Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
MINDRAY HYBASE 3000 UNIV. MOBILE OPERATING TABLE 1 QUARTERLY ANNUALLY ZENITH MEDICAL UP TO DATE
CMAC (AIRWAY MANAGEMENT SET) 1 6 MONTHS EVERY 6 MONTHS KARL STORZ UP TO DATE
BLEASE FOCUS ANESTHESIA MACHINE 1 6 MONTHS EVERY 6 MONTHS SAVIOUR MEDEVICES UP TO DATE
OR/DR TRUMP OR LIGHT 1 QUARTERLY QUARTERLY SAVIOUR MEDEVICES UP TO DATE
GEISTER CAUTERY MACHINE 1 ANNUALLY NOT YET CALIBRATED
G.E . CARDIAC MONITOR 2 6 MONTHS EVERY 6 MONTHS HEALTHSOLUTIONS UP TO DATE
SUCTION MACHINE (CAMI-HOSPIVAC) 1 QUARTERLY IMPEXCOS UNDER WARRANTY
C-ARM 1 6 MONTHS UP TO DATE
AUTOCLAVE (OLD) 1 ANNUALLY ANNUALLY OK
AUTOCLAVE (NEW) 1 6 MONTHS EVERY 6 MONTHS RG MEDITRON UP TO DATE
HANSHIN MACHINE 1 OK
G.E. LULLABY WARMER 1 6 MONTHS EVERY 6 MONTHS HEALTHSOLUTIONS UP TO DATE
TRISMED FM8000 FETAL MONITOR 1 ANNUALLY ANNUALLY BREATHELIFE MEDICAL UP TO DATE
OHMEDA VENTILLATOR 1 6 MONTHS 6 MONTHS BREATHELIFE MEDICAL UP TO DATE
SIMEON OR LIGHT 1 6 MONTHS EVERY 6 MONTHS GLOBEQUIPT BIOMED UP TO DATE
G.E. ANESTHESIA MACHINE 1 6 MONTHS EVERY 6 MONTHS HEALTHSOLUTIONS OK
SUCTION MACHINE (CAMI-HOSPIVAC) 1 QUARTERLY ASYA MEDIKA,INC.
HAL-RAR MACHINE 1 OK
BPM - 200 1 ANNUALLY ANNUALLY ROBUSTAN INC.
BPM - 1000 MATRON 1 ANNUALLY ANNUALLY ROBUSTAN INC.
BPM - 700P GUARDIAN 1 ANNUALLY ANNUALLY ROBUSTAN INC.
OHMEDA ANESTHESIA MACHINE 1 6 MONTHS EVERY 6 MONTHS MEDLAB EQUIPMENT OK
OHMEDA TECH 5 ISOFLURANE (NEW) 1 6 MONTHS NEW UNIT
PENLON SEVOFLURANE (NEW) 1 6 MONTHS NEW UNIT
PENTAX ENDOSCOPY MACHINE 1 QUARTERLY QUARTERLY NPK MEDICAL OK
NOV. 11, 2019 (MONDAY) VISIT HEART STATION. BORROW USER MANUAL OF PHILIPS
AFFINITI 50 ULTASOUND MACHINE. TALKED TO MAM GLENDA
REGARDING THE OTHER EQUIPMENT IN HEART STATION
ALSO ITS PMS. WAITED THE IT DEPT. TO SET-UP MY COMPUTER.
READ THE USER MANUAL I BORROWED TO FAMILIARIZED.
NOV. 12, 2019 (TUESDAY) VISIT LABORATORY DEPT. ASK MAM LOU REGARDING THE MACHINES
INSIDE THE LAB. INSTRUCTED HER MT TO SHOW THE SERVICE REPORTS
GATHERED THE PMS AND CALIBRATIONS SCHEDULE. UPDATED THE
INVENTORY OF MACHINES IN EXCEL.
NOV. 13, 2019 (WEDNESDAY) VISIT X-RAY DEPT. ASK THE TECHNICIAN REGARDING THE EQUIPMENTS
AND ITS PMS SCHEDULES, BUT THEIR SUPERVISOR IS ON LEAVE, THEY
DON'T KNOW WHERE THE SERVICE REPORTS OF THE MACHINES.
VISIT OR COMPLEX. CHECKED THE PMS AND CALIBRATION SCHEDULES
OF EQUIPMENTS. UPDATED THE INVENTORY OF MACHINES.
NOV. 14, 2019 (THURSDAY) SITE VISIT THE R.O. FACILITIES WITH SIR KC.