Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
AN
N
H
maste
TIO
NG
EC
UY
EN
FL
r of
RE
er
I D D esign om
IEF
ect / l.c
t Archit ai
Projec
BR
gm
arch.
+3 @
1
(0 611
)6 n
45 uye
11 ng
1 h
37 n
3 oa
Contents EDUCATION
2014-2016 International Master of Architecture,
01. IMPORTANT MARKS 5 KU Leuven, Sint -Lucas Ghent, Belgium.
1.1. Bach Mai Ii General Hospital/ [Granted by BTC, Belgian Development Agency]
The booklet includes selected works, which have influ- oanh-nguyen-41ab5671/ SKILL CERTIFICATE
ences in the way I see myself as a designer and practice AutoCAD
phone +31 (0) 645 111 373 ***** Practice certificate_ Class 2
this career until now. Besides, there are also showcases of Photoshop *****
my relevant design skills for working both in process and interests Traveling Sketch-up ***** LANGUAGES
finished line, such as hand sketches , collages, documen- Photographing InDesign *****
Sketching Revit *****
tation...And finally, it is a good chance for me to share Vietnamese Native
Cooking Rhino ***** English IELTS 6.5
my views through 5 provocative images, which can tell
more about myself. Swimming Dutch Beginner
3
01 IMPORTANT
. MARKS
4 5
1.1. BACH MAI II GENERAL HOSPITAL/
VIET DUC II SURGICAL HOSPITAL
6 7
1.2. D2 SALES CENTRE
This building is the temporary Sale galery for one real estate
project of Alpha King and they also planned to move their
head office to this new construction. The Interior design ex-
pressed the high demand of hospitality from the client. It
should tightly follow a storyline to sale real estate productions
of the Investor, but also well fit to the pratical mid and low end
budget for the back of house’s area.
During the time to proceed this project, there were many dif-
ficulties to deal with. I personally had grown quickly during
the process. This is a temporary project with 15 years lifespan,
the tight project timeline and high demand client with many
VOs and various decision-makers. The project was transfered
through many colleagues in both Architecture and Interior be-
fored handed to me as team leader of Interior Design. This
situation also happend to other consultants , such as C&S and
MEP. Thus, coordination sessions between all parties required
participants that can catch up quickly issues, be flexible and
strong in team work.
8 9
URBANIZATION
RE-INVENTION
OF NATURAL
PROCESS
WATERWAY
The concept with 3 design themes - Urban fabric - Waterway and Re-
invention gives flexibility for different areas in both practical and coher-
ent to each other.
SYMBIOTIC RELATIONSHIP
CANAL CITY
HISTORY OF DISTRICT 2
URBANIZATION
CANAL
of
WETLAND
URBANIZATION
10 11
D2 Sales Centre - Atrium area D2 Sales Centre - Leasing office’s main hall
D2 Sales Centre - Leasing office
12 13
D2 Sales Centre - Public toilet - View 1 D2 Sales Centre - Funtional room - View 1
D2 Sales Centre - Public toilet - View 2 D2 Sales Centre - Funtional room - View 2
14 15
1.3. MASTER THESIS - ROPSTEN JUNCTION
Please find Reflection paper of the master thesis via the download link below:
https://www.scribd.com/document/436183600/OanhNguyen-RopstenJunction-reflectionpaper
16 17
Water
Eventhough being close
to coastline, there is
lacking of connnection
with water. The sensa-
tion about this element
is neglected, except the
meaning of transport.
In-between
Undefined space exists
between 2 mass touch-
down infrastructural
components (the metro
station and the flyover)
Flows of
movement
Ropsten Junction is full of
movement. The ovelap-
ing and interaction be-
tween flows of public
transport, car, bike, pdes-
trian create a complexity
of this area in both hori-
zontal and vertical orien-
tation
Technical
C omponent
The district heat pump sta-
tion appears interestingly
on the site by exposing the
techinical pipes. They twist,
they overlay, they sprawl
alongside a water deck, a
pedestrian road, they wrap
around a typical technical
mental box. They are alive
in the way they work and
somehow join in the urban
fabric with a rough touch of
industrial manner.
