30-Jan-12 31-Jan-12 01-Feb-12 02-Feb-12 03-Feb-12 04-Feb-12 05-Feb-12 06-Feb-12 07-Feb-12 08-Feb-12 09-Feb-12 10-Feb-12 11-Feb-12

Name of the Site:- Sricity


Man Power
Masons 1 1 1 1 1
Labour contractor
Mc 9 9 9 8 9
(Inamul Haque)
Fc 4 3 3 4
Masons
Local Labour
contractor (Guna Mc
Sekhar)
Fc
Masons
Local Labour
Mc
contractor (Selvam)
Fc
Masons 1 1 1 1 1
Local Labour
contractor Mc 2 1
(K.Venkatesh)
Fc
Masons
Local Labour
Mc
contractor (Murugan)
Fc

Shuttering Contractor Fitters 5 4 4 4 4


(S.Raja) Helpers 3 2 2 2 2
Fitters
Barbending (T.Ravi)
Helpers
Total :- 23 20 20 22 18 0 0 0 0 0 0 0 0
Work Description:- Dust filling,Collection
Dust levelling
tankRaft
plastering,Maintank
andarea
consolidation,pcc
bottom
Reinforcement
matsides
completed,and
levelling,earth
Reinforcement
Shuttering
for Raft top
plinth
consolidation
for
mat,
walls
beams
chairs
and
rodbending
rod
for
haunch
bending,
main portion
tank
and
deshuttering
&placing,1st
balance
bending raft
and
for
liftconcrete
T-106,
wall
tying,concreting
reinforcement
1st
area.
Lift,Cover
for T-106
shifting,shuttering
blocks
cross
casting,12mm
walls,Rods
plates
rods
shifting,Curing
cleaning
straightning
andthe
applying
and
structure.
bending,
shutt

Material Used
Cement
Sand
Steel
Conc M10 in (Cum) 8.90

Conc M15
Conc M30 3.66 1
Dust filling & Consolidation in (Cum) 8.58
Shuttering Qty in (Sqm)
Diesel in (Ltrs)
Petrol in (Ltrs) 2.72
Machinery Used
Jcb Company Owned
Jcb Hired
Tractor Company Owned
Tractor Hired
Water Tanker Company Owned
Baby Millar Hired
Lift Hired
Generator Hired

Name of the Site:- South


Man Power
Masons
Labour contractor
Mc 3 3 3
(Ramanamma)
Fc 10 13 8
Masons
Local Labour
contractor Mc 6 6
(A.Seenaiah)
Fc 8 11
Masons
Brick Masonry
contractor (G.Hari Mc
Babu)
Fc
Masons
Brick Masonry
Mc
contractor (T.Prasad)
Fc
Shuttering Contractor Fitters
(Malli) Helpers
Total :- 13 16 14 17 11 0 0 0 0 0 0 0 0
Work Description:- CC Blocks shifting
Sand,& to GF
CCto
Sand
Blocks
SF,Second
shifting
shifting
Ballies,plywood
from
floor
fromCleaning
GF
GFtoBrick
toSF,Ballies
SF,
for
boards,shuttering
shifting
20mm
Ceiling
well
for
Aggregate
plastering
stacking,
1st, and
steel
shifting
2nd
plates
floors,
forstacking,out
terrace works.
side properly,deshuttering for strucked plates in 2nd floor roof slab removing,curing

Material Used
Cement
Sand
Steel
Conc M10
Conc M15
Conc M20

Machinery Used
Jcb Company Owned
Jcb Hired
Tractor Company Owned
Tractor Hired
Water Tanker Company Owned 1 1 1 1 1
Baby Millar Hired 1 1 1 1 1
Lift Hired 1 1 1 1 1
Generator Hired 1 1 1 1 1

Name of the Site:- CVR F


Man Power
Masons
Labour contractor
Mc 7 5
(Ramanamma)
Fc 11 10
Masons
Local Labour
contractor Mc 5 6 6
(A.Seenaiah)
Fc 5 9 10
Masons
Brick Masonry
contractor (G.Hari Mc
Babu)
Fc
Masons
Brick Masonry
Mc
contractor (T.Prasad)
Fc
Masons 4 5 4 3 4
Brick Masonry
contractor Mc
(K.Sreenivasulu)
Fc 4 4 4 4 4
Masons
Brick Masonry
Mc
contractor (T.Prasad)
Fc
Shuttering Contractor Fitters 2 2 1
(Malli) Helpers 2 2 1
Electrical Contractor Fitters
(V.Ravi) Helpers
Plumbing Contractor Fitters 2
(Mahesh) Helpers 2

