Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Curso Bombeo Mecanico
Curso Bombeo Mecanico
Mecánico
Convencional
Abraham Salazar
SITUACION ACTUAL
BES
4%
BCP
5% FN
4%
% DE POZOS POR MÉTODO
DE LEVANTAMIENTO
BM
LAG
46%
41%
Balancín
Wireline (Bridle)
Pumping Unit
Polished Rod Clamp
Wireline Hanger
(Carrier Bar)
Polished Rod
Tubing Head
Bombeo Casing Head
Polished Rod
Mecánico Sub-Coupling
Surface Pipe
Oilstring (Casing)
Tubing
Coupling Sucker Rod
Tubing Bushing
Guide
Lift Nipple Barrel
Coupling Con-nector Valve Rod
Barrel Cage, Sucker
Coupling Top Open Rod Barrel
Coupling Cage (Open)
Barrel Ball & Seat
See Pump
Barrel Plunger Details Plunger
Coupling Cage
(Closed) Tubing
Extension Coupling Cage Cage (Closed)
Nipple Ball & Seat Ball &
Per- Seat Ball & Seat
Tubing Standing forated
Coupling Balve Nipple Mandrel Plug Seat
Puller Cup
Seating Tubing Spacer
Nipple Coupling Locknut
Gas Coupling
Tubing Pump
Anchor
Mud Anchor Insert Pump
Bull Plug
Bottom End of
Oilstring (Casing)
Wireline (Bridle)
Pumping Unit
Polished Rod Clamp
Wireline Hanger
(Carrier Bar)
Polished Rod
System Sub-Coupling
Surface Pipe
Oilstring (Casing)
Tubing
Coupling Sucker Rod
Tubing Bushing
Guide
Lift Nipple Barrel
Coupling Con-nector Valve Rod
Barrel Cage, Sucker
Coupling Top Open Rod Barrel
Coupling Cage (Open)
Barrel Ball & Seat
See Pump
Barrel Plunger Details Plunger
Coupling Cage
(Closed) Tubing
Extension Coupling Cage Cage (Closed)
Nipple Ball & Seat Ball &
Per- Seat Ball & Seat
Tubing Standing forated
Coupling Balve Nipple Mandrel Plug Seat
Puller Cup
Seating Tubing Spacer
Nipple Coupling Locknut
Gas Coupling
Tubing Pump
Anchor
Mud Anchor Insert Pump
Bull Plug
Bottom End of
Oilstring (Casing)
SARTA DE CABILLAS
VASTAGO DE TIRO
Bomba de Subsuelo
PISTON
VALVULA VIAJERA
BARRIL
VALVULA FIJA
Funcionamiento
de una Bomba
de Subsuelo
Descripción de una unidad de bombeo
A-BBBB-CCC-DDD
Donde:
A: tipo de unidad:
C: Convencional
M: Mark II
A: Balanceada por aire
B: Balanceada por balancín
BBBB: Torque máximo, en Lbs. Pulg.
D: Doble reductor en el engranaje
CCC: Carga Máxima, en Lbs.
DDD: Embolada, en Pulgs.
Convencional
Mark II
Balanceado por
aire
Unidades
Hidrowell
Unidades
Rotaflex
Tail down deflection assistant balance
pumping unit
Swing staff assistance balance pumping
unit
Pure Tail down deflection balance
pumping unit
Análisis Nodal para LAB
DP requerido en
la bomba
Curva de “inflow”
Psuc= IPR - (DP)perf-bomb
Liquid Rate, ql
Análisis dinagráfico ideal
Peso de la sarta
Carga
de cabillas
sumergida
Stroke
Posición
Análisis dinagráfico con gas
Peso de la sarta
Carga
de cabillas
sumergida
Posición
Carrera efectiva
Trabajo gastado en comprimir
gas
Análisis dinagráfico de manera analítica
20000
100
Posición
80
15000
60
10000
40
5000
20
0
0
0 4 8 0 20 40 60 80 100 120 140
Tiempo -5000
Análisis Dinagráfico en campo
(Echometer)
Beam-Pump Design Example
(from Wave Equation)
25,358 1368
18,695 684
Torque, lbf-ft
Load, lb
12,033 0
5370 -684
-1292 -1368
0.0 48.0 96.0 144.0 192.0
Stroke Length, in. 0.3 90.3 180.2 270.1 360.0
Crank Angle, deg
Diseño en Bombeo Mecánico por
ecuación de onda
25,358
18,695
Load, lb
12,033
5370
-1292
0.0 48.0 96.0 144.0 192.0
Stroke Length, in. 0.3
Evolución de los Métodos de Diseño
en BMC
Casing Casing
Tubing Tubing
Rods Rods
Tubing Intake
Perforations Producing Zone
Separadores de gas
Ancla Poor-boy Ancla de copas
Rods
Tubing
Pump
Casing
Seating Nipple
Tubing Intake
Perforations
Suction Tube
Mud Anchor
Producing Zone
Separadores de gas
2 7/8-in. Tubing
Fluid Level Seating Nipple
Gas 3 5/8-in.
