CEAG Emergency Lighting Solutions

www.ceag.de/en

© 2015 Eaton, All Rights Reserved.


• History • Product Development
Agenda • About CEAG • The Eaton Philosophy
• Portfolio • Products & Technologies
• Main Markets • References
• Environmental commitment

© 2015 Eaton, All Rights Reserved. 2


CEAG History

1906 1912 1952

Company founded in CEAG awarded prize for Production of explosion-protected


Cologne. Production of the “safest mining lamp light fittings in Bochum to meet
lamps for use in coal in the world”. the new market requirements.
mines.

1970 1978 1988


A further step on the path to CEAG acquired by BBC AG, As a company operating
success: launch of emergency Mannheim. Explosion independently within the ABB
lighting systems. protected installation material Corporation, CEAG is part of a
completes the explosion strong group of companies and
protection field. is well-armed for the future.

1996 2003 2012


CEAG Group acquired by Emergency lighting Cooper Industries acquired
Cooper Industries. business of CEAG by Eaton – new
established as “CEAG opportunities for CEAG.
Notlichtsysteme GmbH”.

© 2015 Eaton, All Rights Reserved. 3


About CEAG (CEAG Notlichtsysteme GmbH)

Expertise and Technology you can trust


• Founded in Cologne 1906
• Site is located in Soest, Germany
• One of the “Top Ten” employers in Soest
• Number of employees: 230
Soest

© 2015 Eaton, All Rights Reserved. 4


CEAG Portfolio

Safety Luminaires and Central Battery Visualization &


Escape Sign Luminaires Systems Networks

© 2015 Eaton, All Rights Reserved. 5


CEAG Main Markets
Commercial Public Buildings Industrial

Airport Dubai Castle Bellevue, Berlin BP Refinery, Gelsenkirchen

• Airports • Government Buildings • Refineries


• Restaurants • Schools • Pharmaceutical
• Hotels & High-rise • Colleges & Universities Industry
Buildings • Health Centers • Automobile Industry
• Shopping Malls & • Hospitals • Light and Heavy
Retail Shops • Theatres Industry
• Sport Stadia • Galleries & Museums • Energy Supplier
• Logistic Centers • Food Industry
• Railway Stations & • Aerospace Industry
Ports

© 2015 Eaton, All Rights Reserved. 6


Environmental Commitment

Application-optimised
Lower installation costs

Environmentally friendly
Energy-efficient
Low consumption of
Low operating costs
raw materials

Cost-efficient
Optimised investment
costs

Perfect combination of ecological responsibility with high cost-efficiency.

© 2015 Eaton, All Rights Reserved. 7


CEAG Product Development

• New and further development


• Innovative contemporary design and
technologies

• Lighting Laboratory
• Customers light engineering
requirements at in-house lighting
laboratory

• Endurance Testing
• Expose newly developed products
to extreme conditions and life cycle
testing

© 2015 Eaton, All Rights Reserved. 8


Certifications

• Certification of ISO 9001 : 2008


Benefits for our customer:
• Certainty of Eaton‘s commitment to
deliver high quality for all products and
all employees

• Certification of our products


• ENEC
• CNBOP

© 2015 Eaton, All Rights Reserved. 9


The Eaton Philosophy

• Obeying the law


• Integrity of recording and reporting
our financial results
• Respecting human rights
• Delivering quality
• Competing ethically
• Respecting diversity and fair employment practices
• Avoiding conflicts of interest
• Protecting assets and information
• Acting with integrity
• Selling to governments while complying with special laws
• No political contributions
• Environment, health and safety

© 2015 Eaton, All Rights Reserved. 10


Each Safety Luminaire is important –
it protects human´s life & health.

© 2015 Eaton, All Rights Reserved. 11


MAINS LIGHTING
© 2015 Eaton, All Rights Reserved. 12
BLACKOUT
Verschiedene Installationsvarianten
© 2015 Eaton, All Rights Reserved. 13
13
Exit sign

BLACKOUT
© 2015 Eaton, All Rights Reserved. 14
Safety luminaires

BLACKOUT
© 2015 Eaton, All Rights Reserved. 15
Emergency Lighting Technologies
Self-Contained Central Battery AC monitoring
Luminaires (SC) Systems (CBS) systems

Battery Central System AC safety System


included battery luminaires power source luminaires

Visualization

© 2015 Eaton, All Rights Reserved. 16


Emergency Lighting Costs

© 2015 Eaton, All Rights Reserved. 17


Central Battery System Installation

© 2015 Eaton, All Rights Reserved. 18


CEAG Technologies

Individual single luminaire Free programmability of switching All well-proven advantages of the
monitoring of up to 20 luminaires mode of each individual luminaire STAR and CG Technology, now
per circuit without additional data per circuit without additional data available for AC safety power
line. Line. sources.

