Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Reservorio I
API 30.60 Adm.
Metano (CH4) 0 %
RGP 1800.00 PC/BN
Bo 0 (BN/BY)
Yiel 0 BBL/MMPC
PETRÓLEO NEGRO
1 1995.00 1967.00
2 1914.00 1898.00
3 1893.00 1874.00
4 1790.00 1780.00
5 1018.00 1005.00
Total 8610.00 8524.00
48.60
1 H (Espesor) =
5
9.720 1
0.3048
8610.00 8524.00
2
Convertir de metros cuadrado (mts2) a Acres
736762.00 1
4046.8564224
Volumen Bruto=(Acre∗Hespesor)
Vb = 182.058 31.890
(∑24_(𝑖=1)^𝑛▒ ))■8(■8(■
8(∅@𝐻𝑖)&Pozo 𝑖 Hi)@ )
Esp. Neto
N° Porosidad (%)
(mts)
1 21.00 15.00
2 10.00 14.00
3 12.00 14.00
4 3.00 13.00
5 2.60 18.00
Total 48.60 74.00
708.80
ØEfectiva =
48.60
¯S_𝑤𝑦𝑎𝑐= □(64&(∑24_(𝑖=1)^𝑛▒ )/
(∑24_(𝑖=1)^𝑛▒ ))■8(■8(■8(S@𝐻𝑖)&
Wpozo 𝑖 Hi)@ )
Esp. Neto
N° Saturación (%)
(mts)
1 21.00 60.00
2 10.00 48.00
3 12.00 49.00
4 3.00 60.00
5 2.60 51.00
Total 48.60 268.00
2640.60
Sw = 54.333
48.60
Esp.
Porosidad Saturació
Base (mts) Tope (mts) Compacto
(%) n (%)
(mts)
1995.00 1967.00 7.00 15.00 60.00
1914.00 1898.00 6.00 14.00 48.00
1893.00 1874.00 7.00 14.00 49.00
1790.00 1780.00 7.00 13.00 60.00
1018.00 1005.00 10.40 18.00 51.00
9.720 mts
1
31.890 ft.
0.3048
86.00
736762.00 mts2
s2) a Acres
1
182.057855 Acres
4046.8564224
spesor)
Promedio Ponderado
Espesor * Porosidad
315
140
168
39
46.80
708.80
ØEfectiva = 15 % "Buena"
Promedio Ponderado
Espesor * Saturación
1260.00
480.00
588.00
180.00
132.60
2640.60
pies cúbicos
CUANTIFICACIÓN DE LAS RESERVAS DEL CAMPO HUACAY X-2 APLICANDO EL M
VOLUMETRICO
N° de Espesor
Datos del Reservorio Valor Unidad
Pozo (mts)
Presión Inicial del reservorio 9000 PSI 1 25.00
Presión Actual 2500.00 PSI 2 23.00
Presión Abandono 978.00 PSI 3 28.00
Temperatura del reservorio 80.00 °F
Presion Constante 165.00 PSI
Temperatura Constante 14.70 °F
Z inicial 1.022 Adm
Gravedad Especifica del Gas
0.80 Adm
(SGg)
°API 60.00 °API
Relacion de Gas y Petroleo 3700.00 PCN/BN
Area 2430.00 ACRES
Caudal del petróleo obtenido en la prueba ISOCRONAL MODIFICADO
Caudal del gas obtenido en la prueba ISOCRONAL MODIFICADO
Escala
Reservorio I
API 60.00 Adm.
