Sei sulla pagina 1di 376

KEC INTERNATIONAL LIMITED.

STANDARD CIVIL ESTIMATE

CIVIL ESTIMATE-PROJECT XXX -02

PROJECT: -

CLIENT:-

CONSULTANT:-

BOQ quantity of Tower TV,Transit Camp and


R2 Township Building Type - 10.03.2013 KP KMK NDC
B1,B2,B3,C & D
Modified as per Tender Dept. comments, 132kv
R1 28.02.2013 NVB NDC NDC
Eqpt & gantry tower, 80MVA trafo. added
R0 First Preparation 6.02.2013 NVB NDC NDC
REV DESCRIPTION DATE PPD BY CHKD BY APD BY
INDEX SHEET FOR CIVIL WORKS
REV.: = R2

Item
Item Description STATUS
No.
CIVIL WORKS
1 CONTROL ROOM BUILDING
2 TRANSIT CAMP BUILDING
3 TOWNSHIP BUILDING-B1
4 TOWNSHIP BUILDING-B2
5 TOWNSHIP BUILDING-B3
6 TOWNSHIP BUILDING-C
7 TOWNSHIP BUILDING-D
8 FIRE FIGHTING PUMP HOUSE WITH WATER TANK
9 TOWER & EQUIPMENT FOUNDATION
10 AC PANEL ROOM
11 RCC PAVEMENT
12 SURFACE DRAIN
13 CABLE TRENCH
14 DG SET FDN
15 LT STATION FDN
16 EQUIPMENT & TOWER STRUCTURE
17 REACTOR FOUNDATION
18 TRANSFORMER FOUNDATION
19 FIRE WALL & FOUNDATION
20 RAINWATER HARVESTING
21 SITE PREPARATION
22 ANTIWEED TREATMENT & STONE SPREADING
23 DISMENTALING ITEMS

NOTES:
(1) Section-Project supersedes all the respective sections.
(2) All works shall be carried out as per PGCIL approved drawings and shall includes each items as p
miscellaneous items required to complete work as per drawings shall also be included.
(3) Soil investigation is not included in the scope.
(4) Compound wall & Gate is not included in the scope.
(5) Detailed civil working sheet and reinforcement qty. estimation sheets for any particular item are ke
sheets are given the same color code as their main sheet for e.g. Control Room Building (CRB) and it
can unhide the sheet to get the required details.
(6) Surface drain estimate are made considering drain on both side of the road and with max. dept of
(7) Detailed reinforcement qty has been taken as per cubic meter of concrete with different ratio cons

280
SHEET FOR CIVIL WORKS

REF. OF PGCIL
Remark
SPECIFICATION

Section-Civil, clause 7 & 10


Section-Civil
Section-Civil
Section-Civil
Section-Civil
Section-Civil
Section-Civil
Section-Civil, clause 7 & 10
Section-Civil, clause 7
Section-Civil, clause 7 & 10
Section-Civil, clause 6
Section-Civil REFER NOTE. 6
Section-Civil
Section-Civil, clause 7
Section-Civil, clause 7
section-Structure
Section-Civil, clause 7
Section-Civil, clause 7
Section-Civil, clause 7
Section-Civil, clause 5
Section-Civil, clause 3
Section-Civil, clause 3

wings and shall includes each items as per respective section/clause. Any
ngs shall also be included.

ation sheets for any particular item are kept hidden to avoided confusions, and these
r e.g. Control Room Building (CRB) and its other sheets are given Red color code. One

th side of the road and with max. dept of the drawin for that perticular section.
meter of concrete with different ratio considered.

281
SPECIFIC REQUIREMEMTS

Lot items such as Site preparation, Rain water harvesting etc. which
1 cannot quantify shall be carried out as per respective drawings/clause &
sections.

Any specific requirements for e.g. Green Building requirement shall be


2
implemented as per respective clause & drawings.

Any miscellaneous items such as BMK foundation shall be as per PGCIL


3
practice and specification.
SUMMARY SHEET FOR CONCRETE & STEEL

Sr
Description of item Unit Qty
No
1 PCC (1:4:8) Cu.Mtr. 551.59
2 PCC (1:2:4) Cu.Mtr. 130.50
3 RCC Cu.Mtr. 1,757.13
4 RCC-M20(TC,B1 To B3,C,D) Cu.Mtr. 945.00
5 RCC FOR CONTROL ROOM Cu.Mtr. 292.0
6 REINFORCEMENT MT 2,009.11
REINFORCEMENT-(TC,B1 To
7 MT 135.00
B3,C,D)
8 STRUCTURAL STEEL MT 19.08
9 PVC PIPE (110 DIA PIPE) RM 3,500.00
10 PVC PIPE (50 DIA PIPE) RM 1,750.00 bhatianv:
11 PVC PIPE (32 DIA PIPE) RM 1,200.00 Structural steel qty
excludes Gantry tower and
12 PVC PIPE (25 DIA PIPE) RM 300.00 beam qty.

NOTE: This is a comprehensive summary, to get project specific


summary please delete the extra items. For e.g. reactor/power
transformer civil estimate are given for two (2) ratings, one has to
delete civil estimate of not required ratings.
Name of work: CONTROL ROOM BUILDING (CRB)

REF. DRG . - C-ENGG-STD-CRB-ARCH-1000 TO 1005 & C-ENGG-STD-CRB-STR-1011 TO 1018,1020 TO 1022


ABSTRACT

Item
Item Discription QTY. RATE UNIT TOTAL
No.
Excavation for foundation in Earth soils of all types,
sand gravel and soft murum including removing the
excavated materials upto a distance of 50 metres beyond
building area and lift as specified, stacking and spreading
1 as directed including dewatering unless provided 500.00 1.00 Cum. 500.00
elsewhere, preparing the bed for the foundation and
necessary backfilling, ramming, watering complete
excluding shoring and strutting.( Lift Upto 1.5 M )

Providing soling using 80mm size trap metal in layers


of 15cm each including filling voids with sand, ramming,
2 watering etc. complete. 93.00 1.00 Cum. 93.00

Providing and laying in situ Ready Mix cement concrete


M-10/M-15 grade using design mix with minimum
cement content as per IS 456 with maximum water cement
ratio 0.45 using maximum 25/30 mm size and down trap
metal for foundation and bedding with all labours,
materials, plant & equipments, shuttering form work,
staging, including transporting, placing, vibrating with
3 mechanical vibrator, finishing and curing etc. complete. The 38.00 1.00 Cum. 38.00
item also includes heavy dewatering by using pumps or
manually. . The cost also includes all types of taxes, sales
tax, insurance, cess levied by local authority etc. complete.
( 3969 CSR Rate + 830 Additional for RMC Rate = 4799 )

Providing and laying in situ Ready Mix Cement Concrete


M-20/M-25 grade of trap / granite / quartzite / gneiss
metal for RCC foundation like raft, grillage, strip
foundation and footing of RCC column and steel stanchions
including normal dewatering, formwork, compaction,
finishing and curing including transporting from mix plant
4 66.00 1.00 Cum. 66.00
upto distance of 25 Km, pouring the concrete at work site
for 1.5m lift above G.L. and 5.0m lift below GL, etc.
complete... (Excluding reinforcement and structural steel).

Providing and casting in situ Ready Mix Cement


Concrete M-20/M-25 Grade of trap / Granite /
quartzite / gneiss metal of approved quality for RCC
Column as per detailed drawings and designs or as
directed by Engineer-in-charge including normal
dewatering, centering, formwork, compaction, finishing the
form surface with cement mortar 1:3 of sufficient minimum
5 thickness to give a smooth and even surface wherever 44.00 1.00 Cum. 44.00
necessary or roughening if special finish is to be provided
and curing including transporting from mix plant upto
distance of 25 Km, pouring the concrete at work site for
1.5m lift above G.L. and 5.0m lift below GL, etc.
complete... (Excluding reinforcement and structural steel).
Providing and casting in situ Ready Mix Cement
Concrete M-20/M-25 Grade of trap / Granite /
quartzite / gneiss metal of approved quality for RCC work
in Beam as per detailed drawings and designs or as
directed by Engineer-in-charge including normal
dewatering, centering, formwork, compaction, finishing the
form surface with cement mortar 1:3 of sufficient minimum
thickness to give a smooth and even surface wherever
6 necessary or roughing if special finish is to be provided 78.00 1.00 Cum. 78.00
and curing including transporting from mix plant upto
distance of 25 Km, pouring the concrete at work site for
1.5m lift above G.L. and 5.0m lift below GL, etc.
complete... (Excluding reinforcement and structural steel).

Providing and casting in situ Ready Mix Cement


Concrete M-20/M-25 Grade of trap / Granite /
quartzite / gneiss metal of approved quality for RCC work
in Slab as per detailed drawings and designs or as directed
by Engineer-in-charge including normal dewatering,
centering, formwork, compaction, finishing the form
surface with cement mortar 1:3 of sufficient minimum
thickness to give a smooth and even surface wherever
7 necessary or roughing if special finish is to be provided 102.00 1.00 Cum. 102.00
and curing including transporting from mix plant upto
distance of 25 Km, pouring the concrete at work site for
1.5m lift above G.L. and 5.0m lift below GL, etc.
complete... (Excluding reinforcement and structural steel).
CSR Rate 8185 + Pump Rate 175 =8360 ( For Pump rate
Ref CSR I. N. a) Static Pump Page No-13

Providing and casting in situ Ready Mix Cement


Concrete M-20/M-25 Grade of trap / Granite / quartzite /
gneiss metal of approved quality for RCC Chajja as per
detailed drawings and designs or as directed by Engineer-
in-charge including normal dewatering, centering,
formwork, compaction, finishing the form surface with
cement mortar 1:3 of sufficient minimum thickness to give
8 a smooth and even surface wherever necessary or roughing 2.00 1.00 Cum. 2.00
if special finish is to be provided and curing including
transporting from mix plant upto distance of 25 Km,
pouring the concrete at work site for 1.5m lift above G.L.
and 5.0m lift below GL, etc. complete... (Excluding
reinforcement and structural steel).

Providing & fixing in position TMT Steel bar


reinforcement of various diameters for R.C.C. pile caps,
footings, foundations, slabs, beams, columns, canopies,
staircases, newels, chajjas, lintels, pardies, coping, fins,
9 arches, etc. as per detailed designs, drawings and 36.00 1.00 MT. 36.00
schedules, including cutting, bending, hooking the bars,
binding with wires or tack welding and supporting as
required completed.
Providing First/Second class Burnt Brick masonry with
conventional / IS type bricks in cement mortar 1:6 in
foundation and plinth of inner walls & external walls,
10 including bailing out water manually, striking joints on 223.00 1.00 Cum. 223.00
unexposed faces, racking out joints on exposed faces and
watering complete.

Providing and fixing Aluminium Glazing Partition etc


11 complete. 83.00 1.00 Sqm. 83.00

Providing First/Second class Burnt Brick masonry with


conventional / IS type bricks in cement mortar 1:4 in
half brick thick wall including mild steel longitudinal
reinforcement of 2 bars of 6mm dia / 2 hoop iron strip
12 25mm x 1.6mm painted with anticorrosive paint at every 108.00 1.00 Sqm. 108.00
third course properly bent and bonded at ends, scaffolding,
raking out joints and watering complete.

Providing and laying Cement based water proofing


13 treatment of 120 mm av. thickness etc. complete. 300.00 1.00 Sqm. 300.00

Providing waterproof plaster over RCC Chajja, Parapet


14 Wall and sides etc complete. 20.00 1.00 Sqm. 20.00
Providing internal cement plaster 12mm thick in a
single coat in cement mortar 1:6 without neeru finish to
15 concrete or brick surface in all positions including racking 1275.00 1.00 Sqm. 1275.00
out joints, scaffolding and curing complete.

Providing neeru finish to plaster surface in all positions


16 including scaffolding and curing complete. 1275.00 1.00 Sqm. 1275.00

Providing neeru finish to plastered surfaces for


17 ceiling.Including scaffolding curing complete. 532.00 1.00 Sqm. 532.00

18mm cement plaster of mix 1:5 (1 cement : 5 coarse


sand) with under layer 12mm thick and top layer of 6mm
18 763.00 1.00 Sqm. 763.00
thick for external plaster.

Providing and applying primer coat of approved quality to


old/new wall surfaces to receive oil bound distemper
treatment, including scaffolding, preparing the surface as
19 directed completed. (prior approval of S.E. shall be 1807.00 1.00 Sqm. 1807.00
obtained)

Providing and applying two coats of water proof cement


paint and one coat primer of approved manufacturer &
colour to the plastered surface including scaffolding,
20 763.00 1.00 Sqm. 763.00
preparing the surface, watering for two days complete.

Providing and applying washable oil bound distemper of


approved colour shade and quality to old/new surface in
21 two coats, including scaffolding, preparing surface 1807.00 1.00 Sqm. 1807.00
(excluding priming coat) complete.

Providing & fixing Aluminium door with DORMA BTS80 -


universal floor spring, double door with mechanical back
22 check, hydraulic hold open or delayed action etc complete. 12.00 1.00 Sqm. 12.00

Providing & fixing Door with aluminium frame and glazed


23 shutter with ventilators etc complete. 29.00 1.00 Sqm. 29.00

Providing & fixing Fire Proof Steel Door etc complete.


24 6.00 1.00 Sqm. 6.00

Providing & fixing Aluminium frame with particle board


25 shutter door etc complete. 12.00 1.00 Sqm. 12.00

Supplying & fixing in position aluminium glazing FROSTED


26 GLASS window etc complete. 6.00 1.00 Sqm. 6.00

Providing & fixing Rolling Shutter etc complete.


27 8.00 1.00 Sqm. 8.00

Supplying & fixing in position Aluminium glazing window


28 etc complete. 64.00 1.00 Sqm. 64.00

Supplying & fixing in position Aluminium glazed louvered


29 ventilators etc complete. 1.00 1.00 Sqm. 1.00

Providing & Laying in Granite flooring etc complete.


30 118.00 1.00 Sqm. 118.00
Providing & Laying in 52MM thick Cement Concrete
31 flooring with Hardcrete flooring etc complete. 150.00 1.00 Sqm. 150.00

Providing & Laying in VITRIFIED flooring etc complete.


32 284.00 1.00 Sqm. 284.00

Providing & Laying in DHALPUR STONE flooring etc


33 complete. 30.00 1.00 Sqm. 30.00

Providing & Laying in 19MM thick Polished Granite 150 mm


34 high skirting of approved material etc complete. 17.00 1.00 Sqm. 17.00

Providing & Laying in VITRIFIED skirting of approved


35 material etc complete. 44.00 1.00 Sqm. 44.00

Providing & Laying in FALSE CEILING of approved


36 material etc complete. 390.00 1.00 Sqm. 390.00

Providing & Laying 75 thk well compacted brick


37 aggregate (Plinth Protection) 60.00 1.00 Sqm. 60.00

Providing & Laying 50 thk PCC 1:2:4 (Plinth Protection)


38 3.00 1.00 Cum. 3.00

PVC waterstorage tank confirming to ISI: 12701 with


39 cover & locking arrangement etc. complete 94.00 1.00 RMt. 94.00

Providing & Fixing 110 mm diameter Rain Water Pipe


40 11.00 1.00 NOS. 11.00

Providing & Fixing 450X450 SIZE KHURRA ETC.


41 1.00 1.00 NOS. 1.00
COMPLETE
42
43 Plumbing
44 Electrical
45 HVAC (if any)
46 Contingencies
47 Water Charges
48 Contractor Profit
Name of work: B1 TYPE BUILDING

Measurement

Item
Descriptions of Item No Length Breadth Depth Quantity Unit
No.
Excavation for foundation in Earth soils of all
1 types, sand gravel and soft murum etc complete.

For footing of col


F1 2 2.00 1.85 2.6 19.24
F2 10 2.10 1.90 2.6 103.74
F3 2 2.40 2.00 2.6 24.96
F4 4 2.55 2.05 2.6 54.37
F5 4 2.80 2.30 2.6 66.98
Total 269.28
Say 270.00 Cum.

2 Sand Filling
BED ROOM 1 2 3.200 3.240 0.100 2.07
BED ROOM 2 2 3.445 3.175 0.100 2.19
TOI 4 2.150 1.500 0.100 1.29
KITCHEN 2 3.230 2.540 0.100 1.64
LIVING ROOM 2 4.450 3.230 0.100 2.87
STAIR 1 2.400 5.130 0.100 1.23
Total 11.30
Say 12.00 Cum.
Providing and laying in situ Ready Mix
cement concrete M-7.5 grade using design
mix with minimum cement content as per IS
3 456 with maximum water cement ratio 0.6
using maximum 25/30 mm size and down
trap metal for foundation and bedding etc
complete.

A) For footing of col


F1 2 2.000 1.850 0.100 0.740
F2 10 2.100 1.900 0.100 3.990
F3 2 2.400 2.000 0.100 0.960
F4 4 2.550 2.050 0.100 2.091
F5 4 2.800 2.300 0.100 2.576
B) Plinth Beam
X Grid
PB1 1 2.860 0.230 0.050 0.03
PB2 2 1.985 0.230 0.050 0.05
PB3 2 4.450 0.230 0.050 0.10
PB4 2 2.540 0.230 0.050 0.06
PB4a 2 0.995 0.230 0.050 0.02
PB5 1 2.100 0.230 0.050 0.02
PB6 2 4.180 0.230 0.050 0.10
PB7 1 2.345 0.230 0.050 0.03
PB8 2 3.200 0.230 0.050 0.07
PB8a 2 0.995 0.230 0.050 0.02
PB9 1 3.115 0.230 0.050 0.04
PB10 2 3.175 0.230 0.050 0.07
PB11 2 1.560 0.230 0.050 0.04
PB11 2 1.605 0.230 0.050 0.04
PB11 1 0.940 0.230 0.050 0.01
PB11a 2 0.995 0.230 0.050 0.02
PB11a 2 0.830 0.230 0.050 0.02
PB11a 2 0.830 0.230 0.050 0.02
PB12 2 3.130 0.230 0.050 0.07
Y Grid
PB13 2 1.955 0.230 0.050 0.04
PB14 2 3.115 0.230 0.050 0.07
PB15 2 2.905 0.230 0.050 0.07
PB15a 2 0.600 0.230 0.050 0.01
PB16 2 1.500 0.230 0.050 0.03
PB17 2 2.895 0.230 0.050 0.07
PB18 2 1.500 0.230 0.050 0.03
PB19 2 2.635 0.230 0.050 0.06
PB20 2 3.040 0.230 0.050 0.07
PB20a 2 0.600 0.230 0.050 0.01
PB21 2 3.230 0.230 0.050 0.07
PB22 1 2.150 0.230 0.050 0.02
C) Rooms
BED ROOM 1 2 3.200 3.240 0.100 2.07
BED ROOM 2 2 3.445 3.175 0.100 2.19
TOI 4 2.150 1.500 0.100 1.29
KITCHEN 2 3.230 2.540 0.100 1.64
LIVING ROOM 2 4.450 3.230 0.100 2.87
Total 21.83
Say 22.00 Cum.

Providing and laying in situ Ready Mix Cement


Concrete M-20 grade of trap / granite / quartzite /
4 gneiss metal for RCC work in foundation like raft,
grillage, strip foundation and footing of RCC column
etc complete.

REFER ATTACH SHEET "FDN FOR CRB" 25.28


Total 25.28
Say 26.00 Cum.

P & L in situ Ready Mix Cement Conrete M-20


5 Grade of trap metel for RCC Column as per detailed
drawing etc complete.

Column -C1,
F2/C1
Below Plinth 4 0.230 0.450 2.10 0.869
Above Plinth 4 0.230 0.450 7.85 3.250
Column -C2,
F1/C2
Below Plinth 2 0.230 0.450 2.15 0.445
Above Plinth 2 0.230 0.450 6.80 1.408
F2/C2
Below Plinth 2 0.230 0.450 2.10 0.435
Above Plinth 2 0.230 0.450 6.80 1.408
F4/C2
Below Plinth 2 0.230 0.450 2.05 0.424
Above Plinth 2 0.230 0.450 7.85 1.625
Column -C3,
F5/C3
Below Plinth 2 0.230 0.450 2.00 0.414
Above Plinth 2 0.230 0.450 7.85 1.625
Column -C4,
F2/C4
Below Plinth 2 0.230 0.450 2.10 0.435
Above Plinth 2 0.230 0.450 7.85 1.625
Column -C5,
F5/C5
Below Plinth 2 0.300 0.500 2.00 0.600
Above Plinth 2 0.300 0.500 7.85 2.355
Column -C6,
F3/C6
Below Plinth 2 0.230 0.450 2.10 0.435
Above Plinth 2 0.230 0.450 7.85 1.625
Column -C7,
F4/C7
Below Plinth 2 0.300 0.500 2.15 0.645
Above Plinth 2 0.300 0.500 7.85 2.355
Total 21.977
Say 22.000 Cum.

P & L in situ Ready Mix Cement Conrete M-20


6 Grade of trap metal for RCC Beam as per detailed
drawing etc complete.

A) Plinth Beam
X Grid
PB1 1 2.860 0.230 0.450 0.30
PB2 2 1.985 0.230 0.450 0.41
PB3 2 4.450 0.230 0.450 0.92
PB4 2 2.540 0.230 0.450 0.53
PB4a 2 0.995 0.230 0.450 0.21
PB5 1 2.100 0.230 0.450 0.22
PB6 2 4.180 0.230 0.450 0.87
PB7 1 2.345 0.230 0.600 0.32
PB8 2 3.200 0.230 0.450 0.66
PB8a 2 0.995 0.230 0.450 0.21
PB9 1 3.115 0.230 0.450 0.32
PB10 2 3.175 0.230 0.450 0.66
PB11 2 1.560 0.230 0.450 0.32
PB11 2 1.605 0.230 0.450 0.33
PB11 1 0.940 0.230 0.450 0.10
PB11a 2 0.995 0.230 0.450 0.21
PB11a 2 0.830 0.230 0.450 0.17
PB11a 2 0.830 0.230 0.450 0.17
PB12 2 3.130 0.230 0.450 0.65
Y Grid
PB13 2 1.955 0.230 0.450 0.40
PB14 2 3.115 0.230 0.450 0.64
PB15 2 2.905 0.230 0.450 0.60
PB15a 2 0.600 0.230 0.450 0.12
PB16 2 1.500 0.230 0.450 0.31
PB17 2 2.895 0.230 0.450 0.60
PB18 2 1.500 0.230 0.450 0.31
PB19 2 2.635 0.230 0.450 0.55
PB20 2 3.040 0.230 0.450 0.63
PB20a 2 0.600 0.230 0.450 0.12
PB21 2 3.230 0.230 0.450 0.67
PB22 1 2.150 0.230 0.450 0.22
B) Lintel Beam
GROUND FLOOR
W 4 2.100 0.230 0.350 0.68
W2 2 1.500 0.230 0.350 0.24
W4 2 0.750 0.230 0.350 0.12
W5 4 0.750 0.230 0.350 0.24
W6 2 0.750 0.230 0.350 0.12
DW1 2 2.100 0.230 0.350 0.34
D1 2 1.050 0.230 0.350 0.17
D2 6 0.900 0.230 0.350 0.43
D3 4 0.750 0.230 0.350 0.24
O1 1 0.900 0.230 0.350 0.07
FIRST FLOOR
W 4 2.100 0.230 0.350 0.68
W2 2 1.500 0.230 0.350 0.24
W4 2 0.750 0.230 0.350 0.12
W5 4 0.750 0.230 0.350 0.24
W6 2 0.750 0.230 0.350 0.12
DW1 2 2.100 0.230 0.350 0.34
DW2 4 2.100 0.230 0.350 0.68
D1 2 1.050 0.230 0.350 0.17
D2 6 0.900 0.230 0.350 0.43
D3 4 0.750 0.230 0.350 0.24
O1 1 0.900 0.230 0.350 0.07
C) Floor Beam
GRID X
FB1 1 2.860 0.230 0.600 0.39
FB2 2 1.985 0.230 0.600 0.55
FB3 2 4.450 0.230 0.600 1.23
FB4 2 2.540 0.230 0.600 0.70
FB4a 2 0.995 0.230 0.600 0.27
FB5 1 4.180 0.230 0.600 0.58
FB6 1 2.345 0.230 0.600 0.32
FB7 1 4.180 0.230 0.600 0.58
FB8 2 3.200 0.230 0.450 0.66
FB8a 2 0.995 0.230 0.600 0.27
FB9 1 3.115 0.230 0.600 0.43
FB10 2 3.175 0.230 0.600 0.88
FB11 2 3.130 0.230 0.600 0.86
FB12 2 0.995 0.115 0.450 0.10
FB12 2 1.995 0.115 0.450 0.21
FB12 1 0.940 0.115 0.450 0.05
FB12 2 0.830 0.115 0.450 0.09
FB13 2 1.560 0.230 0.450 0.32
FB13 2 1.605 0.230 0.450 0.33
FB13a 4 1.580 0.230 0.300 0.44

GRID Y 1 20.000 0.300 0.500 3.00


FB14 2 1.955 0.230 0.600 0.54
FB15 2 3.115 0.230 0.600 0.86
FB16 2 2.905 0.230 0.600 0.80
FB16a 2 0.600 0.230 0.300 0.08
FB17 2 1.500 0.230 0.450 0.31
FB18 2 2.895 0.230 0.450 0.60
FB19 2 1.500 0.230 0.450 0.31
FB20 2 2.635 0.230 0.600 0.73
FB21 2 3.040 0.230 0.600 0.84
FB21a 2 0.600 0.230 0.350 0.10
FB22 2 3.230 0.230 0.600 0.89
FB23 1 2.150 0.230 0.450 0.22
FB24 2 1.430 0.230 0.600 0.39
D) Roof Beam
X Grid 1 2.860 0.230 0.600 0.39
RB2 2 1.985 0.230 0.600 0.55
RB3 2 4.450 0.230 0.600 1.23
RB4 2 2.540 0.230 0.450 0.53
RB4a 2 0.995 0.230 0.600 0.27
RB5 1 4.180 0.230 0.450 0.43
RB6 1 2.345 0.230 0.600 0.32
RB7 1 4.180 0.230 0.450 0.43
RB8 2 3.200 0.230 0.450 0.66
RB8a 2 0.995 0.230 0.600 0.27
RB9 1 3.115 0.230 0.600 0.43
RB10 2 3.175 0.230 0.600 0.88
RB11 2 3.130 0.230 0.600 0.86
RB12 1 0.940 0.115 0.450 0.05
RB12 2 0.995 0.115 0.450 0.10
RB12 4 0.830 0.115 0.450 0.17
RB13 2 1.560 0.230 0.300 0.22
RB13 2 1.605 0.230 0.300 0.22
RB13a 4 1.580 0.230 0.300 0.44
Y Grid
RB14 1 20.000 0.230 0.600 2.76
RB15 2 1.955 0.230 0.450 0.40
RB16 2 3.115 0.230 0.600 0.86
RB16a 2 0.600 0.230 0.300 0.08
RB17 2 2.895 0.230 0.450 0.60
RB18 2 1.500 0.230 0.450 0.31
RB19 2 2.635 0.230 0.600 0.73
RB20 2 3.040 0.230 0.600 0.84
RB20a 2 0.600 0.230 0.450 0.12
RB21 2 3.230 0.230 0.600 0.89
RB22 2 1.430 0.230 0.600 0.39
E) Staircase Beam
MTB1 2 2.400 0.230 0.400 0.44
MTB2 2 2.400 0.230 0.400 0.44
LB 2 2.400 0.230 0.630 0.70
F) Balcony Beam
BB1 2 3.350 0.150 1.350 1.36
BB2 2 3.350 0.150 1.350 1.36
Total 58.430 Cum.
Say 59.000 Cum.

P & L in situ Ready Mix Cement Conrete M-20


7 Grade of trap metel for RCC Slab as per detailed
drawing etc complete.
A) Ground Floor Slab
S1 2 4.450 3.230 0.120 3.450
S2 2 3.175 3.445 0.110 2.406
2 1.260 0.485 0.110 0.134
S3 4 2.150 1.500 0.100 1.290
S4 2 2.540 3.230 0.110 1.805
S5 2 3.200 3.240 0.110 2.281
2 2.045 1.500 0.110 0.675
2 1.215 0.485 0.110 0.130
B) First Floor Slab
S1 2 4.450 3.230 0.120 3.450
S2 2 3.175 3.445 0.110 2.406
2 1.260 0.485 0.110 0.134
S3 2 4.310 1.500 0.100 1.293
S4 2 2.540 3.230 0.110 1.805
1 3.115 2.150 0.110 0.737
S5 2 3.200 3.240 0.110 2.281
2 1.215 0.485 0.110 0.130
Balcony slab 4 3.350 1.350 0.150 2.714
2 3.300 1.050 0.100 0.69
Staircase roof slab(Head room slab) 1 2.400 1.675 0.140 0.563
Waist slab 4 2.000 1.100 0.150 1.320
2 2.000 1.100 0.150 0.660
Total 30.356
Say 31.000 Cum.

P & L in situ Reay Mix Cement Conrete M-20


8 Grade of trap metel for RCC Chajja as per detailed
drawing etc complete.
RCC Chajja Over W 4 2.000 0.600 0.100 0.480
RCC Chajja Over W2 4 1.700 0.600 0.100 0.408
RCC Chajja Over W4 4 1.400 0.600 0.100 0.336
RCC Chajja Over W5 4 0.950 0.600 0.100 0.228
RCC Chajja Over W6 4 1.050 0.600 0.100 0.252
Total 1.704
Say 2.000 Cum.

Providing & fixing in position TMT Steel bar


reinforcement of various diameters for R.C.C.
pile caps, footings, foundations, slabs, beams,
9 columns, canopies, staircases, newels, chajjas,
lintels, pardies, coping, fins, arches, etc complete.

Total 19.780 MT.


Say 20.000 MT.

Providing Second class Burnt Brick masonry with


10 conventional / IS type bricks in cement mortar 1:6
in foundation and plinth etc complete.

Along Grid A & F 2 7.680 0.230 7.950 28.09


Deduction W5 -4 0.750 0.230 1.050 -0.72
Deduction W6 -4 0.850 0.230 1.650 -1.29
Along Grid B & E 2 4.395 0.115 7.000 7.08
2 2.635 0.230 7.000 8.48
Deduction D2 -2 0.900 0.230 2.550 -1.06
Deduction D3 -2 0.750 0.230 2.100 -0.72
Along Grid C & D 2 6.210 0.230 7.000 20.00
2 2.150 0.115 7.000 3.46
Deduction D1 -2 1.050 0.230 2.100 -1.01
Deduction D3 -2 0.750 0.230 2.100 -0.72
Along Grid 1 1 12.410 0.230 7.950 22.69
1 2.860 0.230 10.825 7.12
Deduction W2 -2 1.500 0.230 1.400 -0.97
Deduction W4 -2 0.750 0.230 1.100 -0.38
Deduction DW1 -2 2.100 0.230 2.550 -2.46
Along Grid 2 1 15.100 0.115 7.000 12.16
2 0.995 0.230 7.950 3.64
Deduction O -4 0.900 0.115 2.550 -1.06
Along Grid 3 2 3.200 0.115 7.000 5.15
2 0.995 0.230 7.950 3.64
Deduction D2 -2 0.900 0.230 2.550 -1.06
Along Grid 4 1 14.160 0.230 7.950 25.89
1 2.860 0.230 10.825 7.12
Deduction W -4 2.100 0.230 1.700 -3.28
Deduction W5 -4 0.750 0.230 1.100 -0.76
Deduction DW2 -4 2.100 0.230 2.550 -4.93
Total 134.090
Say 135.000 Cum.
Providing Second class Burnt Brick masonry with
conventional / IS type bricks in cement mortar 1:4
11
in half brick thick wall etc complete.

GF 1 33.815 3.150 106.517


FF 1 44.000 3.150 138.600
Parapet Wall 1 59.880 1.050 62.874
Total 307.991

Say 308.000 Sqm.

Providing India waterproffing including brick bat


12 coba etc. complete.
Roof slab 1 110.644 110.644
Total 110.644
Say 111.000 Sq.m
Providing waterproof plaster over RCC Chajja,
Parapet Wall and sides in cement mortar 1:3 with
13 neat finishing, floating using approved water
proofing compound at the rate of One Kg. of cement
etc complete.
RCC Chajja 1 20.000 20.000
parapet wall 1 59.880 0.230 13.772
Total 33.772
Say 34.000 Sq.m

Providing internal cement plaster 12mm


thick in a single coat in cement mortar 1:4
without neeru finish to concrete or brick
14
surface in all positions including racking out
joints, scaffolding and curing complete.

GROUND FLOOR
BED ROOM 1 4 3.200 3.150 40.320
4 3.240 3.150 40.824
BED ROOM 2 4 3.445 3.150 43.407
4 3.175 3.150 40.005
TOI 8 2.150 3.150 54.180
8 1.500 3.150 37.800
KITCHEN 4 3.230 3.150 40.698
4 2.540 3.150 32.004
LIVING ROOM 4 4.450 3.150 56.070
4 3.230 3.150 40.698
STAIR 2 2.400 3.150 15.120
2 5.130 3.150 32.319
Deductions
W -4 2.100 1.700 -14.280
W2 -2 1.500 1.400 -4.200
W4 -2 0.750 1.100 -1.650
W5 -4 0.750 1.100 -3.300
W6 -2 0.750 1.100 -1.650
DW1 -2 2.100 2.550 -10.710
D1 -2 1.050 2.100 -4.410
D2 -6 0.900 2.550 -13.770
D3 -4 0.750 2.100 -6.300
O1 -1 0.900 2.550 -2.295
FIRST FLOOR
Qnty 473.445
DW2 -4 1.050 2.100 -8.820
Deductions -71.385

Total 804.120
Say 805.000 Sq.m

Providing neeru finish to plaster surface in


15 all positions including scaffolding and curing
complete.
Internal cement plaster 12 mm thick Qty. same as per item no 805.000
Total 805.000
Say 805.000 Sq.m
Providing neeru finish to plastered
16 surfaces for ceiling.Including scaffolding
curing complete.
BED ROOM 1 2 3.200 3.240 20.736
BED ROOM 2 2 3.445 3.175 21.876
TOI 4 2.150 1.500 12.900
KITCHEN 2 3.230 2.540 16.408
LIVING ROOM 2 4.450 3.230 28.747
STAIR 1 2.400 5.130 12.312
Total 112.979
For FF Level 112.979
Say 226.000 Sq.m

Providing sand face plaster externally in


two coats using approved screened sand in
17 all positions, including providing base coat of
15mm thick in cement mortar 1:4 etc
complete.
Along Grid 1 & 4 2 16.150 7.900 255.170
2 2.860 10.825 61.919
Along Grid A & F 2 8.070 7.900 127.506
2 2.860 10.825 61.919
Deduction -14.794
Total 491.720
Say 492.000 Sq.m

Providing and applying primer coat of


approved quality to old/new wall surfaces to
18
receive oil bound distemper treatment etc
complete.
Qty. same as per item no. 917.979
Total 917.979
Say 918.000 Sq.m

Providing and applying two coats of water


proof cement paint and one coat primer
19 of approved manufacturer & colour to the Qty. same as per item no. 492.000
plastered surface etc complete.

492.000
Say 492.000 Sq.m

Providing and applying washable oil bound


distemper of approved colour shade and
20 Qty. same as per item no 918.000
quality to old/new surface in two coats etc
complete.
Say 918.000 Sq.m

21 Doors and Windows Schedule


GROUND FLOOR
W 4 2.100 1.700 14.28
W2 2 1.500 1.400 4.2
W4 2 0.750 1.100 1.65
W5 4 0.750 1.100 3.3
W6 2 0.750 1.100 1.65
DW1 2 2.100 2.550 10.71
D1 2 1.050 2.100 4.41
D2 6 0.900 2.550 13.77
D3 4 0.750 2.100 6.3
O1 1 0.900 2.550 2.295
FIRST FLOOR
W 4 2.100 1.700 14.28
W2 2 1.500 1.400 4.2
W4 2 0.750 1.100 1.65
W5 4 0.750 1.100 3.3
W6 2 0.750 1.100 1.65
DW1 2 2.100 2.550 10.71
DW2 4 2.100 2.550 21.42
D1 2 1.050 2.100 4.41
D2 6 0.900 2.550 13.77
D3 4 0.750 2.100 6.3
O1 1 0.900 2.550 2.295
Total 146.550
Say 147.000 Sq.m
22 Flooring Details
A) 22mm Thick. Terrazo Tile light shade
LIVING ROOM 4 4.450 3.230 57.49
BEDROOM 1 4 3.200 3.445 44.10
BEDROOM 2 4 3.175 3.445 43.75
BALCONY 4 3.150 1.250 15.75
PASSAGE 1 1.100 5.100 5.61
Total 166.70
Say 167.00 Sq.m
Anti Skid ceramic glazed first quality
B)
floor tile-300x300
KITCHEN 4 2.540 3.230 32.82
TOILET 8 2.150 1.500 25.80
Total 58.62
Say 59.00 Sq.m
C) 80mm Thick Udaipur green marble stone
STAIRCASE 3 2.400 3.560 25.63
Total 25.63
Say 26.00 Sq.m
D) Brick bat coba water proofing
TERRACE 1 110.644 110.64
Total 110.64
Say 111.00 Sq.m

Providing & Laying in Ceramic Glazed Tiles


23 30 x 30 cm with white cement DADO of
approved material etc complete.
TOILET 16 2.150 2.100 72.240
16 1.500 2.100 50.400
KITCHEN 8 2.540 2.100 42.672
8 3.230 2.100 54.264
Total 165.312
Say 166.000 Sq.m

Providing & Laying 75 thk well compacted


24 brick aggregate (Plinth Protection) 1 70.000 0.750 52.500
Total 52.500
Say 53.000 Sq.m

Providing & Laying 50 thk PCC 1:2:4 (Plinth


25 1 70.000 0.750 0.050 2.625
Protection)
Total 2.625
Say 3.000 Cu.m
Providing & Fixing 110 mm diameter Rain
26
Water Pipe
8 6.750 54.000 Rmt.
Total 54.000
Say 54.000 Rmt.
L B D1 D/H
Fdn PCC PCC Col Col Col Col Col Ht above Excavation PCC VOL
Nos
Depth Depth Offset Offset Nos Length Width GL (M3) (M3)
mt mt mt mt

F1(C2) 2 1.80 1.65 0.15 0.35 2.6 0.1 0.1 0.05 1 0.23 0.45 0.3 19.98 0.74
F2(C1) 4 1.90 1.70 0.2 0.4 2.6 0.1 0.1 0.05 1 0.23 0.45 0.3 43.09 1.60
F2(C2) 2 1.90 1.70 0.2 0.4 2.5 0.1 0.1 0.05 1 0.23 0.45 0.3 20.75 0.80
F2(C4) 2 1.90 1.70 0.2 0.4 2.5 0.1 0.1 0.05 1 0.23 0.45 0.3 20.75 0.80
F2(C6) 2 1.90 1.70 0.2 0.4 2.5 0.1 0.1 0.05 1 0.23 0.45 0.3 20.75 0.80
F3(C6) 2 2.20 1.80 0.2 0.4 2.5 0.1 0.1 0.05 1 0.23 0.45 0.3 24.96 0.96
F4(C2) 2 2.35 1.85 0.2 0.45 2.5 0.1 0.1 0.05 1 0.23 0.45 0.3 27.18 1.05
F4(C7) 2 2.35 1.85 0.2 0.45 2.5 0.1 0.1 0.05 1 0.30 0.50 0.3 27.18 1.05
F5(C3) 2 2.60 2.10 0.2 0.5 2.5 0.1 0.1 0.05 1 0.23 0.45 0.3 33.49 1.29
F5(C5) 2 2.60 2.10 0.2 0.5 2.6 0.1 0.1 0.05 1 0.30 0.50 0.3 34.78 1.29
TOTAL QUANTITY =
CONC VOL Formwork Backfill
(M3) Qty. (M2) (M3)

1.41 9.01 17.83


3.70 19.36 37.80
1.85 9.41 18.10
1.85 9.41 18.10
1.85 9.41 18.10
2.25 9.73 21.75
2.64 9.75 23.50
2.67 10.88 23.46
3.51 10.02 28.69
3.55 11.44 29.94
25.28
Name of work: TRANSIT CAMP BUILDING

REF. DRG . - C-ENGG-STD-TRANSIT CAMP-01 TO 15 & C-ENGG-TS-TC-STR-01a TO 06


ABSTRACT

Item
Item Discription QTY. RATE UNIT TOTAL
No.
Excavation for foundation in Earth soils of all types,
sand gravel and soft murum including removing the
excavated materials upto a distance of 50 metres beyond
building area and lift as specified, stacking and spreading
1 as directed including dewatering unless provided 296.00 1.00 Cum. 296.00
elsewhere, preparing the bed for the foundation and
necessary backfilling, ramming, watering complete
excluding shoring and strutting.( Lift Upto 1.5 M )

Sand Filling

2 25.00 1.00 Cum. 25.00

Providing and laying in situ Ready Mix cement concrete


M-7.5 grade using design mix with minimum cement
content as per IS 456 with maximum water cement ratio
0.45 using maximum 25/30 mm size and down trap metal
for foundation and bedding with all labours, materials,
plant & equipments, shuttering form work, staging,
including transporting, placing, vibrating with mechanical
3 vibrator, finishing and curing etc. complete. The item also 89.00 1.00 Cum. 89.00
includes heavy dewatering by using pumps or manually. .
The cost also includes all types of taxes, sales tax,
insurance, cess levied by local authority etc. complete.
( 3969 CSR Rate + 830 Additional for RMC Rate = 4799 )

Providing and laying in situ Ready Mix Cement Concrete


M-20 grade of trap / granite / quartzite / gneiss metal for
RCC foundation like raft, grillage, strip foundation and
footing of RCC column and steel stanchions including
normal dewatering, formwork, compaction, finishing and
curing including transporting from mix plant upto distance
4 24.00 1.00 Cum. 24.00
of 25 Km, pouring the concrete at work site for 1.5m lift
above G.L. and 5.0m lift below GL, etc. complete...
(Excluding reinforcement and structural steel).
Providing and casting in situ Ready Mix Cement
Concrete M-20 Grade of trap / Granite / quartzite /
gneiss metal of approved quality for RCC Column as per
detailed drawings and designs or as directed by Engineer-
in-charge including normal dewatering, centering,
formwork, compaction, finishing the form surface with
cement mortar 1:3 of sufficient minimum thickness to give
a smooth and even surface wherever necessary or
5 31.00 1.00 Cum. 31.00
roughening if special finish is to be provided and curing
including transporting from mix plant upto distance of 25
Km, pouring the concrete at work site for 1.5m lift above
G.L. and 5.0m lift below GL, etc. complete... (Excluding
reinforcement and structural steel).
Providing and casting in situ Ready Mix Cement
Concrete M-20 Grade of trap / Granite / quartzite /
gneiss metal of approved quality for RCC work in Beam
as per detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering, centering,
formwork, compaction, finishing the form surface with
cement mortar 1:3 of sufficient minimum thickness to give
a smooth and even surface wherever necessary or roughing
6 if special finish is to be provided and curing including 65.00 1.00 Cum. 65.00
transporting from mix plant upto distance of 25 Km,
pouring the concrete at work site for 1.5m lift above G.L.
and 5.0m lift below GL, etc. complete... (Excluding
reinforcement and structural steel).

Providing and casting in situ Ready Mix Cement


Concrete M-20 Grade of trap / Granite / quartzite /
gneiss metal of approved quality for RCC work in Slab as
per detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering, centering,
formwork, compaction, finishing the form surface with
cement mortar 1:3 of sufficient minimum thickness to give
a smooth and even surface wherever necessary or roughing
7 if special finish is to be provided and curing including 47.00 1.00 Cum. 47.00
transporting from mix plant upto distance of 25 Km,
pouring the concrete at work site for 1.5m lift above G.L.
and 5.0m lift below GL, etc. complete... (Excluding
reinforcement and structural steel). CSR Rate 8185 +
Pump Rate 175 =8360 ( For Pump rate Ref CSR I. N. a)
Static Pump Page No-13

Providing and casting in situ Ready Mix Cement


Concrete M-20 Grade of trap / Granite / quartzite / gneiss
metal of approved quality for RCC Chajja as per detailed
drawings and designs or as directed by Engineer-in-charge
including normal dewatering, centering, formwork,
compaction, finishing the form surface with cement mortar
1:3 of sufficient minimum thickness to give a smooth and
even surface wherever necessary or roughing if special
8 finish is to be provided and curing including transporting 4.00 1.00 Cum. 4.00
from mix plant upto distance of 25 Km, pouring the
concrete at work site for 1.5m lift above G.L. and 5.0m lift
below GL, etc. complete... (Excluding reinforcement and
structural steel).

Providing & fixing in position TMT Steel bar


reinforcement of various diameters for R.C.C. pile caps,
footings, foundations, slabs, beams, columns, canopies,
staircases, newels, chajjas, lintels, pardies, coping, fins,
9 arches, etc. as per detailed designs, drawings and 24.00 1.00 MT. 24.00
schedules, including cutting, bending, hooking the bars,
binding with wires or tack welding and supporting as
required completed.
Providing Second class Burnt Brick masonry with
conventional / IS type bricks in cement mortar 1:6 in
foundation and plinth of inner walls & external walls,
including bailing out water manually, striking joints on
10 145.00 1.00 Cum. 145.00
unexposed faces, racking out joints on exposed faces and
watering complete.

Providing Second class Burnt Brick masonry with


conventional / IS type bricks in cement mortar 1:4 in
half brick thick wall including mild steel longitudinal
reinforcement of 2 bars of 6mm dia / 2 hoop iron strip
11 25mm x 1.6mm painted with anticorrosive paint at every 302.00 1.00 Sqm. 302.00
third course properly bent and bonded at ends, scaffolding,
raking out joints and watering complete.

Providing and laying water proofing treatment of 112


mm av. thickness consisting of 12 mm thick layer in
Cement Mortar 1:3 with water proofing compound at the
rate of One Kilograme per bag of cement as base,
constructing and laying brick bat coba in cement mortar
1:5 with waterproofing compound at the rate of One
Kilogramme per bag of cement and having average
thickness of 80mm and finishing with 20mm thick cement
plaster layer in cement mortar 1:3 with approved water
Proofing compound at the rate of One Kilogramme per
12 cement bag, including all lead, lifts and laid to proper slope 179.00 1.00 Sqm. 179.00
to drain of water entirely including Watta at the junction of
parapet and work upto a height of 300 mm or as directed
and including finishing the top layer of water proofing
treatment with false marking of 30cm x 30cm or as
directed and covering the whole treatment with seven
year’s guarantee, on requisite stamp paper etc. complete.

Providing waterproof plaster over RCC Chajja, Parapet


Wall and sides in cement mortar 1:3 with neat
finishing, floating using approved water proofing compound
13 at the rate of One Kg. of cement etc complete. 55.00 1.00 Sqm. 55.00
Providing internal cement plaster 12mm thick in a
single coat in cement mortar 1:4 without neeru finish to
14 concrete or brick surface in all positions including racking 858.00 1.00 Sqm. 858.00
out joints, scaffolding and curing complete.

Providing neeru finish to plaster surface in all positions


15 including scaffolding and curing complete. 858.00 1.00 Sqm. 858.00

Providing neeru finish to plastered surfaces for


16 ceiling.Including scaffolding curing complete. 311.00 1.00 Sqm. 311.00

Providing sand face plaster externally in two coats


using approved screened sand in all positions, including
providing base coat of 15mm thick in cement mortar 1:4
mixing approved water proofing compound at the rate of 1
kg./ 50 kg. of cement and curing the same for not less
than two days and keeping the surface of base coat rough
17 to receive the sand faced treatment 8mm thick in cement 310.00 1.00 Sqm. 310.00
mortar 1:4 and finishing the surface by taking out grains
and curing for 14 days including preparing the surface,
watering and scaffolding etc. complete.

Providing and applying primer coat of approved quality to


old/new wall surfaces to receive oil bound distemper
treatment, including scaffolding, preparing the surface as
18 directed completed. (prior approval of S.E. shall be 1169.00 1.00 Sqm. 1169.00
obtained)

Providing and applying two coats of water proof cement


paint and one coat primer of approved manufacturer &
colour to the plastered surface including scaffolding,
19 preparing the surface, watering for two days complete. 310.00 1.00 Sqm. 310.00

Providing and applying washable oil bound distemper of


approved colour shade and quality to old/new surface in
20 two coats, including scaffolding, preparing surface 1169.00 1.00 Sqm. 1169.00
(excluding priming coat) complete.

Doors and Windows


21 159.00 1.00 Sqm. 159.00

22 172.00 1.00 Sqm. 172.00


a)Vetirfied Tile-600x600
b)22mm Thick. Terrazo Tile light shade 51.00 1.00 Sqm. 51.00
c)Anti Skid ceramic glazed first quality floor tile-300x300-
26.00 1.00 Sqm. 26.00
IS:15622
d)80mm Thick Udaipur green marble stone 36.00 1.00 Sqm. 36.00
e)Brick bat coba water proofing 179.00 1.00 Sqm. 179.00
Providing & Laying in Ceramic Glazed Tiles 20 x 30 cm with
23 white cement DADO of approved material etc complete. 134.00 1.00 Sqm. 134.00

24 Skirtting Details 76.00 1.00 RMt. 76.00


Providing & Laying 75 thk well compacted brick
25 53.00 1.00 Sqm. 53.00
aggregate (Plinth Protection)
Providing & Laying 50 thk PCC 1:2:4 (Plinth Protection)
26 3.00 1.00 Cum. 3.00
27 Providing & Fixing 110 mm diameter Rain Water Pipe 54.00 1.00 RMt. 54.00
Name of work: TRANSIT CAMP BUILDING

Measurement

Item
Descriptions of Item No Length Breadth Depth Quantity Unit
No.
Excavation for foundation in Earth soils of all
1 types, sand gravel and soft murum etc complete.

For footing of col


F1 2 1.8 1.8 2.6 16.848
F2 3 2.35 2.05 2.6 37.577
F3 4 2.25 2.05 2.6 47.970
F4 4 2.5 2.2 2.6 57.200
F5 4 2.8 2.55 2.6 74.256
F6 2 2.85 2.55 2.6 37.791
CF1 1 3.475 2.6 2.6 23.491
Total 295.133
Say 296.000 Cum.

2 Sand Filling
DOMOTORY 1 4.000 5.000 0.150 3.000
BED ROOM 1 4.000 5.000 0.150 3.000
TOILET BLOCK 1 4.000 3.500 0.150 2.100
DINING 1 4.085 5.115 0.150 3.134
DRAWING 1 8.520 5.000 0.150 6.390
LOBBY 1 3.965 3.465 0.150 2.061
STAIR 1 3.675 3.465 0.150 1.910
KITCHEN 1 3.415 3.565 0.150 1.826
WC, BATH & PASSAGE & STORE 1 1.830 5.000 0.150 1.373
Total 24.794
Say 25.000 Cum.
Providing and laying in situ Ready Mix
cement concrete M-7.5 grade using design
mix with minimum cement content as per IS
3 456 with maximum water cement ratio 0.6
using maximum 25/30 mm size and down
trap metal for foundation and bedding etc
complete.

For footing of col


F1 2 1.800 1.800 0.100 0.648
F2 3 2.350 2.050 0.100 1.445
F3 4 2.250 2.050 0.100 1.845
F4 4 2.500 2.200 0.100 2.200
F5 4 2.800 2.550 0.100 2.856
F6 2 2.850 2.550 0.100 1.454
CF1 1 3.475 2.600 0.100 0.904
Plinth Beam
PB1 1 3.920 0.330 0.050 0.06
PB2 1 12.120 0.330 0.050 0.20
PB3 1 11.420 0.330 0.050 0.19
PB4 1 4.000 0.330 0.050 0.07
4 1.630 0.330 0.050 0.11
PB5 1 10.605 0.330 0.050 0.17
PB6 1 3.300 0.330 0.050 0.05
PB6 1 4.000 0.330 0.050 0.07
PB7 1 6.330 0.330 0.050 0.10
PB8 1 5.340 0.330 0.050 0.09
PB9 1 3.025 0.330 0.050 0.05
PB10 2 7.455 0.330 0.050 0.25
PB11 1 5.340 0.330 0.050 0.09
PB12 1 5.680 0.330 0.050 0.09
PB13 1 12.365 0.330 0.050 0.20
PB14 1 3.465 0.330 0.050 0.06
PB15 1 16.995 0.330 0.050 0.28
PB16 1 1.995 0.330 0.050 0.03
DOMOTORY 1 4.000 5.000 0.100 2.000
BED ROOM 2 4.000 5.000 0.100 4.000
TOILET BLOCK 3 4.000 3.500 0.100 4.200
DINING 4 4.085 5.115 0.100 8.358
DRAWING 5 8.520 5.000 0.100 21.300
LOBBY 6 3.965 3.465 0.100 8.243
STAIR 7 3.675 3.465 0.100 8.914
KITCHEN 8 3.415 3.565 0.100 9.740
WC, BATH & PASSAGE & STORE 9 1.830 5.000 0.100 8.235
Total 88.508
Say 89.000 Cum.
Providing and laying in situ Ready Mix Cement
Concrete M-20 grade of trap / granite / quartzite /
4 gneiss metal for RCC work in foundation like raft,
grillage, strip foundation and footing of RCC column
etc complete.

REFER ATTACH SHEET "FDN FOR TC" 23.908


Total 23.908
Say 24.000 Cum.
P & L in situ Ready Mix Cement Conrete M-20
5 Grade of trap metel for RCC Column as per detailed
drawing etc complete.

C1
Below Plinth 2 0.350 0.350 2.75 0.674
Above Plinth 2 0.350 0.350 3.150 0.772
C2
Below Plinth 2 0.300 0.500 2.65 0.795
Below Plinth 2 0.300 0.500 2.55 0.765
Above Plinth 4 0.300 0.500 7.350 4.410
C3
Below Plinth 2 0.300 0.500 2.6 0.780
Below Plinth 1 0.300 0.500 2.55 0.383
Above Plinth 2 0.300 0.500 7.350 2.205
Above Plinth 1 0.300 0.500 11.350 1.703
C4
Below Plinth 1 0.300 0.500 2.65 0.398
Below Plinth 1 0.300 0.500 2.6 0.390
Below Plinth 1 0.300 0.500 2.55 0.383
Below Plinth 1 0.300 0.500 2.5 0.375
Above Plinth 4 0.300 0.500 7.350 4.410
C5
Below Plinth 1 0.300 0.500 2.55 0.383
Above Plinth 1 0.300 0.500 11.350 1.703
C6
Below Plinth 1 0.300 0.500 2.6 0.390
Below Plinth 1 0.300 0.500 2.55 0.383
Above Plinth 2 0.300 0.500 7.350 2.205
C7
Below Plinth 3 0.300 0.500 2.65 1.193
Above Plinth 3 0.300 0.500 7.350 3.308
C8
Below Plinth 1 0.230 0.450 2.6 0.269
Below Plinth 1 0.230 0.450 2.55 0.264
Above Plinth 2 0.230 0.450 11.350 2.349

Total 30.885
Say 31.000 Cum.
P & L in situ Ready Mix Cement Conrete M-20
6 Grade of trap metal for RCC Beam as per detailed
drawing etc complete.

a) Plinth Beam
PB1 1 3.770 0.230 0.450 0.39
PB2 1 12.120 0.230 0.450 1.25
PB3 1 11.490 0.230 0.450 1.19
PB4 1 4.000 0.230 0.300 0.28
4 1.630 0.230 0.300 0.45
PB5 1 10.605 0.230 0.450 1.10
PB6 1 3.300 0.230 0.600 0.46
1 3.230 0.230 0.450 0.33
PB7 1 6.690 0.230 0.450 0.69
PB8 1 4.460 0.230 0.450 0.46
PB9 1 3.025 0.230 0.450 0.31
PB10 2 7.610 0.230 0.450 1.58
PB11 1 7.310 0.230 0.450 0.76
PB12 1 5.895 0.230 0.450 0.61
PB13 1 12.395 0.230 0.450 1.28
PB14 1 3.465 0.230 0.300 0.24
PB15 1 16.895 0.230 0.450 1.75
PB16 1 1.995 0.230 0.300 0.14
b) Lintel Beam
GROUND FLOOR
W1 5 2.700 0.230 0.180 2.430
W1a 2 2.700 0.230 0.180 0.972
W2 1 2.100 0.230 0.180 0.378
W4 5 1.800 0.230 0.180 1.620
G1 1 2.600 0.230 0.180 0.468
MD1 2 3.600 0.230 0.180 1.296
D1 3 1.650 0.230 0.180 0.891
D2 3 1.500 0.230 0.150 0.675
D3 5 1.350 0.230 0.150 1.013
WOODEN JALI 1 3.400 0.230 0.180 0.612

FIRST FLOOR
W1 2 2.700 0.230 0.180 0.972
W3 2 1.800 0.230 0.180 0.648
W4 3 1.800 0.230 0.180 0.972
DW1 3 2.700 0.230 0.180 1.458
D1 5 1.650 0.230 0.180 1.485
D2 1 1.500 0.230 0.180 0.270
D3 3 1.350 0.230 0.150 0.608
D4 1 1.650 0.230 0.180 0.297
G2 1 2.600 0.230 0.180 0.468
G3 1 4.690 0.230 0.180 0.844

c) Floor Beam - 3.65m


FB1 1 3.770 0.230 0.450 0.39
FB2 1 12.120 0.230 0.600 1.67
FB3 1 8.405 0.230 0.450 0.87
FB4 1 11.490 0.230 0.600 1.59
FB5 1 10.605 0.230 0.450 1.10
FB6 1 3.215 0.230 0.450 0.33
FB7 1 6.530 0.230 0.600 0.90
FB8 1 6.690 0.230 0.600 0.92
FB9 1 4.460 0.230 0.600 0.62
FB10 2 7.610 0.230 0.600 2.10
FB11 1 7.310 0.230 0.600 1.01
FB12 1 4.545 0.230 0.600 0.63
FB13 1 12.395 0.230 0.600 1.71
FB14 1 3.465 0.230 0.450 0.36
1 1.485 0.230 0.450 0.15
FB15 1 16.895 0.230 0.600 2.33
FB16 1 1.995 0.115 0.300 0.07
FB17 1 1.500 0.230 0.300 0.10
d) Terrace Beam - 6.85m & 7.01m
TB1 1 12.120 0.230 0.600 1.67
TB2 1 3.425 0.230 0.760 0.60
1 8.095 0.230 0.600 1.12
TB3 1 2.725 0.230 0.760 0.48
1 7.145 0.230 0.600 0.99
TB4 1 6.375 0.230 0.600 0.88
TB5 1 4.460 0.230 0.600 0.62
TB6 &TB7 2 5.000 0.230 0.600 1.38
TB8 1 3.845 0.230 0.760 0.67
1 3.465 0.230 0.600 0.48
TB9 1 7.580 0.230 0.760 1.32
TB10 1 12.040 0.230 0.600 1.66
TB11 1 1.995 0.115 0.300 0.07

e) Staircase Beam
MB1 2 2.725 0.230 0.300 0.38
MB2 2 3.075 0.230 0.300 0.42
LB 2 2.725 0.230 0.630 0.79
f) Balcony Beam
BB1 3 5.700 0.150 0.550 1.41
BB2 3 5.700 0.150 0.600 1.54

Total 64.964 Cum.