18 19
02 SKETCHES
. COLLAGES
DRAWINGS
2.1. Sketches and Collages
2.2. Technical Drawings
For review in advance, please find drawings of documen-
tation works via download links below:
https://www.scribd.com/document/433215342/Oanh-
Nguyen-Design-Development-Phuong-Nam-Cosmetic-Sur-
gery-Clinic-VN-VK
https://www.scribd.com/document/433218133/Oanh-
Nguyen-Construction-Drawings-FMP-D7-PEDIATRIC-VN-GSA
https://www.scribd.com/document/433216769/Oanh-
(Sketch by Oanh Nguyen) Nguyen-Technical-Design-AlphaKing-D2-Sale-Galery-VN-
GSA
20 21
2. 1 . SK E TC H E S A ND CO LLA G ES
Thanh Hoa High quality Medical Service Centre - Ground floor [Work in process] D2 Sales Centre - Lounge waiting area [Work in process]
22 23
Cam Ranh Westin - Staff house - Main lobbly [From collage/mood board to final visualization] Cam Ranh Westin - Staff house - Library [From collage/mood board to final visualization]
24 25
2. 2 . T ECH N I C A L DRA WIN G S
D2 Sales Centre - Detail of light wall - Option 1 [Work in process] D2 Sales Centre - Detail of light wall - Option 2 [Work in process]
In this project, the 2/3 of facade is light boxs with LED inside that can do some lighting performances. Thus, the de-
tail of light box wall definitely is one of the most important design, which relevant to price, quality of interior space,
maintainance, capapility of contractor and supplier...So, we discussed first by sketches, directions before detailing.
26 27
Giai đoạn/ Stage Giai đoạn/ Stage
Y1 Y2 Y3 FW 01 3300.0FCL
13350
Hanger rod
6900 6450
VÁCH TRANG TRÍ 01 Hanger rod
LU06
P. CHỤP X-QUANG LB 01 REF: A.6503
2800.0.
X-RAY FEATURE WALL 01
20
9 m²
WRK01
LAB 02 PU 01A
X1 A 18/07/19 CD Submision 1 2200.0. TIVI A 18/07/19 CD Submision 1
WRK 02
P. TIÊM NGỪA P. NGHIÊN CỨU C. Sửa Ngày Nội dung chỉnh sửa bổ sung Ký duyệt 2100.0. C. Sửa Ngày Nội dung chỉnh sửa bổ sung Ký duyệt
HÀNH LANG VACCINATION R.M LABORATORY Rev Date Amendments Approved by
P. CẤP CỨU CORRIDOR Rev Date Amendments Approved by PU 01A
01 02 LƯU Ý
EMERGENCY ROOM 23 10 m² BEN02 17 m² LƯU Ý PU 01A Bản vẽ này không được dùng để xây dựng nếu không được chứng nhận.
22 BEN 04
15 m² BEN 03 LAB 01
Bản vẽ này không được dùng để xây dựng nếu không được chứng nhận.
Người thi công phải kiểm tra tất cả các kích thước tại hiện trường trước khi khởi công
Người thi công phải kiểm tra tất cả các kích thước tại hiện trường trước khi khởi công
28 m² BEN02
Không theo tỉ lệ bản vẽ, chỉ dùng kích thước đã được ghi
Bản vẽ này được đọc kết hợp với thuyết minh kỹ thuật và điều kiện của hợp đồng thầu
Không theo tỉ lệ bản vẽ, chỉ dùng kích thước đã được ghi
Bản vẽ này được đọc kết hợp với thuyết minh kỹ thuật và điều kiện của hợp đồng thầu
Bản vẽ và thiết kế này được giữ bản quyền và không sao chép nếu không được chấp thuận
Bản vẽ và thiết kế này được giữ bản quyền và không sao chép nếu không được chấp thuận
Feature WARNING
WARNING
This drawing shall not be used for construction unless certified
REF: A.6502 This drawing shall not be used for construction unless certified
Contractor to verify all dimensions of existing works on site before commencing any work or
P. KHÁM TỔNG QUÁT Contractor to verify all dimensions of existing works on site before commencing any work or
preparing shop drawings
preparing shop drawings
Do not scale drawings, use written dimensions only
CHILD DEV. Do not scale drawings, use written dimensions only
6450
This drawing is to be read in conjunction with the specifications and conditions of contract
This drawing is to be read in conjunction with the specifications and conditions of contract
BEN 03 04 This drawing and design is copyright and no portion may be reproduced without the permission
This drawing and design is copyright and no portion may be reproduced without the permission
12 m² P. IT Chủ đầu tư dự án/ Project owner Chủ đầu tư dự án/ Project owner
WRK 03 IT PU 02
03
2 m² LM 02
LM 02
2100
LM 02
P. HỒI SỨC CẤP CỨU HÀNH LANG
CRASH ROOM CORRIDOR
21 08 Chấp thuận / Approved by PU 02 PU 02 Chấp thuận / Approved by
WRK 04 6 m²
14 m²
X2 PU 01A PU 01A
13350
350
350
RECP01 P. CHO TRẺ BÚ
FW 02 TIẾP TÂN BREAST FEED.
