Sei sulla pagina 1di 1

Office of the Asst. Executive Engineer (Ele.

), C, O&M Sub-division - S19 VIJAYA BANK LAYOUT


RR No. Account ID Bill No. Billing Period Bill Date Due Date Disconnection Date
(BGEH1281) 9900925000 990099274455 09-10-2019 - 09-11-2019 09-11-2019 23-11-2019 08-12-2019
Name & Address: Type Domestic - LT2A
Tariff 1LT2A1-N
PRESIDENT. Sanctioned load (KW) 3.00
NA2-51,V.B.LAY
OUTBILEKALI Sanctioned load (HP)
-, KAR -560077
Meter Readings for Meter ID 0125633107
Meter Readings for Meter ID 9900925955
Description Date KWH Meter KVAH Meter MD meter PF
Description Date KWH Meter KVAH Meter MD meter PF
Present Reading 09-11-2019 174 0 .9 0
Present Reading 24-10-2019 5398 0 0 0
Previous Reading 24-10-2019 0 0
Previous
09-10-2019 5398 0
Reading
Difference 174 0 .9
Difference 0 0 0
Meter Constant 1 1 1
Meter Constant 1 0 0
Consumption 174 0 .9
Consumption 0 0 0
Less/Add:
0 0
Consumption Less/Add:
.9 0 Consumption
Net Consumption 174 0
Net 0
0 0 0
Consumption

Your Detailed Bill


Description Amount (Rs.)
Fixed charges: For the First 1.00 KW at Rs60.00 per kW 60.00
Fixed charges: For every additional 2.00 KW at Rs70.00 KW 140.00
Energy Charges : For the first 30.000 KWH at Rs3.75 per KWH 112.50
Energy Charges : For the next 70.000 KWH at Rs5.20 per KWH 364.00
Energy Charges : For the next 74.000 KWH at Rs6.75 per KWH 499.50
Fuel Cost Adjustment Charges : 174.000 KWH at Rs0.22 per KWH 38.28
Interest on Revenue 0.00
Interest on Tax 0.00
Tax 87.84
Current Bill Amount 1302.12
Arrears -3192.00
Bill Correction 0.00
Bill rounding adjustment -0.12
Net Payable Amount -1890.00
Rupees Minus One Thousand Eight Hundred Ninety Only
Sd/-
Assistant Executive Engineer (Ele.)

1 As per KERC's guidelines, depending on your consumption for the previous calendar year, Additional Security Deposit of amount Rs.1080 is demanded.Please
pay at the earliest for uninterrupted service.

Potrebbero piacerti anche