Central monitoring and control of Comfortable visualization software


self-contained luminaires including which allows the configuration and
automatic function- and duration monitoring of all CEAG systems.
test.

© 2015 Eaton, All Rights Reserved. 19


CEWA GUARD Technology

• Shortened
inspection effort
• Shortened
maintenance effort
• High safety level

Our Philosophy:
Every safety luminaire is important. It protects health and life.

© 2015 Eaton, All Rights Reserved. 20


CEWA GUARD Technology

1.1 1.3 1.4 1.5 1.6 1.7 1.9 1.10 1.11 1.12 1.20
DL DL BL gDL BL DL DL BL gDL BL DL

DALI EVG
gDL gDL
1.2
gDL
Change- 1.8
gDL
Over Unit

DALI Bus
Battery DLS / 3PH
Central DALI
Unit General Controller
General
Charger Lighting Lighting
Info:
Luminaire
failure
General
CBS energy grid

© 2015 Eaton, All Rights Reserved. 21


CEWA GUARD Technology
CEWA GUARD (CG): The basis for a convenient maintenance and inspection of
centrally supplied systems
When an emergency lighting system is put into operation, it is in perfect condition. What, however,
counts more, is its reliable functioning in case of emergency, regardless of whether that happens
after4 weeks or 5 years. Maintenance, service and inspection are the prerequisite for that reliability.

That is, of course, expensive. Luminaires and batteries must be replaced. Apart from regular visual
checks, all luminaires must be submitted to function and duration Tests. Test data and system-
related information must be documented in a log book. CEAG emergency power supply systems
with CEWA GUARD functions considerably simplify maintenance, service and inspection and
thereby provide for a distinct reduction of costs.

CEWA GUARD is a self-testing and monitoring system. That means only one cable for:
• AC 230 V, 50/60 Hz power supply
• DC 220 V power supply
• data transmission

No additional shielded cables are required to operate the system. The short-circuit-proof L/N
connection provides for a safe and reliable functioning of the system. The backbone and brain of
the system is a microprocessor which controls and monitors all functions, stores any changes of
the status and passes information to an overriding monitoring and display system.

© 2015 Eaton, All Rights Reserved. 22


STAR Technology
• Easier planning
• Reduced installation expenditures
• Less cable lengths

Different switching modes of each single


luminaires without additional data line!

© 2015 Eaton, All Rights Reserved. 23


Conventional Installation

© 2015 Eaton, All Rights Reserved. 24


STAR Technology

Different switching modes of each single luminaires without additional data line!

© 2015 Eaton, All Rights Reserved. 25


STAR Technology
230 V 50 Hz L N PE

Light switch for luminaire 3

2
0101000...1
0 3

Non-maintained light
5
6
Maintained light

Switched maintained
light
220V
20

© 2015 Eaton, All Rights Reserved. 26


STAR Technology
230 V 50 Hz L N PE

Light switch for luminaire 3

2
0111000...1
0 3

Non-maintained light
5
6
Maintained light

Switched maintained
light
220V
20

© 2015 Eaton, All Rights Reserved. 27


STAR Technology
Switch to safety with the STAR (S) Technology!
The continuing development of the CEWA GUARD monitoring system has led to the creation of the
Switching Technology Advanced Revision, or “STAR” for short. This CG-STAR technology allows
different switching modes to be implemented in one and the same circuit, and the switching mode
of each individual luminaire can be re-programmed at any time.

As a result, this technology offers not just the proven CEWA Guard safety when it comes to
operating a safety lighting system, it also gives planners the confidence and flexibility of knowing
that the system can respond and adapt at any time to any changes that are made to a building and
its use.

Your Advantages
The number of outgoing circuits needed can be sharply reduced, since continuously operating,
stand-by and switchable permanent lighting can be realised in one common circuit.This allows the
use of shorter cable distances, reduces installation costs and minimises the effects of burning
materials. Any mode of operation can be assigned at a later date – without encroachment in the
lighting installation. This enables simple project planning without having to take all possible types
of operation into account.

As with CEWA GUARD technology, the STAR and STAR+ technology requires no additional data
cable to the luminaires .

© 2015 Eaton, All Rights Reserved. 28


Central Battery System Components

System Luminaires Modules

LED Luminaires Monitoring Modules

Luminaires with Higher Electronic Ballasts


Degree of Protection

Explosion protected
LED Supply Modules
Luminaires

For Identification & Lighting of For Integration of General Lighting within


Escape Routes Emergency Lighting

© 2015 Eaton, All Rights Reserved. 29


Central Battery Systems

Switchgears

ZB-S substation with


functional integrity ESF-E30

Central Power Supply System ZB-S substation Low Power System


ZB-S US-S SOU1 LP-STAR

Control & Electrical Power Supply of Safety Luminaires in Emergency

© 2015 Eaton, All Rights Reserved. 30


Central overall
fire protection
section
installation

Advantages:
• One distributor for all
emergency light circuits
• Central distributor
maintenance and repair