P. ĐIỀU KHIỂN X-QUANG RECEPTION 10 0.0 .
X-RAY CONTROL 07 3 m² 3200 115 450 115 450
19 9 m² VS CHUNG Tư vấn thiết kế Quốc tế/ International Design consultant Tư vấn thiết kế Quốc tế/ International Design consultant
3 m²
6900
480
4 m²
X3
KHU CHỜ
WAITING AREA HÀNH LANG
17 Hạng mục/ Item Hạng mục/ Item
92
CORRIDOR
45 m² 14
WRK01 7 m² KIẾN TRÚC / ARCHITECT KIẾN TRÚC / ARCHITECT
115 220 330 220 330 220 330 220 115 710
Tên bản vẽ/ Drawing Title 2100 Tên bản vẽ/ Drawing Title
3
MẶT BẰNG NỘI THẤT FW 01 - VÁCH TRANG TRÍ 01 - MẶT BẰNG FW 01 - TƯỜNG TRANG TRÍ
2 A.6401 4 5
FURNITURE LAYOUT PLAN FW 01 - FEATURE WALL 01 - FLOOR PLAN A.6401 A.6401 Mã / Code Mô tả / Description FW 01 - FEATURE WALL
PHÒNG KHÁM 2 TỈ LỆ/ SCALE 1 : 25
CONSULT. ROOM 2 PHÒNG KHÁM 1
16 WRK01 CONSULT ROOM 1 Giám đốc/ Director LB 01 Kính mờ che hộp đèn, dày 6mm/ Frosted glass for light box, 6mm Giám đốc/ Director
10 m² 15 MATTHEW IAIN YOUNG thick MATTHEW IAIN YOUNG
14 m²
Chủ trì bộ môn MATTHEW IAIN LM 01 MDF/ HDF, hoàn thiện laminate, màu gỗ sáng/ MDF, laminate, Chủ trì bộ môn MATTHEW IAIN
Principal YOUNG bright timber color Principal YOUNG
50
Thiết kế NGUYỄN THỊ LM 02 Plywood ghép lớp, dày 50mm, đục lỗ tròn d10mm, cách đều Thiết kế NGUYỄN THỊ
Designed by KIỀU OANH 40mm/ Laminated plywood; 50 mm thick, perforated d10mm, @ Designed by KIỀU OANH
PU 01A PU 01A 40mm
480
400
Vẽ NGUYỄN DUY Vẽ NGUYỄN DUY
Draw by SƠN PU 01A MDF/ HDF, sơn PU, màu trắng, bóng mờ/ MDF, PU painted, white Draw by SƠN
Kiểm KWAN SAN CHAN color, semi-gloss finished Kiểm KWAN SAN CHAN
Checked by PU 03 PU 02 MDF, sơn PU, màu xanh đậm, bóng mờ/ MDF, PU painted, dark Checked by
92
Ngày phát hành/ 18th JULY, 2019 Tỷ lệ/ blue color, semi-gloss finished Ngày phát hành/ 18th JULY, 2019 Tỷ lệ/
1 : 100 1 : 25
Issue Date: Scale: PU 03 MDF, sơn PU, màu xanh nhạt, bóng mờ/ MDF, PU painted, light Issue Date: Scale:
115 220 330 220 330 220 330 220 115 710
Bản vẽ tham khảo/ Cỡ giấy/ blue color, semi-gloss finished Bản vẽ tham khảo/ Cỡ giấy/
File reference: Size: A3 2100 A3
File reference: Size:
1
MẶT BẰNG TẦNG 1 3
Số hiệu bản vẽ/ Số hiệu bản vẽ/
FLOOR PLAN-LEVEL 1-GROUND A2400 FW 01 - VÁCH TRANG TRÍ 01 - MẶT BẰNG 4 5 A.6401
Drawing No.: 1 Drawing No.:
TỈ LỆ/ SCALE 1 : 100
FW 01 - FEATURE WALL 01 - FLOOR PLAN A.6401 A.6401 A.6401
Số tờ bản vẽ/ Revision: Số tờ bản vẽ/ Revision:
A TỈ LỆ/ SCALE 1 : 25 A
Sheet No.: Sheet No.:
3300
150 150 150 150 150
675 100
17.1 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150
A.17
FEATURE WALL 01
200
0
17
200
LU2
200
0
10
VI01
2
1200
200
A 18/07/19 CD Submision 1
200
200 100 750 3000
FFL 0.000 A 18/07/19 CD Submision 1
C. Sửa Ngày Nội dung chỉnh sửa bổ sung Ký duyệt
C. Sửa Ngày Nội dung chỉnh sửa bổ sung Ký duyệt
