Sei sulla pagina 1di 1

10 9 8 7 6 5 4 3 2 1

7500 7500 7500 7500 7500 9000 6000 7500 11000

1
047
2 1
CLADDING 039 039
STAIRCASE

A BRACING BAY TURBINE AND GENERATOR ROTOR LAYDOWN AREA BRACING BAY

1750
4000
LUBE OIL CONSOLE
OPENING CL OF BFP-3

Aa
OPENING FOR LUBE OIL PIPING
4000

HAND RAIL

L OF CONDENSER
2000 2000
Ab
1000

WORK BENCH

CL OF TURBINE
800 MAINTENANCE

BRACING BAY
3000

BAY

C
1000
BRACING BAY

C&I
TEST BENCH

RACK
CL OF BFP-2
ROOM
8000

EL (+) 15.500
(FFL)
3000

OWS CLADDING
SD1
1000 1

Ac
1 042
CEP OPENING R
TURBINE AND GENERATOR ROTOR LAYDOWN AREA

CL OF BFP-1

C OF AUX. HOOK C OF AUX. HOOK

C OF MAIN HOOK C OF MAIN HOOK


EL (+) 15.500

BRACING BAY BRACING BAY


BRACING BAY

B STAIRCASE PIPE HATCH PIPE HATCH PIPE HATCH PIPE HATCH PIPE HATCH

1200
1295

SD1

SHOE RACK
1 SD1 SD1 800 1000
1 1 DOOR UNDER HOLD 1385
1000 MAINTENANCE
800

GENTS TOILET ROOM


1200

1000
CONTROL EQUIPMENT ROOM(A/C) CONTROL ROOM
(A/C) SHIFT INCH.
EL (+) 16.200 AREA

2000
(FFL)

3605
LADIES TOILET UPS PANEL
1000
ROOM
12000

PANTRY
SD 2728
1000 800 1000

2
SD
2
600

2000
800 1385

1535
UPS ROOM
T BOP CONFERENCE ROOM(A/C)

1600
ENGINEERING B-1 B-2
1365

1365
ROOM FOR #2
BRACING BAY (A/C) LVS-70"

BRACING BAY
C CCTV
1200

1000
32"

STAIRCASE
UP LIFT

7500 7500 7500 9000 6000 7500 11000

1
8 7 6 5 4 3 2
PLAN AT EL(+)16.200/EL(+)15.500M LEVEL

Potrebbero piacerti anche