Disadvantages:
• Increased complexity with
E30 cabling and revision
• Cable lengths limited due
to voltage drops
• Fireproof cable

© 2015 Eaton, All Rights Reserved. 31


Decentral overall
fire protection
section
installation

Advantages:
• Partial reduction of costs
for E30 cabling
• Central maintenance and
repair of the distributor for
lower maintenance and
repair costs

Disadvantages:
• Increased complexity with
maintenance and repair
due to decentral
arrangement
• Further electrical service
rooms required if
necessary
• Fireproof cable

© 2015 Eaton, All Rights Reserved. 32


Decentral overall
fire protection
section installation
with small
distribution boxes

Advantages:
• Reduction of costs for E30
cabling and revisions
• No additional electrical
service rooms, if permissible

Disadvantages:
• Complex planning, e.g. due
to selectivity
• Increased complexity with
maintenance and repair due
to decentral arrangement

© 2015 Eaton, All Rights Reserved. 33


Decentral,
section-specific
fire protection
installation with
LP-STAR

Advantages:
• No costs for E30 cabling
and revisions
• Increased safety due to
decentral arrangement of
supply devices

Disadvantages:
• Increased complexity with
maintenance and repair
due to decentral
arrangement

© 2015 Eaton, All Rights Reserved. 34


Decentral,
section-specific
fire protection
installation with
LP-STAR

Advantages:
• No costs for E30 cabling
and revisions
• Increased safety due to
decentral arrangement of
supply devices

Disadvantages:
• Increased complexity with
maintenance and repair
due to decentral
arrangement

© 2015 Eaton, All Rights Reserved. 35


STAR+ Technology

for AC safety power sources.

Free programmability of switching mode of


each individual luminaire per circuit without
additional data line
• easier planning
• reduced installation expenditures
• less cable lengths
1.1 2.1

Automatic monitoring of each single


luminaires without additional data line 1.2 2.2

• shortened inspection effort


1.3 2.3
• shortened maintenance effort
• high safety level 1.20 2.20

© 2015 Eaton, All Rights Reserved. 36


STAR+ Technology
STAR+: STAR Technology now available for AC Safety Power Sources
STAR+ offers all the known benefits of our STAR technology, now also for AC safety power
sources. It is the perfect symbiosis of CEWA GUARD and STAR technology.

With the help of the STAR+ technology the Automatic Test System AT-S+ individually monitors each
CG-S luminaire (up to 20 per circuit), and it does all this using the power supply cable alone.

The new STAR+ technology allows the switching mode of every connected V-CG-S luminaire to be
freely programmed within a 50 or 60 Hz supply network using the system‘s controller. This means
that maintained light, switched maintained light and non-maintained light modes can be combined
in one and the same circuit – there is no need for separate data cables!

© 2015 Eaton, All Rights Reserved. 37


Automatic Luminaire Test System AT-S+

Switchgears

AT-S+ / C30 AT-S+ / SU1 AT-S+ / SOU1

Control of Emergency Luminaires

© 2015 Eaton, All Rights Reserved. 38


Central overall
fire protection
section
installation

Advantages:
• One distributor for all
emergency light circuits
• Central distributor
maintenance and repair
• One electrical service
room for the distributor if
required

Disadvantages:
• Increased complexity with
E30 cabling and revision
• Cable lengths limited due
to voltage drops
• Fireproof cable

© 2015 Eaton, All Rights Reserved. 39


Decentral overall
fire protection
section
installation

Advantages:
• Partial reduction of costs
for E30 cabling
• Central maintenance and
repair of the distributor for
lower maintenance and
repair costs

Disadvantages:
• Increased complexity with
maintenance and repair
due to decentral
arrangement
• Further electrical service
rooms required if
necessary
• Fireproof cable

© 2015 Eaton, All Rights Reserved. 40


Decentral overall
fire protection
section installation
with small
distribution boxes

Advantages:
• Reduction of costs for E30
cabling and revisions
• No additional electrical
service rooms, if permissible

Disadvantages:
• Complex planning,
e.g. selectivity
• Increased complexity with
maintenance and repair due
to decentral arrangement

© 2015 Eaton, All Rights Reserved. 41


Decentral overall
fire protection
section installation
with small
distribution boxes

Advantages:
• Reduction of costs for E30
cabling and revisions
• No additional electrical
service rooms, if permissible

Disadvantages:
• Complex planning,
e.g. selectivity
• Increased complexity with
maintenance and repair due
to decentral arrangement

© 2015 Eaton, All Rights Reserved. 42


Self-Contained Luminaires System

• Central Monitoring Device


• Central Monitoring & Control of Self-Contained
Luminaires
Line 1
1 2 3 200
Line 2
1 2 3 200

