The pipes shall be insulated with 50/30 mm thick puf insulation with
minimum density of 36 kg/cu.mtr. and compressive strength of 40
psi.The insulation shall completely fill the annular space between
service pipe and jacket and shall be bonded to both. Insulation shall
be done on a high pressure injection machine. Direction of flow shall
be marked on the pipes. The piping shall include valves
strainers,measuring instruments etc as indicated below.The piping
A shall be complete with suitable supports wherever required. After
the pipes are installed & pressure tested, the joints/fittings shall be
insulated as per manufacturer's recommendations and complete as
required.The outer jacket shall be 0.6 mm lock seam spiral GI for
sizes up to 600 mm dia pipes.The pre-insulated pipes shall be rated
Class 0 as per BS 476.
The pipes shall be insulated with 50/30 mm thick puf insulation with
minimum density of 36 kg/cu.mtr. and compressive strength of 40
psi.The insulation shall completely fill the annular space between
service pipe and jacket and shall be bonded to both. Insulation shall
be done on a high pressure injection machine. Direction of flow shall
A be marked on the pipes. The piping shall include valves
strainers,measuring instruments etc as indicated below.The piping
shall be complete with suitable supports wherever required. After
the pipes are installed & pressure tested, the joints/fittings shall be
insulated as per manufacturer's recommendations and complete as
required.The outer jacket shall be 0.6 mm lock seam spiral GI for
sizes up to 600 mm dia pipes.The pre-insulated pipes shall be rated
Class 0 as per BS 476.
The pipes shall be insulated with 50/30 mm thick puf insulation with
INQUIRY FOR INSULATION WORK
PROJECT MUNDRA SOLAR POWER TECHPARK PVT. , MUNDRA
CLIENT ADANI
The pipes shall be insulated with 50/30 mm thick puf insulation with
minimum density of 36 kg/cu.mtr. and compressive strength of 40
psi.The insulation shall completely fill the annular space between
service pipe and jacket and shall be bonded to both. Insulation shall
be done on a high pressure injection machine. Direction of flow shall
be marked on the pipes. The piping shall include valves
C strainers,measuring instruments etc as indicated below.The piping
shall be complete with suitable supports wherever required. After
the pipes are installed & pressure tested, the joints/fittings shall be
insulated as per manufacturer's recommendations and complete as
required.The outer jacket shall be 0.6 mm lock seam spiral GI for
sizes up to 600 mm dia pipes.The pre-insulated pipes shall be rated
Class 0 as per BS 476.
Sub Total
GRAND TOTAL
Variation
INQUIRY FOR INSULATION WORK
PROJECT MUNDRA SOLAR POWER TECHPARK PVT. , MUNDRA
CLIENT ADANI
Ba
Item No. Description QTY. UNIT
Pr
(R
High Side of the AC System
The pipes shall be insulated with 50/30 mm thick puf insulation with
minimum density of 36 kg/cu.mtr. and compressive strength of 40
psi.The insulation shall completely fill the annular space between
service pipe and jacket and shall be bonded to both. Insulation shall
be done on a high pressure injection machine. Direction of flow shall
be marked on the pipes. The piping shall include valves
strainers,measuring instruments etc as indicated below.The piping
A shall be complete with suitable supports wherever required. After
the pipes are installed & pressure tested, the joints/fittings shall be
insulated as per manufacturer's recommendations and complete as
required.The outer jacket shall be 0.6 mm lock seam spiral GI for
sizes up to 600 mm dia pipes.The pre-insulated pipes shall be rated
Class 0 as per BS 476.
Ba
Item No. Description QTY. UNIT
Pr
(R
Insulation for pipes from 40 mm to 150mm dia will be with 30 mm
thick insulation and pipes above 150 mm dia shall be with 50 mm
thick insulation. For pipes of 32 mm dia and less, 25 mm hick
insulation shall be used. Outdoor pipes shall be suitably supported
from AC plant room to each AHU. Wooden/Steel/rubber pad supports
Note:
for piping in Trench/vertical run etc shall be included in A/C vendor's
offer. (Trench will be provided by department.)
