FINANCIAL PROPOSAL
Date: 01-12-2016
Cost Breakdown of Stair Retrofitting:
Sl Item Unit Q'ty Rate Total Amount Remarks
1 Chemical Bolt NOS 6.00 11522.00 69132.00
2 New Steel Column NOS 2.00 126334.00 252668.00
3 Stair Retrofitting Work JOB 1.00 89051.00 89051.00
Amount required for stair retrofitting 410851.00
Cost Breakdown of Shed Retrofitting:
4 I-Beam Retrofitting JOB 1.00 477552.00 477552.00
5 Wire Bracing JOB 1.00 31976.00 31976.00
6 Column Replacing JOB 1.00 78185.00 78185.00
Amount required for shed retrofitting 587713.00
Total= ৳ 998,564.00
In Word: Nine Lac Ninety Eight Thousand Five Hundred Sixty Four
Mode of Payment:
1 50% of the quoted rate should be given along with the work order.
2 20% of the quoted rate should be given after completion of the Item 01,02,03 & 06.
3 10% of the quoted rate should be given after completion of the Item 04.
4 10% of the quoted rate should be given after completion of the Item 05.
5 Rest of the 10% of the quoted rate should be given after final checking of the consultant.
Scope of Work:
1 All work will be done as per the initial submitted structural drawing. (See The Attachment)
2 Any further modification will be charged separately as per the current market rate.
Thank You
Sincerely Yours
Zakaria Mahmud
Contact: 8801723239872, 8801716057905. H#366, Level 5, Rd# 28, New DOHS, Mohakhali, Dhaka 1206