Sei sulla pagina 1di 1

Daily Drilling Fluids Report

EGYPTIAN MUD ENGINEERING & CHEMICALS COMPANY


Water Base

Operator General Petroleum Company"GPC" Rig Name ADM#3 Report No. 10


Operator (Rep's) Sameh Tash Country Egypt Date 4/16/2017
Well Name & Number S.E. AL HAMD - 2 Field / Location G.O.S / G.O.S Measure Depth / TVD, m 1057 / 865.63
Contractor ADS Water Depth / RKB, m 49.00 / 72.00 Progress 0
Contractor (Rep's) Kareem Spud Date 07.04.2017 Present Activity Run casing

STRING DATA CASING DATA HOLE VOLUMES MUD PIT VOLUME


OD ID Type Length OD ID Set @ MD bbl min stks Pit
Fluid Type Volume, bbl
24.000 20.000 116.00 Surface Equipments 1.62 0 ID Status
Drill String Capacity 0.00 0 S.TRAP 1 Active S.S. KCL POLY. MUD 24.84
Drill String Displacement 0.00 0 S.TRAP 2 Active S.S. KCL POLY. MUD 24.84
Annular Section 0.00 0 S.TRAP 3 Active S.S. KCL POLY. MUD 24.84
Total Hole With String 1,066.34 0 S.TRAP 4 Active S.S. KCL POLY. MUD 24.84
Total Hole Without String 1,066.34 0 TANK#1 Active S.S. KCL POLY MUD 193.24
Active Pits Volume 292.59 0 TANK#2 Reserve OBM 0.00
Total Circulation Volume 1,360.56 0 TANK#3 Reserve SPUD MUD 0.00
Circulation Volume at Bit 294.21 0 TANK#4 Reserve S.S. KCL POLY. MUD 71.90
TANK#5 Reserve 70.00
SLUG Reserve S.S. KCL POLY. MUD H 30.00

MUD SPECS BIT DATA SOLIDS CONTROL EQUIPMENT CIRCULATION & PUMPS DATA
Fluid Type Hole Size in 17.50 Device Make Size Hrs Pump Make NATIONAL DUPLEX NATIONAL DUPLEX
Parameters min max Bit Size in 17.50 SH.SH#1 SWACO 2*100 3 Pump Model NT. P-160 NT. P-160
Bit No. 1 SH.SH#2 SWACO 1*120( 3 Liner, in 6.50 6.50
Bit Type Rock Bit SH.SH#3 SWACO 2*100 3 Stroke Length, in 12.00 12.00
TFA in2 0.976 MUD CLEANER SWACO 2*140 3 Efficiency, % 97.00 97.00
Depth in m 116.00 DESANDER SWACO 2 CO 3 Pump Rate, stk/min 0 0
W.O.B lbf 0 DESILTER SWACO 16 CO 3 Pump Output, bbl 0.119 0.119
R.P.M 0 CENTRIFUGE Derrick centrif 9 Pump Flow Rate, bbl/min 0.0 0.0
R.O.P m/h 0.0 Flow Rate, gal/min 0.0
Pump Pressure, psi 0.0

MUD PROPERTIES MUD VOLUME ACCOUNTING MUD PRODUCTS CONSUMPTION


Sample Source Flow Line Additions, bbl Daily Cumm. Products Unit Size Used
Time 10:47:49 Initial Volume 1526.38 1017.4 Caustic Soda 25 kg Sax 12.00
Flow Line Temp., F 125 Mud Mixed 0 2155.35 Soda Ash 25 kg Sax 20.00
Depth MD / TVD, m 1,057.00/865.63 Water (dilution) 0 405 EMEC PAC LV 25 kg Sax 32.00
Mud Weight, lb/gal 9.80 Diesel Added 0 0 Brine Vis 25 kg Sax 2.00
Mud Gradient, psi/ft 0.51 Chemicals 6.08 96.33
Funnel Viscosity, sec/Qrt 62 Mud Recieved 0 0
600 / 300 / 200 RPM 81/58/47 Gain 0 0
100 / 6 / 3 RPM 34/11/10 Total Addition 6.08 2656.68
Rheology Temp., F 120
PV / YP / LSYP, cP/lb/100ft2 23/35/9
Gel Str. 10s/10m/30m, lb/100ft2 11 / 15 /
API Fluid Loss, ml/30min 5.6
HTHP, ml/30min/HTHP Temp., F /
Cake API / HTHP, 1/32nd in 0.50/ Losses, bbl Daily Cumm.
Sand Content, Vol % 0.40 Shakers 0 240
Report Oil, Vol % 0.00 S.C.Eq. 0 110
Retort Water, Vol % 88.00 Formation 0 485
Retort Solids, Vol % 12.00 Dumped 0 1164.62
Ph / Ph Temp., F 9.5/120 Trip 0 0
CEC Mud(MBT), ppb 5 Left in Hole 0 0
Alkalinity Mud (Pm), 0.5 Mud Returned 0 0 DAILY ADDITIONAL COST
Alkalinity Filtrate (Pf) / (Mf), 0.15/0.3 Oil in Cuttings 0 0
Chlorides, mg/l 52000 Other 0 0
Total Hardness, mg/l 540 Total Losses 0 1999.62
Glycol, gal/bbl Final Volume 1532.46 1674.46
Glycol Cloud Point, F
ADDITIONAL PARAMETERS

