1: Payment Time-table (Schedule) PLTM Sapaya

YEAR I (2012) YEAR II (2013) YEAR III (2014) YEAR IV (2015)


CONSTRUCTION
WORKS
TYPE OF WORKS COSTS
PORTION
No. (x Rp 1000) PREPARATORY STAGE (PRE- CONSTRUCTION) CONSTRUCTION STAGE WARRANTY STAGE PERCENTAGE
(%)
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6
100
1 1
A PRE-CONSTRUCTION STAGE

1 Feasibility Study

2 UKL/UPL Study

3 UKL/UPL Approval
0.9

4 Bid Document Preparatory

5 Funding

6 Project tender Process 0.8

7 Land Acquisition

75

B CIVIL & METAL WORKS

1 Preparatory Stage 558,481,159 0.007 0.002


0.7
0.002 0.002

2 Civil Works

2.1 Weir 3,961,475,740 0.052 0.013 0.013 0.013 0.013

2.2 Sandtrap 631,822,652 0.008 0.003 0.003 0.003


0.6

2.3 Waterway 10,058,730,564 0.132 0.022 0.022 0.022 0.022 0.022 0.022

2.4 Headpond 1,767,054,144 0.023 0.012 0.012

2.5 Intake Gate and Penstock 3,640,061,322 0.048 0.012 0.012 0.012 0.012
0.5 50
2.6 Powerhouse and Tailrace 4,009,905,732 0.053 0.011 0.011 0.011 0.011 0.011

2.7 Acces Road 3,016,337,219 0.040 0.010 0.010 0.010 0.010

2.8 Insitu Road 227,721,181 0.003 0.001 0.001 0.001

0.4

3 Intake, Gate and Penstock Pipe 12,060,219,564 0.159 0.032 0.032 0.032 0.032 0.032

39,931,809,276 0.525 Portion 0.002 0.012 0.025 0.023 0.026 0.038 0.025 0.054 0.055 0.055 0.066 0.055 0.012 0.012 0.023 0.011 0.011 0.011 0.011 0.000 0.000 0.000 0.000
TOTAL OF CIVIL & METAL WORKS
Portion Cumulative 0.002 0.015 0.040 0.063 0.089 0.127 0.152 0.205 0.260 0.315 0.381 0.437 0.449 0.460 0.483 0.494 0.504 0.515 0.525 0.525 0.525 0.525 0.525

C MECHANICAL & ELECTRICAL WORKS


0.3

& DISTRIBUTION LINES


25

1 Fabrication of M&E Tools and Equipment 28,151,904,000 0.370 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025

2 Instalation of M&E Tools and Equipment 7,037,976,000 0.093 0.031 0.031 0.031

0.2

3 Express Feeder Voltage Network 668,508,000 0.009 0.002 0.002 0.002 0.002 0.002

4 Testing / Commissioning / Training 240,000,000 0.003 0.001 0.001 0.001

36,098,388,000 0.475 0.000 0.000 0.000 0.000 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.026 0.026 0.026 0.026 0.057 0.031 0.031 0.001 0.001
TOTAL OF MECHANICAL & ELECTRICAL WORKS
0.000
0.1
0.000 0.000 0.000 0.025 0.049 0.074 0.099 0.123 0.148 0.173 0.197 0.222 0.247 0.273 0.300 0.326 0.353 0.410 0.441 0.472 0.473 0.474

ENGINEERING SERVICE 0

ADMINISTRATION 0
- - - - - ### ### ### ### ### ### ### ### ### ### ### ### ### 0
76,030,197,276 1.000
T O T A L - - ### 0.002 0.015 0.040 0.063 0.114 0.176 0.226 0.304 0.384 0.463 0.554 0.634 0.671 0.707 0.756 0.793 0.830 0.867 0.935 0.966 0.997 0.998 0.999 ###
- - - 0

Disbursment Per-Year( x Rp 1000) 0.000 33,191,857,553 39,129,828,130


Civil Works Cumulative (x Rp 1000) 0.000 33,191,857,553 39,129,828,130
Portion Cumulative (%) 0.000 83 98
Disbursment Per-Year( x Rp 1000) 0.000 15,014,348,800 26,809,916,800
M&E Works Cumulative (x Rp 1000) 0.000 15,014,348,800 26,809,916,800
Portion Cumulative (%) 0.000 42 74
Total Disbursment Per-Year( x Rp 1000) 0.000 48,206,206,353 65,939,744,930
Cumulative (x Rp 1000) 0.000 48,206,206,353 65,939,744,930
Portion Cumulative (%) 0.000 63.404 86.728
SUMMARY PRICE SCHEDULE
MECHANICAL & ELECTRICAL WORK
#REF!

Number Type of Work Unit Cost

C-1 Mechanical & Electrical Equipment accessories


include :
1 Francis turbine, inlet piece, draft tube, anchors 2 Set Rp 11,655,040,705
2 Cooling water & drainage systems 2 Set Rp 252,086,463
3 Butterfly valve, assembly joint 2 Set incl in C-1.1
4 Hydraulic governor, servomotors, pressure piping & 2 Set incl in C-1.1
hoses
5 Synchronous generator, 3262 kVA, 50 Hz, 6.3 kV, 2 Set Rp 3,018,760,453
1000 rpm, anchor frame
6 Electrical part for parallel opeartion (control system, Ls Rp 3,727,513,337
including protections & cabling)
7 Electrical part - Medium Voltage Equipment including Ls incl in C-1.6
cabling
8 SCADA System Ls Rp 367,501,523
9 Overhead travelling crane Ls Rp 210,001,291
10 Spare parts of mecahnical and electrical part Ls Rp 460,211,847
11 Tools, lubricants, coats Ls Rp 32,813,255
12 Transportation (Local Sea Port), including packing Ls Rp 590,627,526
13 Transportation from local sea Port to Site Ls Rp 1,422,019,000
14 Inland Transportation and Insurance Ls Rp 1,183,435,732
15 Automatic Voltage Regulator Ls Rp 981,097,147
16 Supervision and Comissioning Ls Rp 353,800,000
17 Complete erection, test on site, commissioning, Ls Rp 2,336,258,468
training & trial run
Total C-1 Rp 26,591,166,747
C-2 Network of 20 kV Medium Voltage - 2 km
Conductor AAAC 35 mm2 2.0 km Rp 54,108,000
Concrete poles and accessories 42 Tiang Rp 252,000,000
Insulator Set Rp 302,400,000
Installation costs including crossarm - 2 km. ls Rp 60,000,000
Total C-2 Rp 668,508,000
TOTAL Rp 27,259,674,747
B.2. PRICE SCHEDULE
CIVIL WORKS
SAND POND
###

NUMBER TYPE OF WORK UNIT VOLUME

SANDTRAP

1 Earth Works
a. Excavation Soil m3 920.25
b. Excavation Rock m3 920.25
c. Back Fill m3 560.00
d. Disposal Of Excavated m3 1,280.49
e. Soil compaction and leveling m3 1,280.49

2 Mansonry Works
a. Stone Masonry PC 1:4 m3 585.10
b. Gabin Complete with steel mesh 80x100mm m3 76.50

3 Concrete Works
a. Concrete K.225 m3 11.69

4 Reinforment Works
a. Steel Bar Reinforcing Deformed or Plain Kg 935.20

5 Form Works
a. Form Work Vertical m2 4.20
b. Form Work Horizontal m2 15.60

6 Plastering Works
a. Plester With Cement And Sand 1:4 m2 995.39

7 Canopy Works
a. Concrete K.225 m3 4.19
b.Steel Bar Reinforcing Deformend or Plain Kg 419.00
c.Form Work
Form Work Vertical m2 6.24
Form Work Horisontal m2 25.02
d.PVC Pipe 4" Diameter m1 4.90
e.Plastering With cement And sand 1:2 m2 29.90
f. Painting m2 29.90
g.Water proofing m2 11.90
UNIT
PRICE TOTAL
(Rp.) (Rp.)

45,100.00 41,503,049.50
#N/A #N/A
#N/A #N/A
26,250.00 33,612,862.50
#N/A #N/A
Sub-Total #N/A

669,132.50 391,509,425.75
#N/A #N/A
Sub-Total #N/A

935,660.63 10,937,872.71
Sub-Total 10,937,872.71

#N/A #N/A
Sub-Total #N/A

199,491.67 837,865.00
311,033.33 4,852,120.00
Sub-Total 5,689,985.00

35,175.00 35,012,843.25
Sub-Total 35,012,843.25

935,660.63 3,920,418.02
#N/A #N/A

193,325.00 1,206,348.00
311,033.33 7,782,054.00
200,000.00 980,000.00
40,411.00 1,208,288.90
#N/A #N/A
#N/A #N/A
Sub-Total #N/A

TOTAL #N/A
B.3. PRICE SCHEDULE
CIVIL WORKS
CANAL
###

NUMBER TYPE OF WORK UNIT

CANAL

1 Earth Works
a. Excavation Soil m3
b. Excavation Rock m3
c. Back Fill m3
d. Disposal Of Excavated m3
e. Soil compaction and leveling m3
f. Tree Planting btg

2 Concrete Works
a. Concrete K.225 m3

3 Reinforment Works
a. Steel Bar Reinforcing Deformed or Plain Kg

5 Form Works
a. Form Work Horisontal m2

2 Mansonry Works
a. Stone Masonry PC 1:4 m3

3 Plastering Works
a. Plester With Cement And Sand 1:4 m2
UNIT
VOLUME PRICE TOTAL
(Rp.) (Rp.)

21,795.00 45,100.00 982,954,500.00


50,855.00 #N/A #N/A
39,965.25 #N/A #N/A
32,684.75 26,250.00 857,974,687.50
32,684.75 #N/A #N/A
690.00 #N/A #N/A
Sub-Total #N/A

300.96 935,660.63 281,596,421.70


Sub-Total 281,596,421.70

34,610.40 #N/A #N/A


Sub-Total #N/A

594.00 311,033.33 184,753,800.00


Sub-Total 184,753,800.00

2,482.04 669,132.50 1,660,813,630.30


Sub-Total 1,660,813,630.30

7,952.00 35,175.00 279,711,600.00


Sub-Total 279,711,600.00

TOTAL #N/A
B.9. PRICE SCHEDULE
CIVIL WORKS
BRIDGE WORKS LONG = 35 M ; WIDTH = 3 M
###

NUMBER TYPE OF WORK UNIT

I Clearing Works
1 Tree Hewing Ø> 250 mm M2

II Bridge Works
1 Bouwplank M'
2 Excavation of hard soil M3
3 Disposal Of Excavated M3
4 Soil compaction and leveling M3
5 Sand Pile Thick 10 cm M3
6 Floorwork thick 5 cm M3
7 Sinks foundation, Cyclops Concrete M3
8 Bridge Body Concrete M3
9 Bridge Plate Concrete M3
10 Steel Bar Reinforcing Deformend or Plain Kg
11 Formwork complete with scaffolding M2
12 Steel H. 1000. 450. 16. 36 Kg
13 Steel H. 300. 150. 16. 13 Kg
14 Steel L. 100. 100. 10 Kg
15 Node Plat Steel Kg
16 Railing Bridge from Pipe Ø 3" M'
17 Corrosive Metal Paint M2
18 Stone Masonry for Lening M3
19 Stone Masonry for Oprit M3
20 Layer Spreading Base thickness 15 cm (AWCAS) M3
21 Barrow back to the compaction M3
22 Expantion Joint M'
23 Anchor bolts bh/nos
24 Elastomer Rubber bh/nos
UNIT
VOLUME PRICE TOTAL
(Rp.) (Rp.)

100.00 35,000.00 3,500,000.00


Sub-Total 3,500,000.00

70.00 1,500,000.00 105,000,000.00


1,241.26 45,100.00 55,980,826.00
1,241.26 26,250.00 32,583,075.00
1,241.26 #N/A #N/A
17.40 216,650.00 3,769,710.00
8.70 766,923.50 6,672,234.45
75.36 #N/A #N/A
434.55 1,060,113.00 460,672,104.15
36.75 1,060,113.00 38,959,152.75
54,199.50 #N/A #N/A
859.52 311,033.33 267,339,370.67
36,289.05 32,737.50 1,188,012,774.38
991.44 32,737.50 32,457,267.00
667.80 32,737.50 21,862,102.50
1,080.00 #N/A #N/A
140.00 300,000.00 42,000,000.00
32.97 26,063.89 859,326.42
4.80 669,132.50 3,211,836.00
21.00 669,132.50 14,051,782.50
12.60 #N/A #N/A
126.00 #N/A #N/A
42.00 15,000.00 630,000.00
126.00 5,000.00 630,000.00
12.00 600,000.00 7,200,000.00
Sub-Total #N/A

TOTAL #N/A
B.9. PRICE SCHEDULE
PEKERJAAN SIPIL ( CIVIL WORKS )
PEKERJAAN JEMBATAN P = 12 M; L = 6 M
###

NO. URAIAN SAT

I Pembersihan Lokasi
1 Penebangan Phn-phnan > 250 mm M2

II Pekerjaan Jembatan
1 Bouwplank M'
2 Galian Tanah Keras M3
3 #REF! M3
4 Pemadatan dan Perataan Tanah Hasil Galian M3
5 Pasir uPasir Urug Tebal 10 cm M3
6 Lantai Kerja 5 cm M3
7 Pondasi Sumuran Beton Cyclope M3
8 Beton Badan Jembatan M3
9 Beton Lantai Jembatan M3
10 Baja Penulangan Beton : M3
11 Bekisting Pondasi Plat Dinding & Plat Jembatan M2
Lengkap Dengan Peracah
12 Baja H. 1000. 450. 16. 36 Kg
13 Baja H. 300. 150. 16. 13 Kg
14 Baja L. 100. 100. 10 Kg
15 Baja Plat Simpul Kg
16 Railing Jembatan dari Pipa Ø 3" M'
17 Cat Besi Anti Karat M2
18 Pas. Batu Lening M3
19 Pas. Batu Oprit M3
20 Penghamparan Lapisan Base tebal 15 cm (AWCAS) M3
21 Timbunan Kembali di padatkan M3
22 Plat Pengaku Pada Delatasi M'
23 Angkur Baut bh/nos
24 Perletakan Elastomerik bh/nos
HARGA TOTAL
VOLUME SATUAN BIAYA
(Rp.) (Rp.)

100.00 35,000.00 3,500,000.00


sub jumlah 3,500,000.00

50.00 1,500,000.00 75,000,000.00


930.95 Err:504 Err:504
930.95 Err:504 Err:504
930.95 Err:504 Err:504
4.62 Err:504 Err:504
3.85 Err:504 Err:504
56.52 Err:504 Err:504
316.27 Err:504 Err:504
21.60 Err:504 Err:504
38,855.05 Err:504 Err:504
782.55 Err:504 Err:504

16,589.28 Err:504 Err:504


1,982.88 Err:504 Err:504
228.96 Err:504 Err:504
720.00 Err:504 Err:504
48.00 300,000.00 14,400,000.00
11.30 Err:504 Err:504
4.80 Err:504 Err:504
18.00 Err:504 Err:504
15.75 Err:504 Err:504
157.50 Err:504 Err:504
24.00 15,000.00 360,000.00
152.00 5,000.00 760,000.00
8.00 600,000.00 4,800,000.00
sub jumlah Err:504

TOTAL Err:504
B. RENCANA ANGGARAN BIAYA
PEKERJAAN BOX CULVERT
#REF!

NO. URAIAN SAT VLUME

1 Pekerjaan Box Culvert


1 Bouwplank M' 18.00
2 Galian Tanah Keras M3 7.20
3 Pasir uPasir Urug Tebal 10 cm M3 1.20
4 Urungan Tanah Pilihan M3 124.56
5 Lantai Kerja 5 cm M3 1.40
6 Pasangan Oprit Batu Kali PC 1:4 M3 10.83
7 Pasangan Lening Batu Kali PC 1:4 M3 1.20
8 Beton K275 M3 16.80
9 Baja Penulangan Plat Beton : Kg 1,932.00
10 Bekisting Lengkap dg Perancah M2 95.00
HARGA TTAL
SATUAN BIAYA
(Rp.) (Rp.)

150,000.00 2,700,000.00
Err:504 Err:504
Err:504 Err:504
Err:504 Err:504
Err:504 Err:504
Err:504 Err:504
Err:504 Err:504
Err:504 Err:504
Err:504 Err:504
Err:504 Err:504
sub jumlah Err:504

TOTAL Err:504
REKAPITULASI HARGA
ENGINEERING ESTIMATE (EE)
PEKERJAAN PEMBANGUNAN POS JAGA
DI KANTOR SUB DIVISI REGIONAL LAMPUNG UTARA
SUB DIVRE LAMPUNG UTARA
TAHUN 2018

No Jenis Pekerjaan

I. PEKERJAAN UMUM

II. PEMBANGUNAN POS JAGA

Jumlah
PPN 10%
Total Jumlah + PPN%
Dibulatkan
TOTAL PROYEK
Biaya Konsultan Perencana
Biaya Konsultan Pengawas
Biaya ADM

TERBILANG :
Seratus Delapan Juta Empat Ratus Empat Puluh Dua Ribu Rupiah
REKAPITULASI HARGA
ENGINEERING ESTIMATE (EE)
KERJAAN PEMBANGUNAN POS JAGA
OR SUB DIVISI REGIONAL LAMPUNG UTARA
SUB DIVRE LAMPUNG UTARA
TAHUN 2018

Harga (Rp)

7,150,000.00

91,433,219.78

98,583,219.78
9,858,321.98
108,441,541.76
108,442,000.00
108,442,000.00
8,892,000.00
4,554,000.00
1,301,000.00

pat Ratus Empat Puluh Dua Ribu Rupiah

Kotabumi, ………….
Diajukan oleh,

…………………..
RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE (EE)

PROYEK : PEMBANGUNAN POS JAGA


LOKASI : KANTOR SUB DIVRE LAMPUNG UTARA
SUB DIVISI REGIONAL LAMPUNG UTARA

SAT. VOLUME
NO URAIAN PEKERJAAN
PEK. PEK.

