Sei sulla pagina 1di 1

Project Job Ref.

Section Sheet no./rev.

1
Calc. by Date Chk'd by Date App'd by Date

T 6/11/2019

Pile Group Analysis:


Interface Title

Working Load P=250.00kN


Coordinate X Coordinate Y
Pile 1 -2050 mm -2300 mm
Pile 2 1550 mm 1300 mm
Pile 3 -2050 mm 1300 mm
Pile 4 1550 mm -2300 mm

Pile Load Analysis Results:


Exx=( P1x+ P2x+ P3x+ P4x)/4=-250.00mm
Eyy=( P1y+ P2y+ P3y+ P4y)/4=-500.00mm
Mx=PEyy=-125.00kNm
My=PExx=-62.50kNm

Pile rection = [Total load / Nos of Pile] - [MxYn/Sum(Yn2)] - [MyXn/Sum(Xn2)]


PR1=P/4-((Mx P1yn)/SumYn2)- ((My P1Xn)/SumXn2)=36.458kN
PR2=P/4-((Mx P2yn)/SumYn2)- ((My P2Xn)/SumXn2)=88.542kN
PR3=P/4-((Mx P3yn)/SumYn2)- ((My P3Xn)/SumXn2)=71.181kN
PR4=P/4-((Mx P4yn)/SumYn2)- ((My P4Xn)/SumXn2)=53.819kN

Total Reaction PTotal= PR1 +PR2 +PR3 +PR4=250.000kN

Max Reactiion Pmax=Max(PR1 ,PR2 ,PR3 ,PR4)=88.542kN

Potrebbero piacerti anche