All outstanding obsns pertaining to wks where the wk is over incl DLP and
(b)
obsns which do not have serious implications, the same shall be identified by a
BOO convened at each Comd CE/ADG level with Presiding Officer from
Comd/ADG and members from both STE and concerned CE Zone. The obsns
will be settled as Not Pressed Further/Settled with/without recovery to clear the
backlog of fait accompli cases by BOO and necessary settlement memo will be
issued by STE. STEs will give a feedback on all such cases as on 31 Mar 2018
to respective CE Comd/ADG by 31 Jul 2018.
In respect of obsns for which IRNR even after one year of raising and those
(c)
obsns which are unsettled even after a lapse of one year after completion of
DLP, STE will deliberately study all outstanding obsns project-wise, discuss the
same with concerned OE/AO and seek their comments for one final time. Based
on the CE/AO reply, the STEs will then fwd project-wise cases where the defects/
obsns are found to be fit to be declared as 'Serious Case'. Based on the merit of
the case, the same will be declared as 'Serious Case'. In the balance cases,
recovery if applicable will be intimated by the STEs.
(Reji Ashok)
Dir (Contracts)
for Engineer-in-Chief
Encls : As above
Copy to :-
You are requested to direct all STEs to follow the action plan as
ADGTE
above. Settlement drives at regular intervals be also carried out
for timely resolution of pending obsns.
Internal
E2W (PPC)
3. In the recent interactions with QMG's Branch, E-in-C's Branch, & Comd CEs this
point has been deliberated with concern and there is a felt need to give a re-look to the
existing policy of settlement of obsns & to evolve a healthy & proactive mechanism with
greater involvement at all levels incl CE Comd.
4. The existing policy for formulation & settlement of STE obsns is exhaustively laid
down in ADGTE Policy Compendium-2012. The requisite actions as per existing policy &
further actions to bring about a perceptible improvement in this process are brought out
hereinunder-
(a) Factual Notes: Due care has to be taken while preparing factual notes &
defects to be duly quantified. At this stage itself obsns with financial effect less than
Rs 10000/- to be incl in Minor obsns for which action for settlement rests with
GE/CWE/CE Zones as per their financial limits. All maj obsns should be supported
by site photographs, auth of IS/contract/RMES etc. Repeated maj obsns in same stn
must be termed as serious cases.
(b) Suggestions/Advisory: While formulating the AIR & detailed obsns. those
with suggestive/advisory nature, such as suggestions for improvement in plg aspects
and/or specifications etc to be incl as 'Suggestions and not as 'obsns' & these shall
be left to the Comd CE/CE Zone for further action. These obsns shall not be
indicated as pending STE obsn. However these will be summarized as advisory in
Qtrly news letter of ADGTE.
Contd...2/-
-2-
c . Initial Replies: Those obsns where initial replies are received within
:-,-z)hths STE shat convey his decision within 15 days of receipt In case initial
• mai::-/ cosns is no, recc from GE within three months STE shall info CE
list of such Ot)SnS If the replies are still not received within next two
months thereafter the obsns shall be referred to Comd CE with a copy to HQ
ADGTE
Qtrly Mtq with ACE(C) (Wks): - Every quarter STE shall prepare &
submit a discussion sheet incl obsns. initial replies & further corresp and
views of STE to Comd CE Thereafter a meeting with ACE(C) Wks shall be
held Directions given by ACE(C) Wks shall be recorded & STE shall take
settlement/further action accordingly
;ii ; Half Yrly Mtq with CE Comd:- Meeting with Comd CE shall be held
every six months & STE shall apprise about the progress achieved in qtrly
meetings with ACE(C) wks and also discuss the cases considered of serious
nature Directions of Comd CE shall be recorded & STE shall issue
settlement/draft serious cases accordingly All those obsns which are
classified as advisory/suggestive by Comd CE shall not be explored further &
these snail be left to the appropriate MES authority for further course of
action
f Disposal of obsns > 36 m old: - Present state of obsns more than 36 m old
s at Appx A. To liquidate these large No of obsns by 31 Mar 15 following
r.-Irnedate measures shall be takerv-
it is expected that with the above measures al: the existing outstanding obsns > 1 yr
'eaon icoical conclusion & ultimate goal of having no obsns pending for > 1 yr
ce acneyed by 30 June 15 It is emphasized that settlement of obsns is an
nteract!ve and terative process All STEs are expected to take a proactive approach
mus: be Kept in mind that the main obiective of TE insps a tc bring about a
marked .mprovernent in quality of wks and bring in transparency in the sys and settling of
obsn is a means towards that objective.