I. POS PEKERJAAN UMUM LS 1.00

II. POS PEKERJAAN POS JAGA UNIT 1.00

TOTAL BIAYA
A

HARGA SATUAN JUMLAH HARGA


(RP) (RP)

7,150,000 7,150,000.00

91,433,219.78 91,433,219.78

98,583,219.78
RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE (EE)

PROYEK : PEMBANGUNAN POS JAGA


LOKASI : KANTOR SUB DIVRE LAMPUNG UTARA
SUB DIVISI REGIONAL LAMPUNG UTARA

I PEKERJAAN UMUM
Harga Satuan Jumlah Harga
No Jenis Pekerjaan Satuan Volume Total Harga (Rp)
(Rp) (Rp)
1 Pekerjaan mobilisasi dan demobilisasi alat, bahan Ls 1.00 3,000,000.00 3,000,000.00
dan tukang (termasuk alat-alat berat)
2 Pengukuran dan pembentukan profil Ls 1.00 750,000.00 750,000.00
3 Foto-foto dokumentasi berkala Album 1.00 150,000.00 150,000.00
4 Air kerja 1.00 250,000.00 250,000.00
5 Listrik kerja 1.00 250,000.00 250,000.00
6 Pembersihan lahan dari puing dan bekas bangunan Ls 1.00 750,000.00 750,000.00
7 Kabel hantaran listrik Ls 1.00 2,000,000.00 2,000,000.00
SUB TOTAL I. PEMBANGUNAN POS JAGA : 7,150,000.00
RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE (EE)

PROYEK : PEMBANGUNAN POS JAGA


LOKASI : KANTOR SUB DIVRE LAMPUNG UTARA
SUB DIVISI REGIONAL LAMPUNG UTARA

II PEMBANGUNAN POS JAGA


Harga Satuan Jumlah Harga
No Jenis Pekerjaan Satuan Volume Total Harga (Rp)
(Rp) (Rp)

A PERSIAPAN 1,458,360.00
1 Pengukuran Dan Pemasangan Blouwplank m1 24.000 60,765.00 1,458,360.00

B PEKERJAAN TANAH 1,044,180.81


1 Galian Tanah manual m3 23.153 17,625.00 408,062.81
2 Urugan tanah Kembali manual m3 8.208 19,300.00 158,404.75
3 Urugan Pasir m3 2.205 216,650.00 477,713.25

C PEKERJAAN PONDASI 7,432,884.42


1 Pasangan Batu Belah 1:4 m3 9.433 669,132.50 6,311,592.31
3 Pasangan batu kosong m3 3.308 339,015.00 1,121,292.11

D PEKERJAAN DINDING 11,831,152.00


1 Pasangan Batu Bata 1:4 m2 66.400 178,180.00 11,831,152.00

E PEKERJAAN PLESTERAN DAN ACIAN DINDING 5,366,580.80


1 Plesteran 1:2, T=1,5 Cm m2 132.800 40,411.00 5,366,580.80

F PEKERJAAN BETON 7,979,258.06


1 Bahan Beton K225 ( sloof + Ring balk ) m3 1.470 935,660.63 1,375,421.12
2 Bahan Beton K225 (kolom ) m3 0.507 935,660.63 474,267.66
3 Bahan Beton K225 ( plat dekker ) m3 0.270 935,660.63 252,628.37
4 Bahan Beton K100 ( lantai emplacement ) m3 0.808 766,923.50 619,674.19
5 Pembesihan Dengan Besi Polos Atau Besi Ulir kg 157.282 15,735.00 2,474,825.98
6 Bekisting Untuk Sloof m2 11.550 68,275.00 788,576.25
7 Bekisting Untuk Plat Dekker m2 2.700 68,275.00 184,342.50
8 Bekisting Untuk Kolom m2 9.360 193,325.00 1,809,522.00

G PEKERJAAN KAYU 1,100,000.00


1 Pasang Rouster kayu 15/30 bh 20.000 55,000.00 1,100,000.00

H PEKERJAAN ALLUMUNIUM 8,982,700.98


1 Kusen Aluminium m1 24.580 233,675.56 5,743,745.16
2 Daun Pintu Daun Taekwood m2 1.755 281,920.00 494,769.60
3 Daun Pintu Aluminium Taekwood m2 1.755 1,056,861.67 1,854,792.23
4 Jendela Aluminium + Kaca m2 1.200 741,161.67 889,394.00

I PEKERJAAN ATAP 13,490,490.59


1 Kuda-Kuda Baja Ringan m2 62.200 130,902.39 8,142,128.59
2 Pasang Listplank GRC 20 cm m1 23.400 35,000.00 819,000.00
3 Pasang Atap Metal Roof m2 62.200 56,710.00 3,527,362.00
4 Pasang Karpus Metal Roof m1 16.700 60,000.00 1,002,000.00

J PEKERJAAN PLAFON 3,429,300.00


1 Plafond Kalsiboard, Rangka Hollow & List Tepi m2 32.660 105,000.00 3,429,300.00

K PEKERJAAN KUNCI DAN KACA 1,146,518.44


1 Pemasangan Kunci Tanam Besar 2X Putaran Kuningan bh 1.000 196,325.00 196,325.00
2 Pasang Engsel pintu bh 2.000 41,032.50 82,065.00
3 Pasang Engsel Jendela bh 2.000 64,048.75 128,097.50
4 Pemasangan Grendel Biasa (Kecil) bh 1.000 28,400.00 28,400.00
5 Pasang Kaca tebal 3 mm m2 5.250 135,548.75 711,630.94

L PEKERJAAN PENGECATAN 4,371,677.47


1 Pengecatan Listplank m2 4.680 51,385.83 240,485.70
2 Pengecatan Plafon (Putih) Sek. Catylac m2 32.660 19,644.50 641,589.37
3 Pengecatan Dinding (Krem) Sek. Catylac m2 101.280 34,455.00 3,489,602.40

M PEKERJAAN INSTALASI LISTRIK 3,649,270.00


1 Pemasangan Sekering Group titik 1.000 101,050.00 101,050.00
2 Pemasangan Titik Lampu Gedung titik 9.000 239,850.00 2,158,650.00
3 Pemasangan Stop Kontak titik 3.000 70,850.00 212,550.00
4 Pemasangan Sakelar Tunggal titik 7.000 38,475.00 269,325.00
5 Pemasangan Lampu Led 13 Watt titik 4.000 118,355.00 473,420.00
6 Pemasangan Lampu Led 9 Watt titik 2.000 102,605.00 205,210.00
7 Pemasangan Lampu Led 4 Watt titik 3.000 76,355.00 229,065.00
Harga Satuan Jumlah Harga
No Jenis Pekerjaan Satuan Volume Total Harga (Rp)
(Rp) (Rp)

N PEKERJAAN PENUTUP LANTAI DAN DINDING 3,381,258.12


1 Pekerjaan Urug Pasir Bawah Lantai m3 0.728 216,650.00 157,612.88
2 Pasang Keramik 30X30 cm m2 14.550 132,719.44 1,931,067.92
3 Pasang Keramik 20X20 cm m2 1.950 132,955.00 259,262.25
4 Pasang Keramik 20X25 cm m2 9.475 109,057.00 1,033,315.08

O PEKERJAAN SANITASI 3,108,010.00


1 Memasang Kloset Jongkok bh 1.000 502,450.00 502,450.00
2 Memasang Kran Air Ø ½" atau ¾" bh 1.000 51,725.00 51,725.00
3 Memasang pipa PVC tipe AW Ø 3/4" m1 48.000 21,265.00 1,020,720.00
4 Memasang pipa PVC tipe AW Ø 3" m1 7.500 95,750.00 718,125.00
5 Memasang Bak kontrol Pas Batu Bata 45X45 cm bh 1.000 482,240.00 482,240.00
6 Pemasangan Daun Pintu PVC bh 1.000 332,750.00 332,750.00

P PEKERJAAN SEPTICTANK 5,133,994.11


1 Galian Tanah m3 5.625 17,625.00 99,140.63
2 Urugan Pasir m3 0.375 216,650.00 81,243.75
3 Beton Bertulang Dasar Ruang Kotoran m3 0.180 750,000.00 135,000.00
4 Pasang Batu Bata Adk 1:4 m2 14.250 178,180.00 2,539,065.00
5 Plesteran 1:2, T=1,5 Cm m2 16.500 40,411.00 666,781.50
6 Ijuk Untuk Ruang Resapan 30 cm Ls 1.000 125,000.00 125,000.00
7 Pasang Pipa 4" AW m1 1.500 117,922.50 176,883.75
8 Beton Bertulang Penutup m3 0.375 935,660.63 350,872.73
9 Pembesian polos kg 33.300 15,735.00 523,975.50
10 Bekhisting penutup m2 3.750 68,275.00 256,031.25
11 Pasang Pipa Udara Galvanis 1,5" m1 1.200 150,000.00 180,000.00

Q PEKERJAAN PORTAL GERBANG 8,527,583.99


1 Galian Tanah manual m3 0.60 17,625.00 10,575.00
2 Urugan Pasir m3 0.05 216,650.00 10,832.50
3 Lantai kerja K100 m3 0.05 766,923.50 38,346.18
4 Bahan Beton K225 ( memasang tiang portal ) m3 0.50 935,660.63 467,830.31
5 Memasang portal gerbang lengkap dengan aksesories unit 2.00 4,000,000.00 8,000,000.00
SUB TOTAL PEMBANGUNAN POS JAGA : 91,433,219.78
Daftar Bahan Bangunan

Sumber : Standart Unit Price Lampung

NUMBER MATERIAL UNIT

1 2 3

A. Bahan dasar
1 Batu kali belah m3
2 Batu Pecah Mesin 1/2 m3
3 Batu Pecah Mesin 2/3 m3
4 Batu Pecah Mesin 5/7 m3
5 Batu Pecah Mesin 3/5 cm & 4/6 cm m3
6 Pasir urug m3
7 Pasir pasang m3
8 Pasir beton m3
9 Tanah Urug m3
10 Semen Portland (50 kg) kg
11 Semen warna kg
12 Semen Portland (40 kg) zak
13 Semen Portland (50 kg) zak
14 Batu bata merah bh
15 Air Kerja ltr

B. Kayu
1 Kayu kelas I/Kamper ( Balok ) m3
2 Kayu kelas I/Kamper ( Papan ) m3
3 Kayu kelas III/Meranti ( Balok ) m3
4 Kayu kelas III/Meranti ( Papan ) m3
5 Kayu kelas III/Meranti ( Usuk ) m3
6 Kayu kelas III/Meranti ( Bekisting ) m3
7 Kayu Tarentang m3
8 Kayu Dolken Ø 8 - 10 cm bh

C. Lantai
1 Keramik (Putih) : 30 x 30 cm bh
2 Keramik (Bermotif) : 20 x 20 cm bh
3 Keramik (Bermotif) : 20 x 25 cm bh
4 Keramik : 11 x 11 cm bh
5 Keramik : 40 x 40 cm bh

D. Bahan kaca
1 Kaca Polos 3 mm m2
2 Kaca Polos 5 mm m3
3 Kaca Ryben 5 mm m2

E. Paku
1 Paku 1 s/d 5 cm kg
2 Paku 7 s/d 12 cm kg
Daftar Bahan Bangunan

Sumber : Standart Unit Price Lampung

NUMBER MATERIAL UNIT

1 2 3
3 Paku klem (No.4) / Beton doz
4 Paku asbes sekrup 4 inchi bh

F. BESI BETON
1 Besi beton 6 mm kg
2 Besi beton 16 mm kg
KAWAT
1 Kawat beton kg
2 Bold Nut Black dia 10 s/d 16 mm (5 cm) bh
3 Wire welds kg
4 Artless zinc wire kg
5 Kawat harmonika L : 90 cm m2
6 Kawat Duri m1
Daftar Bahan Bangunan

Sumber : Standart Unit Price Lampung

NUMBER MATERIAL UNIT

1 2 3
PLAT BAJA
1 Plat baja kg
2 Plat baja Gutter m1
3 Spandek Zincalume m2
4 Lisplank Spandek m1

BATANG BAJA
1 Batang baja L 50. 50 . 5 kg
2 Batang baja L 60. 60 . 6 kg
3 Batang baja L 30. 30 . 3 kg
4 Batang baja L 40. 80 . 8 kg
5 Rel pintu dorong kg

PROFIL BAJA
1 Profil baja WF kg

ALUMINIUM
1 Kusen pintu jendela warna 4" x 1 3/4" m1
2 Kusen pintu allumunium m1
3 Kusen jendela allumunium m1
4 Strip Aluminium m1
5 Plat Aluminium m2
6 Sealent m1
7 Skrup Fixer bh
8 Hollow 40x40 m1
9 Hollow 20x40 m1

G. PIPA
Pipa PVC
1 Pipa PVC "AW" ø 1" Panjang 4 M m1
2 Pipa PVC "AW" ø 4" Panjangh 4 M m1

Pipa PVC untuk Instalasi Listrik


1 Pipa PVC "C" ø 5/8" - 17 mm - 4 m m1

Bahan Langit langit / Pintu


1 Papan Gypsum 1200x2400x9 mm lbr
2 Triplek uk. 110x210x4mm lbr
3 Plywood 122 x 244 x 0,9 cm lbr
4 Taekwood 122 x 244 x 0.4 lbr
5 Plat Seng BJLS 0.35 lbr
6 Seng Gelombang BJLS 0.30 Uk(0.8 x 15.5) lbr
Daftar Bahan Bangunan

Sumber : Standart Unit Price Lampung

NUMBER MATERIAL UNIT

1 2 3
7 Daun Pintu PVC bh
8 List Gypsum m1

I. Bahan Atap
1 Metal Roof lbr
2 Fibre glassd Roof tebal 3 mm m2
2 Rangka Atap C-75 t=0.8 m1
3 Rangka Atap C-75 t=0.6 m1
4 Reng 16 - DB Roof Battens t=0.48 mm m1
5 Foot Plate t=1.22 mm m1
6 PLD - Diafragma Plate bh
7 Bracing angin m1
8 Tensioner (Pengaku Tali Angin) bh
9 Big bold bh
10 Little bold bh
11 Dynabolt bh
12 Roof screw bh
13 Wuwung bh
Daftar Bahan Bangunan

Sumber : Standart Unit Price Lampung

NUMBER MATERIAL UNIT

1 2 3
J. Kunci dan Gantungan
1 Kunci Tanam set
2 Kunci Tanam Besar 2x Slag (Kuningan) set
3 Window Wind Hook set
4 Smaal Door Bolt (Grendel) set
5 Big Door Bolt (Grendel) set
6 Door Hinge set
7 Windows Hinge (Kuningan) set

K. BAHAN SANITASI
1 Closed sitting innoncently bh
2 Closed sitting color bh
3 kloset jongkok bh
4 Bak Mandi Fiberglass set
5 sink ( 1 hole ) bh
6 Kran Air dia.1/2 bh
7 Floor Drain bh
8 Wastafel Besar Warna bh
9 Sealm tape bh
10 Tangki Air fibreglass Volume 2000 ltr bh

L. BAHAN FINISHING
LEM / PEREKAT
1 White Fox's Glue kg

BAHAN KAYU FINISHING


1 Soft sandpaper for steel lbr
2 Coarse sandpaper for wood lbr
3 Soft sandpaper for wall lbr
4 Thinner A ltr
5 Rol wall Paint bh
6 Small brush bh

CAT KAYU
1 Paint Catylac/Honey Wood/46623 kg
2 Meni Kayu kg
3 Clear Gloss kg

CAT DINDING
1 Cat dinding Vinilex/Tangerine/982 (Orange) kg
2 Cat dinding Catylac/Sunshine/47332 (Orange) kg
3 Cat dinding Catylac/Gardena/45006 (Cream) 2,5 kg
4 Cat dinding Dulux/Barley White/44519 (Cream) 2,5 kg
Daftar Bahan Bangunan

Sumber : Standart Unit Price Lampung

NUMBER MATERIAL UNIT

1 2 3
5 Cat dinding Vinilex/Barley White/8005 (Cream) 2,5 kg
6 Wall puthy kg
7 Cat dinding Vinilex/White/300 (White) kg
8 Cat dinding Dulux/Brilliant White/2290 (White) kg
9 Cat dinding Catylac/Putih/1501 (White) kg

CAT ATAP / BAJA


1 Steel paint Emco/Skipper blue/28 kg
2 Steel paint Ftalit/River blue/115-116 kg
3 Iron paint blue Emco kg
4 Paint Zincromate kg
5 Meni besi kg
6 Plamir besi kg
Daftar Bahan Bangunan

Sumber : Standart Unit Price Lampung

NUMBER MATERIAL UNIT

1 2 3
M. BAHAN INSTALASI LISTRIK

1 Kabel NYM 3 x 2,5 mm m


2 Stop Kontak bh
3 Fitting Plafon bh
4 Electric switch phase single bh
5 Electric switch phase double bh
6 kap lampu 14 inch + fitting E27 bh
7 Lamp LED 18 W bh
8 Lamp LED 13 W bh
9 Lamp LED 9 W bh
10 Lamp LED 6 W pcs
11 Lamp LED 4 W bh
12 Spotlight LED Phillips 50 W bh
13 T Doos PVC bh
14 Isolator bh
15 MCB 1 Pole bh
16 Lampu TL LED 20 Watt setara Phillips bh
17 Rumah TL In Bow bh

N. BAHAN LAIN
#VALUE! Box APAR bh
#VALUE! Fire Extinguisher 6 kg bh
#VALUE! Kapur Pasang kg
4 Cerucuk dolken dia. 10 cm, pjg 3 m btg

O. BETON CETAK
1 Salutan beton U ( U ditch) 50 x 30 Cm m1
2 Gorong-gorong beton 50 x 30 Cm m2
3 Panel Beton Precast (5x40x240) lbr
4 Kolom Beton Precast bh
5 Kansteen 10x20x40 bh
6 Paving Block m2

P. POMPA AIR
1 Jet pump, Capacity 12 litres / minutes Unit

Q. UPAH TENAGA
1 Pekerja hari
2 Tukang kayu hari
3 Tukang batu hari
4 Tukang cat hari
5 Tukang Besi hari
Daftar Bahan Bangunan