Total :- 18 28 30 26 26 0 0 0 0 0 0 0 0
Work Description:- Septic tank excavated
Septic Tank
earth
Pcc
trench
dressing,Brick
forLevelling,Side
septic3rd
tank
Floor
work
12Shuttering
Cum
Bricks
atRaft
2nd
done,
Concrete
shifting,
floor
for
brick
2nd
PCC,
Septic
Completed,
block,GF
shfting
Marking,PCC
tank
for2nd
raft
3rd
3rdblock
reinforcement
floor,700nos,water
Floor
laying,Coast
east
Bricks
side600
iswall
guards
innos
progress,Block-2
curing,runners
plastering,plumbing
and
rooms
2 units
tiles Sand
and
cleaning,GF
GFshuttering
and
shifted.Curing
Dormitory
sanitary
2nd
sheets
inner
block
fixing
& wall
stacking,plastering
Cleaning
bw
in plastering
progress.
dismantling
for coast
is and
in guard
progress.
for
rubbish
GFrooms,
block-1,and
cleaning,water
Coastblock
Gua
Material Used
Cement
Sand
Steel
Conc M10 in (Cum) 12.032
Conc M15 in (Cum) 7.29
Conc M20 in (Cum)

Machinery Used
Jcb Company Owned
Jcb Hired
Tractor Company Owned
Tractor Hired
Water Tanker Company Owned
Baby Millar Hired
Lift Hired
Generator Hired

14-Feb-12 15-Feb-12 16-Feb-12 17-Feb-12 18-Feb-12 19-Feb-12 20-Feb-12 21-Feb-12 22-Feb-12 23-Feb-12 24-Feb-12 25-Feb-12 26-Feb-12
Name of the Site:- Sricity
Man Power
Masons
Labour contractor
Mc
(Inamul Haque)
Fc
Masons
Local Labour
contractor (Guna Mc
Sekhar)
Fc
Masons
Local Labour
Mc
contractor (Selvam)
Fc
Masons
Local Labour
contractor Mc
(K.Venkatesh)
Fc
Masons
Local Labour
Mc
contractor (Murugan)
Fc
Shuttering Contractor Fitters
(S.Raja) Helpers
Fitters
Barbending (T.Ravi)
Helpers
Total :- 0 0 0 0 0 0 0 0 0 0 0 0 0
Work Description:-

Material Used
Cement
Sand
Steel
Conc M10
Conc M15
Conc M20

Machinery Used
Jcb Company Owned
Jcb Hired
Tractor Company Owned
Tractor Hired
Water Tanker Company Owned
Baby Millar Hired
Lift Hired
Generator Hired

Name of the Site:- South


Man Power
Masons
Labour contractor
Mc
(Ramanamma)
Fc
Masons
Local Labour
contractor Mc
(A.Seenaiah)
Fc
Masons
Brick Masonry
contractor (G.Hari Mc
Babu)
Fc
Masons
Brick Masonry
Mc
contractor (T.Prasad)
Brick Masonry
contractor (T.Prasad)
Fc
Shuttering Contractor Fitters
(Malli) Helpers
Total :- 0 0 0 0 0 0 0 0 0 0 0 0 0
Work Description:-

Material Used
Cement
Sand
Steel
Conc M10
Conc M15
Conc M20

Machinery Used
Jcb Company Owned
Jcb Hired
Tractor Company Owned
Tractor Hired
Water Tanker Company Owned
Baby Millar Hired
Lift Hired
Generator Hired

Name of the Site:- CVR F


Man Power
Masons
Labour contractor
Mc
(Ramanamma)
Fc
Masons
Local Labour
contractor Mc
(A.Seenaiah)
Fc
Masons
Brick Masonry
contractor (G.Hari Mc
Babu)
Fc
Masons
Brick Masonry
Mc
contractor (T.Prasad)
Fc
Masons
Brick Masonry
contractor Mc
(K.Sreenivasulu)
Fc
Masons
Brick Masonry
Mc
contractor (T.Prasad)
Fc
Shuttering Contractor Fitters
(Malli) Helpers
Electrical Contractor Fitters
(V.Ravi) Helpers
Plumbing Contractor Fitters
(Mahesh) Helpers

Total :- 0 0 0 0 0 0 0 0 0 0 0 0 0
Work Description:-

Material Used
Cement
Sand
Steel
Conc M10
Conc M15
Conc M20

Machinery Used
Jcb Company Owned
Jcb Hired
Tractor Company Owned
Tractor Hired
Water Tanker Company Owned
Baby Millar Hired
Lift Hired
Generator Hired
12-Feb-12 13-Feb-12

0 0

aunch portion bending and tying, reinforcement shifting,shuttering plates cleaning and applying shuttering oil and shifting ply boards for 2nd lift. And Curing works.
0 0
0 0

Floor Bricks 600 nos and 2 units Sand shifted.Curing & Cleaning for coast guard rooms, Coast Guard rooms corridor parapet wall completed.
27-Feb-12 28-Feb-12
0 0
0 0
0 0