Thin Wall
5 1/2-in. Casing Pipe (1/8-in.)
Decontralizer
Diametrically Lower Port
Opposed to Lower
Port (not to scale)
Dip Tube
Casing
Perforations
SEPARACION DE GAS EN FONDO DE POZO
SEPARACION
FUERA DEL
ANCLA
SEPARACION
DENTRO DEL
ANCLA
WF
110,0
INCREMENTO DE HASTA
100,0
30% DE EFICIENCIA
VOLUMETRICA DE 90,0
SEPARACION PARA MAS
DE 3000 POZOS. 80,0
EFICIENCI A
CAPACIDAD DE 70,0
SELECCION OPTIMA
PARA SEPARADORES 60,0
ESTATICOS DE FONDO. CO601200.
50,0 D2O601200.
D1O601200.
EGO1200.
40,0
EFO601200.
PO601200
TO601200.
30,0
20,0
0 400 800 1200 1600 2000
CAUDAL DE LIQUIDO
UNIDAD DE BOMBEO
GUAYA
CRUDO
CABEZAL
LINEA DE GAS
CONEXION
REVEST IDOR SART A DE CABILLAS
LINEA DE
FLUJO
REVEST IDOR
EDUCT OR
CONVENCIONAL
GAS
PIST ON
VALVULA VIAJERA
VALVULA FIJA
CRUDO
COLGADOR
FORRO GRAVA
RANURADO
(LINER)
UNIDAD DE BOMBEO
GUAYA
CONEXION
REVEST IDOR SART A DE CABILLAS
LINEA DE
FLUJO
REVEST IDOR
EDUCT OR
DILUENTE POR
GAS
ANULAR
SIN
EMPACADURA
PIST ON
VALVULA VIAJERA
VALVULA FIJA
CRUDO
COLGADOR
FORRO
RANURADO GRAVA
(LINER)
UNIDAD DE BOMBEO
GUAYA
MEZCLA
CRUDO-DILUENT E
CABEZAL
INYECCION DE
DILUENT E
SART A DE CABILLAS
REVEST IDOR
EDUCT OR
DILUENTE
POR ANULAR
CON
EMPACADURA
PIST ON
VALVULA VIAJERA
DOSIFICADOR
VALVULA FIJA
EMPACADURA
CRUDO
COLGADOR
FORRO
RANURADO GRAVA
(LINER)
UNIDAD DE BOMBEO
GUAYA
SART A DE CABILLAS
REVEST IDOR
EDUCT OR
DILUENTE POR LA
TUBERIA
NIPLE RANURADO
EMPACADURA
PIST ON
VALVULA VIAJERA
VALVULA FIJA
CRUDO
COLGADOR
FORRO GRAVA
RANURADO
(LINER)
UNIDAD DE BOMBEO
GUAYA
LINEA DE FLUJO
FLUIDO PERMANENT E
PARA LUBRICACION
SART A DE CABILLAS
REVEST IDOR
EDUCT OR
PRENSAESTOPA
DE SUBSUELO
PRENSAEST OPA DE SUBSUELO
PIST ON
VALVULA VIAJERA
VALVULA FIJA
EMPACADURA
CRUDO
COLGADOR
FORRO
RANURADO GRAVA
(LINER)
Prensaestopa
de subsuelo
Production
Diluente
Petroleo
Software
ANTES
Métodos Empíricos Análisis y
diagnósticos
AHORA
Diseño, diagnóstico y
Simuladores optimización de métodos de
levantamiento artificial
Fuerte base en
Análisis Nodal
Fuerte base en
Análisis Dinagráfico
Análisis Nodal
SARP
CEALC
(diseño y diagnóstico)
NODALB PDVSA
(diseño y diagnóstico) Intevep
Análisis Dinagráfico
RodStar RodDiag
(diseño) (diagnóstico)
Theta
Enterprises
XDiag
(diseño y diagnóstico)
Dynasim PDVSA
(diagnóstico) Servicios
NodalB
Sistema de análisis nodal para bombeo mecánico
BANCO DE Estructura
Actuador neumático
PRUEBAS
metálica
PARA Posicionador
BOMBAS DE Vástago
SUBSUELO
Revestidor de Separador
Plexiglass
Válvula
viajera
Bomba de Rotámetros
subsuelo
Válvula fija
Inyección aire-líquido
METODOLOGIA PARA
EXPERIMENTOS
P2
P3
P1
TOMAS DE PRESION
P3
P2
P1, P3
P1