Say 65.000 Cum.
P & L in situ Ready Mix Cement Conrete M-20
7 Grade of trap metel for RCC Slab as per detailed
drawing etc complete.
GF slab
S1 1 4.090 3.000 0.110 1.350
S2 1 8.290 4.885 0.110 4.455
S3 1 4.200 5.000 0.140 2.940
S4 1 7.530 3.580 0.110 2.965
S5 1 4.115 9.500 0.140 5.473
1 4.385 3.300 0.110 1.592
1 4.885 1.630 0.110 0.876
FF slab
S1 1 12.490 5.000 0.140 8.743
S2 1 7.530 3.580 0.110 2.965
S3 1 4.115 4.500 0.140 2.592
S4 1 3.300 2.800 0.110 1.016
Balcony slab 6 4.000 1.150 0.150 4.140
3 3.300 0.100 1.050 1.04
Staircase roof slab(Head room slab) 1 4.445 3.465 0.140 2.156
Waist slab 6 2.200 1.200 0.150 2.376
3 3.465 1.200 0.150 1.871

Total 46.550
Say 47.000 Cum.
P & L in situ Reay Mix Cement Conrete M-20
8 Grade of trap metel for RCC Chajja as per detailed
drawing etc complete
RCC Chajja Over W1 7 2.500 0.600 0.100 1.050
RCC Chajja Over W1a 2 2.500 0.600 0.100 0.300
RCC Chajja Over W2 1 1.970 0.600 0.100 0.118
RCC Chajja Over W3 2 1.470 0.600 0.100 0.176
RCC Chajja Over W4 8 1.065 0.600 0.100 0.511
RCC Chajja Over DW1 4 2.500 0.600 0.100 0.600
RCC Chajja Over D2 3 1.500 0.600 0.100 0.270
RCC Chajja Over D4 1 1.650 0.600 0.100 0.099

Total 3.125
Say 4.000 Cum.
Providing & fixing in position TMT Steel bar
reinforcement of various diameters for R.C.C.
pile caps, footings, foundations, slabs, beams,
9 columns, canopies, staircases, newels, chajjas,
lintels, pardies, coping, fins, arches, etc complete.

Total 23.940 MT.


Say 24.000 MT.

Providing Second class Burnt Brick masonry with


10 conventional / IS type bricks in cement mortar 1:6
in foundation and plinth etc complete.
Along Grid 5 1 12.950 0.230 7.950 23.68
Deduction W1 -4 2.100 0.230 1.650 -3.19
Deduction MD1 -1 3.000 0.230 2.550 -1.76
Deduction G3 -1 4.090 0.230 2.650 -2.49
Along Grid 4 1 8.435 0.230 7.000 13.58
1 3.720 0.115 7.000 2.99
Deduction MD1 -1 3.000 0.230 2.550 -1.76
Deduction D1 -1 1.050 0.115 2.100 -0.25
Deduction O -1 0.900 0.115 2.550 -0.26
Along Grid 3 1 3.445 0.230 7.000 5.55
1 7.230 0.115 7.000 5.82
Deduction D1 -1 1.050 0.115 2.100 -0.25
Deduction D3 -2 0.750 0.115 2.100 -0.36
Deduction O -1 3.300 0.115 3.800 -1.44
Along Grid 2 1 7.415 0.115 7.950 6.78
Deduction D2 -2 0.900 0.115 2.550 -0.53
Deduction D4 -1 1.050 0.115 2.550 -0.31
Deduction W3 -1 1.200 0.115 1.700 -0.23
Deduction O -1 1.830 0.115 1.650 -0.35
Along Grid 1 1 7.530 0.230 7.950 13.77
Deduction W1a -1 2.100 0.230 1.650 -0.80
Along Grid F 1 18.425 0.115 7.000 14.83
Deduction D1 -2 1.050 0.115 2.100 -0.51
Deduction D3 -3 0.750 0.115 2.100 -0.54
Deduction Wooden Jali -1 2.800 0.115 3.800 -1.22
Deduction Passage -1 0.900 0.115 2.100 -0.22
Along Grid E 1 6.165 0.230 6.950 9.85
Deduction D2 -1 1.500 0.230 1.350 -0.47
Deduction W4 -2 1.200 0.230 1.650 -0.91
Along Grid D 1 4.455 0.230 6.950 7.12
Deduction W1 -1 2.100 0.230 1.650 -0.80
Deduction W2 -1 1.500 0.230 0.100 -0.03
Along Grid B 1 3.465 0.230 7.950 6.34
Deduction G1 -1 2.000 0.230 2.000 -0.92
Along Grid A 1 5.000 0.230 7.950 9.14
Deduction W1 -1 2.100 0.230 2.550 -1.23
Along Grid G 1 21.885 0.230 7.950 40.02
Deduction W1 -2 2.100 0.230 1.650 -1.59
Deduction W1a -1 2.100 0.230 1.650 -0.80
Deduction W4 -4 1.050 0.230 2.550 -2.46
Deduction DW1 -2 2.100 0.230 2.550 -2.46
WATER TANK 1 14.280 0.230 4.000 13.14
(FFL INCLUDED) Total 144.451 Cum.
Say 145.000 Cum.
Providing Second class Burnt Brick masonry with
conventional / IS type bricks in cement mortar 1:4
11
in half brick thick wall etc complete.

GF 1 33.815 3.150 106.517


FF 1 41.000 3.200 131.200
Parapet Wall 1 63.955 1.000 63.955
Total 301.672

Say 302.000 Sqm.

Providing India waterproffing including brick bat


12 coba etc. complete.
Roof slab 1 178.638 178.638
Total 178.638
Say 179.000 Sq.m
Providing waterproof plaster over RCC Chajja,
Parapet Wall and sides in cement mortar 1:3 with
13 neat finishing, floating using approved water
proofing compound at the rate of One Kg. of cement
etc complete.
RCC Chajja 1 40.000 40.000
parapet wall 1 63.955 0.230 14.710
Total 54.710
Say 55.000 Sq.m

Providing internal cement plaster 12mm


thick in a single coat in cement mortar 1:4
without neeru finish to concrete or brick
14
surface in all positions including racking out
joints, scaffolding and curing complete.

DOMOTORY 2 4.000 3.200 25.600


2 5.000 3.200 32.000
BED ROOM 2 4.000 3.200 25.600
2 5.000 3.200 32.000
TOILET BLOCK 2 4.000 3.200 25.600
2 3.500 3.200 22.400
DINING 2 4.085 3.200 26.144
2 5.115 3.200 32.736
DRAWING 2 8.520 3.200 54.528
2 5.000 3.200 32.000
LOBBY 2 3.965 3.200 25.376
2 3.465 3.200 22.176
STAIR 4 3.675 3.200 47.040
4 3.465 3.200 44.352
KITCHEN 2 3.415 3.200 21.856
2 3.565 3.200 22.816
WC, BATH & PASSAGE & STORE 2 1.830 3.200 11.712
2 5.000 3.200 32.000
Qty
Deductions
W1 -5 2.100 1.650 -17.325
W1a -2 2.100 1.650 -6.930
W2 -1 1.500 1.350 -2.025
W4 -5 1.200 1.650 -9.900
G1 -1 2.000 2.000 -4.000
MD1 -2 3.000 2.550 -15.300
D1 -3 1.050 2.100 -6.615
D2 -3 0.900 2.550 -6.885
D3 -5 0.750 2.100 -7.875
WOODEN JALI -1 2.800 3.800 -10.640
O1 -1 1.500 2.550 -3.825
Total-GF 444.616
For FFL Quantity almost same
Qty 478.336
Deduction
W1 -2 2.100 1.650 -6.930
W3 -2 1.200 1.700 -4.080
W4 -3 1.200 1.650 -5.940
DW1 -3 2.100 2.550 -16.065
D1 -5 1.050 2.100 -11.025
D2 -1 0.900 2.550 -2.295
D3 -3 0.750 2.100 -4.725
D4 -1 1.050 2.550 -2.678
O1 -1 0.900 2.550 -2.295
O2 -1 -3.000 2.550 7.650
G2 -1 2.000 3.150 -6.300
G3 -1 4.090 2.650 -10.839
Total-FF 412.815

TOTAL 857.431
Say 858.000 Sq.m

Providing neeru finish to plaster surface in


15 all positions including scaffolding and curing
complete.
Internal cement plaster 12 mm thick Qty. same as per item no 858.000
Total 858.000
Say 858.000 Sq.m
Providing neeru finish to plastered
16 surfaces for ceiling.Including scaffolding
curing complete.
DOMOTORY 1 4.000 5.000 20.000
BED ROOM 1 4.000 5.000 20.000
TOILET BLOCK 1 4.000 3.500 14.000
DINING 1 4.085 5.115 20.895
DRAWING 1 8.520 5.000 42.600
LOBBY 1 3.965 3.465 13.739
STAIR 1 3.675 3.465 12.734
KITCHEN 1 3.415 3.565 12.174
WC, BATH & PASSAGE & STORE 1 1.830 5.000 9.150

Total 165.292
For FF Level 145.292
Say 311.000 Sq.m
Providing sand face plaster externally in
two coats using approved screened sand in
17 all positions, including providing base coat of
15mm thick in cement mortar 1:4 etc
complete.

ALONG GRID 1 & 5 2 13.180 7.900 208.244


ALONG GRID A & G 1 22.115 7.900 174.709
Deduction -72.984
Total 309.969
Say 310.000 Sq.m

Providing and applying primer coat of


approved quality to old/new wall surfaces to
18
receive oil bound distemper treatment etc
complete.
Qty. same as per item no. 1169.000
Total 1169.000
Say 1169.000 Sq.m

Providing and applying two coats of water


proof cement paint and one coat primer
19 of approved manufacturer & colour to the Qty. same as per item no. 310.000
plastered surface etc complete.

310.000
Say 310.000 Sq.m

Providing and applying washable oil bound


distemper of approved colour shade and
20 Qty. same as per item no 1169.000
quality to old/new surface in two coats etc
complete.
Say 1169.000 Sq.m

21 Doors and Windows


GROUND FLOOR
W1 5 2.100 1.650 17.325
W1a 2 2.100 1.650 6.930
W2 1 1.500 1.350 2.025
W4 5 1.200 1.650 9.900
G1 1 2.000 2.000 4.000
MD1 2 3.000 2.550 15.300
D1 3 1.050 2.100 6.615
D2 3 0.900 2.550 6.885
D3 5 0.750 2.100 7.875
WOODEN JALI 1 2.800 3.800 10.640

FIRST FLOOR
W1 2 2.100 1.650 6.930
W3 2 1.200 1.700 4.080
W4 3 1.200 1.650 5.940
DW1 3 2.100 2.550 16.065
D1 5 1.050 2.100 11.025
D2 1 0.900 2.550 2.295
D3 3 0.750 2.100 4.725
D4 1 1.050 2.550 2.678
G2 1 2.000 3.150 6.300
G3 1 4.090 2.650 10.839

Total 158.371
Say 159.000 Sq.m

22 Flooring Details
a) Vetirfied Tile-600x600
DINING 1 4.085 5.115 20.895
DRAWING 1 8.520 5.000 42.600
LOBBY 2 3.965 3.465 27.477
KITCHEN 1 3.300 5.165 17.045
VIP LOUNGE 1 4.085 5.115 20.895
1 8.520 5.000 42.600
Total 171.512
Say 172.000 Sq.m
b) 22mm Thick. Terrazo Tile light shade
DOMOTORY 1 4.000 5.000 20.000
CARE TAKER ROOM 1 3.300 2.800 9.240
STORE ROOM 1 1.830 1.990 3.642
BALCONY 3 4.000 1.500 18.000
Total 50.882
Say 51.000 Sq.m
Anti Skid ceramic glazed first quality
C)
floor tile-300x300-IS:15622
TOILET-(GF & FF) 4 2.500 1.675 16.75
TOILET-GF 1 1.830 1.200 2.196
1 1.830 1.500 2.745
TOILET(Bedroom) 1 2.500 1.600 4.000
Total 25.691
Say 26.000 Sq.m
d) 80mm Thick Udaipur green marble stone
STAIRCASE 3 3.445 3.465 35.811
Total 35.811
Say 36.000 Sq.m
e) Brick bat coba water proofing
TERRACE 1 178.638 178.638
Total 178.638
Say 179.000 Sq.m
Providing & Laying in Ceramic Glazed Tiles
23 20 x 30 cm with white cement DADO of
approved material etc complete.
TOILET-(GF & FF) 8 2.500 2.100 42.00
8 1.675 2.100 28.14
TOILET-GF 2 1.830 2.100 7.69
2 1.200 2.100 5.04
2 1.830 2.100 7.69
2 1.500 2.100 6.30
TOILET(Bedroom) 2 2.500 2.100 10.50
2 1.600 2.100 6.72
KITCHEN 1 13.960 1.400 19.54

Total 133.616
Say 134.000 Sqm

24 Skirtting Details
a) Vetirfied Tile
DINING 1 18.400 18.40
DRAWING 1 27.040 27.04
LOBBY 2 14.860 29.72
Total 75.160
Say 76.000 Rmt.

Providing & Laying 75 thk well compacted


25 1 70.000 0.750 52.500
brick aggregate (Plinth Protection)
Total 52.500
Say 53.000 Sq.m

Providing & Laying 50 thk PCC 1:2:4 (Plinth


26 1 70.000 0.750 0.050 2.625
Protection)
Total 2.625
Say 3.000 Cu.m
Providing & Fixing 110 mm diameter Rain
27
Water Pipe
8 6.750 54.000 Rmt.
Total 54.000
Say 54.000 Rmt.
L B D1 D/H
Fdn PCC PCC Col Col Col Col Col Ht above Excavation PCC VOL
Nos
Depth Depth Offset Offset Nos Length Width GL (M3) (M3)
mt mt mt mt

F1 2 1.60 1.60 0.15 0.25 2.6 0.1 0.1 0.05 1 0.35 0.35 0.3 16.85 0.65
F2 2 2.15 1.85 0.15 0.35 2.6 0.1 0.1 0.05 1 0.3 0.5 0.3 25.05 0.96
F2 1 2.15 1.85 0.15 0.35 2.6 0.1 0.1 0.05 1 0.23 0.45 0.3 12.53 0.48
F3 1 2.05 1.85 0.15 0.35 2.6 0.1 0.1 0.05 1 0.3 0.5 0.3 11.99 0.46
F3 1 2.05 1.85 0.15 0.35 2.6 0.1 0.1 0.05 1 0.3 0.5 0.3 11.99 0.46
F3 2 2.05 1.85 0.15 0.35 2.6 0.1 0.1 0.05 1 0.3 0.5 0.3 23.99 0.92
F4 1 2.30 2.00 0.15 0.40 2.6 0.1 0.1 0.05 1 0.3 0.5 0.3 14.30 0.55
F4 1 2.30 2.00 0.15 0.40 2.6 0.1 0.1 0.05 1 0.3 0.5 0.3 14.30 0.55
F4 2 2.30 2.00 0.15 0.40 2.6 0.1 0.1 0.05 1 0.3 0.5 0.3 28.60 1.10
F5 1 2.60 2.35 0.15 0.45 2.6 0.1 0.1 0.05 1 0.3 0.5 0.3 18.56 0.71
F5 1 2.60 2.35 0.15 0.45 2.6 0.1 0.1 0.05 1 0.3 0.5 0.3 18.56 0.71
F5 1 2.60 2.35 0.15 0.45 2.6 0.1 0.1 0.05 1 0.3 0.5 0.3 18.56 0.71
F5 1 2.60 2.35 0.15 0.45 2.6 0.1 0.1 0.05 1 0.3 0.5 0.3 18.56 0.71
F6 1 2.65 2.35 0.15 0.45 2.6 0.1 0.1 0.05 1 0.3 0.5 0.3 18.90 0.73
F6 1 2.65 2.35 0.15 0.45 2.6 0.1 0.1 0.05 1 0.3 0.5 0.3 18.90 0.73
CF1 1 3.475 2.40 0 0.50 2.6 0.1 0.1 0.05 2 0.3 0.5 0.3 24.84 0.96
TOTAL QUANTITY = 296.48 11.40
CONC VOL Formwork Backfill
(M3) Qty. (M2) (M3)

1.00 9.34 15.20


1.89 10.56 22.20
0.93 4.67 11.11
0.90 5.25 10.63
0.90 5.25 10.63
1.80 10.50 21.26
1.18 5.29 12.57
1.18 5.29 12.57
2.36 10.58 25.14
1.67 5.41 16.18
1.67 5.41 16.18
1.67 5.41 16.18
1.67 5.41 16.18
1.70 5.42 16.47
1.70 5.42 16.47
1.67 7.68 22.22
23.91 106.87 261.17
NAME OF WORK : TOWNSHIP TYPE -B-1BUILDING

REF. DRG . - C-ENGG-TS-STD-B1-DS-01 TO 14 & C-ENGG-TS-STD-TYPE-B1-STR-01 TO 4


ABSTRACT

Item
Item Discription QTY. RATE UNIT TOTAL
No.
Excavation for foundation in Earth soils of all types,
sand gravel and soft murum including removing the
excavated materials upto a distance of 50 metres beyond
building area and lift as specified, stacking and spreading
1 as directed including dewatering unless provided 270.00 1.00 Cum. 270.00
elsewhere, preparing the bed for the foundation and
necessary backfilling, ramming, watering complete
excluding shoring and strutting.( Lift Upto 1.5 M )

Providing soling using 80mm size trap metal in layers


of 15cm each including filling voids with sand, ramming,
2 watering etc. complete. 12.00 1.00 Cum. 12.00

Providing and laying in situ Ready Mix cement concrete


M-7.5 grade using design mix with minimum cement
content as per IS 456 with maximum water cement ratio
0.45 using maximum 25/30 mm size and down trap metal
for foundation and bedding with all labours, materials,
plant & equipments, shuttering form work, staging,
including transporting, placing, vibrating with mechanical
3 vibrator, finishing and curing etc. complete. The item also 22.00 1.00 Cum. 22.00
includes heavy dewatering by using pumps or manually. .
The cost also includes all types of taxes, sales tax,
insurance, cess levied by local authority etc. complete.
( 3969 CSR Rate + 830 Additional for RMC Rate = 4799 )

Providing and laying in situ Ready Mix Cement Concrete


M-20 grade of trap / granite / quartzite / gneiss metal for
RCC foundation like raft, grillage, strip foundation and
footing of RCC column and steel stanchions including
normal dewatering, formwork, compaction, finishing and
curing including transporting from mix plant upto distance
4 26.00 1.00 Cum. 26.00
of 25 Km, pouring the concrete at work site for 1.5m lift
above G.L. and 5.0m lift below GL, etc. complete...
(Excluding reinforcement and structural steel).
Providing and casting in situ Ready Mix Cement
Concrete M-20 Grade of trap / Granite / quartzite /
gneiss metal of approved quality for RCC Column as per
detailed drawings and designs or as directed by Engineer-
in-charge including normal dewatering, centering,
formwork, compaction, finishing the form surface with
cement mortar 1:3 of sufficient minimum thickness to give
a smooth and even surface wherever necessary or
5 22.00 1.00 Cum. 22.00
roughening if special finish is to be provided and curing
including transporting from mix plant upto distance of 25
Km, pouring the concrete at work site for 1.5m lift above
G.L. and 5.0m lift below GL, etc. complete... (Excluding
reinforcement and structural steel).

Providing and casting in situ Ready Mix Cement


Concrete M-20 Grade of trap / Granite / quartzite /
gneiss metal of approved quality for RCC work in Beam
as per detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering, centering,
formwork, compaction, finishing the form surface with
cement mortar 1:3 of sufficient minimum thickness to give
a smooth and even surface wherever necessary or roughing
6 if special finish is to be provided and curing including 59.00 1.00 Cum. 59.00
transporting from mix plant upto distance of 25 Km,
pouring the concrete at work site for 1.5m lift above G.L.
and 5.0m lift below GL, etc. complete... (Excluding
reinforcement and structural steel).

Providing and casting in situ Ready Mix Cement


Concrete M-20 Grade of trap / Granite / quartzite /
gneiss metal of approved quality for RCC work in Slab as
per detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering, centering,
formwork, compaction, finishing the form surface with
cement mortar 1:3 of sufficient minimum thickness to give
a smooth and even surface wherever necessary or roughing
7 if special finish is to be provided and curing including 31.00 1.00 Cum. 31.00
transporting from mix plant upto distance of 25 Km,
pouring the concrete at work site for 1.5m lift above G.L.
and 5.0m lift below GL, etc. complete... (Excluding
reinforcement and structural steel). CSR Rate 8185 +
Pump Rate 175 =8360 ( For Pump rate Ref CSR I. N. a)
Static Pump Page No-13

Providing and casting in situ Ready Mix Cement


Concrete M-20 Grade of trap / Granite / quartzite / gneiss
metal of approved quality for RCC Chajja as per detailed
drawings and designs or as directed by Engineer-in-charge
including normal dewatering, centering, formwork,
compaction, finishing the form surface with cement mortar
1:3 of sufficient minimum thickness to give a smooth and
even surface wherever necessary or roughing if special
8 finish is to be provided and curing including transporting 2.00 1.00 Cum. 2.00
from mix plant upto distance of 25 Km, pouring the
concrete at work site for 1.5m lift above G.L. and 5.0m lift
below GL, etc. complete... (Excluding reinforcement and
structural steel).
Providing & fixing in position TMT Steel bar
reinforcement of various diameters for R.C.C. pile caps,
footings, foundations, slabs, beams, columns, canopies,
staircases, newels, chajjas, lintels, pardies, coping, fins,
9 arches, etc. as per detailed designs, drawings and 20.00 1.00 MT. 20.00
schedules, including cutting, bending, hooking the bars,
binding with wires or tack welding and supporting as
required completed.

Providing Second class Burnt Brick masonry with


conventional / IS type bricks in cement mortar 1:6 in
foundation and plinth of inner walls & external walls,
including bailing out water manually, striking joints on
10 135.00 1.00 Cum. 135.00
unexposed faces, racking out joints on exposed faces and
watering complete.

Providing Second class Burnt Brick masonry with


conventional / IS type bricks in cement mortar 1:4 in
half brick thick wall including mild steel longitudinal
reinforcement of 2 bars of 6mm dia / 2 hoop iron strip
11 25mm x 1.6mm painted with anticorrosive paint at every 308.00 1.00 Sqm. 308.00
third course properly bent and bonded at ends, scaffolding,
raking out joints and watering complete.

Providing and laying water proofing treatment of 112


mm av. thickness consisting of 12 mm thick layer in
Cement Mortar 1:3 with water proofing compound at the
rate of One Kilograme per bag of cement as base,
constructing and laying brick bat coba in cement mortar
1:5 with waterproofing compound at the rate of One
Kilogramme per bag of cement and having average
thickness of 80mm and finishing with 20mm thick cement
plaster layer in cement mortar 1:3 with approved water
Proofing compound at the rate of One Kilogramme per
12 cement bag, including all lead, lifts and laid to proper slope 111.00 1.00 Sqm. 111.00
to drain of water entirely including Watta at the junction of
parapet and work upto a height of 300 mm or as directed
and including finishing the top layer of water proofing
treatment with false marking of 30cm x 30cm or as
directed and covering the whole treatment with seven
year’s guarantee, on requisite stamp paper etc. complete.

Providing waterproof plaster over RCC Chajja, Parapet


Wall and sides in cement mortar 1:3 with neat
finishing, floating using approved water proofing compound
13 at the rate of One Kg. of cement etc complete. 34.00 1.00 Sqm. 34.00
Providing internal cement plaster 12mm thick in a
single coat in cement mortar 1:4 without neeru finish to
14 concrete or brick surface in all positions including racking 805.00 1.00 Sqm. 805.00
out joints, scaffolding and curing complete.

Providing neeru finish to plaster surface in all positions


15 including scaffolding and curing complete. 805.00 1.00 Sqm. 805.00

Providing neeru finish to plastered surfaces for


16 ceiling.Including scaffolding curing complete. 226.00 1.00 Sqm. 226.00

Providing sand face plaster externally in two coats


using approved screened sand in all positions, including
providing base coat of 15mm thick in cement mortar 1:4
mixing approved water proofing compound at the rate of 1
kg./ 50 kg. of cement and curing the same for not less
than two days and keeping the surface of base coat rough
17 to receive the sand faced treatment 8mm thick in cement 492.00 1.00 Sqm. 492.00
mortar 1:4 and finishing the surface by taking out grains
and curing for 14 days including preparing the surface,
watering and scaffolding etc. complete.

Providing and applying primer coat of approved quality to


old/new wall surfaces to receive oil bound distemper
treatment, including scaffolding, preparing the surface as
18 directed completed. (prior approval of S.E. shall be 918.00 1.00 Sqm. 918.00
obtained)

Providing and applying two coats of water proof cement


paint and one coat primer of approved manufacturer &
colour to the plastered surface including scaffolding,
19 preparing the surface, watering for two days complete. 492.00 1.00 Sqm. 492.00

Providing and applying washable oil bound distemper of


approved colour shade and quality to old/new surface in
two coats, including scaffolding, preparing surface
20 918.00 1.00 Sqm. 918.00
(excluding priming coat) complete.

Doors and Windows Schedule 147.00 1.00 Sqm. 147.00


21

Flooring Details
A)22mm Thick. Terrazo Tile light shade 167.00 1.00 Sqm. 167.00
B)Anti Skid ceramic glazed first quality floor tile-
22 59.00 1.00 Sqm. 59.00
300x300
80mm Thick Udaipur green marble stone 26.00 1.00 Sqm. 26.00
Brick bat coba water proofing 111.00 1.00 Sqm. 111.00

Providing & Laying in Ceramic Glazed Tiles 30 x 30 cm


with white cement DADO of approved material etc complete.
23 166.00 1.00 Sqm. 166.00

Providing & Laying 75 thk well compacted brick


24 aggregate (Plinth Protection) 53.00 1.00 Sqm. 53.00

Providing & Laying 50 thk PCC 1:2:4 (Plinth Protection)


25 3.00 1.00 Cum. 3.00
25 3.00 1.00 Cum. 3.00

Providing & Fixing 110 mm diameter Rain Water Pipe


26 54.00 1.00 RMt. 54.00
Name of work: CONTROL ROOM BUILDING

Measurement

Item
Descriptions of Item No Length Breadth Depth Quantity Unit
No.
Excavation for foundation in Earth soils of all
1 types, sand gravel and soft murum etc complete.

For footing of col


F1 4 3.95 3.45 2.6 141.726
F2 3 3.65 3.15 2.6 89.681
F3 5 3.05 2.85 2.6 113.003
F4 2 2.75 2.95 2.6 42.185
F5 2 2.75 2.75 2.6 39.325
F6 4 2.45 2.25 2.6 57.330
F7 2 1.65 1.95 2.6 16.731
Total 499.980
Say 500.000 Cum.

Providing soling using 80mm size trap metal


in layers of 15cm each including filling voids
2
with sand, ramming, watering etc. complete.

ACDB/DCDB ROOM 1 9.655 14.770 0.300 42.781


BATTERY ROOM 1 9.770 4.770 0.300 13.981
ELECTRONIC TEST LAB 1 4.830 3.335 0.300 4.832
STORE 1 4.710 4.710 0.300 6.655
1.35M WIDE PASSAGE 1 1.350 4.830 0.300 1.956
STAIR CASE AREA 1 5.000 5.000 0.300 7.500
ENT. LOBBY 1 5.000 10.000 0.300 15.000
Total 92.706
Say 93.000 Cum.
Providing and laying in situ Ready Mix
cement concrete M-10 grade using design
mix with minimum cement content as per IS
3 456 with maximum water cement ratio 0.6
using maximum 25/30 mm size and down
trap metal for foundation and bedding etc
complete.

For footing of col


F1 4 3.950 3.450 0.075 4.088
F2 3 3.650 3.150 0.075 2.587
F3 5 3.050 2.850 0.075 3.260
F4 2 2.750 2.950 0.075 1.217
F5 2 2.750 2.750 0.075 1.134
F6 4 2.450 2.250 0.075 1.654
F7 2 1.650 1.950 0.075 0.483
ACDB/DCDB ROOM 1 9.655 14.770 0.075 10.695
BATTERY ROOM 1 9.770 4.770 0.075 3.495
ELECTRONIC TEST LAB 1 4.830 3.335 0.075 1.208
STORE 1 4.710 4.710 0.075 1.664
1.35M WIDE PASSAGE 1 1.350 4.830 0.075 0.489
STAIR CASE AREA 1 5.000 5.000 0.075 1.875
ENT. LOBBY 1 5.000 10.000 0.075 3.750
Total 37.599
Say 38.000 Cum.

Providing and laying in situ Ready Mix Cement


Concrete M-20 grade of trap / granite / quartzite /
4 gneiss metal for RCC work in foundation like raft,
grillage, strip foundation and footing of RCC column
etc complete.

REFER ATTACH SHEET "FDN FOR CRB"


Total 65.862
Say 66.000 Cum.

P & L in situ Ready Mix Cement Conrete M-20


5 Grade of trap metel for RCC Column as per detailed
drawing etc complete.

Column -C1,
F6/C1
Below Plinth 4 0.350 0.450 2.25 1.418
Above Plinth 4 0.350 0.450 8.350 5.261
Column-C2
F1/C2
Below Plinth 3 0.350 0.600 2.15 1.355
Above Plinth 3 0.350 0.600 8.350 5.261
Column-C2A
F1/C2A
Below Plinth 1 0.350 0.600 2.15 0.452
Above Plinth 1 0.350 0.600 13.350 2.804
Column -C3
F4/C3
Below Plinth 2 0.350 0.450 2.25 0.709
Above Plinth 2 0.350 0.450 8.350 2.630
Column -C4
F3/C4
Below Plinth 3 0.350 0.450 2.25 1.063
Above Plinth 3 0.350 0.450 8.350 3.945
Column -C4A
F3/C4
Below Plinth 2 0.350 0.450 2.25 0.709
Above Plinth 2 0.350 0.450 13.350 4.205
Column -C5
F5/C5
Below Plinth 2 0.350 0.600 2.25 0.945
Above Plinth 2 0.350 0.600 8.350 3.507
Column -C6
F2/C6
Below Plinth 1 0.350 0.600 2.175 0.457
Above Plinth 1 0.350 0.600 8.350 1.754
Column -C6A
F2/C6A
Below Plinth 1 0.350 0.600 2.175 0.457
Above Plinth 1 0.350 0.600 13.350 2.804
Column -C7
F2/C7
Below Plinth 1 0.350 0.350 2.175 0.266
Above Plinth 1 0.350 0.350 8.350 1.023
Column -C8
F7/C8
Below Plinth 2 0.350 0.450 2.2 0.693
Above Plinth 2 0.350 0.450 4.350 1.370
Total 43.085
Say 44.000 Cum.
P & L in situ Ready Mix Cement Conrete M-20
6 Grade of trap metal for RCC Beam as per detailed
drawing etc complete.

a) Plinth Beam
MPB1 1 15.000 0.300 0.450 2.03
MPB2 1 15.000 0.300 0.450 2.03
MPB3 1 15.000 0.300 0.450 2.03
MPB4 1 25.000 0.300 0.450 3.38
MPB5 1 15.000 0.300 0.450 2.03
MPB6 1 15.000 0.300 0.450 2.03
MPB7 1 15.000 0.300 0.450 2.03
MPB8 1 10.000 0.300 0.450 1.35
MPB9 1 10.000 0.300 0.450 1.35
MPB10 1 6.000 0.300 0.450 0.81
MPB11 1 6.000 0.300 0.450 0.81
MPB12 1 5.000 0.300 0.450 0.68
SPB-1 1 5.000 0.300 0.450 0.68
DEDUCTION
C1 4 0.350 0.450 0.450 -0.28
C2,C2A 4 0.350 0.600 0.450 -0.38
C3 2 0.350 0.450 0.450 -0.14
C4,C4A 5 0.350 0.450 0.450 -0.35
C5 2 0.350 0.600 0.450 -0.19
C6,C6A 2 0.350 0.600 0.450 -0.19
C7 1 0.350 0.350 0.450 -0.06
C8 2 0.350 0.450 0.450 -0.14
b) Lintel Beam
L1 12 2.000 0.230 0.250 1.38
L2 17 1.545 0.230 0.150 0.91
L3 1 2.400 0.230 0.250 0.14
L1' 9 2.000 0.230 0.250 1.04
L3' 3 1.200 0.115 0.150 0.06
c) FF Beam
MB101 1 10.000 0.300 0.500 1.50
MB101 1 1.500 0.200 0.500 0.15
MB103 1 10.000 0.300 0.750 2.25
MB103 1 15.000 0.300 0.500 2.25
MB103 1 1.500 0.200 0.500 0.15
MB104 1 10.000 0.300 0.750 2.25
MB105 1 10.000 0.300 0.500 1.50
MB106 1 25.000 0.300 0.500 3.75
MB107 1 5.000 0.300 0.500 0.75
MB108 1 15.000 0.300 0.500 2.25
MB109 1 15.000 0.300 0.500 2.25
MB110 1 21.000 0.300 0.500 3.15
MB111 1 21.000 0.300 0.500 3.15
MB112 1 10.000 0.300 0.500 1.50
MB113 1 10.000 0.300 0.500 1.50
SB101 1 5.000 0.300 0.500 0.75
SB102 1 5.000 0.300 0.500 0.75
SB103 1 5.000 0.300 0.500 0.75
SB104 1 5.000 0.200 0.500 0.50

d) RF Beam
MB201 1 10.000 0.300 0.500 1.50
MB202 1 10.000 0.300 0.750 2.25
MB202 1 15.000 0.300 0.500 2.25
MB203 1 10.000 0.300 0.750 2.25
MB203 1 15.000 0.300 0.500 2.25
MB204 1 25.000 0.300 0.500 3.75
MB205 1 15.000 0.300 0.500 2.25
MB206 1 15.000 0.300 0.500 2.25
MB207 1 15.000 0.300 0.500 2.25
MB208 1 15.000 0.300 0.500 2.25
MB209 1 10.000 0.300 0.500 1.50
MB210 1 10.000 0.200 0.500 1.00

DEDUCTION
C1 4 0.350 0.450 0.500 -0.32
C2,C2A 4 0.350 0.600 0.500 -0.42
C3 2 0.350 0.350 0.500 -0.12
C4,C4A 5 0.350 0.600 0.500 -0.53
C5 2 0.350 0.350 0.500 -0.12
C6,C6A 2 0.350 0.350 0.500 -0.12
C7 1 0.350 0.450 0.500 -0.08
C8 2 0.350 0.450 0.500 -0.16
Total 77.970 Cum.
Say 78.000 Cum.

P & L in situ Ready Mix Cement Conrete M-20


7 Grade of trap metel for RCC Slab as per detailed
drawing etc complete.
Roof slab 1 301.000 0.150 45.150
first floor slab 1 300.000 0.150 45.000
MUMTTY SLAB 1 30.000 0.150 4.500
Stair Waist Slab (150 thk) 1 15.236 1.500 0.150 3.43
landing slab (150 thk) 2 3.000 1.500 0.150 1.35
2 4.770 0.810 0.150 1.16
step (R = 15 & T = 300 Nos = 50) 50 1.200 0.300 0.150 1.35
DEDUCTION
C1 4 0.350 0.450 0.150 -0.09
C2,C2A 4 0.350 0.600 0.150 -0.13
C3 2 0.350 0.450 0.150 -0.05
C4,C4A 5 0.350 0.450 0.150 -0.12
C5 2 0.350 0.600 0.150 -0.06
C6,C6A 2 0.350 0.600 0.150 -0.06
C7 1 0.350 0.350 0.150 -0.02
C8 2 0.350 0.450 0.150 -0.05
Total 101.360
Say 102.000 Cum.
P & L in situ Reay Mix Cement Conrete M-20
8 Grade of trap metel for RCC Chajja as per detailed
drawing etc complete.
RCC Chajja Over W1 9 2.000 0.570 0.100 1.026
Total 1.026
Say 2.000 Cum.

Providing & fixing in position TMT Steel bar


reinforcement of various diameters for R.C.C.
pile caps, footings, foundations, slabs, beams,
9 columns, canopies, staircases, newels, chajjas,
lintels, pardies, coping, fins, arches, etc complete.

Total 35.564 MT.


Say 36.000 MT.

Providing Second class Burnt Brick masonry with


10 conventional / IS type bricks in cement mortar 1:6
in foundation and plinth etc complete.

Along Grid A 1 15.000 0.230 8.500 29.33


Deduction W1 -2 2.000 0.230 1.650 -1.52
DOOR D4 -1 1.000 0.230 2.400 -0.55
GLASS G1 -2 5.000 0.230 3.500 -8.05
GLASS G2 -1 2.800 0.230 3.000 -1.93
deduction lintel beam -6 2.300 0.230 0.250 -0.79
Along Grid B 1 10.000 0.230 8.500 19.55
1 15.000 0.230 4.000 13.80
Deduction W1 -2 2.000 0.230 1.650 -1.52
Deduction W2 -1 0.600 0.230 1.500 -0.21
DOOR D3 -1 1.200 0.230 2.400 -0.66
deduction lintel beam -2 1.500 0.230 0.250 -0.17
Along Grid C 1 10.000 0.230 4.000 9.20
1 20.000 0.230 4.000 18.40
Deduction D3 -2 1.200 0.230 2.400 -1.32
deduction lintel beam -1 16.900 0.230 0.250 -0.97
Along Grid D 1 25.000 0.230 8.500 48.88
Deduction W1 -8 2.000 0.230 2.400 -8.83
Deduction W2 -1 0.600 0.230 1.500 -0.21
Deduction MD -1 2.770 0.230 3.750 -2.39
DEDUCTION G1 -1 5.000 0.230 3.500 -4.03
deduction lintel beam -5 2.300 0.230 0.250 -0.66
Along Grid 1 1 15.000 0.230 8.500 29.33
Deduction W1 -5 2.000 0.230 2.400 -5.52
Deduction RS -1 2.400 0.230 3.000 -1.66
deduction lintel beam -1 2.700 0.230 0.250 -0.16
deduction lintel beam -2 2.300 0.230 0.250 -0.26
Along Grid 3 1 15.000 0.230 8.500 29.33
1 5.000 0.230 4.000 4.60
Deduction D2 & D3 -2 1.200 0.230 2.400 -1.32
Deduction D1 -1 1.500 0.230 2.400 -0.83
deduction lintel beam -1 1.800 0.230 0.250 -0.10
deduction lintel beam -1 1.500 0.230 0.250 -0.09
Along Grid 4 1 15.000 0.230 8.500 29.33
Deduction D1 -1 1.500 0.230 2.400 -0.83
Deduction D2 -1 1.200 0.230 2.400 -0.66
Deduction Passage -1 1.350 0.230 4.000 -1.24
decuction lintel beam -1 1.800 0.230 0.250 -0.10
Along Grid 5 1 5.000 0.230 8.500 9.78
1 15.000 0.230 4.000 13.80
deduction D3 -1 1.200 0.230 2.400 -0.66
deduction D5 -1 1.000 0.230 2.400 -0.55
deduction D7 -2 0.750 0.230 2.400 -0.83
deduction lintel beam -2 1.300 0.230 0.250 -0.15
deduction lintel beam -2 1.050 0.230 0.250 -0.12
deduction lintel beam -1 1.500 0.230 0.250 -0.09
Along Grid 6 1 10.000 0.230 8.500 19.55
Deduction W1 -3 2.000 0.230 2.400 -3.31
Deduction W2 -1 0.600 0.230 1.500 -0.21
Deduction lintel beam -1 2.300 0.230 0.250 -0.13
deduction lintel beam -1 1.500 0.230 0.250 -0.09

Total 222.123 Cum.


Say 223.000 Cum.
11
Providing and fixing Aluminium Glazing Partition
etc complete.

Along Grid A 1 10.000 3.500 35.00


Along Grid 1 1 5.000 3.500 17.50
ALONG GRID D 1 5.000 3.500 17.50
Along Grid A 1 2.800 3.000 8.40
Along Grid A 1 2.800 1.500 4.20
Total 82.600 Sqm.
Say 83.000 Sqm.

12

Providing Second class Burnt Brick masonry with


conventional / IS type bricks in cement mortar 1:4
in half brick thick wall etc complete.
1 10.000 4.000 40.000
Deduction D6 -1 0.900 2.400 -2.160
Parapet Wall 1 70.000 1.000 70.000
Total 107.840
Say 108.000 Sqm.

Providing India waterproffing including brick bat


13 coba etc. complete.
Roof slab 1 300.000 300.000
Total 300.000
Say 300.000 Sq.m
14
Providing waterproof plaster over RCC Chajja,
Parapet Wall and sides in cement mortar 1:3 with
neat finishing, floating using approved water
proofing compound at the rate of One Kg. of cement
etc complete.
RCC Chajja Over W1 9 2.300 0.600 12.420
RCC Chajja Over W2 0 1.300 0.600 0.000
RCC Chajja Over V 0 7.000 0.600 0.000
RCC Chajja Over D 1 4.700 1.500 7.050
parapet wall 0 70.000 0.115 0.000
Total 19.470
Say 20.000 Sq.m

15
Providing internal cement plaster 12mm
thick in a single coat in cement mortar 1:4
without neeru finish to concrete or brick
surface in all positions including racking out
joints, scaffolding and curing complete.

ACDB/DCDB ROOM 2 9.655 4.000 77.240


2 14.770 4.000 118.160
LESS RS -0.5 2.400 3.000 -3.600
LESS W1 -3 2.000 2.400 -14.400
LESS D2 -0.5 1.200 2.400 -1.440
BATTERY ROOM 2 9.770 4.000 78.160
2 4.770 4.000 38.160
LESS W1 -1.5 2.000 2.400 -7.200
LESS D2 -0.5 1.200 2.400 -1.440
ELECTRONIC TEST LAB 2 4.830 4.000 38.640
2 3.335 4.000 26.680
LESS W1 -0.5 2.000 2.400 -2.400
LESS D3 -0.5 1.200 2.400 -1.440
PASSAGE 2 4.830 4.000 38.640
LESS D3 -0.5 1.200 2.400 -1.440
STORE ROOM 2 4.710 4.000 37.680
2 4.710 4.000 37.680
LESS W1 -1 2.000 2.400 -4.800
LESS D5 -0.5 1.000 2.400 -1.200
ENT. LOBBY 2 15.000 4.000 120.000
LESS D2 -0.5 1.200 2.400 -1.440
LESS MD -0.5 2.000 2.400 -2.400
LESS PASSAGE -1 1.350 4.000 -5.400
CONTROL ROOM 2 9.770 4.000 78.160
2 4.830 4.000 38.640
LESS W1 -1.5 2.000 2.400 -7.200
LESS D3 -0.5 1.200 2.400 -1.440
CONFERENCE ROOM 2 7.970 4.000 63.760
2 4.770 4.000 38.160
LESS D3 -0.5 1.200 2.400 -1.440
LESS W1 -0.5 2.000 2.400 -2.400
GEN. MAINTENANCE STAFF ROOM 2 9.770 4.000 78.160
2 4.710 4.000 37.680
LESS D3 -0.5 1.200 2.400 -1.440
LESS W1 -1.5 2.000 2.400 -7.200
PANTRY ROOM 2 2.815 4.000 22.520
2 1.865 4.000 14.920
LESS D6 -1 0.900 2.400 -2.160
LESS W2 -0.5 0.600 1.500 -0.450
LOBBY/WAITING AREA 2 4.710 4.000 37.680
2 2.790 4.000 22.320
LESS D1 -0.5 1.500 2.400 -1.800
LESS D3 -1 1.200 2.400 -2.880
LESS D6 -1 0.900 2.400 -2.160
TOILET 1 25.000 4.000 100.000
LESS D6 -1 0.900 2.400 -2.160
LESS D7 -1 0.750 2.100 -1.575
LESS W2 -0.5 0.600 1.500 -0.450
ADMIN AREA 2 4.710 4.000 37.680
2 6.600 4.000 52.800
LESS D3 -0.5 1.200 2.400 -1.440
LESS D7 -0.5 0.750 2.400 -0.900
LESS W1 -1 2.000 2.400 -4.800
SR. OFFICER ROOM 2 3.415 4.000 27.320
2 4.710 4.000 37.680
LESS D3 -0.5 1.200 2.400 -1.440
LESS D7 -0.5 0.750 2.400 -0.900
LESS W1 -0.5 2.000 2.400 -2.400
TOILET 1 11.800 4.000 47.200
LESS D7 -1 0.750 2.400 -1.800
LESS W2 -0.5 0.600 1.500 -0.450
LESS G -0.5 1.185 3.000 -1.778
LOBBY 1 7.885 4.000 31.540
LESS D1 -1 1.500 2.400 -3.600
Total 1274.398
Say 1275.000 Sq.m
Providing neeru finish to plaster surface in
16 all positions including scaffolding and curing
complete.
Internal cement plaster 12 mm thick Qty. same as per item no 1275.000
Total 1275.000
Say 1275.000 Sq.m
Providing neeru finish to plastered
17 surfaces for ceiling.Including scaffolding
curing complete.

ACDB/DCDB ROOM 1 9.655 14.770 142.604


BATTERY ROOM 1 9.770 4.770 46.603
STORE ROOM 1 4.710 4.710 22.184
ELECTRONIC TEST LAB 1 4.830 3.335 16.108
PASSAGE 1 1 1.350 4.830 6.521
PASSAGE 2 1 4.740 5.000 23.700
CONTROL ROOM 1 9.770 4.830 47.189
CONFERENCE ROOM 1 7.970 4.770 38.017
GEN. MAINTENANCE STAFF ROOM 1 9.770 4.710 46.017
LOBBY/WAITING AREA 1 4.710 2.790 13.141
SR. OFFICER ROOM 1 3.415 4.710 16.085
STORE & PANTRY ROOM 1 2.815 1.865 5.250
TOILET 1 5.000 2.880 14.400
TOILET 2 1 1.185 4.710 5.581
PASSAGE 3 1 1.570 4.770 7.489
ADMIN ROOM 1 4.710 6.600 31.086
LOBBY AREA 1 9.940 5.000 49.700
Total 531.674
Say 532.000 Sq.m
Providing sand face plaster externally in
two coats using approved screened sand in
18 all positions, including providing base coat of
15mm thick in cement mortar 1:4 etc
complete.

ALONG GRID A 1 25.000 8.500 212.50


LESS W1 -3.5 2.000 2.400 -16.800
LESS D4 -0.5 1.000 2.400 -1.200
LESS W2 -0.5 0.600 1.500 -0.450
ALONG GRID D 1 25.000 8.500 212.500
LESS W1 -4 2.000 2.400 -19.200
LESS W2 -0.5 0.600 1.500 -0.450
LESS MD -0.5 2.770 3.750 -5.194
LESS G1 -0.5 5.000 3.500 -8.750
ALONG GRID 1 1 15.000 8.500 127.500
LESS W1 -2.5 2.000 2.400 -12.000
LESS RS -0.5 2.400 3.000 -3.600
ALONG GRID 6 1 10.000 8.500 85.000
LESS W1 -1.5 2.000 2.400 -7.200
LESS W2 -0.5 0.600 1.500 -0.450
ALONG GRID 4 1 5.000 12.000 60.000
PARAPET 2 70.000 1.000 140.000
Total 762.206
Say 763.000 Sq.m
Providing and applying primer coat of
approved quality to old/new wall surfaces to
19
receive oil bound distemper treatment etc
complete.
Qty. same as per item no. 1806.674
Total 1806.674
Say 1807.000 Sq.m

Providing and applying two coats of water


proof cement paint and one coat primer
20 of approved manufacturer & colour to the
plastered surface etc complete.

Qty. same as per item no. 763.000


763.000
Say 763.000 Sq.m
Providing and applying washable oil bound
distemper of approved colour shade and
21
quality to old/new surface in two coats etc
complete.
Qty. same as per item no 1807.000
Say 1807.000 Sq.m
Providing & fixing Aluminium door with
DORMA BTS80 - universal floor spring,
22 double door with mechanical back check,
hydraulic hold open or delayed action etc
complete.
Door-MD 1 4.770 2.400 11.448
Total 11.448
Say 12.000 Sq.m
Providing & fixing Door with aluminium frame
23 and glazed shutter with ventilators etc complete.

Door-D1 2 1.500 2.400 7.200


Door-D3 6 1.200 2.400 17.280
Door-D4 2 1.000 2.100 4.200
Total 28.680
Say 29.000 Sq.m
Providing & fixing Fire Proof Steel Door etc
24
complete.

Door-D2 2 1.200 2.400 5.760


Total 5.760
Providing & fixing Aluminium frame with
25 Say 6.000 Sq.m
particle board shutter door etc complete.

Door-D5 2 0.900 2.400 4.320


Door-D6 4 0.750 2.400 7.200
Total 11.520
Supplying & fixing in position aluminium
26 glazing FROSTED GLASS window etc complete. Say 12.000 Sq.m

W3 1 1.200 1.650 1.980


W4 1 0.900 1.650 1.485
W5 2 0.600 1.350 1.620
Total 5.085
Providing & fixing Rolling Shutter etc
27 Say 6.000 Sq.m
complete.

RS 1 2.400 3.000 7.200


Total 7.200
Supplying & fixing in position aluminium
28 Say 8.000 Sq.m
glazing window etc complete.

Window-W1 18 2.000 1.650 59.400


Window-W2 2 1.200 1.650 3.960
Total 63.360
Say 64.000 Sq.m
Supplying & fixing in position aluminium glazed
29
louvered ventilators etc complete.
Ventilators V 1 0.900 0.600 0.540
Total 0.540
Say 1.000 Sq.m
Providing & Laying in Granite flooring etc
30
complete.

LOBBY 1 5.000 12.000 60.000


PASSAGE 1 5.000 1.500 7.500
LOBBY 1ST FLOOR 1 25.000 25.000
WAITING AREA 1ST FLOOR 1 5.000 5.000 25.000
Total 117.500
Say 118.000 Sqm
Providing & Laying in 52MM thick Cement
31 Concrete flooring with Hardcrete flooring
etc complete.

ACDB ROOM 1 10.000 15.000 150.000


Total 150.000
Say 150.000 Sqm
Providing & Laying in VITRIFIED flooring etc
32
complete.

BATTERY ROOM 1 9.770 4.770 46.603


STORE ROOM 1 4.700 4.700 22.090
ELECTRONIC TEST LAB 1 4.830 3.335 16.108
CONTROL ROOM 1 9.770 4.830 47.189
CONFORENCE ROOM 1 7.970 4.770 38.017
GENERAL MAINTENANCE STAFF ROOM 1 9.770 4.700 45.919
SR. OFFICER ROOM 1 4.700 3.415 16.051
ADMIN AREA 1 6.600 4.700 31.020
TOILET 1 4.400 4.700 20.680

Total 283.676
Say 284.000 Sqm

Providing & Laying in DHALPUR STONE


33
flooring etc complete.

ENTRANCE 1 6.000 5.000 30.000

Total 30.000
Say 30.000 Sqm
Providing & Laying in 19MM thick Polished
34 Granite 150 mm high skirting of approved material
etc complete.

1 110.000 0.150 16.500


Total 16.500
Say 17.000 Sqm
Providing & Laying in VITRIFIED skirting of
35
approved material etc complete.

ACDB ROOM 1 48.000 0.300 14.400


BATTERY ROOM 1 29.000 0.300 8.700
STORE 1 18.000 0.300 5.400
ELECTRONIC TEST LAB 1 16.000 0.150 2.400
CONTROL ROOM 1 29.000 0.150 4.350
CONFORENCE ROOM 1 25.000 0.150 3.750
GENERAL MAINTANENCE ROOM 1 29.000 0.150 4.350
Total 43.350
Say 44.000 Sqm
Providing & Laying in FALSE CEILING of
36
approved material etc complete.

1 10.000 5.000 50.000


1 10.000 5.000 50.000
1 5.000 5.000 25.000
2 10.000 5.000 100.000
1 8.000 5.000 40.000
1 10.000 5.000 50.000
1 5.000 5.000 25.000
1 3.400 5.000 17.000
1 5.000 6.600 33.000
Total 390.000
Say 390.000 Sqm
Providing & Laying 75 thk well compacted
37
brick aggregate (Plinth Protection)
1 80.000 0.750 60.000
Total 60.000
Say 60.000 Sq.m
Providing & Laying 50 thk PCC 1:2:4 (Plinth
38
Protection)
1 80.000 0.750 0.050 3.000
Total 3.000
Say 3.000 Cu.m
Providing & Fixing 110 mm diameter Rain
39
Water Pipe
11 8.500 93.500 Rmt.
Total 93.500
Say 94.000 Rmt.
Providing & Fixing 450X450 SIZE KHURRA
40
ETC. COMPLETE
11 11.000 NOS
Total 11.000
Say 11.000 NOS
L B D1 D/H
Fdn PCC PCC Col Col Col Col Col Ht above Excavation
Discription Nos
Depth Depth Offset Offset Nos Length Width GL (M3)
mt mt mt mt

F1/C2,C2A 4 3.3 3.8 0.3 0.5 2.5 0.075 0.075 0.5 1 0.35 0.6 0.5 140.36
F2/C6,C6A 2 3 3.5 0.3 0.475 2.5 0.075 0.075 0.475 1 0.35 0.6 0.5 59.21
F3/C4,C4A 5 2.7 2.9 0.3 0.4 2.5 0.075 0.075 0.4 1 0.35 0.45 0.5 111.92
F4/C3 2 2.6 2.8 0.3 0.4 2.5 0.075 0.075 0.4 1 0.35 0.45 0.5 41.78
F5/C5 2 2.6 2.6 0.3 0.4 2.5 0.075 0.075 0.4 1 0.35 0.6 0.5 38.95
F6/C1 4 2.1 2.3 0.3 0.4 2.5 0.075 0.075 0.4 1 0.35 0.45 0.5 56.78
F7/C8 2 1.5 1.8 0.3 0.45 2.5 0.075 0.075 0.45 1 0.35 0.45 0.5 16.57
F2/C7 1 3 3.5 0.3 0.475 2.5 0.075 0.075 0.475 1 0.35 0.35 0.5 29.61
0 1.7 1.7 0.15 0.375 3 0.075 0.075 0.375 1 0.35 0.35 0.3 0.00
0 1.4 1.4 0.15 0.375 3 0.075 0.075 0.375 1 0.35 0.35 0.3 0.00
0 1.6 1.6 0.15 0.4 3 0.075 0.075 0.4 1 0.35 0.35 0.3 0.00
CT 0 1.7 1.7 0.25 0.25 1.5 0.075 0.075 0 1 0.6 0.6 0.3 0.00
LA 0 1.5 1.5 0.25 0.25 1.5 0.075 0.075 0 1 0.5 0.5 0.3 0.00
CVT 0 1.4 1.4 0.25 0.25 1.5 0.075 0.075 0 1 0.55 0.55 0.3 0.00
BPI 0 1.75 1.75 0.25 0.25 1.5 0.075 0.075 0 1 0.6 0.6 0.3 0.00
HIGH BPI 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00
ISO 0 1.5 1.5 0.25 0.25 1.5 0.075 0.075 0 1 0.55 0.55 0.3 0.00
CB 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00
WT 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00
TOTAL QUANTITY = 495.17
PCC VOL CONC VOL Formwork Backfill
(M3) (M3) Qty. (M2) (M3)

4.09 20.36 36.04 115.92


1.72 8.30 17.40 49.19
3.26 13.85 37.60 94.81
1.22 5.16 14.80 35.40
1.13 4.83 16.12 32.98
1.65 6.98 27.20 48.14
0.48 2.27 12.12 13.82
0.86 4.11 7.44 24.64
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
14.42 65.86 168.71 414.89
Name of work: TOWNSHIP TYPE -B-2 BUILDING

REF. DRG . - C-ENGG-TS-STD-B2-DS-01 TO 14 & C-ENGG-TS-STD-TYPE-B2-STR-01 TO 4


ABSTRACT

Item
Item Discription QTY. RATE UNIT TOTAL
No.
Excavation for foundation in Earth soils of all types,
sand gravel and soft murum including removing the
excavated materials upto a distance of 50 metres beyond
building area and lift as specified, stacking and spreading
1 as directed including dewatering unless provided 444.00 1.00 Cum. 444.00
elsewhere, preparing the bed for the foundation and
necessary backfilling, ramming, watering complete
excluding shoring and strutting.( Lift Upto 1.5 M )

Sand Filling
2 14.00 1.00 Cum. 14.00

Back Filling
3 395.00 1.00 Cum. 395.00

Providing and laying in situ Ready Mix cement concrete


M-7.5 grade using design mix with minimum cement
content as per IS 456 with maximum water cement ratio
0.45 using maximum 25/30 mm size and down trap metal
for foundation and bedding with all labours, materials,
plant & equipments, shuttering form work, staging,
including transporting, placing, vibrating with mechanical
4 vibrator, finishing and curing etc. complete. The item also 33.00 1.00 Cum. 33.00
includes heavy dewatering by using pumps or manually. .
The cost also includes all types of taxes, sales tax,
insurance, cess levied by local authority etc. complete.
( 3969 CSR Rate + 830 Additional for RMC Rate = 4799 )

Providing and laying in situ Ready Mix Cement Concrete


M-20 grade of trap / granite / quartzite / gneiss metal for
RCC foundation like raft, grillage, strip foundation and
footing of RCC column and steel stanchions including
normal dewatering, formwork, compaction, finishing and
curing including transporting from mix plant upto distance
5 32.00 1.00 Cum. 32.00
of 25 Km, pouring the concrete at work site for 1.5m lift
above G.L. and 5.0m lift below GL, etc. complete...
(Excluding reinforcement and structural steel).
Providing and casting in situ Ready Mix Cement
Concrete M-20 Grade of trap / Granite / quartzite /
gneiss metal of approved quality for RCC Column as per
detailed drawings and designs or as directed by Engineer-
in-charge including normal dewatering, centering,
formwork, compaction, finishing the form surface with
cement mortar 1:3 of sufficient minimum thickness to give
a smooth and even surface wherever necessary or
6 28.00 1.00 Cum. 28.00
roughening if special finish is to be provided and curing
including transporting from mix plant upto distance of 25
Km, pouring the concrete at work site for 1.5m lift above
G.L. and 5.0m lift below GL, etc. complete... (Excluding
reinforcement and structural steel).
Providing and casting in situ Ready Mix Cement
Concrete M-20 Grade of trap / Granite / quartzite /
gneiss metal of approved quality for RCC work in Beam
as per detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering, centering,
formwork, compaction, finishing the form surface with
cement mortar 1:3 of sufficient minimum thickness to give
a smooth and even surface wherever necessary or roughing
7 if special finish is to be provided and curing including 59.00 1.00 Cum. 59.00
transporting from mix plant upto distance of 25 Km,
pouring the concrete at work site for 1.5m lift above G.L.
and 5.0m lift below GL, etc. complete... (Excluding
reinforcement and structural steel).