5 This has the approval of ADGTE and will be followed with immediate effect
(Balpt Singh)
CDOS&C)
Jt DG TE
For ADGTE
Ends: As abc Je
Copy to:-
E-in-C Br (E8) - With a request to issue directions to all Comd CEs accordingly
All Comd For necessary action alongwith encls A zone wise list of pending
obsns of concerned comd is also encl as Appx B- to • BT
(as applicable to the Comd).
RESTRICTED
5
STE-WISE OBSNS
4499
._11,.,4 -----
2 1 II 1 ii
3511 3090 2768 2521
a ill
2
STE STE STE STE STE
STE Pune STE MAP STE Jaipur
Ch garh LucKnow Kolkata Jam mu Chennai
Outstanding As on 31 Mar 2017 7305 4499 4158 3923 3511 3090 2768 2521
Cleared during the Qtr 1120 1043 423 1094 68 605 839 735
Added during the Qtr 1008 1023 517 718 352 549 421 516
Outstanding As on 01 Jan 2018 7417 4519 4064 4299 3227 3146 3186 2740
- Status of Obsns IRNR (Initial Reply Not Recd). There has been a
:onsiderable delay in submission of initial reply by the executives to certain observations
- wised by STEs. The status of these obsns is given below which needs to be monitored by
- gher headquarters:-
Comd DG
WC CC SC NC SC SWC MAP EC
AP
Raised Total
STE STE STE STE STE STE STE STE
STE C'garh Lucknow Pune Jammu Chennai Jaipur MAP Kolkata
IRNR 4819 1741 1676 1530 1398 1146 1015 997 14322
RESTRICTED
RESTRICTED
6
5. Observations Summary : CEs Zone Wise. The aata visualization in the form of heat
chart represents outstanding observations summary on a color gradient increasing in gravity
from 3 3 4 column wise depending upon No of observations
for each Zone.
1 - 1Y2 1Y: - 2 2 -3
< 6 Months < 1 Year > 3 Years
Years Years Years G/Ttl Total New
STE Comd Formation obsns (IRNR) obsns Obsn
IRNR R I IRNR R IRNR R IRNR R IRNR R IRNR
Settled
Total 301 2385 635 322 494 42 380 65 544 67 993 87 6315 2968 362 489
F.: CE Kolkata Zone 437 39 13 14 5 6 7 7 0 0 7 3 538 69 318 51
=- CE Shillong Zone 53 94 79 69 103 3 68 22 92 5 65 2 655 195 0 70
CE Shiliguri Zone 292 8 85 25 8 1 14 0 32 2 24 1 492 37 15 251
EC
E.:, .:, CE (Navy) Vizag 69 389 171 22 127 25 29 8 85 9 67 38 1039 491 0 174
Admiral
Superintendent Naval 0 0 3 0 0 0 0 0 5 0 7 0 15 0 0 0
Dockyard (ASD) Vizag
Total 851 530 351 130 243 35 118 37 214 16 170 44 2739 792 333 546
CE Delhi Zone 163 549 473 471 69 63 116 43 58 56 56 0 2117 1182 142 62
' CE Chandigarh 129 892 178 193 38 58 20 0 20 5 0 0 1533 1148 138 174
WC CE Pathankot Zone 47 254 26 21 131 107 29 85 45 64 44 10 863 541 128 86
CE Jalandhar Zone 13 843 50 136 97 274 51 0 45 47 45 4 1605 1304 95 79
.-;: S.VC I CE (AF) Palam 418 396 144 188 106 53 102 10 102 56 89 16 1680 719 239 238
tl
Total 770 2934 871 1009 441 555 318 138 270 228 234 30 7798 4894 742 639
__ CE Lucknow Zone 117 241 132 0 167 25 104 20 34 0 39 0 879 286 0 97
CC CE Barielly Zone 459 424 92 0 136 0 58 0 27 0 42 0 424 0 19
CC
CC i I CE Jabalpur Zone 253 299 13 4 92 0 23 0 49 0 194 0 303 147 111
CC !CE (AF) Allahabad 139 440 83 0 34 0 0 0 38 0 43 0 777 440 30 99
Total 968 1404 320 4 429 25 185 20 148 0 318 0 3821 1453 177 326
CE Srinagar Zone 0 0 17 52 0 0 48 4 10 0 15 1 147 57 0 0
NC
CE Leh Zone 0 0 56 68 0 0 92 43 60 16 108 62 505 189 0 13
Total 0 0 73 120 0 140 47 70 16 123 63 652 246 27 13
_•• - CE Jaipur Zone 0 180 57 70 65 25 147 23 87 22 162 8 846 328 81 55
SWC CE Bhathinda Zone 109 27 9 18 17 1 16 24 45 11 153 ,1 441 92 41 187
5WC. SC. f7..: CE (AF) Gandhinagar 100 164 78 139 158 29 50 42 188 7 251 40 1246 421 29 219
Total 209 371 144 227 240 55 213 89 320 40 566 59 253.3= 841 151 461
RESTRICTED
RESTRICTED
7 '
1 - 1% 1% - 2 2 -3
< 6 Months < 1 Year > 3 Years
STE Comd Fvr nation I Years Years Years G/Ttl Total New 01)1
obsns (IRNR) obsns Sett'
R IRNR R IRNR R IRNR R IRNR R IRNR R IRNR
S T:C2) CE Chennai Zone 16 206 12 0 - 6 11 7 6 37 8 24 0 333 231 0 11.