Sumber : Standart Unit Price Lampung

NUMBER MATERIAL UNIT

1 2 3
6 Tukang pipa hari
7 Tukang las hari
8 Tukang Listrik hari
9 Tukang (Burnisher) hari
10 Tukang Masak Aspal hari
11 Tukang Gergaji hari
12 Kepala tukang kayu hari
13 Kepala tukang batu hari
14 Kepala tukang cat hari
15 Mandor hari
16 Kepala tukang besi hari
17 Tukang bor hari
18 Penjaga malam hari
19 Handyman Aluminium hari
20 Biaya Pasang Ls
21 Biaya Penulisan Ls
22 Kepala Tukang Listrik day

R. Bahan Bakar Minyak


1 Diesel Fuel ltr
2 Oil ltr

S. Alat Berat
1 Roller Vibrator jam
2 Excavator jam
3 Dump Truck jam
4 Concrete Mixer jam
5 Concrete Vibrator jam
6 ARC Welding Generator, 230 A jam
7 Welding Machines and material hari
8 A Tool Ls
UNIT PRICE

175,000.00
325,000.00
325,000.00
325,000.00
380,000.00
170,000.00
185,000.00
185,000.00
70,000.00
2,700.00
8,000.00
61,575.00
75,000.00
600.00
30.00

3,750,000.00
4,500,000.00
3,000,000.00
3,250,000.00
2,500,000.00
2,750,000.00
2,750,000.00
30,000.00

6,222.22
2,600.00
3,250.00
650.00
16,250.00

115,000.00
145,000.00
125,000.00

17,000.00
17,000.00
UNIT PRICE

4
15,000.00
150.00

14,000.00
14,000.00

22,000.00
14,000.00
35,000.00
29,700.00
25,000.00
2,121.21
UNIT PRICE

25,000.00
31,500.00
98,900.00
34,150.00

16,000.00
16,000.00
16,000.00
16,000.00
225,000.00

19,500.00

147,777.78
147,777.78
112,000.00
44,444.44
144,444.44
66,666.67
2,000.00
27,777.78
33,333.33

10,500.00
71,250.00

2,000.00

70,000.00
68,000.00
110,000.00
117,800.00
60,000.00
45,000.00
UNIT PRICE

4
275,000.00
7,000.00

38,000.00
135,000.00
17,000.00
13,333.3
7,000.000
9,722.22
3,055.56
2,777.78
9,722.22
550.00
450.00
2,400.00
1,200.00
47,500.00
UNIT PRICE

125,000.00
170,000.00
25,000.00
20,000.00
30,000.00
55,000.00
35,000.00

1,100,000.00
2,468,400.00
350,000.00
350,000.00

42,500.00
35,000.00
1,350,000.00
6,000.00
3,400,000.00

40,500.00

7,500.00
7,500.00
7,500.00
25,000.00
30,000.00
12,000.00

35,000.00
20,000.00
60,000.00

30,650.00
21,200.00
58,500.00
245,000.00
UNIT PRICE

4
78,000.00
40,000.00
30,650.00
90,000.00
22,000.00

88,888.89
61,111.11
88,888.89
55,555.56
25,000.00
49,777.78
UNIT PRICE

14,000.00
22,500.00
16,000.00
32,500.00
35,000.00
120,000.00
168,000.00
80,000.00
65,000.00
45,000.00
40,000.00
1,200,000.00
4,000.00
6,000.00
90,000.00
264,000.00
220,000.00

350,000.00
2,000,000.00
3,010.23
42,500.00

366,000.00
415,000.00
190,000.00
300,000.00
35,000.00
162,000.00

2,800,000.00

40,000.00
50,000.00
50,000.00
50,000.00
50,000.00
UNIT PRICE

4
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
60,000.00
60,000.00
60,000.00
65,000.00
70,000.00
60,000.00
65,000.00
70,000.00
51,000.00
22,000.00
70,000.00

11,000.00
55,000.00

150,000.00
300,000.00
65,000.00
28,750.00
23,750.00
120,000.00
270,000.00
1,100.00
Analisa harga sa
No. Koefisien Satuan
Pekerjaan Persiapan

1 m1
A
0.2 hari
0.4 hari
0.02 hari
0.02 hari
B
1.2500 Btg
2.5000 Kg
1.2000 Lbr
0.0050 M3
0.0090 M3
0.0320 M3
0.0600 Kg
0.4500 Kg

2 m1
A
0.0050 hari
0.0100 hari
0.1000 hari
0.1000 hari
B
0.0200 kg
0.0070 m3
0.0120 m3

3 m1

1.0000 ls
1.0000 Ls

0.1300 m3
0.2500 kg
1

4 m2

0.05 hari
0.3 hari
Analisa harga sa
No. Koefisien Satuan
1 hari
2 hari
2 hari

0.7 kg
0.08 m2
0.15 m3
0.1 m4
0.15 m5
30 bh
0.25 lbr
1.1 kg
0.15 bh
0.85 kg
0.06 lbr
0.08 m3
1.25 bh
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga

Pagar Sementara dari Seng Gelombang Tinggi 2,00 m


TENAGA
Pekerja Rp 40,000.00
Tukang kayu Rp 50,000.00
Kepala tukang kayu Rp 60,000.00
Mandor Rp 65,000.00
BAHAN
Kayu Dolken Ø 8 - 10 cm Rp 30,000.00
Semen Portland (50 kg) Rp 2,700.00
Plat Seng BJLS 0.35 Rp 60,000.00
Pasir beton Rp 185,000.00
Batu Pecah Mesin 3/5 cm & 4/6 cm Rp 380,000.00
Kayu kelas III/Meranti ( Balok ) Rp 3,000,000.00
Paku 7 s/d 12 cm Rp 17,000.00
Meni besi Rp 25,000.00

Pengukuran dan Pemasangan Blouwplank (UTZET)


TENAGA
Mandor Rp 65,000.00
Kepala tukang kayu Rp 60,000.00
Tukang kayu Rp 50,000.00
Pekerja Rp 40,000.00
BAHAN
Paku 7 s/d 12 cm Rp 17,000.00
Kayu kelas III/Meranti ( Papan ) Rp 2,500,000.00
Kayu kelas III/Meranti ( Usuk ) Rp 2,750,000.00

Papan Nama Proyek


TENAGA
Biaya Penulisan Rp 22,000.00
Biaya Pasang Rp 51,000.00
BAHAN
Kayu Tarentang Rp 2,750,000.00
Paku 7 s/d 12 cm Rp 17,000.00
Paint Catylac/Honey Wood/46623 Rp 35,000.00

Pembuatan Direksi Kit


TENAGA
Mandor Rp 65,000.00
Kepala tukang batu Rp 60,000.00
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga
Tukang batu Rp 50,000.00
Tukang batu Rp 50,000.00
Pekerja Rp 40,000.00
BAHAN
Semen Portland (50 kg) Rp 2,700.00
Kaca Polos 5 mm Rp 145,000.00
Pasir pasang Rp 185,000.00
Pasir beton Rp 185,000.00
Batu Pecah Mesin 5/7 Rp 325,000.00
Batu bata merah Rp 600.00
Seng Gelombang BJLS 0.30 Uk(0.8 x 15.5) Rp 45,000.00
Plat baja Rp 25,000.00
Kunci Tanam Rp 125,000.00
Paku 7 s/d 12 cm Rp 17,000.00
Triplek uk. 110x210x4mm Rp 68,000.00
Kayu kelas III/Meranti ( Usuk ) Rp 2,500,000.00
Kayu Dolken Ø 8 - 10 cm Rp 30,000.00
atuan pekerjaan
Total

Rp 259,365.00

Rp 8,000.00
Rp 20,000.00
Rp 1,200.00
Rp 1,300.00

Rp 37,500.00
Rp 6,750.00
Rp 72,000.00
Rp 925.00
Rp 3,420.00
Rp 96,000.00
Rp 1,020.00
Rp 11,250.00

Rp 60,765.00

Rp 325.00
Rp 600.00
Rp 5,000.00
Rp 4,000.00

Rp 340.00
Rp 17,500.00
Rp 33,000.00

Rp 469,750.00

Rp 22,000.00
Rp 51,000.00

Rp 357,500.00
Rp 4,250.00
Rp 35,000.00

Rp 691,270.00

Rp 3,250.00
Rp 18,000.00
atuan pekerjaan
Total
Rp 50,000.00
Rp 100,000.00
Rp 80,000.00

Rp 1,890.00
Rp 11,600.00
Rp 27,750.00
Rp 18,500.00
Rp 48,750.00
Rp 18,000.00
Rp 11,250.00
Rp 27,500.00
Rp 18,750.00
Rp 14,450.00
Rp 4,080.00
Rp 200,000.00
Rp 37,500.00
Analisa harga sa
No. Koefisien Satuan
Pekerjaan Tanah, Lapis Pondasi dan Perkerasan Jalan
1 m2
### 0.0150 hari
### 0.0070 hari
### 0.0070 jam
### 0.1500 Ls

2 m3
### 0.4000 hari
### 0.0250 hari

3 m3
### 0.2260 hari
### 0.0070 hari
### 0.0670 Jam
### 0.0670 Jam
0.0670 Jam
1.0000 Ls

4 ### m3
### 0.0330 Jam
### 0.0264 Jam
### 0.0825 jam
### 0.0363 jam

5 m3
### 0.7500 hari
### 0.0250 hari

6 m3
### 0.4500 hari
### 0.0200 hari

7 m3
### 0.0300 hari
### 0.0080 hari
### 1.2000 m3
### 0.0075 Jam
### 0.0109 Jam
Analisa harga sa
No. Koefisien Satuan
0.0333 Jam

8 m3
### 0.3000 hari
### 0.0100 hari
### 1.2000 hari
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga
h, Lapis Pondasi dan Perkerasan Jalan
Cleanup Locations (Heavy Equipment)
Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Excavator Rp 300,000.00
Alat Bantu Rp 1,100.00

Soil Excavation
Pekerja Rp 40,000.00
Mandor Rp 65,000.00

Soil Excavation with Heavy Equipment


Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Excavator Rp 300,000.00
Dump Truck Rp 65,000.00
Roller Vibrator Rp 150,000.00
A Tool Rp 1,100.00
Contractor Profit 10%

Hard Soil Excavation with Heavy Equipment


Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Excavator Rp 300,000.00
Dump Truck Rp 65,000.00
Contractor Profit 10%

Soil Excavation (into >1M) Manual


Pekerja Rp 40,000.00
Mandor Rp 65,000.00

Back Fill
Pekerja Rp 40,000.00
Mandor Rp 65,000.00

(Soil Pile) Urugan Tanah


Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tanah Urug Rp 70,000.00
Excavator Rp 300,000.00
Roller Vibrator Rp 150,000.00
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga
Dump Truck Rp 65,000.00

Sand Pile
Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Pasir urug Rp 170,000.00
atuan pekerjaan
Total

Rp 3,320.00
Rp 600.00
Rp 455.00
Rp 2,100.00
Rp 165.00

Rp 17,625.00
Rp 16,000.00
Rp 1,625.00

Rp 45,100.00
Rp 9,040.00
Rp 455.00
Rp 20,100.00
Rp 4,355.00
Rp 10,050.00
Rp 1,100.00

Rp 30,143.40
Rp 1,319.20
Rp 1,712.75
Rp 24,750.00
Rp 2,361.45

Rp 31,625.00
Rp 30,000.00
Rp 1,625.00

Rp 19,300.00
Rp 18,000.00
Rp 1,300.00

Rp 91,769.50
Rp 1,200.00
Rp 520.00
Rp 84,000.00
Rp 2,250.00
Rp 1,635.00
atuan pekerjaan
Total
Rp 2,164.50

Rp 216,650.00
Rp 12,000.00
Rp 650.00
Rp 204,000.00
Analisa harga sa
No. Koefisien Satuan
Pekerjaan Pasangan
1 m3
### 0.7800 hari
### 0.0390 hari
0.3900 hari
0.0390 hari
### 1.2000 m3
### 0.4320 m3

2 m3
### 1.5000 hari
### 0.7500 hari
### 0.0750 hari
### 0.0750 hari
### 1.2000 m3
### 0.5200 m3
### 3.2600 zak
### 0.4020 jam

3 m3
### 1.5000 hari
### 0.7500 hari
### 0.0750 hari
### 0.0750 hari
### 1.2000 m3
### 0.5440 m3
### 3.2600 zak
### 0.4020 jam

4 m2
### 0.6000 hari
### 0.0300 hari
### 0.2000 hari
### 0.0200 hari
### 140.0000 bh
### 0.0930 m3
### 0.5310 zak

5 m2
### 0.6000 hari
### 0.0300 hari
Analisa harga sa
No. Koefisien Satuan
### 0.2000 hari
### 0.0200 hari
### 140.0000 bh
### 0.0800 m3
### 0.8700 zak
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga

Aanstamping
Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang batu Rp 50,000.00
Kepala tukang batu Rp 60,000.00
Batu kali belah Rp 175,000.00
Pasir urug Rp 170,000.00

Stone Masonry PC 1:4


Pekerja Rp 40,000.00
Tukang batu Rp 50,000.00
Kepala tukang batu Rp 60,000.00
Mandor Rp 65,000.00
Batu kali belah Rp 175,000.00
Pasir pasang Rp 185,000.00
Semen Portland (50 kg) Rp 75,000.00
Concrete Mixer Rp 28,750.00

Stone Masonry PC 1:5


Pekerja Rp 40,000.00
Tukang batu Rp 50,000.00
Kepala tukang batu Rp 60,000.00
Mandor Rp 65,000.00
Batu kali belah Rp 175,000.00
Pasir pasang Rp 185,000.00
Semen Portland (50 kg) Rp 75,000.00
Concrete Mixer Rp 28,750.00

Brick masonry PC 1:4


Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang batu Rp 50,000.00
Kepala tukang batu Rp 60,000.00
Batu bata merah Rp 600.00
Pasir pasang Rp 185,000.00
Semen Portland (50 kg) Rp 75,000.00

Brick masonry PC 1:2


Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga
Tukang batu Rp 50,000.00
Kepala tukang batu Rp 60,000.00
Batu bata merah Rp 600.00
Pasir pasang Rp 185,000.00
Semen Portland (50 kg) Rp 75,000.00
atuan pekerjaan
Total

Rp 339,015.00
Rp 31,200.00
Rp 2,535.00
Rp 19,500.00
Rp 2,340.00
Rp 210,000.00
Rp 73,440.00

Rp 669,132.50
Rp 60,000.00
Rp 37,500.00
Rp 4,500.00
Rp 4,875.00
Rp 210,000.00
Rp 96,200.00
Rp 244,500.00
Rp 11,557.50

Rp 673,572.50
Rp 60,000.00
Rp 37,500.00
Rp 4,500.00
Rp 4,875.00
Rp 210,000.00
Rp 100,640.00
Rp 244,500.00
Rp 11,557.50

Rp 178,180.00
Rp 24,000.00
Rp 1,950.00
Rp 10,000.00
Rp 1,200.00
Rp 84,000.00
Rp 17,205.00
Rp 39,825.00

Rp 201,200.00
Rp 24,000.00
Rp 1,950.00
atuan pekerjaan
Total
Rp 10,000.00
Rp 1,200.00
Rp 84,000.00
Rp 14,800.00
Rp 65,250.00
Analisa harga sa
No. Koefisien Satuan
Pekerjaan Plesteran
1 m2
### 0.3000 hari
### 0.0150 hari
### 0.1500 hari
### 0.0150 hari
### 0.0200 m3
### 0.2045 zak

2 m2
### 0.3000 hari
### 0.0150 hari
### 0.1500 hari
### 0.0150 hari
### 0.0240 m3
### 0.1248 zak
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga

Plastering 1:2, T=1,5 cm


Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang batu Rp 50,000.00
Kepala tukang batu Rp 60,000.00
Pasir pasang Rp 185,000.00
Semen Portland (50 kg) Rp 75,000.00

Plastering 1:4, T=1,5 cm


Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang batu Rp 50,000.00
Kepala tukang batu Rp 60,000.00
Pasir pasang Rp 185,000.00
Semen Portland (50 kg) Rp 75,000.00
atuan pekerjaan
Total

Rp 40,411.00
Rp 12,000.00
Rp 975.00
Rp 7,500.00
Rp 900.00
Rp 3,700.00
Rp 15,336.00

Rp 35,175.00
Rp 12,000.00
Rp 975.00
Rp 7,500.00
Rp 900.00
Rp 4,440.00
Rp 9,360.00
Analisa harga sa
No. Koefisien Satuan
Pekerjaan Beton
1 m3
### 0.4256 m3
### 0.5374 m3
### 10.3250 zak
### 215.0000 liter
### 1.6500 hari
### 0.2750 hari
0.0280 hari
### 0.0830 hari
### 0.1000 jam
### 0.0610 jam
### 1.0000 jam

2 m3
### 0.4363 m3
### 0.5511 m3
### 9.2750 zak
### 215.0000 liter
### 1.6500 hari
### 0.2750 hari
0.0280 hari
### 0.0830 hari
### 0.1000 jam
### 0.3160 jam
### 1.0000 jam

3 m3
### 0.4806 m3
### 0.5416 m3
### 8.1600 zak
### 215.0000 liter
### 1.6500 hari
### 0.2750 hari
0.0280 hari
### 0.0830 hari
### 0.6830 jam
### 0.0560 jam
### 1.0000 jam

4 m3
### 0.5431 m3
Analisa harga sa
No. Koefisien Satuan
### 0.5258 m3
### 6.1750 zak
### 215.0000 liter
### 1.6500 hari
### 0.2750 hari
0.0280 hari
### 0.0830 hari
### 0.6830 jam
### 0.0560 jam
### 1.0000 jam

5 kg
### 1.0500 kg
### 0.0150 kg
### 0.0070 hari
### 0.0070 hari
### 0.0007 hari
### 0.0004 hari

6 m1
2.5000 pcs
0.0500 M3
0.1000 hari
0.0500 hari
0.0100 hari
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga

Concrete Materials K300


Pasir beton Rp 185,000.00
Batu Pecah Mesin 1/2 Rp 325,000.00
Semen Portland (40 kg) Rp 61,575.00
Air Kerja Rp 30.00
Pekerja Rp 40,000.00
Tukang batu Rp 50,000.00
Kepala tukang batu Rp 60,000.00
Mandor Rp 65,000.00
Concrete Mixer Rp 28,750.00
Concrete Vibrator Rp 23,750.00
A Tool Rp 1,100.00

Concrete Materials K225


Pasir beton Rp 185,000.00
Batu Pecah Mesin 1/2 Rp 325,000.00
Semen Portland (40 kg) Rp 61,575.00
Air Kerja Rp 30.00
Pekerja Rp 40,000.00
Tukang batu Rp 50,000.00
Kepala tukang batu Rp 60,000.00
Mandor Rp 65,000.00
Concrete Mixer Rp 28,750.00
Concrete Vibrator Rp 23,750.00
A Tool Rp 1,100.00

Concrete Materials K175


Pasir beton Rp 185,000.00
Batu Pecah Mesin 1/2 Rp 325,000.00
Semen Portland (40 kg) Rp 61,575.00
Air Kerja Rp 30.00
Pekerja Rp 40,000.00
Tukang batu Rp 50,000.00
Kepala tukang batu Rp 60,000.00
Mandor Rp 65,000.00
Concrete Mixer Rp 28,750.00
Concrete Vibrator Rp 23,750.00
A Tool Rp 1,100.00

Concrete Materials K100


Pasir beton Rp 185,000.00
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga
Batu Pecah Mesin 1/2 Rp 325,000.00
Semen Portland (40 kg) Rp 61,575.00
Air Kerja Rp 30.00
Pekerja Rp 40,000.00
Tukang batu Rp 50,000.00
Kepala tukang batu Rp 60,000.00
Mandor Rp 65,000.00
Concrete Mixer Rp 28,750.00
Concrete Vibrator Rp 23,750.00
A Tool Rp 1,100.00
Contractor Profit 10%

Steel Bar Reinforcing Deformend or Plain


Besi beton 16 mm Rp 14,000.00
Kawat beton Rp 22,000.00
Pekerja Rp 40,000.00
Tukang Besi Rp 50,000.00
Kepala tukang besi Rp 70,000.00
Mandor Rp 65,000.00

Pemasangan Kansteen Beton 10x20x40


Kansteen 10x20x40 Rp 35,000.00
Pasir pasang Rp 185,000.00
Pekerja Rp 40,000.00
Tukang batu Rp 50,000.00
Mandor Rp 65,000.00
atuan pekerjaan
Total

Rp 987,841.23
Rp 78,736.00
Rp 174,644.60
Rp 635,761.88
Rp 6,450.00
Rp 66,000.00
Rp 13,750.00
Rp 1,680.00
Rp 5,395.00
Rp 2,875.00
Rp 1,448.75
Rp 1,100.00

Rp 935,660.63
Rp 80,706.25
Rp 179,091.25
Rp 571,108.13
Rp 6,450.00
Rp 66,000.00
Rp 13,750.00
Rp 1,680.00
Rp 5,395.00
Rp 2,875.00
Rp 7,505.00
Rp 1,100.00

Rp 882,718.66
Rp 88,915.16
Rp 176,010.25
Rp 502,452.00
Rp 6,450.00
Rp 66,000.00
Rp 13,750.00
Rp 1,680.00
Rp 5,395.00
Rp 19,636.25
Rp 1,330.00
Rp 1,100.00

Rp 766,923.50
Rp 100,478.13
atuan pekerjaan
Total
Rp 170,878.50
Rp 380,225.63
Rp 6,450.00
Rp 66,000.00
Rp 13,750.00
Rp 1,680.00
Rp 5,395.00
Rp 19,636.25
Rp 1,330.00
Rp 1,100.00

Rp 15,735.00
Rp 14,700.00
Rp 330.00
Rp 280.00
Rp 350.00
Rp 49.00
Rp 26.00

Rp 103,900.00
Rp 87,500.00
Rp 9,250.00
Rp 4,000.00
Rp 2,500.00
Rp 650.00
Analisa harga sa
No. Koefisien Satuan
Pekerjaan Kayu
1 m2
### 0.0075 m3
### 0.3000 kg
### 0.1000 ltr
### 0.5200 hari
### 0.2600 hari
### 0.0260 hari
### 0.0260 hari

2 m2
### 0.0075 m3
### 0.4000 kg
### 0.2000 ltr
### 0.0025 m3
### 0.3500 lbr
### 2.0000 bh
### 0.6600 hari
### 0.3300 hari
### 0.0330 hari
### 0.0330 hari

3 m2
### 0.0067 m3
### 0.4000 kg
### 0.2000 ltr
### 0.0030 m3
### 0.3500 lbr
### 2.0000 bh
### 0.6600 hari
### 0.3300 hari
### 0.0330 hari
### 0.0330 hari

4 m2
### 0.3500 hari
### 1.0500 hari
### 0.1050 hari
### 0.0180 hari
### 1.0000 Sheet
0.0196 m3
0.3000 doz
Analisa harga sa
No. Koefisien Satuan
0.3000 kg

5 bh
### 0.6000 hari
### 0.6000 hari
### 0.0300 hari
### 0.0300 hari
### 1.0000 Sheet
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga

Formwork for Sloof


Kayu kelas III/Meranti ( Bekisting ) Rp 2,750,000.00
Paku 1 s/d 5 cm Rp 17,000.00
Oil Rp 55,000.00
Pekerja Rp 40,000.00
Tukang kayu Rp 50,000.00
Kepala tukang kayu Rp 60,000.00
Mandor Rp 65,000.00

Formwork for Coloum


Kayu kelas III/Meranti ( Bekisting ) Rp 2,750,000.00
Paku 7 s/d 12 cm Rp 17,000.00
Oil Rp 55,000.00
Kayu kelas I/Kamper ( Balok ) Rp 3,750,000.00
Plywood 122 x 244 x 0,9 cm Rp 110,000.00
Kayu Dolken Ø 8 - 10 cm Rp 30,000.00
Pekerja Rp 40,000.00
Tukang kayu Rp 50,000.00
Kepala tukang kayu Rp 60,000.00
Mandor Rp 65,000.00

Formwork for Beam


Kayu kelas III/Meranti ( Bekisting ) Rp 2,750,000.00
Paku 7 s/d 12 cm Rp 17,000.00
Oil Rp 55,000.00
Kayu kelas I/Kamper ( Balok ) Rp 3,750,000.00
Plywood 122 x 244 x 0,9 cm Rp 110,000.00
Kayu Dolken Ø 8 - 10 cm Rp 30,000.00
Pekerja Rp 40,000.00
Tukang kayu Rp 50,000.00
Kepala tukang kayu Rp 60,000.00
Mandor Rp 65,000.00

Daun Pintu Taekwood


Pekerja Rp 40,000.00
Tukang kayu Rp 50,000.00
Kepala tukang kayu Rp 60,000.00
Mandor Rp 65,000.00
Taekwood 122 x 244 x 0.4 Rp 117,800.00
Kayu kelas I/Kamper ( Balok ) Rp 3,750,000.00
Paku klem (No.4) / Beton Rp 15,000.00
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga
White Fox's Glue Rp 40,500.00

Daun Pintu PVC


Pekerja Rp 40,000.00
Tukang kayu Rp 50,000.00
Kepala tukang kayu Rp 60,000.00
Mandor Rp 65,000.00
Daun Pintu PVC Rp 275,000.00
atuan pekerjaan
Total

Rp 68,275.00
Rp 20,625.00
Rp 5,100.00
Rp 5,500.00
Rp 20,800.00
Rp 13,000.00
Rp 1,560.00
Rp 1,690.00

Rp 193,325.00
Rp 20,625.00
Rp 6,800.00
Rp 11,000.00
Rp 9,375.00
Rp 38,500.00
Rp 60,000.00
Rp 26,400.00
Rp 16,500.00
Rp 1,980.00
Rp 2,145.00

Rp 192,908.33
Rp 18,333.33
Rp 6,800.00
Rp 11,000.00
Rp 11,250.00
Rp 38,500.00
Rp 60,000.00
Rp 26,400.00
Rp 16,500.00
Rp 1,980.00
Rp 2,145.00

Rp 281,920.00
Rp 14,000.00
Rp 52,500.00
Rp 6,300.00
Rp 1,170.00
Rp 117,800.00
Rp 73,500.00
Rp 4,500.00
atuan pekerjaan
Total
Rp 12,150.00

Rp 332,750.00
Rp 24,000.00
Rp 30,000.00
Rp 1,800.00
Rp 1,950.00
Rp 275,000.00
Analisa harga sa
No. Koefisien Satuan
Pekerjaan Baja
1 kg
a. Fabrikasi
### 0.0300 hari
### 0.0300 hari
### 0.0015 hari

b. Instalasi
### 0.0300 hari
### 0.0300 hari
### 0.0150 hari

c. Bahan dan Alat


### 1.1000 kg
### 0.0500 kg
### 0.0250 jam
### 0.0010 jam

2 kg
### 1.1500 kg
### 0.0600 hari
### 0.0600 hari
### 0.0060 hari
### 0.0030 hari

Pekerjaan Pintu Dorong Gudang

1 m2
1.0500 hari
1.0500 hari
0.1050 hari
0.0520 hari
2.9406 Kg
5.3257 Kg
6.8160 Kg
0.0840 m3
16.4000 Kg
0.0500 Kg
1.3333 pcs

2 m2
1.0500 hari
Analisa harga sa
No. Koefisien Satuan
1.0500 hari
0.1050 hari
0.0520 hari
21.0000 Kg
32.8000 Kg
0.0500 Kg
1.3333 pcs

Pekerjaan Rangka Menara Air


1 kg
a. Fabrikasi
0.0300 hari
0.0300 hari
0.0015 hari

b. Instalasi
0.0300 hari
0.0300 hari
0.0015 hari

c. Bahan dan Alat


1.1000 kg
0.0500 kg
0.0250 jam
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga

Supplying And Steel Construction Installing WF


a. Fabrikasi
Pekerja Rp 40,000.00
Tukang las Rp 50,000.00
Mandor Rp 65,000.00

b. Instalasi
Pekerja Rp 40,000.00
Tukang las Rp 50,000.00
Mandor Rp 65,000.00

c. Bahan dan Alat


Profil baja WF Rp 19,500.00
Wire welds Rp 35,000.00
ARC Welding Generator, 230 A Rp 120,000.00
Dump Truck Rp 65,000.00

Pemasangan Shear Connector Siku L 50 x 50 x 5


Batang baja L 50. 50 . 5 Rp 16,000.00
Pekerja Rp 40,000.00
Tukang Besi Rp 50,000.00
Kepala tukang besi Rp 70,000.00
Mandor Rp 65,000.00

Dorong Gudang

Pintu Sliding / Dorong Plat Tebal 2 MM (lengkap)


Pekerja Rp 40,000.00
Tukang Besi Rp 50,000.00
Kepala tukang besi Rp 70,000.00
Mandor Rp 65,000.00
Batang baja L 50. 50 . 5 Rp 24,415.00
Batang baja CNP 60 Rp 32,737.50
Profil baja WF Rp 32,737.50
Stone Masonry PC 1:4 Rp 669,132.50
Plat baja Rp 25,000.00
Wire welds Rp 35,000.00
Roller Bearing Rp 100,000.00

Pintu Sliding / Dorong Plat Tebal 1,2 MM (lengkap)


Pekerja Rp 40,000.00
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga
Tukang Besi Rp 50,000.00
Kepala tukang besi Rp 70,000.00
Mandor Rp 65,000.00
Batang baja L 30. 30 . 3 Rp 16,000.00
Plat baja Rp 25,000.00
Wire welds Rp 35,000.00
Roller Bearing Rp 100,000.00

Pemb. Rangka Menara Air Besi Siku


a. Fabrikasi
Pekerja Rp 40,000.00
Tukang las Rp 50,000.00
Mandor Rp 65,000.00

b. Instalasi
Pekerja Rp 40,000.00
Tukang las Rp 50,000.00
Mandor Rp 65,000.00

c. Bahan dan Alat


Batang baja L 60. 60 . 6 Rp 16,000.00
Wire welds Rp 35,000.00
ARC Welding Generator, 230 A Rp 120,000.00
atuan pekerjaan
Total

Rp 32,737.50

Rp 1,200.00
Rp 1,500.00
Rp 97.50

Rp 1,200.00
Rp 1,500.00
Rp 975.00

Rp 21,450.00
Rp 1,750.00
Rp 3,000.00
Rp 65.00

Rp 24,415.00
Rp 18,400.00
Rp 2,400.00
Rp 3,000.00
Rp 420.00
Rp 195.00

Rp 1,175,804.55
Rp 42,000.00
Rp 52,500.00
Rp 7,350.00
Rp 3,380.00
Rp 71,794.75
Rp 174,350.54
Rp 223,138.80
Rp 56,207.13
Rp 410,000.00
Rp 1,750.00
Rp 133,333.33

Rp 1,396,313.33
Rp 42,000.00
atuan pekerjaan
Total
Rp 52,500.00
Rp 7,350.00
Rp 3,380.00
Rp 336,000.00
Rp 820,000.00
Rp 1,750.00
Rp 133,333.33

Rp 27,945.00

Rp 1,200.00
Rp 1,500.00
Rp 97.50

Rp 1,200.00
Rp 1,500.00
Rp 97.50

Rp 17,600.00
Rp 1,750.00
Rp 3,000.00
Analisa harga sa
No. Koefisien Satuan
Pekerjaan Allumunium
1 m1
### 0.0430 hari
### 0.0020 hari
### 0.0430 hari
### 0.0040 hari
### 1.1000 m1
### 0.7500 m1
### 2.0000 bh
### 1.0000 ls

2 m2
### 0.0850 hari
### 0.0040 hari
### 0.0850 hari
### 0.0090 hari
### 4.4000 m1
### 14.6000 m1
### 1.1000 m2
### 1.0000 m1
### 1.0000 ls

3 m2
### 0.0850 hari
### 0.0040 hari
### 0.0850 hari
### 0.0090 hari
### 4.4000 m1
### 2.2000 m1
### 1.0000 m1
### 1.0000 ls

4 m2
### 0.0850 hari
### 0.0040 hari
### 0.0850 hari
### 0.0090 hari
### 4.4000 m1
### 1.1000 m1
### 1.0000 m1
### 1.0000 ls
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga

Alluminium Cushion
Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Handyman Aluminium Rp 70,000.00
Mandor Rp 65,000.00
Kusen pintu jendela warna 4" x 1 3/4" Rp 147,777.78
Sealent Rp 66,666.67
Skrup Fixer Rp 2,000.00
A Tool Rp 12,000.00

Alluminium Door Strip Wide 8 CM + Glass


Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Handyman Aluminium Rp 70,000.00
Mandor Rp 65,000.00
Kusen pintu allumunium Rp 147,777.78
Strip Aluminium Rp 44,444.44
Kaca Polos 5 mm Rp 145,000.00
Sealent Rp 66,666.67
A Tool Rp 12,000.00

Door Panil Alluminium


Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Handyman Aluminium Rp 70,000.00
Mandor Rp 65,000.00
Kusen pintu allumunium Rp 147,777.78
Plat Aluminium Rp 144,444.44
Sealent Rp 66,666.67
A Tool Rp 12,000.00

Alluminium Window + Glass


Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Handyman Aluminium Rp 70,000.00
Mandor Rp 65,000.00
Kusen jendela allumunium Rp 112,000.00
Kaca Polos 5 mm Rp 145,000.00
Sealent Rp 66,666.67
A Tool Rp 12,000.00
atuan pekerjaan
Total

Rp 233,675.56
Rp 1,720.00
Rp 130.00
Rp 3,010.00
Rp 260.00
Rp 162,555.56
Rp 50,000.00
Rp 4,000.00
Rp 12,000.00

Rp 1,547,472.78
Rp 3,400.00
Rp 260.00
Rp 5,950.00
Rp 585.00
Rp 650,222.22
Rp 648,888.89
Rp 159,500.00
Rp 66,666.67
Rp 12,000.00

Rp 1,056,861.67
Rp 3,400.00
Rp 260.00
Rp 5,950.00
Rp 585.00
Rp 650,222.22
Rp 317,777.78
Rp 66,666.67
Rp 12,000.00

Rp 741,161.67
Rp 3,400.00
Rp 260.00
Rp 5,950.00
Rp 585.00
Rp 492,800.00
Rp 159,500.00
Rp 66,666.67
Rp 12,000.00
Analisa harga sa
No. Koefisien Satuan
FLOOR WORKS
1 m2
### 0.0400 m3
### 10.0000 kg
### 1.5000 kg
### 11.0000 bh
### 0.2500 hari
### 0.0130 hari
### 0.1250 hari
### 0.0130 hari

2 m2
### 0.0400 m3
### 10.4000 kg
### 1.5000 kg
### 26.0000 bh
### 0.2500 hari
### 0.0130 hari
### 0.1250 hari
### 0.0130 hari

3 m2
### 0.0230 m3
### 8.7600 kg
### 0.9000 kg
### 21.0000 bh
### 0.0800 hari
### 0.0040 hari
### 0.0400 hari
### 0.0040 hari

4 m2
### 0.0230 m3
### 8.7600 kg
### 0.9000 kg
### 7.0000 bh
### 0.0800 hari
### 0.0040 hari
### 0.0400 hari
### 0.0040 hari
Analisa harga sa
No. Koefisien Satuan
m2
1.0000 m3
0.0800 m3
### 0.1500 hari
### 0.0100 hari
### 0.2000 hari
### 0.0100 hari
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga

Pair of Ceramics 30X30 CM


Pasir pasang Rp 185,000.00
Semen Portland (50 kg) Rp 2,700.00
Semen warna Rp 8,000.00
Keramik (Putih) : 30 x 30 cm Rp 6,222.22
Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang batu Rp 50,000.00
Kepala tukang batu Rp 60,000.00

Pair of Ceramics 20X20 CM


Pasir pasang Rp 185,000.00
Semen Portland (50 kg) Rp 2,700.00
Semen warna Rp 8,000.00
Keramik (Bermotif) : 20 x 20 cm Rp 2,600.00
Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang batu Rp 50,000.00
Kepala tukang batu Rp 60,000.00