Providing and casting in situ Ready Mix Cement


Concrete M-20 Grade of trap / Granite / quartzite /
gneiss metal of approved quality for RCC work in Slab as
per detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering, centering,
formwork, compaction, finishing the form surface with
cement mortar 1:3 of sufficient minimum thickness to give
a smooth and even surface wherever necessary or roughing
8 if special finish is to be provided and curing including 38.00 1.00 Cum. 38.00
transporting from mix plant upto distance of 25 Km,
pouring the concrete at work site for 1.5m lift above G.L.
and 5.0m lift below GL, etc. complete... (Excluding
reinforcement and structural steel). CSR Rate 8185 +
Pump Rate 175 =8360 ( For Pump rate Ref CSR I. N. a)
Static Pump Page No-13

Providing and casting in situ Ready Mix Cement


Concrete M-20 Grade of trap / Granite / quartzite / gneiss
metal of approved quality for RCC Chajja as per detailed
drawings and designs or as directed by Engineer-in-charge
including normal dewatering, centering, formwork,
compaction, finishing the form surface with cement mortar
1:3 of sufficient minimum thickness to give a smooth and
even surface wherever necessary or roughing if special
9 finish is to be provided and curing including transporting 3.00 1.00 Cum. 3.00
from mix plant upto distance of 25 Km, pouring the
concrete at work site for 1.5m lift above G.L. and 5.0m lift
below GL, etc. complete... (Excluding reinforcement and
structural steel).

Providing & fixing in position TMT Steel bar


reinforcement of various diameters for R.C.C. pile caps,
footings, foundations, slabs, beams, columns, canopies,
staircases, newels, chajjas, lintels, pardies, coping, fins,
10 arches, etc. as per detailed designs, drawings and 23.00 1.00 MT. 23.00
schedules, including cutting, bending, hooking the bars,
binding with wires or tack welding and supporting as
required completed.
Providing Second class Burnt Brick masonry with
conventional / IS type bricks in cement mortar 1:6 in
foundation and plinth of inner walls & external walls,
including bailing out water manually, striking joints on
11 128.00 1.00 Cum. 128.00
unexposed faces, racking out joints on exposed faces and
watering complete.

Providing Second class Burnt Brick masonry with


conventional / IS type bricks in cement mortar 1:4 in
half brick thick wall including mild steel longitudinal
reinforcement of 2 bars of 6mm dia / 2 hoop iron strip
12 25mm x 1.6mm painted with anticorrosive paint at every 218.00 1.00 Sqm. 218.00
third course properly bent and bonded at ends, scaffolding,
raking out joints and watering complete.

Providing and laying water proofing treatment of 112


mm av. thickness consisting of 12 mm thick layer in
Cement Mortar 1:3 with water proofing compound at the
rate of One Kilograme per bag of cement as base,
constructing and laying brick bat coba in cement mortar
1:5 with waterproofing compound at the rate of One
Kilogramme per bag of cement and having average
thickness of 80mm and finishing with 20mm thick cement
plaster layer in cement mortar 1:3 with approved water
Proofing compound at the rate of One Kilogramme per
13 cement bag, including all lead, lifts and laid to proper slope 183.00 1.00 Sqm. 183.00
to drain of water entirely including Watta at the junction of
parapet and work upto a height of 300 mm or as directed
and including finishing the top layer of water proofing
treatment with false marking of 30cm x 30cm or as
directed and covering the whole treatment with seven
year’s guarantee, on requisite stamp paper etc. complete.

Providing waterproof plaster over RCC Chajja, Parapet


Wall and sides in cement mortar 1:3 with neat
finishing, floating using approved water proofing compound
14 at the rate of One Kg. of cement etc complete. 44.00 1.00 Sqm. 44.00
Providing internal cement plaster 12mm thick in a
single coat in cement mortar 1:4 without neeru finish to
15 concrete or brick surface in all positions including racking 937.00 1.00 Sqm. 937.00
out joints, scaffolding and curing complete.

Providing neeru finish to plaster surface in all positions


16 including scaffolding and curing complete. 937.00 1.00 Sqm. 937.00

Providing neeru finish to plastered surfaces for


17 ceiling.Including scaffolding curing complete. 267.00 1.00 Sqm. 267.00

Providing sand face plaster externally in two coats


using approved screened sand in all positions, including
providing base coat of 15mm thick in cement mortar 1:4
mixing approved water proofing compound at the rate of 1
kg./ 50 kg. of cement and curing the same for not less
than two days and keeping the surface of base coat rough
18 to receive the sand faced treatment 8mm thick in cement 473.00 1.00 Sqm. 473.00
mortar 1:4 and finishing the surface by taking out grains
and curing for 14 days including preparing the surface,
watering and scaffolding etc. complete.

Providing and applying primer coat of approved quality to


old/new wall surfaces to receive oil bound distemper
treatment, including scaffolding, preparing the surface as
19 directed completed. (prior approval of S.E. shall be 1071.00 1.00 Sqm. 1071.00
obtained)

Providing and applying two coats of water proof cement


paint and one coat primer of approved manufacturer &
colour to the plastered surface including scaffolding,
20 preparing the surface, watering for two days complete. 473.00 1.00 Sqm. 473.00

Providing and applying washable oil bound distemper of


approved colour shade and quality to old/new surface in
two coats, including scaffolding, preparing surface
21 1071.00 1.00 Sqm. 1071.00
(excluding priming coat) complete.

Doors and Windows Schedule 147.00 1.00 Sqm. 147.00


22

Flooring Details
A)22mm Thick. Terrazo Tile light shade 171.00 1.00 Sqm. 171.00
B)Anti Skid ceramic glazed first quality floor tile-
23 58.00 1.00 Sqm. 58.00
300x300
80mm Thick Udaipur green marble stone 43.00 1.00 Sqm. 43.00
Brick bat coba water proofing 183.00 1.00 Sqm. 183.00

Providing & Laying in Ceramic Glazed Tiles 30 x 30 cm


with white cement DADO of approved material etc complete.
24 219.00 1.00 Sqm. 219.00

Providing & Laying 75 thk well compacted brick


aggregate (Plinth Protection)
25 53.00 1.00 Sqm. 53.00
25 53.00 1.00 Sqm. 53.00

Providing & Laying 50 thk PCC 1:2:4 (Plinth Protection)


26 3.00 1.00 Cum. 3.00

Providing & Fixing 110 mm diameter Rain Water Pipe


27 85.00 1.00 RMt. 85.00
Name of work: B2 TYPE BUILDING

Measurement

Item
Descriptions of Item No Length Breadth Depth Quantity Unit
No.
Excavation for foundation in Earth soils of all
1 types, sand gravel and soft murum etc complete.

For footing of col Total 443.30


Say 444.00 Cum.

2 Sand Filling
LIVING ROOM 2 4.300 3.085 0.100 2.65
KITCHEN 2 2.500 3.200 0.100 1.60
BED ROOM 1 2 3.430 3.600 0.100 2.47
TOILET 4 2.150 1.500 0.100 1.29
DINNING 2 3.250 2.615 0.100 1.70
BED ROOM 2 2 3.250 3.380 0.100 2.20
STAIR 1 2.400 4.900 0.100 1.18
Cub Board 4 0.600 1.500 0.100 0.36
Total 13.45
Say 14.00 Cum.

Back Filling Total 394.839


3
Say 395.00 Cum.
Providing and laying in situ Ready Mix
cement concrete M-7.5 grade using design
mix with minimum cement content as per IS
4 456 with maximum water cement ratio 0.6
using maximum 25/30 mm size and down
trap metal for foundation and bedding etc
complete.

A) For footing of col 17.050


B) Plinth Beam
X Grid
PB1 1 2.860 0.330 0.050 0.05
PB2 1 1.945 0.330 0.050 0.03
PB3 1 4.300 0.330 0.050 0.07
PB4 1 4.300 0.330 0.050 0.07
PB5 1 1.945 0.330 0.050 0.03
PB6 1 3.210 0.330 0.050 0.05
PB7 1 3.210 0.330 0.050 0.05
PB8 1 2.400 0.330 0.050 0.04
PB9 1 2.385 0.330 0.050 0.04
PB10 1 4.080 0.330 0.050 0.07
PB11 1 2.400 0.330 0.050 0.04
PB12 1 4.080 0.330 0.050 0.07
PB13 1 2.385 0.330 0.050 0.04
PB14 2 1.385 0.330 0.050 0.05
PB15 2 2.035 0.330 0.050 0.07
PB15A 2 0.600 0.330 0.050 0.02
PB16 2 1.815 0.330 0.050 0.06
PB17 2 3.030 0.330 0.050 0.10
PB18 2 1.385 0.330 0.050 0.05
PB19 1 3.250 0.330 0.050 0.05
PB20 1 3.250 0.330 0.050 0.05
PB21 2 2.280 0.330 0.050 0.08
2 2.055 0.330 0.050 0.07
PB22 4 0.600 0.330 0.050 0.04
PB23 2 3.035 0.115 0.050 0.03
Y Grid
PB24 2 3.600 0.330 0.050 0.12
PB25 2 1.500 0.330 0.050 0.05
PB26 2 2.865 0.330 0.050 0.09
PB27 2 2.615 0.330 0.050 0.09
PB28 2 2.865 0.330 0.050 0.09
PB29 2 2.845 0.330 0.050 0.09
PB29A 2 0.335 0.330 0.050 0.01
PB30 2 3.150 0.330 0.050 0.10
PB30A 2 0.600 0.330 0.050 0.02
PB31 2 3.085 0.330 0.050 0.10
PB31A 2 1.700 0.330 0.050 0.06
PB32 1 3.160 0.330 0.050 0.05
C) Rooms
LIVING ROOM 2 4.300 3.085 0.100 2.65
KITCHEN 2 2.500 3.200 0.100 1.60
BED ROOM 1 2 3.430 3.600 0.100 2.47
TOILET 4 2.150 1.500 0.100 1.29
DINNING 2 3.250 2.615 0.100 1.70
BED ROOM 2 2 3.250 3.380 0.100 2.20
STAIR 1 2.400 4.900 0.100 1.18
Cub Board 4 0.600 1.500 0.100 0.36
Total 32.69
Say 33.00 Cum.

Providing and laying in situ Ready Mix Cement


Concrete M-20 grade of trap / granite / quartzite /
5 gneiss metal for RCC work in foundation like raft,
grillage, strip foundation and footing of RCC column
etc complete.

REFER ATTACH SHEET "FDN FOR CRB" 31.41


Total 31.41
Say 32.00 Cum.
P & L in situ Ready Mix Cement Conrete M-20
6 Grade of trap metel for RCC Column as per detailed
drawing etc complete.

Column -C1,
F1/C1
Below Plinth 2 0.230 0.450 2.15 0.445
Above Plinth 2 0.230 0.450 6.80 1.408
CF3/C1
Below Plinth 5 0.230 0.450 2.00 1.035
Above Plinth 5 0.230 0.450 7.85 4.062
CF4/C1
Below Plinth 4 0.230 0.450 2.05 0.849
Above Plinth 4 0.230 0.450 7.85 3.250
Column -C2,
F2/C2
Below Plinth 2 0.230 0.450 2.1 0.435
Above Plinth 2 0.230 0.450 7.85 1.625
F2/C2
Below Plinth 2 0.230 0.450 2.10 0.435
Above Plinth 2 0.230 0.450 6.80 1.408
CF1/C2
Below Plinth 2 0.230 0.450 1.90 0.393
Above Plinth 2 0.230 0.450 7.85 1.625
CF3/C2
Below Plinth 2 0.230 0.450 2.00 0.414
Above Plinth 2 0.230 0.450 7.85 1.625
Column -C3,
CF2/C3
Below Plinth 2 0.230 0.450 1.90 0.393
Above Plinth 2 0.230 0.450 10.675 2.210
Column -C4,
CF1/C4
Below Plinth 2 0.230 0.450 1.90 0.393
Above Plinth 2 0.230 0.450 7.85 1.625
Column -C5,
F3/C5
Below Plinth 2 0.300 0.500 2.00 0.600
Above Plinth 2 0.300 0.500 10.675 3.203
Total 27.432
Say 28.000 Cum.

P & L in situ Ready Mix Cement Conrete M-20


7 Grade of trap metal for RCC Beam as per detailed
drawing etc complete.

A) Plinth Beam
X Grid
PB1 1 2.860 0.230 0.450 0.30
PB2 1 1.945 0.230 0.450 0.20
PB3 1 4.300 0.230 0.450 0.45
PB4 1 4.300 0.230 0.450 0.45
PB5 1 1.945 0.230 0.450 0.20
PB6 1 3.210 0.230 0.450 0.33
PB7 1 3.210 0.230 0.450 0.33
PB8 1 2.400 0.230 0.450 0.25
PB9 1 2.385 0.230 0.450 0.25
PB10 1 4.080 0.230 0.450 0.42
PB11 1 2.400 0.230 0.450 0.25
PB12 1 4.080 0.230 0.450 0.42
PB13 1 2.385 0.230 0.450 0.25
PB14 2 1.385 0.230 0.450 0.29
PB15 2 2.035 0.230 0.450 0.42
PB15A 2 0.600 0.230 0.450 0.12
PB16 2 1.815 0.230 0.450 0.38
PB17 2 3.030 0.230 0.450 0.63
PB18 2 1.385 0.230 0.450 0.29
PB19 1 3.250 0.230 0.450 0.34
PB20 1 3.250 0.230 0.450 0.34
PB21 2 2.280 0.230 0.450 0.47
2 2.055 0.230 0.450 0.43
PB22 4 0.600 0.230 0.450 0.25
PB23 2 3.035 0.115 0.450 0.31
Y Grid
PB24 2 3.600 0.230 0.450 0.75
PB25 2 1.500 0.230 0.450 0.31
PB26 2 2.865 0.230 0.450 0.59
PB27 2 2.615 0.230 0.450 0.54
PB28 2 2.865 0.230 0.450 0.59
PB29 2 2.845 0.230 0.450 0.59
PB29A 2 0.335 0.230 0.450 0.07
PB30 2 3.150 0.230 0.450 0.65
PB30A 2 0.600 0.230 0.450 0.12
PB31 2 3.085 0.230 0.450 0.64
PB31A 2 1.700 0.230 0.450 0.35
PB32 1 3.160 0.230 0.450 0.33
B) Lintel Beam
GROUND FLOOR
W1 4 2.700 0.230 0.180 0.45
W2 2 2.100 0.230 0.180 0.17
W3 2 2.100 0.230 0.180 0.17
W4 4 1.800 0.230 0.180 0.30
W5 4 1.350 0.230 0.150 0.19
DW1 2 2.700 0.230 0.180 0.22
D1 1 1.650 0.230 0.180 0.07
D2 6 1.400 0.230 0.150 0.29
D3 4 1.350 0.230 0.150 0.19
O1 1 2.100 0.230 0.180 0.09
G1 1 2.600 0.230 0.180 0.11
FIRST FLOOR
W2 4 2.100 0.230 0.180 0.35
W3 2 2.100 0.230 0.180 0.17
W4 2 1.800 0.230 0.180 0.15
W5 4 1.350 0.230 0.150 0.19
DW1 2 2.700 0.230 0.180 0.22
D1 2 1.650 0.230 0.180 0.14
D2 6 1.400 0.230 0.150 0.29
D3 4 1.350 0.230 0.150 0.19
O1 1 2.100 0.230 0.180 0.09
G2 1 2.600 0.230 0.180 0.11
C) Floor Beam
X Grid
FB1 1 2.860 0.230 0.600 0.39
FB2 1 1.945 0.230 0.600 0.27
FB3 1 4.300 0.230 0.600 0.59
FB4 1 4.300 0.230 0.600 0.59
FB5 1 1.945 0.230 0.600 0.27
FB6 1 3.210 0.230 0.600 0.44
FB7 1 3.210 0.230 0.600 0.44
FB9 1 2.385 0.230 0.600 0.33
FB10 1 4.080 0.230 0.600 0.56
FB11 1 2.400 0.230 0.600 0.33
FB12 1 4.080 0.230 0.600 0.56
FB13 1 2.385 0.230 0.600 0.33
FB14 2 1.385 0.230 0.600 0.38
FB15 2 2.035 0.230 0.600 0.56
FB15A 2 0.600 0.230 0.300 0.08
FB16 2 1.815 0.230 0.600 0.50
FB17 2 3.030 0.230 0.600 0.84
FB18 2 1.385 0.230 0.600 0.38
FB19 1 3.250 0.230 0.600 0.45
FB20 1 3.250 0.230 0.600 0.45
FB21 2 2.280 0.230 0.300 0.31
2 2.055 0.230 0.300 0.28
FB22 4 0.600 0.230 0.300 0.17
FB23 2 3.035 0.115 0.450 0.31
Y Grid
FB24 2 3.600 0.230 0.600 0.99
FB25 2 1.500 0.230 0.600 0.41
FB26 2 2.865 0.230 0.600 0.79
FB27 2 2.615 0.230 0.600 0.72
FB28 2 2.865 0.230 0.450 0.59
FB29 2 2.845 0.230 0.600 0.79
FB30 2 3.150 0.230 0.450 0.65
FB30A 2 0.600 0.230 0.300 0.08
FB31 2 3.085 0.230 0.450 0.64
FB31A 2 1.700 0.230 0.600 0.47
FB32 1 3.160 0.230 0.450 0.33
D) Roof Beam
X Grid
TB1 1 2.860 0.230 0.600 0.39
TB2 1 1.945 0.230 0.600 0.27
TB3 1 4.300 0.230 0.600 0.59
TB4 1 4.300 0.230 0.600 0.59
TB5 1 1.945 0.230 0.600 0.27
TB6 1 3.210 0.230 0.600 0.44
TB7 1 3.210 0.230 0.600 0.44
TB9 1 2.385 0.230 0.450 0.25
TB10 1 4.080 0.230 0.600 0.56
TB11 1 2.400 0.230 0.625 0.35
TB12 1 4.080 0.230 0.600 0.56
TB13 1 2.385 0.230 0.450 0.25
TB14 2 1.385 0.230 0.450 0.29
TB15 2 2.035 0.230 0.600 0.56
TB15A 2 0.600 0.230 0.300 0.08
TB16 2 1.815 0.230 0.600 0.50
TB17 2 3.030 0.230 0.600 0.84
TB18 2 1.385 0.230 0.600 0.38
TB19 1 3.250 0.230 0.600 0.45
TB20 1 3.250 0.230 0.600 0.45
TB21 2 2.280 0.230 0.300 0.31
2 2.055 0.230 0.300 0.28
TB22 4 0.600 0.230 0.300 0.17
TB23 2 3.035 0.115 0.450 0.31
Y Grid
TB24 2 3.600 0.230 0.600 0.99
TB25 2 1.500 0.230 0.600 0.41
TB26 2 2.865 0.230 0.600 0.79
TB27 2 2.615 0.230 0.600 0.72
TB28 2 2.865 0.230 0.450 0.59
TB29 2 2.845 0.230 0.600 0.79
TB30 2 3.150 0.230 0.450 0.65
TB30A 2 0.600 0.230 0.300 0.08
TB31 2 3.085 0.230 0.450 0.64
TB31A 2 1.700 0.230 0.600 0.47
TB32 1 3.160 0.230 0.450 0.33
E) Balcony Beams
BB1 2 5.650 0.150 0.550 0.93
BB2 2 6.035 0.150 0.550 1.00
BB3 2 5.935 0.150 0.550 0.98
2 5.650 0.150 0.600 1.02
2 6.035 0.150 0.600 1.09
2 5.935 0.150 0.600 1.07
F) Staircase Beam
MB1 2 2.400 0.230 0.400 0.44
MB2 2 3.085 0.230 0.400 0.57
MB2 2 1.480 0.230 0.450 0.31
LB 2 2.400 0.230 0.450 0.50

Total 58.270 Cum.


Say 59.000 Cum.
P & L in situ Ready Mix Cement Conrete M-20
8 Grade of trap metel for RCC Slab as per detailed
drawing etc complete.
A) Ground Floor Slab
S1 2 4.300 3.085 0.120 3.184
S2 2 3.250 3.380 0.110 2.417
2 1.820 0.600 0.110 0.240
S3 4 2.150 1.500 0.100 1.290
S4 2 3.250 2.615 0.110 1.870
2 2.500 3.200 0.110 1.760
2 1.500 1.000 0.110 0.330
S5 2 3.430 3.600 0.110 2.717
2 2.055 0.600 0.110 0.271
B) First Floor Slab
S1 2 4.300 3.085 0.120 3.184
S2 2 3.250 3.380 0.110 2.417
2 1.820 0.375 0.110 0.150
S3 4 2.150 1.500 0.100 1.290
S4 2 3.250 2.615 0.110 1.870
2 2.500 3.200 0.110 1.760
S5 2 3.430 3.600 0.110 2.717
2 2.055 0.375 0.110 0.170
Balcony slab 4 2.750 1.350 0.100 1.485
8 3.135 1.350 0.100 3.39
C) Staircase Beam
Slab 1 4.900 2.400 0.140 1.65
Waist 2 4.900 2.400 0.150 3.53
Total 37.680
Say 38.000 Cum.

P & L in situ Reay Mix Cement Conrete M-20


9 Grade of trap metel for RCC Chajja as per detailed
drawing etc complete.
RCC Chajja Over W2 4 2.100 0.600 0.100 0.504
RCC Chajja Over W3 4 2.100 0.600 0.100 0.504
RCC Chajja Over W4 8 1.800 0.600 0.100 0.864
RCC Chajja Over W5 8 1.350 0.600 0.100 0.648
Staircase 1 2.100 0.750 0.100 0.158
Total 2.678
Say 3.000 Cum.

Providing & fixing in position TMT Steel bar


reinforcement of various diameters for R.C.C.
pile caps, footings, foundations, slabs, beams,
10 columns, canopies, staircases, newels, chajjas,
lintels, pardies, coping, fins, arches, etc complete.

Total 22.393 MT.


Say 23.000 MT.
Providing Second class Burnt Brick masonry with
11 conventional / IS type bricks in cement mortar 1:6
in foundation and plinth etc complete.

Along Grid A 2 4.060 0.230 7.850 14.66


Deduction W3 -4 1.500 0.230 1.650 -2.28
Along Grid B 2 0.945 0.230 7.850 3.41
Along Grid E 2 0.820 0.230 7.850 2.96
Along Grid F 2 4.565 0.230 10.675 22.42
2 0.600 0.230 7.850 2.17
Along Grid G 1 3.160 0.230 7.850 5.71
Along Grid 1 1 4.560 0.230 7.850 8.23
Along Grid 2 1 3.000 0.230 7.850 5.42
Deduction W5 -4 0.750 0.230 1.050 -0.72
Along Grid 3 1 11.260 0.230 7.850 20.33
Deduction W1 -4 1.500 0.230 1.350 -1.86
Along Grid 4 1 3.760 0.230 7.850 6.79
Deduction D3 -8 0.750 0.230 2.100 -2.90
Along Grid 6 1 6.420 0.230 7.850 11.59
Deduction W1 -4 2.100 0.230 1.650 -3.19
Along Grid 7 1 12.490 0.230 7.850 22.55
1 2.860 0.230 10.675 7.02
Deduction G1 -2 2.000 0.230 2.000 -1.84
Deduction G2 -2 2.000 0.230 3.150 -2.90
Parapet Wall 1 40.390 0.230 1.050 9.75
Total 127.321
Say 128.000 Cum.
Providing Second class Burnt Brick masonry with
conventional / IS type bricks in cement mortar 1:4
12
in half brick thick wall etc complete.

GF 1 28.600 3.150 90.090


FF 1 28.600 3.150 90.090
Parapet Wall 1 35.070 1.050 36.824
Total 217.004
Say 218.000 Sqm.

Providing India waterproffing including brick bat


13 coba etc. complete.
Roof slab 1 182.487 182.487
Total 182.487
Say 183.000 Sq.m
Providing waterproof plaster over RCC Chajja,
Parapet Wall and sides in cement mortar 1:3 with
14 neat finishing, floating using approved water
proofing compound at the rate of One Kg. of cement
etc complete.
RCC Chajja 1 30.000 30.000
parapet wall 1 40.390 0.230 9.290
1 35.070 0.115 4.033
Total 43.323
Say 44.000 Sq.m

Providing internal cement plaster 12mm


thick in a single coat in cement mortar 1:4
without neeru finish to concrete or brick
15
surface in all positions including racking out
joints, scaffolding and curing complete.

GROUND FLOOR
LIVING ROOM 4 4.300 3.150 54.180
4 3.085 3.150 38.871
KITCHEN 4 2.500 3.150 31.500
4 3.200 3.150 40.320
BED ROOM 1 4 3.430 3.150 43.218
4 3.600 3.150 45.360
TOILET 8 2.150 3.150 54.180
8 1.500 3.150 37.800
DINNING 4 3.250 3.150 40.950
4 2.615 3.150 32.949
BED ROOM 2 4 3.250 3.150 40.950
4 3.380 3.150 42.588
STAIR 2 2.400 3.150 15.120
2 4.900 3.150 30.870
Deductions
W1 -4 2.100 1.650 -13.860
W2 -2 1.500 1.350 -4.050
W3 -2 1.500 1.650 -4.950
W4 -4 1.200 1.650 -7.920
W5 -4 0.750 1.050 -3.150
DW1 -2 2.100 2.500 -10.500
D1 -1 1.050 2.100 -2.205
D2 -6 0.900 2.100 -11.340
D3 -4 0.750 2.100 -6.300
O1 -2 1.500 2.500 -7.500
G1 -1 2.000 2.000 -4.000
FIRST FLOOR
Qnty 548.856
G2 -1 2.000 3.150 -6.300
Deductions -78.915

Total 936.722
Say 937.000 Sq.m
Providing neeru finish to plaster surface in
16 all positions including scaffolding and curing
complete.
Internal cement plaster 12 mm thick Qty. same as per item no 937.000
Total 937.000
Say 937.000 Sq.m
Providing neeru finish to plastered
17 surfaces for ceiling.Including scaffolding
curing complete.
LIVING ROOM 2 4.300 3.085 26.531
KITCHEN 2 2.500 3.200 16.000
BED ROOM 1 2 3.430 3.600 24.696
TOILET 4 2.150 1.500 12.900
DINNING 2 3.250 2.615 16.998
BED ROOM 2 2 3.250 3.380 21.970
STAIR 1 2.400 5.900 14.160
Total 133.255
For FF Level 133.255
Say 267.000 Sq.m

Providing sand face plaster externally in


two coats using approved screened sand in
18 all positions, including providing base coat of
15mm thick in cement mortar 1:4 etc
complete.
Along Grid 1 & 7 1 41.490 7.850 325.697
1 2.860 10.675 30.531
Along Grid A 1 12.850 7.850 100.873
1 3.400 10.675 36.295
Deduction -20.877
Total 472.518
Say 473.000 Sq.m

Providing and applying primer coat of


approved quality to old/new wall surfaces to
19
receive oil bound distemper treatment etc
complete.
Qty. same as per item no. 1070.255
Total 1070.255
Say 1071.000 Sq.m

Providing and applying two coats of water


proof cement paint and one coat primer
20 of approved manufacturer & colour to the Qty. same as per item no. 473.000
plastered surface etc complete.

473.000
Say 473.000 Sq.m

Providing and applying washable oil bound


distemper of approved colour shade and
21 Qty. same as per item no 1071.000
quality to old/new surface in two coats etc
complete.
Say 1071.000 Sq.m
22 Doors and Windows Schedule
GROUND FLOOR
W1 4 2.100 1.650 13.86
W2 2 1.500 1.350 4.05
W3 2 1.500 1.650 4.95
W4 4 1.200 1.650 7.92
W5 4 0.750 1.050 3.15
DW1 2 2.100 2.500 10.50
D1 1 1.050 2.100 2.21
D2 6 0.900 2.100 11.34
D3 4 0.750 2.100 6.30
O1 1 2.000 2.500 5.00
G1 1 2.000 2.000 4.00
FIRST FLOOR
W2 4 2.100 1.650 13.86
W3 2 1.500 1.350 4.05
W4 2 1.500 1.650 4.95
W5 4 1.200 1.650 7.92
DW1 2 2.100 2.500 10.50
D1 2 1.050 2.100 4.41
D2 6 0.900 2.100 11.34
D3 4 0.750 2.100 6.30
O1 1 1.500 2.500 3.75
G2 1 2.000 3.150 6.30
Total 146.655
Say 147.000 Sq.m
23 Flooring Details
A) 22mm Thick. Terrazo Tile light shade
LIVING ROOM 4 4.300 3.085 53.06
BEDROOM 1 4 3.430 3.600 49.39
BEDROOM 2 4 3.250 3.380 43.94
BALCONY 2 2.750 1.350 7.43
4 3.135 1.350 16.93
Total 170.75
Say 171.00 Sq.m
Anti Skid ceramic glazed first quality
B)
floor tile-300x300
KITCHEN 4 2.500 3.200 32.00
TOILET 8 2.150 1.500 25.80
Total 57.80
Say 58.00 Sq.m
C) 80mm Thick Udaipur green marble stone
STAIRCASE 3 2.400 5.900 42.48
Total 42.48
Say 43.00 Sq.m
D) Brick bat coba water proofing
TERRACE 1 182.487 182.49
Total 182.49
Say 183.00 Sq.m

Providing & Laying in Ceramic Glazed Tiles


24 30 x 30 cm with white cement DADO of
approved material etc complete.
TOILET 16 2.150 2.100 72.240
16 1.500 2.100 50.400
KITCHEN 8 2.500 2.100 42.000
8 3.200 2.100 53.760
Total 218.400
Say 219.000 Sq.m

Providing & Laying 75 thk well compacted


25 brick aggregate (Plinth Protection) 1 69.790 0.750 52.343

Total 52.343
Say 53.000 Sq.m

Providing & Laying 50 thk PCC 1:2:4 (Plinth


26 1 69.790 0.750 0.050 2.617
Protection)
Total 2.617
Say 3.000 Cu.m
Providing & Fixing 110 mm diameter Rain
27
Water Pipe
12 6.800 81.600 Rmt.
1 2.875 2.875 Rmt.
Total 84.475
Say 85.000 Rmt.
L B D1 D/H
Fdn PCC PCC Col Col Col Col Col Ht above Excavation PCC VOL
Nos
Depth Depth Offset Offset Nos Length Width GL (M3) (M3)
mt mt mt mt

F1(C1) 2 2.25 1.85 0.15 0.35 2.5 0.1 0.1 0.05 1 0.23 0.45 0.5 26.12 1.00
F2(C2) 5 2.75 2.30 0.2 0.4 2.5 0.1 0.1 0.05 1 0.23 0.45 0.5 95.88 3.69
F3(C5) 2 3.15 2.60 0.2 0.5 2.5 0.1 0.1 0.05 1 0.23 0.45 0.5 48.78 1.88
CF1(C12,C2) 2 5.25 2.60 0.6 2.5 0.1 0.1 0.05 2 0.23 0.45 0.5 79.35 3.05
CF2(C3,C3) 1 6.00 2.60 0.6 2.5 0.1 0.1 0.05 2 0.23 0.45 0.5 45.14 1.74
CF3(C1,C1,C2) 2 3.40 1.85 0.5 2.5 0.1 0.1 0.05 3 0.23 0.45 0.5 38.38 1.48
2 2.55 3.60 0.5 2.5 0.1 0.1 0.05 3 0.23 0.45 0.5 54.34 2.09
CF4(C1,C1) 2 3.60 2.60 0.45 2.5 0.1 0.1 0.05 2 0.23 0.45 0.5 55.33 2.13
TOTAL QUANTITY = 443.30 17.05
CONC VOL Formwork Backfill
(M3) Qty. (M2) (M3)

1.94 9.67 23.17


8.85 27.78 83.34
5.19 11.40 41.71
6.16 13.06 70.14
3.49 6.53 39.91
2.51 20.40 86.64

3.25 13.87 49.95


31.41 102.70 394.84
Name of work: TOWNSHIP TYPE - B-3 BUILDING

REF. DRG . - C-ENGG-TS-STD-B3-DS-01 TO 14 & C-ENGG-TS-STD-TYPE-B3-STR-01 TO 5


ABSTRACT

Item
Item Discription QTY. RATE UNIT TOTAL
No.
Excavation for foundation in Earth soils of all types,
sand gravel and soft murum including removing the
excavated materials upto a distance of 50 metres beyond
building area and lift as specified, stacking and spreading
1 as directed including dewatering unless provided 515.00 1.00 Cum. 515.00
elsewhere, preparing the bed for the foundation and
necessary backfilling, ramming, watering complete
excluding shoring and strutting.( Lift Upto 1.5 M )

Sand Filling
2 16.00 1.00 Cum. 16.00

Back Filling
3 452.00 1.00 Cum. 452.00

Providing and laying in situ Ready Mix cement concrete


M-7.5 grade using design mix with minimum cement
content as per IS 456 with maximum water cement ratio
0.45 using maximum 25/30 mm size and down trap metal
for foundation and bedding with all labours, materials,
plant & equipments, shuttering form work, staging,
including transporting, placing, vibrating with mechanical
4 vibrator, finishing and curing etc. complete. The item also 38.00 1.00 Cum. 38.00
includes heavy dewatering by using pumps or manually. .
The cost also includes all types of taxes, sales tax,
insurance, cess levied by local authority etc. complete.
( 3969 CSR Rate + 830 Additional for RMC Rate = 4799 )

Providing and laying in situ Ready Mix Cement Concrete


M-20 grade of trap / granite / quartzite / gneiss metal for
RCC foundation like raft, grillage, strip foundation and
footing of RCC column and steel stanchions including
normal dewatering, formwork, compaction, finishing and
curing including transporting from mix plant upto distance
5 44.00 1.00 Cum. 44.00
of 25 Km, pouring the concrete at work site for 1.5m lift
above G.L. and 5.0m lift below GL, etc. complete...
(Excluding reinforcement and structural steel).
Providing and casting in situ Ready Mix Cement
Concrete M-20 Grade of trap / Granite / quartzite /
gneiss metal of approved quality for RCC Column as per
detailed drawings and designs or as directed by Engineer-
in-charge including normal dewatering, centering,
formwork, compaction, finishing the form surface with
cement mortar 1:3 of sufficient minimum thickness to give
a smooth and even surface wherever necessary or
6 29.00 1.00 Cum. 29.00
roughening if special finish is to be provided and curing
including transporting from mix plant upto distance of 25
Km, pouring the concrete at work site for 1.5m lift above
G.L. and 5.0m lift below GL, etc. complete... (Excluding
reinforcement and structural steel).
Providing and casting in situ Ready Mix Cement
Concrete M-20 Grade of trap / Granite / quartzite /
gneiss metal of approved quality for RCC work in Beam
as per detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering, centering,
formwork, compaction, finishing the form surface with
cement mortar 1:3 of sufficient minimum thickness to give
a smooth and even surface wherever necessary or roughing
7 if special finish is to be provided and curing including 61.00 1.00 Cum. 61.00
transporting from mix plant upto distance of 25 Km,
pouring the concrete at work site for 1.5m lift above G.L.
and 5.0m lift below GL, etc. complete... (Excluding
reinforcement and structural steel).

Providing and casting in situ Ready Mix Cement


Concrete M-20 Grade of trap / Granite / quartzite /
gneiss metal of approved quality for RCC work in Slab as
per detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering, centering,
formwork, compaction, finishing the form surface with
cement mortar 1:3 of sufficient minimum thickness to give
a smooth and even surface wherever necessary or roughing
8 if special finish is to be provided and curing including 43.00 1.00 Cum. 43.00
transporting from mix plant upto distance of 25 Km,
pouring the concrete at work site for 1.5m lift above G.L.
and 5.0m lift below GL, etc. complete... (Excluding
reinforcement and structural steel). CSR Rate 8185 +
Pump Rate 175 =8360 ( For Pump rate Ref CSR I. N. a)
Static Pump Page No-13

Providing and casting in situ Ready Mix Cement


Concrete M-20 Grade of trap / Granite / quartzite / gneiss
metal of approved quality for RCC Chajja as per detailed
drawings and designs or as directed by Engineer-in-charge
including normal dewatering, centering, formwork,
compaction, finishing the form surface with cement mortar
1:3 of sufficient minimum thickness to give a smooth and
even surface wherever necessary or roughing if special
9 finish is to be provided and curing including transporting 3.00 1.00 Cum. 3.00
from mix plant upto distance of 25 Km, pouring the
concrete at work site for 1.5m lift above G.L. and 5.0m lift
below GL, etc. complete... (Excluding reinforcement and
structural steel).

Providing & fixing in position TMT Steel bar


reinforcement of various diameters for R.C.C. pile caps,
footings, foundations, slabs, beams, columns, canopies,
staircases, newels, chajjas, lintels, pardies, coping, fins,
10 arches, etc. as per detailed designs, drawings and 26.00 1.00 MT. 26.00
schedules, including cutting, bending, hooking the bars,
binding with wires or tack welding and supporting as
required completed.
Providing Second class Burnt Brick masonry with
conventional / IS type bricks in cement mortar 1:6 in
foundation and plinth of inner walls & external walls,
including bailing out water manually, striking joints on
11 114.00 1.00 Cum. 114.00
unexposed faces, racking out joints on exposed faces and
watering complete.
Providing Second class Burnt Brick masonry with
conventional / IS type bricks in cement mortar 1:4 in
half brick thick wall including mild steel longitudinal
reinforcement of 2 bars of 6mm dia / 2 hoop iron strip
12 25mm x 1.6mm painted with anticorrosive paint at every 235.00 1.00 Sqm. 235.00
third course properly bent and bonded at ends, scaffolding,
raking out joints and watering complete.

Providing and laying water proofing treatment of 112


mm av. thickness consisting of 12 mm thick layer in
Cement Mortar 1:3 with water proofing compound at the
rate of One Kilograme per bag of cement as base,
constructing and laying brick bat coba in cement mortar
1:5 with waterproofing compound at the rate of One
Kilogramme per bag of cement and having average
thickness of 80mm and finishing with 20mm thick cement
plaster layer in cement mortar 1:3 with approved water
Proofing compound at the rate of One Kilogramme per
13 cement bag, including all lead, lifts and laid to proper slope 198.00 1.00 Sqm. 198.00
to drain of water entirely including Watta at the junction of
parapet and work upto a height of 300 mm or as directed
and including finishing the top layer of water proofing
treatment with false marking of 30cm x 30cm or as
directed and covering the whole treatment with seven
year’s guarantee, on requisite stamp paper etc. complete.

Providing waterproof plaster over RCC Chajja, Parapet


Wall and sides in cement mortar 1:3 with neat
finishing, floating using approved water proofing compound
14 at the rate of One Kg. of cement etc complete. 44.00 1.00 Sqm. 44.00
Providing internal cement plaster 12mm thick in a
single coat in cement mortar 1:4 without neeru finish to
15 concrete or brick surface in all positions including racking 994.00 1.00 Sqm. 994.00
out joints, scaffolding and curing complete.

Providing neeru finish to plaster surface in all positions


16 including scaffolding and curing complete. 994.00 1.00 Sqm. 994.00

Providing neeru finish to plastered surfaces for


17 ceiling.Including scaffolding curing complete. 282.00 1.00 Sqm. 282.00

Providing sand face plaster externally in two coats


using approved screened sand in all positions, including
providing base coat of 15mm thick in cement mortar 1:4
mixing approved water proofing compound at the rate of 1
kg./ 50 kg. of cement and curing the same for not less
than two days and keeping the surface of base coat rough
18 to receive the sand faced treatment 8mm thick in cement 475.00 1.00 Sqm. 475.00
mortar 1:4 and finishing the surface by taking out grains
and curing for 14 days including preparing the surface,
watering and scaffolding etc. complete.

Providing and applying primer coat of approved quality to


old/new wall surfaces to receive oil bound distemper
treatment, including scaffolding, preparing the surface as
19 directed completed. (prior approval of S.E. shall be 1135.00 1.00 Sqm. 1135.00
obtained)

Providing and applying two coats of water proof cement


paint and one coat primer of approved manufacturer &
colour to the plastered surface including scaffolding,
20 preparing the surface, watering for two days complete. 475.00 1.00 Sqm. 475.00

Providing and applying washable oil bound distemper of


approved colour shade and quality to old/new surface in
two coats, including scaffolding, preparing surface
21 1135.00 1.00 Sqm. 1135.00
(excluding priming coat) complete.

Doors and Windows Schedule 164.00 1.00 Sqm. 164.00


22

Flooring Details
A)22mm Thick. Terrazo Tile light shade 232.00 1.00 Sqm. 232.00
B)Anti Skid ceramic glazed first quality floor tile-
23 62.00 1.00 Sqm. 62.00
300x300
80mm Thick Udaipur green marble stone 43.00 1.00 Sqm. 43.00
Brick bat coba water proofing 198.00 1.00 Sqm. 198.00

Providing & Laying in Ceramic Glazed Tiles 30 x 30 cm


with white cement DADO of approved material etc complete.
24 227.00 1.00 Sqm. 227.00

Providing & Laying 75 thk well compacted brick


aggregate (Plinth Protection)
25 53.00 1.00 Sqm. 53.00
25 53.00 1.00 Sqm. 53.00

Providing & Laying 50 thk PCC 1:2:4 (Plinth Protection)


26 3.00 1.00 Cum. 3.00

Providing & Fixing 110 mm diameter Rain Water Pipe


27 31.00 1.00 RMt. 31.00
Name of work: B3 TYPE BUILDING

Measurement

Item
Descriptions of Item No Length Breadth Depth Quantity Unit
No.
Excavation for foundation in Earth soils of all
1 types, sand gravel and soft murum etc complete.

For footing of col Total 514.10


Say 515.00 Cum.

2 Sand Filling
LIVING ROOM 2 4.500 3.200 0.100 2.88
KITCHEN 2 2.600 3.200 0.100 1.66
BED ROOM 1 2 3.500 4.300 0.100 3.01
TOILET 2 1.600 2.150 0.100 0.69
TOILET 2 1.600 2.150 0.100 0.69
DINNING 2 2.700 3.483 0.100 1.88
BED ROOM 2 2 4.000 3.500 0.100 2.80
STAIR 1 2.400 4.900 0.100 1.18
Cub Board 4 0.600 1.500 0.100 0.36
Total 15.15
Say 16.00 Cum.

Back Filling Total 451.235


3
Say 452.00 Cum.
Providing and laying in situ Ready Mix
cement concrete M-7.5 grade using design
mix with minimum cement content as per IS
4 456 with maximum water cement ratio 0.6
using maximum 25/30 mm size and down
trap metal for foundation and bedding etc
complete.

A) For footing of col 19.773


B) Plinth Beam
X Grid
PB1 1 2.400 0.330 0.050 0.04
PB2 1 3.280 0.330 0.050 0.05
PB3 1 2.150 0.330 0.050 0.04
PB4 1 4.500 0.330 0.050 0.07
PB5 1 4.500 0.330 0.050 0.07
PB6 1 2.150 0.330 0.050 0.04
PB7 1 3.280 0.330 0.050 0.05
PB8 1 2.400 0.330 0.050 0.04
PB9 1 2.300 0.330 0.050 0.04
PB10 1 4.230 0.330 0.050 0.07
PB11 1 2.400 0.330 0.050 0.04
PB12 1 4.280 0.330 0.050 0.07
PB13 1 2.300 0.330 0.050 0.04
PB14 1 3.275 0.330 0.050 0.05
PB14A 1 0.370 0.330 0.050 0.01
PB15 1 3.275 0.330 0.050 0.05
PB15A 1 0.370 0.330 0.050 0.01
PB16 2 1.600 0.330 0.050 0.05
PB17 2 1.600 0.330 0.050 0.05
PB18 1 2.370 0.330 0.050 0.04
PB19 1 1.485 0.330 0.050 0.02
PB20 1 3.885 0.330 0.050 0.06
PB21 1 3.885 0.330 0.050 0.06
PB22 1 1.485 0.330 0.050 0.02
PB23 1 2.370 0.330 0.050 0.04
PB23A 2 2.700 0.330 0.050 0.09
2 2.755 0.330 0.050 0.09
2 1.535 0.330 0.050 0.05
Y Grid
PB24 2 4.300 0.330 0.050 0.14
PB25 2 1.930 0.330 0.050 0.06
PB26 2 2.645 0.330 0.050 0.09
PB27 2 3.263 0.330 0.050 0.11
PB28 2 2.815 0.330 0.050 0.09
PB29 2 3.483 0.330 0.050 0.11
PB30 2 3.280 0.330 0.050 0.11
PB31 2 3.170 0.330 0.050 0.10
PB32 1 3.280 0.330 0.050 0.05
C) Rooms
LIVING ROOM 2 4.500 3.200 0.100 2.88
KITCHEN 2 2.600 3.200 0.100 1.66
BED ROOM 1 2 3.500 4.300 0.100 3.01
TOILET 2 1.600 2.150 0.100 0.69
TOILET 2 1.600 2.150 0.100 0.69
DINNING 2 2.700 3.483 0.100 1.88
BED ROOM 2 2 4.000 3.500 0.100 2.80
STAIR 1 2.400 4.900 0.100 1.18
Cub Board 4 0.600 1.500 0.100 0.36
Total 37.17
Say 38.00 Cum.
Providing and laying in situ Ready Mix Cement
Concrete M-20 grade of trap / granite / quartzite /
5 gneiss metal for RCC work in foundation like raft,
grillage, strip foundation and footing of RCC column
etc complete.

REFER ATTACH SHEET 43.10


Total 43.10
Say 44.00 Cum.

P & L in situ Ready Mix Cement Conrete M-20


6 Grade of trap metel for RCC Column as per detailed
drawing etc complete.

Column -C1,
F3/C1
Below Plinth 4 0.230 0.450 2.10 0.869
Above Plinth 4 0.230 0.450 7.85 3.250
CF4/C1
Below Plinth 4 0.230 0.450 1.95 0.809
Above Plinth 4 0.230 0.450 7.85 3.250
Column -C2,
F2/C2
Below Plinth 2 0.230 0.450 2.15 0.445
Above Plinth 2 0.230 0.450 6.80 1.408
F5/C2
Below Plinth 2 0.230 0.450 2.05 0.424
Above Plinth 2 0.230 0.450 10.675 2.210
CF1/C2
Below Plinth 2 0.230 0.450 1.95 0.404
Above Plinth 2 0.230 0.450 7.85 1.625
Column -C3,
CF1/C3
Below Plinth 2 0.230 0.450 1.95 0.404
Above Plinth 2 0.230 0.450 7.850 1.625
Column -C4,
CF2/C4
Below Plinth 2 0.300 0.500 2.05 0.615
Above Plinth 2 0.300 0.500 10.675 3.203
Column -C5,
F4/C5
Below Plinth 2 0.300 0.500 2.05 0.615
Above Plinth 2 0.300 0.500 6.800 2.040
Column -C6,
F5/C6
Below Plinth 1 0.230 0.450 2.05 0.212
Above Plinth 1 0.230 0.450 7.850 0.812
CF3/C6
Below Plinth 4 0.230 0.450 2.050 0.849
Above Plinth 4 0.230 0.450 7.850 3.250
Total 28.317
Say 29.000 Cum.
P & L in situ Ready Mix Cement Conrete M-20
7 Grade of trap metal for RCC Beam as per detailed
drawing etc complete.

A) Plinth Beam
X Grid
PB1 1 2.400 0.230 0.450 0.25
PB2 1 3.280 0.230 0.450 0.34
PB3 1 2.150 0.230 0.450 0.22
PB4 1 4.500 0.230 0.450 0.47
PB5 1 4.500 0.230 0.450 0.47
PB6 1 2.150 0.230 0.450 0.22
PB7 1 3.280 0.230 0.450 0.34
PB8 1 2.400 0.230 0.450 0.25
PB9 1 2.300 0.230 0.450 0.24
PB10 1 4.230 0.230 0.450 0.44
PB11 1 2.400 0.230 0.450 0.25
PB12 1 4.280 0.230 0.450 0.44
PB13 1 2.300 0.230 0.450 0.24
PB14 1 3.275 0.230 0.450 0.34
PB14A 1 0.370 0.230 0.450 0.04
PB15 1 3.275 0.230 0.450 0.34
PB15A 1 0.370 0.230 0.450 0.04
PB16 2 1.600 0.230 0.450 0.33
PB17 2 1.600 0.230 0.450 0.33
PB18 1 2.370 0.230 0.450 0.25
PB19 1 1.485 0.230 0.450 0.15
PB20 1 3.885 0.230 0.450 0.40
PB21 1 3.885 0.230 0.450 0.40
PB22 1 1.485 0.230 0.450 0.15
PB23 1 2.370 0.230 0.450 0.25
PB23A 2 2.700 0.230 0.450 0.56
2 2.755 0.230 0.450 0.57
2 1.535 0.230 0.450 0.32
Y Grid
PB24 2 4.300 0.230 0.450 0.89
PB25 2 1.930 0.230 0.450 0.40
PB26 2 2.645 0.230 0.450 0.55
PB27 2 3.263 0.230 0.600 0.90
PB28 2 2.815 0.230 0.450 0.58
PB29 2 3.483 0.230 0.450 0.72
PB30 2 3.280 0.230 0.450 0.68
PB31 2 3.170 0.230 0.450 0.66
PB32 1 3.280 0.230 0.450 0.34
B) Lintel Beam
GROUND FLOOR
W1 6 2.700 0.230 0.180 0.67
W2 2 2.100 0.230 0.180 0.17
W3 2 2.100 0.230 0.180 0.17
W4 2 1.800 0.230 0.180 0.15
W5 4 1.350 0.230 0.150 0.19
DW1 2 2.700 0.230 0.180 0.22
D1 2 1.650 0.230 0.180 0.14
D2 6 1.500 0.230 0.180 0.37
D3 6 1.350 0.230 0.150 0.28
O1 2 2.100 0.230 0.180 0.17
FIRST FLOOR
W1 2 2.700 0.230 0.180 0.22
W2 4 2.700 0.230 0.180 0.45
W3 2 2.100 0.230 0.180 0.17
W4 2 1.800 0.230 0.180 0.15
W5 4 1.350 0.230 0.150 0.19
DW1 2 2.700 0.230 0.180 0.22
D1 2 1.650 0.230 0.180 0.14
D2 6 1.500 0.230 0.180 0.37
D3 4 1.350 0.230 0.150 0.19
O1 2 2.100 0.230 0.180 0.17
C) Floor Beam
X Grid
FB1 1 2.400 0.230 0.600 0.33
FB2 1 3.280 0.230 0.600 0.45
FB3 1 2.150 0.230 0.600 0.30
FB4 1 4.500 0.230 0.600 0.62
FB5 1 4.500 0.230 0.600 0.62
FB6 1 2.150 0.230 0.600 0.30
FB7 1 3.280 0.230 0.600 0.45
FB9 1 2.300 0.230 0.450 0.24
FB10 1 4.230 0.230 0.450 0.44
FB11 1 2.400 0.230 0.600 0.33
FB12 1 4.280 0.230 0.450 0.44
FB13 1 2.300 0.230 0.450 0.24
FB14 1 3.275 0.230 0.600 0.45
FB14A 1 0.370 0.230 0.300 0.03
FB15 1 3.275 0.230 0.600 0.45
FB15A 1 0.370 0.230 0.300 0.03
FB16 2 1.600 0.230 0.450 0.33
FB17 2 1.600 0.230 0.600 0.44
FB18 1 2.370 0.230 0.600 0.33
FB19 1 1.485 0.230 0.600 0.20
FB20 1 3.885 0.230 0.600 0.54
FB21 1 3.885 0.230 0.600 0.54
FB22 1 1.485 0.230 0.600 0.20
FB23 1 2.370 0.230 0.600 0.33
FB23A 2 2.700 0.230 0.300 0.37
2 2.755 0.230 0.300 0.38
FB23B 2 1.535 0.230 0.300 0.21
Y Grid
FB24 2 4.300 0.230 0.600 1.19
FB25 2 1.930 0.230 0.600 0.53
FB26 2 2.645 0.230 0.450 0.55
FB27 2 3.263 0.230 0.600 0.90
FB28 2 2.815 0.230 0.450 0.58
FB29 2 3.483 0.230 0.450 0.72
FB30 2 3.280 0.230 0.450 0.68
FB30 2 0.370 0.230 0.300 0.05
FB31 2 3.170 0.230 0.750 1.09
FB31A 2 1.700 0.230 0.600 0.47
FB32 1 3.280 0.230 0.450 0.34
D) Roof Beam
X Grid
TB1 1 2.400 0.230 0.600 0.33
TB2 1 3.280 0.230 0.600 0.45
TB3 1 2.150 0.230 0.600 0.30
TB4 1 4.500 0.230 0.600 0.62
TB5 1 4.500 0.230 0.600 0.62
TB6 1 2.150 0.230 0.600 0.30
TB7 1 3.280 0.230 0.600 0.45
TB9 1 2.300 0.230 0.450 0.24
TB10 1 4.230 0.230 0.450 0.44
TB11 1 2.400 0.230 0.600 0.33
TB12 1 4.280 0.230 0.450 0.44
TB13 1 2.300 0.230 0.450 0.24
TB14 1 3.275 0.230 0.600 0.45
TB14A 1 0.370 0.230 0.300 0.03
TB15 1 3.275 0.230 0.600 0.45
TB15A 1 0.370 0.230 0.300 0.03
TB16 2 1.600 0.230 0.300 0.22
TB17 2 1.600 0.230 0.600 0.44
TB18 1 2.370 0.230 0.600 0.33
TB19 1 1.485 0.230 0.600 0.20
TB20 1 3.885 0.230 0.600 0.54
TB21 1 3.885 0.230 0.600 0.54
TB22 1 1.485 0.230 0.600 0.20
TB23 1 2.370 0.230 0.600 0.33
TB23A 2 2.700 0.230 0.300 0.37
2 2.755 0.230 0.300 0.38
TB23B 2 1.535 0.115 0.300 0.11
Y Grid
TB24 2 4.300 0.230 0.600 1.19
TB25 2 1.930 0.230 0.600 0.53
TB26 2 2.645 0.230 0.450 0.55
TB27 2 3.263 0.230 0.600 0.90
TB28 2 2.815 0.230 0.450 0.58
TB29 2 3.483 0.230 0.450 0.72
2 0.450 0.230 0.300 0.06
TB30 2 3.280 0.230 0.450 0.68
2 0.370 0.230 0.300 0.05
TB31 2 3.170 0.230 0.600 0.87
TB32 1 3.280 0.230 0.450 0.34
E) Balcony Beams
BB1 2 6.300 0.150 0.550 1.04
BB2 2 6.830 0.150 0.550 1.13
BB3 2 5.905 0.150 0.550 0.97
2 6.300 0.150 0.600 1.13
2 6.830 0.150 0.600 1.23
2 5.905 0.150 0.600 1.06
F) Staircase Beam
MB1 2 2.400 0.230 0.400 0.44
MB2 2 3.085 0.230 0.400 0.57
MB2 2 1.480 0.230 0.450 0.31
LB 2 2.400 0.230 0.450 0.50
Total 60.074 Cum.
Say 61.000 Cum.

P & L in situ Ready Mix Cement Conrete M-20


8 Grade of trap metel for RCC Slab as per detailed
drawing etc complete.
A) Ground Floor Slab
S1 2 4.500 3.200 0.120 3.456
S2 2 4.000 3.500 0.110 3.080
2 1.555 0.600 0.110 0.205
S3 2 1.600 2.150 0.100 0.688
2 1.600 2.250 0.100 0.720
S4 2 3.200 2.600 0.110 1.830
2 2.700 3.483 0.110 2.069
2 1.600 1.135 0.110 0.400
S5 2 3.500 4.300 0.110 3.311
2 1.500 0.600 0.110 0.198
B) First Floor Slab
S1 2 4.500 3.200 0.120 3.456
S2 2 4.000 3.500 0.110 3.080
2 1.555 0.600 0.110 0.205
S3 2 1.600 2.150 0.100 0.688
2 1.600 2.250 0.100 0.720
S4 2 3.200 2.600 0.110 1.830
2 2.700 3.483 0.110 2.069
2 1.600 1.135 0.110 0.400
S5 2 3.500 4.300 0.110 3.311
2 1.500 0.600 0.110 0.198
Balcony slab 4 3.100 1.500 0.100 1.860
4 3.635 1.500 0.100 2.18
4 2.905 1.500 0.100 1.74
C) Staircase Beam
Slab 1 4.900 2.400 0.140 1.65
Waist 2 4.900 2.400 0.150 3.53

Total 42.873
Say 43.000 Cum.

P & L in situ Reay Mix Cement Conrete M-20


9 Grade of trap metel for RCC Chajja as per detailed
drawing etc complete.
RCC Chajja Over W2 4 2.100 0.600 0.100 0.504
RCC Chajja Over W3 4 2.100 0.600 0.100 0.504
RCC Chajja Over W4 4 1.800 0.600 0.100 0.432
RCC Chajja Over W5 8 1.350 0.600 0.100 0.648
Staircase 1 2.100 0.750 0.100 0.158
Total 2.246
Say 3.000 Cum.
Providing & fixing in position TMT Steel bar
reinforcement of various diameters for R.C.C.
pile caps, footings, foundations, slabs, beams,
10 columns, canopies, staircases, newels, chajjas,
lintels, pardies, coping, fins, arches, etc complete.

Total 25.025 MT.


Say 26.000 MT.

Providing Second class Burnt Brick masonry with


11 conventional / IS type bricks in cement mortar 1:6
in foundation and plinth etc complete.

Along Grid A 2 5.270 0.230 7.850 19.03


Deduction W3 -4 1.500 0.230 1.650 -2.28
Along Grid B 2 1.930 0.230 7.850 6.97
Along Grid E 2 0.370 0.230 7.850 1.34
Along Grid F 2 5.130 0.230 10.675 25.19
Along Grid G 1 3.280 0.230 7.850 5.92
Along Grid 1 1 4.030 0.230 7.850 7.28
Along Grid 2 1 9.750 0.230 7.850 17.60
Deduction W1 -4 2.300 0.230 1.650 -3.49
Deduction W5 -4 0.750 0.230 1.050 -0.72
Along Grid 3 1 3.870 0.230 7.850 6.99
Deduction W4 -4 1.200 0.230 1.650 -1.82
Along Grid 4 1 1.200 0.230 7.850 2.17
Along Grid 6 1 20.760 0.230 7.850 37.48
Deduction W1 -4 2.100 0.230 1.650 -3.19
Deduction W2 -4 1.500 0.230 1.350 -1.86
Deduction W4 -4 1.200 0.230 1.650 -1.82
Deduction DW1 -4 2.100 0.230 2.500 -4.83
Along Grid 7 1 2.400 0.230 10.675 5.89
Deduction G1 -1 2.000 0.230 2.000 -0.92
Deduction G2 -1 2.000 0.230 3.150 -1.45
Parapet Wall 1 40.390 0.230 1.050 9.75
Total 113.471
Say 114.000 Cum.
Providing Second class Burnt Brick masonry with
conventional / IS type bricks in cement mortar 1:4
12
in half brick thick wall etc complete.

