Public works must usually be let only They should know neither friends nor
after advertising, and to the “lowest favourites among the bidders in the
responsible bidder.” letting of any work to be done under
Where the law provides that the their specifications and should strive to
contract shall be given “to the lowest award the contract to the lowest and
responsible bidder giving adequate best bidder in all cases.
security.”
QUESTION: In contracting for construction
QUESTION: Why are the bidding procedures for work on fixed bids basis, why should the owner
the construction of public works more rigidly take the responsibility for and pay the cost of
fixed than are those for the construction on obtaining borings and other exploration of the
private works? site?
To eliminate collusion and fraud, and The locality belongs to the owner, and
these requirements must be observed the contractor should not be asked to
in order that a legal contract may be gamble on its conditions. The
established. contractor should bid on guaranteed
local conditions with an increase or
NEGOTIATION CONSTRUCTION CONTRACTS reduction of price for variations.
The negotiations which are necessary to
prior to the awarding of a construction QUESTION: In what respects should the
contract will vary in type and formality contractor be given a maximum of freedom to
with the nature of the work to be done. pursue the work as he desires?
QUESTION: Why is more than one bid usually The contractor, when bound to a time
solicited for any given construction contract? limit, should be given the utmost
freedom as to the order and manner of
To secure for the public or the owner doing the work.
the advantages of the competition and
the right to select a proposal which is
advantageous. QUESTION: In how much detail should the
plans and specifications set forth the work to
COMPETITIVE LETTINGS – are usually the most be performed on a construction project?
desirable methods of letting construction
contracts. In so far as is economically feasible, the
plans and specifications should give full
details as to required work, including all
dimensions, quantities, classes of
materials, and everything else that is
reasonably required in preparing a cost
estimate.