Pair of Ceramic 20 x 25 cm
Pasir pasang Rp 185,000.00
Semen Portland (50 kg) Rp 2,700.00
Semen warna Rp 8,000.00
Keramik (Bermotif) : 20 x 25 cm Rp 3,250.00
Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang batu Rp 50,000.00
Kepala tukang batu Rp 60,000.00

Pair of Ceramic 40 x 40 cm
Pasir pasang Rp 185,000.00
Semen Portland (50 kg) Rp 2,700.00
Semen warna Rp 8,000.00
Keramik : 40 x 40 cm Rp 16,250.00
Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang batu Rp 50,000.00
Kepala tukang batu Rp 60,000.00
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga
Pemasangan Paving Block
Paving Block Rp 162,000.00
Pasir urug Rp 170,000.00
Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang batu Rp 50,000.00
Kepala tukang batu Rp 60,000.00
atuan pekerjaan
Total

Rp 132,719.44
Rp 7,400.00
Rp 27,000.00
Rp 12,000.00
Rp 68,444.44
Rp 10,000.00
Rp 845.00
Rp 6,250.00
Rp 780.00

Rp 132,955.00
Rp 7,400.00
Rp 28,080.00
Rp 12,000.00
Rp 67,600.00
Rp 10,000.00
Rp 845.00
Rp 6,250.00
Rp 780.00

Rp 109,057.00
Rp 4,255.00
Rp 23,652.00
Rp 7,200.00
Rp 68,250.00
Rp 3,200.00
Rp 260.00
Rp 2,000.00
Rp 240.00

Rp 154,557.00
Rp 4,255.00
Rp 23,652.00
Rp 7,200.00
Rp 113,750.00
Rp 3,200.00
Rp 260.00
Rp 2,000.00
Rp 240.00
atuan pekerjaan
Total
Rp 192,850.00
Rp 162,000.00
Rp 13,600.00
Rp 6,000.00
Rp 650.00
Rp 10,000.00
Rp 600.00
Analisa harga sa
No. Koefisien Satuan
WORKS OF ROOF, CEILING, LISTPLANK AND WALL
Pekerjaan Atap
1 m2
### 1.0200 m2
### 6.0000 bh
### 0.1500 hari
### 0.0080 hari
### 0.0750 hari
### 0.0080 hari

2 m2
### 1.0500 m2
### 6.0000 bh
### 0.1500 hari
### 0.0080 hari
### 0.0750 hari
### 0.0080 hari

3 m2
### 1.0500 m2
### 6.0000 bh
### 0.1500 hari
### 0.0080 hari
### 0.0750 hari
### 0.0080 hari

4 m2
### 0.1500 hari
### 0.2500 hari
### 0.0250 hari
### 0.0750 hari
### 0.7500 m1
2.0000 m1
### 0.1500 kg
### 6.0000 bh
### 0.3819 m2

5 m2
### 0.2000 hari
### 0.0500 hari
Analisa harga sa
No. Koefisien Satuan
### 0.4500 hari
### 0.0100 hari
### 1.4880 m1
### 2.2320 m1
### 3.6000 m1
### 0.3250 bh
### 0.7150 bh
### 0.2500 bh
### 5.4000 bh
### 8.0000 bh
### 0.8750 bh

Pekerjaan Atap
1 m1
### 0.1500 hari
### 0.0100 hari
### 0.3000 hari
### 0.0250 hari
### 1.0500 m1

2 m1
### 0.1500 hari
### 0.0100 hari
### 0.3000 hari
### 0.0250 hari
### 1.0500 m1

3 m1
### 0.1000 hari
### 0.0100 hari
### 0.2000 hari
### 0.0250 hari
### 1.0500 m2
Analisa harga sa
No. Koefisien Satuan
Pekerjaan Atap
4 m1
### 0.0500 hari
### 0.0500 hari
### 0.0050 hari
### 0.0030 hari
0.0100 kg
1.1000 m1

5 m1
### 0.1000 hari
### 0.0050 hari
### 0.2000 hari
### 0.0250 hari
### 0.0070 m3
### 0.0500 kg

6 m1
### 0.0840 hari
### 0.0040 hari
### 0.1250 hari
### 0.0130 hari
### 1.0200 bh
6.0000 pcs

7 m2
### 0.1000 hari
### 0.0050 hari
### 0.1000 hari
### 0.0100 hari
### 1.1000 m2
0.0200 doz
0.0018 m3

Pekerjaan Pengecatan

1 ### m2
### 0.0700 hari
### 0.0025 hari
### 0.1050 hari
### 0.0040 hari
Analisa harga sa
No. Koefisien Satuan
### 0.3000 lbr
### 0.2000 bh
### 0.1500 kg
### 0.3000 kg

2 ### m2
### 0.0350 hari
### 0.0250 hari
### 0.1100 hari
### 0.0100 hari
### 0.1000 lbr
### 0.0100 bh
### 0.1000 kg
### 0.2600 kg

3 ### m2
### 0.0350 hari
### 0.0250 hari
### 0.1100 hari
### 0.0100 hari
### 0.1000 lbr
### 0.0100 bh
### 0.1000 kg
### 0.2600 kg

4 ### m2
### 0.0100 hari
### 0.0250 hari
### 0.0750 hari
### 0.0080 hari
### 0.4000 lbr
### 0.0500 bh
### 0.1500 ltr
### 0.2500 kg
Analisa harga sa
No. Koefisien Satuan
Pekerjaan Pengecatan
5 ### m2
### 0.0050 hari
### 0.0250 hari
### 0.0750 hari
### 0.0080 hari
### 0.4000 hari
### 0.0500 hari
### 0.1500 hari
### 0.6670 kg

6 ### m2
### 0.0100 hari
### 0.0030 hari
### 0.0750 hari
### 0.0080 hari
### 0.4000 lbr
### 0.0500 bh
### 0.1500 ltr
### 0.2500 kg

7 ### m2
### 0.0200 hari
### 0.0025 hari
### 0.0630 hari
### 0.0063 hari
### 0.0100 bh
### 0.1000 kg
### 0.3600 kg
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga
EILING, LISTPLANK AND WALL

Pair of Metal Roof (multi roof)


Metal Roof Rp 38,000.00
Roof screw Rp 1,200.00
Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang Besi Rp 50,000.00
Kepala tukang kayu Rp 60,000.00

Pair of spandek zincalume Roof


Spandek Zincalume Rp 98,900.00
Roof screw Rp 1,200.00
Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang Besi Rp 50,000.00
Kepala tukang kayu Rp 60,000.00

Pair of Fibre glass Roof


Fibre glassd Roof tebal 3 mm Rp 135,000.00
Roof screw Rp 1,200.00
Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang Besi Rp 50,000.00
Kepala tukang kayu Rp 60,000.00

Pair of Ceiling Kalsiboard, Draft Hollow & List Side


Pekerja Rp 40,000.00
Tukang kayu Rp 50,000.00
Kepala tukang kayu Rp 60,000.00
Mandor Rp 65,000.00
Hollow 40x40 Rp 27,777.78
Hollow 20x40 Rp 33,333.33
Artless zinc wire Rp 29,700.00
Paku asbes sekrup 4 inchi Rp 150.00
Papan Gypsum 1200x2400x9 mm Rp 70,000.00

Pair of ligthweigth steel roof truss


Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga
Tukang Besi Rp 50,000.00
Mandor Rp 65,000.00
Rangka Atap C-75 t=0.8 Rp 17,000.00
Rangka Atap C-75 t=0.6 Rp 13,333.33
Reng 16 - DB Roof Battens t=0.48 mm Rp 7,000.00
Foot Plate t=1.22 mm Rp 9,722.22
Bracing angin Rp 2,777.78
Tensioner (Pengaku Tali Angin) Rp 9,722.22
Big bold Rp 550.00
Little bold Rp 450.00
Dynabolt Rp 2,400.00

Gutters of flat steel plate


Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang Besi Rp 50,000.00
Mandor Rp 65,000.00
Plat baja Gutter Rp 31,500.00

Lisplank kliplock
Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang Besi Rp 50,000.00
Mandor Rp 65,000.00
Lisplank Spandek Rp 34,150.00

Wall Coverings Spandeck Kliplock


Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang Besi Rp 50,000.00
Mandor Rp 65,000.00
Spandek Zincalume Rp 98,900.00
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga

Pair of List Side Plafon Gypsum


Pekerja Rp 40,000.00
Tukang kayu Rp 50,000.00
Kepala tukang kayu Rp 60,000.00
Mandor Rp 65,000.00
Paku 1 s/d 5 cm Rp 17,000.00
List gypsum Rp 7,000.00

Lisplank Wood 3/25 cm


Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang kayu Rp 50,000.00
Mandor Rp 65,000.00
Kayu kelas I/Kamper ( Papan ) Rp 4,500,000.00
Paku 1 s/d 5 cm Rp 17,000.00

Pemasangan Wuwung Genteng tbl 4 mm


Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang kayu Rp 50,000.00
Kepala tukang kayu Rp 60,000.00
Wuwung Rp 47,500.00
Paku asbes sekrup 4 inchi Rp 150.00

Pemasangan Kawat Harmonika


Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang kayu Rp 50,000.00
Kepala tukang kayu Rp 60,000.00
Kawat harmonika L : 90 cm Rp 25,000.00
Paku klem (No.4) / Beton Rp 15,000.00
Kayu kelas I/Kamper ( Balok ) Rp 3,750,000.00

Wood Paint As much as 3x painted


Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang cat Rp 50,000.00
Kepala tukang cat Rp 60,000.00
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga
Plamir besi Rp 49,777.78
Paint Catylac/Honey Wood/46623 Rp 35,000.00
Meni Kayu Rp 20,000.00
Clear Gloss Rp 60,000.00
Contractor Profit 10%

Wall Paint Vinilex/Tangerine/982 As much as 2x painted (Orange)


Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang cat Rp 50,000.00
Kepala tukang cat Rp 60,000.00
Soft sandpaper for wall Rp 7,500.00
Rol wall Paint Rp 30,000.00
Wall puthy Rp 40,000.00
Cat dinding Vinilex/Tangerine/982 (Orange) Rp 30,650.00

Wall Paint Vinilex/Barley White/2290 As much as 2x painted (Cream)


Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang cat Rp 50,000.00
Kepala tukang cat Rp 60,000.00
Soft sandpaper for wall Rp 7,500.00
Rol wall Paint Rp 30,000.00
Wall puthy Rp 40,000.00
Cat dinding Vinilex/Barley White/8005 (Cream) Rp 78,000.00
Contractor Profit 10%

Steel Column Paint As Much As 2x Painted


Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang cat Rp 50,000.00
Kepala tukang cat Rp 60,000.00
Soft sandpaper for steel Rp 7,500.00
Small brush Rp 12,000.00
Thinner A Rp 25,000.00
Steel paint Ftalit/River blue/115-116 Rp 61,111.11
Contractor Profit 10%
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga

Steel Paint Shines As much as 4x painted


Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang cat Rp 50,000.00
Kepala tukang cat Rp 60,000.00
Soft sandpaper for steel Rp 7,500.00
Small brush Rp 12,000.00
Thinner A Rp 25,000.00
Steel paint Ftalit/River blue/115-116 Rp 61,111.11

Paint Zincromate As much as 2x painted


Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang cat Rp 50,000.00
Kepala tukang cat Rp 60,000.00
Soft sandpaper for steel Rp 7,500.00
Small brush Rp 12,000.00
Thinner A Rp 25,000.00
Paint Zincromate Rp 55,555.56

Plafon Paint Vinilex/White/300 As much as 2x painted (White)


Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang cat Rp 50,000.00
Kepala tukang cat Rp 60,000.00
Small brush Rp 12,000.00
Wall puthy Rp 40,000.00
Cat dinding Vinilex/White/300 (White) Rp 30,650.00
atuan pekerjaan
Total

Rp 56,710.00
Rp 38,760.00
Rp 7,200.00
Rp 6,000.00
Rp 520.00
Rp 3,750.00
Rp 480.00

Rp 121,795.00
Rp 103,845.00
Rp 7,200.00
Rp 6,000.00
Rp 520.00
Rp 3,750.00
Rp 480.00

Rp 159,700.00
Rp 141,750.00
Rp 7,200.00
Rp 6,000.00
Rp 520.00
Rp 3,750.00
Rp 480.00

Rp 144,463.00
Rp 6,000.00
Rp 12,500.00
Rp 1,500.00
Rp 4,875.00
Rp 20,833.33
Rp 66,666.67
Rp 4,455.00
Rp 900.00
Rp 26,733.00

Rp 130,902.39
Rp 8,000.00
Rp 3,250.00
atuan pekerjaan
Total
Rp 22,500.00
Rp 650.00
Rp 25,296.00
Rp 29,760.00
Rp 25,200.00
Rp 3,159.72
Rp 1,986.11
Rp 2,430.56
Rp 2,970.00
Rp 3,600.00
Rp 2,100.00

Rp 56,350.00
Rp 6,000.00
Rp 650.00
Rp 15,000.00
Rp 1,625.00
Rp 33,075.00

Rp 59,132.50
Rp 6,000.00
Rp 650.00
Rp 15,000.00
Rp 1,625.00
Rp 35,857.50

Rp 120,120.00
Rp 4,000.00
Rp 650.00
Rp 10,000.00
Rp 1,625.00
Rp 103,845.00
atuan pekerjaan
Total

Rp 12,865.00
Rp 2,000.00
Rp 2,500.00
Rp 300.00
Rp 195.00
Rp 170.00
Rp 7,700.00

Rp 48,300.00
Rp 4,000.00
Rp 325.00
Rp 10,000.00
Rp 1,625.00
Rp 31,500.00
Rp 850.00

Rp 60,000.00
Rp 3,360.00
Rp 260.00
Rp 6,250.00
Rp 780.00
Rp 48,450.00
Rp 900.00

Rp 44,475.00
Rp 4,000.00
Rp 325.00
Rp 5,000.00
Rp 600.00
Rp 27,500.00
Rp 300.00
Rp 6,750.00

Rp 51,385.83
Rp 2,800.00
Rp 162.50
Rp 5,250.00
Rp 240.00
atuan pekerjaan
Total
Rp 14,933.33
Rp 7,000.00
Rp 3,000.00
Rp 18,000.00

Rp 22,144.00
Rp 1,400.00
Rp 1,625.00
Rp 5,500.00
Rp 600.00
Rp 750.00
Rp 300.00
Rp 4,000.00
Rp 7,969.00

Rp 34,455.00
Rp 1,400.00
Rp 1,625.00
Rp 5,500.00
Rp 600.00
Rp 750.00
Rp 300.00
Rp 4,000.00
Rp 20,280.00

Rp 28,882.78
Rp 400.00
Rp 1,625.00
Rp 3,750.00
Rp 480.00
Rp 3,000.00
Rp 600.00
Rp 3,750.00
Rp 15,277.78
atuan pekerjaan
Total

Rp 54,166.11
Rp 200.00
Rp 1,625.00
Rp 3,750.00
Rp 480.00
Rp 3,000.00
Rp 600.00
Rp 3,750.00
Rp 40,761.11

Rp 26,063.89
Rp 400.00
Rp 195.00
Rp 3,750.00
Rp 480.00
Rp 3,000.00
Rp 600.00
Rp 3,750.00
Rp 13,888.89

Rp 19,644.50
Rp 800.00
Rp 162.50
Rp 3,150.00
Rp 378.00
Rp 120.00
Rp 4,000.00
Rp 11,034.00
Analisa harga sa
No. Koefisien Satuan
Pekerjaan Listrik
1 - titik
### 0.0250 hari
### 0.0250 hari
### 0.0170 hari
0.0140 hari
### 1.0000 pcs
0.0500 %

2 - titik
### 0.1000 hari
### 0.0100 hari
### 0.0100 hari
0.0140 hari
### 1.0000 pcs
0.0500 %

3 - titik
### 0.0250 hari
### 0.0250 hari
### 0.0170 hari
0.0140 hari
1.0000 pcs
### 2.5000 m
1.0000 pcs
2.5000 M'

4 - titik
### 0.1500 hari
### 0.1500 hari
### 0.1800 hari
0.1500 hari
### 12.0000 m
1.0000 pcs
10.0000 M'
2.0000 pcs

5 - Unit
### 0.1660 hari
### 0.1660 hari
### 0.0330 hari
Analisa harga sa
No. Koefisien Satuan
### 0.0166 m
1.0000 pcs
1.0000 pcs
1.0000 pcs
5.0000 %

6 - set
### 2.5000 hari
### 4.0000 hari
### 0.4000 hari
5.0000 pcs
6.0000 pcs
65.0000 m
8.0000 m
10.0000 pcs
2.0000 pcs
1.0000 Lot
1.0000 Lot

7 ### titik
### 0.2000 hari
### 0.0200 hari
### 0.0200 hari
0.0100 hari
### 1.0000 pcs
Analisa harga sa
No. Koefisien Satuan
Pekerjaan Listrik
8 titik
### 0.1660 hari
### 0.1660 hari
### 0.0330 hari
0.0170 hari
### 1.0000 pcs
1.0000 pcs
5.0000 %

9 titik
### 0.1660 hari
### 0.1660 hari
### 0.0330 hari
0.0170 hari
### 1.0000 pcs
1.0000 pcs
5.0000 %

10 titik
### 0.1660 hari
### 0.1660 hari
### 0.0330 hari
0.0170 hari
### 1.0000 pcs
1.0000 pcs
5.0000 %

11 titik
### 0.1660 hari
### 0.1660 hari
### 0.0330 hari
0.0170 hari
### 1.0000 pcs
1.0000 pcs
5.0000 %

12 titik
### 0.1660 hari
### 0.1660 hari
### 0.0330 hari
Analisa harga sa
No. Koefisien Satuan
0.0170 hari
### 1.0000 pcs
1.0000 pcs
5.0000 %

13 titik
### 0.1660 hari
### 0.1660 hari
### 0.0330 hari
0.0170 hari
### 1.0000 pcs
1.0000 pcs
5.0000 %

13 titik
### 0.1660 hari
### 0.0830 hari
### 0.0330 hari
0.0170 hari
1.0000 bh
1.0000 bh
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga

Pemasangan Saklar Tunggal


Pekerja Rp 40,000.00
Tukang Listrik Rp 50,000.00
Kepala Tukang Listrik Rp 70,000.00
Mandor Rp 65,000.00
Electric switch phase single Rp 32,500.00
Perlengkapan instalasi Rp 1,625.00

Pemasangan Saklar Ganda


Pekerja Rp 40,000.00
Tukang Listrik Rp 50,000.00
Kepala Tukang Listrik Rp 70,000.00
Mandor Rp 65,000.00
Electric switch phase double Rp 35,000.00
Perlengkapan instalasi Rp 1,750.00

Pemasangan Stop Kontak


Pekerja Rp 40,000.00
Tukang Listrik Rp 50,000.00
Kepala Tukang Listrik Rp 70,000.00
Mandor Rp 65,000.00
Stop Kontak Rp 22,500.00
Kabel NYM 3 x 2,5 mm Rp 14,000.00
T Doos PVC Rp 4,000.00
Pipa PVC "C" ø 5/8" - 17 mm - 4 m Rp 2,000.00

Pemasangan 1 buah Titik Lampu


Pekerja Rp 40,000.00
Tukang Listrik Rp 50,000.00
Kepala Tukang Listrik Rp 70,000.00
Mandor Rp 65,000.00
Kabel NYM 3 x 2,5 mm Rp 14,000.00
T Doos PVC Rp 4,000.00
Pipa PVC "C" ø 5/8" - 17 mm - 4 m Rp 2,000.00
Isolator Rp 6,000.00

Pemasangan Panel Meter 1 Phase


Pekerja Rp 1,325.00
Tukang Listrik Rp 4,325.00
Kepala Tukang Listrik Rp 1,121,600.00
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga
Mandor Rp 120,000.00
Box Panel Rp 1,018,224.00
Cu Bar Rp 520,150.00
MCCB,3p 300 A Rp 3,953,140.00
Perlengkapan instalasi Rp 76,918.70

Pemasangan Penangkal Petir Gudang (6 Stick)


Pekerja Rp 40,000.00
Tukang Listrik Rp 50,000.00
Kepala Tukang Listrik Rp 70,000.00
Lihtning Protection Rp 75,000.00
Splitzen Tembaga 0 1" Rp 25,000.00
Kawat BC 0 55 mm2 Rp 62,500.00
Pipa konduit PVC 0 3/4" Rp 14,500.00
Klem Kawat BC Rp 15,000.00
Bak Kontrol Pas. Bata UK 40x40x40, lengkap Rp 175,000.00
Pentanahan Bahan Cooper Rod 01" Rp 750,000.00
Testing Rp 2,000,000.00

Pemasangan Sekring / MCB


Pekerja Rp 40,000.00
Tukang Listrik Rp 50,000.00
Kepala Tukang Listrik Rp 70,000.00
Mandor Rp 65,000.00
MCB 1 Pole Rp 90,000.00
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga

Pemasangan Lampu Sorot LED 50 Watt


Pekerja Rp 40,000.00
Tukang Listrik Rp 50,000.00
Kepala Tukang Listrik Rp 70,000.00
Mandor Rp 65,000.00
kap lampu 14 inch + fitting E27 Rp 120,000.00
Spotlight LED Phillips 50 W Rp 1,200,000.00
Rp 60,000.00

Pemasangan Lampu LED Gudang 18 Watt (Plus Kap)


Pekerja Rp 40,000.00
Tukang Listrik Rp 50,000.00
Kepala Tukang Listrik Rp 70,000.00
Mandor Rp 65,000.00
kap lampu 14 inch + fitting E27 Rp 120,000.00
Lamp LED 18 W Rp 168,000.00
Rp 8,400.00

Pemasangan Lampu LED 13 Watt


Pekerja Rp 40,000.00
Tukang Listrik Rp 50,000.00
Kepala Tukang Listrik Rp 70,000.00
Mandor Rp 65,000.00
Fitting Plafon Rp 16,000.00
Lamp LED 13 W Rp 80,000.00
Rp 4,000.00

Pemasangan titik Lampu LED 9 Watt


Pekerja Rp 40,000.00
Tukang Listrik Rp 50,000.00
Kepala Tukang Listrik Rp 70,000.00
Mandor Rp 65,000.00
Fitting Plafon Rp 16,000.00
Lamp LED 9 W Rp 65,000.00
Rp 3,250.00

Pemasangan titik Lampu LED 4 Watt


Pekerja Rp 40,000.00
Tukang Listrik Rp 50,000.00
Kepala Tukang Listrik Rp 70,000.00
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga
Mandor Rp 65,000.00
Fitting Plafon Rp 16,000.00
Lamp LED 4 W Rp 40,000.00
Rp 2,000.00

Pemasangan 1 titik Lampu LED 6 Watt


Pekerja Rp 40,000.00
Tukang Listrik Rp 50,000.00
Kepala Tukang Listrik Rp 70,000.00
Mandor Rp 65,000.00
Fitting Plafon Rp 16,000.00
Lamp LED 6 W Rp 45,000.00
Rp 2,250.00
Contractor Profit 10%

Pemasangan Lampu TL LED 2 x 20 Watt (Plus Kap)


Pekerja Rp 40,000.00
Tukang Listrik Rp 50,000.00
Kepala Tukang Listrik Rp 70,000.00
Mandor Rp 65,000.00
Lampu TL LED 20 Watt setara Phillips Rp 264,000.00
Rumah TL In Bow Rp 220,000.00
Contractor Profit 10%
atuan pekerjaan
Total

Rp 38,475.00
Rp 1,000.00
Rp 1,250.00
Rp 1,190.00
Rp 910.00
Rp 32,500.00
Rp 1,625.00

Rp 42,860.00
Rp 4,000.00
Rp 500.00
Rp 700.00
Rp 910.00
Rp 35,000.00
Rp 1,750.00

Rp 70,850.00
Rp 1,000.00
Rp 1,250.00
Rp 1,190.00
Rp 910.00
Rp 22,500.00
Rp 35,000.00
Rp 4,000.00
Rp 5,000.00

Rp 239,850.00
Rp 6,000.00
Rp 7,500.00
Rp 12,600.00
Rp 9,750.00
Rp 168,000.00
Rp 4,000.00
Rp 20,000.00
Rp 12,000.00

Rp 5,608,375.40
Rp 219.95
Rp 717.95
Rp 37,012.80
atuan pekerjaan
Total
Rp 1,992.00
Rp 1,018,224.00
Rp 520,150.00
Rp 3,953,140.00
Rp 76,918.70

Rp 8,281,500.00
Rp 100,000.00
Rp 200,000.00
Rp 28,000.00
Rp 375,000.00
Rp 150,000.00
Rp 4,062,500.00
Rp 116,000.00
Rp 150,000.00
Rp 350,000.00
Rp 750,000.00
Rp 2,000,000.00

Rp 101,050.00
Rp 8,000.00
Rp 1,000.00
Rp 1,400.00
Rp 650.00
Rp 90,000.00
atuan pekerjaan
Total

Rp 1,398,355.00
Rp 6,640.00
Rp 8,300.00
Rp 2,310.00
Rp 1,105.00
Rp 120,000.00
Rp 1,200,000.00
Rp 60,000.00

Rp 314,755.00
Rp 6,640.00
Rp 8,300.00
Rp 2,310.00
Rp 1,105.00
Rp 120,000.00
Rp 168,000.00
Rp 8,400.00

Rp 118,355.00
Rp 6,640.00
Rp 8,300.00
Rp 2,310.00
Rp 1,105.00
Rp 16,000.00
Rp 80,000.00
Rp 4,000.00

Rp 102,605.00
Rp 6,640.00
Rp 8,300.00
Rp 2,310.00
Rp 1,105.00
Rp 16,000.00
Rp 65,000.00
Rp 3,250.00

Rp 76,355.00
Rp 6,640.00
Rp 8,300.00
Rp 2,310.00
atuan pekerjaan
Total
Rp 1,105.00
Rp 16,000.00
Rp 40,000.00
Rp 2,000.00

Rp 81,605.00
Rp 6,640.00
Rp 8,300.00
Rp 2,310.00
Rp 1,105.00
Rp 16,000.00
Rp 45,000.00
Rp 2,250.00

Rp 498,205.00
Rp 6,640.00
Rp 4,150.00
Rp 2,310.00
Rp 1,105.00
Rp 264,000.00
Rp 220,000.00
Analisa harga sa
No. Koefisien Satuan
Pekerjaan Pagar & Drainase
1 m1
### 0.3750 hari
### 0.1250 hari
0.0120 hari
### 0.0190 hari
### 0.0740 M3
0.1460 M3
45.0000 kg
2.0000 sheet
0.4000 pcs

2 m1
0.5020 hari
0.1506 hari
0.0502 hari
0.3400 M3
1.0750 M2
29.5800 kg
1.0000 Ls

2 m1
0.5020 hari
0.1506 hari
0.0502 hari
0.5800 m3
1.1000 m3
133.980 kg
1.0000 Ls

m1
0.1500 hari
0.2000 hari
0.2000 hari
0.0200 hari
0.0100 hari
0.0585 m1
21.5635 m1
0.0800 m3
0.0080 m3
27.1069 m1
1.0000 Ls
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga

Precast Fence (5 x 40 x 240)


Pekerja Rp 40,000.00
Tukang batu Rp 50,000.00
Kepala tukang batu Rp 60,000.00
Mandor Rp 65,000.00
Pasir beton Rp 185,000.00
Batu Pecah Mesin 2/3 Rp 325,000.00
Semen Portland (50 kg) Rp 2,700.00
Panel Beton Precast (5x40x240) Rp 190,000.00
Kolom Beton Precast Rp 300,000.00

Concrete Drainase
Pekerja Rp 40,000.00
Tukang batu Rp 50,000.00
Mandor Rp 65,000.00
Beton K225 Rp 935,660.63
Kayu Bekisting Rp 192,908.33
Besi tulangan Rp 2,700.00
A Tool Rp 1,100.00

Box Concrete Drainase 100 x 100 cm


Pekerja Rp 40,000.00
Tukang batu Rp 50,000.00
Mandor Rp 65,000.00
Beton K225 Rp 935,660.63
Kayu Bekisting Rp 192,908.33
Besi tulangan Rp 2,700.00
A Tool Rp 1,100.00

Pagar berduri di tanah lahan kosong t=2,5 m


Pekerja Rp 40,000.00
Tukang batu Rp 50,000.00
Tukang Besi Rp 50,000.00
Kepala tukang batu Rp 60,000.00
Mandor Rp 65,000.00
beton k225 pondasi (m3) Rp 935,660.63
Batang baja L 40. 80 . 8 Rp 16,000.00
Galian tanah pondasi Rp 17,625.00
Timbunan kembali Rp 30,900.99
Kawat Duri Rp 2,121.21
A Tool Rp 1,100.00
atuan pekerjaan
Total

Rp 705,845.00
Rp 15,000.00
Rp 6,250.00
Rp 720.00
Rp 1,235.00
Rp 13,690.00
Rp 47,450.00
Rp 121,500.00
Rp 380,000.00
Rp 120,000.00

Rp 637,340.57
Rp 20,080.50
Rp 7,530.00
Rp 3,263.00
Rp 318,124.61
Rp 207,376.46
Rp 79,866.00
Rp 1,100.00

Rp 1,148,601.83
Rp 20,080.50
Rp 7,530.00
Rp 3,263.00
Rp 542,683.16
Rp 212,199.17
Rp 361,746.00
Rp 1,100.00

Rp 195,143.57
Rp 6,000.00
Rp 10,000.00
Rp 10,000.00
Rp 1,200.00
Rp 650.00
Rp 54,736.15
Rp 345,016.00
Rp 1,410.00
Rp 247.21
Rp 57,499.57
Rp 1,100.00
Analisa harga sa
No. Koefisien Satuan
Pekerjaan Pipa dan Sanitasi
1 m1
### 0.0360 hari
### 0.0020 hari
### 0.0600 hari
### 0.0060 hari
### 1.2000 m1
1.0000

2 m1
### 0.0540 hari
### 0.0030 hari
### 0.0900 hari
### 0.0090 hari
### 1.2000 m1
1.0000

3 bh
### 1.0000 hari
### 0.1600 hari
### 1.5000 hari
### 0.1500 hari
### 6.0000 kg
### 0.0100 m3
### 1.0000 bh

4 bh
### 1.2000 hari
### 0.1000 hari
### 1.4500 hari
### 0.1500 hari
### 6.0000 kg
### 0.0100 m3
### 1.0000 bh
1.0000

5 bh
### 1.0000 hari
### 0.1600 hari
### 1.5000 hari
### 0.1500 hari
Analisa harga sa
No. Koefisien Satuan
### 6.0000 kg
### 0.0100 m3
### 1.0000 bh

6 bh
### 1.800 hari
### 0.540 hari
### 2.700 hari
### 0.110 hari
1.0000 pcs
1.0000

7 bh
### 0.010 hari
### 0.100 hari
### 0.010 hari
### 0.005 hari
### 1.000 pcs
### 0.500 pcs

8 m2
### 3.200 hari
### 1.500 hari
### 0.011 hari
### 0.016 hari
### 0.250 M3
### 77.000 Kg
0.130 M3
0.020 M3
1.600 Kg
0.090 M3
Analisa harga sa
No. Koefisien Satuan
9 m1
### 0.125 hari
### 0.100 hari
### 0.010 hari
### 0.010 hari
### 40.000 bh
### 1.500 Kg
0.120 M3

10 bh
### 0.010 hari
### 0.100 hari
### 0.010 hari
### 0.005 hari
### 1.000 pcs

11 m1
### 0.010 hari
### 0.100 hari
### 0.010 hari
### 0.005 hari
### 1.000 Bh
### 1.200 Kg

11 m1
### 0.010 hari
### 0.100 hari
### 0.010 hari
### 0.005 hari
### 1.000 Bh
### 1.200 Kg

12 set
1.000 pcs
0.060 lot

13 set
0.030 hari
0.300 hari
0.030 hari
0.002 hari
1.000 pcs
Analisa harga sa
No. Koefisien Satuan
0.060 lot

14 Ls
1.0000 Ls
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga

Pipe Pvc Type Aw Dia DIA 1"


Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang pipa Rp 50,000.00
Kepala tukang besi Rp 70,000.00
Pipa PVC "AW" ø 1" Panjang 4 M Rp 10,500.00
Perlengkapan 35% harga pipa Rp 3,675.00

Pipe Pvc Type Aw Dia 4"


Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang pipa Rp 50,000.00
Kepala tukang besi Rp 70,000.00
Pipa PVC "AW" ø 4" Panjangh 4 M Rp 71,250.00
Perlengkapan 35% harga pipa Rp 24,937.50

Closed Sitting
Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang batu Rp 50,000.00
Kepala tukang batu Rp 60,000.00
Semen Portland (50 kg) Rp 2,700.00
Pasir pasang Rp 185,000.00
Closed sitting innoncently Rp 1,100,000.00

Wastafel
Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang batu Rp 50,000.00
Kepala tukang batu Rp 60,000.00
Semen Portland (50 kg) Rp 2,700.00
Pasir pasang Rp 185,000.00
Wastafel Besar Warna Rp 1,350,000.00
Perlengkapan 12% harga wastafel Rp 162,000.00

Memasang Kloset Jongkok


Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang batu Rp 50,000.00
Kepala tukang batu Rp 60,000.00
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga
Semen Portland (50 kg) Rp 2,700.00
Pasir pasang Rp 185,000.00
kloset jongkok Rp 350,000.00

Memasang Bak Mandi Viber Glass Vol. 0,30 m³


Pekerja Rp 40,000.00
Kepala tukang batu Rp 60,000.00
Tukang batu Rp 50,000.00
Mandor Rp 65,000.00
Bak Mandi Fiberglass Rp 350,000.00
Perlengkapan 18 % harga bak Rp 63,000.00

Memasang Kran Air Ø ½" atau ¾"


Pekerja Rp 40,000.00
Tukang las Rp 50,000.00
Tukang batu Rp 50,000.00
Mandor Rp 65,000.00
Kran Air dia.1/2 Rp 42,500.00
Sealm tape Rp 6,000.00

Memasang Bak kontrol Pas Batu Bata 45X45 cm


Pekerja Rp 40,000.00
Tukang Batu Rp 50,000.00
Kepala Tukang Rp 50,000.00
Mandor Rp 65,000.00
Batu Bata Rp 600.00
Semen Portland Rp 2,700.00
Pasir Pasang Rp 185,000.00
Batu Kerikil Rp 325,000.00
Besi Beton Rp 14,000.00
Pasir Beton Rp 185,000.00
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga
Membuat saluran drain
Pekerja Rp 40,000.00
Tukang Batu Rp 50,000.00
Kepala Tukang Rp 50,000.00
Mandor Rp 65,000.00
Batu Bata Rp 600.00
Semen Portland Rp 2,700.00
Pasir Pasang Rp 185,000.00

Memasang 1 buah floor drain


Pekerja Rp 40,000.00
Tukang batu Rp 50,000.00
Kepala tukang batu Rp 60,000.00
Mandor Rp 65,000.00
Floor Drain Rp 35,000.00

Memasang Uditch 60x30 cm


Pekerja Rp 40,000.00
Tukang Batu Rp 50,000.00
Kepala Tukang Rp 50,000.00
Mandor Rp 65,000.00
beton U-Ditch 60 x 30 cm Rp 366,000.00
Semen Portland Rp 2,700.00

Memasang box culvert 50x30 cm


Pekerja Rp 40,000.00
Tukang Batu Rp 50,000.00
Kepala Tukang Rp 50,000.00
Mandor Rp 65,000.00
gorong-gorong beton 50 x 30 cm Rp 415,000.00
Semen Portland Rp 2,700.00

1 Buah Tangki Air fibreglass Volume 2000 ltr


Tangki Air fibreglass Volume 2000 ltr Rp 3,400,000.00
Perlengkapan 6 % harga bak Rp 204,000.00

Bak Cuci Stainless Steel/ Kithcen Sink


Pekerja Rp 40,000.00
Tukang batu Rp 50,000.00
Kepala tukang batu Rp 60,000.00
Mandor Rp 65,000.00
sink ( 1 hole ) Rp -
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga
Perlengkapan 6 % harga bak Rp -