GF 1 31.320 3.150 98.658


FF 1 31.320 3.150 98.658
Parapet Wall 1 35.070 1.050 36.824
Total 234.140
Say 235.000 Sqm.

Providing India waterproffing including brick bat


13 coba etc. complete.
Roof slab 1 197.646 197.646
Total 197.646
Say 198.000 Sq.m
Providing waterproof plaster over RCC Chajja,
Parapet Wall and sides in cement mortar 1:3 with
14 neat finishing, floating using approved water
proofing compound at the rate of One Kg. of cement
etc complete.
RCC Chajja 1 30.000 30.000
parapet wall 1 40.390 0.230 9.290
1 35.070 0.115 4.033
Total 43.323
Say 44.000 Sq.m

Providing internal cement plaster 12mm


thick in a single coat in cement mortar 1:4
without neeru finish to concrete or brick
15
surface in all positions including racking out
joints, scaffolding and curing complete.

GROUND FLOOR
LIVING ROOM 4 4.500 3.150 56.700
4 3.200 3.150 40.320
KITCHEN 4 2.600 3.150 32.760
4 3.200 3.150 40.320
BED ROOM 1 4 3.500 3.150 44.100
4 4.300 3.150 54.180
TOILET 4 1.600 3.150 20.160
4 2.150 3.150 27.090
DINNING 4 2.700 3.150 34.020
4 3.483 3.150 43.886
BED ROOM 2 4 4.000 3.150 50.400
4 3.500 3.150 44.100
STAIR 2 2.400 3.150 15.120
2 4.900 3.150 30.870
Deductions
W1 -6 2.100 1.650 -20.790
W2 -2 1.500 1.350 -4.050
W3 -2 1.500 1.650 -4.950
W4 -2 1.200 1.650 -3.960
W5 -4 0.750 1.050 -3.150
DW1 -2 2.100 2.500 -10.500
D1 -2 1.050 2.100 -4.410
D2 -6 0.900 2.100 -11.340
D3 -6 0.750 2.100 -9.450
O1 -2 1.500 2.500 -7.500
FIRST FLOOR
Qnty 534.026
G1 -1 2.000 2.000 -4.000
Deductions -59.310
SECOND FLOOR
Qnty 1 71.510 1.050 75.086
Deductions
G2 -1 2.000 3.150 -6.300
Total 993.427
Say 994.000 Sq.m

Providing neeru finish to plaster surface in


16 all positions including scaffolding and curing
complete.
Internal cement plaster 12 mm thick Qty. same as per item no 994.000
Total 994.000
Say 994.000 Sq.m
Providing neeru finish to plastered
17 surfaces for ceiling.Including scaffolding
curing complete.
LIVING ROOM 2 4.500 3.200 28.800
KITCHEN 2 2.600 3.200 16.640
BED ROOM 1 2 3.500 4.300 30.100
TOILET 2 1.600 2.150 6.880
DINNING 2 2.700 3.483 18.808
BED ROOM 2 2 4.000 3.500 28.000
STAIR 1 2.400 4.900 11.760
Total 140.988
For FF Level 140.988
Say 282.000 Sq.m
Providing sand face plaster externally in
two coats using approved screened sand in
18 all positions, including providing base coat of
15mm thick in cement mortar 1:4 etc
complete.
Along Grid 1 & 7 1 49.500 7.850 388.575
1 2.860 10.675 30.531
Along Grid A 1 14.050 7.850 110.293
1 3.400 10.675 36.295
Deduction -91.600
Total 474.093
Say 475.000 Sq.m

Providing and applying primer coat of


approved quality to old/new wall surfaces to
19
receive oil bound distemper treatment etc
complete.
Qty. same as per item no. 1134.988
Total 1134.988
Say 1135.000 Sq.m

Providing and applying two coats of water


proof cement paint and one coat primer
20 of approved manufacturer & colour to the Qty. same as per item no. 475.000
plastered surface etc complete.

475.000
Say 475.000 Sq.m

Providing and applying washable oil bound


distemper of approved colour shade and
21 Qty. same as per item no 1135.000
quality to old/new surface in two coats etc
complete.
Say 1135.000 Sq.m

22 Doors and Windows Schedule


GROUND FLOOR
W1 6 2.100 1.650 20.79
W2 2 1.500 1.350 4.05
W3 2 1.500 1.650 4.95
W4 2 1.200 1.650 3.96
W5 4 0.750 1.050 3.15
DW1 2 2.100 2.500 10.5
D1 2 1.050 2.100 4.41
D2 6 0.900 2.100 11.34
D3 6 0.750 2.100 9.45
O1 2 1.500 2.500 7.5
FIRST FLOOR
W1 2 2.100 1.650
W2 2 2.100 1.350 5.67
W3 2 1.500 1.650 4.95
W4 2 1.200 1.650 3.96
W5 4 0.750 1.050 3.15
DW1 4 2.100 2.500 21
D1 2 1.050 2.100 4.41
D2 6 0.900 2.100 11.34
D3 6 0.750 2.100 9.45
O1 2 1.500 2.500 7.5
G1 1 2.000 2.000 4
SECOND FLOOR
D5 1 0.900 2.000 1.8
G2 1 2.000 3.150 6.3
Total 163.630
Say 164.000 Sq.m
23 Flooring Details
A) 22mm Thick. Terrazo Tile light shade
LIVING ROOM 4 4.500 3.200 57.60
BEDROOM 1 4 3.500 4.300 60.20
BEDROOM 2 4 4.000 3.500 56.00
BALCONY 4 3.630 1.500 21.78
4 3.100 1.500 18.60
4 2.905 1.500 17.43
Total 231.61
Say 232.00 Sq.m
Anti Skid ceramic glazed first quality
B)
floor tile-300x300
KITCHEN 4 2.600 3.200 33.28
TOILET 4 2.250 1.600 14.40
4 2.150 1.600 13.76
Total 61.44
Say 62.00 Sq.m
C) 80mm Thick Udaipur green marble stone
STAIRCASE 3 2.400 5.900 42.48
Total 42.48
Say 43.00 Sq.m
D) Brick bat coba water proofing
TERRACE 1 197.646 197.65
Total 197.65
Say 198.00 Sq.m

Providing & Laying in Ceramic Glazed Tiles


24 30 x 30 cm with white cement DADO of
approved material etc complete.
TOILET 16 2.250 2.100 75.600
16 1.600 2.100 53.760
KITCHEN 8 2.600 2.100 43.680
8 3.200 2.100 53.760
Total 226.800
Say 227.000 Sq.m

Providing & Laying 75 thk well compacted


25 brick aggregate (Plinth Protection) 1 70.000 0.750 52.500

Total 52.500
Say 53.000 Sq.m

Providing & Laying 50 thk PCC 1:2:4 (Plinth


26 1 70.000 0.750 0.050 2.625
Protection)
Total 2.625
Say 3.000 Cu.m
Providing & Fixing 110 mm diameter Rain
27
Water Pipe
4 6.800 27.200 Rmt.
1 2.875 2.875 Rmt.
Total 30.075
Say 31.000 Rmt.
L B D1 D/H
Fdn PCC PCC Col Col Col Col Col Ht above Excavation PCC VOL
Nos
Depth Depth Offset Offset Nos Length Width GL (M3) (M3)
mt mt mt mt

F2(C2) 2 2.55 2.25 0.15 0.35 2.5 0.1 0.1 0.05 1 0.230 0.450 0.5 35.04 1.35
F3(C1) 4 2.70 2.65 0.20 0.4 2.5 0.1 0.1 0.05 1 0.230 0.450 0.5 85.96 3.31
F4(C5) 2 2.85 2.70 0.25 0.45 2.5 0.1 0.1 0.05 1 0.300 0.500 0.5 45.99 1.77
F5(C2,C6) 3 3.20 2.65 0.25 0.45 2.5 0.1 0.1 0.05 1 0.230 0.450 0.5 75.58 2.91
CF1(C2,C3) 2 5.40 2.80 0.55 2.5 0.1 0.1 0.05 2 0.230 0.450 0.5 87.36 3.36
CF2(C4,C4) 1 6.15 3.05 0.6 2.5 0.1 0.1 0.05 2 0.300 0.500 0.5 53.66 2.06
CF3(C6,C6) 2 3.90 2.50 0.45 2.5 0.1 0.1 0.05 2 0.230 0.450 0.5 57.56 2.21
CF4(C1,C1) 2 4.40 2.85 0.55 2.5 0.1 0.1 0.05 2 0.230 0.450 0.5 72.96 2.81
TOTAL QUANTITY = 514.10 19.77
CONC VOL Formwork Backfill
(M3) Qty. (M2) (M3)

2.65 10.09 31.04


7.98 22.70 74.67
5.09 13.71 39.14
8.34 19.18 64.33
6.22 13.33 77.78
4.22 7.68 47.37
3.38 13.87 51.97
5.22 13.33 64.93
43.10 113.89 451.24
Name of work: TOWNSHIP TYPE - C BUILDING

REF. DRG . - C-ENGG-TS-STD-TYPE C-DS-01 TO 15 & C-ENGG-TS-STD-TYPE-C-STR-1 TO 4


ABSTRACT

Item
Item Discription QTY. RATE UNIT TOTAL
No.
Excavation for foundation in Earth soils of all types,
sand gravel and soft murum including removing the
excavated materials upto a distance of 50 metres beyond
building area and lift as specified, stacking and spreading
1 as directed including dewatering unless provided 426.00 1.00 Cum. 426.00
elsewhere, preparing the bed for the foundation and
necessary backfilling, ramming, watering complete
excluding shoring and strutting.( Lift Upto 1.5 M )

Sand Filling
2 22.00 1.00 Cum. 22.00

3 Back filling 366.00 1.00 Cum. 366.00


Providing and laying in situ Ready Mix cement concrete
M-7.5 grade using design mix with minimum cement
content as per IS 456 with maximum water cement ratio
0.45 using maximum 25/30 mm size and down trap metal
for foundation and bedding with all labours, materials,
plant & equipments, shuttering form work, staging,
including transporting, placing, vibrating with mechanical
4 vibrator, finishing and curing etc. complete. The item also 41.00 1.00 Cum. 41.00
includes heavy dewatering by using pumps or manually. .
The cost also includes all types of taxes, sales tax,
insurance, cess levied by local authority etc. complete.
( 3969 CSR Rate + 830 Additional for RMC Rate = 4799 )

Providing and laying in situ Ready Mix Cement Concrete


M-20 grade of trap / granite / quartzite / gneiss metal for
RCC foundation like raft, grillage, strip foundation and
footing of RCC column and steel stanchions including
normal dewatering, formwork, compaction, finishing and
curing including transporting from mix plant upto distance
5 44.00 1.00 Cum. 44.00
of 25 Km, pouring the concrete at work site for 1.5m lift
above G.L. and 5.0m lift below GL, etc. complete...
(Excluding reinforcement and structural steel).
Providing and casting in situ Ready Mix Cement
Concrete M-20 Grade of trap / Granite / quartzite /
gneiss metal of approved quality for RCC Column as per
detailed drawings and designs or as directed by Engineer-
in-charge including normal dewatering, centering,
formwork, compaction, finishing the form surface with
cement mortar 1:3 of sufficient minimum thickness to give
a smooth and even surface wherever necessary or
6 38.00 1.00 Cum. 38.00
roughening if special finish is to be provided and curing
including transporting from mix plant upto distance of 25
Km, pouring the concrete at work site for 1.5m lift above
G.L. and 5.0m lift below GL, etc. complete... (Excluding
reinforcement and structural steel).
Providing and casting in situ Ready Mix Cement
Concrete M-20 Grade of trap / Granite / quartzite /
gneiss metal of approved quality for RCC work in Beam
as per detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering, centering,
formwork, compaction, finishing the form surface with
cement mortar 1:3 of sufficient minimum thickness to give
a smooth and even surface wherever necessary or roughing
7 if special finish is to be provided and curing including 64.00 1.00 Cum. 64.00
transporting from mix plant upto distance of 25 Km,
pouring the concrete at work site for 1.5m lift above G.L.
and 5.0m lift below GL, etc. complete... (Excluding
reinforcement and structural steel).

Providing and casting in situ Ready Mix Cement


Concrete M-20 Grade of trap / Granite / quartzite /
gneiss metal of approved quality for RCC work in Slab as
per detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering, centering,
formwork, compaction, finishing the form surface with
cement mortar 1:3 of sufficient minimum thickness to give
a smooth and even surface wherever necessary or roughing
8 if special finish is to be provided and curing including 56.00 1.00 Cum. 56.00
transporting from mix plant upto distance of 25 Km,
pouring the concrete at work site for 1.5m lift above G.L.
and 5.0m lift below GL, etc. complete... (Excluding
reinforcement and structural steel). CSR Rate 8185 +
Pump Rate 175 =8360 ( For Pump rate Ref CSR I. N. a)
Static Pump Page No-13

Providing and casting in situ Ready Mix Cement


Concrete M-20 Grade of trap / Granite / quartzite / gneiss
metal of approved quality for RCC Chajja as per detailed
drawings and designs or as directed by Engineer-in-charge
including normal dewatering, centering, formwork,
compaction, finishing the form surface with cement mortar
1:3 of sufficient minimum thickness to give a smooth and
even surface wherever necessary or roughing if special
9 finish is to be provided and curing including transporting 5.00 1.00 Cum. 5.00
from mix plant upto distance of 25 Km, pouring the
concrete at work site for 1.5m lift above G.L. and 5.0m lift
below GL, etc. complete... (Excluding reinforcement and
structural steel).

Providing & fixing in position TMT Steel bar


reinforcement of various diameters for R.C.C. pile caps,
footings, foundations, slabs, beams, columns, canopies,
staircases, newels, chajjas, lintels, pardies, coping, fins,
10 arches, etc. as per detailed designs, drawings and 29.00 1.00 MT. 29.00
schedules, including cutting, bending, hooking the bars,
binding with wires or tack welding and supporting as
required completed.
Providing Second class Burnt Brick masonry with
conventional / IS type bricks in cement mortar 1:6 in
foundation and plinth of inner walls & external walls,
including bailing out water manually, striking joints on
11 106.00 1.00 Cum. 106.00
unexposed faces, racking out joints on exposed faces and
watering complete.

Providing Second class Burnt Brick masonry with


conventional / IS type bricks in cement mortar 1:4 in
half brick thick wall including mild steel longitudinal
reinforcement of 2 bars of 6mm dia / 2 hoop iron strip
12 25mm x 1.6mm painted with anticorrosive paint at every 316.00 1.00 Sqm. 316.00
third course properly bent and bonded at ends, scaffolding,
raking out joints and watering complete.

Providing and laying water proofing treatment of 112


mm av. thickness consisting of 12 mm thick layer in
Cement Mortar 1:3 with water proofing compound at the
rate of One Kilograme per bag of cement as base,
constructing and laying brick bat coba in cement mortar
1:5 with waterproofing compound at the rate of One
Kilogramme per bag of cement and having average
thickness of 80mm and finishing with 20mm thick cement
plaster layer in cement mortar 1:3 with approved water
Proofing compound at the rate of One Kilogramme per
13 cement bag, including all lead, lifts and laid to proper slope 242.00 1.00 Sqm. 242.00
to drain of water entirely including Watta at the junction of
parapet and work upto a height of 300 mm or as directed
and including finishing the top layer of water proofing
treatment with false marking of 30cm x 30cm or as
directed and covering the whole treatment with seven
year’s guarantee, on requisite stamp paper etc. complete.

Providing waterproof plaster over RCC Chajja, Parapet


Wall and sides in cement mortar 1:3 with neat
finishing, floating using approved water proofing compound
14 at the rate of One Kg. of cement etc complete. 68.00 1.00 Sqm. 68.00
Providing internal cement plaster 12mm thick in a
single coat in cement mortar 1:4 without neeru finish to
15 concrete or brick surface in all positions including racking 765.00 1.00 Sqm. 765.00
out joints, scaffolding and curing complete.

Providing neeru finish to plaster surface in all positions


16 including scaffolding and curing complete. 765.00 1.00 Sqm. 765.00

Providing neeru finish to plastered surfaces for


17 ceiling.Including scaffolding curing complete. 213.00 1.00 Sqm. 213.00

Providing sand face plaster externally in two coats


using approved screened sand in all positions, including
providing base coat of 15mm thick in cement mortar 1:4
mixing approved water proofing compound at the rate of 1
kg./ 50 kg. of cement and curing the same for not less
than two days and keeping the surface of base coat rough
18 to receive the sand faced treatment 8mm thick in cement 421.00 1.00 Sqm. 421.00
mortar 1:4 and finishing the surface by taking out grains
and curing for 14 days including preparing the surface,
watering and scaffolding etc. complete.

Providing and applying primer coat of approved quality to


old/new wall surfaces to receive oil bound distemper
treatment, including scaffolding, preparing the surface as
19 directed completed. (prior approval of S.E. shall be 978.00 1.00 Sqm. 978.00
obtained)

Providing and applying two coats of water proof cement


paint and one coat primer of approved manufacturer &
colour to the plastered surface including scaffolding,
20 preparing the surface, watering for two days complete. 421.00 1.00 Sqm. 421.00

Providing and applying washable oil bound distemper of


approved colour shade and quality to old/new surface in
two coats, including scaffolding, preparing surface
21 978.00 1.00 Sqm. 978.00
(excluding priming coat) complete.

Doors and Windows


22 162.00 1.00 Sqm. 162.00

23 64.00 1.00 Sqm. 64.00


a)Vetirfied Tile-600x600

b)Terrazo Tile light shade


242.00 1.00 Sqm. 242.00

c)Anti Skid ceramic glazed first quality floor tile-300x300-


IS:15622 89.00 1.00 Sqm. 89.00

d)80mm Thick Udaipur green marble stone 37.00 1.00 Sqm. 37.00
e)Brick bat coba water proofing
242.00 1.00 Sqm. 242.00

Providing & Laying in Ceramic Glazed Tiles 20 x 30 cm with


24 white cement DADO of approved material etc complete. 305.00 1.00 Sqm. 305.00

Providing & Laying 75 thk well compacted brick


25 aggregate (Plinth Protection) 56.00 1.00 Sqm. 56.00

Providing & Laying 50 thk PCC 1:2:4 (Plinth Protection)


26 3.00 1.00 Cum. 3.00

Providing & Fixing 110 mm diameter Rain Water Pipe


27 68.00 1.00 RMt. 68.00
Name of work: C-TYPE BUILDING

Measurement

Item
Descriptions of Item No Length Breadth Depth Quantity Unit
No.
Excavation for foundation in Earth soils of all
1 types, sand gravel and soft murum etc complete.

For Footing Total 425.835


Say 426.000 Cum.

2 Sand Filling
BED ROOM -1 2 3.600 3.600 0.100 2.592
BED ROOM -2 2 3.600 3.300 0.100 2.376
BED ROOM -3 2 3.900 3.300 0.100 2.574
Dining 2 1.335 3.115 0.100 0.832
2 2.850 4.700 0.100 2.679
Living Room 2 4.385 3.600 0.100 3.157
KITCHEN 2 3.750 3.300 0.100 2.475
Toilet -1 4 2.150 1.500 0.100 1.290
Toilet -2 2 1.500 2.200 0.100 0.660
Staircase 1 2.400 5.130 0.100 1.231
Platform 2 2.885 1.350 0.100 0.779
Cub board 6 1.575 0.600 0.100 0.567
Total 21.212
Say 22.000 Cum.

3 Back Filling 365.776


Total 365.776
Say 366.000 Cum.
Providing and laying in situ Ready Mix
cement concrete M-7.5 grade using design
mix with minimum cement content as per IS
4 456 with maximum water cement ratio 0.6
using maximum 25/30 mm size and down
trap metal for foundation and bedding etc
complete.

For Footing 16.378


Plinth Beam
PB19 1 2.150 0.330 0.050 0.04
PB63,65 2 4.400 0.330 0.050 0.15
PB18 1 2.400 0.330 0.050 0.04
PB44 4 1.115 0.215 0.050 0.05
Alround 2 74.260 0.330 0.050 2.45
PB64 1 3.075 0.330 0.050 0.05
PB23 1 2.400 0.330 0.050 0.04
BED ROOM -1 2 3.600 3.600 0.100 2.592
BED ROOM -2 2 3.600 3.300 0.100 2.376
BED ROOM -3 2 3.900 3.300 0.100 2.574
Dining 2 1.335 3.115 0.100 0.832
2 2.850 4.700 0.100 2.679
Living Room 2 4.385 3.600 0.100 3.157
KITCHEN 2 3.750 3.300 0.100 2.475
Toilet -1 4 2.150 1.500 0.100 1.290
Toilet -2 2 1.500 2.200 0.100 0.660
Staircase 1 2.400 5.130 0.100 1.231
Platform 2 2.885 1.350 0.100 0.779
Cub board 6 1.575 0.600 0.100 0.567
Total 40.399
Say 41.000 Cum.

Providing and laying in situ Ready Mix Cement


Concrete M-20 grade of trap / granite / quartzite /
5 gneiss metal for RCC work in foundation like raft,
grillage, strip foundation and footing of RCC column
etc complete.

REFER ATTACH SHEET "FDN FOR TC" 43.681


Total 43.681
Say 44.000 Cum.
P & L in situ Ready Mix Cement Conrete M-20
6 Grade of trap metel for RCC Column as per detailed
drawing etc complete.

C1
Below Plinth 2 0.230 0.450 2.05 0.424
Above Plinth 2 0.230 0.450 7.850 1.625
C2
Below Plinth 6 0.300 0.500 2.05 1.845
Above Plinth 6 0.300 0.500 10.675 9.608
C3
Below Plinth 2 0.300 0.500 1.95 0.585
Above Plinth 2 0.300 0.500 10.675 3.203
C4
Below Plinth 10 0.230 0.450 2.05 2.122
Above Plinth 10 0.230 0.450 7.850 8.125
C5
Below Plinth 2 0.300 0.500 2.05 0.615
Above Plinth 2 0.300 0.500 7.850 2.355
C6
Below Plinth 7 0.230 0.450 2.05 1.485
Above Plinth 7 0.230 0.450 7.850 5.687

Total 37.678
Say 38.000 Cum.
P & L in situ Ready Mix Cement Conrete M-20
7 Grade of trap metal for RCC Beam as per detailed
drawing etc complete.

a) Plinth Beam
PB19 1 2.150 0.230 0.300 0.15
PB63,65 2 4.400 0.230 0.600 1.21
PB18 1 2.400 0.230 0.600 0.33
PB44 4 1.115 0.115 0.450 0.23
Alround 2 74.260 0.230 0.450 15.37
PB64 1 3.075 0.230 0.600 0.42
PB23 1 2.400 0.230 0.450 0.25
b) Lintel Beam
GROUND FLOOR
W 4 2.400 0.230 0.180 0.397
W1 6 2.700 0.230 0.180 0.671
W2 4 2.100 0.230 0.180 0.348
W4 2 1.800 0.230 0.180 0.149
W5 6 1.350 0.230 0.180 0.335
DW1 2 2.700 0.230 0.180 0.224

FIRST FLOOR
W1 4 2.700 0.230 0.180 0.447
W2 2 2.100 0.230 0.180 0.174
W3 4 2.100 0.230 0.180 0.348
W4 2 1.800 0.230 0.180 0.149
W5 6 1.350 0.230 0.180 0.335
DW1 2 2.700 0.230 0.180 0.224
DW2 4 2.400 0.230 0.180 0.397

c) Floor Beam - 3.60m


Shaft Beam 6 2.550 0.230 0.300 1.06
Shaft Beam 2 1.865 0.230 0.300 0.26
230x450 2 27.305 0.230 0.450 5.65
230x450 1 2.400 0.230 0.450 0.25
230x600 2 41.860 0.230 0.600 11.55
230x600 1 3.080 0.230 0.600 0.43
d) Floor Beam - 6.750m
Shaft Beam 6 2.550 0.230 0.300 1.06
Shaft Beam 2 1.865 0.230 0.450 0.39
230x450 2 26.000 0.230 0.450 5.38
230x450 1 2.400 0.230 0.450 0.25
230x450 1 3.080 0.230 0.450 0.32
230x600 2 41.860 0.230 0.600 11.55
230x625 1 2.400 0.230 0.625 0.35

f) Balcony Beam
BB1 2 5.985 0.150 0.550 0.99
BB2 2 4.170 0.150 0.600 0.75
BB3 2 4.070 0.150 0.600 0.73
Total 63.119 Cum.
Say 64.000 Cum.
P & L in situ Ready Mix Cement Conrete M-20
8 Grade of trap metel for RCC Slab as per detailed
drawing etc complete.
GF slab
S1 2 4.845 4.060 0.130 5.114
S2 2 11.605 3.960 0.120 11.029
S3 2 8.345 2.980 0.120 5.968
S4 2 5.630 3.530 0.120 4.770

FF slab
S1 2 4.845 4.060 0.130 5.114
S2 2 11.605 3.960 0.120 11.029
S3 2 8.345 2.980 0.120 5.968
S4 2 5.630 3.530 0.120 4.770
Balcony slab 2 2.985 1.500 0.100 0.90
2 2.000 1.500 0.100 0.60
2 1.900 1.500 0.100 0.57

Total 55.829
Say 56.000 Cum.
P & L in situ Reay Mix Cement Conrete M-20
9 Grade of trap metel for RCC Chajja as per detailed
drawing etc complete
GROUND FLOOR
W1 6 2.700 0.600 0.100 0.972
W2 4 2.100 0.600 0.100 0.504
W4 2 1.800 0.600 0.100 0.216
W5 6 1.350 0.600 0.100 0.486

FIRST FLOOR
W1 4 2.700 0.600 0.100 0.648
W2 2 2.100 0.600 0.100 0.252
W3 2 2.100 0.600 0.100 0.252
W4 2 1.800 0.600 0.100 0.216
W5 6 1.350 0.600 0.100 0.486
DW1 2 2.700 0.600 0.100 0.324
DW2 4 2.400 0.600 0.100 0.576

Total 4.932
Say 5.000 Cum.
Providing & fixing in position TMT Steel bar
reinforcement of various diameters for R.C.C.
pile caps, footings, foundations, slabs, beams,
10 columns, canopies, staircases, newels, chajjas,
lintels, pardies, coping, fins, arches, etc complete.

Total 28.607 MT.


Say 29.000 MT.

Providing Second class Burnt Brick masonry with


11 conventional / IS type bricks in cement mortar 1:6
in foundation and plinth etc complete.
Ground Floor 2 38.520 0.230 3.200 56.70
Ground Floor 1 3.080 0.230 3.200 2.27
First Floor 2 38.520 0.230 2.700 47.84
1 3.080 0.230 2.700 1.91
Parapet wall 1 66.000 0.230 1.000 15.18
WATER TANK 1 14.280 0.230 4.000 13.14
Deduction
GROUND FLOOR
W -4 1.800 0.230 1.650 -2.732
W1 -4 2.100 0.230 1.650 -3.188
W2 -4 1.500 0.230 1.350 -1.863
W4 -2 1.200 0.230 1.650 -0.911
W5 -6 0.750 0.230 1.050 -1.087
DW1 -2 2.100 0.230 2.500 -2.415
D1 -2 1.050 0.230 2.100 -1.014

FIRST FLOOR
W1 -4 2.100 0.230 1.650 -3.188
W2 -2 1.500 0.230 1.350 -0.932
W3 -4 1.500 0.230 1.650 -2.277
W4 -2 1.200 0.230 1.650 -0.911
W5 -6 0.750 0.230 1.050 -1.087
DW1 -2 2.100 0.230 2.500 -2.415
DW2 -4 1.800 0.230 2.500 -4.140
D1 -2 1.050 0.230 2.100 -1.014
G1 -1 2.000 0.230 2.000 -0.920
G2 -1 2.000 0.230 3.150 -1.449

Total 105.498 Cum.


Say 106.000 Cum.
Providing Second class Burnt Brick masonry with
conventional / IS type bricks in cement mortar 1:4
12
in half brick thick wall etc complete.

GF 2 24.000 3.150 151.200


FF 2 30.000 3.150 189.000

Deduction
D2 -8 0.900 2.100 -15.120
D3 -6 0.750 2.100 -9.450

Total 315.630
Say 316.000 Sqm.

Providing India waterproffing including brick bat


13 coba etc. complete.
Roof slab 1 241.228 241.228
Total 241.228
Say 242.000 Sq.m
Providing waterproof plaster over RCC Chajja,
Parapet Wall and sides in cement mortar 1:3 with
14 neat finishing, floating using approved water
proofing compound at the rate of One Kg. of cement
etc complete.
RCC Chajja 1 50.000 50.000
parapet wall 1 74.000 0.230 17.020
Total 67.020
Say 68.000 Sq.m

Providing internal cement plaster 12mm


thick in a single coat in cement mortar 1:4
without neeru finish to concrete or brick
15
surface in all positions including racking out
joints, scaffolding and curing complete.

BED ROOM -1 4 3.600 3.150 45.360


4 3.600 3.150 45.360
BED ROOM -2 4 3.600 3.150 45.360
4 3.300 3.150 41.580
BED ROOM -3 4 3.900 3.150 49.140
4 3.300 3.150 41.580
Dining 4 1.335 3.150 16.821
4 3.115 3.150 39.249
4 2.850 3.150 35.910
4 4.700 3.150 59.220
Living Room 4 4.000 3.150 50.400
4 3.600 3.150 45.360
KITCHEN 4 3.750 3.150 47.250
4 3.300 3.150 41.580
Toilet -1 8 2.150 3.150 54.180
8 1.500 3.150 37.800
Toilet -2 4 1.500 3.150 18.900
4 2.200 3.150 27.720
Staircase 2 2.400 3.150 15.120
2 5.130 3.150 32.319
Platform 4 2.885 3.150 36.351
4 1.350 3.150 17.010
Cub board 12 1.575 3.150 59.535
12 0.600 3.150 22.680
Deductions
GROUND FLOOR
W -4 1.800 1.650 -11.880
W1 -4 2.100 1.650 -13.860
W2 -4 1.500 1.350 -8.100
W4 -2 1.200 1.650 -3.960
W5 -6 0.750 1.050 -4.725
DW1 -2 2.100 2.500 -10.500
D1 -2 1.050 2.100 -4.410
FIRST FLOOR
W1 -4 2.100 1.650 -13.860
W2 -2 1.500 1.350 -4.050
W3 -4 1.500 1.650 -9.900
W4 -2 1.200 1.650 -3.960
W5 -6 0.750 1.050 -4.725
DW1 -2 2.100 2.500 -10.500
DW2 -4 1.800 2.500 -18.000
D1 -2 1.050 2.100 -4.410
D2 -8 0.900 2.100 -15.120
D3 -6 0.750 2.100 -9.450
G1 -1 2.000 2.000 -4.000
G2 -1 2.000 3.150 -6.300

TOTAL 764.075
Say 765.000 Sq.m

Providing neeru finish to plaster surface in


16 all positions including scaffolding and curing
complete.
Internal cement plaster 12 mm thick Qty. same as per item no 765.000
Total 765.000
Say 765.000 Sq.m
Providing neeru finish to plastered
17 surfaces for ceiling.Including scaffolding
curing complete.
BED ROOM -1 2 3.600 3.600 25.920
BED ROOM -2 2 3.600 3.300 23.760
BED ROOM -3 2 3.900 3.300 25.740
Dining 2 1.335 3.115 8.317
2 2.850 4.700 26.790
Living Room 2 4.385 3.600 31.572
KITCHEN 2 3.750 3.300 24.750
Toilet -1 4 2.150 1.500 12.900
Toilet -2 2 1.500 2.200 6.600
Staircase 1 2.400 5.130 12.312
Platform 2 2.885 1.350 7.790
Cub board 6 1.575 0.600 5.670

Total 212.121
Say 213.000 Sq.m
Providing sand face plaster externally in
two coats using approved screened sand in
18 all positions, including providing base coat of
15mm thick in cement mortar 1:4 etc
complete.

North and south side wall 2 24.880 7.900 393.104


west and east side wall 2 10.405 7.900 164.399
Deduction -137.140
Total 420.363
Say 421.000 Sq.m

Providing and applying primer coat of


approved quality to old/new wall surfaces to
19
receive oil bound distemper treatment etc
complete.
Qty. same as per item no. 978.000
Total 978.000
Say 978.000 Sq.m

Providing and applying two coats of water


proof cement paint and one coat primer
20 of approved manufacturer & colour to the Qty. same as per item no. 421.000
plastered surface etc complete.

421.000
Say 421.000 Sq.m

Providing and applying washable oil bound


distemper of approved colour shade and
21 Qty. same as per item no 978.000
quality to old/new surface in two coats etc
complete.
Say 978.000 Sq.m

22 Doors and Windows


GROUND FLOOR
W 4 1.800 1.650 11.880
W1 4 2.100 1.650 13.860
W2 4 1.500 1.350 8.100
W4 2 1.200 1.650 3.960
W5 6 0.750 1.050 4.725
DW1 2 2.100 2.500 10.500
D1 2 1.050 2.100 4.410

FIRST FLOOR
W1 4 2.100 1.650 13.860
W2 2 1.500 1.350 4.050
W3 4 1.500 1.650 9.900
W4 2 1.200 1.650 3.960
W5 6 0.750 1.050 4.725
DW1 2 2.100 2.500 10.500
DW2 4 1.800 2.500 18.000
D1 2 1.050 2.100 4.410
D2 8 0.900 2.100 15.120
D3 6 0.750 2.100 9.450
G1 1 2.000 2.000 4.000
G2 1 2.000 3.150 6.300
Total 161.710
Say 162.000 Sq.m

23 Flooring Details
a) Vetirfied Tile-600x600
Living 4 4.385 3.600 63.144
Total 63.144
Say 64.000 Sq.m
b) Terrazo Tile light shade
Bed room-1 4 3.600 3.600 51.840
Bed room-2 4 3.600 3.300 47.520
4 3.900 3.300 51.480
BALCONY 2 2.985 1.500 8.955
2 2.000 1.500 6.000
2 1.900 1.500 5.700
Dining 4 1.335 3.115 16.634
4 2.850 4.700 53.580

Total 241.709
Say 242.000 Sq.m
Anti Skid ceramic glazed first quality
C)
floor tile-300x300-IS:15622
KITCHEN 4 3.750 3.300 49.5
Toilet -1 8 2.150 1.500 25.8
Toilet -2 4 1.500 2.200 13.2

Total 88.500
Say 89.000 Sq.m
d) 80mm Thick Udaipur green marble stone
STAIRCASE 3 2.400 5.130 36.936
Total 36.936
Say 37.000 Sq.m
e) Brick bat coba water proofing
TERRACE 1 241.228 241.228
Total 241.228
Say 242.000 Sq.m
Providing & Laying in Ceramic Glazed Tiles
24 20 x 30 cm with white cement DADO of
approved material etc complete.
KITCHEN 8 3.750 2.100 63.00
8 3.300 2.100 55.44
Toilet -1 16 2.150 2.100 72.24
16 1.540 2.100 51.74
Toilet -2 8 1.500 2.100 25.20
8 2.200 2.100 36.96

Total 304.584
Say 305.000 Sqm

Providing & Laying 75 thk well compacted


25 1 74.000 0.750 55.500
brick aggregate (Plinth Protection)
Total 55.500
Say 56.000 Sq.m

Providing & Laying 50 thk PCC 1:2:4 (Plinth


26 1 74.000 0.750 0.050 2.775
Protection)
Total 2.775
Say 3.000 Cu.m
Providing & Fixing 110 mm diameter Rain
27
Water Pipe
10 6.800 68.000 Rmt.
1 10.675 10.675 Rmt.
Total 68.000
Say 68.000 Rmt.
L B D1 D/H
Fdn PCC PCC Col Col Col Col Col Ht above Excavation PCC VOL
Nos
Depth Depth Offset Offset Nos Length Width GL (M3) (M3)
mt mt mt mt

F2 12 2.25 1.90 0.25 0.45 2.6 0.1 0.1 0.05 1 0.23 0.45 0.5 160.52 6.17
F3 3 2.35 1.95 0.25 0.45 2.6 0.1 0.1 0.05 3 0.23 0.45 0.5 42.76 1.64
F3 4 2.35 1.95 0.25 0.45 2.6 0.1 0.1 0.05 4 0.3 0.5 0.5 57.02 2.19
F4 4 2.40 1.90 0.25 0.45 2.6 0.1 0.1 0.05 4 0.3 0.5 0.5 56.78 2.18
F5 2 3.05 2.45 0.3 0.55 2.6 0.1 0.1 0.05 1 0.3 0.5 0.5 44.79 1.72
CF1 2 3.800 2.875 0 0.45 2.6 0.1 0.1 0.05 2 0.23 0.45 0.5 63.96 2.46
TOTAL QUANTITY = 425.83 16.38
CONC VOL Formwork Backfill
(M3) Qty. (M2) (M3)

17.09 68.15 137.26


4.57 38.89 36.55
6.15 76.44 48.68
6.12 76.44 48.48
5.99 14.76 37.07
3.75 14.42 57.75
43.68 289.09 365.78
Name of work: TOWNSHIP TYPE - D BUILDING

REF. DRG . - C-ENGG-TS-STD-TYPE D-DS-01 TO 13 & C-ENGG-TS-STD-TYPE-C-STR-1 TO 4


ABSTRACT

Item
Item Discription QTY. RATE UNIT TOTAL
No.
Excavation for foundation in Earth soils of all types,
sand gravel and soft murum including removing the
excavated materials upto a distance of 50 metres beyond
building area and lift as specified, stacking and spreading
1 as directed including dewatering unless provided 191.00 1.00 Cum. 191.00
elsewhere, preparing the bed for the foundation and
necessary backfilling, ramming, watering complete
excluding shoring and strutting.( Lift Upto 1.5 M )

Providing soling using 80mm size trap metal in layers


of 15cm each including filling voids with sand, ramming,
2 watering etc. complete. 22.00 1.00 Cum. 22.00

Providing and laying in situ Ready Mix cement concrete


M-7.5 grade using design mix with minimum cement
content as per IS 456 with maximum water cement ratio
0.45 using maximum 25/30 mm size and down trap metal
for foundation and bedding with all labours, materials,
plant & equipments, shuttering form work, staging,
including transporting, placing, vibrating with mechanical
3 vibrator, finishing and curing etc. complete. The item also 23.00 1.00 Cum. 23.00
includes heavy dewatering by using pumps or manually. .
The cost also includes all types of taxes, sales tax,
insurance, cess levied by local authority etc. complete.
( 3969 CSR Rate + 830 Additional for RMC Rate = 4799 )

Providing and laying in situ Ready Mix Cement Concrete


M-20 grade of trap / granite / quartzite / gneiss metal for
RCC foundation like raft, grillage, strip foundation and
footing of RCC column and steel stanchions including
normal dewatering, formwork, compaction, finishing and
curing including transporting from mix plant upto distance
4 14.00 1.00 Cum. 14.00
of 25 Km, pouring the concrete at work site for 1.5m lift
above G.L. and 5.0m lift below GL, etc. complete...
(Excluding reinforcement and structural steel).
Providing and casting in situ Ready Mix Cement
Concrete M-20 Grade of trap / Granite / quartzite /
gneiss metal of approved quality for RCC Column as per
detailed drawings and designs or as directed by Engineer-
in-charge including normal dewatering, centering,
formwork, compaction, finishing the form surface with
cement mortar 1:3 of sufficient minimum thickness to give
a smooth and even surface wherever necessary or
5 22.00 1.00 Cum. 22.00
roughening if special finish is to be provided and curing
including transporting from mix plant upto distance of 25
Km, pouring the concrete at work site for 1.5m lift above
G.L. and 5.0m lift below GL, etc. complete... (Excluding
reinforcement and structural steel).

Providing and casting in situ Ready Mix Cement


Concrete M-20 Grade of trap / Granite / quartzite /
gneiss metal of approved quality for RCC work in Beam
as per detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering, centering,
formwork, compaction, finishing the form surface with
cement mortar 1:3 of sufficient minimum thickness to give
a smooth and even surface wherever necessary or roughing
6 if special finish is to be provided and curing including 32.00 1.00 Cum. 32.00
transporting from mix plant upto distance of 25 Km,
pouring the concrete at work site for 1.5m lift above G.L.
and 5.0m lift below GL, etc. complete... (Excluding
reinforcement and structural steel).

Providing and casting in situ Ready Mix Cement


Concrete M-20 Grade of trap / Granite / quartzite /
gneiss metal of approved quality for RCC work in Slab as
per detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering, centering,
formwork, compaction, finishing the form surface with
cement mortar 1:3 of sufficient minimum thickness to give
a smooth and even surface wherever necessary or roughing
7 if special finish is to be provided and curing including 17.00 1.00 Cum. 17.00
transporting from mix plant upto distance of 25 Km,
pouring the concrete at work site for 1.5m lift above G.L.
and 5.0m lift below GL, etc. complete... (Excluding
reinforcement and structural steel). CSR Rate 8185 +
Pump Rate 175 =8360 ( For Pump rate Ref CSR I. N. a)
Static Pump Page No-13

Providing and casting in situ Ready Mix Cement


Concrete M-20 Grade of trap / Granite / quartzite / gneiss
metal of approved quality for RCC Chajja as per detailed
drawings and designs or as directed by Engineer-in-charge
including normal dewatering, centering, formwork,
compaction, finishing the form surface with cement mortar
1:3 of sufficient minimum thickness to give a smooth and
even surface wherever necessary or roughing if special
8 finish is to be provided and curing including transporting 2.00 1.00 Cum. 2.00
from mix plant upto distance of 25 Km, pouring the
concrete at work site for 1.5m lift above G.L. and 5.0m lift
below GL, etc. complete... (Excluding reinforcement and
structural steel).
Providing & fixing in position TMT Steel bar
reinforcement of various diameters for R.C.C. pile caps,
footings, foundations, slabs, beams, columns, canopies,
staircases, newels, chajjas, lintels, pardies, coping, fins,
9 arches, etc. as per detailed designs, drawings and 13.00 1.00 MT. 13.00
schedules, including cutting, bending, hooking the bars,
binding with wires or tack welding and supporting as
required completed.

Providing Second class Burnt Brick masonry with


conventional / IS type bricks in cement mortar 1:6 in
foundation and plinth of inner walls & external walls,
including bailing out water manually, striking joints on
10 53.00 1.00 Cum. 53.00
unexposed faces, racking out joints on exposed faces and
watering complete.

Providing Second class Burnt Brick masonry with


conventional / IS type bricks in cement mortar 1:4 in
half brick thick wall including mild steel longitudinal
reinforcement of 2 bars of 6mm dia / 2 hoop iron strip
11 25mm x 1.6mm painted with anticorrosive paint at every 160.00 1.00 Sqm. 160.00
third course properly bent and bonded at ends, scaffolding,
raking out joints and watering complete.

Providing and laying water proofing treatment of 112


mm av. thickness consisting of 12 mm thick layer in
Cement Mortar 1:3 with water proofing compound at the
rate of One Kilograme per bag of cement as base,
constructing and laying brick bat coba in cement mortar
1:5 with waterproofing compound at the rate of One
Kilogramme per bag of cement and having average
thickness of 80mm and finishing with 20mm thick cement
plaster layer in cement mortar 1:3 with approved water
Proofing compound at the rate of One Kilogramme per
12 cement bag, including all lead, lifts and laid to proper slope 141.00 1.00 Sqm. 141.00
to drain of water entirely including Watta at the junction of
parapet and work upto a height of 300 mm or as directed
and including finishing the top layer of water proofing
treatment with false marking of 30cm x 30cm or as
directed and covering the whole treatment with seven
year’s guarantee, on requisite stamp paper etc. complete.

Providing waterproof plaster over RCC Chajja, Parapet


Wall and sides in cement mortar 1:3 with neat
finishing, floating using approved water proofing compound
13 at the rate of One Kg. of cement etc complete. 34.00 1.00 Sqm. 34.00
Providing internal cement plaster 12mm thick in a
single coat in cement mortar 1:4 without neeru finish to
14 concrete or brick surface in all positions including racking 408.00 1.00 Sqm. 408.00
out joints, scaffolding and curing complete.

Providing neeru finish to plaster surface in all positions


15 including scaffolding and curing complete. 408.00 1.00 Sqm. 408.00

Providing neeru finish to plastered surfaces for


16 ceiling.Including scaffolding curing complete. 141.00 1.00 Sqm. 141.00

Providing sand face plaster externally in two coats


using approved screened sand in all positions, including
providing base coat of 15mm thick in cement mortar 1:4
mixing approved water proofing compound at the rate of 1
kg./ 50 kg. of cement and curing the same for not less
than two days and keeping the surface of base coat rough
17 to receive the sand faced treatment 8mm thick in cement 257.00 1.00 Sqm. 257.00
mortar 1:4 and finishing the surface by taking out grains
and curing for 14 days including preparing the surface,
watering and scaffolding etc. complete.

Providing and applying primer coat of approved quality to


old/new wall surfaces to receive oil bound distemper
treatment, including scaffolding, preparing the surface as
18 directed completed. (prior approval of S.E. shall be 549.00 1.00 Sqm. 549.00
obtained)

Providing and applying two coats of water proof cement


paint and one coat primer of approved manufacturer &
colour to the plastered surface including scaffolding,
19 preparing the surface, watering for two days complete. 257.00 1.00 Sqm. 257.00

Providing and applying washable oil bound distemper of


approved colour shade and quality to old/new surface in
two coats, including scaffolding, preparing surface
20 549.00 1.00 Sqm. 549.00
(excluding priming coat) complete.

Doors and Windows Schedule 76.00 1.00 Sqm. 76.00


21

Flooring Details
A)Vetrified Tiles(.6m x .6m) 54.00 1.00 Sqm. 54.00
B)22mm Thick. Terrazo Tile light shade 47.00 1.00 Sqm. 47.00
22 C)Anti Skid ceramic glazed first quality floor tile-
31.00 1.00 Sqm. 31.00
300x300

D)60mm Thk. Flexi Paver Blocks 17.00

E)80mm Thick Udaipur green marble stone 7.00 1.00 Sqm. 7.00
F)Brick bat coba water proofing 141.00 1.00 Sqm. 141.00

Providing & Laying in Ceramic Glazed Tiles 30 x 30 cm


with white cement DADO of approved material etc complete.
23 102.00 1.00 Sqm. 102.00
23 102.00 1.00 Sqm. 102.00

Providing & Laying 75 thk well compacted brick


aggregate (Plinth Protection)
24 43.00 1.00 Sqm. 43.00

Providing & Laying 50 thk PCC 1:2:4 (Plinth Protection)


25 3.00 1.00 Cum. 3.00

Providing & Fixing 110 mm diameter Rain Water Pipe


26 18.00 1.00 RMt. 18.00
Name of work: D TYPE BUILDING

Measurement

Item
Descriptions of Item No Length Breadth Depth Quantity Unit
No.
Excavation for foundation in Earth soils of all
1 types, sand gravel and soft murum etc complete.

For footing of col


F1 2 1.40 1.40 2.6 10.19
F2 7 1.80 1.40 2.6 45.86
F3 12 1.80 1.50 2.6 84.24
F4 4 1.95 1.65 2.6 33.46
F5 2 2.00 1.65 2.6 17.16
Total 190.92
Say 191.00 Cum.

2 Sand Filling
DRAWING ROOM 1 5.975 3.800 0.150 3.41
MASTER BED ROOM 1 4.000 4.255 0.150 2.55
TOILET(MBR) 1 1.950 2.865 0.150 0.84
BED ROOM 1 1 3.655 4.255 0.150 2.33
TOILET(BR1) 1 2.020 2.750 0.150 0.83
BED ROOM 2 1 3.520 3.175 0.150 1.68
TOILET(BR2) 1 1.985 2.400 0.150 0.71
BED ROOM 3 1 3.700 3.600 0.150 2.00
KITCHEN 1 3.405 3.385 0.150 1.73
DINING 1 3.520 3.800 0.150 2.01
SERVANT ROOM 1 2.100 3.250 0.150 1.02
TOILET(SR) 1 2.100 1.200 0.150 0.38
STAIR 1 3.405 2.980 0.150 1.52
Total 21.01
Say 22.00 Cum.
Providing and laying in situ Ready Mix
cement concrete M-7.5 grade using design
mix with minimum cement content as per IS
3 456 with maximum water cement ratio 0.6
using maximum 25/30 mm size and down
trap metal for foundation and bedding etc
complete.

A) For footing of col


F1 2 1.400 1.400 0.100 0.392
F2 7 1.800 1.400 0.100 1.764
F3 12 1.800 1.500 0.100 3.240
F4 4 1.950 1.650 0.100 1.287
F5 2 2.000 1.650 0.100 0.660
B) Plinth Beam
X Grid
PB1 1 3.700 0.230 0.050 0.04
PB2 1 1.730 0.230 0.050 0.02
1 3.405 0.230 0.050 0.04
PB3 1 1.800 0.230 0.050 0.02
PB4 1 3.700 0.230 0.050 0.04
PB5 1 3.950 0.230 0.050 0.05
1 1.800 0.230 0.050 0.02
1 3.405 0.230 0.050 0.04
PB6 1 1.715 0.230 0.050 0.02
PB7 2 3.520 0.230 0.050 0.08
PB8 1 1.380 0.230 0.050 0.02
1 1.825 0.230 0.050 0.02
1 4.000 0.230 0.050 0.05
PB9 1 1.880 0.230 0.050 0.02
1 2.100 0.230 0.050 0.02
PB10 1 4.000 0.230 0.050 0.05
1 3.655 0.230 0.050 0.04
PB11 1 4.220 0.230 0.050 0.05
1 4.035 0.230 0.050 0.05
PB12 1 2.100 0.230 0.050 0.02
PB13 1 2.100 0.230 0.050 0.02
Y Grid
PB14 1 2.735 0.230 0.050 0.03
PB15 1 3.265 0.230 0.050 0.04
1 2.400 0.230 0.050 0.03
PB16 1 1.700 0.230 0.050 0.02
1 0.600 0.230 0.050 0.01
PB17 1 2.180 0.230 0.050 0.03
1 1.930 0.230 0.050 0.02
1 0.470 0.230 0.050 0.01
PB18 1 3.380 0.230 0.050 0.04
1 3.580 0.230 0.050 0.04
PB19 2 0.600 0.230 0.050 0.01
PB20 1 3.815 0.230 0.050 0.04
PB21 1 3.270 0.230 0.050 0.04
PB22 1 3.050 0.230 0.050 0.04
1 3.580 0.230 0.050 0.04
1 1.605 0.230 0.050 0.02
1 2.040 0.230 0.050 0.02
1 0.600 0.230 0.050 0.01
PB23 1 4.010 0.230 0.050 0.05
PB24 1 3.165 0.230 0.050 0.04
1 5.235 0.230 0.050 0.06
PB25 1 4.060 0.230 0.050 0.05

C) ROOMS
DRAWING ROOM 1 5.975 3.800 0.100 2.27
MASTER BED ROOM 1 4.000 4.255 0.100 1.70
TOILET(MBR) 1 1.950 2.865 0.100 0.56
BED ROOM 1 1 3.655 4.255 0.100 1.56
TOILET(BR1) 1 2.020 2.750 0.100 0.56
BED ROOM 2 1 3.520 3.175 0.100 1.12
TOILET(BR2) 1 1.985 2.400 0.100 0.48
BED ROOM 3 1 3.700 3.600 0.100 1.33
KITCHEN 1 3.405 3.385 0.100 1.15
DINING 1 3.520 3.800 0.100 1.34
SERVANT ROOM 1 2.100 3.250 0.100 0.68
TOILET(SR) 1 2.100 1.200 0.100 0.25
STAIR 1 3.405 2.980 0.100 1.01
Total 22.75
Say 23.00 Cum.

Providing and laying in situ Ready Mix Cement


Concrete M-20 grade of trap / granite / quartzite /
4 gneiss metal for RCC work in foundation like raft,
grillage, strip foundation and footing of RCC column
etc complete.

REFER ATTACH SHEET "FDN FOR CRB" 13.76


Total 13.76
Say 14.00 Cum.

P & L in situ Ready Mix Cement Conrete M-20


5 Grade of trap metel for RCC Column as per detailed
drawing etc complete.

Column -C1,
F1/C1 (Dia)
Below Plinth 1 0.300 0.000 2.275 0.161
Above Plinth 1 0.300 0.000 3.60 0.255
Column -C2,
F2/C2
Below Plinth 4 0.230 0.450 2.2 0.911
Above Plinth 4 0.230 0.450 5.15 2.132
F3/C2
Below Plinth 1 0.230 0.450 2.2 0.228
Above Plinth 1 0.230 0.450 4.65 0.481
F3/C2
Below Plinth 1 0.230 0.450 2.20 0.228
Above Plinth 1 0.230 0.450 7.70 0.797
F4/C2
Below Plinth 1 0.230 0.450 2.20 0.228
Above Plinth 1 0.230 0.450 4.65 0.481
F4/C2
Below Plinth 1 0.230 0.450 2.20 0.228
Above Plinth 1 0.230 0.450 7.70 0.797
F5/C2
Below Plinth 1 0.230 0.450 2.20 0.228
Above Plinth 1 0.230 0.450 4.65 0.481
F5/C2
Below Plinth 1 0.230 0.450 2.20 0.228
Above Plinth 1 0.230 0.450 7.70 0.797
Column -C3,
F2/C3
Below Plinth 1 0.230 0.450 2.20 0.228
Above Plinth 1 0.230 0.450 7.85 0.812
F3/C3
Below Plinth 1 0.230 0.450 2.20 0.228
Above Plinth 1 0.230 0.450 4.65 0.481
F3/C3
Below Plinth 2 0.230 0.450 2.20 0.455
Above Plinth 2 0.230 0.450 5.15 1.066
F3/C3
Below Plinth 1 0.230 0.450 2.20 0.228
Above Plinth 1 0.230 0.450 7.70 0.797
F4/C3
Below Plinth 1 0.230 0.450 2.20 0.228
Above Plinth 1 0.230 0.450 4.65 0.481
F4/C3
Below Plinth 1 0.230 0.450 2.20 0.228
Above Plinth 1 0.230 0.450 7.70 0.797
Column -C4,
F2/C4
Below Plinth 2 0.230 0.450 2.20 0.455
Above Plinth 2 0.230 0.450 5.15 1.066
F3/C4
Below Plinth 1 0.230 0.450 2.20 0.228
Above Plinth 1 0.230 0.450 4.65 0.481
Column -C5,
F1/C5
Below Plinth 1 0.230 0.450 2.20 0.228
Above Plinth 1 0.230 0.450 5.15 0.533
F3/C5
Below Plinth 3 0.230 0.450 2.20 0.683
Above Plinth 3 0.230 0.450 4.65 1.444
Column -C6,
F3/C6
Below Plinth 1 0.230 0.450 2.20 0.228
Above Plinth 1 0.230 0.450 5.15 0.533
Column -C7,
F3/C7
Below Plinth 1 0.230 0.450 2.20 0.228
Above Plinth 1 0.230 0.450 7.70 0.797
Total 21.592
Say 22.000 Cum.

P & L in situ Ready Mix Cement Conrete M-20


6 Grade of trap metal for RCC Beam as per detailed
drawing etc complete.

A) Plinth Beam
X Grid
PB1 1 3.700 0.230 0.450 0.38
PB2 1 1.730 0.230 0.450 0.18
1 3.405 0.230 0.450 0.35
PB3 1 1.800 0.230 0.350 0.14
PB4 1 3.700 0.230 0.450 0.38
PB5 1 3.950 0.230 0.450 0.41
1 1.800 0.230 0.450 0.19
1 3.405 0.230 0.450 0.35
PB6 1 1.715 0.230 0.450 0.18
PB7 2 3.520 0.230 0.450 0.73
PB8 1 1.380 0.230 0.450 0.14
1 1.825 0.230 0.450 0.19
1 4.000 0.230 0.450 0.41
PB9 1 1.880 0.230 0.450 0.19
1 2.100 0.230 0.450 0.22
PB10 1 4.000 0.230 0.450 0.41
1 3.655 0.230 0.450 0.38
PB11 1 4.220 0.230 0.300 0.29
1 4.035 0.230 0.300 0.28
PB12 1 2.100 0.230 0.300 0.14
PB13 1 2.100 0.230 0.300 0.14
Y Grid
PB14 1 2.735 0.230 0.450 0.28
PB15 1 3.265 0.230 0.450 0.34
1 2.400 0.230 0.450 0.25
PB16 1 1.700 0.230 0.450 0.18
1 0.600 0.230 0.300 0.04
PB17 1 2.180 0.230 0.450 0.23
1 1.930 0.230 0.450 0.20
1 0.470 0.230 0.300 0.03
PB18 1 3.380 0.230 0.450 0.35
1 3.580 0.230 0.300 0.25
PB19 2 0.600 0.230 0.300 0.08
PB20 1 3.815 0.230 0.450 0.39
PB21 1 3.270 0.230 0.450 0.34
PB22 1 3.050 0.230 0.450 0.32
1 3.580 0.230 0.450 0.37
1 1.605 0.230 0.450 0.17
1 2.040 0.230 0.450 0.21
1 0.600 0.230 0.300 0.04
PB23 1 4.010 0.230 0.450 0.42
PB24 1 3.165 0.230 0.450 0.33
1 5.235 0.230 0.450 0.54
PB25 1 4.060 0.230 1.000 0.93
B) Lintel Beam
GROUND FLOOR
W 3 0.000 0.230 0.350 0.00
W1 2 2.100 0.230 0.350 0.34
W2 1 1.500 0.230 0.350 0.12
W4 1 1.200 0.230 0.350 0.10
W5 4 0.750 0.230 0.350 0.24
V1 2 0.900 0.230 0.350 0.14
DW1 1 2.100 0.230 0.350 0.17
D2 2 0.900 0.230 0.350 0.14
D3 6 0.750 0.230 0.350 0.36
D4 4 1.050 0.230 0.350 0.34
G3 1 1.800 0.230 0.350 0.14
FIRST FLOOR
D5 4 0.900 0.230 0.350 0.29
G3 2 1.800 0.230 0.350 0.29
C) Roof Beam
X Grid
RB1 1 12.780 0.230 0.450 1.32
RB2 1 3.700 0.230 0.450 0.38
RB3 1 9.155 0.230 0.450 0.95
RB4 1 1.715 0.230 0.300 0.12
RB5 2 3.520 0.230 0.600 0.97
RB6 1 3.520 0.230 0.450 0.36
RB7 1 7.205 0.230 0.450 0.75
RB8 1 3.980 0.230 0.450 0.41
RB9 1 4.000 0.230 0.600 0.55
1 3.655 0.230 0.600 0.50
RB10 1 4.220 0.230 0.600 0.58
1 4.035 0.230 0.300 0.28
RB11 1 2.100 0.230 0.600 0.29
Y Grid
RB12 1 2.735 0.230 0.600 0.38
RB13 1 3.265 0.230 0.600 0.45
1 2.400 0.230 0.600 0.33
RB14 1 2.300 0.230 0.600 0.32
RB15 1 4.110 0.230 0.450 0.43
1 0.470 0.230 0.300 0.03
RB16 1 3.380 0.230 0.600 0.47
1 3.580 0.230 0.450 0.37
RB17 2 0.600 0.230 0.300 0.08
RB18 1 3.815 0.230 0.450 0.39
RB19 1 3.270 0.230 0.600 0.45
RB20 1 4.655 0.230 0.600 0.64
1 6.220 0.230 0.450 0.64
RB21 1 4.010 0.230 0.450 0.42
RB22 1 8.400 0.230 0.600 1.16
RB23 1 4.060 0.230 0.600 0.56
D) Staircase Beam
MTB1 1 3.520 0.230 0.450 0.36
MTB2 1 3.520 0.230 0.450 0.36
1 3.290 0.230 0.450 0.34
MTB3 2 2.385 0.230 0.450 0.49
MTB4 2 2.500 0.230 0.450 0.52
Total 31.740 Cum.
Say 32.000 Cum.