2. The pre-insulated pipe shall run to the expansion tank from the
main chilled water return line running at highest level.
The pipes shall be insulated with 50/30 mm thick puf insulation with
minimum density of 36 kg/cu.mtr. and compressive strength of 40
psi.The insulation shall completely fill the annular space between
service pipe and jacket and shall be bonded to both. Insulation shall
be done on a high pressure injection machine. Direction of flow shall
A be marked on the pipes. The piping shall include valves
strainers,measuring instruments etc as indicated below.The piping
shall be complete with suitable supports wherever required. After
the pipes are installed & pressure tested, the joints/fittings shall be
insulated as per manufacturer's recommendations and complete as
required.The outer jacket shall be 0.6 mm lock seam spiral GI for
sizes up to 600 mm dia pipes.The pre-insulated pipes shall be rated
Class 0 as per BS 476.
Ba
Item No. Description QTY. UNIT
Pr
(R
17.0 100 mm dia pressure gauges (with pet cock/gate valve) 18 Each
18.0 Automatic Air vents 6 Each
19.0 Drain plugs 10 Each
The pipes shall be insulated with 50/30 mm thick puf insulation with
INQUIRY FOR INSULATION WORK
PROJECT MUNDRA SOLAR POWER TECHPARK PVT. , MUNDRA
CLIENT ADANI
Ba
Item No. Description QTY. UNIT
Pr
(R
The pipes shall be insulated with 50/30 mm thick puf insulation with
minimum density of 36 kg/cu.mtr. and compressive strength of 40
psi.The insulation shall completely fill the annular space between
service pipe and jacket and shall be bonded to both. Insulation shall
be done on a high pressure injection machine. Direction of flow shall
be marked on the pipes. The piping shall include valves
C strainers,measuring instruments etc as indicated below.The piping
shall be complete with suitable supports wherever required. After
the pipes are installed & pressure tested, the joints/fittings shall be
insulated as per manufacturer's recommendations and complete as
required.The outer jacket shall be 0.6 mm lock seam spiral GI for
sizes up to 600 mm dia pipes.The pre-insulated pipes shall be rated
Class 0 as per BS 476.
Ba
Item No. Description QTY. UNIT
Pr
(R
80 mm dia 3 way mixing valve with modulating motor controlled by
23 6 Each
DDC
50 mm dia 3 way mixing valve with modulating motor controlled by
24 4 Each
DDC
40 mm dia 3 way mixing valve with modulating motor controlled by
25 21 Each
DDC
26 100 mm globe valve 2 Each
27 80 mm globe valve 3 Each
28 50 mm globe valve 4 Each
29 40 mm globe valve 20 Each
30 125 mm dia flexible pipe connectors 3 Each
31 100 mm dia flexible pipe connectors 7 Each
32 65 mm dia flexible pipe connectors 7 Each
33 50 mm dia flexible pipe connectors 23 Each
34 Automatic Air Vents 45 Each
35 Drain plugs 45 Each
36 Dial type thermometer 45 Each
37 100 mm dia Pressure gauges (with pet cock/gate valve) 45 Each
Hand held Digital manometer (Multiscale differential pressure meter)
38 2 Each
of Advance make or equivalent
Ba
Item No. Installation of Pre-insulated Chilled
Description
water and drain piping of MS QTY. UNIT
Pr
class C pipes complete with all accessories and specials. The pipes (R
shall be insulated with 50/30 mm thick puf insulation with minimum
density of 36 kg/cu.mtr. and compressive strength of 40 psi.The
insulation shall completely fill the annular space between service
pipe and jacket and shall be bonded to both. Insulation shall be done
on a high pressure injection machine. Direction of flow shall be
A marked on the pipes. The piping shall include valves
strainers,measuring instruments etc as indicated below.The piping
shall be complete with suitable supports wherever required. After
the pipes are installed & pressure tested, the joints/fittings shall be
insulated as per manufacturer's recommendations and complete as
required.The outer jacket shall be 0.6 mm lock seam spiral GI for
sizes up to 600 mm dia pipes.The pre-insulated pipes shall be rated
Class 0 as per BS 476.