Memasang Jet Pump


Pemasangan mesin Jet Pump Rp 2,800,000.00
atuan pekerjaan
Total

Rp 21,265.00
Rp 1,440.00
Rp 130.00
Rp 3,000.00
Rp 420.00
Rp 12,600.00
Rp 3,675.00

Rp 117,922.50
Rp 2,160.00
Rp 195.00
Rp 4,500.00
Rp 630.00
Rp 85,500.00
Rp 24,937.50

Rp 1,252,450.00
Rp 40,000.00
Rp 10,400.00
Rp 75,000.00
Rp 9,000.00
Rp 16,200.00
Rp 1,850.00
Rp 1,100,000.00

Rp 1,666,050.00
Rp 48,000.00
Rp 6,500.00
Rp 72,500.00
Rp 9,000.00
Rp 16,200.00
Rp 1,850.00
Rp 1,350,000.00
Rp 162,000.00

Rp 502,450.00
Rp 40,000.00
Rp 10,400.00
Rp 75,000.00
Rp 9,000.00
atuan pekerjaan
Total
Rp 16,200.00
Rp 1,850.00
Rp 350,000.00

Rp 659,550.00
Rp 72,000.00
Rp 32,400.00
Rp 135,000.00
Rp 7,150.00
Rp 350,000.00
Rp 63,000.00

Rp 51,725.00
Rp 400.00
Rp 5,000.00
Rp 500.00
Rp 325.00
Rp 42,500.00
Rp 3,000.00

Rp 482,240.00
Rp 128,000.00
Rp 75,000.00
Rp 550.00
Rp 1,040.00
Rp 150.00
Rp 207,900.00
Rp 24,050.00
Rp 6,500.00
Rp 22,400.00
Rp 16,650.00
atuan pekerjaan
Total
Rp 61,400.00
Rp 5,000.00
Rp 5,000.00
Rp 500.00
Rp 650.00
Rp 24,000.00
Rp 4,050.00
Rp 22,200.00

Rp 41,325.00
Rp 400.00
Rp 5,000.00
Rp 600.00
Rp 325.00
Rp 35,000.00

Rp 375,465.00
Rp 400.00
Rp 5,000.00
Rp 500.00
Rp 325.00
Rp 366,000.00
Rp 3,240.00

Rp 424,465.00
Rp 400.00
Rp 5,000.00
Rp 500.00
Rp 325.00
Rp 415,000.00
Rp 3,240.00

Rp 3,604,000.00
Rp 3,400,000.00
Rp 204,000.00

Rp 18,097.50
Rp 1,200.00
Rp 15,000.00
Rp 1,800.00
Rp 97.50
Rp -
atuan pekerjaan
Total
Rp -

Rp 2,800,000.00
Rp 2,800,000.00
Analisa harga sa
No. Koefisien Satuan
PEKERJAAN KUNCI, PENGGANTUNGAN dan KACA
1 bh
### 0.0100 hari
### 0.0050 hari
### 0.5000 hari
### 0.0100 hari
1.0000 Set

2 ### bh
### 0.0100 hari
### 0.0050 hari
### 0.5000 hari
### 0.0100 hari
1.0000 Set

3 bh
### 0.0100 hari
### 0.0005 hari
### 0.1000 hari
### 0.0100 hari
1.0000 Set

4 bh
### 0.0150 hari
### 0.0008 hari
### 0.1500 bh
### 0.0150 hari
1.0000 Set

5 bh
### 0.0600 hari
### 0.1200 hari
1.0000 Set

6 bh
### 0.0600 hari
### 0.1200 hari
1.0000 Set
Analisa harga sa
No. Koefisien Satuan
7 m2
### 0.0150 hari
### 0.0008 hari
### 0.1500 hari
### 0.0150 hari
1.1000 Set

8 m2
### 0.0150 hari
### 0.0008 hari
### 0.1500 hari
### 0.0150 hari
1.1000 Set

9 Set
### 0.0800 hari
### 0.1400 hari
1.0000 Set
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga
CI, PENGGANTUNGAN dan KACA
Pemasangan kunci tanam biasa
Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang kayu Rp 50,000.00
Kepala tukang kayu Rp 60,000.00
Kunci Tanam Rp 125,000.00

Pemasangan kunci tanam besar 2x putaran Kuningan


Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang kayu Rp 50,000.00
Kepala tukang kayu Rp 60,000.00
Kunci Tanam Besar 2x Slag (Kuningan) Rp 170,000.00

Pemasangan engsel kuningan jendela


Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang kayu Rp 50,000.00
Kepala tukang kayu Rp 60,000.00
Windows Hinge (Kuningan) Rp 35,000.00

Pemasangan engsel kuningan pintu


Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang kayu Rp 50,000.00
Kepala tukang kayu Rp 60,000.00
Door Hinge Rp 55,000.00

Pemasangan grendel biasa (kecil)


Pekerja Rp 40,000.00
Tukang kayu Rp 50,000.00
Smaal Door Bolt (Grendel) Rp 20,000.00

Pemasangan grendel biasa (besar)


Pekerja Rp 40,000.00
Tukang kayu Rp 50,000.00
Big Door Bolt (Grendel) Rp 30,000.00
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga
Pemasangan Kaca Mati Tebal 3 mm Polos
Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang kayu Rp 50,000.00
Kepala tukang kayu Rp 60,000.00
Kaca Polos 3 mm Rp 115,000.00

Pemasangan Kaca Mati Tebal 3 mm Rayban


Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang kayu Rp 50,000.00
Kepala tukang kayu Rp 60,000.00
Kaca Ryben 5 mm Rp 125,000.00
Contractor Profit 10%

Pemasangan hak angin sikutan (biasa)


Pekerja Rp 40,000.00
Tukang kayu Rp 50,000.00
Window Wind Hook Rp 25,000.00
Contractor Profit 10%
atuan pekerjaan
Total

Rp 151,325.00
Rp 400.00
Rp 325.00
Rp 25,000.00
Rp 600.00
Rp 125,000.00

Rp 196,325.00
Rp 400.00
Rp 325.00
Rp 25,000.00
Rp 600.00
Rp 170,000.00

Rp 41,032.50
Rp 400.00
Rp 32.50
Rp 5,000.00
Rp 600.00
Rp 35,000.00

Rp 64,048.75
Rp 600.00
Rp 48.75
Rp 7,500.00
Rp 900.00
Rp 55,000.00

Rp 28,400.00
Rp 2,400.00
Rp 6,000.00
Rp 20,000.00

Rp 38,400.00
Rp 2,400.00
Rp 6,000.00
Rp 30,000.00
atuan pekerjaan
Total
Rp 135,548.75
Rp 600.00
Rp 48.75
Rp 7,500.00
Rp 900.00
Rp 126,500.00

Rp 146,548.75
Rp 600.00
Rp 48.75
Rp 7,500.00
Rp 900.00
Rp 137,500.00

Rp 35,200.00
Rp 3,200.00
Rp 7,000.00
Rp 25,000.00
Analisa harga sa
No. Koefisien Satuan
KESEHATAN, KESELAMATAN KERJA & LINGKUNGAN (K3L)
1 Ls
5.0000 bh
20.0000 bh
25.0000 bh
2.0000 bh
2.0000 bh
10.0000 m2
1.0000 bh
20.0000 bh
5.0000 bh
50.0000 bh
2.0000 set
2.0000 Ls

Pekerjaan Tanah, Lapis Pondasi dan Perkerasan Jalan

9 titik
0.4000 hari
0.0200 hari
0.1000 hari
0.0500 hari
1.1000 batang
1.0000 ls
Analisa harga satuan pekerjaan
Tipe Pekerjaan Harga
ELAMATAN KERJA & LINGKUNGAN (K3L)
Perlengkapan K3
Helm Safety Putih Rp 55,000.00
Helm Safety Kuning Rp 38,000.00
Rompi Rp 35,000.00
Safety Belt Rp 56,000.00
Safety Hardness Rp 350,000.00
Jaring Pengaman Rp 200,000.00
Tandu Rp 350,000.00
Sepatu Boot Rp 100,000.00
Sepatu Safety Rp 300,000.00
Sarung Tangan Rp 5,000.00
P3K Rp 400,000.00
Spanduk K3L & Rambu K3 Rp 300,000.00
Contractor Profit 10%

h, Lapis Pondasi dan Perkerasan Jalan

Pemasangan cerucuk dolken (dia. 10 cm, panjang 3m) per titik


Pekerja Rp 40,000.00
Mandor Rp 65,000.00
Tukang kayu Rp 50,000.00
Kepala tukang kayu Rp 60,000.00
cerucuk dia. 10 cm, panjang 3 m Rp 42,500.00
alat bantu Rp 10,000.00
atuan pekerjaan
Total
Rp 10,222,000.00

Rp 275,000.00
Rp 760,000.00
Rp 875,000.00
Rp 112,000.00
Rp 700,000.00
Rp 2,000,000.00
Rp 350,000.00
Rp 2,000,000.00
Rp 1,500,000.00
Rp 250,000.00
Rp 800,000.00
Rp 600,000.00

Rp 82,050.00
Rp 16,000.00
Rp 1,300.00
Rp 5,000.00
Rp 3,000.00
Rp 46,750.00
Rp 10,000.00
DAFTAR HARGA SATUAN PEKERJAAN

Pekerjaan : Pembanguan Gudang dan Prasarananya


Lokasi : Mesuji Lampung

No. Jenis Pekerjaan

I Pekerjaan Persiapan
Pagar Sementara Dari Seng Gelombang Tinggi 2,00 M
Pengukuran Dan Pemasangan Blouwplank (Utzet)
Papan Nama Proyek
Pembuatan Direksi Kit
Pembersihan Lahan dengan Alat
Perlengkapan K3

II Pekerjaan Tanah, Lapis Pondasi dan Perkerasan Jalan


Galian Tanah Manual
Galian Biasa Dengan Alat
Galian Tanah Biasa Manual
Pek. Galian Dan Back Fill (Excavation And Back Fill)
Urugan tanah di padatkan
Urugan Pasir
Urugan Sirtu

III Pekerjaan Pasangan


Pasangan Batu Kosong
Pasangan Batu Belah 1:4
Pasangan Batu Belah 1:5
Pasangan Batu Bata 1:4
Pasangan Batu Bata 1:2

IV Pekerjaan Plestaran
Plesteran 1:2, T=1,5 Cm
Plesteran 1:4, T=1,5 Cm

V Pekerjaan Beton
Bahan Beton K300
Bahan Beton K225
Bahan Beton K175
Bahan Beton K100
DAFTAR HARGA SATUAN PEKERJAAN

Pekerjaan : Pembanguan Gudang dan Prasarananya


Lokasi : Mesuji Lampung

No. Jenis Pekerjaan


Pemasangan Kansteen Beton 10X20X40
Pembesihan Dengan Besi Polos Atau Besi Ulir

VI Pekerjaan Kayu
Bekisting Untuk Sloof
Bekisting Untuk Kolom
Bekisting Untuk Balok
Daun Pintu Taekwood
Lisplank Kayu 3/25 Cm

VII Pekerjaan Besi / Baja


Pengadaan Dan Pemasangan Konstruksi Baja Wf
Pemasangan Shear Connector Siku L 50 X 50 X 5
Pintu Sliding / Dorong Plat Tebal 1,2 Mm (Lengkap)
Pintu Sliding / Dorong Plat Tebal 2 Mm (Lengkap)
Pemb. Rangka Menara Air Besi Siku

VIII Pekerjaan Aluminium


Kusen Aluminium
Pintu Aluminium Strip Lebar 8 Cm + Kaca
Pintu Panil Aluminium
Jendela Aluminium + Kaca
Pemasangan Daun Pintu PVC

IX Pekerjaan Atap, Plafond dan Penutup Dinding


Pasang Atap Metal Roof (multi roof)
Pasang atap fibre glass t= 3 mm
Pasang Atap spandek zincalume
Pasang Nok / Bubungan Atap Zincalume
Plafond Kalsiboard, Rangka Hollow & List Tepi
Kuda-Kuda Baja Ringan Dan Atap
Talang Datar Dari Plat Baja / Drainase
Lisplank Kliplock
Penutup Dinding, Spandek Kliplock
Pasang List Plafon
Pemasangan Hak Angin Sikutan (Biasa)
DAFTAR HARGA SATUAN PEKERJAAN

Pekerjaan : Pembanguan Gudang dan Prasarananya


Lokasi : Mesuji Lampung

No. Jenis Pekerjaan


Pemasangan Kawat Harmonika

X Pekertjaan kunci dan pengantung


Pemasangan Kunci Tanam Besar 2X Putaran Kuningan
Pasang Engsel Jendela
Pemasangan Engsel Kuningan Pintu
Pemasangan Grendel Biasa (Kecil)
Pemasangan Grendel Biasa (Besar)
Pasang Kaca tebal 3 mm
Pasang Kaca wireglass tebal 5 mm

XI Pekerjaan Pengecatan
Pengecatan Kayu
Cat Tembok Gudang Sebanyak 2X Dicat (Orange)
Cat Tembok Kantor Sebanyak 2X Dicat (Krem)
Cat Kolom Baja Sebanyak 2X Dicat (Biru)
Cat Pintu Besi Mengkilat Sebanyak 4X Dicat
Cat Zincromate Sebanyak 2X Dicat
Cat Plafon Sebanyak 2X Dicat
DAFTAR HARGA SATUAN PEKERJAAN

Pekerjaan : Pembanguan Gudang dan Prasarananya


Lokasi : Mesuji Lampung

No. Jenis Pekerjaan


XII Pekerjaan Instalasi Listrik
Pemasangan Panel Meter 1 Phase
Pemasangan Sekering Group
Pemasangan Titik Lampu Gedung
Pemasangan Stop Kontak
Pemasangan Sakelar Tunggal
Pemasangan Sakelar Ganda
Pemasangan Penagkal Petir Gudang
Pemasangan Lampu Sorot Led 50 Watt
Pemasangan Lampu Led Gudang 18 Watt (Plus Kap)
Pemasangan Lampu Led 13 Watt
Pemasangan Titik Lampu Led 9 Watt
Pemasangan 1 Titik Lampu Led 6 Watt
Pemasangan Titik Lampu Led 4 Watt
Pemasangan Lampu Tl Led 2 X 20 Watt (Plus Kap)

XIII Pekerjaan Lantai


Pasang Keramik 30X30 Cm
Pasang Keramik 20X20 Cm
Pasang Keramik 20X25 Cm
Pasang Keramik 40X40 Cm
Pemasangan Paving Block

XV Pekerjaan Pipa dan Sanitasi


Memasang Kloset Jongkok
Memasang Bak Mandi Bata Bata, Vol 0.3 m³
Memasang Kran Air Ø ½" atau ¾"
Memasang Bak kontrol Pas Batu Bata 45X45 cm
Membuat Septictank 1.5x2x2 m + Peresapan
Pipa Pvc Type Aw Dia 1"
Pipa Pvc Type Aw Dia 4"
Memasang Kloset Duduk
Memasang Wastafel
Membuat Saluran Drain
Memasang 1 Buah Floor Drain
Memasang Uditch 60X30 Cm
Memasang Box Culvert 50X30 Cm
1 Buah Tangki Air Fibreglass Volume 1 M3
DAFTAR HARGA SATUAN PEKERJAAN

Pekerjaan : Pembanguan Gudang dan Prasarananya


Lokasi : Mesuji Lampung

No. Jenis Pekerjaan


Pekerjaan Pemb. Sumur Bor (30 meter)
Memasang Jet Pump
Bak Cuci Stanlees Steel/ Kitchen Sink

XVI Pekerjaan Pagar Precast


Pagar Precast (5x50x213)
Concrete Drainase
Box Concrete Drainase 100 X 100 Cm
Pagar Berduri Di Tanah Lahan Kosong T=2,5 M
KERJAAN

Harga satuan

259,365.00 m1
60,765.00 m1
469,750.00 m1
691,270.00 m2
3,320.00 m2
10,222,000.00 Ls

17,625.00 m3
45,100.00 m3
31,625.00 m3
30,900.99 M3
91,769.50 m3
216,650.00 m3
187,000.00 m3

339,015.00 m3
669,132.50 m3
673,572.50 m3
178,180.00 m2
201,200.00 m2

40,411.00 m2
35,175.00 m2

987,841.23 m3
935,660.63 m3
882,718.66 m3
766,923.50 m3
KERJAAN

Harga satuan
103,900.00 m1
15,735.00 kg

68,275.00 m2
193,325.00 m2
192,908.33 m2
281,920.00 m2
48,300.00 m1

32,737.50 kg
24,415.00 kg
1,396,313.33 M2
1,175,804.55 M2
27,945.00 kg

233,675.56 m1
1,547,472.78 m2
1,056,861.67 m2
741,161.67 m2
332,750.00 bh

56,710.00 m2
159,700.00 m2
121,795.00 m2
60,000.00 m1
144,463.00 m2
130,902.39 m2
56,350.00 m1
59,132.50 m1
120,120.00 m1
12,865.00 m1
35,200.00 Set
KERJAAN

Harga satuan
44,475.00 m2

196,325.00 bh
41,032.50 bh
64,048.75 bh
28,400.00 bh
38,400.00 bh
135,548.75 m2
146,548.75 m2

51,385.83 M2
22,144.00 M2
34,455.00 M2
28,882.78 M2
54,166.11 M2
26,063.89 M2
19,644.50 M2
KERJAAN

Harga satuan

5,608,375.40 Unit
101,050.00 titik
239,850.00 titik
70,850.00 titik
38,475.00 titik
42,860.00 titik
8,281,500.00 set
1,398,355.00 titik
314,755.00 titik
118,355.00 titik
102,605.00 titik
81,605.00 titik
76,355.00 titik
498,205.00 titik

132,719.44 m2
132,955.00 m2
109,057.00 m2
154,557.00 m2
192,850.00 m2

502,450.00 bh
1,239,000.00 set
51,725.00 bh
482,240.00 bh
2,560,165.00 set
21,265.00 m1
117,922.50 m1
1,252,450.00 bh
1,666,050.00 bh
61,400.00 m1
41,325.00 bh
375,465.00 m1
424,465.00 m1
3,604,000.00 bh
KERJAAN