P & L in situ Ready Mix Cement Conrete M-20


7 Grade of trap metel for RCC Slab as per detailed
drawing etc complete.
A) Ground Floor Slab
S1 1 5.975 3.800 0.130 2.952
S2 1 3.700 3.600 0.110 1.465
1 3.405 3.385 0.110 1.268
1 3.520 3.175 0.110 1.229
1 3.520 3.800 0.110 1.471
S3 1 3.945 3.270 0.110 1.419
S4 1 3.655 4.255 0.130 2.022
1 4.000 4.255 0.130 2.213
S5 1 3.200 3.240 0.100 1.037
1 2.045 1.500 0.100 0.307
1 1.215 0.485 0.100 0.059
Staircase roof slab(Head room slab) 2 0.900 0.900 0.140 0.227
Waist slab (S10) 3 1.500 0.900 0.150 0.608
S8 1 5.860 0.750 0.150 0.659
Total 16.935
Say 17.000 Cum.

P & L in situ Reay Mix Cement Conrete M-20


8 Grade of trap metel for RCC Chajja as per detailed
drawing etc complete.
RCC Chajja Over W 3 2.200 0.600 0.100 0.396
RCC Chajja Over W1 2 2.200 0.600 0.100 0.264
RCC Chajja Over W2 1 1.600 0.600 0.100 0.096
RCC Chajja Over W4 1 1.300 0.600 0.100 0.078
RCC Chajja Over W5 4 1.300 0.600 0.100 0.312
Total 1.146
Say 2.000 Cum.

Providing & fixing in position TMT Steel bar


reinforcement of various diameters for R.C.C.
pile caps, footings, foundations, slabs, beams,
9 columns, canopies, staircases, newels, chajjas,
lintels, pardies, coping, fins, arches, etc complete.

Total 12.279 MT.


Say 13.000 MT.

Providing Second class Burnt Brick masonry with


10 conventional / IS type bricks in cement mortar 1:6
in foundation and plinth etc complete.

Along Grid A 1 3.175 0.230 5.150 3.76


Deduction W -1 1.800 0.230 1.700 -0.70
Along Grid B 1 8.295 0.230 4.650 8.87
Deduction D2 -1 0.750 0.230 1.100 -0.19
Along Grid D 1 3.270 0.230 4.650 3.50
Along Grid F 1 2.110 0.230 3.600 1.75
Deduction D4 -1 1.050 0.230 2.550 -0.62
Along Grid H 1 0.980 0.230 5.150 1.16
Along Grid I 1 5.135 0.230 5.150 6.08
1 3.585 0.230 7.700 6.35
Deduction DW1 -1 2.100 0.230 2.500 -1.21
Deduction D4 -1 1.050 0.230 2.500 -0.60
Deduction W4 -1 1.200 0.230 1.650 -0.46
Deduction G3 -1 1.800 0.230 4.500 -1.86
Along Grid 1 1 2.100 0.230 5.150 2.49
Deduction W5 -1 0.750 0.230 1.050 -0.18
Along Grid 2 1 8.255 0.230 5.150 9.78
Along Grid 3 1 1.270 0.230 5.150 1.50
Along Grid 4 1 1.270 0.230 5.150 1.50
Deduction D2 -1 0.900 0.230 2.100 -0.43
Deduction D3 -1 0.750 0.230 2.100 -0.36
Along Grid 5 1 3.945 0.230 3.600 3.27
Deduction D2 -1 0.900 0.230 2.100 -0.43
Along Grid 6 1 8.905 0.230 5.150 10.55
Deduction W1 -1 2.100 0.230 1.650 -0.80
Deduction W2 -1 1.500 0.230 1.350 -0.47
Deduction V1 -1 0.900 0.230 0.300 -0.06
Total 52.181
Say 53.000 Cum.
Providing Second class Burnt Brick masonry with
conventional / IS type bricks in cement mortar 1:4
11
in half brick thick wall etc complete.

GF 1 49.350 3.100 152.985


Parapet Wall 1 6.090 1.050 6.395
Total 159.380
Say 160.000 Sqm.

Providing India waterproffing including brick bat


12 coba etc. complete.
Roof slab 1 140.375 140.375
Total 140.375
Say 141.000 Sq.m
Providing waterproof plaster over RCC Chajja,
Parapet Wall and sides in cement mortar 1:3 with
13 neat finishing, floating using approved water
proofing compound at the rate of One Kg. of cement
etc complete.
RCC Chajja 1 20.000 20.000
parapet wall 1 56.860 0.230 13.078
Total 33.078
Say 34.000 Sq.m

Providing internal cement plaster 12mm


thick in a single coat in cement mortar 1:4
without neeru finish to concrete or brick
14
surface in all positions including racking out
joints, scaffolding and curing complete.

GROUND FLOOR
DRAWING ROOM 2 5.975 3.100 37.045
2 3.800 3.100 23.560
MASTER BED ROOM 2 4.000 3.100 24.800
2 4.255 3.100 26.381
TOILET(MBR) 2 1.950 3.100 12.090
2 2.865 3.100 17.763
BED ROOM 1 2 3.655 3.100 22.661
2 4.255 3.100 26.381
TOILET(BR1) 2 2.020 3.100 12.524
2 2.750 3.100 17.050
BED ROOM 2 2 3.520 3.100 21.824
2 3.175 3.100 19.685
TOILET(BR2) 2 1.985 3.100 12.307
2 2.400 3.100 14.880
BED ROOM 3 2 3.700 3.100 22.940
2 2.400 3.100 14.880
KITCHEN 2 3.405 3.100 21.111
2 2.400 3.100 14.880
DINING 2 3.520 3.100 21.824
2 2.400 3.100 14.880
SERVANT ROOM 2 2.100 3.100 13.020
2 2.400 3.100 14.880
TOILET(SR) 2 2.100 3.100 13.020
2 2.400 3.100 14.880
STAIR 2 3.405 3.100 21.111
2 2.400 3.100 14.880
Deductions
GROUND FLOOR
W -3 1.800 1.650 -8.910
W1 -2 2.100 1.650 -6.930
W2 -1 1.500 1.350 -2.025
W4 -1 1.200 1.650 -1.980
W5 -4 0.750 1.050 -3.150
V1 -2 0.900 0.300 -0.540
DW1 -1 2.100 2.500 -5.250
D2 -2 0.900 2.100 -3.780
D3 -6 0.750 2.100 -9.450
D4 -4 1.050 2.500 -10.500
G3 -1 1.800 4.500 -8.100
FIRST FLOOR
D5 -4 0.900 2.000 -7.200
G3 -2 1.800 4.500 -16.200
Total 407.242
Say 408.000 Sq.m

Providing neeru finish to plaster surface in


15 all positions including scaffolding and curing
complete.
Internal cement plaster 12 mm thick Qty. same as per item no 408.000
Total 408.000
Say 408.000 Sq.m
Providing neeru finish to plastered
16 surfaces for ceiling.Including scaffolding
curing complete.
DRAWING ROOM 1 5.975 3.800 22.705
MASTER BED ROOM 1 4.000 4.255 17.020
TOILET(MBR) 1 1.950 2.865 5.587
BED ROOM 1 1 3.655 4.255 15.552
TOILET(BR1) 1 2.020 2.750 5.555
BED ROOM 2 1 3.520 3.175 11.176
TOILET(BR2) 1 1.985 2.400 4.764
BED ROOM 3 1 3.700 3.600 13.320
KITCHEN 1 3.405 3.385 11.526
DINING 1 3.520 3.800 13.376
SERVANT ROOM 1 2.100 3.250 6.825
TOILET(SR) 1 2.100 1.200 2.520
STAIR 1 3.405 2.980 10.147
Total 140.073
Say 141.000 Sq.m

Providing sand face plaster externally in


two coats using approved screened sand in
17 all positions, including providing base coat of
15mm thick in cement mortar 1:4 etc
complete.
1 51.070 5.150 263.011
1 5.970 7.700 45.969
Deduction -52.545
Total 256.435
Say 257.000 Sq.m

Providing and applying primer coat of


approved quality to old/new wall surfaces to
18
receive oil bound distemper treatment etc
complete.
Qty. same as per item no. 548.073
Total 548.073
Say 549.000 Sq.m
Providing and applying two coats of water
proof cement paint and one coat primer
19 of approved manufacturer & colour to the Qty. same as per item no. 257.000
plastered surface etc complete.

257.000
Say 257.000 Sq.m

Providing and applying washable oil bound


distemper of approved colour shade and
20 Qty. same as per item no 549.000
quality to old/new surface in two coats etc
complete.
Say 549.000 Sq.m

21 Doors and Windows Schedule


GROUND FLOOR
W 3 0.000 1.650 0
W1 2 2.100 1.650 6.93
W2 1 1.500 1.350 2.025
W4 1 1.200 1.650 1.98
W5 4 0.750 1.050 3.15
V1 2 0.900 0.300 0.54
DW1 1 2.100 2.500 5.25
D2 2 0.900 2.100 3.78
D3 6 0.750 2.100 9.45
D4 4 1.050 2.500 10.5
G3 1 1.800 4.500 8.1
FIRST FLOOR
D5 4 0.900 2.000 7.2
G3 2 1.800 4.500 16.2
Total 75.105
Say 76.000 Sq.m
22 Flooring Details
A) Vetrified Tiles(.6m x .6m)
DRAWING ROOM 1 5.975 3.800 22.705
DINNING ROOM 1 3.520 3.800 13.376
MASTER BEDROOM 1 4.000 4.255 17.02
Total 53.10
Say 54.00 Sq.m
B) 22mm Thick. Terrazo Tile light shade
SERVANT'S ROOM 1 2.100 3.250 6.83
BED ROOM 1 1 3.655 4.255 15.55
BED ROOM 2 1 3.520 3.175 11.18
BED ROOM 3 1 3.700 3.600 13.32
Total 46.87
Say 47.00 Sq.m
Anti Skid ceramic glazed first quality
C)
floor tile-300x300
KITCHEN 1 3.405 3.385 11.53
SERVANT'S TOILET 1 2.100 1.200 2.52
MASTER BED ROOM (TOILET) 1 1.985 2.865 5.69
BED ROOM 1 (TOILET) 1 2.020 2.750 5.56
BED ROOM 2 (TOILET) 1 1.985 2.400 4.76
Total 30.05
Say 31.00 Sq.m
D) 60mm Thk. Flexi Paver Blocks 1 3.945 4.250 16.77
Total 16.77
Say 17.00 Sq.m
E) 80mm Thick Udaipur green marble stone
STAIRCASE 3 2.400 0.900 6.48
Total 6.48
Say 7.00 Sq.m
F) Brick bat coba water proofing
TERRACE 1 140.375 140.38
Total 140.38
Say 141.00 Sq.m

Providing & Laying in Ceramic Glazed Tiles


23 30 x 30 cm with white cement DADO of
approved material etc complete.
TOILET(MBR) 2 1.950 2.100 8.19
2 2.865 2.100 12.033
TOILET(BR1) 2 2.020 2.100 8.484
2 2.750 2.100 11.55
TOILET(BR2) 2 1.985 2.100 8.337
2 2.400 2.100 10.08
KITCHEN 2 3.405 2.100 14.301
2 3.385 2.100 14.217
TOILET(SR) 2 2.100 2.100 8.82
2 1.200 2.100 5.04
Total 101.052
Say 102.000 Sq.m

Providing & Laying 75 thk well compacted


24 brick aggregate (Plinth Protection) 1 56.860 0.750 42.645

Total 42.645
Say 43.000 Sq.m

Providing & Laying 50 thk PCC 1:2:4 (Plinth


25 1 56.860 0.750 0.050 2.132
Protection)
Total 2.132
Say 3.000 Cu.m
Providing & Fixing 110 mm diameter Rain
26
Water Pipe
5 3.600 18.000 Rmt.
Total 18.000
Say 18.000 Rmt.
L B D1 D/H
Fdn PCC PCC Col Col Col Col Col Ht above Excavation PCC VOL
Nos
Depth Depth Offset Offset Nos Length Width GL (M3) (M3)
mt mt mt mt

F1(C1) 1 1.20 1.20 0.15 0.225 2.5 0.1 0.1 0.05 1 0.3 0.3 0.5 5.10 0.20
F1(C5) 1 1.20 1.20 0.15 0.225 2.5 0.1 0.1 0.05 1 0.23 0.45 0.5 5.10 0.20
F2(C2) 4 1.60 1.20 0.2 0.3 2.5 0.1 0.1 0.05 1 0.23 0.45 0.5 26.21 1.01
F2(C3) 1 1.60 1.20 0.2 0.3 2.5 0.1 0.1 0.05 1 0.23 0.45 0.5 6.55 0.25
F2(C4) 2 1.60 1.20 0.2 0.3 2.5 0.1 0.1 0.05 1 0.23 0.45 0.5 13.10 0.50
F3(C2) 2 1.60 1.30 0.2 0.3 2.5 0.1 0.1 0.05 1 0.23 0.45 0.5 14.04 0.54
F3(C3) 4 1.60 1.30 0.2 0.3 2.5 0.1 0.1 0.05 1 0.23 0.45 0.5 28.08 1.08
F3(C4) 1 1.60 1.30 0.2 0.3 2.5 0.1 0.1 0.05 1 0.23 0.45 0.5 7.02 0.27
F3(C5) 3 1.60 1.30 0.2 0.3 2.5 0.1 0.1 0.05 1 0.23 0.45 0.5 21.06 0.81
F3(C6) 1 1.60 1.30 0.2 0.3 2.5 0.1 0.1 0.05 1 0.23 0.45 0.5 7.02 0.27
F3(C7) 1 1.60 1.30 0.2 0.3 2.5 0.1 0.1 0.05 1 0.23 0.3 0.5 7.02 0.27
F4(C2) 2 1.75 1.45 0.2 0.3 2.5 0.1 0.1 0.05 1 0.23 0.45 0.5 16.73 0.64
F4(C3) 2 1.75 1.45 0.2 0.3 2.5 0.1 0.1 0.05 1 0.30 0.50 0.5 16.73 0.64
F5(C2) 2 1.80 1.45 0.2 0.3 2.5 0.1 0.1 0.05 1 0.23 0.45 0.5 17.16 0.66
TOTAL QUANTITY = 190.92 7.34
CONC VOL Formwork Backfill
(M3) Qty. (M2) (M3)

0.27 4.05 4.63


0.27 4.49 4.63
1.89 19.17 23.31
0.47 4.79 5.83
0.95 9.58 11.65
1.02 9.66 12.48
2.05 19.33 24.95
0.51 4.83 6.24
1.54 14.50 18.71
0.51 4.83 6.24
0.51 4.02 6.24
1.24 9.90 14.85
1.25 11.20 14.84
1.28 9.94 15.22
13.76 130.31 169.81
Name of work: Fire-Fighting Pump House Building BOQ (FFPH)

REF. DRG. NO. - C/ENGG/STD/FFPH-1 TO 6


ABSTRACT

Item
Item Discription QTY. RATE UNIT TOTAL
No.
Excavation for foundation in Earth soils of all types,
sand gravel and soft murum including removing the
excavated materials upto a distance of 50 metres beyond
building area and lift as specified, stacking and spreading
as directed including dewatering unless provided
1 elsewhere, preparing the bed for the foundation and 92.00 1.00 Cum. 92.00
necessary backfilling, ramming, watering complete
excluding shoring and strutting.( Lift Upto 1.5 M )

Providing soling using 80mm size trap metal in layers


of 15cm each including filling voids with sand, ramming,
2 watering etc. complete. 177.00 1.00 Cum. 177.00

Providing and laying in situ Ready Mix cement concrete


M-10 grade using design mix with minimum cement
content as per IS 456 with maximum water cement ratio
0.45 using maximum 25/30 mm size and down trap metal
for foundation and bedding with all labours, materials,
plant & equipments, shuttering form work, staging,
including transporting, placing, vibrating with mechanical
3 25.00 1.00 Cum. 25.00
vibrator, finishing and curing etc. complete. The item also
includes heavy dewatering by using pumps or manually. .
The cost also includes all types of taxes, sales tax,
insurance, cess levied by local authority etc. complete.

Providing and laying in situ Ready Mix Cement Concrete


M-20 grade of trap / granite / quartzite / gneiss metal for
RCC foundation like raft, grillage, strip foundation and
footing of RCC column and steel stanchions including
normal dewatering, formwork, compaction, finishing and
curing including transporting from mix plant upto distance
4 10.00 1.00 Cum. 10.00
of 25 Km, pouring the concrete at work site for 1.5m lift
above G.L. and 5.0m lift below GL, etc. complete...
(Excluding reinforcement and structural steel).

Providing and casting in situ Ready Mix Cement


Concrete M-20 Grade of trap / Granite / quartzite /
gneiss metal of approved quality for RCC Column as per
detailed drawings and designs or as directed by Engineer-
in-charge including normal dewatering, centering,
formwork, compaction, finishing the form surface with
cement mortar 1:3 of sufficient minimum thickness to give
5 a smooth and even surface wherever necessary or 9.00 1.00 Cum. 9.00
roughening if special finish is to be provided and curing
including transporting from mix plant upto distance of 25
Km, pouring the concrete at work site for 1.5m lift above
G.L. and 5.0m lift below GL, etc. complete..
Providing and casting in situ Ready Mix Cement
Concrete M-20 Grade of trap / Granite / quartzite /
gneiss metal of approved quality for RCC work in Beam
as per detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering, centering,
formwork, compaction, finishing the form surface with
cement mortar 1:3 of sufficient minimum thickness to give
6 a smooth and even surface wherever necessary or roughing 6.00 1.00 Cum. 6.00
if special finish is to be provided and curing including
transporting from mix plant upto distance of 25 Km,
pouring the concrete at work site for 1.5m lift above G.L.
and 5.0m lift below GL, etc. complete... (Excluding
reinforcement and structural steel).

Providing and casting in situ Ready Mix Cement


Concrete M-30 Grade of trap / Granite / quartzite /
gneiss metal of approved quality for RCC work in Slab as
per detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering, centering,
formwork, compaction, finishing the form surface with
cement mortar 1:3 of sufficient minimum thickness to give
a smooth and even surface wherever necessary or roughing
7 if special finish is to be provided and curing including 142.00 1.00 Cum. 142.00
transporting from mix plant upto distance of 25 Km,
pouring the concrete at work site for 1.5m lift above G.L.
and 5.0m lift below GL, etc. complete... (Excluding
reinforcement and structural steel). CSR Rate 8185 +
Pump Rate 175 =8360 ( For Pump rate Ref CSR I. N. a)
Static Pump Page No-13

P & L in situ Ready Mix Cement Conrete M-20 Grade of trap


metel for RCC Wall as per detailed drawing etc complete.
8 176.00 1.00 Cum. 176.00

Providing & fixing in position TMT Steel bar


reinforcement of various diameters for R.C.C. pile caps,
footings, foundations, slabs, beams, columns, canopies,
staircases, newels, chajjas, lintels, pardies, coping, fins,
9 arches, etc. as per detailed designs, drawings and 21.88 1.00 MT. 21.88
schedules, including cutting, bending, hooking the bars,
binding with wires or tack welding and supporting as
required completed.

Misc. Structural steel including rails embedments, edge


protection angle, grating etc. but excluding the
10 reinforcement steel and steel for lattice and pipe structure. 8.00 1.00 Sqm. 8.00

Providing Second class Burnt Brick masonry with


conventional / IS type bricks in cement mortar 1:6 in
foundation and plinth of inner walls & external walls,
11 including bailing out water manually, striking joints on 50.00 1.00 Cum. 50.00
unexposed faces, racking out joints on exposed faces and
watering complete.

P & L of Corrugated ASBESTOS CEMENT SHEET's (A.C.


12 SHEETS) for the plan area of water tank 203.00 1.00 Sqm. 203.00
Providing and laying water proofing treatment of 112
mm av. thickness consisting of 12 mm thick layer in
Cement Mortar 1:3 with water proofing compound at the
rate of One Kilograme per bag of cement as base,
constructing and laying brick bat coba in cement mortar
1:5 with waterproofing compound at the rate of One
Kilogramme per bag of cement and having average
thickness of 80mm and finishing with 20mm thick cement
plaster layer in cement mortar 1:3 with approved water
13 Proofing compound at the rate of One Kilogramme per 104.00 1.00 Sqm. 104.00
cement bag, including all lead, lifts and laid to proper slope
to drain of water entirely including Watta at the junction of
parapet and work upto a height of 300 mm or as directed
and including finishing the top layer of water proofing
treatment with false marking of 30cm x 30cm or as
directed and covering the whole treatment with seven
year’s guarantee, on requisite stamp paper etc. complete.

Providing waterproof plaster over RCC Chajja, Parapet


Wall and sides in cement mortar 1:3 with neat
finishing, floating using approved water proofing compound
14 30.00 1.00 Sqm. 30.00
at the rate of One Kg. of cement etc complete.
Providing internal cement plaster 12mm thick in a
single coat in cement mortar 1:4 without neeru finish to
15 concrete or brick surface in all positions including racking 313.00 1.00 Sqm. 313.00
out joints, scaffolding and curing complete.

Providing neeru finish to plaster surface in all positions


16 including scaffolding and curing complete. 313.00 1.00 Sqm. 313.00

Providing sand face plaster externally in two coats


using approved screened sand in all positions, including
providing base coat of 15mm thick in cement mortar 1:4
mixing approved water proofing compound at the rate of 1
kg./ 50 kg. of cement and curing the same for not less
than two days and keeping the surface of base coat rough
17 to receive the sand faced treatment 8mm thick in cement 213.00 1.00 Sqm. 213.00
mortar 1:4 and finishing the surface by taking out grains
and curing for 14 days including preparing the surface,
watering and scaffolding etc. complete.

Providing and applying primer coat of approved quality to


old/new wall surfaces to receive oil bound distemper
treatment, including scaffolding, preparing the surface as
18 213.00 1.00 Sqm. 213.00
directed completed. (prior approval of S.E. shall be
obtained)

Providing and applying two coats of water proof cement


paint and one coat primer of approved manufacturer &
colour to the plastered surface including scaffolding,
19 213.00 1.00 Sqm. 213.00
preparing the surface, watering for two days complete.

Providing and fixing anodized aluminium fully glazed


doors including door frame with powder coating 5 mm
thick sheet glass necessary fixtures, and fastenings,
20 neoprene type rubber plain gaskets as per IS Std. & 9.00 1.00 Sqm. 9.00
detailed drawing etc. complete (Sample to be got approved
from Ex. Engineer before use)

Supplying and fixing in position anodized extruded


modular aluminium section Two track sliding
windows mounted on rectangular frame of size 63 x 38 x
2.00mm thick (1.054kg/Rmt) made up of two track drain
21 bottom section of size 61 x 45 x 1.3mm thick 9.00 1.00 Sqm. 9.00
(1.055kg/Rmt) and top and sides sections of size 61 x 31 x
1.3mm thick (0.659 kg/Rmt) etc. complete as directed by
Engineer in charge.

Providing and laying in position Approved flooring of


22 approved quality 2 etc. complete. 99.00 1.00 Sqm. 99.00

Providing and laying in position skirting or dado of of


approved quality 25mm to 30mm thick on plaster in
cement mortar 1:4, including cement float, filling joints
23 4.00 1.00 Sqm. 4.00
with neat cement slurry, curing polishing and cleaning
complete.

24 P & L formwork for different structural components etc complete


827.00 1 Sqm. 827

25 P & L PVC water stops 9 1 Sqm. 9


26 Electrical
27 HVAC (if any)
28 Contingencies
29 Water Charges
30 Contractor Profit
Name of work: Fire-Fighting Pump House Building (PGCIL Project)

Measurement Sheet

Item
Descriptions of Item No Length Breadth Depth Quantity Unit
No.
Excavation for foundation in Earth soils of all
1 types, sand gravel and soft murum etc complete.

For F1, F2 & F3 (up to plinth level-refer fdn detail) Total 91.825
Say 92.000 Cum.

Providing soling/ Stone packing using


80mm size trap metal in layers of 15cm each
2
including filling voids with sand, ramming,
watering etc. complete.
Pump House 1 12.6 8.2 0.2 20.664

Water Tank 1 19.42 10 0.8 155.360

Total 176.024
Say 177.000 Cum.
Providing and laying in situ Ready Mix
cement concrete M-10 grade using design
mix with minimum cement content as per IS
3 456 with maximum water cement ratio 0.6
using maximum 25/30 mm size and down
trap metal for foundation and bedding etc
complete.
For F1, F2 & F3 (up to plinth level-refer fdn detail) 2.67
Pump House 1 12.6 8.2 0.075 7.749
Water Tank 1 19.42 10 0.075 14.565

Total 24.989
Say 25.000 Cum.
Providing and laying in situ Ready Mix Cement
Concrete M-20 grade of trap / granite / quartzite /
gneiss metal for RCC work in foundation like raft
4 grillage, strip foundation and footing of RCC column
etc complete.

For F1, F2 & F3 (up to plinth level-refer fdn detail) 9.861


Total 9.861
Say 10.000 Cum.
P & L in situ Ready Mix Cement Conrete M-20
Grade of trap metel for RCC Column as per detailed
5 drawing etc complete.

For C1, C4, C8, C11 4 0.500 0.3 4.3 2.580


For C2,C3, C9, C10 4 0.500 0.3 4.3 2.580
FOR C6, C13 4 0.400 0.28 4.3 1.926
For Stub column SC1 4 0.230 0.23 2 0.423
For Stub column SC2 4 0.230 0.23 1.77 0.375
For Stub column SC3 4 0.230 0.23 1.54 0.326
For Stub column SC4 4 0.230 0.23 1.31 0.277
For Stub column SC5 4 0.230 0.23 1 0.212
For Stub column SC6 4 0.230 0.23 0.64 0.135
For Stub column SC7 4 0.230 0.23 0.5 0.106
Total 8.940
Say 9.000 Cum.
P & L in situ Ready Mix Cement Conrete M-20
Grade of trap metal for RCC Beam as per detailed
6 drawing etc complete.

A. Plinth Beams
PB1 to PB3 & PB6 TO PB8 2 12.300 0.230 0.450 2.55
PB11, PB12, PB15 & PB16 2 7.900 0.230 0.450 1.64
B. Lintel Beams
L1, L3,L4 3 4.107 0.230 0.270 0.77
L2 2 7.900 0.230 0.270 0.98
C. Roof Beams

RB1 to RB7 6 4.107 0.230 0.600 3.40


RB9, RB10 2 7.900 0.230 0.600 2.18
Total 5.58
Say 6.000 Cum.
P & L in situ Ready Mix Cement Conrete M-20
7 Grade of trap metel for RCC Slab as per detailed Cum.
drawing etc complete.
PUMP HOUSE 1 12.6 8.2 0.150 15.498
WATER TANK BOTTOM SLAB 1 19.42 10 0.650 126.230

Total 141.728
Say 142.000
P & L in situ Ready Mix Cement Conrete M-20
Grade of trap metel for RCC Wall as per detailed
8 drawing etc complete. Cum.

Short Direction 3 10.000 0.600 4.250 76.500


Long Direction 2 19.420 0.600 4.250 99.042
Total 175.542
Say 176.000
9 Providing & fixing in position TMT Steel bar
reinforcement of various diameters for R.C.C. Total 19.020
pile caps, footings, foundations, slabs, beams,
columns, canopies, staircases, newels, chajjas, Add 15% extra length, losses etc. 21.873
lintels, pardies, coping, fins, arches, etc complete.
Say 21.880 MT.

Providing & Fixing M.S. (Mild Steel) sections


for various compnent parts of Pump House &
10
water tank etc. complete

a Purlins (ISMC-175)
Length =1041mm 16 10.41 22.7 3780.912 Kg
b. SAG Rods L=19420 mm 2 19.420 1.580 61.37 Kg
c. Cleat Angle L=1041 16 10.41 22.7 3780.91 Kg
d. Insert Plate 32 3.768 120.58 Kg

7850x 0.2 x 0.2 x 0.012= 3.768 Kg


e. Lugs

300x2+175=775mmx2= 1550mm 32 1.377 44.064 Kg

f. M.S. Rung Ladder

L= 300*2+1000*2=2600mm 16 6.417 102.669 Kg


7890.500 Kg

Add 30% extra length, losses etc. 10257.650

Total 7.891 MT.


Say 8.000 MT.

Providing Second class Burnt Brick masonry with

11 conventional / IS type bricks in cement mortar 1:6

in foundation and plinth etc complete.


Above Plinth upto Slab Bottom
PB1 to PB3 6 4.108 0.230 4.300 24.37
PB4 2 7.900 0.230 4.300 15.63
Wall Under Roof for Water Tank
Area= 1/2*2*2*10.41=20.82sq.m for 1 side 2 20.820 0.230 9.58
Other Side 2 7.470 0.230 2.000 6.87
Deductions
RS1 1 2.500 0.230 3.400 -1.96
W1 2 0.900 0.230 1.200 -0.50
W2 2 2.700 0.230 1.200 -1.49
V1 4 3.010 0.230 0.600 -1.66
V3 3 1.000 0.230 0.600 -0.41
D 1 1.000 0.230 2.100 -0.48
D1 2 0.900 0.230 1.850 -0.77
Total 49.18 Cum.
Say 50.00
P & L of Corrugated ASBESTOS CEMENT SHEET
12 (A.C. SHEETS) for the plan area of water tank Sq.m

1 10.420 19.420 202.356


Total 202.356
Say 203.000
Providing India waterproffing including brick bat
13 coba etc. complete. Sqm.

For Pump House 1 12.600 8.200 103.32


Total 103.320 Sq.m
Say 104.000
Sq.m
Providing waterproof plaster over RCC Chajja,
Parapet Wall and sides in cement mortar 1:3 with
14 neat finishing, floating using approved water
proofing compound at the rate of One Kg. of cement
etc complete.
W1 2 0.900 0.600 1.080
W2 2 2.700 0.600 3.240
Parapet Wall 1 41.600 0.600 24.960

Total 29.280
Say 30.000 sq.m
Providing internal cement plaster 12mm
thick in a single coat in cement mortar 1:4
without neeru finish to concrete or brick
15 surface in all positions including racking out Sq.m
joints, scaffolding and curing complete.

Pump House 2 12.6 4.300 108.360


2 8 4.300 68.800
for ceilling
Pump House 1 12.6 8 100.800
For Brickwall under Roof of Water tank 2 10.41 20.82
Other Side 2 10.41 2 41.640
Deductions
RS1 1 2.500 3.400 -8.500
W1 2 0.900 1.200 -2.160
W2 2 2.700 1.200 -6.480
V1 4 3.010 0.600 -7.224
V3 3 1.000 0.600 -1.800
D 1 1.000 2.100 -2.100
total 312.156
Say 313.000
Providing neeru finish to plaster surface in
16 all positions including scaffolding and curing Sq.m
complete.
Internal cement plaster 12 mm thick as per item no 15 313.000

Total 313.000
Say 313.000

Providing sand face plaster externally in


two coats using approved screened sand in
17 all positions, including providing base coat of Sq.m
15mm thick in cement mortar 1:4 etc
complete.

i) x direction Walls 2 12.600 4.300 108.360


ii) y direction Walls 2 8.200 4.300 70.520
For Parapet Wall 2 12.600 0.550 13.860
2 8.200 0.550 9.020
Deductions
RS1 1 2.500 3.400 8.500
W1 2 0.900 1.500 2.700
W2 2 2.700 1.500 8.100
V1 4 3.010 0.600 7.224
V3 3 1.000 0.600 1.800
Total 212.960
Say 213.000

Providing and applying two coats of water


proof cement paint and one coat primer
18 Qty. same as per item no.17 213.000 Sq.m
of approved manufacturer & colour to the
plastered surface etc complete.
Say 213.000
19 Providing and applying washable oil bound Qty. same as per item no.17 213.000 Sq.m
distemper of approved colour shade and
quality to old/new surface in two coats etc Say 213.000
complete.
Providing & fixing Teak Wood frame door and
20 rolling shutter etc complete.

D 1 1.500 2.100 3.15 Sq.m


D1 2 1.200 2.100 5.04
RS 1 1 2.500 3.400 8.19
say 9 Sq.m
21 Supplying & fixing in position anodised Sq.m
extruded
W1 modular aluminium section Two track 2 0.900 1.200 2.160
sliding window etc complete.
W2 2 2.700 1.200 6.480
Total 8.640
Say 9.000 Sq.m

22 Providing & Laying in flooring etc complete.


PUMP HOUSE 1 12.3 8 98.400
Total 98.400
Say 99.000 sq.m
Providing & Laying in skirting of approved
material etc complete.
23

PUMP HOUSE 2 12.3 0.100 2.460


2 8 0.100 1.600
Deductions
D 1 1.500 0.100 -0.150
D1 2 1.200 0.100 -0.240

3.670
P & L formwork for different structural
components for material like wooden plys/ steel Say 4.000 sq.m
24 sheets etc complete sq.m
Column Footing
For F1 4 8.6 0.400 13.76
For F2 4 8.6 0.400 13.76

Columns
For C1 4 1.400 6.8 38.08
For C2 4 1.400 6.8 38.08
For Stub column SC1 2 0.920 2 3.68
For Stub column SC2 2 0.920 1.77 3.2568
For Stub column SC3 2 0.920 1.54 2.8336
For Stub column SC4 2 0.920 1.31 2.4104
For Stub column SC5 2 0.920 1 1.84
For Stub column SC6 2 0.920 0.64 1.1776
For Stub column SC7 2 0.920 0.5 0.92
For Stub column SC8 2 0.920 0.23 0.4232
Plinth Beams
PB1 to PB3 6 4.108 1.230 30.31335
PB4 2 7.900 1.430 22.594
Lintels :-L1 to L3 5 12.600 0.730 45.99
L4 2 7.900 0.860 13.588
Roof Beam
RB1 to RB3 6 4.108 1.230 30.31335
RB4 4 7.900 1.430 45.188
Slabs
Pump house 1 12.600 7.550 95.13
Water tank 1 9.310 18.620 173.3522

RCC Walls
1 65.170 4.250 276.9725

Total 826.143
Say 827 Sq.m.
25 P & L PVC water stops 9 9 Nos
26 Electrical
27 HVAC (if any)
28 Contingencies
29 Water Charges
30 Contractor Profit
220 kV TOWER & EQUIPMENT FOUNDATION BOQ BOLONGIR SUBSTATION
L B D1 D/H lc bc
Fdn PCC PCC Col Col Col Col Col Ht Excavation
Discription Nos
Depth Depth Offset Offset Nos Length Width above GL (M3)
mt mt mt mt mt mt

F1 1 2.15 1.9 0.15 0.3 2.5 0.075 0.075 0 1 0.5 0.3 0.6 12.14
FOOTING
F2 4 2.7 2 0.15 0.375 2.5 0.075 0.075 0 1 0.5 0.3 0.6 63.11
F1 & F2
F3 2 1.8 1.5 0.15 0.35 2.5 0.075 0.075 0 1 0.4 0.28 0.6 16.57
TOTAL QTY = 91.82
NT FOUNDATION BOQ BOLONGIR SUBSTATION
PCC VOL CONC VOL Formwork Backfill
(M3) (M3) Qty. (M2) (M3)

0.35 1.27 5.70 10.52


1.84 6.73 23.08 54.54
0.48 1.86 9.46 14.23
2.67 9.86 38.24 79.29
Name of work:- AC Panel Room Building BOQ , C/ENGG/STD/SPR/STR-3011, ARCH-3000

REF. DRG. NO.-C-ENGG-STD-PR-ARCH-3000


No. of Panal Building (for 400 kV S/S) 1
ABSTRACT

Item
Item Discription QTY. RATE UNIT TOTAL
No.
Excavation for foundation in Earth soils of all types,
sand gravel and soft murum including removing the
excavated materials upto a distance of 50 metres beyond
building area and lift as specified, stacking and spreading
1 as directed including dewatering unless provided 24.20 1.00 Cum. 24.20
elsewhere, preparing the bed for the foundation and
necessary backfilling, ramming, watering complete
excluding shoring and strutting.( Lift Upto 1.5 M )

Providing soling using 80mm size trap metal in layers


of 15cm each including filling voids with sand, ramming,
2 watering etc. complete. 17.60 1.00 Cum. 17.60

Providing and laying in situ Ready Mix cement concrete


M-10 grade using design mix with minimum cement
content as per IS 456 with maximum water cement ratio
0.45 using maximum 25/30 mm size and down trap metal
for foundation and bedding with all labours, materials,
plant & equipments, shuttering form work, staging,
3 including transporting, placing, vibrating with mechanical 1.90 1.00 Cum. 1.90
vibrator, finishing and curing etc. complete. The item also
includes heavy dewatering by using pumps or manually. .
The cost also includes all types of taxes, sales tax,
insurance, cess levied by local authority etc. complete.

Providing and laying in situ Ready Mix Cement Concrete


M-20 grade of trap / granite / quartzite / gneiss metal for
RCC foundation like raft, grillage, strip foundation and
footing of RCC column and steel stanchions including
normal dewatering, formwork, compaction, finishing and
4 curing including transporting from mix plant upto distance 4.70 1.00 Cum. 4.70
of 25 Km, pouring the concrete at work site for 1.5m lift
above G.L. and 5.0m lift below GL, etc. complete...
(Excluding reinforcement and structural steel).

Providing and casting in situ Ready Mix Cement


Concrete M-20 Grade of trap / Granite / quartzite /
gneiss metal of approved quality for RCC Column as per
detailed drawings and designs or as directed by Engineer-
in-charge including normal dewatering, centering,
formwork, compaction, finishing the form surface with
cement mortar 1:3 of sufficient minimum thickness to give
5 5.00 1.00 Cum. 5.00
a smooth and even surface wherever necessary or
roughening if special finish is to be provided and curing
including transporting from mix plant upto distance of 25
Km, pouring the concrete at work site for 1.5m lift above
G.L. and 5.0m lift below GL, etc. complete..
Providing and casting in situ Ready Mix Cement
Concrete M-20 Grade of trap / Granite / quartzite /
gneiss metal of approved quality for RCC work in Beam
as per detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering, centering,
formwork, compaction, finishing the form surface with
cement mortar 1:3 of sufficient minimum thickness to give
6 a smooth and even surface wherever necessary or roughing 6.00 1.00 Cum. 6.00
if special finish is to be provided and curing including
transporting from mix plant upto distance of 25 Km,
pouring the concrete at work site for 1.5m lift above G.L.
and 5.0m lift below GL, etc. complete... (Excluding
reinforcement and structural steel).

Providing and casting in situ Ready Mix Cement


Concrete M-30 Grade of trap / Granite / quartzite /
gneiss metal of approved quality for RCC work in Slab as
per detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering, centering,
formwork, compaction, finishing the form surface with
cement mortar 1:3 of sufficient minimum thickness to give
a smooth and even surface wherever necessary or roughing
7 if special finish is to be provided and curing including 5.30 1.00 Cum. 5.30
transporting from mix plant upto distance of 25 Km,
pouring the concrete at work site for 1.5m lift above G.L.
and 5.0m lift below GL, etc. complete... (Excluding
reinforcement and structural steel). CSR Rate 8185 +
Pump Rate 175 =8360 ( For Pump rate Ref CSR I. N. a)
Static Pump Page No-13

Providing & fixing in position TMT Steel bar


reinforcement of various diameters for R.C.C. pile caps,
footings, foundations, slabs, beams, columns, canopies,
staircases, newels, chajjas, lintels, pardies, coping, fins,
8 arches, etc. as per detailed designs, drawings and 1.20 1.00 MT. 1.20
schedules, including cutting, bending, hooking the bars,
binding with wires or tack welding and supporting as
required completed.

Providing Second class Burnt Brick masonry with


conventional / IS type bricks in cement mortar 1:6 in
foundation and plinth of inner walls & external walls,
9 including bailing out water manually, striking joints on 15.00 1.00 Cum. 15.00
unexposed faces, racking out joints on exposed faces and
watering complete.

Providing India Manglore Tiles for Roof etc. complete.


10 52.02 1.00 Sqm. 52.02

Providing internal cement plaster 12mm thick in a


single coat in cement mortar 1:4 without neeru finish to
11 concrete or brick surface in all positions including racking 125.00 1.00 Sqm. 125.00
out joints, scaffolding and curing complete.

Providing neeru finish to plaster surface in all positions


12 including scaffolding and curing complete. 125.00 1.00 Sqm. 125.00
Providing sand face plaster externally in two coats
using approved screened sand in all positions, including
providing base coat of 15mm thick in cement mortar 1:4
mixing approved water proofing compound at the rate of 1
kg./ 50 kg. of cement and curing the same for not less
than two days and keeping the surface of base coat rough
13 to receive the sand faced treatment 8mm thick in cement 92.00 1.00 Sqm. 92.00
mortar 1:4 and finishing the surface by taking out grains
and curing for 14 days including preparing the surface,
watering and scaffolding etc. complete.

Providing and applying primer coat of approved quality to


old/new wall surfaces to receive oil bound distemper
treatment, including scaffolding, preparing the surface as
14 92.00 1.00 Sqm. 92.00
directed completed. (prior approval of S.E. shall be
obtained)

Providing and applying two coats of water proof cement


paint and one coat primer of approved manufacturer &
colour to the plastered surface including scaffolding,
15 92.00 1.00 Sqm. 92.00
preparing the surface, watering for two days complete.

Providing and fixing anodized aluminium fully glazed


doors including door frame with powder coating 5 mm
thick sheet glass necessary fixtures, and fastenings,
16 4.50 1.00 Sqm. 4.50
neoprene type rubber plain gaskets as per IS Std. &
detailed drawing etc. complete (Sample to be got approved
from Ex. Engineer before use)

Providing and laying in position Approved flooring of


17 approved quality 2 etc. complete. 36.00 1.00 Sqm. 36.00

Providing and laying in position skirting or dado of of


approved quality 25mm to 30mm thick on plaster in
cement mortar 1:4, including cement float, filling joints
18 3.00 1.00 Sqm. 3.00
with neat cement slurry, curing polishing and cleaning
complete.

P & L 6mm thk. Chequred plate


19 5.60 1.00 Sqm. 5.60
Providing and laying in situ Ready Mix cement concrete
M-10 grade using design mix with minimum cement
content as per IS 456 with maximum water cement ratio
20 0.6 using maximum 25/30 mm size and down trap metal 3.00 1.00 Cum. 3.00
for Internal Cable ternch etc complete.

providing & Laying 22GX12mm Chicken wire mesh for


21 all Wall, flooring & roof. 135.00 1.00 Sqm. 135.00
Name of work:- AC PANEL ROOM

Measurement Sheet

Item
Descriptions of Item No Length Breadth Depth Quantity Unit
No.
Excavation for foundation in Earth soils of all
1 types, sand gravel and soft murum etc complete.

For footing of col


C1 to C8 8 1.6 1.2 1.575 24.192

Total 24.192
Say 24.200 Cum.

Providing soling using 80mm size trap metal


in layers of 15cm each including filling voids
2
with sand, ramming, watering etc. complete.

Passage 1 9.0 3.9 0.5 17.55


Total 17.550
Say 17.600 Cum.
Providing and laying in situ Ready Mix
cement concrete M-10 grade using design
mix with minimum cement content as per IS
3 456 with maximum water cement ratio 0.6
using maximum 25/30 mm size and down
trap metal for foundation and bedding etc
complete.

Under C1 8 1.6 1.2 0.075 1.152


Under Plinth Beams 8 3 0.4 0.075 0.720
Total 1.872
Say 1.900 Cum.
Providing and laying in situ Ready Mix Cement
Concrete M-20 grade of trap / granite / quartzite /
gneiss metal for RCC work in foundation like raft,
4 grillage, strip foundation and footing of RCC column
etc complete.

For footing of col


C1 8 1.6 1.2 0.300 4.608

Total 4.608
Say 4.700 Cum.
P & L in situ Ready Mix Cement Conrete M-20
Grade of trap metel for RCC Column as per detailed
5 drawing etc complete.

C1 8 0.400 0.3 5.2 4.99


Total 4.992
Say 5.000 Cum.
P & L in situ Ready Mix Cement Conrete M-20
Grade of trap metal for RCC Beam as per detailed
6 drawing etc complete.

a) Plinth Beam
Plinth Beam 6 3.000 0.350 0.250 1.58
2 3.900 0.350 0.250 0.68
Roof Beam
b) Roof Beam 6 3.000 0.350 0.250 1.58
4 3.900 0.350 0.250 1.37
TOTAL 5.20
Say 6.000 Cum.
P & L in situ Ready Mix Cement Conrete M-20
Grade of trap metel for RCC Slab as per detailed
7 Cum.
drawing etc complete.

Office 1 10.2 5.1 0.100 5.202

Total 5.202
Say 5.300
P & L in situ Reay Mix Cement Conrete M-20
Grade of trap metel for RCC Chajja as per detailed
8 drawing etc complete. Cum.

for Door (D) 0 1.200 0.600 0.150 0.000


D1 0 1.100 0.600 0.150 0.000
W 0 1.400 0.600 0.150 0.000
W1 0 1.200 0.600 0.150 0.000

Total 0.000

Say 0.000

Providing & fixing in position TMT Steel bar


reinforcement of various diameters for R.C.C.
pile caps, footings, foundations, slabs, beams,
9 columns, canopies, staircases, newels, chajjas,
lintels, pardies, coping, fins, arches, etc complete.

Total 1200.002 kg
Say 1.200 ton
Providing and fixing mild steel grill work
for windows, ventilators weighing 20 kg
per sq.m. as per drawing, including necessary
10
fixtures, welding and painting with one coat of
anti-corrosive paint etc. complete.

W 0 1.200 1.200 0.000


W1 0 1.000 1.200 0.000
V 0 0.700 0.900 0.000

Total 0.000
Say 0.000 Sq.m
11
Providing Second class Burnt Brick masonry with

a) conventional / IS type bricks in cement mortar 1:6

in foundation and plinth etc complete.


ABOVE Plinth Beams upto FLOOR lvl (x Dir) 2 7.800 0.230 3.000 10.764
ABOVE Plinth Beams upto FLOOR lvl (y Dir) 2 3.500 0.230 3.000 4.83
DEDUCTIONS
D1 1 1.200 0.230 2.100 -0.58
D2 1 0.750 0.230 2.100 -0.36
Windows
W 1 0.750 0.230 0.750 -0.13
Total 14.52
say 15.00 Cum.
Providing Second class Burnt Brick masonry with
conventional / IS type bricks in cement mortar 1:4
12 in half brick thick wall etc complete. SQ.M

X-DIRECTION WALLS 0 20.100 0.900 0.000


Y-DIRECTION WALLS 0 10.660 0.900 0.000

Total 0.000
Say 0.000
Providing India Manglore Tiles for Roof etc.
13 complete. Sqm.

1 10.200 5.100 52.02

Total 52.020 Sq.m


Say 52.020
Sq.m
Providing waterproof plaster over RCC Chajja,
Parapet Wall and sides in cement mortar 1:3 with
14 neat finishing, floating using approved water
proofing compound at the rate of One Kg. of cement
etc complete.
0 58.000 2.630 0.000
D 0 1.200 0.600 0.000
D1 0 1.100 0.600 0.000
W 0 1.400 0.600 0.000
W1 0 1.200 0.600 0.000
0
Total 0.000
Say 0.000 sq.m
Providing internal cement plaster 12mm
thick in a single coat in cement mortar 1:4
15 without neeru finish to concrete or brick Sq.m
surface in all positions including racking out
joints, scaffolding and curing complete.

X direction 2 8.8 3.000 52.500

Y Direction 2 3.7 3.000 22.200

DEDUCTIONS
D 0.5 1.200 2.400 -1.440
D1 0.5 0.750 2.100 -0.788
W 0.5 0.750 0.750 -0.281
for ceilling
Office 1 10.2 5.1 52.020

total 124.211
Say 125.000
Providing neeru finish to plaster surface in
all positions including scaffolding and curing
16 complete. Sq.m

Internal cement plaster 12 mm thick as per item no 15 125.000

Total 125.000
Say 125.000
Providing sand face plaster externally in
two coats using approved screened sand in
all positions, including providing base coat of
17- Sq.m
15mm thick in cement mortar 1:4 etc
complete.

i) x direction Walls 2 9.250 3.500 64.750


ii) 2 4.150 3.500 29.050
y direction Walls
For Parapet Wall 0 20.100 0.900 0.000
0 10.600 0.900 0.000
Deductions
As per internal Plaster -2.509
Total 91.291
Say 92.000
Providing and applying two coats of water
proof cement paint and one coat primer
18 Qty. same as per item no.17 92.000 Sq.m
of approved manufacturer & colour to the
plastered surface etc complete.

Say 92.000
Providing and applying washable oil bound
distemper of approved colour shade and
19 quality to old/new surface in two coats etc Qty. same as per item no.17 92.000 Sq.m
complete.

Say 92.000
Providing & fixing Glazed Aluminium
Casement door and shutter etc complete.
20 Sq.m

D 1 1.2 2.400 2.88


D1 1 0.75 2.100 1.575

4.455
say 4.5 Sq.m
Supplying & fixing in position anodised
21 extruded modular aluminium section Two track Sq.m
sliding window etc complete.

W 0 1.200 1.200 0.000


W1 0 1.000 1.200 0.000
V 0 0.700 0.900 0.000

Total 0.000
Say 0.000 Sq.m

22 Providing & Laying in flooring etc complete. Sq


Office 1 9.0 3.9 35.100
Say 36.000 sq.m
Providing & Laying in skirting of approved
23 material etc complete.
Office 2 10.2 0.100 2.040
2 5.1 0.100 1.020
DEDUCTIONS
D 1 1.200 0.100 -0.120
D1 1 0.750 0.100 -0.075
2.865
Say 3.000 sq.m
24 P & L 6mm thk. Chequred plate
1 8.5 0.450 3.825
1 8.4 0.200 1.680

Say 5.600 sq.m

Providing and laying in situ Ready Mix


cement concrete M-10 grade using design
mix with minimum cement content as per IS
25 456 with maximum water cement ratio 0.6
using maximum 25/30 mm size and down
trap metal for Internal Cable ternch etc
complete.
1 8.500 0.100 1.450 1.233
1 8.400 0.100 1.200 1.008
total 2.241
say 3.000 cu.m

providing & Laying 22GX12mm Chicken wire


26
mesh for all Wall, flooring & roof.
Ceiling, floor 2 8.700 3.500 60.900
Wall in x direction 2 8.700 3.000 52.200
wall in y direction 2 3.500 3.000 21.000
total 134.100
say 135.000 Sq.m

27 Plumbing
28 Electrical
29 HVAC (if any)
30 Contingencies
31 Water Charges
32 Contractor Profit
L B D1 D/H
Fdn PCC PCC Col Col Col Col Col Ht above Excavation
Discription Nos
Depth Depth Offset Offset Nos Length Width GL (M3)
mt mt mt mt

F1 8 1.6 1.2 0.3 0.3 1.5 0.075 0.075 0 1 0.3 0.4 0.15 29.77
0 0 0 0 0 0 0 0 0 0 0 0 0 0.00
TOTAL QUANTITY = 29.77
PCC VOL CONC VOL Formwork Backfill
(M3) (M3) Qty. (M2) (M3)

1.42 4.61 28.56 23.74


0.00 0.00 0.00 0.00
1.42 4.61 28.56 23.74
Name of work:- AC Panel Room Building BOQ , C/ENGG/STD/SPR/STR-3011, ARCH-3000

REF. DRG. NO.-C-ENGG-STD-PR-ARCH-3000


No. of Panal Building (for 220 kV S/S) 1
ABSTRACT

Item
Item Discription QTY. RATE UNIT TOTAL
No.
Excavation for foundation in Earth soils of all types,
sand gravel and soft murum including removing the
excavated materials upto a distance of 50 metres beyond
building area and lift as specified, stacking and spreading
1 as directed including dewatering unless provided 18.20 1.00 Cum. 18.20
elsewhere, preparing the bed for the foundation and
necessary backfilling, ramming, watering complete
excluding shoring and strutting.( Lift Upto 1.5 M )

Providing soling using 80mm size trap metal in layers


of 15cm each including filling voids with sand, ramming,
2 watering etc. complete. 11.70 1.00 Cum. 11.70

Providing and laying in situ Ready Mix cement concrete


M-10 grade using design mix with minimum cement
content as per IS 456 with maximum water cement ratio
0.45 using maximum 25/30 mm size and down trap metal
for foundation and bedding with all labours, materials,
plant & equipments, shuttering form work, staging,
3 including transporting, placing, vibrating with mechanical 1.50 1.00 Cum. 1.50
vibrator, finishing and curing etc. complete. The item also
includes heavy dewatering by using pumps or manually. .
The cost also includes all types of taxes, sales tax,
insurance, cess levied by local authority etc. complete.

Providing and laying in situ Ready Mix Cement Concrete


M-20 grade of trap / granite / quartzite / gneiss metal for
RCC foundation like raft, grillage, strip foundation and
footing of RCC column and steel stanchions including
normal dewatering, formwork, compaction, finishing and
4 curing including transporting from mix plant upto distance 5.20 1.00 Cum. 5.20
of 25 Km, pouring the concrete at work site for 1.5m lift
above G.L. and 5.0m lift below GL, etc. complete...
(Excluding reinforcement and structural steel).

Providing and casting in situ Ready Mix Cement


Concrete M-20 Grade of trap / Granite / quartzite /
gneiss metal of approved quality for RCC Column as per
detailed drawings and designs or as directed by Engineer-
in-charge including normal dewatering, centering,
formwork, compaction, finishing the form surface with
cement mortar 1:3 of sufficient minimum thickness to give
5 4.00 1.00 Cum. 4.00
a smooth and even surface wherever necessary or
roughening if special finish is to be provided and curing
including transporting from mix plant upto distance of 25
Km, pouring the concrete at work site for 1.5m lift above
G.L. and 5.0m lift below GL, etc. complete..
Providing and casting in situ Ready Mix Cement
Concrete M-20 Grade of trap / Granite / quartzite /
gneiss metal of approved quality for RCC work in Beam
as per detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering, centering,
formwork, compaction, finishing the form surface with
cement mortar 1:3 of sufficient minimum thickness to give
6 a smooth and even surface wherever necessary or roughing 4.00 1.00 Cum. 4.00
if special finish is to be provided and curing including
transporting from mix plant upto distance of 25 Km,
pouring the concrete at work site for 1.5m lift above G.L.
and 5.0m lift below GL, etc. complete... (Excluding
reinforcement and structural steel).

Providing and casting in situ Ready Mix Cement


Concrete M-30 Grade of trap / Granite / quartzite /
gneiss metal of approved quality for RCC work in Slab as
per detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering, centering,
formwork, compaction, finishing the form surface with
cement mortar 1:3 of sufficient minimum thickness to give
a smooth and even surface wherever necessary or roughing
7 if special finish is to be provided and curing including 3.70 1.00 Cum. 3.70
transporting from mix plant upto distance of 25 Km,
pouring the concrete at work site for 1.5m lift above G.L.
and 5.0m lift below GL, etc. complete... (Excluding
reinforcement and structural steel). CSR Rate 8185 +
Pump Rate 175 =8360 ( For Pump rate Ref CSR I. N. a)
Static Pump Page No-13

Providing & fixing in position TMT Steel bar


reinforcement of various diameters for R.C.C. pile caps,
footings, foundations, slabs, beams, columns, canopies,
staircases, newels, chajjas, lintels, pardies, coping, fins,
8 arches, etc. as per detailed designs, drawings and 0.93 1.00 MT. 0.93
schedules, including cutting, bending, hooking the bars,
binding with wires or tack welding and supporting as
required completed.

Providing Second class Burnt Brick masonry with


conventional / IS type bricks in cement mortar 1:6 in
foundation and plinth of inner walls & external walls,
9 including bailing out water manually, striking joints on 15.00 1.00 Cum. 15.00
unexposed faces, racking out joints on exposed faces and
watering complete.

Providing India Manglore Tiles for Roof etc. complete.


10 36.72 1.00 Sqm. 36.72

Providing internal cement plaster 12mm thick in a


single coat in cement mortar 1:4 without neeru finish to
11 concrete or brick surface in all positions including racking 92.00 1.00 Sqm. 92.00
out joints, scaffolding and curing complete.

Providing neeru finish to plaster surface in all positions


12 including scaffolding and curing complete. 92.00 1.00 Sqm. 92.00
Providing sand face plaster externally in two coats
using approved screened sand in all positions, including
providing base coat of 15mm thick in cement mortar 1:4
mixing approved water proofing compound at the rate of 1
kg./ 50 kg. of cement and curing the same for not less
than two days and keeping the surface of base coat rough
13 to receive the sand faced treatment 8mm thick in cement 71.00 1.00 Sqm. 71.00
mortar 1:4 and finishing the surface by taking out grains
and curing for 14 days including preparing the surface,
watering and scaffolding etc. complete.

Providing and applying primer coat of approved quality to


old/new wall surfaces to receive oil bound distemper
treatment, including scaffolding, preparing the surface as
14 71.00 1.00 Sqm. 71.00
directed completed. (prior approval of S.E. shall be
obtained)

Providing and applying two coats of water proof cement


paint and one coat primer of approved manufacturer &
colour to the plastered surface including scaffolding,
15 71.00 1.00 Sqm. 71.00
preparing the surface, watering for two days complete.

Providing and fixing anodized aluminium fully glazed


doors including door frame with powder coating 5 mm
thick sheet glass necessary fixtures, and fastenings,
16 4.50 1.00 Sqm. 4.50
neoprene type rubber plain gaskets as per IS Std. &
detailed drawing etc. complete (Sample to be got approved
from Ex. Engineer before use)

Providing and laying in position Approved flooring of


17 approved quality 2 etc. complete. 24.00 1.00 Sqm. 24.00

Providing and laying in position skirting or dado of of


approved quality 25mm to 30mm thick on plaster in
cement mortar 1:4, including cement float, filling joints
18 3.00 1.00 Sqm. 3.00
with neat cement slurry, curing polishing and cleaning
complete.