Metano (CH4) 0 %
RGP 3700.00 PC/BN
Bo 53947.37 (BN/BY)
Yiel 0.0185365854 BBL/MMPC
GAS CONDESADO
H espesor
N°
(mts)
1 25.00
2 23.00
3 28.00
Total 76.00
Convertir de metros (mts) a Pies
76.00
0.3048
Volumen Bruto=(Acre∗Hespesor)
Vb = 2430.00 249.344
∅ ̅= □(64&(∑_(𝑖=1)^𝑛▒ )/
(∑_(𝑖=1)^𝑛▒ ))■8(■8(■8( Promedio Ponderad
∅@𝐻𝑖)&Pozo 𝑖 Hi)@ )
Esp. Neto
N° Porosidad (%)
(mts)
1 25.00 16.00
2 23.00 15.00
3 28.00 17.00
Total 76.00 48.00
1221.00
ØEfectiva =
76.00
¯S_𝑤𝑦𝑎𝑐= □(64&(∑_(𝑖=1)^𝑛▒ )/
(∑_(𝑖=1)^𝑛▒ ))■8(■8(■8(S@𝐻𝑖)&Wp
ozo 𝑖 Hi)@ )
Esp. Neto
N° Saturación (%)
(mts)
1 25.00 44.60
2 23.00 52.75
3 28.00 49.60
Total 76.00 146.95
3717.05
Sw = 48.91
76.00
𝛽𝑔𝑖 = (𝑃𝑐𝑠∗𝑍𝑖∗𝑇𝑦𝑖)/
(𝑇𝑐𝑠∗𝑃𝑦𝑖)
PC@c.y.
βgi = 0.00193
PC@c.s.
〖 𝑇〗 _𝑝𝑐 =169.2+349.5 �_𝑔 −74.0 〖� _𝑔 〗 ^2
Tpc = 330.40 °R
〖 𝑃〗 _𝑝𝑟=
𝑃_𝑦𝑎𝑐/ 〖 !𝑃 〗
_𝑝𝑐
2500.00
Ppr =
646.24
〖 𝑇〗 _𝑝𝑟=
𝑇_𝑦𝑎𝑐/ 〖 !
𝑇 〗 _𝑝𝑐
165 460
Tpr =
330.40
𝛽_(𝑔𝑎𝑏 )=
(𝑃𝑐𝑠∗𝑍𝑎𝑏∗𝑇𝑦𝑖)/
(𝑇𝑐𝑠∗𝑃𝑦𝑎𝑏)
14.70 0.91452 165 460
βgab = 80 460 978
PC@c.y.
βgab = 0.015910
PC@c.s.
Calcular el Gpmax:
1
Gpmax = 13484.690 [ 0.00193 -
𝐹𝑎𝑐𝑡𝑜𝑟 𝑑𝑒 𝑅𝑒𝑐𝑢𝑝𝑒𝑟𝑎𝑐𝑖ó𝑛= �_𝑝𝑚𝑎𝑥/(�𝑂𝐸𝑆
@𝑐.𝑠.) * 100 %
𝐹𝑎𝑐𝑡𝑜𝑟 𝑑𝑒 𝑅𝑒𝑐𝑢𝑝𝑒𝑟𝑎𝑐𝑖ó𝑛= �_𝑝𝑚𝑎𝑥/(�𝑂𝐸𝑆
@𝑐.𝑠.) * 100 %
6131990.82
FR = * 100 %
6979575
FR = 87.856 %
X-2 APLICANDO EL METODO
Porosidad Saturación
(%) (%)
16.00 44.60
15.00 52.75
17.00 49.60
380.00 (BPD)
20500.00 (MMPCD)
76.00
249.344 Ft.
0.3048
Promedio Ponderado
Espesor * Porosidad
400
345
476
1221.00
ØEfectiva = 16 % "Buena"
Promedio Ponderado
Espesor * Saturación
1115.00
1213.25
1388.80
3717.05
s cúbicos)
1−(��) )
0.4891 / 1000000
s cúbicos)
9389.625
=
4860000
1.60
_𝑔 〗 ^2
1.60
Adm.
n inicial (βgab)
8402.15
=
528120
��−1/(��
1
0.01591 ]
62.855 ]
1000000
𝑂𝐸𝑆
𝑂𝐸𝑆