Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
30
This month inspection report several defect items were noted related to Ceiling and M&E Works as shown below. Such cases
of defect can be best detected earlier and can be resolved by having coordination drawing of ASM&E. Another way is by
utilizing the 3D or 4D modelling Tool for clash detection. Therefore utilizing any of the two mentioned method can be helpful to
avoid the same defects in the future.
Ceiling hanger rod supporting the Do not fix the ceiling hanger rod to M&E
ceiling is fixed through the M&E Ducts support. If possible provide
Duct support. Vibration from the isolation joint to reduce the vibration to
duct could be transmitted to ceiling.
ceiling.
Prior to ceiling works make a
coordinattion drawing to check the
ceiling support layout against the M&E
ducts location.
There is wall opening on the upper Review the drawing to check the same
part of the wall due to pipe case and refer to the designer for
penetration and wall louver. Water appropriate revision or relocation of
splash from wall opening and electrical panel.
louver may cause serious problem
to Electrical Panel Boards.
For louver provide flashing as protection
against water splash from the louver
fins and to be able to drain the water
outside.
Other items of defects such as the following below are samples of pointed out items which affect the structural integrity of the
building and serious defect due to water leak. In the same manner it is important to take note of the following items and
consider the suggested preventive measure to prevent the same defects from recurring.
Due to bad alignment the Hollow Should the same site condition is
Core slab was cut on site to fit to encountered, hollow core slab should
the location and to fix alignment. be produced in the factory according to
actual site dimension and condition.
The improper manner of cutting the Position of hollow core slab should be
hollow core on site may lead to adjusted at least at every grid.
structural defect.
Due to embeded pipes, the soil Review the drawing and if the toilet floor
supporting the Slab on Grade is SOG propose to convert the toilet
(SOG) floor of toilet cannot be area into a suspended slab.
properly compacted which may
also cause to possible cracks of
SOG.
Steel truss of long span rack for Discuss and confirm with the structural
external piping has sagged. It designer about the truss structural
seems to be lack of rigidity as viability in consideration of the
obviously manifested by deflection. deflection.
The distance between roof and Anticipate the same kind of defect as
window jamb is too low that the early as possible from the design
installation of flashing is very drawing and discuss with the designer
difficult to manage to be properly for possible change and how to improve
installed and water tight. the detail to prevent water leak.
Future potential water leak For proper installation of flashing,
problem may take place between higher distance from roof to window
roof and flashing and in case of opening is prefered such 300mm or
heavy rain water will splash to higher.
window.
Electrical pipes penetrated directly Route the pipes to dog house or pipe
thru the waterproofed RC Roof shaft. Do not allow penetration of pipes
slab. to RC Roof without proper opening to
prevent damage of water proofing
The slab water proofing was membrane.
damaged and its difficult to ensure
water tightness around the pipe
Slab joint around the column has Provide isolation between RC Column
no isolation joint. In the future and Slab to prevent appearance of
crack may appear and propagate crack at the joint and on slab surface.
on slab surface.
Weld joint between beam and steel Weld joint should be done at the factory
plate was done on site and so the and check welding quality according to
method of Quality check was not standard.
properly conducted.
Beam length fall short as per During the visit to steel fabrication and
actual requirement that opted to inspection check the steel members
provide thickened concrete at length and consider the 15~20mm non-
column face. shrink grout thickness.