Line 3
1 2 3 200

Line 4
1 2 3 200

• Self-Contained Luminaires
• Identification & Lighting of Escape Routes

© 2015 Eaton, All Rights Reserved. 43


CGLine+ self-
contained
luminaire system

Advantages:
• No fireproof cables
• Decentral safety power
sources
• No additional service
room

Disadvantages:
• Additional effort for
maintenance and repair
due to decentral battery
arrangement
• Separate data line to
each single luminaire
• Life time of batteries: 4
years, influenced by
ambient temperatures
(max. 30° C)

© 2015 Eaton, All Rights Reserved. 44


Visualization

CGVision:
A software to safe your time…
• Intuitive Operating Concept
• Configuration & programming of the
complete system

• Fully Automatic Process


• Weekly automatic test of each single
luminaire

• Graphical Display Possibilities


• Display of luminaires in layout plans
& concise display of location in aerial
views

© 2015 Eaton, All Rights Reserved. 45


Visualization

Web-based Visualization…

Web-Module for visualization and


monitoring of your systems

• Actual operation
modes
• Localized failure
information
• Easy menu structure

© 2015 Eaton, All Rights Reserved. 46


Our Strengths

• Expertise
• Over 40 years experience and
long term relationship with our
customers

• Innovation
• Newest technologies and energy
efficient systems

• Know- how
• Quality standards and access to
the world wide network of Eaton

© 2015 Eaton, All Rights Reserved. 47


References

© 2015 Eaton, All Rights Reserved. 48


Assembly Halls / Assembly Rooms

Castle Bellevue, Berlin Semper Opera, Dresden

Grand Moshe, Abu Dhabi German Bundestag, Berlin

© 2015 Eaton, All Rights Reserved. 49


Assembly Halls / Assembly Rooms

Exhibition Centre, Leipzig National Theatre, Budapest

Exhibition Centre, Frankfurt National Convention Centre Doha, Qatar

© 2015 Eaton, All Rights Reserved. 50


Sport & Olympic Venues

Fritz Walter Stadium, Niedersachsen Stadium, Karaiskaki Stadium,


Kaiserslautern Hannover Athens

© 2015 Eaton, All Rights Reserved. 51


Sport & Olympic Venues

Watercube, Beijing Olympic Hockey Stadium, Athens

Spaladium Arena, Croatia Arena, Oberhausen

© 2015 Eaton, All Rights Reserved. 52


Commercial Centres / Shopping Malls

Centro, Oberhausen Karstadt, Leipzig

Montedoro Freetime, Trieste Arkady Pankrac, Prague

© 2015 Eaton, All Rights Reserved. 53


Commercial Centres / Shopping Malls

Dubai Mall, Dubai Deira City Centre, Dubai

Burjuman Expansion, Dubai Sahara Centre, Dubai

© 2015 Eaton, All Rights Reserved. 54


Hotels

Emirates Palace, Abu Dhabi Atlantis, Dubai

Yas Marina, Abu Dhabi Madinat Jumeirah, Dubai

© 2015 Eaton, All Rights Reserved. 55


Hotels

Jumeirah Beach Resort, Dubai Grand Hotel Portoroz, Slovenia

Kameha Grand, Bonn Marriott, Budapest

© 2015 Eaton, All Rights Reserved. 56


Schools & Universities

Technical University Berlin Westfälische Wilhelms-University, Münster

University Dresden Ruhr University, Bochum

© 2015 Eaton, All Rights Reserved. 57


Schools & Universities

University Groningen American University Sharjah

University Warwick, Coventry University Sote, Budapest

© 2015 Eaton, All Rights Reserved. 58


Airports & Train Stations

Airport Frankfurt Airport Köln/Bonn

Airport Vienna Central Station Berlin

© 2015 Eaton, All Rights Reserved. 59


Airports & Train Stations

Airport Dubai Airport Bangkok

Airport Athens Airport Copenhagen

© 2015 Eaton, All Rights Reserved. 60


Industry

Ceska Rafinerska, Litvinov Ruhr Oel GmbH, Site Scholven

Digital Park II, Bratislava Cinram, Alsdorf

© 2015 Eaton, All Rights Reserved. 61


High-Rise Buildings

Burj Khalifa Bin Zayed, Capricorn Tower, Burj Al Arab,


Dubai Dubai Dubai

© 2015 Eaton, All Rights Reserved. 62


High-Rise Buildings

Ritz-Carlton Doha, Qatar Tower 115, Bratislava

Capital Gate Tower, Abu Dhabi Fairmont Hotel, Dubai

© 2015 Eaton, All Rights Reserved. 63


CEAG Notlichtsysteme GmbH, Senator-Schwartz-Ring 26, D-59494 Soest
www.ceag.de

© 2015 Eaton, All Rights Reserved. 64