Material Used
Cement
Sand
Steel
Conc M10 in (Cum) 8.90
Conc M15
Conc M30 3.66 1
Dust filling & Consolidation in (Cum) 8.58
Shuttering Qty in (Sqm)
Diesel in (Ltrs)
Petrol in (Ltrs) 2.72
Machinery Used
Jcb Company Owned
Jcb Hired
Tractor Company Owned
Tractor Hired
Water Tanker Company Owned
Baby Millar Hired
Lift Hired
Generator Hired
Material Used
Cement
Sand
Steel
Conc M10
Conc M15
Conc M20
Machinery Used
Jcb Company Owned
Jcb Hired
Tractor Company Owned
Tractor Hired
Water Tanker Company Owned 1 1 1 1 1
Baby Millar Hired 1 1 1 1 1
Lift Hired 1 1 1 1 1
Generator Hired 1 1 1 1 1
Total :- 18 28 30 26 26 0 0 0 0 0 0 0 0
Work Description:- Septic tank excavated
Septic Tank
earth
Pcc
trench
dressing,Brick
forLevelling,Side
septic3rd
tank
Floor
work
12Shuttering
Cum
Bricks
atRaft
2nd
done,
Concrete
shifting,
floor
for
brick
2nd
PCC,
Septic
Completed,
block,GF
shfting
Marking,PCC
tank
for2nd
raft
3rd
3rdblock
reinforcement
floor,700nos,water
Floor
laying,Coast
east
Bricks
side600
iswall
guards
innos
progress,Block-2
curing,runners
plastering,plumbing
and
rooms
2 units
tiles Sand
and
cleaning,GF
GFshuttering
and
shifted.Curing
Dormitory
sanitary
2nd
sheets
inner
block
fixing
& wall
stacking,plastering
Cleaning
bw
in plastering
progress.
dismantling
for coast
is and
in guard
progress.
for
rubbish
GFrooms,
block-1,and
cleaning,water
Coastblock
Gua
Material Used
Cement
Sand
Steel
Conc M10 in (Cum) 12.032
Conc M15 in (Cum) 7.29
Conc M20 in (Cum)
Machinery Used
Jcb Company Owned
Jcb Hired
Tractor Company Owned
Tractor Hired
Water Tanker Company Owned
Baby Millar Hired
Lift Hired
Generator Hired
14-Feb-12 15-Feb-12 16-Feb-12 17-Feb-12 18-Feb-12 19-Feb-12 20-Feb-12 21-Feb-12 22-Feb-12 23-Feb-12 24-Feb-12 25-Feb-12 26-Feb-12
Name of the Site:- Sricity
Man Power
Masons
Labour contractor
Mc
(Inamul Haque)
Fc
Masons
Local Labour
contractor (Guna Mc
Sekhar)
Fc
Masons
Local Labour
Mc
contractor (Selvam)
Fc
Masons
Local Labour
contractor Mc
(K.Venkatesh)
Fc
Masons
Local Labour
Mc
contractor (Murugan)
Fc
Shuttering Contractor Fitters
(S.Raja) Helpers
Fitters
Barbending (T.Ravi)
Helpers
Total :- 0 0 0 0 0 0 0 0 0 0 0 0 0
Work Description:-
Material Used
Cement
Sand
Steel
Conc M10
Conc M15
Conc M20
Machinery Used
Jcb Company Owned
Jcb Hired
Tractor Company Owned
Tractor Hired
Water Tanker Company Owned
Baby Millar Hired
Lift Hired
Generator Hired
Material Used
Cement
Sand
Steel
Conc M10
Conc M15
Conc M20
Machinery Used
Jcb Company Owned
Jcb Hired
Tractor Company Owned
Tractor Hired
Water Tanker Company Owned
Baby Millar Hired
Lift Hired
Generator Hired
Total :- 0 0 0 0 0 0 0 0 0 0 0 0 0
Work Description:-
Material Used
Cement
Sand
Steel
Conc M10
Conc M15
Conc M20
Machinery Used
Jcb Company Owned
Jcb Hired
Tractor Company Owned
Tractor Hired
Water Tanker Company Owned
Baby Millar Hired
Lift Hired
Generator Hired
12-Feb-12 13-Feb-12
0 0
aunch portion bending and tying, reinforcement shifting,shuttering plates cleaning and applying shuttering oil and shifting ply boards for 2nd lift. And Curing works.
0 0
0 0
Floor Bricks 600 nos and 2 units Sand shifted.Curing & Cleaning for coast guard rooms, Coast Guard rooms corridor parapet wall completed.
27-Feb-12 28-Feb-12
0 0
0 0
0 0