P & L 6mm thk. Chequred plate


19 5.60 1.00 Sqm. 5.60
Providing and laying in situ Ready Mix cement concrete
M-10 grade using design mix with minimum cement
content as per IS 456 with maximum water cement ratio
20 0.6 using maximum 25/30 mm size and down trap metal 3.00 1.00 Cum. 3.00
for Internal Cable ternch etc complete.

providing & Laying 22GX12mm Chicken wire mesh for


21 all Wall, flooring & roof. 135.00 1.00 Sqm. 135.00
Name of work:- AC PANEL ROOM

Measurement Sheet

Item
Descriptions of Item No Length Breadth Depth Quantity Unit
No.
Excavation for foundation in Earth soils of all
1 types, sand gravel and soft murum etc complete.

For footing of col


C1 to C8 6 1.6 1.2 1.575 18.144

Total 18.144
Say 18.200 Cum.

Providing soling using 80mm size trap metal


in layers of 15cm each including filling voids
2
with sand, ramming, watering etc. complete.

Passage 1 6.0 3.9 0.5 11.70


Total 11.700
Say 11.700 Cum.
Providing and laying in situ Ready Mix
cement concrete M-10 grade using design
mix with minimum cement content as per IS
3 456 with maximum water cement ratio 0.6
using maximum 25/30 mm size and down
trap metal for foundation and bedding etc
complete.

Under C1 6 1.6 1.2 0.075 0.864


Under Plinth Beams 6 3 0.4 0.075 0.540
Total 1.404
Say 1.500 Cum.
Providing and laying in situ Ready Mix Cement
Concrete M-20 grade of trap / granite / quartzite /
gneiss metal for RCC work in foundation like raft,
4 grillage, strip foundation and footing of RCC column
etc complete.

For footing of col


C1 6 1.6 1.2 0.450 5.184

Total 5.184
Say 5.200 Cum.
P & L in situ Ready Mix Cement Conrete M-20
Grade of trap metel for RCC Column as per detailed
5 drawing etc complete.

C1 6 0.400 0.3 5.2 3.74


Total 3.744
Say 4.000 Cum.
P & L in situ Ready Mix Cement Conrete M-20
Grade of trap metal for RCC Beam as per detailed
6 drawing etc complete.

a) Plinth Beam
Plinth Beam 4 3.000 0.350 0.250 1.05
2 3.900 0.350 0.250 0.68
Roof Beam
b) Roof Beam 4 3.000 0.350 0.250 1.05
3 3.900 0.350 0.250 1.02
TOTAL 3.81
Say 4.000 Cum.
P & L in situ Ready Mix Cement Conrete M-20
Grade of trap metel for RCC Slab as per detailed
7 Cum.
drawing etc complete.

Office 1 7.2 5.1 0.100 3.672

Total 3.672
Say 3.700
P & L in situ Reay Mix Cement Conrete M-20
Grade of trap metel for RCC Chajja as per detailed
8 drawing etc complete. Cum.

for Door (D) 0 1.200 0.600 0.150 0.000


D1 0 1.100 0.600 0.150 0.000
W 0 1.400 0.600 0.150 0.000
W1 0 1.200 0.600 0.150 0.000

Total 0.000

Say 0.000

Providing & fixing in position TMT Steel bar


reinforcement of various diameters for R.C.C.
pile caps, footings, foundations, slabs, beams,
9 columns, canopies, staircases, newels, chajjas,
lintels, pardies, coping, fins, arches, etc complete.

Total 928.349 kg
Say 0.928 ton
Providing and fixing mild steel grill work
for windows, ventilators weighing 20 kg
per sq.m. as per drawing, including necessary
10
fixtures, welding and painting with one coat of
anti-corrosive paint etc. complete.

W 0 1.200 1.200 0.000


W1 0 1.000 1.200 0.000
V 0 0.700 0.900 0.000

Total 0.000
Say 0.000 Sq.m
11
Providing Second class Burnt Brick masonry with

a) conventional / IS type bricks in cement mortar 1:6

in foundation and plinth etc complete.


ABOVE Plinth Beams upto FLOOR lvl (x Dir) 2 7.800 0.230 3.000 10.764
ABOVE Plinth Beams upto FLOOR lvl (y Dir) 2 3.500 0.230 3.000 4.83
DEDUCTIONS
D1 1 1.200 0.230 2.100 -0.58
D2 1 0.750 0.230 2.100 -0.36
Windows
W 1 0.750 0.230 0.750 -0.13
Total 14.52
say 15.00 Cum.
Providing Second class Burnt Brick masonry with
conventional / IS type bricks in cement mortar 1:4
12 in half brick thick wall etc complete. SQ.M

X-DIRECTION WALLS 0 20.100 0.900 0.000


Y-DIRECTION WALLS 0 10.660 0.900 0.000

Total 0.000
Say 0.000
Providing India Manglore Tiles for Roof etc.
13 complete. Sqm.

1 7.200 5.100 36.72

Total 36.720 Sq.m


Say 36.720
Sq.m
Providing waterproof plaster over RCC Chajja,
Parapet Wall and sides in cement mortar 1:3 with
14 neat finishing, floating using approved water
proofing compound at the rate of One Kg. of cement
etc complete.
0 58.000 2.630 0.000
D 0 1.200 0.600 0.000
D1 0 1.100 0.600 0.000
W 0 1.400 0.600 0.000
W1 0 1.200 0.600 0.000
0
Total 0.000
Say 0.000 sq.m
Providing internal cement plaster 12mm
thick in a single coat in cement mortar 1:4
15 without neeru finish to concrete or brick Sq.m
surface in all positions including racking out
joints, scaffolding and curing complete.

X direction 2 5.8 3.000 34.800

Y Direction 2 3.7 3.000 22.200

DEDUCTIONS
D 0.5 1.200 2.400 -1.440
D1 0.5 0.750 2.100 -0.788
W 0.5 0.750 0.750 -0.281
for ceilling
Office 1 7.2 5.1 36.720

total 91.211
Say 92.000
Providing neeru finish to plaster surface in
all positions including scaffolding and curing
16 complete. Sq.m

Internal cement plaster 12 mm thick as per item no 15 92.000

Total 92.000
Say 92.000
Providing sand face plaster externally in
two coats using approved screened sand in
all positions, including providing base coat of
17- Sq.m
15mm thick in cement mortar 1:4 etc
complete.

i) x direction Walls 2 6.250 3.500 43.750


ii) 2 4.150 3.500 29.050
y direction Walls
For Parapet Wall 0 18.000 0.900 0.000
0 10.600 0.900 0.000
Deductions
As per internal Plaster -2.509
Total 70.291
Say 71.000
Providing and applying two coats of water
proof cement paint and one coat primer
18 Qty. same as per item no.17 71.000 Sq.m
of approved manufacturer & colour to the
plastered surface etc complete.

Say 71.000
Providing and applying washable oil bound
distemper of approved colour shade and
19 quality to old/new surface in two coats etc Qty. same as per item no.17 71.000 Sq.m
complete.

Say 71.000
Providing & fixing Glazed Aluminium
Casement door and shutter etc complete.
20 Sq.m

D 1 1.2 2.400 2.88


D1 1 0.75 2.100 1.575

4.455
say 4.5 Sq.m
Supplying & fixing in position anodised
21 extruded modular aluminium section Two track Sq.m
sliding window etc complete.

W 0 1.200 1.200 0.000


W1 0 1.000 1.200 0.000
V 0 0.700 0.900 0.000

Total 0.000
Say 0.000 Sq.m

22 Providing & Laying in flooring etc complete. Sq


Office 1 6.0 3.9 23.400
Say 24.000 sq.m
Providing & Laying in skirting of approved
23 material etc complete.
Office 2 10.2 0.100 2.040
2 5.1 0.100 1.020
DEDUCTIONS
D 1 1.200 0.100 -0.120
D1 1 0.750 0.100 -0.075
2.865
Say 3.000 sq.m
24 P & L 6mm thk. Chequred plate
1 8.5 0.450 3.825
1 8.4 0.200 1.680

Say 5.600 sq.m

Providing and laying in situ Ready Mix


cement concrete M-10 grade using design
mix with minimum cement content as per IS
25 456 with maximum water cement ratio 0.6
using maximum 25/30 mm size and down
trap metal for Internal Cable ternch etc
complete.
1 8.500 0.100 1.450 1.233
1 8.400 0.100 1.200 1.008
total 2.241
say 3.000 cu.m

providing & Laying 22GX12mm Chicken wire


26
mesh for all Wall, flooring & roof.
Ceiling, floor 2 8.700 3.500 60.900
Wall in x direction 2 8.700 3.000 52.200
wall in y direction 2 3.500 3.000 21.000
total 134.100
say 135.000 Sq.m

27 Plumbing
28 Electrical
29 HVAC (if any)
30 Contingencies
31 Water Charges
32 Contractor Profit
L B D1 D/H
Fdn PCC PCC Col Col Col Col Col Ht above Excavation
Discription Nos
Depth Depth Offset Offset Nos Length Width GL (M3)
mt mt mt mt

F1 6 1.6 1.2 0.3 0.3 1.5 0.075 0.075 0 1 0.3 0.4 0.15 22.33
0 3 3.5 0.3 0.475 2.5 0.075 0.075 0.475 1 0.35 0.6 0.5 0.00
0 2.7 2.9 0.3 0.4 2.5 0.075 0.075 0.4 1 0.35 0.45 0.5 0.00
0 2.6 2.8 0.3 0.4 2.5 0.075 0.075 0.4 1 0.35 0.45 0.5 0.00
0 2.6 2.6 0.3 0.4 2.5 0.075 0.075 0.4 1 0.35 0.6 0.5 0.00
0 2.1 2.3 0.3 0.4 2.5 0.075 0.075 0.4 1 0.35 0.45 0.5 0.00
0 1.5 1.8 0.3 0.45 2.5 0.075 0.075 0.45 1 0.35 0.45 0.5 0.00
0 3 3.5 0.3 0.475 2.5 0.075 0.075 0.475 1 0.35 0.35 0.5 0.00
0 1.7 1.7 0.15 0.375 3 0.075 0.075 0.375 1 0.35 0.35 0.3 0.00
0 1.4 1.4 0.15 0.375 3 0.075 0.075 0.375 1 0.35 0.35 0.3 0.00
0 1.6 1.6 0.15 0.4 3 0.075 0.075 0.4 1 0.35 0.35 0.3 0.00
0 1.7 1.7 0.25 0.25 1.5 0.075 0.075 0 1 0.6 0.6 0.3 0.00
0 1.5 1.5 0.25 0.25 1.5 0.075 0.075 0 1 0.5 0.5 0.3 0.00
0 1.4 1.4 0.25 0.25 1.5 0.075 0.075 0 1 0.55 0.55 0.3 0.00
0 1.75 1.75 0.25 0.25 1.5 0.075 0.075 0 1 0.6 0.6 0.3 0.00
0 0 0 0 0 0 0 0 0 0 0 0 0 0.00
0 1.5 1.5 0.25 0.25 1.5 0.075 0.075 0 1 0.55 0.55 0.3 0.00
0 0 0 0 0 0 0 0 0 0 0 0 0 0.00
0 0 0 0 0 0 0 0 0 0 0 0 0 0.00
TOTAL QUANTITY = 22.33
PCC VOL CONC VOL Formwork Backfill
(M3) (M3) Qty. (M2) (M3)

1.06 3.46 21.42 17.81


0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
1.06 3.46 21.42 17.81
LT EQUIPMENT FOUNDATION BOQ
REF.
Excavation PCC VOL CONC Formwork Backfill REINF. Qty
Discription DRG. Nos
(M3) (M3) VOL (M3) Qty. (M2) (M3) (Mton)
NO.

CT 1 3.54 0.17 0.84 4.45 2.53


PT 1 3.54 0.17 0.84 4.45 2.53
LA 1 3.54 0.17 0.84 4.45 2.53
CB C/ENGG/TUM/72.5/EQP/FDN/10
1 6.70 0.32 2.64 11.40 3.74
EQPT CB BOX 1 0.76 0.06 0.24 3.20 0.47
FDN BPI 1 3.54 0.17 0.84 4.45 2.53 1.71
(72.5KV) ISO 2 11.17 0.53 2.80 15.60 7.84

A2 STR C/ENGG/BIDADI/DP/FDN/01
1 19.85 0.95 5.50 10.56 13.41
52.66 2.53 14.55 58.56 35.58 1.71
NOTE: Quantities are estimated assuming plinth level 300mm above
FGL. Quantities may vary if plinth level vary as per site condition.
DESCRIPTION NOS NOS OF BAR LENGTH DIAMETR LENGTH OF BAR
(Mt) MM 8 10 12 16 20 25 28 30 32 36 40
EQUIPMENT FDN 72.5KV
CT 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 7 1.5 10 0 10.5 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 7 1.5 10 0 10.5 0 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 7 1.5 10 0 10.5 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 7 1.5 10 0 10.5 0 0 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 1 8 2.1 12 0 0 16.8 0 0 0 0 0 0 0 0
MAIN BAR 0 0 2.1 12 0 0 0 0 0 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 1 10 1.75 8 17.5 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 10 1.5 8 15 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12.8395 25.92593 14.933 0 0 0 0 0 0 0 0

PT 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 7 1.5 10 0 10.5 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 7 1.5 10 0 10.5 0 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 7 1.5 10 0 10.5 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 7 1.5 10 0 10.5 0 0 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 1 8 2.1 12 0 0 16.8 0 0 0 0 0 0 0 0
MAIN BAR 1 0 2.1 12 0 0 0 0 0 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 1 10 1.75 8 17.5 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 10 1.5 8 15 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
LA 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 7 1.5 10 0 10.5 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 7 1.5 10 0 10.5 0 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 7 1.5 10 0 10.5 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 7 1.5 10 0 10.5 0 0 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 1 8 2.1 12 0 0 16.8 0 0 0 0 0 0 0 0
MAIN BAR 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 1 9 1.95 8 17.55 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 18 0.75 8 13.5 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BPI 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 7 1.5 10 0 10.5 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 7 1.5 10 0 10.5 0 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 7 1.5 10 0 10.5 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 7 1.5 10 0 10.5 0 0 0 0 0 0 0 0 0

COLUMN
MAIN BAR 1 8 2.1 12 0 0 16.8 0 0 0 0 0 0 0 0
MAIN BAR 0 0 2.1 12 0 0 0 0 0 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 1 10 1.75 8 17.5 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 10 1.5 8 15 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

ISO 2
FOUNDATION
BOTTOM BAR
ALONG LENGTH 2 7 2.15 10 0 30.1 0 0 0 0 0 0 0 0 0
ALONG WIDTH 2 9 1.65 10 0 29.7 0 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 2 7 2.15 10 0 30.1 0 0 0 0 0 0 0 0 0
ALONG WIDTH 2 9 1.65 10 0 29.7 0 0 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 4 8 2.1 12 0 0 67.2 0 0 0 0 0 0 0 0
MAIN BAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 4 10 1.75 8 70 0 0 0 0 0 0 0 0 0 0
SEC TIE 4 10 1.5 8 60 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
51.358 73.82716 59.733 0 0 0 0 0 0 0 0
A2 STR 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 2 26 3.6 16 0 0 0 187.2 0 0 0 0 0 0 0
ALONG WIDTH 2 26 3.6 16 0 0 0 187.2 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 2 15 3.6 12 0 0 108 0 0 0 0 0 0 0 0
ALONG WIDTH 2 15 3.6 12 0 0 108 0 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 2 8 2.25 16 0 0 0 36 0 0 0 0 0 0 0
MAIN BAR 2 8 2.25 20 0 0 0 0 36 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 2 9 3.75 8 67.5 0 0 0 0 0 0 0 0 0 0
SEC TIE 2 18 2.85 8 102.6 0 0 0 0 0 0 0 0 0 0
SEC TIE 2 18 1.05 8 37.8 0 0 0 0 0 0 0 0 0 0

CB 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 6 3.15 10 0 18.9 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 13 1.35 10 0 17.55 0 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 6 3.15 10 0 18.9 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 13 1.35 10 0 17.55 0 0 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 2 12 2 12 0 0 48 0 0 0 0 0 0 0 0
MAIN BAR 0 0 2.4 12 0 0 0 0 0 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 2 10 2.75 8 55 0 0 0 0 0 0 0 0 0 0
SEC TIE 2 20 1.89 8 75.6 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 20 2.79 8 0 0 0 0 0 0 0 0 0 0 0
CB MARSHLING BOX
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 3 3.15 10 0 9.45 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 13 0.7 10 0 9.1 0 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 0 6 1.15 8 0 0 0 0 0 0 0 0 0 0 0
ALONG WIDTH 0 6 1.15 8 0 0 0 0 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 0 12 1.55 8 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 0 12 1.55 8 0 0 0 0 0 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 0 10 1.25 8 0 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 10 1.25 8 0 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 10 2.31 8 0 0 0 0 0 0 0 0 0 0 0
51.5951 56.45062 42.667 0 0 0 0 0 0 0 0

TOTAL WEIGHT OF BAR = 261.24 295.56 420.51 648.54 88.89 0 0 0 0 0 0

TOTAL STEEL QUANTITY = 1714.74 KG


1.71 Mton
132kV Equipment & Tower foundation BOQ
L B D1 D/H lc bc
Reference Fdn PCC PCC Col Col Col Col Col Ht Excavation
Discription Nos
drg. No Depth Depth Offset Offset Nos Length Width above GL (M3)
mt mt mt mt mt mt

132kV LA E/S/C/-695 1 1.2 1.2 0.3 0.3 1.2 0.05 0.05 0 1 0.8 0.8 0.30 2.11
KX809-MGI-
132kV CB 1 3.5 1 0.3 0.3 2 0.075 0.075 0 2 0.8 0.45 0.30 8.71
C4-006
132kV SINGLE BPI E/S/C/-710 1 1.4 1.4 0.25 0.25 1.2 0.05 0.05 0 1 0.6 0.6 0.30 2.81
132kV HI LEVEL
E/S/C/-742 1 1.6 1.6 0.25 0.25 1.45 0.05 0.05 0 1 0.7 0.7 0.30 4.34
SINGLE BPI
132kV, 1250A ISO. E/S/C/-765 2 1 2.5 0.25 0.25 1.2 0.05 0.05 0 4 0.4 0.4 0.30 7.15
132kV, 1250A ISO.
E/S/C/-765 1 0.5 0.8 1.25 0 0 0 0 0 1 0 0 0.00 0.00
(PEDESTAL)
(766)-132kV, 2000A
E/S/C/-766 1 4.2 1.5 0.3 0.3 1.45 0.05 0.05 0 4 0.6 0.6 0.30 10.32
ISO.
132kV, 2000A ISO.
E/S/C/-766 1 0.5 0.75 1.45 0 0 0 0 0 1 0 0 0.00 0.00
(PEDESTAL)
132kV PT E/S/C/-785 1 1.25 1.25 0.2 0.2 1.2 0.05 0.05 0 1 0.8 0.8 0.30 2.28
132kV CT E/S/C/-786 1 1.25 1.25 0.2 0.2 1.2 0.05 0.05 0 1 0.8 0.8 0.30 2.28
132kV, 1250A LOW
E/S/C/-800 1 2.5 1.5 0.3 0.3 1.2 0.05 0.05 0 6 0.4 0.9 0.30 5.20
LVL. ISO.
132kV, 1250A LOW
E/S/C/-800 1 0.8 0.5 1.35 0 0 0 0 0 0 0 0 0.00 0.00
LVL. ISO. (PEDESTAL)
250kVA ST TRAFO E/S/C/-616 1 2 1.8 0.3 0.3 1.15 0 0 0 2 0.37 1.8 1.45 4.14
132kV A FRAME E/S/C/-718 1 1.7 1.7 0.35 0.35 2.0 0.05 0.05 0 4 0.5 0.5 0.30 6.64
132kV Gantry Tower E/S/C/-758 1 4.0 4.8 0.4 0.4 2.0 0.05 0.05 0 4 0.6 0.6 0.30 41.18

TOTAL QTY. = 97.16

NOTE: Quantities are estimated assuming plinth level 300mm above FGL. Quantities may vary if plinth level vary as per site condition.
ent & Tower foundation BOQ
PCC VOL CONC Formwork Backfill REINF. Qty
(M3) VOL (M3) Qty. (M2) (M3) (KG)

0.08 1.20 5.28 0.83 61.82


0.31 2.49 12.70 5.91 0
0.11 0.94 4.40 1.76 54.54
0.14 1.38 5.80 2.82 73.21
0.29 2.85 19.50 4.01 201.79
0.00 0.50 3.25 0.00
0.34 3.98 17.34 6.00 248.74
0.00 0.54 3.63 0.00
0.09 1.14 5.16 1.04 63.27
0.09 1.14 5.16 1.04 63.27

0.21 3.72 21.12 1.28 125.02

0.00 0.54 3.51 0.00


0.00 4.14 22.24 0.00 218.47
0.16 2.96 17.98 3.52 101.38
1.00 10.42 25.28 29.76 641.5

2.84 37.94 172.35 57.96 1853.01

ry if plinth level vary as per site condition.


DESCRIPTION NOS NOS OF BAR LENGTH DIAMETR LENGTH OF BAR
(Mt) MM 8 10 12 16 20 25 28 30

(695)-120kV LA 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 7 1.4 10 0 9.8 0 0 0 0 0 0
ALONG WIDTH 1 7 1.4 10 0 9.8 0 0 0 0 0 0
TOP BAR
ALONG LENGTH 1 7 1.4 10 0 9.8 0 0 0 0 0 0
ALONG WIDTH 1 7 1.4 10 0 9.8 0 0 0 0 0 0

COLUMN
MAIN BAR 1 8 2.0 16 0 0 0 16 0 0 0 0
MAIN BAR 0 0 0 0 0 0 0 0 0 0 0 0
TIES
MASTER RING 1 6 3 8 18 0 0 0 0 0 0 0
SEC TIE 1 6 2.2 8 13.2 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0

TOTAL WEIGHT OF BAR = 12.33 24.2 0 25.29 0 0 0 0

(710)-132kV SINGLE BPI 1


FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 9 1.5 10 0 13.5 0 0 0 0 0 0
ALONG WIDTH 1 9 1.5 10 0 13.5 0 0 0 0 0 0
TOP BAR
ALONG LENGTH 1 9 1.5 10 0 13.5 0 0 0 0 0 0
ALONG WIDTH 1 9 1.5 10 0 13.5 0 0 0 0 0 0

COLUMN
MAIN BAR 1 8 1.7 12 0 0 13.6 0 0 0 0 0
MAIN BAR 0 0 0 0 0 0 0 0 0 0 0 0
TIES
MASTER RING 1 6 2.2 8 13.2 0 0 0 0 0 0 0
SEC TIE 1 6 1.64 8 9.84 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0

TOTAL WEIGHT OF BAR = 9.11 33.34 12.09 0 0 0 0 0

(733)-1000/555 33kV CT & 1500/111 33kV CT 1


FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 7 1.2 10 0 8.4 0 0 0 0 0 0
ALONG WIDTH 1 7 1.2 10 0 8.4 0 0 0 0 0 0
TOP BAR
ALONG LENGTH 1 7 1.2 10 0 8.4 0 0 0 0 0 0
ALONG WIDTH 1 7 1.2 10 0 8.4 0 0 0 0 0 0

COLUMN
MAIN BAR 1 8 1.8 12 0 0 14 0 0 0 0 0
MAIN BAR 0 0 0 0 0 0 0 0 0 0 0 0
TIES
MASTER RING 1 6 2.6 8 15.6 0 0 0 0 0 0 0
SEC TIE 1 6 1.9 8 11.4 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0

TOTAL WEIGHT OF BAR = 10.66667 20.74074 12.44444 0 0 0 0 0

(742)-132kV HI LEVEL SINGLE BPI 1


FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 11 1.7 10 0 18.7 0 0 0 0 0 0
ALONG WIDTH 1 11 1.7 10 0 18.7 0 0 0 0 0 0
TOP BAR
ALONG LENGTH 1 11 1.7 10 0 18.7 0 0 0 0 0 0
ALONG WIDTH 1 11 1.7 10 0 18.7 0 0 0 0 0 0
COLUMN
MAIN BAR 1 8 2.05 12 0 0 16.4 0 0 0 0 0
MAIN BAR 0 0 0 0 0 0 0 0 0 0 0 0
TIES
MASTER RING 1 7 2.6 8 18.2 0 0 0 0 0 0 0
SEC TIE 1 7 1.9 8 13.3 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0

TOTAL WEIGHT OF BAR = 12.45 46.18 14.58 0 0 0 0 0

(751)-33kV LOW LEVEL BPI 1


FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 13 1.4 10 0 18.2 0 0 0 0 0 0
ALONG WIDTH 1 7 2.6 10 0 18.2 0 0 0 0 0 0
TOP BAR
ALONG LENGTH 1 13 1.4 10 0 18.2 0 0 0 0 0 0
ALONG WIDTH 1 7 2.6 10 0 18.2 0 0 0 0 0 0

COLUMN
MAIN BAR 2 8 1.8 12 0 0 28.8 0 0 0 0 0
MAIN BAR 0 0 0 0 0 0 0 0 0 0 0 0
TIES
MASTER RING 2 6 1.3 8 15.6 0 0 0 0 0 0 0
SEC TIE 2 6 1.3 8 15.6 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0

TOTAL WEIGHT OF BAR = 12.33 44.94 25.6 0 0 0 0 0

(752)-33kV HIGH LEVEL COMPOSITE BPI 1

FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 14 1.5 10 0 21 0 0 0 0 0 0
ALONG WIDTH 1 9 2.5 10 0 22.5 0 0 0 0 0 0
TOP BAR
ALONG LENGTH 1 14 1.5 10 0 21 0 0 0 0 0 0
ALONG WIDTH 1 9 2.5 10 0 22.5 0 0 0 0 0 0

COLUMN
MAIN BAR 2 8 1.8 12 0 0 28.8 0 0 0 0 0
MAIN BAR 0 0 0 0 0 0 0 0 0 0 0 0
TIES
MASTER RING 2 6 1.3 8 15.6 0 0 0 0 0 0 0
SEC TIE 2 6 1.3 8 15.6 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0

TOTAL WEIGHT OF BAR = 12.33 53.71 25.6 0 0 0 0 0

(765)-132kV, 1250A ISO. 1

FOUNDATION
BOTTOM BAR
ALONG LENGTH 2 14 1.2 10 0 33.6 0 0 0 0 0 0
ALONG WIDTH 2 6 2.7 10 0 32.4 0 0 0 0 0 0
TOP BAR
ALONG LENGTH 2 14 1.2 10 0 33.6 0 0 0 0 0 0
ALONG WIDTH 2 6 2.7 10 0 32.4 0 0 0 0 0 0

COLUMN
MAIN BAR 4 8 1.7 16 0 0 0 54.4 0 0 0 0
PEDESTAL 1 6 1.75 12 0 0 10.5 0 0 0 0 0
TIES
MASTER RING 4 6 1.35 8 32.4 0 0 0 0 0 0 0
SEC TIE 4 6 0.6 8 14.4 0 0 0 0 0 0 0
SEC TIE 1 7 2.35 8 16.45 0 0 0 0 0 0 0

TOTAL WEIGHT OF BAR = 24.99 81.49 9.34 85.97 0 0 0 0

DVC
(766)-132kV, 2000A ISO. 1

FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 34 1.7 12 0 0 57.8 0 0 0 0 0
ALONG WIDTH 1 12 4.4 12 0 0 52.8 0 0 0 0 0
TOP BAR
ALONG LENGTH 1 34 1.7 10 0 57.8 0 0 0 0 0 0
ALONG WIDTH 1 12 4.4 10 0 52.8 0 0 0 0 0 0

COLUMN
MAIN BAR 2 8 2.05 16 0 0 0 32.8 0 0 0 0
PEDESTAL 0.5 6 2 12 0 0 6 0 0 0 0 0
TIES
MASTER RING 2 7 2.15 8 30.1 0 0 0 0 0 0 0
SEC TIE 2 7 1.56 8 21.84 0 0 0 0 0 0 0
SEC TIE 0.5 10 2.25 8 11.25 0 0 0 0 0 0 0

TOTAL WEIGHT OF BAR = 24.97 68.28 103.65 51.84 0 0 0 0

DVC
(785)-132kV PT 1

FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 7 1.5 10 0 10.5 0 0 0 0 0 0
ALONG WIDTH 1 7 1.5 10 0 10.5 0 0 0 0 0 0
TOP BAR
ALONG LENGTH 1 7 1.5 10 0 10.5 0 0 0 0 0 0
ALONG WIDTH 1 7 1.5 10 0 10.5 0 0 0 0 0 0

COLUMN
MAIN BAR 1 8 2 16 0 0 0 16 0 0 0 0

TIES
MASTER RING 1 6 2.95 8 17.7 0 0 0 0 0 0 0
SEC TIE 1 6 2.13 8 12.78 0 0 0 0 0 0 0

TOTAL WEIGHT OF BAR = 12.05 25.93 0 25.29 0 0 0 0

DVC
(786)-132kV CT 1

FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 7 1.5 10 0 10.5 0 0 0 0 0 0
ALONG WIDTH 1 7 1.5 10 0 10.5 0 0 0 0 0 0
TOP BAR
ALONG LENGTH 1 7 1.5 10 0 10.5 0 0 0 0 0 0
ALONG WIDTH 1 7 1.5 10 0 10.5 0 0 0 0 0 0

COLUMN
MAIN BAR 1 8 2 16 0 0 0 16 0 0 0 0

TIES
MASTER RING 1 6 2.95 8 17.7 0 0 0 0 0 0 0
SEC TIE 1 6 2.13 8 12.78 0 0 0 0 0 0 0

TOTAL WEIGHT OF BAR = 12.05 25.93 0 25.29 0 0 0 0

(800)-132kV, 1250A LOW LVL. ISO. 1


FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 20 1.7 10 0 34 0 0 0 0 0 0
ALONG WIDTH 1 12 2.7 10 0 32.4 0 0 0 0 0 0
TOP BAR
ALONG LENGTH 1 15 1.7 10 0 25.5 0 0 0 0 0 0
ALONG WIDTH 1 9 2.7 10 0 24.3 0 0 0 0 0 0
COLUMN
MAIN BAR 2 6 2.0 12 0 0 24 0 0 0 0 0
PEDESTAL 1 6 2.15 12 0 0 12.9 0 0 0 0 0
TIES
MASTER RING 2 6 2.35 8 28.2 0 0 0 0 0 0 0
SEC TIE 2 6 0.6 8 7.2 0 0 0 0 0 0 0
SEC TIE 1 7 2.35 8 16.45 0 0 0 0 0 0 0

TOTAL WEIGHT OF BAR = 20.49 71.73 32.8 0 0 0 0 0

DVC
(616)-250kV ST TRAFO 1

FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 11 2 10 0 22 0 0 0 0 0 0
ALONG WIDTH 1 12 2.2 10 0 26.4 0 0 0 0 0 0
TOP BAR
ALONG LENGTH 1 11 2 10 0 22 0 0 0 0 0 0
ALONG WIDTH 1 12 2.2 10 0 26.4 0 0 0 0 0 0

COLUMN
MAIN BAR 2 23 3.1 10 0 142.6 0 0 0 0 0 0

TIES
MASTER RING 2 14 4.09 10 0 114.52 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0

TOTAL WEIGHT OF BAR = 0 218.47 0 0 0 0 0 0

(718)132kV A FRAME 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 14 1.9 10 0 26.6 0 0 0 0 0 0
ALONG WIDTH 1 14 1.9 10 0 26.6 0 0 0 0 0 0
TOP BAR
ALONG LENGTH 1 10 1.9 10 0 19 0 0 0 0 0 0
ALONG WIDTH 1 10 1.9 10 0 19 0 0 0 0 0 0

COLUMN
MAIN BAR 1 8 2.8 16 0 0 0 22.4 0 0 0 0
MAIN BAR 0 0 0 0 0 0 0 0 0 0 0 0
TIES
MASTER RING 1 10 1.75 8 17.5 0 0 0 0 0 0 0
SEC TIE 1 10 0.7 8 7 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0

TOTAL WEIGHT OF BAR = 9.68 56.3 0 35.4 0 0 0 0

(758)132kV GT 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 32 5.0 12 0 0 160 0 0 0 0 0
ALONG WIDTH 1 28 4.2 12 0 0 117.6 0 0 0 0 0
TOP BAR
ALONG LENGTH 1 32 5.0 10 0 160 0 0 0 0 0 0
ALONG WIDTH 1 28 4.2 10 0 117.6 0 0 0 0 0 0

COLUMN
MAIN BAR 4 4 2.8 20 0 0 0 0 44.8 0 0 0
MAIN BAR 4 4 2.8 16 0 0 0 44.8 0 0 0 0
TIES
MASTER RING 4 9 2.15 8 77.4 0 0 0 0 0 0 0
SEC TIE 4 9 0.8 8 28.8 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL WEIGHT OF BAR = 41.96 171.36 246.76 70.8 110.62 0 0 0

(762)33kV ISO 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 10 1.1 10 0 11 0 0 0 0 0 0
ALONG WIDTH 1 6 2 10 0 12 0 0 0 0 0 0
TOP BAR
ALONG LENGTH 1 10 1.1 10 0 11 0 0 0 0 0 0
ALONG WIDTH 1 6 2 10 0 12 0 0 0 0 0 0

COLUMN
MAIN BAR 1 10 2 12 0 0 20 0 0 0 0 0
MAIN BAR 0 0 0 0 0 0 0 0 0 0 0 0
TIES
MASTER RING 1 8 2.4 8 19.2 0 0 0 0 0 0 0
SEC TIE 1 8 2.4 8 19.2 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0

TOTAL WEIGHT OF BAR = 15.18 28.4 17.78 0 0 0 0 0

(764)33kV.1250A ISO 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 17 3.5 12 0 0 59.5 0 0 0 0 0
ALONG WIDTH 1 17 3.5 12 0 0 59.5 0 0 0 0 0
TOP BAR
ALONG LENGTH 1 17 3.5 12 0 0 59.5 0 0 0 0 0
ALONG WIDTH 1 17 3.5 12 0 0 59.5 0 0 0 0 0

COLUMN
MAIN BAR 2 16 2.8 16 0 0 0 89.6 0 0 0 0
MAIN BAR 0 0 0 0 0 0 0 0 0 0 0 0
TIES
MASTER RING 2 45 2.2 8 198 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0

TOTAL WEIGHT OF BAR = 78.23 0 211.56 141.6 0 0 0 0


32 36 40

0 0 0
0 0 0

0 0 0
0 0 0

0 0 0
0 0 0

0 0 0
0 0 0
0 0 0

0 0 0

0 0 0
0 0 0

0 0 0
0 0 0

0 0 0
0 0 0

0 0 0
0 0 0
0 0 0

0 0 0

0 0 0
0 0 0

0 0 0
0 0 0

0 0 0
0 0 0

0 0 0
0 0 0
0 0 0

0 0 0

0 0 0
0 0 0

0 0 0
0 0 0
0 0 0
0 0 0

0 0 0
0 0 0
0 0 0

0 0 0

0 0 0
0 0 0

0 0 0
0 0 0

0 0 0
0 0 0

0 0 0
0 0 0
0 0 0

0 0 0

0 0 0
0 0 0
0 0 0
0 0 0

0 0 0
0 0 0

0 0 0
0 0 0
0 0 0

0 0 0

0 0 0
0 0 0

0 0 0
0 0 0

0 0 0
0 0 0

0 0 0
0 0 0
0 0 0

0 0 0
0 0 0
0 0 0

0 0 0
0 0 0

0 0 0
0 0 0

0 0 0
0 0 0
0 0 0

0 0 0

0 0 0
0 0 0

0 0 0
0 0 0

0 0 0

0 0 0
0 0 0

0 0 0

0 0 0
0 0 0

0 0 0
0 0 0

0 0 0

0 0 0
0 0 0

0 0 0

0 0 0
0 0 0

0 0 0
0 0 0
0 0 0
0 0 0

0 0 0
0 0 0
0 0 0

0 0 0

0 0 0
0 0 0

0 0 0
0 0 0

0 0 0

0 0 0
0 0 0

0 0 0
0 0 0
0 0 0

0 0 0
0 0 0

0 0 0
0 0 0

0 0 0
0 0 0
0 0 0

0 0 0

0 0 0
0 0 0

0 0 0
0 0 0

0 0 0
0 0 0

0 0 0
0 0 0
0 0 0
0 0 0

0 0 0
0 0 0

0 0 0
0 0 0

0 0 0
0 0 0

0 0 0
0 0 0
0 0 0

0 0 0

0 0 0
0 0 0

0 0 0
0 0 0

0 0 0
0 0 0

0 0 0
0 0 0
0 0 0

0 0 0
220 kV TOWER & EQUIPMENT FOUNDATION BOQ
REF. L B D1 D/H lc bc
Fdn PCC PCC Col Col Col Col Col Ht
Discription DRG. Nos
Depth Depth Offset Offset Nos Length Width above GL
NO. mt mt mt mt mt mt

CA 1 6 5 0.2 0.5 3.4282 2.4282 2.5 0.075 0.075 0.5 4 0.5 0.5 0.3

CB C/ENGG/STD/TOW/220/FDN/02A
1 7.2 6.2 0.2 0.6 3.4128 2.4138 2.5 0.075 0.075 0.6 4 0.6 0.6 0.3

CC 1 2.6 2.1 0.2 0.5 2.5 0.075 0.075 0.5 1 0.5 0.5 0.3

CD 1 3.2 3.2 0.2 0.5 2.5 0.075 0.075 0.5 1 0.5 0.5 0.3

CE C/ENGG/STD/TOW/220/FDN/02
1 2.8 2.8 0.2 0.5 2.5 0.075 0.075 0.5 1 0.5 0.5 0.3
CTA 1 6.6 5.6 0.2 0.5 3.4168 2.4168 2.5 0.075 0.075 0.5 4 0.6 0.6 0.3
CTB 1 7.7 6.7 0.2 0.6 3.4108 2.4108 2.5 0.075 0.075 0.6 4 0.6 0.6 0.3
CTC C/ENGG/STD/TOW/220/FDN/02A
1 7.4 7.4 0.2 0.6 3.4108 3.4108 2.5 0.075 0.075 0.6 4 0.6 0.6 0.3

TOWER
CTD 1 3.2 2.2 0.2 0.5 2.5 0.075 0.075 0.5 1 0.5 0.5 0.3
FDN
(220 KV)
CTE C/ENGG/STD/TOW/220/FDN/02
1 3.3 3.3 0.2 0.5 2.5 0.075 0.075 0.5 1 0.6 0.6 0.3

CTF C/ENGG/STD/TOW/220/FDN/02A
1 6.7 6.7 0.2 0.6 3.4138 3.4138 2.5 0.075 0.075 0.6 4 0.6 0.6 0.3

CTG 1 2.4 2 0.2 0.45 2.5 0.075 0.075 0.45 1 0.5 0.5 0.3

CTH C/ENGG/STD/TOW/220/FDN/02
1 3.35 2.35 0.2 0.5 2.5 0.075 0.075 0.5 1 0.5 0.5 0.3
CTI C/ENGG/STD/TOW/220/FDN/02A
1 6.5 6.5 0.2 0.5 3.4168 3.4168 2.5 0.075 0.075 0.5 4 0.6 0.6 0.3
CT 1 1.7 1.7 0.25 0.25 1.5 0.075 0.075 0 1 0.6 0.6 0.3
LA 1 1.5 1.5 0.25 0.25 1.5 0.075 0.075 0 1 0.5 0.5 0.3
EQPT FDN
CVT 1 1.4 1.4 0.25 0.25 1.5 0.075 0.075 0 1 0.55 0.55 0.3
(220 KV)
BPI 1 1.75 1.75 0.25 0.25 1.5 0.075 0.075 0 1 0.6 0.6 0.3
ISO C/ENGG/STD/EQP/220/FDN/02
1 1.5 1.5 0.25 0.25 1.5 0.075 0.075 0 1 0.55 0.55 0.3
TOTAL QTY =

NOTE:
(1) Quantities are estimated assuming plinth level 300mm above FGL. Quantities may vary if plinth level vary as per site condition.
(2) Quantity of Tower & Equipments are estimated from the layout & SLD provided by PGCIL.
WER & EQUIPMENT FOUNDATION BOQ
PCC REINF.
Excavation CONC Formwork Backfill
VOL Qty
(M3) VOL (M3) Qty. (M2) (M3)
(M3) (Mton)

81.56 2.38 15.65 22.80 63.54

120.18 3.50 25.15 26.48 91.53

15.93 0.46 2.79 6.48 12.68

28.90 0.84 4.35 7.16 23.70

22.41 0.65 3.57 6.84 18.18


99.94 2.91 19.14 26.96 77.89
138.46 4.03 27.78 26.88 106.66
146.78 4.28 30.18 27.04 112.32

20.27 0.59 3.31 6.76 16.37

30.65 0.89 4.88 8.16 24.88


19.63

120.83 3.52 26.41 26.48 90.89

14.12 0.41 2.37 6.46 11.34

22.53 0.66 3.58 6.88 18.29


113.87 3.32 21.76 27.28 88.79
5.39 0.26 1.28 5.42 3.85
4.29 0.20 0.95 4.60 3.13
3.78 0.18 0.96 4.81 2.64
5.69 0.27 1.32 5.47 4.09
4.29 0.20 1.03 4.91 3.05
999.87 29.56 196.47 257.87 773.84 19.63

may vary if plinth level vary as per site condition.


d by PGCIL.
DESCRIPTION NOS NOS OF BAR LENGTH DIAMETR LENGTH OF BAR
(Mt) MM 8 10 12 16 20 25 28 30 32 36 40
TOWER FDN 220KV
CA 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 29 5.2 12 0 0 150.8 0 0 0 0 0 0 0 0
ALONG WIDTH 1 35 6.2 12 0 0 217 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 29 5.3 12 0 0 153.7 0 0 0 0 0 0 0 0
ALONG WIDTH 1 35 6.3 12 0 0 220.5 0 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 4 8 3.4 25 0 0 0 0 0 108.8 0 0 0 0 0
MAIN BAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 4 11 1.75 8 77 0 0 0 0 0 0 0 0 0 0
SEC TIE 4 22 0.7 8 61.6 0 0 0 0 0 0 0 0 0 0

CB 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 42 6.4 12 0 0 268.8 0 0 0 0 0 0 0 0
ALONG WIDTH 1 49 7.4 12 0 0 362.6 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 42 6.5 12 0 0 273 0 0 0 0 0 0 0 0
ALONG WIDTH 1 49 7.5 12 0 0 367.5 0 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 4 4 2.8 25 0 0 0 0 0 44.8 0 0 0 0 0
MAIN BAR 4 8 2.8 20 0 0 0 0 89.6 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 4 10 2.15 8 86 0 0 0 0 0 0 0 0 0 0
SEC TIE 4 20 1.65 8 132 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
CC 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 13 2.3 12 0 0 29.9 0 0 0 0 0 0 0 0
ALONG WIDTH 1 16 2.8 12 0 0 44.8 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 13 2.4 12 0 0 31.2 0 0 0 0 0 0 0 0
ALONG WIDTH 1 16 2.9 12 0 0 46.4 0 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 1 4 2.8 20 0 0 0 0 11.2 0 0 0 0 0 0
MAIN BAR 1 4 2.8 16 0 0 0 11.2 0 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 1 11 1.75 8 19.25 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 22 0.7 8 15.4 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0
CD 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 19 3.4 12 0 0 64.6 0 0 0 0 0 0 0 0
ALONG WIDTH 1 19 3.4 12 0 0 64.6 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 19 3.5 12 0 0 66.5 0 0 0 0 0 0 0 0
ALONG WIDTH 1 19 3.5 12 0 0 66.5 0 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 1 8 2.8 25 0 0 0 0 0 22.4 0 0 0 0 0
MAIN BAR 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 1 11 1.75 8 19.25 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 22 0.7 8 15.4 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0 8 0 0 0 0 0 0 0 0 0 0 0
CE 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 17 3 12 0 0 51 0 0 0 0 0 0 0 0
ALONG WIDTH 1 17 3 12 0 0 51 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 17 3.1 12 0 0 52.7 0 0 0 0 0 0 0 0
ALONG WIDTH 1 17 3.1 12 0 0 52.7 0 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 1 8 2.8 25 0 0 0 0 0 22.4 0 0 0 0 0
MAIN BAR 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 1 11 1.75 8 19.25 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 22 0.7 8 15.4 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0 0 0
CTA 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 33 5.8 12 0 0 191.4 0 0 0 0 0 0 0 0
ALONG WIDTH 1 40 6.8 12 0 0 272 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 33 5.9 12 0 0 194.7 0 0 0 0 0 0 0 0
ALONG WIDTH 1 40 6.9 12 0 0 276 0 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 4 12 2.8 20 0 0 0 0 134.4 0 0 0 0 0 0
MAIN BAR 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 4 11 2.15 8 94.6 0 0 0 0 0 0 0 0 0 0
SEC TIE 4 22 1.65 8 145.2 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0 0 0
CTB 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 34 6.9 16 0 0 0 234.6 0 0 0 0 0 0 0
ALONG WIDTH 1 39 7.9 16 0 0 0 308.1 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 28 7 16 0 0 0 196 0 0 0 0 0 0 0
ALONG WIDTH 1 32 8 16 0 0 0 256 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 4 12 2.8 25 0 0 0 0 0 134.4 0 0 0 0 0
MAIN BAR 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 4 10 2.15 8 86 0 0 0 0 0 0 0 0 0 0
SEC TIE 4 20 1.65 8 132 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0 0 0
CTC 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 47 7.6 16 0 0 0 357.2 0 0 0 0 0 0 0
ALONG WIDTH 1 47 7.6 16 0 0 0 357.2 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 31 7.7 16 0 0 0 238.7 0 0 0 0 0 0 0
ALONG WIDTH 1 31 7.7 16 0 0 0 238.7 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 4 8 2.8 25 0 0 0 0 0 89.6 0 0 0 0 0
MAIN BAR 4 8 2.8 20 0 0 0 0 89.6 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 4 10 2.15 8 86 0 0 0 0 0 0 0 0 0 0
SEC TIE 4 20 1.65 8 132 0 0 0 0 0 0 0 0 0 0
SEC TIE 4 20 0.8 8 64 0 0 0 0 0 0 0 0 0 0
CTD 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 13 2.4 12 0 0 31.2 0 0 0 0 0 0 0 0
ALONG WIDTH 1 19 3.4 12 0 0 64.6 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 13 2.5 12 0 0 32.5 0 0 0 0 0 0 0 0
ALONG WIDTH 1 19 3.5 12 0 0 66.5 0 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 1 4 2.8 25 0 0 0 0 0 11.2 0 0 0 0 0
MAIN BAR 1 4 2.8 20 0 0 0 0 11.2 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 1 11 1.75 8 19.25 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 22 0.7 8 15.4 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0
CTE 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 20 3.5 12 0 0 70 0 0 0 0 0 0 0 0
ALONG WIDTH 1 20 3.5 12 0 0 70 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 20 3.6 12 0 0 72 0 0 0 0 0 0 0 0
ALONG WIDTH 1 20 3.6 12 0 0 72 0 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 1 12 2.8 20 0 0 0 0 33.6 0 0 0 0 0 0
MAIN BAR 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 1 11 2.15 8 23.65 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 22 1.65 8 36.3 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0 0 0
CTF 4
FOUNDATION
BOTTOM BAR
ALONG LENGTH 4 28 6.9 16 0 0 0 772.8 0 0 0 0 0 0 0
ALONG WIDTH 4 28 6.9 16 0 0 0 772.8 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 4 28 7 16 0 0 0 784 0 0 0 0 0 0 0
ALONG WIDTH 4 28 7 16 0 0 0 784 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 16 4 2.8 25 0 0 0 0 0 179.2 0 0 0 0 0
MAIN BAR 16 12 2.8 20 0 0 0 0 537.6 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 16 10 2.15 8 344 0 0 0 0 0 0 0 0 0 0
SEC TIE 16 20 1.65 8 528 0 0 0 0 0 0 0 0 0 0
SEC TIE 20 0.8 8 0 0 0 0 0 0 0 0 0 0 0
CTG 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 11 2.2 12 0 0 24.2 0 0 0 0 0 0 0 0
ALONG WIDTH 1 13 2.6 12 0 0 33.8 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 11 2.3 12 0 0 25.3 0 0 0 0 0 0 0 0
ALONG WIDTH 1 13 2.7 12 0 0 35.1 0 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 1 8 2.8 20 0 0 0 0 22.4 0 0 0 0 0 0
MAIN BAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 1 11 1.75 8 19.25 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 22 0.7 8 15.4 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0 0 0
CTH 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 15 2.55 12 0 0 38.25 0 0 0 0 0 0 0 0
ALONG WIDTH 1 21 3.55 12 0 0 74.55 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 15 2.65 12 0 0 39.75 0 0 0 0 0 0 0 0
ALONG WIDTH 1 21 3.65 12 0 0 76.65 0 0 0 0 0 0 0 0
COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 1 8 2.8 25 0 0 0 0 0 22.4 0 0 0 0 0
MAIN BAR 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 1 11 1.75 8 19.25 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 22 0.7 8 15.4 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0 0 0
CTI 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 38 6.7 12 0 0 254.6 0 0 0 0 0 0 0 0
ALONG WIDTH 1 38 6.7 12 0 0 254.6 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 38 6.8 12 0 0 258.4 0 0 0 0 0 0 0 0
ALONG WIDTH 1 38 6.8 12 0 0 258.4 0 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 4 4 2.8 25 0 0 0 0 0 44.8 0 0 0 0 0
MAIN BAR 4 8 2.8 20 0 0 0 0 89.6 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 4 11 2.15 8 94.6 0 0 0 0 0 0 0 0 0 0
SEC TIE 4 22 1.65 8 145.2 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0 0 0
EQUIPMENT FDN 220KV
CT 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 7 1.85 10 0 12.95 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 7 1.85 10 0 12.95 0 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 7 1.85 10 0 12.95 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 7 1.85 10 0 12.95 0 0 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 1 8 2.15 12 0 0 17.2 0 0 0 0 0 0 0 0
MAIN BAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 1 10 2.15 8 21.5 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 20 0.8 8 16 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0 0 0
LA 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 7 1.65 10 0 11.55 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 7 1.65 10 0 11.55 0 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 7 1.65 10 0 11.55 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 7 1.65 10 0 11.55 0 0 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 1 8 2.15 12 0 0 17.2 0 0 0 0 0 0 0 0
MAIN BAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 1 10 1.75 8 17.5 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 20 0.7 8 14 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0 0 0
CVT 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 6 1.55 10 0 9.3 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 6 1.55 10 0 9.3 0 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 6 1.55 10 0 9.3 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 6 1.55 10 0 9.3 0 0 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 1 8 2.15 12 0 0 17.2 0 0 0 0 0 0 0 0
MAIN BAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 1 10 1.95 8 19.5 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 20 0.75 8 15 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0 0 0
BPI 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 8 1.9 10 0 15.2 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 8 1.9 10 0 15.2 0 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 8 1.9 10 0 15.2 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 8 1.9 10 0 15.2 0 0 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 1 8 2.15 12 0 0 17.2 0 0 0 0 0 0 0 0
MAIN BAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 1 10 2.15 8 21.5 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 20 0.8 8 16 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ISO 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 7 1.65 10 0 11.55 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 7 1.65 10 0 11.55 0 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 7 1.65 10 0 11.55 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 7 1.65 10 0 11.55 0 0 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 1 8 2.15 12 0 0 17.2 0 0 0 0 0 0 0 0
MAIN BAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 1 10 1.95 8 19.5 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 20 0.75 8 15 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL WEIGHT OF BAR = 1047.53 149.51 4896.27 8393.17 2516.55 2623.46 0 0 0 0 0

TOTAL STEEL QUANTITY = 19626.49 KG


19.63 Mton
400 kV TOWER & EQUIPMENT FOUNDATION BOQ
REF. L B D1 D/H lc bc
Fdn PCC PCC Col Col Col Col Col Ht Excavation
Discription DRG. Nos
Depth Depth Offset Offset Nos Length Width above GL (M3)
NO. mt mt mt mt mt mt

TA 1 2.8 2.8 0.2 0.5 3 0.075 0.075 0.5 1 0.6 0.6 0.3 26.76
TB 1 4.2 4.2 0.2 0.6 3 0.075 0.075 0.6 1 0.6 0.6 0.3 58.19
TC 1 2.6 2.2 0.2 0.4 3 0.075 0.075 0.4 1 0.5 0.5 0.3 19.87
C/ENGG/STD/TOW/400/FDN/01
TE 1 3 2.2 0.2 0.45 3 0.075 0.075 0.45 1 0.5 0.5 0.3 22.76
TI 1 3.5 2.75 0.2 0.5 3 0.075 0.075 0.5 1 0.6 0.6 0.3 32.55
TK 1 3.7 3.7 0.2 0.5 3 0.075 0.075 0.5 1 0.6 0.6 0.3 45.58
TH 1 9.5 8.5 0.2 0.7 4.3858 3.3858 3 0.075 0.075 0.7 4 0.6 0.6 0.3 256.68
TOWER TJ 1 9 8 0.2 0.6 4.3888 3.3888 3 0.075 0.075 0.6 4 0.6 0.6 0.3 229.31
FDN
TL 1 9.2 9.2
C/ENGG/STD/TOW/400/FDN/01A 0.2 0.75 4.3858 4.3858 3 0.075 0.075 0.75 4 0.6 0.6 0.3 268.82
(400 KV)
TM 1 8.2 8.2 0.2 0.6 4.4108 4.4108 3 0.075 0.075 0.6 4 0.6 0.6 0.3 214.40
TN 1 8.6 8.6 0.2 0.65 4.3888 4.3888 3 0.075 0.075 0.65 4 0.6 0.6 0.3 235.43

LM C/ENGG/STD/TOW/400/FDN/03
1 3.8 3.8 0.2 0.6 3 0.075 0.075 0.6 1 0.6 0.6 0.3 47.98

CT 1 1.95 1.95 0.25 0.25 1.5 0.075 0.075 0 1 0.7 0.7 0.3 6.95
EQPT LA 1 1.55 1.55 0.25 0.25 1.5 0.075 0.075 0 1 0.55 0.55 0.3 4.55
FDN CVT 1 1.8 1.8 0.25 0.25 1.5 0.075 0.075 0 1 0.6 0.6 0.3 5.99
(400KV) BPI 1 1.85 1.85 0.25 0.25 1.5 0.075 0.075 0 1 0.6 0.6 0.3 6.30
ISO C/ENGG/STD/EQP/400/FDN/01
1 1.7 1.7 0.25 0.25 1.5 0.075 0.075 0 1 0.6 0.6 0.3 5.39
TOTAL QTY = 1487.50

NOTE:
(1) Quantities are estimated assuming plinth level 300mm above FGL. Quantities may vary if plinth level vary as per site condition.
(2) Quantity of Tower & Equipments are estimated from the layout & SLD provided by PGCIL.
R & EQUIPMENT FOUNDATION BOQ
PCC VOL CONC Formwork Backfill REINF. Qty
(M3) VOL (M3) Qty. (M2) (M3) (Mton)

0.65 4.06 8.96 22.04


1.42 8.29 9.84 48.48
0.48 2.57 7.72 16.82
0.56 3.05 7.78 19.16
0.79 4.65 9.22 27.11
1.11 5.96 9.68 38.50
6.26 47.87 32.16 202.55
5.59 38.58 32.72 185.14
6.56 54.77 31.84 207.50
5.23 38.24 32.48 170.93
5.74 43.75 32.32 185.94 25.31

1.17 7.13 9.52 39.68

0.33 1.71 6.29 4.90


0.22 1.07 4.96 3.27
0.29 1.37 5.52 4.34
0.30 1.41 5.57 4.59
0.26 1.28 5.42 3.85
36.96 265.75 252.00 1184.79 25.31

y vary if plinth level vary as per site condition.