Current Dilution Factor 0.57


SOLIDS ANALYSIS BIT HYDRAULICS MUD COST ANALYSIS
Dissolved Solids, Vol % 2.36 Rheology Model Power Law 17.50 Original Water Base Spud Mud 2,410.00
NaCl, % wt / ppb 8.1 / 30 AV / DP, ft/min 17.50 Original Water Base S.S KCL POLY. MUD 59,292.50
KCl, % wt / ppb / AV / DC, ft/min
Avg.Sp.Gr. Solids, 2.28 AV / Riser, ft/min
Corrected Solids, Vol % 9.64 Bit HHSI, hp/in2 0
LGS, Vol % 2.59 Bit Press. Loss, psi 0
Betonite, Vol % 0.3 Nozzels Vel., ft/sec 0
Betonite, ppb 2.74 ECD @ Bit, lb/gal 9.8
Drilled Solids, Vol % 2.29 ECD @ Casing Shoe, lb/gal
Drilled Solids, ppb 21.68 Leak-Off Test
HGS (EMEC CARB (EF)), Vol % 7.05 n 0.48
HGS (EMEC CARB (EF)), ppb 66.94 k (lbf.sec^-n/100ft^2) 3.065
Aw 0.9503

Total Cost 61,702.50


RIG OPERATIONS TIME DISTRIBUTION MUD TREATMENT
CONTINUED WIPER TRIP TO 116MT ,BACK FREELY TO BOTTOM WITH REAMED DOWN WIPER TRIP 06:00 *TREATED ACTIVE SYSTEM WITH C.SODA TO CONTROL Ph ,SODA ASH & S.BICARB TO
LASTTWO STANDS ,SWEPT HOLE WITH PUMPED 15 BBLS LOW VIS FOLLOW WTH 40 BBLS Circulation 03:00 CONTROL TOTAL HARDNES AND E. PAC LV TO CONTROL FLUID LOSS TO KEEP WITHIN
HVP IN TOW TIMES ,SPOTTED 35 BBLS HVP ON BOTTOM ,FLOW CHECK ,POOH FOR POOH 08:00 RANGE.
RUNNING 13 3/8" CSG ,L/D DIRECTIONAL BHA ,R/UP CSG TOOLS AND RIH 13 3/8" CSG , IN R/U Casing Equip. 03:00 *SPOT ON BOTTOM 35 BBLS HVP.
PROGRESS. Run casing 04:00
*DUMPED AND CLEANED OLD SPUD MUD FROM RESRVE PIT#3 AND DEAD VOLUME FROM
Total 1.00:00:00 PIT#5
LITHOLOGY DATA *RESEVED ABOUT +/- 720 BBLS OF OBM IN PIT#2 AND PIT#5:(MWT: 9 PPG & VIS: 155 SEC. )
Age
Formation Drilled South Gharib
Lithology Anhydrite
DEVIATION DATA
Inclination / Azimuth, de
MD / TVD, m
Horisontal Displ., m
A.fatah Elnokrashi District Egypt District Representative Alaa El Meligue Daily Cost, $ Cummulative Cost, $
EMEC ENGINEER
Badry Elsayed Ahmad Warehouse ALEX. Free Zone Field Representative HAKIM 2900 61702.5

General Petroleum Company"GPC", Egypt Page 1 of 1 April, 2017

Potrebbero piacerti anche