200
Rev Date Amendments Approved by
Rev Date Amendments Approved by
200
LƯU Ý
Bản vẽ này không được dùng để xây dựng nếu không được chứng nhận.
LƯU Ý
200
LU2 KHU CHỜ LU2
1.5
Người thi công phải kiểm tra tất cả các kích thước tại hiện trường trước khi khởi công Bản vẽ này không được dùng để xây dựng nếu không được chứng nhận.
Không theo tỉ lệ bản vẽ, chỉ dùng kích thước đã được ghi Người thi công phải kiểm tra tất cả các kích thước tại hiện trường trước khi khởi công
200
SOFA01 WAITING AREA Bản vẽ này được đọc kết hợp với thuyết minh kỹ thuật và điều kiện của hợp đồng thầu
Bản vẽ và thiết kế này được giữ bản quyền và không sao chép nếu không được chấp thuận
Không theo tỉ lệ bản vẽ, chỉ dùng kích thước đã được ghi
Bản vẽ này được đọc kết hợp với thuyết minh kỹ thuật và điều kiện của hợp đồng thầu
17 Bản vẽ và thiết kế này được giữ bản quyền và không sao chép nếu không được chấp thuận
1200
200
WARNING
45 m² This drawing shall not be used for construction unless certified WARNING
200
Contractor to verify all dimensions of existing works on site before commencing any work or This drawing shall not be used for construction unless certified
C1 3150 preparing shop drawings Contractor to verify all dimensions of existing works on site before commencing any work or
2400
Do not scale drawings, use written dimensions only preparing shop drawings
200
2250
This drawing is to be read in conjunction with the specifications and conditions of contract Do not scale drawings, use written dimensions only
10 This drawing and design is copyright and no portion may be reproduced without the permission
paint PT09 This drawing is to be read in conjunction with the specifications and conditions of contract
200
2100
6772
0 This drawing and design is copyright and no portion may be reproduced without the permission
1
Chủ đầu tư dự án/ Project owner
Chủ đầu tư dự án/ Project owner
200
LU2 LU2 LM 02
200
1200
200
200
26
300 41
0.5
SOFA01 PU 01A
200
Chấp thuận / Approved by
KHU CHỜ Chấp thuận / Approved by
CHA05 CHA03 WAITING AREA LU2
650
17 LU1
200
45 m²
300
X3 X3 KHU CHỜ
100
200
17 150mm skirting below number wrong or Tư vấn Quản lý dự án/ Project management consultant
LU5
1200
1200
Lầu 19, HavanaTower, 132 Hàm Nghi, P. Bến Thành, Quận 1, TP. HCM
200
PL
MẶT BẰNG KHU CHỜ RCP
MẶT BẰNG TRẦN
WAITING AREA LAYOUT PLAN REFLECTED CEILING PLAN
D7 PEDIATRICS CLINIC
TỈ LỆ/ SCALE 1 : 50 TỈ LỆ/ SCALE 1 : 50
D7 PEDIATRICS CLINIC
200
X4 X4
200
Hạng mục/ Item
3450.0 FCL 3450.0 FCL Hạng mục/ Item
150
200
KIẾN TRÚC / ARCHITECT
150
3150.0 FCL
300
200
KHU VỰC CHỜ
PT01 PT01 PT01
paint PT09 CHI TIẾT HÌNH HỌA TRANG TRÍ TƯỜNG
WAITING AREA
2200
200
2019
2200.0 . 2200.0 .
