/2017 Revision No. 0 Revision Date 00/00/00 Manpower Deployment columns added Resp. : TL - Production
BOTTEL NECK CT AND
Cell: NEW DAMPER FRONT TEAM LEADER:- DATE:- SHIFT:A PROCESS NAME
CHANGEOVER TARGET
TIME IATF 16949 : 2016
Target Execution
p
ACTUAL
ra
PLANNED OPERATOR
Difference OPERATOR
Sc
NEW PARTS
Time Cum- Actual Actual (+/-) Hourly Description of Issue, Actions & Root Cause LOSS TIME PURCHASE STORE
POWER
MAINT PED
INPROCESS
SETUP & C/O MANPOWER
TRAINING /
Q.A
OTHER
Details
Hourly FAILURE SETTING AUDIT LOSS TIME
ulative Pieces / Cum- Target LOSS TIME
k
Target PROCESS NAME NAME / SAP CODE LEVEL
or
Target Hour ulative
w
Re
6:00 CYLINDER WASHING
8:00
9:00
9:00 GREASING
NUT TIGHTENING
10:00 VERIFICATION
- 340 1957
13:00 GASFILLING
14:30
TOTAL 2554
REJECTIO
S. No. MODEL PLAN BUILT QA TEST
N
REWORK FOR SAP SAP DOC. NO EHS DETAIL CONSUMABLE DETAILS NEW DOVELOPMENT DETAILS
LEVEL 4
9
10
11
KAIZENS DETAILS
12
13
14
TOTAL
DEFECT MATRIX
Dent / Damage miss print issue
Ot
wrong sticker role
Washing
Dent / Damage wrong part number selected
CV Assy.
Spring Damage
Q.A Testing
dent/scrach passon
teflone damage
part mixup
disc mixup
Std.Issue Date :01/07/2017 Revision No. 0 Revision Date 00/00/00 Manpower Deployment columns added Resp. : TL - Production
BOTTEL NECK CT AND
Cell: NERKON TEAM LEADER:- DATE:- SHIFT:A PROCESS NAME
CHANGEOVER TARGET
TIME IATF 16949 : 2016
Target Execution
p
ACTUAL
ra
PLANNED OPERATOR
Difference OPERATOR
Sc
NEW PARTS
Time Cum- Actual Actual (+/-) Hourly CONVEYOUR 1 CONVEYOUR 2 LOSS TIME PURCHASE STORE
POWER
MAINT PED
INPROCESS
SETUP & C/O MANPOWER
TRAINING /
Q.A
OTHER
Details
Hourly FAILURE SETTING AUDIT LOSS TIME
ulative Pieces / Cum- Target LOSS TIME
k
Target PROCESS NAME NAME / SAP CODE LEVEL
or
Target Hour ulative
w
Re
6:00
PRE WASHING
- 825 825
7:00
LOADING
7:00
- 900 1725
UNLOADING
8:00
8:00
MOVEMENT
- 750 2475
9:00
9:00
- 900 3375
10:00
10:00
- 900 4275
11:00
11:00
- 450 4725
12:00
12:00
- 900 5625
13:00
13:00
- 750 6375
14:00
14:00
- 375 6750
14:30
TOTAL 6750
S. No. MODEL PLAN BUILT REWORK FOR SAP SAP DOC. NO EHS DETAIL CONSUMABLE DETAILS NEW DOVELOPMENT DETAILS
LEVEL 4
9
10
11
KAIZENS DETAILS
12
13
14
TOTAL
DEFECT MATRIX
Dent / Damage miss print issue
Ot
wrong sticker role
Washing
Dent / Damage wrong part number selected
CV Assy.
Spring Damage
Q.A Testing
dent/scrach passon
teflone damage
part mixup
disc mixup
Std.Issue Date :01/07/2017 Revision No. 0 Revision Date 00/00/00 Manpower Deployment columns added Resp. : TL - Production
BOTTEL NECK CT AND
Cell: NERKON TEAM LEADER:- DATE:- SHIFT:B PROCESS NAME
CHANGEOVER TARGET
TIME IATF 16949 : 2016
Target Execution
p
ACTUAL
ra
PLANNED OPERATOR
Difference OPERATOR
Sc
NEW PARTS
Time Actual Actual (+/-) Hourly CONVEYOUR 1 CONVEYOUR 2 LOSS TIME PURCHASE STORE
POWER
MAINT PED
INPROCESS
SETUP & C/O MANPOWER
TRAINING /
Q.A
OTHER
Details
Hourly Cum-ulative FAILURE SETTING AUDIT LOSS TIME
Pieces / Cum- Target LOSS TIME
k
Target Target PROCESS NAME NAME / SAP CODE LEVEL
or
Hour ulative
w
Re
2:30
PRE WASHING
- 375 375
3:00
LOADING
3:00
- 900 1275
UNLOADING
4:00
4:00
MOVEMENT
- 750 2025
5:00
5:00
- 900 2925
6:00
6:00
- 900 3825
7:00
7:00
- 450 4275
8:00
8:00
- 900 5175
9:00
9:00
- 750 5925
10:00
10:00
- 750 6675
11:00
TOTAL 6675
S. No. MODEL PLAN BUILT REWORK FOR SAP SAP DOC. NO EHS DETAIL CONSUMABLE DETAILS NEW DOVELOPMENT DETAILS
LEVEL 4
9
10
11
KAIZENS DETAILS
12
13
14
TOTAL
DEFECT MATRIX
Dent / Damage miss print issue
Ot
wrong sticker role
Washing
Dent / Damage wrong part number selected
Pressure Rust due component Fallen inside Sticker reverse/ wrinkle on sticker
Tube
damage sticker
Washing
Dent / Damage scaning problem
CV Assy.
Spring Damage
Q.A Testing
dent/scrach passon
teflone damage
part mixup
disc mixup