PGCIL.
DESCRIPTION NOS NOS OF BAR LENGTH DIAMETR LENGTH OF BAR
(Mt) MM 8 10 12 16 20 25 28 30 32 36 40
TOWER FDN 400KV
TA 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 17 3.1 12 0 0 52.7 0 0 0 0 0 0 0 0
ALONG WIDTH 1 17 3.1 12 0 0 52.7 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 17 3.3 12 0 0 56.1 0 0 0 0 0 0 0 0
ALONG WIDTH 1 17 3.3 12 0 0 56.1 0 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 1 4 3.3 20 0 0 0 0 13.2 0 0 0 0 0 0
MAIN BAR 1 12 3.3 16 0 0 0 39.6 0 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 1 13 2.15 8 27.95 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 26 1.65 8 42.9 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 26 0.65 8 16.9 0 0 0 0 0 0 0 0 0 0

TB 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 29 4.4 16 0 0 0 127.6 0 0 0 0 0 0 0
ALONG WIDTH 1 29 4.4 16 0 0 0 127.6 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 20 4.6 16 0 0 0 92 0 0 0 0 0 0 0
ALONG WIDTH 1 20 4.6 16 0 0 0 92 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 1 4 3.3 28 0 0 0 0 0 0 13.2 0 0 0 0
MAIN BAR 1 12 3.3 25 0 0 0 0 0 39.6 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 1 12 2.15 8 25.8 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 24 1.65 8 39.6 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 24 0.8 8 19.2 0 0 0 0 0 0 0 0 0 0

TC 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 12 2.9 12 0 0 34.8 0 0 0 0 0 0 0 0
ALONG WIDTH 1 13 2.5 12 0 0 32.5 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 12 3.1 12 0 0 37.2 0 0 0 0 0 0 0 0
ALONG WIDTH 1 13 2.7 12 0 0 35.1 0 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 1 12 3.3 20 0 0 0 0 39.6 0 0 0 0 0 0
MAIN BAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 1 13 2.15 8 27.95 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 26 1.65 8 42.9 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0 0 0

TE 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 12 2.4 12 0 0 28.8 0 0 0 0 0 0 0 0
ALONG WIDTH 1 16 3.2 12 0 0 51.2 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 13 2.6 12 0 0 33.8 0 0 0 0 0 0 0 0
ALONG WIDTH 1 18 3.4 12 0 0 61.2 0 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 1 8 3.45 20 0 0 0 0 27.6 0 0 0 0 0 0
MAIN BAR 1 4 3.45 16 0 0 0 13.8 0 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 1 12 1.75 8 21 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 24 1.35 8 32.4 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0 0 0

TI 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 17 2.95 12 0 0 50.15 0 0 0 0 0 0 0 0
ALONG WIDTH 1 21 3.7 12 0 0 77.7 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 20 3.15 12 0 0 63 0 0 0 0 0 0 0 0
ALONG WIDTH 1 24 3.9 12 0 0 93.6 0 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 1 4 3.4 25 0 0 0 0 0 13.6 0 0 0 0 0
MAIN BAR 1 8 3.4 20 0 0 0 0 27.2 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 1 12 2.15 8 25.8 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 24 1.81 8 43.44 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0 0 0

TK 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 22 3.9 16 0 0 0 85.8 0 0 0 0 0 0 0
ALONG WIDTH 1 22 3.9 16 0 0 0 85.8 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 16 4.1 16 0 0 0 65.6 0 0 0 0 0 0 0
ALONG WIDTH 1 16 4.1 16 0 0 0 65.6 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 1 4 3.4 25 0 0 0 0 0 13.6 0 0 0 0 0
MAIN BAR 1 8 3.4 20 0 0 0 0 27.2 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 1 13 2.15 8 27.95 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 26 1.81 8 47.06 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0 0 0

TH 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 49 8.7 20 0 0 0 0 426.3 0 0 0 0 0 0
ALONG WIDTH 1 55 9.7 20 0 0 0 0 533.5 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 46 8.8 16 0 0 0 404.8 0 0 0 0 0 0 0
ALONG WIDTH 1 51 9.8 16 0 0 0 499.8 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 4 4 3.9 28 0 0 0 0 0 0 62.4 0 0 0 0
MAIN BAR 4 12 3.9 25 0 0 0 0 0 187.2 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 4 11 2.15 8 94.6 0 0 0 0 0 0 0 0 0 0
SEC TIE 4 22 1.65 8 145.2 0 0 0 0 0 0 0 0 0 0
SEC TIE 4 22 0.8 8 70.4 0 0 0 0 0 0 0 0 0 0

TJ 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 43 8.2 20 0 0 0 0 352.6 0 0 0 0 0 0
ALONG WIDTH 1 48 9.2 20 0 0 0 0 441.6 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 43 8.3 16 0 0 0 356.9 0 0 0 0 0 0 0
ALONG WIDTH 1 48 9.3 16 0 0 0 446.4 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 4 16 3.9 25 0 0 0 0 0 249.6 0 0 0 0 0
MAIN BAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 4 12 2.15 8 103.2 0 0 0 0 0 0 0 0 0 0
SEC TIE 4 24 1.65 8 158.4 0 0 0 0 0 0 0 0 0 0
SEC TIE 4 24 0.85 8 81.6 0 0 0 0 0 0 0 0 0 0

TL 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 53 9.4 20 0 0 0 0 498.2 0 0 0 0 0 0
ALONG WIDTH 1 53 9.4 20 0 0 0 0 498.2 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 43 9.5 16 0 0 0 408.5 0 0 0 0 0 0 0
ALONG WIDTH 1 43 9.5 16 0 0 0 408.5 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 4 4 3.9 28 0 0 0 0 0 0 62.4 0 0 0 0
MAIN BAR 4 12 3.9 25 0 0 0 0 0 187.2 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 4 11 2.15 8 94.6 0 0 0 0 0 0 0 0 0 0
SEC TIE 4 22 1.65 8 145.2 0 0 0 0 0 0 0 0 0 0
SEC TIE 4 22 0.8 8 70.4 0 0 0 0 0 0 0 0 0 0
TM 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 59 8.4 16 0 0 0 495.6 0 0 0 0 0 0 0
ALONG WIDTH 1 59 8.4 16 0 0 0 495.6 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 55 8.5 12 0 0 467.5 0 0 0 0 0 0 0 0
ALONG WIDTH 1 55 8.5 12 0 0 467.5 0 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 4 12 3.9 25 0 0 0 0 0 187.2 0 0 0 0 0
MAIN BAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 4 12 2.15 8 103.2 0 0 0 0 0 0 0 0 0 0
SEC TIE 4 24 1.81 8 173.76 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0 0 0

TN 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 69 8.8 16 0 0 0 607.2 0 0 0 0 0 0 0
ALONG WIDTH 1 69 8.8 16 0 0 0 607.2 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 35 8.9 16 0 0 0 311.5 0 0 0 0 0 0 0
ALONG WIDTH 1 35 8.9 16 0 0 0 311.5 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 4 4 3.9 28 0 0 0 0 0 0 62.4 0 0 0 0
MAIN BAR 4 12 3.9 25 0 0 0 0 0 187.2 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 4 12 2.15 8 103.2 0 0 0 0 0 0 0 0 0 0
SEC TIE 4 24 1.65 8 158.4 0 0 0 0 0 0 0 0 0 0
SEC TIE 4 24 0.8 8 76.8 0 0 0 0 0 0 0 0 0 0

LM 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 18 4.1 16 0 0 0 73.8 0 0 0 0 0 0 0
ALONG WIDTH 1 18 4.1 16 0 0 0 73.8 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 27 4.4 12 0 0 118.8 0 0 0 0 0 0 0 0
ALONG WIDTH 1 27 4.4 12 0 0 118.8 0 0 0 0 0 0 0 0

COLUMN
MAIN BAR 1 12 3.3 28 0 0 0 0 0 0 39.6 0 0 0 0
MAIN BAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TIES
MASTER RING 1 12 2.15 8 25.8 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 24 1.65 8 39.6 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0 0 0

EQUIPMENT FDN 400KV


CT 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 10 2.25 10 0 22.5 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 10 2.25 10 0 22.5 0 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 9 2.25 10 0 20.25 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 9 2.25 10 0 20.25 0 0 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 1 4 2.1 16 0 0 0 8.4 0 0 0 0 0 0 0
MAIN BAR 1 4 2.1 12 0 0 8.4 0 0 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 1 9 2.55 8 22.95 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 18 0.9 8 16.2 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0 0 0

LA 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 7 1.85 10 0 12.95 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 7 1.85 10 0 12.95 0 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 7 1.85 10 0 12.95 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 7 1.85 10 0 12.95 0 0 0 0 0 0 0 0 0
COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 1 8 2.4 12 0 0 19.2 0 0 0 0 0 0 0 0
MAIN BAR 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 1 9 1.95 8 17.55 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 18 0.75 8 13.5 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0 0 0

CVT 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 9 2.1 10 0 18.9 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 9 2.1 10 0 18.9 0 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 9 2.1 10 0 18.9 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 9 2.1 10 0 18.9 0 0 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 1 8 2.4 12 0 0 19.2 0 0 0 0 0 0 0 0
MAIN BAR 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 1 9 2.15 8 19.35 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 18 0.8 8 14.4 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0.65 8 0 0 0 0 0 0 0 0 0 0 0

BPI 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 11 2.15 10 0 23.65 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 11 2.15 10 0 23.65 0 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 9 2.15 10 0 19.35 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 9 2.15 10 0 19.35 0 0 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 1 8 2.1 12 0 0 16.8 0 0 0 0 0 0 0 0
MAIN BAR 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 1 9 2.15 8 19.35 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 18 0.8 8 14.4 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0 0 0

ISO 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 7 2 10 0 14 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 7 2 10 0 14 0 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 7 2 10 0 14 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 7 2 10 0 14 0 0 0 0 0 0 0 0 0

COLUMN 0 0 0 0 0 0 0 0 0 0 0
MAIN BAR 1 8 2.1 12 0 0 16.8 0 0 0 0 0 0 0 0
MAIN BAR 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TIES 0 0 0 0 0 0 0 0 0 0 0
MASTER RING 1 9 2.15 8 19.35 0 0 0 0 0 0 0 0 0 0
SEC TIE 1 18 0.8 8 14.4 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0 0 0

TOTAL WEIGHT OF BAR = 891.52 219.08 1839.7 9963.3 7123.96 4109.57 1161.49 0 0 0 0

TOTAL STEEL QUANTITY = 25308.61 KG


25.31 Mton
400KV EQUIPMENT FOUNDATION BOQ
REF. DRG . - PGCIL SUPPLIED STD. EQUIPMENT FOUNDATION DRAWINGS
REF. L B D1 D/H lc bc
Fdn PCC PCC Col Col Col Col Col Ht Excavation PCC VOL
Discription DRG. Nos
Depth Depth Offset Offset Nos Length Width above GL (M3) (M3)
NO. mt mt mt mt mt mt

400KV WT
WT C/ENGG/STD/EQP/FDN/04
1 2.4 2.4 0.25 0.25 1.5 0.075 0.075 0 3 0.6 0.6 0.3 10.24 0.49
FDN

TOTAL QTY = 10.24 0.49


NOTE:
(1) Quantities are estimated assuming plinth level 300mm above FGL. Quantities may vary if plinth level vary as per site condition.
(2) Quantity of Equipments are estimated from the layout & SLD provided by PGCIL.
PMENT FOUNDATION BOQ

CONC VOL Formwork Backfill REINF. Qty


(M3) Qty. (M2) (M3) (Mton)

3.11 13.56 6.64 0.20

3.11 13.56 6.64 0.20

y vary if plinth level vary as per site condition.


DESCRIPTION NOS NOS OF BAR LENGTH DIAMETR LENGTH OF BAR
(Mt) MM 8 10 12 16 20 25 28 30 32 36 40
EQUIPMENT FDN 400KV
WT 1
FOUNDATION
BOTTOM BAR
ALONG LENGTH 1 17 2.6 12 0 0 44.2 0 0 0 0 0 0 0 0
ALONG WIDTH 1 17 2.6 12 0 0 44.2 0 0 0 0 0 0 0 0
TOP BAR 0 0 0 0 0 0 0 0 0 0 0
ALONG LENGTH 1 11 2.6 10 0 28.6 0 0 0 0 0 0 0 0 0
ALONG WIDTH 1 11 2.6 10 0 28.6 0 0 0 0 0 0 0 0 0

COLUMN
MAIN BAR 3 8 2.15 12 0 0 51.6 0 0 0 0 0 0 0 0
MAIN BAR 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TIES
MASTER RING 3 10 2.15 8 64.5 0 0 0 0 0 0 0 0 0 0
SEC TIE 3 10 1.56 8 46.8 0 0 0 0 0 0 0 0 0 0
SEC TIE 0 0 0 0 0 0 0 0 0 0 0 0 0 0

TOTAL WEIGHT OF BAR = 43.98 35.31 124.45 0 0 0 0 0 0 0 0

TOTAL STEEL QUANTITY = 203.74 KG


0.20 Mton
Name of work: 63 MVAR REACTOR FOUNDATION ESTIMATE
No. of Reactor= 1
REF. DRG. NO. C/ENGG/SR/MADTIRU/63MVAR/FDN/01, SHEET 1 TO
ABSTRACT

Item
Item Discription QTY. RATE UNIT TOTAL
No.
Excavation for foundation
1 383.00 1.00 Cum. 383.00

PCC (1:4:8)
2 20.00 1.00 Cum. 20.00

RCC M20 CONCRETE


3 132.00 1.00 Cum. 132.00

TMT Steel Bars/ Reinforcement in RCC


4 5.81 1.00 MT. 5.81

M.S. Sections / Rail Section / Insert Plate


5 1.19 1.00 MT. 1.19

Steel Grating 40 mm thick


6 85.00 1.00 Sq.m 85.00

Stone filling (40 mm size) for transformer


7 9.00 1.00 Cum. 9.00

8 Commercial Rail 27.20 1 Rmt 27.2


Name of work: 63 MVAR REACTOR FOUNDATION ESTIMATE FOR TUMKUR

Measurement Sheet

Item
Descriptions of Item No Length Breadth Depth Quantity Unit
No.
1 Excavation for foundation
REACTOR FDN 1 13.475 8.125 2.075 227.18008
COOLER BANK AREA 1 3.425 2.315 2.075 16.452416
COOLER BANK AREA 1 8.04 5.425 2.075 90.505
JACK PAD FDN 4 2.25 2.25 2.075 42.019
PULLING BLOCK 2 1 2 1.575 6.300
Total 382.457
Say 383.000 Cum.
2 PCC Bed Concrete
Projected 75mm on all sides
PIT WALL 1 55.205 1.150 0.075 4.761
REACTOR FDN 1 6.310 5.725 0.075 2.709
COOLER BANK AREA ('c) 4 1.350 1.350 0.075 0.547
JACK PAD FDN 4 2.400 2.400 0.075 1.728
PULLING BLOCK 2 1.150 2.150 0.075 0.371
RAIL CUM ROAD 1 5.060 8.500 0.075 3.226
GRADE SLAB 1 85.000 0.075 6.375
Total 19.717
Say 20.000 Cum.
3 RC Concrete M-20
PIT WALL 1 48.820 0.150 1.200 8.788
PIT RAFT 1 48.820 1.000 0.250 12.205
SUMP WALL 1 3.400 0.200 1.700 1.156
SUMP RAFT 1 1.400 1.100 0.150 0.231
PIT WALL WITH RAFT 1 6.385 0.200 1.800 2.299
GRADE SLAB 1 85.000 0.100 8.500
REACTOR FDN 1 6.160 5.575 0.500 17.171
CONCRETE BLOCK 1 5.660 3.200 1.800 32.602
2 0.750 0.675 1.800 1.823
RAIL WALL 2 1.700 0.300 1.650 1.683
COOLER BANK AREA ('c) COLUMN 4 0.550 0.550 2.050 2.481
COOLER BANK AREA ('c) COLUMN RAFT 4 1.200 1.200 0.250 1.440
COOLER BANK AREA (P) COLUMN 6 0.400 0.400 1.200 1.152
COLUMN SC1 11 0.250 0.250 0.700 0.481
PULLING BLOCK RAFT 2 1.000 2.000 0.300 1.200
PULLING BLOCK COLUMN 2 0.500 1.500 1.500 2.250
JACK PAD FDN 4 2.250 2.250 0.300 6.075
S/C 11-11 COLUMN 4 0.600 0.600 2.000 2.880
RAIL CUM ROAD 1 8.500 8.060 0.400 27.404
Total 131.819 Cum.
Say 132.000 Cum.
4 TMT Steel Bars/ Reinforcement in RCC
Total 5811.000
Say 5.811 MT.
5 M.S. Sections
ISMB 150 759.9
INSERT PLATES 278.00775
add 10%
TOTAL 1188.000 Kg
Say 1.19 MT

6 MS GRATING 40 MM THK 1 85.000 85.000 Sq.m


Total 85.000
Say 85.000 sq.m
7 40 MM SIZE GRAVEL FILL (100 MM THK) 1 85.000 0.100 8.500 Cum.
Total 8.500
Say 9.000 Cum.

8 Commercial Rail 2.00 13.6 27.2 Rmt


Name of work: 80 MVAR REACTOR FOUNDATION ESTIMATE

REF. DRG. NO. = C/ENGG/ER-II/BAHARAMPUR/80MVAR/FDN/01/ SHE

No. of Reactor= 1
ABSTRACT

Item
Item Discription QTY. RATE UNIT TOTAL
No.
Excavation for foundation
1 416.00 1.00 Cum. 416.00

PCC (1:4:8)
2 21.00 1.00 Cum. 21.00
RCC M20 CONCRETE
3 128.00 1.00 Cum. 128.00

TMT Steel Bars/ Reinforcement in RCC


4 5.16 1.00 MT. 5.16

M.S. Sections / Insert Plate


5 1.24 1.00 MT. 1.24

Steel Grating 40 mm thick


6 114.00 1.00 Sq.m 114.00

Stone filling (40 mm size) for transformer


7 12.00 1.00 Cum. 12.00

8 Commercial Rail 36.00 1 Rmt 36


Name of work: 80 MVAR REACTOR FOUNDATION ESTIMATE FOR BHARAMPUR

Measurement Sheet

Item
Descriptions of Item No Length Breadth Depth Quantity Unit
No.
1 Excavation for foundation
COOLER BANK AREA 1 8.09 7.79 2.075 130.76878
REACTOR FDN AREA 1 13.525 8.175 2.075 229.42627
Block 2 0 6.8 4.55 2.075 0.000
JACK PAD FDN 4 2.4 2.4 2.075 47.808
PULLING BLOCK 2 1.15 2.15 1.575 7.788
Total 415.791
Say 416.000 Cum.
2 PCC Bed Concrete
Projected 75mm on all sides
COOLER BANK AREA 1 8.090 7.790 0.075 4.727
TRAFO FDN AREA 1 13.525 8.175 0.075 8.293
Block 2 0 6.800 4.550 0.075 0.000
JACK PAD FDN 4 2.400 2.400 0.075 1.728
PULLING BLOCK 2 1.150 2.150 0.075 0.371
GRADE SLAB 1 70.000 0.075 5.250
Total 20.368
Say 21.000 Cum.
3 RC Concrete M-20
PIT WALL 1 51.920 0.150 1.200 9.346
PIT RAFT 1 51.920 1.000 0.250 12.980
SUMP WALL 1 4.000 0.200 1.700 1.360
SUMP RAFT 1 1.400 1.150 0.150 0.242
PIT WALL WITH RAFT 1 6.285 0.200 1.800 2.263
GRADE SLAB 1 70.000 0.100 7.000
TRAFO RAFT 1 6.160 5.575 0.500 17.171
CONCRETE BLOCK 1 5.660 3.200 1.800 32.602
2 0.750 0.675 1.800 1.823
RAIL WALL 2 1.500 0.300 1.644 1.480
NGR BLOCK RAFT 0 2.270 1.920 0.250 0.000
NGR BLOCK 0 1.970 1.620 2.050 0.000
S/C 8-8 RAFT 0 1.000 1.000 0.250 0.000
S/C 8-8 COLUMN 0 0.550 0.550 2.050 0.000
SC1 COLUMN 11 0.250 0.250 0.710 0.488
S/C 7-7 COLUMN 6 0.400 0.400 1.200 1.152
S/C 6-6 RAFT 4 1.200 1.200 0.250 1.440
S/C 6-6 COLUMN 4 0.550 0.550 2.050 2.481
PULLING BLOCK RAFT 2 1.000 2.000 0.300 1.200
PULLING BLOCK COLUMN 2 0.500 1.500 1.500 2.250
S/C 11-11 RAFT 4 2.250 2.250 0.300 6.075
S/C 11-11 COLUMN 4 0.600 0.600 2.000 2.880
RAIL CUM ROAD 1 13.000 4.460 0.400 23.192
Total 127.422 Cum.
Say 128.000 Cum.
4 TMT Steel Bars/ Reinforcement in RCC
Total 5157.000
Say 5.157 MT.
5 M.S. Sections
ISMB 150 1 48.000 715.68
INSERT PLATES 408.5925
add 10% 112.42725
TOTAL 1236.700 Kg
Say 1.24 MT
6 MS GRATING 40 MM THK 1 114.000 114.000 Sq.m
Total 114.000
Say 114.000 sq.m

7 40 MM SIZE GRAVEL FILL (100 MM THK) 1 114.000 0.100 11.400 Cum.


Total 11.400
Say 12.000 Cum.

8 Commercial Rail 2.00 18 36 Rmt


Name of work: 80 MVA TRANSFORMER FOUNDATION ESTIMATE

Ref. Drg. No. =


E/S/C/-814
No. of Transformer= 1
ABSTRACT
Item
Item Discription QTY. RATE UNIT TOTAL
No.

1 Excavation for foundation 62.00 1.00 Cum. 62.00

2 PCC (1:3:6) 14.00 1.00 Cum. 14.00

3 RCC M20 (1:1.5:3) 25.00 1.00 Cum. 25.00

4 TMT Steel Bars/ Reinforcement in RCC 2.34 1.00 MT. 2.34

5 Insert Plate and other 0.19 1.00 MT. 0.19

6 Rail (90 lbs/yard) length 10.00 1.00 m. 10.00

7 Contingencies
8 Water Charges
9 Contractor Profit
Name of work: 80 MVA TRANSFORMER FOUNDATION ESTIMATE FOR BAIDA

Measurement Sheet

Item
Descriptions of Item No Length Breadth Depth Quantity Unit
No.
1 Excavation for foundation
TRANSFORMER BLOCK 1 5.35 4.6 1.5 36.915
PIT WALL 1 42 0.55 0.5 11.55
COOLING BANK
FDN - F1, F1A, F1B 8 0.6 0.6 1.25 3.6
FDN - F2 4 0.7 0.7 1.25 2.45
FDN - F3, F3A 2 1.6 1.1 1.25 4.4
FDN- F4 2 0.8 0.8 1.25 1.6
FDN- F5 1 1.3 0.75 1.25 1.21875
Total 61.734
Say 62.000 Cum.
2 PCC Bed Concrete
Projected 75mm on all sides
TRANSFORMER BLOCK 1 5.350 4.600 0.050 1.231
PIT WALL 1 42.000 0.550 0.100 2.310
PCC ABOVE FGL 1 14.000 7.000 0.100 9.800
COOLING BANK
FDN - F1, F1A, F1B 8 0.6 0.6 0.050 0.144
FDN - F2 4 0.7 0.7 0.050 0.098
FDN - F3, F3A 2 1.6 1.1 0.050 0.176
FDN- F4 2 0.8 0.8 0.050 0.064
FDN- F5 1 1.3 0.75 0.050 0.049
Total 13.871
Say 14.000 Cum.
3 RC Concrete M-20 (1:1.5:3)
TRANSFORMER BLOCK RAFT 1 5.25 4.5 0.35 8.269
TRANSFORMER BLOCK COLUMN 2 0.750 4.500 1.457 9.835
COOLING BANK
FDN-F1 RAFT 8 0.500 0.500 0.250 0.500
FDN-F1 COLUMN 8 0.400 0.250 1.450 1.160
FDN-F2 RAFT 4 0.600 0.600 0.250 0.360
FDN-F2 COLUMN 4 0.400 0.400 1.450 0.928
FDN-F3 RAFT (BOTTOM) 2 1.500 1.000 0.250 0.750
FDN-F3 COLUMN 4 0.400 0.400 0.950 0.608
FDN-F3 COLUMN 1 2 0.400 0.250 1.450 0.290
FDN-F3 RAFT (TOP) 2 1.650 0.400 0.400 0.528
FDN-F4 RAFT (BOTTOM) 2 0.700 0.700 0.250 0.245
FDN-F4 COLUMN 4 0.400 0.250 0.950 0.380
FDN-F4 RAFT (TOP) 2 1.100 0.250 0.400 0.220
FDN-F5 RAFT 1 1.200 0.650 0.250 0.195
FDN-F5 COLUMN 2 0.150 0.650 1.450 0.283
Total 24.550 Cum.
Say 25.000 Cum.
4 TMT Steel Bars/ Reinforcement in RCC
Total 2339.010
Say 2.339 MT.

5 M.S. Sections

Total 190
Say 190.000 Kg
Item
Descriptions of Item No Length Breadth Depth Quantity Unit
No.
Say 0.19 MT
Rail (90 lbs/yard) length
6 1 10.000 10.000

Total 10.000
Say 10.000 m

7 Contingencies
8 Water Charges

9 Contractor Profit
Name of work: 315 MVA TRANSFORMER FOUNDATION ESTIMATE

Ref. Drg. No. = C/ENGG/AN/315/CGL/TRF/FDN/01, SHEET 1 TO 7 OF 7


No. of Transformer= 1
ABSTRACT
Item
Item Discription QTY. RATE UNIT TOTAL
No.
Excavation for foundation
1 453.00 1.00 Cum. 453.00
PCC (1:4:8)
2 36.00 1.00 Cum. 36.00
RCC M20
3 214.00 1.00 Cum. 214.00
TMT Steel Bars/ Reinforcement in
4 RCC 12.19 1.00 MT. 12.19

M.S. Sections / Rail Section / Insert


5 Plate 3.70 1.00 MT. 3.70

Steel Grating 40 mm thick


6 145.00 1.00 Sq.m 145.00
Stone filling (40 mm size) for
7 transformer 14.50 1.00 Cum. 14.50

8 Rail (52 kg/m section) 76.00 1.00 M 76.00

9 6mm thk Chequard Plate 1.96 1.00 Sq.m 1.96


Name of work: 315 MVA TRANSFORMER FOUNDATION ESTIMATE
Measurement Sheet

Item No. Descriptions of Item No Length Breadth Depth


1 Excavation for foundation
COOLING BANK 1 16.05 7.7 1.375
PEDESTAL-C 8 1.5 1.5 0.2
TRANSFORMER 1 12 6.9 1.375
TRANSFORMER BLOCK 1 9.08 5.2 0.7
RAIL CUM ROAD-19M(Road c/c to Tranc/c) 1 14 6.75 0.331
JACKING PAD FOOTING 6 3.15 2.15 2.075
BELOW PIT WALL 1 74 0.925 0.1
SUMP 1 1.4 1.4 0.825
PULLING BLOCK 2 1 2 2.075
Total
Say
2 PCC Bed Concrete
Projected 75mm on all sides
COOLING BANK 1 16.050 7.700 0.075
TRANSFORMER BLOCK 1 12.600 8.100 0.075
RAIL CUM ROAD-19M(Road c/c to
1 14.000 6.750 0.075
Tranc/c)
JACKING PAD FOOTING 6 3.150 2.150 0.075
PIT WALL 1 74.000 1.250 0.075
RAIL WALL RAFT 1 7.880 1.700 0.075
PULLING BLOCK 2 1.000 2.000 0.075
Total
Say
3 RC Concrete M-20
TRANSFORMER BLOCK RAFT 1 9.08 6.3 0.4
TRANSFORMER BLOCK 1 7.880 4.000 1.900
RAIL WALL 4 1.500 0.300 1.900
RAIL CUM ROAD-19M(Road c/c to
1 14.000 6.150 0.556
Tranc/c)
JACKING PAD FOOTING 6 3.000 2.000 0.300
6 0.600 0.600 1.900
RCC WALL 1 7.880 0.200 1.900
PIT FLOOR 1 1 14.700 7.400 0.100
PIT FLOOR 2 1 11.700 1.400 0.100
1 11.700 1.800 0.100
PIT WALL RAFT 1 74.000 0.775 0.200
PIT WALL 1 74.000 0.150 1.160
PIT WALL 1 74.800 0.100 0.340
SUMP RAFT 1 1.400 1.400 0.150
SUMP WALL 1 4.800 0.200 2.100
PULLING BLOCK 2 1.000 3.000 0.300
2 0.750 1.500 2.000
PEDESTAL-B 2 0.300 0.300 1.500
PEDESTAL-C - RAFT 8 1.500 1.500 0.200
PEDESTAL-C 8 0.600 0.600 1.500
PEDESTAL-H 2 0.750 0.250 1.500
PEDESTAL-K 2 0.300 0.300 1.500
PEDESTAL-S 4 0.300 0.300 1.500
PEDESTAL-M 2 0.950 0.150 1.500
PEDESTAL-SC1 20 0.250 0.250 1.050

Total
Say
TMT Steel Bars/ Reinforcement in
4
RCC
Total
Say
5 M.S. Sections
Total
Say
Say

6 P & Applying MS Grit


Detail for Grating size (approximately) 54 0.500 1.925
8 0.4 1.925
Size of the grating fixed by 27 0.5 1.675
manufacturer according to notch 4 0.4 1.675
cutting(around pedestal projection) 13 0.5 1.086
2 0.5 1.086
1 0.35 0.600
7 0.5 0.600
1 0.45 0.600
7 0.5 0.600
5 0.34 1.200
20 0.34 1.882
5 0.34 1.611
10 0.5 1.175
2 0.45 1.175
8 0.5 1.435
8 0.5 1.024
4 0.4 1.486
9 0.5 1.443
6 0.5 1.176
4 0.4 1.200

Say

7 Rail length 4.00 19

8 6mm thk Chequard Plate 1.00 1.4 1.4


N ESTIMATE

Quantity Unit

169.93
3.60
113.85
33.05
31.28
84.32
6.85
1.62
8.30
452.790
453.000 Cum.

9.269
7.655
7.088
3.048
6.938
1.005
0.300
35.301
36.000 Cum.

22.882
59.888
3.420
47.872
10.800
4.104
2.994
10.878
1.638
2.106
11.470
12.876
2.543
0.294
2.016
1.800
4.500
0.270
3.600
4.320
0.563
0.270
0.540
0.428
1.313

213.383 Cum.
214.000 Cum.

12188.782
12.189 MT.

3698
3698.000 Kg
3.70 MT

51.975
6.160
22.613
2.680
7.059
1.086
0.210
2.100
0.270
2.100
2.040
12.798
2.739
5.875
1.058
5.740
4.096
2.378
6.494
3.528
1.920
144.916 sq.m
145.000 sq.m

76.000 M

1.960 Sq.m
Sr. No Length of Bar Nos of Strs. No. of Bars Length Unit weight
1 For RCC wall
a In Raft (10mm dia)
L= 775-50*2+100*2+150
1.025m
for top & bottom
1.025 *2 = 2.05m
Length of wall = 74m
Spacing of bar 150mm
Nos = 74/0.15= 493+1
Say 494 Nos 1 494 2.05 0.617
b. Long Bars (8mm dia)
L= 78m (71.2 = aprox. 78m)
Heigth =0. 675
Nos= .675/0.20
3.5 + 1 = say 4 Nos
Top & Bottom
4*2=8
length=75 m 1 8 78 0.395
c. Vertical Surface of wall
L= 300+1200+300+150
1950 mm
10 mm dia @ 150C/c
Nos = 74/0.15= 493+1 1 494 1.95 0.617
On other suface
L= 1200+250-100+300
1600 mm
Nos = 74/0.15= 493+1 1 494 1.6 0.617
d Horizontal Surface
L=1200+300+100
1600 mm
1.6/ 0.20 = 8+1
Say 9 Nos 1 9 78 0.395
Other side
1200+150
1350 mm
1.35/0.20 = 6.75 + 1
say 8 nos 1 8 78 0.395
=====================================================================================
2 For RCC floor
In Raft
a Length =15.3
nos. = 8.6/0.2=43+1
say 44 nos 1 44 15.3 0.395
length = 8.3
nos. = 15.3/0.2=77 1 77 8.3 0.395
b. Length =12
nos. = 3.5/0.2=17..5
say 18nos 1 18 12 0.395
length = 7.5
nos. = 66 1 60 3.5 0.395
=====================================================================================
3 For Main Transfo Block
In Raft
a Long Bars (16mm Dia.)
L=9080-50*2+300*2
9.58mm
Nos of bars
6.3/0.15
42 Nos 1 42 9.58 1.578
Other side (16mm dia)
L= 6300-2*50+2*300
6.8 m
Nos. of Bars 1 61 6.8 1.578
9.08/0.15= 60.5+1
Say 61 nos
At top(12mm dia)
Length = 1.5 1 61 1.5 0.888
Length = 9.08 1 6 1.5 0.888
Length = 2.6 1 61 2.6 0.888
Length = 9.08 1 13 1.5 0.888
b. Vertical Bars (16mm 150 c/c)
L= 2300-100+200+300
2700 mm
No. of Bars
4.0/0.15=26.67 say 27
Other side 27 nos.
Long side
7.88/0.15=52.53+1= say 53
Total Nos=27*2+53*2
160 Nos. 1 160 2.7 1.579
c. Stirrupps (12mm 150 c/c)
L= 4.00*2+7.88*2-50*4
23.5
say 24 m
No.of bars = 1.9/0.15=12.66
Say 12.66 + 1 = 14nos 1 14 24 0.617
d. At top of block
L= 4000
4.00m
No 0f bars= 7.88/0.2=39.4+1
say 40 nos 1 40 4.3 0.395
At bottom 1 20 7.88 0.394
L= 400*2+200
1000mm
No of bars = 4450/200=
say 20 nos. 4 20 1 0.395
L=400*2+200
1000mm
nos. of bars = 7880/200=
40 nos 4 40 1 0.395

Jackind pad - 4-16 dia-L-2.0m 4 4 2 1.579


Stirrups
L=400*4+150=1750mm 4 8 1.75 0.395
Nos of stirrups= 2000/250=8
4 Pulling Block
a In Raft (10mm 200c/c)
1000-100+200*2=1300mm
Nos of bars = 2000/200=10
Say 10
Top & bottom 4 10 1.3 0.617
b. 2000-100+200*2=2300mm
Nos of bars = 1000/200=5
Say 5 Nos 4 5 2.3 0.617
c. In Columns (12mm 200 c/c)
1700+300-100+200*2
L=2300mm
nos. = 1500/200 = 7.5+1
say 8 nos.
nos. = 500/200 = 2.5+1
say 3 nos.
total nos. = 8+3 = 11 4 11 2.3 0.888
5 Rail wall (12mm 150 c/c)
L=2600-100 = 2500
2.5m
nos. = 1.7/0.15 = 11.33 +1
say 12nos.
bothface = 12 *2 = 24 4 24 2.5 0.888
Hori reinft. (10mm 200 c/c)
L = 1.7m+.6m=2.3
nos. = 2.3/0.20 = 12 + 1
bothface = 13*2 = 26 nos. 4 26 2.3 0.617
6 Top RCC slab rail supports
14m x 6.150m
14000-100+300=14200mm
a Nos of bars=6.15/0.2=30.75
30.75 + 1 Say31 Nos 3 31 14.2 0.617
Other Side
b. L= 6150-100+300=6.350m
Nos of Bars=14/0.2=45 Nos 3 70 6.35 0.617
c. jacking pad
Raft (16mm 150 c/c)-at Bottom
length = 3.3
length = 2.3mm
Nos. of bar = 3000/150 = 20
say 20nos. 6 14 3.3 1.579
Nos. of bar = 2000/150 = 14
say 14nos.
bothways & bothface
6 20 2.3 1.579
=======================================================================================
d Raft (12mm 150 c/c) at top
length = 3.3
length = 2.3mm
Nos. of bar = 3000/150 = 20
say 20nos. 6 14 3.3 0.888
Nos. of bar = 2000/150 = 14
say 14nos.
bothways & bothface
6 20 2.3 0.888
e Pedestal (8-20mm)
length =2.3-100+250*2
length = 2.7mm
Nos. of bar =8
6 8 2.7 2.47
Stirrups
L=600*4+150=2550mm
Nos of stirrups= 2300/250=9.2 6 10 2.55 0.395

7 RCC wall (10mm 150 c/c)


L=7880-100 = 7780
7.78m
nos. = 7.78/0.15 = 52
bothface = 52 *2 = 104 1 104 2.5 0.617
Hori reinft. (8mm 200 c/c)
L = 7.88m
nos. = 2.3/0.20 = 12 + 1
bothface = 13*2 = 26 nos. 1 26 8.4 0.395

8 SUMP RCC wall (10mm 150 c/c)


L=1200-100 = 1100
1.10m
nos. = 1.1/0.15 = 7.3
say 8nos.
bothface = 8 *8 = 64 1 64 2.1 0.617
Hori reinft. (8mm 150 c/c)
L = 4.5m
nos. = 2.3/0.20 = 12 + 1
bothface = 13*2 = 26 nos. 1 26 4.5 0.395
9 Footings supports to coolers
a Pedestal-C
Raft (12mm 200 c/c)
length =1500-100+250*2
length = 1900mm
Nos. of bar =1500/200 = 7.5
say 8nos.
bothways & bothface
8*2 =16 nos. 8 16 1.9 0.888

Vertical Face
1500-100+2*150+300
L=2000 mm 8 8 2 0.888
Stirrups
L=600*4+150=2550mm
Nos of stirrups= 1500/250=6 8 6 2.55 0.395
L=1800mm
Nos of stirrups= 1500/250=6 8 6 1.8 0.395
=======================================================================================
b. Pedestal-B
Vertical Face
1500-100+2*150
L= 1700 2 4 1.7 0.888
Stirrups
L=300*4+150=1350mm 2 6 1.35 0.395
Nos of stirrups= 1500/250=6
=======================================================================================

c Pedestal-H
Vertical Face
1500-100+2*150
L= 1700 2 6 1.7 0.888
Stirrups
L=1700mm 2 6 1.7 0.395
Nos of stirrups= 1500/250=6

d. Pedestal-K
Vertical Face
1500-100+2*150
L= 1700 2 4 1.7 0.888
Stirrups
L=300*4+150=1350mm 2 6 1.35 0.395
Nos of stirrups= 1500/250=6

e. Pedestal-S
Vertical Face
1500-100+2*150
L= 1700 4 4 1.7 0.888
Stirrups
L=300*4+150=1350mm 4 6 1.35 0.395
Nos of stirrups= 1500/250=6
f Pedestal-M
Vertical Face
1500-100+2*150
L= 1700 2 10 1.7 0.888
Stirrups
L=1900mm 2 6 1.9 0.395
Nos of stirrups= 1500/250=6
g Pedestal-SC1
Vertical Face
1050-100+2*150
L= 1450 20 4 1.45 0.888
Stirrups
L=250*4+150=1150mm 20 6 1.15 0.395
Nos of stirrups= 1050/200=6

===================================================================================

f Legs for insert plate

J-12MM DIA 2 12 0.75 0.888


IP1-10MM DIA 1 20 0.36 0.617
IP2-10MM DIA 2 100 0.8 0.617
IP3-10MM DIA 2 91 0.5 0.617
IP4-10MM DIA 2 53 0.6 0.617

Total
Add 10% extra for bend,lap
(for 1 trfo. Fdn) Grand Total
Say

MILD STEEL QUANTITIES


IP size (L X W X Thk.) Cu.m Nos sity of steel Wtt
J 0.35x0.25x0.02 0.00175 12 7850 164.85
IP1 0.15x0.15x0.006 0.000135 20 7850 21.195
IP2 0.25x0.3x0.012 0.0009 100 7850 706.5
IP3 0.2x0.2x0.006 0.00024 91 7850 171.444
IP4 0.25x0.3x0.006 0.00045 53 7850 187.2225
ISMB 150 L=84M 84 14.9 1251.6
ISMC 75 L=2.8M 2.8 7.14 19.992
Pl 70x70x6 0.70x0.7x0.006 0.0000294 320 7850 73.8528
Pl 100x40x8 0.1x0.04x0.008 0.000032 320 7850 80.384
Flat 40x6-300LG 0.3x0.04x0.006 0.000072 200 7850 113.04
ISA 75X75X6 L=4x19=76m 76 6.8 516.8
ISA 50X50X6 L=50M 50 4.5 225
ISA 50X50X5 L=4M 4 3.8 15.2

Total 3547.0803
add 10% ext 150
Grand Total 3697.0803
Say 3698
Total Weight

624.8359 Kg

246.48 Kg

594.3561 Kg

487.6768 Kg

277.29 Kg

246.48 Kg
=========

265.914 kg

252.4445 kg

85.32 Kg

82.95 Kg
=========
634.92408 Kg

654.5544 Kg

81.252 Kg
7.992 Kg
140.8368 Kg
17.316 Kg

682.128 Kg

207.312 Kg

67.94 Kg
62.0944 Kg

31.6 Kg

63.2 Kg

50.528 Kg

22.12 Kg
32.084 Kg

28.382 Kg

89.8656 Kg

213.12 Kg

147.5864 Kg

814.8102 Kg

822.7695 Kg

437.6988 Kg

435.804 Kg
===========

246.1536 Kg

245.088 Kg

320.112 Kg

60.435 Kg

160.42 Kg

86.268 Kg

82.9248 Kg

46.215 Kg
215.9616 Kg

113.664 Kg

48.348 Kg

34.128 Kg
===========

12.0768 Kg

6.399 Kg

===========

18.1152 Kg

8.058 Kg

12.0768 Kg

6.399 Kg

24.1536 Kg

12.798 Kg
30.192 Kg

9.006 Kg
103.008 Kg

54.51 Kg

15.984 Kg
4.4424 Kg
98.72 Kg
56.147 Kg
39.2412 Kg

11080.71
1108.071
12188.782 Kg
12189 Kg

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

Kg
Kg
Kg
Kg
Name of work: RCC FIRE WALL FOUNDATION ESTIMATE

Ref. Drg. No. = C/ENGG/AN/315/CGL/FWALL/FDN/02, SHEET 1 TO 3 OF 3

No. of Transformer= 1
ABSTRACT
Item
Item Discription QTY. RATE UNIT TOTAL
No.
Excavation for foundation
1 72.00 1.00 Cum. 72.00
PCC (1:4:8)
2 3.00 1.00 Cum. 3.00
RCC M20
3 54.00 1.00 Cum. 54.00
TMT Steel Bars/ Reinforcement in
4 RCC 4.69 1.00 MT. 4.69
Sr. No Length of Bar Nos of Strs. No. of Bars Length Unit weight
1 For Footing
a In Raft (16mm dia)
L= 2600-50*2+100*2+150
2.85m
for bottom
Length = 3m
Spacing of bar 150mm
Nos = 3/0.150= 20
Say 20 Nos 4 20 2.85 1.578
b. In Raft (16mm dia)
L= 3000-50*2+100*2+150
3.25m
for bottom
Length = 2.6m
Spacing of bar 150mm
Nos = 2.60/0.15= 18
Say 18 Nos 4 18 3.25 1.578
c In Raft (10mm dia)
L= 2600-50*2+100*2+150
2.85m
for bottom
Length = 3m
Spacing of bar 150mm
Nos = 3/0.150= 20
Say 20 Nos 4 20 2.85 0.617
d. In Raft (10mm dia)
L= 3000-50*2+100*2+150
3.25m
for bottom
Length = 2.6m
Spacing of bar 150mm
Nos = 2.60/0.15= 18
Say 18 Nos 4 18 3.25 0.617

e. Column (4-20mm+10-16mm)
1 Vertical rod
2600-100+300+2*150
L=3100mm
4-20mm dia rod 4 4 3.1 2.47
10-16mm dia rod 4 10 3.1 1.578
2 Stirrups
Nos of stirrups=2600/150=18
L=750*2+450*2+150=2550mm 4 18 2.55 0.395
L=450*2+450*2+150=1950mm 4 18 1.95 0.395
L=200*2+450*2+100=1400mm 4 18 1.4 0.395
L=750+2*100=950mm 4 18 0.95 0.395

3 Vertical rod
8500+300
L=8800mm
14-16mm dia rod 4 14 8.8 1.578
5 Stirrups
Nos of stirrups=4800/150=32
L=600*2+450*2+150=2250mm 4 32 2.25 0.395
L=450*2+450*2+150=1950mm 4 32 1.95 0.395
L=150*2+450*2+100=1300mm 4 32 1.3 0.395
L=600+2*100=800mm 4 32 0.8 0.395
6 Stirrups
Nos of stirrups=3100/190=17
L=600*2+450*2+150=2250mm 4 17 2.25 0.395
L=450*2+450*2+150=1950mm 4 17 1.95 0.395
L=150*2+450*2+100=1300mm 4 17 1.3 0.395
L=600+2*100=800mm 4 17 0.8 0.395
D. BEAM
1 Main rod
14200-100+300+2*150
L=14700mm
3-12mm dia rod-Top and bottom 3 6 14.7 0.888
2 Stirrups
Nos of stirrups=7750/150=52
L=600*2+240*2+100=1780mm 3 52 1.78 0.395
3 Stirrups
Nos of stirrups=6450/250=26
L=600*2+240*2+100=1780mm 3 26 1.78 0.395

e. RCC wall (10mm dia)


1 L=14200-100=14100
Nos of rod=12400/150=83
Vertical rod-83*2=166 1 166 8.4 0.617
L=8500-(600*3)=6700
Nos of rod=6700/200=34
Horiz rod-34*2 1 68 14.1 0.617
===================================================================================
Total
Add 10% extra for bend,lap
(for 1 trfo. Fdn) Grand Total
Say
Total Weight

359.784 Kg

92.313 Kg

140.676 Kg

36.0945 Kg

122.512 Kg
195.672 Kg

72.522 Kg
55.458 Kg
39.816 Kg
27.018 Kg

777.6384 Kg
113.76 Kg
98.592 Kg
65.728 Kg
40.448 Kg

60.435 Kg
52.377 Kg
34.918 Kg
21.488 Kg
234.9648 Kg

109.6836 Kg

54.8418 Kg

860.3448 Kg

591.5796 Kg
============
4258.6645
425.86645
4684.531 Kg
4685 Kg
Name of work: 500 MVA TRANSFORMER FOUNDATION ESTIMATE

Ref. Drg. No.= C/ENGG/AMT/500/CGL/TRF/FDN/01, SHEET 1 TO 7 OF 7

No. of Transformer= 1
ABSTRACT
Item
Item Discription QTY. RATE UNIT TOTAL
No.
Excavation for foundation
1 567.00 1.00 Cum. 567.00
PCC (1:4:8)
2 39.00 1.00 Cum. 39.00
RCC M20
3 232.00 1.00 Cum. 232.00
TMT Steel Bars/ Reinforcement in
4 RCC 13.03 1.00 MT. 13.03

M.S. Sections / Rail Section / Insert


5 Plate 3.78 1.00 MT. 3.78

Steel Grating 40 mm thick


6 185.00 1.00 Sq.m 185.00
Stone filling (40 mm size) for
7 transformer 18.50 1.00 Cum. 18.50

8 Rail (52 kg/m section) 60.00 1.00 M 60.00

9 6mm thk Chequard Plate 1.96 1.00 Sq.m 1.96


Name of work: 500 MVA TRANSFORMER FOUNDATION ESTIMATE
Measurement Sheet

Item No. Descriptions of Item No Length Breadth Depth


1 Excavation for foundation
COOLING BANK 1 17.6 8 1.375
PEDESTAL-C 8 1.5 1.5 0.2
TRANSFORMER 1 13.9 9.6 1.375
TRANSFORMER BLOCK 1 9.7 7 0.7
RAIL CUM ROAD 1 10.15 5.15 2.075
BELOW PIT WALL 1 70.5 0.925 0.1
SUMP 1 1.4 1.4 0.825
PULLING BLOCK 2 1.65 3.15 2.075
Total
Say
2 PCC Bed Concrete
Projected 75mm on all sides
COOLING BANK 1 17.600 8.000 0.075
TRANSFORMER BLOCK 1 13.900 9.600 0.075
RAIL CUM ROAD 2 4.700 6.750 0.075
1 10.150 5.150 0.075
PIT WALL 1 71.200 1.250 0.075
RAIL WALL RAFT 1 8.650 2.625 0.075
PULLING BLOCK 2 1.650 3.150 0.075
Total
Say
3 RC Concrete M-20
TRANSFORMER BLOCK RAFT 1 9.7 5.65 0.4
TRANSFORMER BLOCK 1 8.500 4.450 1.900
RAIL WALL RAFT 1 8.500 1.350 0.400
RAIL WALL RAFT 4 1.950 0.400 1.900
RAIL CUM ROAD 2 6.150 4.700 0.556
1 10.000 5.000 0.400
4 0.600 0.600 1.900
RCC WALL 1 8.500 0.200 1.900
PIT FLOOR 1 1 16.400 6.800 0.100
PIT FLOOR 2 1 13.000 1.950 0.100
1 13.000 2.250 0.100
PIT WALL RAFT 1 74.800 0.775 0.200
PIT WALL 1 74.800 0.150 1.160
PIT WALL 1 74.800 0.100 0.340
SUMP RAFT 1 1.400 1.400 0.500
SUMP WALL 1 4.800 0.200 2.100
PULLING BLOCK 2 1.500 3.000 0.300
2 0.750 2.250 2.000
PEDESTAL-B 2 0.300 0.300 1.500
PEDESTAL-C - RAFT 8 1.500 1.500 0.200
PEDESTAL-C 8 0.600 0.600 1.500
PEDESTAL-D 2 0.400 0.400 1.500
PEDESTAL-E 10 0.300 0.300 1.500
PEDESTAL-H 1 0.650 0.250 1.500
PEDESTAL-K 4 0.300 0.300 1.500
PEDESTAL-L 1 0.300 0.300 1.500
PEDESTAL-S 2 0.300 0.300 1.500
PEDESTAL-N 2 0.300 0.300 1.500
PEDESTAL-SC1 18 0.250 0.250 1.050

Total
Say
TMT Steel Bars/ Reinforcement in
4
RCC
Total
Say
5 M.S. Sections
Total
Say
Say
6 P & Applying MS Grit
Detail for Grating size (approximately) 96 0.500 2.000
6 0.4 2.000
Size of the grating fixed by 8 0.5 1.895
manufacturer according to notch 12 0.5 1.200
cutting(around pedestal projection) 1 0.4 1.895
22 0.4 1.800
6 0.4 1.700
6 0.4 0.743
12 0.4 1.750
6 0.4 1.852
6 0.4 1.550
6 0.4 1.760
6 0.291 1.700
8 0.5 1.250
1 0.45 1.250
8 0.5 1.350
1 0.45 1.350
6 0.29 1.550
6 0.29 0.740
18 0.29 1.343

Say

7 Rail length 4 15

8 6mm thk Chequard Plate 1 1.400 1.400


N ESTIMATE

Quantity Unit

193.60
3.60
183.48
47.53
108.47
6.52
1.62
21.57
566.383
567.000 Cum.

10.560
10.008
4.759
3.920
6.675
1.703
0.780
38.405
39.000 Cum.

21.922
71.868
4.590
5.928
32.142
20.000
2.736
3.230
11.152
2.535
2.925
11.594
13.015
2.543
0.980
2.016
2.700
6.750
0.270
3.600
4.320
0.480
1.350
0.244
0.540
0.135
0.270
0.270
1.181

231.286 Cum.
232.000 Cum.

13027.397
13.027 MT.

3784
3784.000 Kg
3.78 MT

96.000
4.800
7.580
7.200
0.758
15.840
4.080
1.783
8.400
4.445
3.720
4.224
2.968
5.000
0.563
5.400
0.608
2.697
1.288
7.010

184.363 sq.m
185.000 sq.m

60.000 M

1.960 Sq.m
Sr. No Length of Bar Nos of Strs. No. of Bars Length Unit weight
1 For RCC wall
a In Raft (10mm dia)
L= 775-50*2+100*2+150
1.025m
for top & bottom
1.025 *2 = 2.05m
Length of wall = 71.2m
Spacing of bar 150mm
Nos = 71.2/0.15= 475+1
Say 476 Nos 1 476 2.05 0.617
b. Long Bars (8mm dia)
L= 75m (71.2 = aprox. 75m)
Heigth =0. 675
Nos= .675/0.20
3.5 + 1 = say 4 Nos
Top & Bottom
4*2=8
length=75 m 1 8 75 0.395
c. Vertical Surface of wall
L= 300+1200+300+150
1950 mm
10 mm dia @ 150C/c
71.2/0.15= 475+1 Nos 1 476 1.95 0.617
On other suface
L= 1200+250-100+300
1600 mm
71.2/0.15= 475+1 Nos 1 476 1.6 0.617
d Horizontal Surface
L=1200+300+100
1600 mm
1.6/ 0.20 = 8+1
Say 9 Nos 1 9 75 0.395
Other side
1200+150
1350 mm
1.35/0.20 = 6.75 + 1
say 8 nos 1 8 75 0.395
=====================================================================================
2 For RCC floor
In Raft
a Length =17.6-0.1=16.6
nos. = 8.6/0.2=43+1
say 44 nos 1 44 16.6 0.395
length = 8.3
nos. = 88 1 88 8.3 0.395
b. Length =14.2-0.1=13.2
nos. = 4.6/0.2=22+1
say 23 nos 1 23 13.2 0.395
length = 9.6
nos. = 66 1 66 4.6 0.395
=====================================================================================
3 For Main Transfo Block
In Raft
a Long Bars (16mm Dia.)
L=9700-50*2+300*2
10.20 mm
Nos of bars
7/0.15
46+ 1 Say 47 Nos 1 47 10.2 1.578
Other side (16mm dia)
L= 7000-2*50+2*300
7.5 m
Nos. of Bars 1 65 7.5 1.578
9.7/0.15= 64.5+1
Say 65 nos
At top(12mm dia)
Length = 1.5 1 38 1.5 0.888
Length = 1.5 1 65 1.5 0.888
b. Vertical Bars (16mm 150 c/c)
L= 2300-100+200+300
2700 mm
No. of Bars
4.45/0.15=29.66 say 30
Other side 30 nos.
Long side
8.5/0.15=56.67+1= say 57
Total Nos= 30*2+57*2
176 Nos. 1 176 2.7 1.579
c. Stirrupps (12mm 150 c/c)
L= 4.45*2+8.5*2-50*4
25.9
say 26 m
No.of bars = 1.9/0.15=12.66
Say 12.66 + 1 = 14nos 1 14 26 0.617
d At top of block
L= 4450
4.45m
No 0f bars= 8.5./0.2=42.5+1
say 43 nos 1 43 4.45 0.395
At bottom 1 30 4.27 0.394
L= 400*2+200
1000mm
No of bars = 4450/200=
22.5+1= say 23 nos. 4 21 1 0.395
L=400*2+200
1000mm
nos. of bars = 8500/200=
42.5+1 = 43 nos 4 43 1 0.395

Jackind pad - 4-16 dia-L-2.0m 4 4 2 1.579


Stirrups
L=400*4+150=1750mm 4 8 1.75 0.395
Nos of stirrups= 2000/250=8
4 Pulling Block
a In Raft (10mm 200c/c)
1500-100+200*2=1800mm
Nos of bars = 3000/200=15+1
Say 16
Top & bottom 4 16 1.8 0.617
b. 3000-100+200*2=3300mm
Nos of bars = 1500/200=7.5+1
Say 9 Nos 4 9 3.3 0.617
c. In Columns (12mm 200 c/c)
1700+300-100+200*2
L=2300mm
nos. = 2250/200 = 11.25+1
say 13 nos.
nos. = 750/200 = 3.75+1
say 5 nos.
total nos. = 13+5 = 18 4 18 2.3 0.888
5 Rail wall Raft (12mm 200 c/c)
length = 1950+300+300
l = 2.55m
nos. = 2550/200 = 12.75 +1
say = 13 nos.
bothface = 13*2 =26 nos. 1 26 8.8 0.888
L= 85000+300 (8mm 150 c/c)
8.8m
nos. = 1.95/0.2 = 10+1
say 11 nos.
1 11 2.85 0.888
6 RCC wall (12mm 150 c/c)
L=2600-100 = 2500
2.5m
nos. = 1.95/0.15 = 13 +1
say 14nos.
bothface = 14 *2 = 28 4 28 2.5 0.888
Hori reinft. (10mm 150 c/c)
L = 1.95m
nos. = 2.3/0.20 = 12 + 1
bothface = 13*2 = 26 nos. 4 26 2.55 0.617
7 Top RCC slab rail supports
9m x 6.150m
9000-100+300=9200mm
a Nos of bars=6.15/0.2=30.5
30.5 + 1 Say31 Nos 3 31 9.6 0.617
Other Side
b. L= 6150-100+300=6.350m
Nos of Bars=9/0.2=45 Nos 3 45 6.35 0.617
c. jacking pad
Raft (16mm 150 c/c)
length = 5000-100+250*2
length = 5400mm
Nos. of bar = 10000/150 = 66.7
say 67nos.
bothways & bothface
67*2 =134 nos. 1 134 5.4 1.579
=======================================================================================
d Raft (16mm 150 c/c)
length =10000-100+250*2
length = 10400mm
Nos. of bar = 5000/150 = 33.3
say 34nos.
bothways & bothface
34*2 =68 nos. 1 68 10.4 1.579

e Pedestal (20mm)
length =2.3-100+250*2
length = 2.7mm
Nos. of bar =8
4 1 2.7 2.47
Stirrups
L=600*4+150=2550mm
Nos of stirrups= 2300/250=9.2 4 10 2.55 0.395

8 RCC wall (10mm 150 c/c)


L=8500-100 = 8400
8.4m
nos. = 8.4/0.15 = 56
say 56nos.
bothface = 56 *2 = 112 1 112 2.5 0.617
Hori reinft. (8mm 150 c/c)
L = 8.4m
nos. = 2.3/0.20 = 12 + 1
bothface = 13*2 = 26 nos. 1 26 8.4 0.395

9 SUMP RCC wall (10mm 150 c/c)


L=1200-100 = 1100
1.10m
nos. = 1.1/0.15 = 7.3
say 8nos.
bothface = 8 *8 = 64 1 64 2.1 0.617
Hori reinft. (8mm 150 c/c)
L = 4.5m
nos. = 2.3/0.20 = 12 + 1
bothface = 13*2 = 26 nos. 1 26 4.5 0.395
8 Footings supports to coolers
a Pedestal-C
Raft (12mm 150 c/c)
length =1500-100+250*2
length = 1900mm
Nos. of bar =1500/200 = 7.5
say 8nos.
bothways & bothface
8*2 =16 nos. 8 16 1.9 0.888

Vertical Face
1500-100+2*150+300
L=2000 mm 8 8 2 0.888
Stirrups
L=600*4+150=2550mm
Nos of stirrups= 1500/250=6 8 6 2.55 0.395
=======================================================================================
b. Pedestal-C
Vertical Face
1500-100+2*150
L= 1700 2 4 1.7 0.888
Stirrups
L=300*4+150=1350mm 2 6 1.35 0.395
Nos of stirrups= 1500/250=6
=======================================================================================
c. Pedestal-D
Vertical Face
1500-100+2*150
L= 1700 2 4 1.7 0.888
Stirrups
L=400*4+150=1750mm 2 6 1.75 0.395
Nos of stirrups= 1500/250=6

d. Pedestal-E
Vertical Face
1500-100+2*150
L= 1700 10 4 1.7 0.888
Stirrups
L=300*4+150=1350mm 10 6 1.35 0.395
Nos of stirrups= 1500/250=6

e. Pedestal-H
Vertical Face
1500-100+2*150
L= 1700 1 6 1.7 0.888
Stirrups
L=1700mm 1 6 1.7 0.395
Nos of stirrups= 1500/250=6

d. Pedestal-K
Vertical Face
1500-100+2*150
L= 1700 4 4 1.7 0.888
Stirrups
L=300*4+150=1350mm 4 6 1.35 0.395
Nos of stirrups= 1500/250=6

e. Pedestal-L
Vertical Face
1500-100+2*150
L= 1700 1 4 1.7 0.888
Stirrups
L=300*4+150=1350mm 1 6 1.35 0.395
Nos of stirrups= 1500/250=6

e. Pedestal-S
Vertical Face
1500-100+2*150
L= 1700 2 4 1.7 0.888
Stirrups
L=300*4+150=1350mm 2 6 1.35 0.395
Nos of stirrups= 1500/250=6

e. Pedestal-N
Vertical Face
1500-100+2*150
L= 1700 2 4 1.7 0.888
Stirrups
L=300*4+150=1350mm 2 6 1.35 0.395
Nos of stirrups= 1500/250=6
e. Pedestal-SC1
Vertical Face
1050-100+2*150
L= 1450 18 4 1.45 0.888
Stirrups
L=250*4+150=1150mm 18 6 1.15 0.395
Nos of stirrups= 1050/200=6

f Legs for insert plate

J-12MM DIA 2 16 0.75 0.888


S1-12MM DIA 2 6 0.9 0.888
IP1-10MM DIA 1 18 0.36 0.617
IP2-10MM DIA 2 80 0.8 0.617
IP3-10MM DIA 2 120 0.5 0.617
IP4-10MM DIA 2 53 0.6 0.617

===================================================================================
Total
Add 10% extra for bend,lap
(for 1 trfo. Fdn) Grand Total
Say

MILD STEEL QUANTITIES


IP size (L X W X Thk.) size Nos sity of steel Wtt
S1 0.4x0.4x0.02 0.0032 6 7850 150.72
J 0.35x0.25x0.02 0.00175 16 7850 219.8
IP1 0.15x0.15x0.006 0.000135 18 7850 19.0755
IP2 0.25x0.3x0.012 0.0009 80 7850 565.2
IP3 0.2x0.2x0.006 0.00024 120 7850 226.08
IP4 0.25x0.3x0.006 0.00045 53 7850 187.2225
ISMB 150 L=85M 85 14.9 1266.5
ISMC 75 L=2.8M 2.8 7.14 19.992
Pl 70x70x6 0.7x0.7x0.006 0.0000294 320 7850 73.8528
Pl 100x40x8 0.1x0.04x0.008 0.000032 320 7850 80.384
Flat 40x6-300LG 0.3x0.04x0.006 0.000072 200 7850 113.04
ISA 75X75X6 L=4x15=60m 60 6.8 408
ISA 50X50X6 L=64M 64 4.5 288
ISA 50X50X5 L=4M 4 3.8 15.2

Total 3633.0668
add 10% ext 150
Grand Total 3783.0668
Say 3784
Total Weight

602.0686 Kg

237 Kg

572.6994 Kg

469.9072 Kg

266.625 Kg

237 Kg
==========

288.508 kg

288.508 kg

119.922 Kg

119.922 Kg
==========
756.4932 Kg

769.275 Kg

50.616 Kg
86.58 Kg

750.3408 Kg

224.588 Kg

75.58325 Kg
50.4714 Kg

33.18 Kg

67.94 Kg

50.528 Kg

22.12 Kg
71.0784 Kg

73.2996 Kg

147.0528 Kg

203.1744 Kg

27.8388 Kg

248.64 Kg

163.6284 Kg

550.8576 Kg

528.92325 Kg
1142.5644 Kg
============

1116.6688 Kg

26.676 Kg

40.29 Kg

172.76 Kg

86.268 Kg

82.9248 Kg

46.215 Kg
215.9616 Kg

113.664 Kg

48.348 Kg
============

12.0768 Kg

6.399 Kg

============

12.0768 Kg

8.295 Kg

60.384 Kg

31.995 Kg

9.0576 Kg

4.029 Kg

24.1536 Kg
12.798 Kg

6.0384 Kg

3.1995 Kg

12.0768 Kg

6.399 Kg

12.0768 Kg

6.399 Kg
92.7072 Kg

49.059 Kg

21.312 Kg
9.5904 Kg
3.99816 Kg
78.976 Kg
74.04 Kg
39.2412 Kg

11843.088
1184.3088
13027.397 Kg
13028 Kg

Kg

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

Kg
Kg
Kg
Kg
Name of work: RCC FIRE WALL FOUNDATION ESTIMATE

Ref. Drg. No. = C/ENGG/AMT/500/CGL/FWALL/FDN/02, SHEET 1 TO 3 OF 3


No. of Firewall= 1
ABSTRACT
Item
Item Discription QTY. RATE UNIT TOTAL
No.
Excavation for foundation
1 85.00 1.00 Cum. 85.00
PCC (1:4:8)
2 4.00 1.00 Cum. 4.00
RCC M20
3 65.00 1.00 Cum. 65.00
TMT Steel Bars/ Reinforcement in
4 RCC 5.61 1.00 MT. 5.61
Sr. No Length of Bar Nos of Strs. No. of Bars Length Unit weight
1 For Footing
a In Raft (16mm dia)
L= 2750-50*2+100*2+150
3.00m
for bottom
Length = 3m
Spacing of bar 125mm
Nos = 3/0.125= 24+1
Say 25 0Nos 4 25 3 1.578
b. In Raft (16mm dia)
L= 3000-50*2+100*2+150
3.25m
for bottom
Length = 2.75m
Spacing of bar 125mm
Nos = 2.75/0.125= 22+1
Say 23Nos 4 23 3.25 1.578
c In Raft (10mm dia)
L= 2750-50*2+100*2+150
3.00m
for top
Length = 3m
Spacing of bar 125mm
Nos = 3/0.125= 24+1
Say 25 0Nos 4 25 3 0.617
d In Raft (10mm dia)
L= 3000-50*2+100*2+150
3.25m
for top
Length = 2.75m
Spacing of bar 125mm
Nos = 2.75/0.125= 22+1
Say 23Nos 4 23 3.25 0.617

c. Column (4-25mm+8-20mm)
1 Vertical rod
6050-100+300+2*150
L=6550mm
4-25mm dia rod 4 4 6.55 3.85
8-20mm dia rod 4 8 6.55 2.47
2 Stirrups
Nos of stirrups=4950/150=33
L=800*2+450*2+150=2650mm 4 33 2.65 0.395
L=600*2+450*2+150=2100mm 4 33 2.1 0.395
L=800+2*100=1000mm 4 33 1 0.395
L=450+2*100=650mm 4 33 0.65 0.395
3 Stirrups
Nos of stirrups=1100/250=5
L=800*2+450*2+150=2650mm 4 5 2.65 0.395
L=600*2+450*2+150=2100mm 4 5 2.1 0.395
L=800+2*100=1000mm 4 5 1 0.395
L=450+2*100=650mm 4 5 0.65 0.395

4 Vertical rod
6400+1200+300
L=7900mm
8-20mm dia rod 4 8 7.9 2.47
5 Stirrups
Nos of stirrups=4200/150=28
L=600*2+450*2+150=2250mm 4 28 2.25 0.395
L=600+2*100=800mm 4 28 0.8 0.395
L=450+2*100=650mm 4 28 0.65 0.395
6 Stirrups
Nos of stirrups=2200/250=8.8
L=600*2+450*2+150=2250mm 4 9 2.25 0.395
L=600+2*100=800mm 4 9 0.8 0.395
L=450+2*100=650mm 4 9 0.65 0.395
D. BEAM
1 Main rod
15200-100+300+2*150
L=15700mm
3-16mm dia rod-Top and bottom 4 6 15.7 1.578
2 Stirrups
Nos of stirrups=9950/150=67
L=600*2+240*2+100=1780mm 4 67 1.78 0.395
3 Stirrups
Nos of stirrups=5250/250=21
L=600*2+240*2+100=1780mm 4 21 1.78 0.395

e. RCC wall (10mm dia)


1 L=15200-100=15100
Nos of rod=15100/175=87
Vertical rod 1 116 10.2 0.617
L=10200-(600*4)=7800
Nos of rod=7800/130=60
Horiz rod 1 60 15.2 0.617
===================================================================================
Total
Add 10% extra for bend,lap
(for 1 trfo. Fdn) Grand Total
Say
Total Weight

473.4 Kg

117.9555 Kg

185.1 Kg

46.12075 Kg

403.48 Kg
517.712 Kg

138.171 Kg
109.494 Kg
52.14 Kg
33.891 Kg

20.935 Kg
16.59 Kg
7.9 Kg
5.135 Kg

624.416 Kg

99.54 Kg
35.392 Kg
28.756 Kg

31.995 Kg
11.376 Kg
9.243 Kg
594.5904 Kg

188.4308 Kg

59.0604 Kg

730.0344 Kg

562.704 Kg
============
5103.5623
510.35623
5613.9185 Kg
5614 Kg
STD. PGCIL DRAWING = C/ENGG/STD/M25/ROAD/411
RCC Road 5.5M wide Concrete pavement BOQ
C/ENGG/STD/M25/ROAD/411

Length of Road (Approx) = 1


Width of Main Road = 5.5
Item Description of Work Quantity Unit Rate
No.