MURAL DETAILS
2
Giám đốc/ Director
200
Giám đốc/ Director
MATTHEW IAIN YOUNG
1.5 WALL02a MATTHEW IAIN YOUNG
200
Chủ trì bộ môn MATTHEW IAIN
Principal YOUNG Chủ trì bộ môn MATTHEW IAIN
Principal YOUNG
Thiết kế NGUYỄN THỊ
200
18.1 19.1 1 09.1 10.1 12.1
1100.0 . Designed by KIỀU OANH Thiết kế NGUYỄN THỊ
2200
200
1140 375 275 Draw by SƠN Vẽ NGUYỄN DUY
0.5 GPO01 Draw by SƠN
Kiểm
1100
200
KWAN SAN CHAN
40mm/ Laminated plywood; 50 mm thick, perforated d10mm, @ Checked by
Ngày phát hành/ 18th JULY, 2019 Tỷ lệ/
450
450
0 1 : 50 40mm
0.0 FFL 0.0 FFL Issue Date: Scale: Ngày phát hành/ 18th JULY, 2019 Tỷ lệ/ 1 : 25
PU 01A MDF/ HDF, sơn PU, màu trắng, bóng mờ/ MDF, PU painted, white Issue Date: Scale:
Bản vẽ tham khảo/ Cỡ giấy/
File reference: Size: A3 CHI TIẾT TRANH TƯỜNG 02 color, semi-gloss finished Bản vẽ tham khảo/ Cỡ giấy/
3 File reference: Size: A3
Số hiệu bản vẽ/ M01 - MURAL DETAIL
MẶT ĐỨNG 17.1 MẶT ĐỨNG 17.2 A.17 TỈ LỆ/ SCALE 1 : 25 Số hiệu bản vẽ/
17.1 17.2 Drawing No.:
ELEVATION 17.1 ELEVATION 17.2 A.6502
Drawing No.:
Số tờ bản vẽ/ Revision:
TỈ LỆ/ SCALE 1 : 50 TỈ LỆ/ SCALE 1 : 50 A Số tờ bản vẽ/ Revision:
Sheet No.:
A
Sheet No.:
FMP Pediatric Clinic, District 7, HCMC, Vietnam [Construction Drawings] FMP Pediatric Clinic, District 7, HCMC, Vietnam [Construction Drawings]
28 29
03 FASCINATION
. INSPIRATION
IMAGINATION
3.1. Order Of Disorder
3.2. Courage
3.3. Performance Of Living Frames
3.4. Contrast And Supplementary
3.5. Valuable Background
30 31
3.1. ORDER OF DISORDER
32 33
3.2. COURAGE
34 35
3.3. PERFORMANCE OF LIVING FRAMES
36 37
3.4. CONTRAST AND SUPPLEMENTARY
Like a dipole of matter, the image strongly speaks out the con-
cept of using oposite and supplemental interactive identities
in lighting design and material scheme.
Each design identy is pushed to extreme. The dark tunnel is a
perfect background for colorful light cube. The neutral - dark-
grey range is a smooth transition from one to another pole of
the concept.
38 39
3.5. VALUABLE BACKGROUND
The material selection that the fashion designer applied for this
look provoke me the general design principle of relationship
between featured elements and surrounding context within
one object, hierarchy of design. We can see the same effect
in architecture and interior design.
The design choices of finishes, color scheme, texture on the
fabric, forms, details, proportion...have the similiar ways of ar-
chitecture / interior design.
40 41
OANH NGUYEN . M.Arch
[oanhnguyen611@gmail.com]