CE (R&D) •
F.C,SC(P),SC(C) 28 45 22 9 14 4 19 28 53 26 82 35 365 147 0 99
Secunderabad
'.'C,EC,SWC,CC
CE (R&D) Delhi 4 180 0 0 2 94 11 0 1 0 27 4 323 278 9 0
Nc.
ADG
Obsn :C,EC,SC(C),
(Projects) CE (Fy) Hyd 5 74 26 131 , 29 0 34 21 6 0 54 8 388 234 0 26
ettled S:4')
CCE No 1 (Army)
0 67 25 8 30 10 0 0 0 0 0 0 140 85 0 6
92 EC ADG Missamari
(NEI)
31
EC CCE No 3 Narangi 0 41 0 0 0 0 0 0 0 0 0 0 41 41 0 0
EC CCE NEP Chabua 61 1 0 0 0 0 0 0 6 0 0 0 68 1 0 48
121
EC CE (AF) Shillong Zone 182 0 109 25 18 0 92 23 125 58 258 29 919 135 0 15:
25 Total 243 109 136 33 52 11 92 23 131 58 258 29 1175 263 0 20f
489 NC CE Udhampur Zone 18 264 15 4 52 47 42 20 109 124 87 23 805 482 20 24
ADG (N)
51 NC CE (AF) Udhampur 0 70 12 133 34 23 6 0 50 32 82 3 445 261 70 0
70 Total 18 334 27 137 86 70 48 20 159 156 169 26 1250 743 90 24
::::,P) DGNP Mumbai 0 0 0 0 0 0 0 0 0 0 21 0 21 0 0 0
DGW
174 EC CE DCNP Vizag 4 87 19 15 11 18 22 21 31 9 , 97 17 351 167 0 26
Total 4 87 19 15 11 18 22 21 31 9 118 17 372 167 0 26
....AP DG MAP DG MAP 45 570 286 359 1340 4 49 10 776 72 0 0 3511 1015 227 19
546 Total 45 570 286 359 1340 4 49 10 776 72 0 0 3511 1015 227 19
62 Grand Total 3487 9279 2922 2496 3387 924 1636 525 2807 696 3214 402
.. ._ .
174 -R ecdep y. IRNR-Initial Reply Not Received
86
Table 2.3: CEs Zone observation summary
79
238 ,
6. Draft Paras (DPs). The status of Service-wise /Headquarter-wise outstanding
639
DPs at the end of quarter is as follows:-
97
19
Services / Cases Cases raised Cases finalized Cases
111 as on during 01 Jan 2018 during 01 Jan 2018 as on
Headquarters
99 01 Jan 2018 to 31 Mar 2018 to 31 Mar 2018 31 Mar 2018
326 Army 02 01 01
0 Navy 00 00
13 AF 01 01 00
13 A DG (Projects)* 14 01 13
1 ADG (NEI)**
00 00
ADG (N)*** 00
187
I 00
DGW*"* 00 00
Total 1 17 00 03 14
461
Table 2.4 (a) : Summary of outstanding Draft Paras at the end of Quarter Ending Mar 18