1 Earthwork in excavation in the following types of soil


and rock up to and including 3.0 Meters lift including
pumping out any water accumulating inside the
excavated pit/ trench, adequate protection during
excavation/ drilling/ blasting, transporting the
excavated soil for all lead & stacking selectively
including disposing off the rubbish, rock fragments,
excess spoils etc. lead up to 500 Mtr. in the area as
directed by the Engineer, including labour, tools and
tackles etc complete as per drawing, specification and
direction of the Engineer-in-charge.
a) Ordinary soil, Hard soil and soft & decomposed rock.
2.75 M3 1.00

Hard rock
b) - M3

2 300mm thick water bound macadam


(WBM) in three equal layers of 100mm each at the
bottom with available best approved quality sand
including watering, ramming, consolidating etc.,
including cost of all materials, tools, tackles and labour
complete as directed by the Engineer-in-charge.
1.65 M3 1.00

3 Providing and laying plain cement concrete 1:4:8 (1


Cement : 4 Coarse sand : 8 Graded stone aggregate
20mm nominal size) in foundation, consolidating,
finishing, curing etc., as per drawing and instruction
from time to time complete in all respects including the
cost of centering and shuttering etc, including cost of all
materials, tools, tackles and labour complete as directed
by the Engineer-in-charge. 0.55 M3 1.00
4 Providing and laying reinforced cement concrete M25
using 20mm down chips including machine mixing,
placing in position and mechanically vibrating with plate
vibrator and niddle vibrator both in pavement
(excluding cost of centering, shuttering and
reinforcement), finishing, curing complete in all respects
as per specification and drawings, including cost of all
materials, tools, tackles and labour complete as directed
by the Engineer-in-charge. 0.55 M3 1.00

5 Steel reinforcement (for reinforced cement concrete


work) including transporting, straightening, cutting to
requisite length, bending to correct shape, placing in
proper position and binding with 16 gauge black
annealed wire at every intersection complete in all
respects as per drawings, specification and direction.
(including the cost of steel) including cost of all
materials, tools, tackles and labour complete as directed
by the Engineer-in-charge.
a) TMT Bars
0.02 MT 1.00

b) M.S. Rod
1.00 MT 1.00

6 Providing and fixing centering and shuttering (Steel


plate on steel frame or plywood on wooden frame) in
pavement cocreting work including strutting, etc.
keeping the same in position during concreting and
removal of the same after specified period, Complete
with including cost of all materials, tools, tackles and
labour complete as directed by the Engineer-in-charge. 2.60 M2 1.00

7 Providing and fixing in position 12 MM thick and 200


mm deep pre-moulded (bitumastic sheet) joint filler in
Expansion Joints including cost of all materials, labour,
tools and tackles etc complete as per direction of the
Engineer-in-Charge. - RM 1.00

8 Providing and fixing in position Polythene sheet of 125


Microns between PCC & RCC Slab including cost of all
materials, labour, tools and tackles etc complete as per
direction of the Engineer-in-Charge. 5.50 M2 1.00
9 Providing, laying and fixing the following types non-
pressure NP3 class RCC pipes with cillors jointed with
stiff mixture of cement mortar in the proportion of 1:2
(1 cement : 2 fine sand) including testing of joints etc.
complete. including cost of all materials, labour, tools
and tackles etc complete as per direction of the
Engineer-in-Charge.
a) 100 mm dia. 5.50 RM 1.00

b) 250 mm dia. - RM 1.00

10 Providing and fixing precast Kerb Stone of size


300x300x150 in M-20 cement concrete and setting in
position with cement concrete 1 : 2 : 4 (1 cement : 2
coarse sand : 4 graded stone aggregate 12.5 mm
nominal size) of 400mm wide and 75 mm thick
including cost of excavation etc with all contractors
material, labour, transportation, lead & lift etc. complete
including cost of incidental charges for successful
completion of work and as directed by Engineer-in-
charge at site. 2.00 RM 1.00
RCC Road 3.75M wide Concrete pavement BOQ
Length of Road (Approx) = 1
Width of Main Road = 3.75
Item Description of Work Quantity Unit Rate
No.

1 Earthwork in excavation in the following types of soil


and rock up to and including 3.0 Meters lift including
pumping out any water accumulating inside the
excavated pit/ trench, adequate protection during
excavation/ drilling/ blasting, transporting the
excavated soil for all lead & stacking selectively
including disposing off the rubbish, rock fragments,
excess spoils etc. lead up to 500 Mtr. in the area as
directed by the Engineer, including labour, tools and
tackles etc complete as per drawing, specification and
direction of the Engineer-in-charge.
a) Ordinary soil, Hard soil and soft & decomposed rock.
1.88 M3 1.00

b) Hard rock - M3
2 300mm thick water bound macadam
(WBM) in three equal layers of 100mm each at the
bottom with available best approved quality sand
including watering, ramming, consolidating etc.,
including cost of all materials, tools, tackles and labour
complete as directed by the Engineer-in-charge.
1.13 M3 1.00

3 Providing and laying plain cement concrete 1:4:8 (1


Cement : 4 Coarse sand : 8 Graded stone aggregate
20mm nominal size) in foundation, consolidating,
finishing, curing etc., as per drawing and instruction
from time to time complete in all respects including the
cost of centering and shuttering etc, including cost of all
materials, tools, tackles and labour complete as directed
by the Engineer-in-charge. 0.38 M3 1.00

4 Providing and laying reinforced cement concrete M25


using 20mm down chips including machine mixing,
placing in position and mechanically vibrating with plate
vibrator and niddle vibrator both in pavement
(excluding cost of centering, shuttering and
reinforcement), finishing, curing complete in all respects
as per specification and drawings, including cost of all
materials, tools, tackles and labour complete as directed
by the Engineer-in-charge. 0.38 M3 1.00

5 Steel reinforcement (for reinforced cement concrete


work) including transporting, straightening, cutting to
requisite length, bending to correct shape, placing in
proper position and binding with 16 gauge black
annealed wire at every intersection complete in all
respects as per drawings, specification and direction.
(including the cost of steel) including cost of all
materials, tools, tackles and labour complete as directed
by the Engineer-in-charge.
a) TMT Bars 0.02 MT 1.00

b) M.S. Rod 1.00 MT 1.00


6 Providing and fixing centering and shuttering (Steel
plate on steel frame or plywood on wooden frame) in
pavement cocreting work including strutting, etc.
keeping the same in position during concreting and
removal of the same after specified period, Complete
with including cost of all materials, tools, tackles and
labour complete as directed by the Engineer-in-charge. 1.90 M2 1.00

7 Providing and fixing in position 12 MM thick and 200

mm deep pre-moulded (bitumastic sheet) joint filler in

Expansion Joints including cost of all materials, labour,

tools and tackles etc complete as per direction of the

Engineer-in-Charge. 3.75 RM 1.00

8 Providing and fixing in position Polythene sheet of 125


Microns between PCC & RCC Slab including cost of all
materials, labour, tools and tackles etc complete as per
direction of the Engineer-in-Charge. 3.75 M2 1.00

9 Providing, laying and fixing the following types non-


pressure NP3 class RCC pipes with cillors jointed with
stiff mixture of cement mortar in the proportion of 1:2
(1 cement : 2 fine sand) including testing of joints etc.
complete. including cost of all materials, labour, tools
and tackles etc complete as per direction of the
Engineer-in-Charge.
a) 100 mm dia. 3.75 RM 1.00

b) 250 mm dia. - RM 1.00


10 Providing and fixing precast Kerb Stone of size
300x300x150 in M-20 cement concrete and setting in
position with cement concrete 1 : 2 : 4 (1 cement : 2
coarse sand : 4 graded stone aggregate 12.5 mm
nominal size) of 400mm wide and 75 mm thick
including cost of excavation etc with all contractors
material, labour, transportation, lead & lift etc. complete
including cost of incidental charges for successful
completion of work and as directed by Engineer-in-
charge at site. 2.00 RM 1.00
Mt.
Mt.

Amount

2.75

1.65

0.55
0.55

0.02

1.00

2.60

5.50
5.50

2.00

Mt.
Mt.
Amount

1.88

-
1.13

0.38

0.38

0.02

1.00
1.90

3.75

3.75

3.75

-
2.00
STD. PGCIL DRAWING = C/ENGG/STD/DRAIN/01
SURFACE DRAIN SEC- A-A FOR RCC Road 5.5M wide
C/ENGG/STD/DRAIN/01
Length of Road (Approx) = 1
Width of Main Road = 5.5
Item Description of Work Quantity Unit Rate
No.

1 Earthwork in excavation in the following types of soil


and rock up to and including 3.0 Meters lift including
pumping out any water accumulating inside the
excavated pit/ trench, adequate protection during
excavation/ drilling/ blasting, transporting the
excavated soil for all lead & stacking selectively
including disposing off the rubbish, rock fragments,
excess spoils etc. lead up to 500 Mtr. in the area as
directed by the Engineer, including labour, tools and
tackles etc complete as per drawing, specification and
direction of the Engineer-in-charge.
a) Ordinary soil, Hard soil and soft & decomposed rock.
1.23 M3 1.00

2 Providing and laying plain cement concrete 1:4:8 (1


Cement : 4 Coarse sand : 8 Graded stone aggregate
20mm nominal size) in foundation, consolidating,
finishing, curing etc., as per drawing and instruction
from time to time complete in all respects including the
cost of centering and shuttering etc, including cost of all
materials, tools, tackles and labour complete as directed
by the Engineer-in-charge. 0.14 M3 1.00

3 Brick work with cement mortar CM 1:6 0.71 M3 1.00

4 12 mm thick Cement Plaster with Neat Cement Finish


4.72 M2 1.00

5 Providing and laying 25 mm plain cement concrete 1:2:4


(1 Cement : 2 Coarse sand : 4 Graded stone aggregate
nominal size) 0.60 M2 1.00

6 Screener 125 mm x 125 mm with MS flat at 2 mt regular


interval for Gravel Side 2.00 Nos 1.00

SURFACE DRAIN SEC- A-A FOR RCC Road 3.75M wide


Length of Road (Approx) = 1
Width of Main Road = 3.75
Item Description of Work Quantity Unit Rate
No.

1 Earthwork in excavation in the following types of soil


and rock up to and including 3.0 Meters lift including
pumping out any water accumulating inside the
excavated pit/ trench, adequate protection during
excavation/ drilling/ blasting, transporting the
excavated soil for all lead & stacking selectively
including disposing off the rubbish, rock fragments,
excess spoils etc. lead up to 500 Mtr. in the area as
directed by the Engineer, including labour, tools and
tackles etc complete as per drawing, specification and
direction of the Engineer-in-charge.
a) Ordinary soil, Hard soil and soft & decomposed rock.
1.23 M3 1.00

2 Providing and laying plain cement concrete 1:4:8 (1


Cement : 4 Coarse sand : 8 Graded stone aggregate
20mm nominal size) in foundation, consolidating,
finishing, curing etc., as per drawing and instruction
from time to time complete in all respects including the
cost of centering and shuttering etc, including cost of all
materials, tools, tackles and labour complete as directed
by the Engineer-in-charge. 0.14 M3 1.00

3 Brick work with cement mortar CM 1:6 0.71 M3 1.00

4 12 mm thick Cement Plaster with Neat Cement Finish


4.72 M2 1.00

5 Providing and laying 25 mm plain cement concrete 1:2:4


(1 Cement : 2 Coarse sand : 4 Graded stone aggregate
nominal size) 0.60 M2 1.00

6 Screener 125 mm x 125 mm with MS flat at 2 mt regular


interval for Gravel Side 2.00 Nos 1.00
M wide

Mt.
Mt.

Amount

1.23

0.14

0.71

4.72

0.60

2.00

M wide
Mt.
Mt.
Amount

1.23

0.14

0.71

4.72

0.60

2.00
STD. PGCIL DRAWING = C/ENGG/STD/DRAIN/01
SURFACE DRAIN SEC- B-B FOR RCC Road 5.5M wide
C/ENGG/STD/DRAIN/01
Length of Road (Approx) = 1
Width of Main Road = 5.5
Item Description of Work Quantity Unit Rate
No.

1 Earthwork in excavation in the following types of soil


and rock up to and including 3.0 Meters lift including
pumping out any water accumulating inside the
excavated pit/ trench, adequate protection during
excavation/ drilling/ blasting, transporting the
excavated soil for all lead & stacking selectively
including disposing off the rubbish, rock fragments,
excess spoils etc. lead up to 500 Mtr. in the area as
directed by the Engineer, including labour, tools and
tackles etc complete as per drawing, specification and
direction of the Engineer-in-charge.
a) Ordinary soil, Hard soil and soft & decomposed rock.
2.52 M3 1.00

2 Providing and laying plain cement concrete 1:4:8 (1


Cement : 4 Coarse sand : 8 Graded stone aggregate
20mm nominal size) in foundation, consolidating,
finishing, curing etc., as per drawing and instruction
from time to time complete in all respects including the
cost of centering and shuttering etc, including cost of all
materials, tools, tackles and labour complete as directed
by the Engineer-in-charge. 0.19 M3 1.00

3 Brick work with cement mortar CM 1:6 1.15 M3 1.00

4 12 mm thick Cement Plaster with Neat Cement Finish


5.22 M2 1.00

5 Providing and laying 25 mm plain cement concrete 1:2:4


(1 Cement : 2 Coarse sand : 4 Graded stone aggregate
nominal size) 0.90 M2 1.00

6 Screener 125 mm x 125 mm with MS flat at 2 mt regular


interval for Gravel Side 2.00 Nos 1.00

SURFACE DRAIN SEC-B-B FOR RCC Road 3.75M wide


Length of Road (Approx) = 1
Width of Main Road = 3.75
Item Description of Work Quantity Unit Rate
No.

1 Earthwork in excavation in the following types of soil


and rock up to and including 3.0 Meters lift including
pumping out any water accumulating inside the
excavated pit/ trench, adequate protection during
excavation/ drilling/ blasting, transporting the
excavated soil for all lead & stacking selectively
including disposing off the rubbish, rock fragments,
excess spoils etc. lead up to 500 Mtr. in the area as
directed by the Engineer, including labour, tools and
tackles etc complete as per drawing, specification and
direction of the Engineer-in-charge.
a) Ordinary soil, Hard soil and soft & decomposed rock.
2.52 M3 1.00

2 Providing and laying plain cement concrete 1:4:8 (1


Cement : 4 Coarse sand : 8 Graded stone aggregate
20mm nominal size) in foundation, consolidating,
finishing, curing etc., as per drawing and instruction
from time to time complete in all respects including the
cost of centering and shuttering etc, including cost of all
materials, tools, tackles and labour complete as directed
by the Engineer-in-charge. 0.19 M3 1.00

3 Brick work with cement mortar CM 1:6 1.15 M3 1.00

4 12 mm thick Cement Plaster with Neat Cement Finish


5.22 M2 1.00

5 Providing and laying 25 mm plain cement concrete 1:2:4


(1 Cement : 2 Coarse sand : 4 Graded stone aggregate
nominal size) 0.90 M2 1.00

6 Screener 125 mm x 125 mm with MS flat at 2 mt regular


interval for Gravel Side 2.00 Nos 1.00
M wide

Mt.
Mt.

Amount

2.52

0.19

1.15

5.22

0.90

2.00

M wide
Mt.
Mt.
Amount

2.52

0.19

1.15

5.22

0.90

2.00
STD. PGCIL DRAWING = C/ENGG/STD/DRAIN/01
SURFACE DRAIN SEC- C-C FOR RCC Road 5.5M wide
C/ENGG/STD/DRAIN/01
Length of Road (Approx) = 100
Width of Main Road = 5.5
Item Description of Work Quantity Unit Rate
No.

1 Earthwork in excavation in the following types of soil


and rock up to and including 3.0 Meters lift including
pumping out any water accumulating inside the
excavated pit/ trench, adequate protection during
excavation/ drilling/ blasting, transporting the
excavated soil for all lead & stacking selectively
including disposing off the rubbish, rock fragments,
excess spoils etc. lead up to 500 Mtr. in the area as
directed by the Engineer, including labour, tools and
tackles etc complete as per drawing, specification and
direction of the Engineer-in-charge.
a) Ordinary soil, Hard soil and soft & decomposed rock.
425.85 M3 1.00

2 Providing and laying plain cement concrete 1:4:8 (1


Cement : 4 Coarse sand : 8 Graded stone aggregate
20mm nominal size) in foundation, consolidating,
finishing, curing etc., as per drawing and instruction
from time to time complete in all respects including the
cost of centering and shuttering etc, including cost of all
materials, tools, tackles and labour complete as directed
by the Engineer-in-charge. 25.05 M3 1.00

3 Brick work with cement mortar CM 1:6 156.40 M3 1.00

4 12 mm thick Cement Plaster with Neat Cement Finish


642.00 M2 1.00

5 Providing and laying 25 mm plain cement concrete 1:2:4


(1 Cement : 2 Coarse sand : 4 Graded stone aggregate
nominal size) 120.00 M2 1.00

6 Screener 125 mm x 125 mm with MS flat at 2 mt regular


interval for Gravel Side 100.00 Nos 1.00

SURFACE DRAIN SEC-C-C FOR RCC Road 3.75M wide


Length of Road (Approx) = 1
Width of Main Road = 3.75
Item Description of Work Quantity Unit Rate
No.

1 Earthwork in excavation in the following types of soil


and rock up to and including 3.0 Meters lift including
pumping out any water accumulating inside the
excavated pit/ trench, adequate protection during
excavation/ drilling/ blasting, transporting the
excavated soil for all lead & stacking selectively
including disposing off the rubbish, rock fragments,
excess spoils etc. lead up to 500 Mtr. in the area as
directed by the Engineer, including labour, tools and
tackles etc complete as per drawing, specification and
direction of the Engineer-in-charge.
a) Ordinary soil, Hard soil and soft & decomposed rock.
4.26 M3 1.00

2 Providing and laying plain cement concrete 1:4:8 (1


Cement : 4 Coarse sand : 8 Graded stone aggregate
20mm nominal size) in foundation, consolidating,
finishing, curing etc., as per drawing and instruction
from time to time complete in all respects including the
cost of centering and shuttering etc, including cost of all
materials, tools, tackles and labour complete as directed
by the Engineer-in-charge. 0.25 M3 1.00

3 Brick work with cement mortar CM 1:6 1.56 M3 1.00

4 12 mm thick Cement Plaster with Neat Cement Finish


6.42 M2 1.00

5 Providing and laying 25 mm plain cement concrete 1:2:4


(1 Cement : 2 Coarse sand : 4 Graded stone aggregate
nominal size) 1.20 M2 1.00

6 Screener 125 mm x 125 mm with MS flat at 2 mt regular


interval for Gravel Side 2.00 Nos 1.00
M wide

Mt.
Mt.

Amount

425.85

25.05

156.40

642.00

120.00

100.00

M wide
Mt.
Mt.
Amount

4.26

0.25

1.56

6.42

1.20

2.00
STD. PGCIL DRAWING = C/ENGG/STD/DRAIN/01
SURFACE DRAIN SEC- D-D FOR RCC Road 5.5M wide
C/ENGG/STD/DRAIN/01
Length of Road (Approx) = 1
Width of Main Road = 5.5
Item Description of Work Quantity Unit Rate
No.

1 Earthwork in excavation in the following types of soil


and rock up to and including 3.0 Meters lift including
pumping out any water accumulating inside the
excavated pit/ trench, adequate protection during
excavation/ drilling/ blasting, transporting the
excavated soil for all lead & stacking selectively
including disposing off the rubbish, rock fragments,
excess spoils etc. lead up to 500 Mtr. in the area as
directed by the Engineer, including labour, tools and
tackles etc complete as per drawing, specification and
direction of the Engineer-in-charge.
a) Ordinary soil, Hard soil and soft & decomposed rock.
6.46 M3 1.00

2 Providing and laying plain cement concrete 1:4:8 (1


Cement : 4 Coarse sand : 8 Graded stone aggregate
20mm nominal size) in foundation, consolidating,
finishing, curing etc., as per drawing and instruction
from time to time complete in all respects including the
cost of centering and shuttering etc, including cost of all
materials, tools, tackles and labour complete as directed
by the Engineer-in-charge. 0.31 M3 1.00

3 Brick work with cement mortar CM 1:6 2.25 M3 1.00

4 12 mm thick Cement Plaster with Neat Cement Finish


7.62 M2 1.00

5 Providing and laying 25 mm plain cement concrete 1:2:4


(1 Cement : 2 Coarse sand : 4 Graded stone aggregate
nominal size) 1.50 M2 1.00

6 Screener 125 mm x 125 mm with MS flat at 2 mt regular


interval for Gravel Side 2.00 Nos 1.00

SURFACE DRAIN SEC-D-D FOR RCC Road 3.75M wide


Length of Road (Approx) = 1
Width of Main Road = 3.75
Item Description of Work Quantity Unit Rate
No.

1 Earthwork in excavation in the following types of soil


and rock up to and including 3.0 Meters lift including
pumping out any water accumulating inside the
excavated pit/ trench, adequate protection during
excavation/ drilling/ blasting, transporting the
excavated soil for all lead & stacking selectively
including disposing off the rubbish, rock fragments,
excess spoils etc. lead up to 500 Mtr. in the area as
directed by the Engineer, including labour, tools and
tackles etc complete as per drawing, specification and
direction of the Engineer-in-charge.
a) Ordinary soil, Hard soil and soft & decomposed rock.
6.46 M3 1.00

2 Providing and laying plain cement concrete 1:4:8 (1


Cement : 4 Coarse sand : 8 Graded stone aggregate
20mm nominal size) in foundation, consolidating,
finishing, curing etc., as per drawing and instruction
from time to time complete in all respects including the
cost of centering and shuttering etc, including cost of all
materials, tools, tackles and labour complete as directed
by the Engineer-in-charge. 0.31 M3 1.00

3 Brick work with cement mortar CM 1:6 2.25 M3 1.00

4 12 mm thick Cement Plaster with Neat Cement Finish


7.62 M2 1.00

5 Providing and laying 25 mm plain cement concrete 1:2:4


(1 Cement : 2 Coarse sand : 4 Graded stone aggregate
nominal size) 1.50 M2 1.00

6 Screener 125 mm x 125 mm with MS flat at 2 mt regular


interval for Gravel Side 2.00 Nos 1.00
M wide

Mt.
Mt.

Amount

6.46

0.31

2.25

7.62

1.50

2.00

M wide
Mt.
Mt.
Amount

6.46

0.31

2.25

7.62

1.50

2.00
Name of work: DG SET FOUNDATION ESTIMATE

REF. DRG . - C/ENGG/BOKEBA/DG/250/FDN/21


No. of DG SET = 1
ABSTRACT

Item
Item Discription QTY. RATE UNIT TOTAL
No.
Excavation for foundation
1 10.00 1.00 Cum. 10.00

PCC (1:4:8)
2 1.00 1.00 Cum. 1.00
PCC (1:5:10)
3 5.00 1.00 Cum. 5.00
RCC M20/25 CONCRETE
4 4.00 1.00 Cum. 4.00

TMT Steel Bars/ Reinforcement in RCC


5 0.16 1.00 MT. 0.16

SAND FILLING
6 4.00 1.00 Cum. 4.00
GANTRY BEAM, TOWER & EQUIPMENT STRUCTURE BOQ

NUTS / FDN
Type of Reference Height /
Sr. NO STR (Kg) BOLTS BOLTS
Tower/Beam drg./BOM no. Span (mt)
(Kg) (2a) (Kg) (2b)

LATTICE STRUCTURE
A 400 KV GANTRY BEAM & TOWER BOQ
a. Tower
ASTL/KEC/TUMKUR&
1 TA GOOTY/01, SHEET 1 22.5 3385 148.344 175.2
OF 1
ASTL/KEC/TUMKUR&
2 TB GOOTY/02, SHEET 1 22.5 5057.9 199.143 468.012
OF 1
ASTL/KEC/TUMKUR&
3 TC GOOTY/03, SHEET 1,2 15 2473.4 117.642 66.036
OF 2
LINE DIA-C-ENGG-STD-
4 TD STR-4725, SHEET 1 OF 15 5320.13 128.184 175.2
1
LINE DIA-C-ENGG-STD-
5 TE STR-4726, SHEET 1 OF 22.5 1995.18 399.1 175.2
1
LINE DIA-C-ENGG-STD-
6 TF STR-4727, SHEET 1 OF 22.5 3168.18 633.7 468.012
1
KPD/A99/PGCIL/BOL/
7 TG E1-024, SHEET 1, 2 OF 29.5 5040.418 313.2276 175.2
2
ASTL/KEC/TUMKUR&
8 TH GOOTY/04, SHEET 1,2 29.5 8436.84 327.663 624.016
OF 2
ASTL/KEC/TUMKUR&
9 TI GOOTY/05, SHEET 1,2 29.5 4301.51 188.034 175.2
OF 2
ASTL/KEC/TUMKUR&
10 TJ GOOTY/06, SHEET 1,2 29.5 7211.5 272.9055 624.016
OF 2
ASTL/KEC/TUMKUR&
11 TK GOOTY/07, SHEET 1,2 29.5 5320.13 128.184 175.2
OF 2
ASTL/KEC/TUMKUR&
12 TL GOOTY/08, SHEET 1,2 29.5 8044 355.236 624.016
OF 2
ASTL/KEC/TUMKUR&
13 TM GOOTY/09, SHEET 1,2 29.5 6877.42 303.261 468.012
OF 2
ASTL/KEC/TUMKUR&
14 TN GOOTY/10, SHEET 1,2 29.5 8110.55 371.952 624.016
OF 2
C-ENGG-STD-400-FAB-
15 TV 474042,SHEET 1 OF 1 33.5 14060 682.5 624.016
b. Beam
ASTL/KEC/TUMKUR&
1 G1 GOOTY/01, SHEET 1,2 24 3958.99 224.721 -
OF 2
ASTL/KEC/TUMKUR&
2 G2 GOOTY/02, SHEET 1,2 24 3315.18 176.5785 -
OF 2
ASTL/KEC/TUMKUR&
3 GA GOOTY/03, SHEET 1 27 4423.16 194.3235 -
OF 1
ASTL/KEC/TUMKUR&
4 GB GOOTY/06, SHEET 1,2 27 3923.7 193.2735 -
OF 2
B 220 KV GANTRY BEAM & TOWER BOQ
a. Tower
KEC/TNS/TUM/PG/ST
1 CA D/COL/0243, SHEET 1 21.2 2655.75 132.783 233.6
OF 1
KEC/TNS/TUM/PG/ST
2 CB D/COL/0243, SHEET 1 21.2 3742.38 159.0225 624.016
OF 1
KEC/TNS/TUM/PG/ST
3 CC D/COL/0245, SHHET 1 11.7 1572.67 55.377 88.048
OF 1

C-ENGG-STD-220-FAB-
4 CTB 474049, SHEET 1 OF 1 21.2 4259.24 230.664 624.016

KEC/TNS/TUM/PG/ST
5 CTC D/COL/0250, SHEET 1 21.2 4812.95 192.3495 624.016
OF 1
KEC/TNS/TUM/PG/ST
6 CTD D/COL/0251, SHEET 1 16.2 2333.89 113.8725 175.2
OF 1

C-ENGG-STD-220-FAB-
7 CTE 474052, SHEET 1 OF 1 16.2 3219.12 201.642 624.016

C-ENGG-STD-220-FAB-
8 CTF 474053, SHEET 1 OF 1 16.2 3735.84 190.575 624.016

KEC/TNS/TUM/PG/ST
9 CTG D/COL/0254, SHEET 1 11.7 1726.98 117.3585 88.048
OF 1
KEC/TNS/TUM/PG/ST
10 CTH D/COL/0255, SHEET 1 11.7 2234.43 119.742 233.6
OF 1
KEC/TNS/TUM/PG/ST
11 CTI D/COL/0256, SHEET 1 21.2 3579.04 218.064 624.016
OF 1
KEC/TNS/TUM/PG/ST
12 LM D/COL/0258, SHEET 1 47.5 12920.39 197.4945 624.016
TO 4 OF 4
b. NON STANDARD TOWER BOQ
C-ENGG-NONSTD-
13 CTAN 400FAB-474048, 24.7 6821.73 199.143 624.016
SHEET 1 TO 2 OF 2
C-ENGG-NONSTD-
14 CTEN 400FAB-474063, 25.7 6137.33 199.143 624.016
SHEET 1 TO 2 OF 2
C-ENGG-NONSTD-FAB-
15 CEN 474047 11.7 2116.68 128.184 175.2
C-ENGG-NONSTD-220-
16 CJ FAB-474064 21.2 2871.72 159.023 175.2
C-ENGG-NONSTD-220-
17 CK STR-474065 21.2 3749.62 159.023 624.016
C-ENGG-NON-STD-
18 CTINN FAB-474064 22.2 3818.69 159.023 624.016
C-ENGG-STD-220-FAB-
19 CTEP 474052 21.2 3412.33 159.023 624.016
c. Beam
KEC/TNS/TUM/PG/ST
1 B1 D/BEAM/0241, SHEET 16 1624.89 106.428 -
1 OF 1
KEC/TNS/TUM/PG/ST
2 BG1 D/BEAM/0242, SHEET 16 1857.31 108.0765 -
1 OF 1
C. 132KV GANTRY BEAM & TOWER BOQ
132 KV
1 GANTRY E/S/C-756. R0 16.4 2370.92 237.1 -
TOWER

132 KV BEAM
(PHASE
DISTANCE=270
2 E/S/C-759 12.5 1003.97 100.4 -
0 & BAY
WIDTH=12500
MM)

132 KV -A-
3 FRAME E/S/C-760. R0 8.9 1338.92 133.9 -
STRUCTURE
D. 72.5 KV GANTRY BEAM & TOWER BOQ
a. Tower
C-ENGG-STD-FAB-
1 A2 4713, SHEET 1, 2 OF 2 8.5 2330.7 - -

PIPE STRUCTURE
E. 400 KV EQUIPMENT STRUCTURE BOQ
a. Equipment Str
ASTL/KEC/TUMKUR&
GOOTY/400KV/01,
1 CT SHEET 1 OF 2 3.625 484.98 2.3625 22.012
ASTL/KEC/TUMKUR&
GOOTY/400KV/01,
2 CTJ SHEET 2 OF 2 3.625 516.11 3.486 22.012
ASTL/KEC/TUMKUR&
GOOTY/400KV/04,
3 LA SHEET 1 OF 1 4.91 316.08 5.607 22.012
ASTL/KEC/TUMKUR&
GOOTY/400KV/05,
4 CVT SHEET 1 OF 2 3.368 301.37 3.507 22.012
ASTL/KEC/TUMKUR&
GOOTY/400KV/05,
5 CVTJ SHEET 2 OF 2 3.368 325.77 3.507 22.012
ASTL/KEC/TUMKUR&
GOOTY/400KV/02,
6 BPI SHEET 1 OF 1 4.35 266.78 4.1685 22.012
ISO WITH 2 E/S
7 (ACW) 3.91 2425.5 24.255 132.072
ISO WITH 2 E/S
8 (CW) 3.91 2396.25 23.9625 132.072

ISO WITH 1 E/S


9 L.H.S. (ACW) 3.91 2303.19 23.0319 132.072
ASTL/KEC/TUMKUR&GOOTY/400KV/03, SHEET 1 TO 7 OF 7
ISO WITH 1 E/S
10 R.H.S. (ACW) 3.91 2303.19 23.0319 132.072

ISO WITH 1 E/S


11 L.H.S. (CW) 3.91 2273.94 22.7394 132.072

ISO WITH 1 E/S


12 R.H.S. (CW) 3.91 2273.94 22.7394 132.072
ASTL/KEC/TUMKUR&
GOOTY/400KV/06,
13 WT SHEET 1 OF 1 4.35 304.81 5.649 66.036
F. 220 KV EQUIPMENT STRUCTURE BOQ
a. Equipment Str
ASTL/KEC/TUMKUR&
GOOTY/220KV/01,
1 CT SHEET 1 OF 2 3.065 308.42 3.6225 22.012
ASTL/KEC/TUMKUR&
GOOTY/220KV/01,
2 CTJ SHEET 2 OF 2 3.065 336.27 3.6225 22.012
ASTL/KEC/TUMKUR&
GOOTY/220KV/04,
3 LA SHEET 1 OF 1 3.545 241.77 3.36 22.012
ASTL/KEC/TUMKUR&
GOOTY/220KV/05,
4 CVT SHEET 1 OF 2 3.03 210.58 2.4465 22.012
ASTL/KEC/TUMKUR&
GOOTY/220KV/05,
5 CVTJ SHEET 2 OF 2 3.03 227.82 2.4465 22.012
ASTL/KEC/TUMKUR&
GOOTY/220KV/02,
6 BPI SHEET 1 OF 1 3.46 183.17 4.095 22.012
ASTL/KEC/TUMKUR&
GOOTY/220KV/07,
7 HIGH BPI SHEET 1 OF 1 5.685 466.5 4.095 22.012
8 TANDEM
ISO WITH 2ISO
E/S 3.215 1570.2 15.702 132.072
9 (CW) 2 E/S
ISO WITH 3.215 1594.26 15.9426 132.072
10 (ACW) 3.215 1609.08 16.0908 132.072
ISO WITH 1 E/S ASTL/KEC/TUMKUR&GOOTY/220KV/02, SHEET 1 TO 5 OF 5
11 (CW) 3.215 1553.19 15.5319 132.072
ISO WITH 1 E/S
12 (ACW) 3.215 1560.58 15.6058 132.072
ASTL/KEC/TUMKUR&
GOOTY/220KV/06,
13 WT SHEET 1 OF 1 3.6 215.24 5.376 66.036
G. 132 KV EQUIPMENT STRUCTURE (LATTICE) BOQ
1 132 KV LA E/S/C-695.R2 3.005 230.08 23.01 -
2 132 KV BPI E/S/C-710.R2 3.523 204.05 20.41 -
132 KV HIGH
3 E/S/C-742.R1 5.723 320.99 32.1 -
LEVEL BPI

132 KV,1250A
TRIPLE POLE
4 E/S/C-765. R2 3.31 835.88 83.59 -
LOW LEVEL
ISO (WITH E/S)

132KV, 1250A
TRIPLE POLE
5 E/S/C-765. R2 3.31 821.72 82.18 -
LOW LEVEL
ISO. (W/O ES)
132 KV 2000A
TRIPLE POLE
6 E/S/C-766. R2 8.9 1756.13 175.62 -
HIGH LEVEL
ISOLATOR

7 FOR 132 KV PT E/S/C-785. R2 2.89 199.37 19.94 -

FOR 132 KV
8 E/S/C-786. R2 2.9 224.83 22.49 -
CT
132 KV,1250A
TRIPLE POLE
9 LOW LEVEL E/S/C-800. R1 3.31 876.36 87.64 -
TANDEM
ISOLATOR
10 132kV CVT 0 -
H. 72.5 KV EQUIPMENT STRUCTURE BOQ
a. Equipment Str

1 CT 2.94 SHEET
GSTL-KEC-72.5KV-EQP-BOL-02, 158.73
1 OF 1 1.5873 22.012

2 PT 5.535 SHEET
GSTL-KEC-72.5KV-EQP-BOL-03, 152.56
1 OF 1 1.5256 22.012

3 LA FROM QPT. DRG 3.035 150 1.5 22.012

4 BPI 3.485 SHEET


GSTL-KEC-72.5KV-EQP-BOL-01, 174
1 OF 1 1.74 22.012

5 ISO 3.268 SHEET


GSTL-KEC-72.5KV-EQP-BOL-04, 1036
1 OF 1 10.36 132.072

NOTE: * UNIT RATE AS ON 31ST AUG.,2012.


** UNIT RATE CONSIDERED IS WITHOUT ANY TAX & CHARGES. ANY TAX & CHARGES WILL BE APPLICABLE EXTRA AS PER
(1) For the structure whoes proto drawings and BOMs are not available with us, weight has been calculated from the line
and plate).
T STRUCTURE BOQ
bhatianv:
MOUN In this excel sheet we have tried to cover standard PGCIL
TOTAL
TING Unit Total Cost 400kv/220kv/72.5kv equipments, gantry tower and beam structure
Wt. Per Qty. BOQ with reference to PGCIL 400/220kv Tumkur Project and 132/33kV
BOLT Rate/kg * (INR) DVC project. Structure weight breakup is as follows:
STR (Kg)
(kg)
1. Structure Weight (Kg): This weight includes lattice/Pipe
RE structure, base plate, gusset plates. This weight considered from the
Proto drawings & BOMS.
& TOWER BOQ
2. Nuts and Bolts weight (Kg):

2a. This weight of nuts and bolts required for fabrication of the
- 3708.544 60 1 222513 structure + 5% extra as per PGCIL requirements is included in this
part.

2b. This is the weight of Foundation Bolts required per structure as per
- 5725.055 60 1 343504 PGCIL drawings.

3. Equipment mounting bolts weight (Kg): The weight of


equipment mounting bolts is considered in this part. Though nos. and
- 2657.078 60 1 159425 diameter of the bolts may vary as per vendor we have considered
PGCIL Tumkur project as a reference.

Structure weights are considered from the Proto drawings and BOMs of
- 5623.514 60 1 337411 Tumkur project, but for the structures whose proto drawings and BOMs
are not available, weight has been calculated from line diagram (+
20% extra for nuts, bolts and plates).

- 2569.48 60 1 154169

- 4269.892 60 1 256194

- 5528.8456 60 1 331731

- 9388.519 60 1 563312

- 4664.744 60 1 279885

- 8108.4215 60 1 486506

- 5623.514 60 1 337411

- 9023.252 60 1 541396

- 7648.693 60 1 458922

- 9106.518 60 1 546392

- 15366.516 60 1 921991

- 4183.711 60 1 251023

- 3491.7585 60 1 209506
- 4617.4835 60 1 277050

- 4116.9735 60 1 247019

TOWER BOQ

- 3022.133 60 1 181328

- 4525.4185 60 1 271526

- 1716.095 60 1 102966

- 5113.92 60 1 306836

- 5629.3155 60 1 337759

- 2622.9625 60 1 157378

- 4044.778 60 1 242687

- 4550.431 60 1 273026

- 1932.3865 60 1 115944

- 2587.772 60 1 155267

- 4421.12 60 1 265268

- 13741.901 60 1 824515
WER BOQ

- 7644.889 60 1 458694

- 6960.489 60 1 417630

- 2420.064 60 1 145204

- 3205.9425 60 1 192357

- 4532.6585 60 1 271960

- 4601.729 60 1 276104

- 4195.3685 60 1 251723

- 1731.318 60 1 103880

- 1965.3865 60 1 117924

& TOWER BOQ

- 2608.02 1 1 2609

- 1104.37 1 1 1105

- 1472.82 1 1 1473

& TOWER BOQ

- 2330.7 60 1 139842

UCTURE BOQ

2.26 509.3545 65 1 33109

2.26 541.608 65 1 35205

0.564 343.699 65 1 22341

0.564 326.889 65 1 21248


0.564 351.289 65 1 22834

1.128 292.9605 65 1 19043

1.256 2581.827 65 1 167819

1.256 2552.2845 65 1 165899

1.256 2458.2939 65 1 159790

1.256 2458.2939 65 1 159790

1.256 2428.7514 65 1 157869

1.256 2428.7514 65 1 157869

1.128 376.495 65 1 24473


UCTURE BOQ

0.816 334.0545 65 1 21714

0.816 361.9045 65 1 23524


0.564 267.142 65 1 17365

0.564 235.0385 65 1 15278

0.564 252.2785 65 1 16399

0.628 209.277 65 1 13604

0.628 492.607 65 1 32020


3.384 1717.974 65 1 111669
3.384 1742.2746 65 1 113248
3.384 1757.2428 65 1 114221

3.384 1700.7939 65 1 110552

3.384 1708.2578 65 1 111037

1.128 286.652 65 1 18633


RE (LATTICE) BOQ
253.09 1 1 254
224.46 1 1 225
353.09 1 1 354

919.47 1 1 920

903.9 1 1 904

1931.75 1 1 1932

219.31 1 1 220

247.32 1 1 248

964 1 1 964

0 1 1 0
UCTURE BOQ
0.468 182.3293 65 1 11852

0.468 176.0976 65 1 11447

0.468 173.512 65 1 11279

0.23 197.752 65 1 12854

0.468 1178.432 65 1 76599

BE APPLICABLE EXTRA AS PER PRESENT CONDITION.


s been calculated from the line diagram (+20% extra for nut, bolt
400 kV Tumkur & Gooty Equipment foundtion bolt Quantity
bhatianv:

Anchor Length of Bolt Threaded


Length No of structures No. of foundation THIS SHEET IS MENT
Total EQUIPMENT Bolt
Sr No Equipment Dia. (mm) Bolts per Total No. of Bolts ESTIMATE TOTAL NO
Quantity L (mm) T per equipment
(mm)-d structure FOUNDATION BOLT O
VARIOUS DIAMETER

Lightning Arrester per


1 phase 1 28 925 125 1 4 4

2 Isolator 1 28 925 125 6 4 24


Current transformer
3 per phase 1 28 925 125 1 4 4

Capacitive Voltage
4 Transformer per 1 28 925 125 1 4 4
phase

Bus Post Insulator per


5 phase 1 28 925 125 1 4 4
Circuit Breaker
6 without PIR & CSD 1
Circuit Breaker with
7 PIR 1
given by Circuit Breaker Manufacturer
Circuit Breaker with
8 CSD 1
Circuit Breaker with
9 PIR 1

10 Wave Trap 1 28 925 125 1 12 12

220 kV Tumkur Equipment foundtion bolt Quantity


Lightning Arrester per
1 phase 1 28 925 125 1 4 4

2 Isolator 1 28 925 125 6 4 24


Current transformer
3 per phase 1 28 925 125 1 4 4

Capacitive Voltage
4 Transformer per 1 28 925 125 1 4 4
phase

Bus Post Insulator per


5 phase 1 28 925 125 1 4 4
Circuit Breaker
6 1 given by Circuit Breaker Manufacturer

7 Wave Trap 1 28 925 125 1 12 12


E- 72.5 kV Equipments

1 CB

Current transformer
per phase 28 925 4
2 1 125 1 4

3 1 28 925 125 1 4 4
Voltage Transformer
per phase
4 Isolator 1 28 925 125 6 4 24
5 BPI 1 28 925 125 1 4 4
H/L 132kV BPI 28 925 4
6 LA 1 125 1 4
(Str. & fdn details of
132kV SEB foundtion bolt Quantity
132kV H/L single
1 bus support of solid - 1 8 8
1 20 600
core post insulator -
bus height
Structure
=7350mmfor L/L
above
132kV
TOC) BPI
(Str. & fdn details of
132kV single bus
2 support of solid 1 20 425 - 1 8 8
core post insulator -
bus height
=5150mm above
TOC)
L/L 132kV LA
3 (Str. & fdn details of 1 20 700 - 1 4 4
132kV
132kV LA )
Isolator
4 (High level) - 1 25 950 - 1 16 16
without E/s

5 Marshalling box for - 1 4 4


1 12 450
above
6 132kV Isolator (Low - 1 8 8
1 20 700
level) - with E/s

7 Marshalling box for - 1 4 4


1 12 450
above

8 132kV Isolator (Low - 1 8 8


1 20 700
level) - Without E/s

9 Marshalling box for - 1 4 4


1 12 450
above

132kV Isolator (Low


10 level) - Tandem - 1 20 600 - 1 16 16
without E/s

11 Marshalling box for - 1 4 4


1 12 500
above
12 132kV CT 1 20 600 100 1 4 4
13 132kV CVT 1 - 1 0
14 132kV EMVT 1 20 600 100 1 4 4
15 under supplier - 1 #VALUE!
132kV CB
scope
- 1 0
F- 11 kV Equipments

1 HG FUSE 1 28 925 125 1 12 12


STRUCTURE

Hence Total no. of foundation Bolts required for equipments (except CB & Wave trap) - D=28 mm,L = 925 mm, T = 125 mm 156
400 kV Lattice Tower foundtion bolt Quantity

Type of Total Quantity Anchor Bolt Dia. Length of Bolt Threaded Length
Sr No Tower (mm)-d (mm) L (mm) T

1 TA 1 40 1225 180
2 TB 1 56 1700 220
3 TC 1 28 925 125
4 TD 1 40 1225 180
5 TE 1 40 1225 180
6 TF 1 56 1700 220
7 TG 1 40 1225 180
8 TH 1 56 1700 220
9 TI 1 40 1225 180
10 TJ 1 56 1700 220
11 TK 1 40 1225 180
12 TL 1 56 1700 220
13 TM 1 56 1700 220
14 TN 1 56 1700 220
15 NS TP 1 56 1700 220
16 NS TV 1 56 1700 220
17 NS TV1 1 56 1700 220
18 NS TWSN 1 56 1700 220
19 NS TXN 1 56 1700 220
20 NS TXN1 1 63 1920 270
21 NS TXN2 1 63 1920 270
220 kV Lattice Tower foundtion bolt Quantity
1 CA 1 40 1225 180
2 CB 1 56 1700 220
3 CC 1 28 925 125
4 CD 1 40 1225 180
5 CE 1 40 1225 180
6 CTA 1 56 1700 220
7 CTB 1 56 1700 220
8 CTC 1 56 1700 220
9 CTD 1 40 1225 180
10 CTE 1 56 1700 220
11 CTF 1 56 1700 220
12 CTG 1 28 925 125
13 CTH 1 40 1225 180
14 CTI 1 56 1700 220
15 LM 1 56 1700 180
132kv Lattice tower Foundation bolt Quantity
1 132kV A-
1 25 725 150
Frame
2 132kV
Gantry 40 1015 160
1
Tower

Hence Total no. of foundation Bolts required for equipments - D=28 mm,L = 925 mm, T = 125 mm
Hence Total no. of foundation Bolts required for equipments - D=40 mm,L = 1225 mm, T = 180 mm
Hence Total no. of foundation Bolts required for equipments - D=56 mm,L = 1700 mm, T = 220 mm
Hence Total no. of foundation Bolts required for equipments - D=63 mm,L = 1920 mm, T = 270 mm
bolt Quantity
bhatianv:
Total
No. of foundation Quantity THIS SHEET IS MENT TO
No of structures Bolts per ESTIMATE TOTAL NO. OF
per equipment of No.
structure FOUNDATION BOLT OF
of Bolts VARIOUS DIAMETER.

4 3 12
4 3 12
4 3 12
4 3 12
4 3 12
4 3 12
4 3 12
4 4 16
4 3 12
4 4 16
4 3 12
4 4 16
4 3 12
4 4 16
4 4 16
4 4 16
4 4 16
4 4 16
4 4 16
4 4 16
4 4 16
bolt Quantity
4 4 16
4 4 16
4 4 16
4 4 16
4 3 12
4 3 12
4 4 16
4 4 16
4 3 12
4 4 16
4 4 16
4 4 16
4 4 16
4 4 16
4 4 16
n bolt Quantity

1 16 16
1 16 16

D=28 mm,L = 925 mm, T = 125 mm 44


=40 mm,L = 1225 mm, T = 180 mm 144
D=56 mm,L = 1700 mm, T = 220 mm 304
D=63 mm,L = 1920 mm, T = 270 mm 32
Out door Cable Trench & Cable Trench Crossing Estimate for Section 1-1, 2-2, 3-3, 2A-2A
REF. DRG . - C/ENGG/STD/CT/01, 02 & 03
PGCIL STANDARD SECTION 1-1 LENGTH = 1
PGCIL STANDARD SECTION 2-2 LENGTH = 1
PGCIL STANDARD SECTION 3-3 LENGTH = 1
PGCIL STANDARD TRENCH CROSSING SEC.2-2 NOS. = 1
ABSTRACT
Item
Item Discription QTY. RATE UNIT
No.
Excavation in all types of soil and rock including backfilling
1 disposal etc. for all leads & lifts 15.64 1.00 Cum. 15.64

Providing and laying of Plain Cement Concrete (PCC) 1:4:8


2 0.94 1.00 Cum. 0.94

Providing and laying of Plain Cement Concrete (PCC) 1:2:4


3 3.30 1.00 Cum. 3.30

Brick Masonary in CM 1:6


4 4.27 1.00 Cum. 4.27
providing and laying of Reinforced Cement Concrete (RCC)
1:1.5:3 nominal mix including pre cast, shuttering,
5 grouting, of pockets & underpinning but excluding steel 1.64 1.00 Cum. 1.64
Reinforcement

Providing & fixing in position TMT Steel bar


reinforcement of various diameters as per detailed
designs, drawings and schedules, including cutting,
6 bending, hooking the bars, binding with wires or tack 0.10 1.00 Mton 0.10
welding and supporting as required completed.

Misc Structural Steel including rails, embedments, edge


protection angles, gratings etc. but excluding the
Mton 0.28
7 reinforcement steel and steel for lattice and pipe 0.28 1.00
structures.

Providing and fixing form work as per drawing. 15.60 Sqm. 15.60
8 1.00

RCC Hume Pipe Class NP-3 (300 mm Diameter) 10.00 RMt. 10.00
9 1.00

NOTE: Please enter the length of the perticular section in the above given cell (highlighted with
yellow color) to get the estimate.
Name of work: Cable Trench & Cable Trench Crossing Estimate for Section 1-2, 2-2,2A-2A
REF. DRG . - CABLE TRENCH LAYOUT
SECTION 1-1 LENGTH = 1
SECTION 2-2 LENGTH = 1
SECTION 2B-2B LENGTH = 1
SECTION 3-3 (0.6*0.3*1.025) LENGTH = 1
SECTION 4-4 (1*0.3*0.6) LENGTH = 1
SECTION 5-5 (1*0.6*0.6) LENGTH = 1
ABSTRACT
Item
Item Discription QTY. RATE UNIT
No.
Excavation in all types of soil and rock including backfilling
1 disposal etc. for all leads & lifts 6.34 1.00 Cum. 6.34

Providing and laying of Plain Cement Concrete (PCC) 1:4:8


2 0.42 1.00 Cum. 0.42

providing and laying of Reinforced Cement Concrete (RCC)


1:1.5:3 nominal mix including pre cast, shuttering,
3 grouting, of pockets & underpinning but excluding steel 1.83 1.00 Cum. 1.83
Reinforcement

Providing & fixing in position TMT Steel bar


reinforcement of various diameters as per detailed
designs, drawings and schedules, including cutting,
4 bending, hooking the bars, binding with wires or tack 0.12 1.00 Mton 0.12
welding and supporting as required completed.

Misc Structural Steel including rails, embedments, edge


protection angles, gratings etc. but excluding the
Mton 0.52
5 reinforcement steel and steel for lattice and pipe 0.52 1.00
structures.

Providing and fixing form work as per drawing.


6 24.40 1.00 Sqm. 24.40

NOTE: Please enter the length of the perticular section in the above given cell (highlighted with
yellow color) to get the estimate.
Name of work: Sump Pit
REF. DRG . - CABLE TRENCH LAYOUT
Nos of Cable Trench Crossing Road = 1 Nos
Sr.Nos Description Nos L B D/H QTY
(mt) (mt) (mt)
1 Excavation 1 2.45 2.45 2.1 12.6053
2 PCC
PCC (1:4:8) 1 2.45 2.45 0.075 0.45019
4 Concrete
base 1 2.3 2.3 0.15 0.7935
side wall 1 8.6 2.05 0.15 2.6445
cover 6 2.3 0.4 0.05 0.276
sub total = 3.714
4 Reinforcement Dia
base
bottom bar 30 2.2 8 26.0741
top bar 30 2.2 8 26.0741
wall
Long Wall 60 2.2 8 52.1481
Short Wall 60 2.2 8 52.1481
distribution bar 28 8.4 8 92.9185
Trench cover
main bar 6 2.3 8 3 16.3556
distribution bar 6 0.4 8 11 10.4296
sub total = 276.148
5 Structural Angles / Flats
Nos unit wt
Trench cover L50x50x5 6 5.4 3.8 123.12
Edge Protection flat 75x5 1 9.2 0.075 0.005 27.0825
Edge Protection flat 75x5 1 8 0.075 0.005 23.55
sub total = 173.753

6 Formwork
side wall 2 9.2 2.2 40.48
4 RCC Hume pipe NP3
250 mm Diameter 1 1 1
T

TOTAL QTY UNIT

12.61 cu.m

0.45 cu.m

3.71 cu.m

276.15 kg

173.75 kg

40.48 sq.m

1.00 RMt.

Potrebbero piacerti anche