Ba
Item No. Description QTY. UNIT
Pr
(R
65 mm dia 3 way mixing valve with modulating motor controlled by
25 15 Each
DDC
50 mm dia 3 way mixing valve with modulating motor controlled by
26 2 Each
DDC
27 125 mm globe valve 1 Each
28 100 mm globe valve 3 Each
29 80 mm globe valve 8 Each
30 65 mm globe valve 12 Each
31 50 mm globe valve 3 Each
32 150 mm dia flexible pipe connectors 1 Each
33 125 mm dia flexible pipe connectors 4 Each
34 100 mm dia flexible pipe connectors 12 Each
35 80 mm dia flexible pipe connectors 22 Each
36 65 mm dia flexible pipe connectors 5 Each
37 Automatic Air Vents 55 Each
38 Drain plugs 45 Each
39 Dial type thermometer 33 Each
40 100 mm dia Pressure gauges (with pet cock/gate valve) 34 Each
Ba
Item No. Description QTY. UNIT
Pr
(R
2 100 mm dia MS class C pipe 24 RM
3 80 mm dia MS class C pipe 27 RM
4 65 mm dia MS class C pipe 33 RM
5 50 mm dia MS class C pipe 7 RM
6 40 mm dia MS class C pipe 8 RM
7 32 mm dia MS class C pipe 8 RM
8 25 mm dia MS class C pipe 9 RM
9 100 mm dia butterfly valve 7 Each
10 65 mm dia butterfly valve 5 Each
11 50 mm dia butterfly valve 5 Each
12 32 mm dia butterfly valve/ ball valve 5 Each
13 125 mm dia Automatic balancing cum flow measurement valve 2 Each
14 100 mm dia balancing cum flow measurement valve 5 Each
15 65 mm dia balancing cum flow measurement valve 2 Each
16 50 mm dia balancing cum flow measurement valve 2 Each
17 32 mm dia balancing cum flow measurement valve 2 Each
80 mm dia 3 way mixing valve with modulating motor controlled by
18 5 Each
DDC
50 mm dia 3 way mixing valve with modulating motor controlled by
19 1 Each
DDC
40 mm dia 3 way mixing valve with modulating motor controlled by
20 1 Each
DDC
25 mm dia 3 way mixing valve with modulating motor controlled by
21 1 Each
DDC
22 80 mm dia globe valve 5 Each
23 50 mm dia globe valve 1 Each
24 40 mm dia globe valve 1 Each
25 25 mm dia globe valve 1 Each
26 100 mm dia flexible pipe connectors 7 Each
27 65 mm dia flexible pipe connectors 3 Each
28 50 mm dia flexible pipe connectors 3 Each
29 32 mm dia flexible pipe connectors 3 Each
30 Dial type thermometer 11 Each
31 100 mm dia pressure gauges ( with pet cock /gate valve) 11 Each
33 Automatic Air vents 11 Each
34 Drain plugs. 11 Each
INQUIRY FOR INSULATION WORK
PROJECT MUNDRA SOLAR POWER TECHPARK PVT. , MUNDRA
CLIENT ADANI
Ba
Item No. Description QTY. UNIT
Pr
(R
Thermal insulation of supply and return air ducting (Inside building)
with 19 mm thick Physically crosslinked polyolefin foam insulation
B with factory laminated aluminium foil facing and self adhesive 55 Sqm
backing and with class 0 fire properties as per BS 476 and complete
as required.
Sub Total
GRAND TOTAL
Variation