Harga satuan
15,000,000.00 Ls
2,800,000.00 Ls
18,097.50 bh

705,845.00 m1
637,340.57 m1
1,148,601.83 m1
195,143.57 m1
3. PRICE SCHEDULE ANALYSIS
PEMBANGUNAN PLTM
RINCIAN PEKERJAAN PERSIAPAN
###

No. Uraian Satuan Volume

3.1.3 KANTOR/DIREKSI KEET UNTUK REKANAN DAN PLN


1 Biaya Pembangunan Rumah
- Pembangunan Rumah Operator Unit 1.00
2 Biaya Lain-Lain
a Pemasangan kawat berduri dan tiang beton per 2 m, tinggi 1.8 m dll m 67.00
b Pembuatan dan penggalian sumur m 15.00
c Pengadaan dan pemasangan pompa air listrik buah 1.00
d Pengadaan dan pemasangan pipa PVC tipe AW, dia.3/4" dan asesoris m 50.00
e Buis Beton, Dia. 80 cm m 16.00
f Pengadaan jaringan instalasi listrik (1300 watt) buah 1.00
g Stop Kran, kran dia. 3/4" & etc. unit 2.00
h Bak Pembersih/penyaringan Air Unit 2.00
i Pengadaan dan pembuatan konstruksi baja sederhana untuk reservoir kg 300.00
air setinggi 3,0 m (pakai besi suku L 30 mm x 30 mm x 3 mm).
j Tandon fiber untuk reservoir reservoir, 1000 ltr kapasitas buah 1.00
Jumlah

3.1.4 PEMBUATAN PAPAN NAMA SEMENTARA unit 1.00


Tenaga
a Tukang kayu o/h 1.00
b Pekerja o/h 2.00
Bahan
a ### m3 0.13
b Papan Kayu Klas II 8/25cm m3 0.21
c ### kg 5.50
d Cat Kayu Mutu Tinggi kg 9.00
Jumlah
Jumlah

3.1.5 PEMBUATAN PAPAN NAMA PERMANEN


Papan Nama Terbuat dari Tiang Besi dan Papan Nama dari Kayu unit 1.00
Tenaga
a Tukang kayu o/h 4.00
b Tukang las o/h 4.00
c Pekerja o/h 16.00
Bahan
a ### m1 8.00
b Batang baja L 40. 80 . 8 kg 35.00
c Kayu kelas I/Kamper ( Papan ) m3 0.21
d ### kg 2.00
3. PRICE SCHEDULE ANALYSIS
PEMBANGUNAN PLTM
RINCIAN PEKERJAAN PERSIAPAN
###

No. Uraian Satuan Volume

e Iron paint blue Emco kg 3.00


f Cat Kayu Mutu Tinggi kg 5.00
g Pondasi Beton m3 0.30
Alat
a Bold Nut Black dia 10 s/d 16 mm (5 cm) kg 0.5000
b Wire welds kg 0.5000
c ARC Welding Generator, 230 A jam 2.0000
d Dump Truck jam 1.0000
Jumlah

3.1.6 BARAK KERJA UNTUK REKANAN


a Pembangunan rumah type semi permanen m2 60.00
b Pengadaan dan pembuatan konstruksi baja sederhana untuk reservoir kg 300.00
air setinggi 3,0 m (pakai besi suku L 30 mm x 30 mm x 3 mm).

c Tandon fiber untuk reservoir reservoir, 1000 ltr kapasitas buah 1.00
d Pengadaan dan pemasangan pompa air listrik buah 1.00
e Pengadaan dan pemasangan pipa PVC tipe AW, dia.3/4" dan asesoris m 30.00
Jumlah
3. PRICE SCHEDULE ANALYSIS
PEMBANGUNAN PLTM
RINCIAN PEKERJAAN PERSIAPAN
###

No. Uraian Satuan Volume

3.1.7 PEMBERSIHAN DAN PENATAAN LOKASI


Tenaga
Tukang kayu hari 6
Pekerja hari 30
Alat
Alat Bantu set 1
Jumlah
3.1.8 PENGUKURAN/BOUWPLANK DAN SETTING OUT (UITZET)
Tenaga
a Juru Ukur hari 1.00
b Tukang kayu hari 2.00
c Pekerja hari 6.00
Bahan
a Kayu Balok m3 1.50
b Kayu Papan m3 1.04
Alat
a Waterpass dan Assesoris unit 2.00
b Theodolite dan Assesoris unit 1.00
Jumlah
3.1.9 PENYEDIAAN AIR KERJA
a pengadaan pompa air unit 1.00
b Tandon fiber untuk reservoir reservoir, 500 ltr kapasitas unit 2.00
c Pengadaan dan pemasangan pipa PVC tipe AW, dia.3/4" dan asesoris m 10.00
Jumlah
3.1.10 LISTRIK UNTUK BEKERJA
pengadaan genset dan asesoris unit 1.00
Jumlah
3.2 PEMBUATAN GAMBAR KONSTRUKSI, GAMBAR KERJA ( SHOP
DRAWING ) & AS BUILT DRAWING
a Pembuatan Gambar Kerja (Shop Drawing) tahap Pelaksanaan u/ Pek. exemplar 4.00
SIPIL, E&M, METAL DLL
b Pembuatan Gambar As-Build Drawings exemplar 4.00
c Laporan Final exemplar 4.00
i Laporan Bulanan exemplar 48.00
ii Foto dokumentasi (digital file) exemplar 48.00
Jumlah
Harga Satuan Total Harga
(Rp.) (Rp.)

#REF! #REF!

45,000 3,015,000
100,000 1,500,000
650,000 650,000
32,000 1,600,000
250,000 4,000,000
1,500,000 1,500,000
185,000 370,000
16,000,000 32,000,000
14,000.00 4,200,000

750,000 750,000
Jumlah #REF!

1,565,631.50 1,565,632

50,000.00 50,000
40,000.00 80,000

#N/A #N/A
#N/A #N/A
#N/A #N/A
35,000.00 315,000
Jumlah #N/A
Jumlah #N/A

4,500,000.00 4,500,000

50,000.00 200,000
50,000.00 200,000
40,000.00 640,000

#N/A #N/A
16,000.00 560,000
4,500,000.00 945,000
#N/A #N/A
Harga Satuan Total Harga
(Rp.) (Rp.)
88,889.00 266,667
35,000.00 175,000
882,718.66 264,816

14,000.00 7,000
35,000.00 17,500
120,000.00 240,000
65,000.00 65,000
Jumlah 4,500,000

253,000.00 15,180,000
#N/A #N/A

750,000.00 750,000
650,000.00 650,000
32,000.00 960,000
Jumlah #N/A
Harga Satuan Total Harga
(Rp.) (Rp.)

50,000.00 300,000
40,000.00 1,200,000

1,000,000.00 1,000,000
Jumlah 2,500,000

225,000.00 225,000
50,000.00 100,000
40,000.00 240,000

#N/A #N/A
#N/A #N/A

75,000.00 150,000
1,650,000.00 1,650,000
Jumlah #N/A

650,000.00 650,000
750,000.00 1,500,000
32,000.00 320,000
Jumlah 2,470,000

4,500,000.00 4,500,000
Jumlah 4,500,000

1,875,000.00 7,500,000

1,875,000.00 7,500,000

73,000.00 3,500,000
21,000.00 1,000,000
Jumlah 19,500,000.00
3.A.8 ANALISA HARGA SATUAN
PEMBANGUNAN PUSAT LISTRIK TENAGA MINI HYDRO ( PLTM )
PEKERJAAN SIPIL ( CIVIL WORKS )
HARGA SATUAN : SALURAN, DUIKER, GORONG-GORONG, BOX, SAYAP SALUR
PLTM LELIPANG ( 1X500 kW )

NO. URAIAN PEKERJAAN SAT VOLUME

3.A.8 HARGA SATUAN : SALURAN, DUIKER, GORONG-GORONG, BOX, SAYAP SALUR


1.1. PEMBUATAN SALURAN
A. SALURAN PASANGAN BATU KALI TANPA PLESTER TYPE A
1. Galian Tanah M3 2.300
2. Galian Tanah Cadas M3 0.575
3. Pemadatan, Perataan/Pembuangan tanah M3 2.875
4. Pasangan Batu Belah 1 : 4 M3 0.875
5. Plesteran 1 : 4 t = 1.5 cm M2 0.600
6. Plesteran 1 : 2 t = 1.5 cm M2 1.500
7. Siaran 1 : 2 M2 2.360
8. Drainage Hole/Pipa Suling bh 2.000
Harga Satuan Saluran Type A per M'

SALURAN TYPE A'


1. Galian Tanah M3 1.800
2. Galian Tanah Cadas M3 0.450
3. Pemadatan, Perataan/Pembuangan tanah M3 2.250
4. Pasangan Batu Belah 1 : 4 M3 0.750
8. Drainage Hole/Pipa Suling bh 2.000
Harga Satuan Saluran Type A' per M'

B. SALURAN TYPE B 0.20


1. Galian Tanah M3 0.219
2. Galian Tanah Cadas M3 0.055
3. Pemadatan, Perataan/Pembuangan tanah M3 0.274
4. Pasangan Batu Belah 1 : 4 M3 0.603
5. Plesteran 1 : 4 t = 1.5 cm M2 0.600
6. Plesteran 1 : 2 t = 1.5 cm M2 0.300
7. Siaran 1 : 2 M2 1.955
8. Drainage Hole/Pipa Suling bh 2.000
Harga Satuan Saluran Type B per M'

C. SALURAN TYPE C 0.20


1. Galian Tanah M3 0.209
2. Galian Tanah Cadas M3 0.052
3. Pemadatan, Perataan/Pembuangan tanah M3 0.262

153
3.A.8 ANALISA HARGA SATUAN
PEMBANGUNAN PUSAT LISTRIK TENAGA MINI HYDRO ( PLTM )
PEKERJAAN SIPIL ( CIVIL WORKS )
HARGA SATUAN : SALURAN, DUIKER, GORONG-GORONG, BOX, SAYAP SALUR
PLTM LELIPANG ( 1X500 kW )

NO. URAIAN PEKERJAAN SAT VOLUME

4. Pasangan Batu Belah 1 : 4 M3 0.273


5. Plesteran 1 : 4 t = 1.5 cm M2 0.600
6. Plesteran 1 : 2 t = 1.5 cm M2 0.300
7. Siaran 1 : 2 M2 0.872
8. Drainage Hole/Pipa Suling bh 2.000
Harga Satuan Saluran Type C per M'

D. SALURAN TYPE D 0.20


1. Galian Tanah M3 0.608
2. Galian Tanah Cadas M3 0.152
3. Pemadatan, Perataan/Pembuangan tanah M3 0.760
4. Pasangan Batu Belah 1 : 4 M3 0.340
5. Plesteran 1 : 4 t = 1.5 cm M2 0.600
6. Plesteran 1 : 2 t = 1.5 cm M2 0.500
7. Siaran 1 : 2 M2 0.677
8. Drainage Hole/Pipa Suling bh 2.000
Harga Satuan Saluran Type D per M'

E. SALURAN TYPE W 40/70


PANJANG : M' 1.00
1. Galian Tanah M3 1.30
2. Urugan Kembali M3 0.56
4. Pasangan Batu Belah 1 : 4 M3 0.45
5. Plesteran 1 : 4 M2 2.44
6. Pipa PVC dia 2 " M' 1.33

F. SALURAN TYPE W 40/70 TERTUTUP


PANJANG : M' 1.00
1. Galian Tanah M3 1.70
2. Urugan Kembali M3 0.43
3. Urugan Pasir M3 0.25
4. Pasangan Batu Belah 1 : 4 M3 0.94
5. Plesteran 1 : 4 M2 1.84
6. Pipa PVC dia 2 " M' 0.70
7. Beton K.225 M3 0.17
8. Tulangan beton 110 kg/m3 kg 18.15

154
3.A.8 ANALISA HARGA SATUAN
PEMBANGUNAN PUSAT LISTRIK TENAGA MINI HYDRO ( PLTM )
PEKERJAAN SIPIL ( CIVIL WORKS )
HARGA SATUAN : SALURAN, DUIKER, GORONG-GORONG, BOX, SAYAP SALUR
PLTM LELIPANG ( 1X500 kW )

NO. URAIAN PEKERJAAN SAT VOLUME

G. SALURAN TYPE W 30/40


PANJANG : M' 1.00
1. Galian Tanah M3 0.60
2. Urugan Kembali M3 0.37
3. Urugan Pasir M3 0.06
4. Pasangan Batu Bata 1 : 4 M3 0.17
5. Plesteran 1 : 4 M2 1.60

H. SALURAN TYPE W 30/40 TERTUTUP


PANJANG : M' 1.00
1. Galian Tanah M3 0.60
2. Urugan Kembali M3 0.37
3. Urugan Pasir M3 0.06
4. Pasangan Batu Bata 1 : 4 M3 0.17
5. Plesteran 1 : 3 M2 1.10
6. Beton K225 M3 0.06
6. Tulangan beton 120 kg/m3 kg 6.60

I. SALURAN TANAH
1. Galian Tanah M3 0.375
2. Pemadatan, Perataan/Pembuangan tanah M3 0.375
Harga Satuan Saluran Tanah per M'

PERBAIKAN SALURAN
J. PERBAIKAN SALURAN PASANGAN BATU KALI/BELAH
1. Pasangan Batu Belah 1 : 4 M2 0.180
2. Plesteran 1 : 4 t = 1.5 cm M2 0.130
3. Plesteran 1 : 2 t = 1.5 cm M2 0.120
4. Siaran 1 : 2 M2 0.850
5. Drainage Hole/Pipa Suling bh 1.000
Harga Satuan Saluran Type A per M'

K. PERBAIKAN SALURAN TANAH


1. Galian Tanah M3 0.094
2. Pemadatan, Perataan/Pembuangan tanah M3 0.094
Harga Satuan Saluran Tanah per M'

155
3.A.8 ANALISA HARGA SATUAN
PEMBANGUNAN PUSAT LISTRIK TENAGA MINI HYDRO ( PLTM )
PEKERJAAN SIPIL ( CIVIL WORKS )
HARGA SATUAN : SALURAN, DUIKER, GORONG-GORONG, BOX, SAYAP SALUR
PLTM LELIPANG ( 1X500 kW )

NO. URAIAN PEKERJAAN SAT VOLUME

1.2. PEMBUATAN DUIKER ( BOX CULVERT )


1.2.1 DUIKER TYPE A UNTUK ACCESS ROAD
1 DUIKER TYPE A' ( 1 x 1m ) H=2 m 0.00
1. Galian Tanah M3 2.250
2. Galian Tanah Cadas M3 0.750
3. Timbunan kembali M3 1.040
4. Pembuangan/perataan tanah M3 1.960
5. Pasangan Batu Belah 1 : 4 M3 0.680
6. Beton Bertulang K-225 u/ Penutup Duiker M3 0.350
7. Tulangan Beton 110 kg/m3 kg 38.500
8. Plesteran 1 : 4 t = 1.5 cm M2 3.000
Harga Satuan DUIKER TYPE A' ( 1 x 1m ) H=2 m

2 DUIKER TYPE A' ( 1 x 1.5m ) H=2 m 0.00


1. Galian Tanah M3 2.250
2. Galian Tanah Cadas M3 0.750
3. Timbunan kembali M3 0.340
4. Pembuangan/perataan tanah M3 2.660
5. Pasangan Batu Belah 1 : 4 M3 0.880
6. Beton Bertulang K-225 u/ Penutup Duiker M3 0.350
7. Tulangan Beton 110 kg/m3 kg 38.500
8. Plesteran 1 : 4 t = 1.5 cm M2 4.000
Harga Satuan DUIKER TYPE A' ( 1 x 1.5m ) H=2 m

1.2.2 DUIKER UNTUK INSITU ROAD


1 DUIKER TYPE A' 2x ( 1 x 1m ) H=2 m Insitu R 0.00
1. Galian Tanah M3 3.000
2. Galian Tanah Cadas M3 1.000
3. Timbunan kembali M3 2.080
4. Pembuangan/perataan tanah M3 1.920
5. Pasangan Batu Belah 1 : 4 M3 1.120
6. Beton Bertulang K-225 u/ Penutup Duiker M3 0.600
7. Tulangan Beton 110 kg/m3 kg 66.000
8. Plesteran 1 : 4 t = 1.5 cm M2 6.000
Harga Satuan DUIKER TYPE A' 2x ( 1 x 1m ) H=2 m Insitu R

156
3.A.8 ANALISA HARGA SATUAN
PEMBANGUNAN PUSAT LISTRIK TENAGA MINI HYDRO ( PLTM )
PEKERJAAN SIPIL ( CIVIL WORKS )
HARGA SATUAN : SALURAN, DUIKER, GORONG-GORONG, BOX, SAYAP SALUR
PLTM LELIPANG ( 1X500 kW )

NO. URAIAN PEKERJAAN SAT VOLUME

DUIKER TYPE B UNTUK INSITU ROAD


2 DUIKER TYPE B ( 1 x 1m ) H=0 m Insitu R 0.00
1. Galian Tanah M3 0.000
2. Galian Tanah Cadas M3 0.000
3. Timbunan kembali M3 1.960
4. Pembuangan/perataan tanah M3 1.960
5. Pasangan Batu Belah 1 : 4 M3 0.680
6. Beton Bertulang K-225 u/ Penutup Duiker M3 0.350
7. Tulangan Beton 110 kg/m3 kg 38.500
8. Plesteran 1 : 4 t = 1.5 cm M2 3.000
Harga Satuan DUIKER TYPE B ( 1 x 1m ) H=0 m Insitu R

3 DUIKER TYPE B ( 1 x 1.5m ) H=0 m Insitu R 0.00


1. Galian Tanah M3 0.000
2. Galian Tanah Cadas M3 0.000
3. Timbunan kembali M3 2.380
4. Pembuangan/perataan tanah M3 2.380
5. Pasangan Batu Belah 1 : 4 M3 0.880
6. Beton Bertulang K-225 u/ Penutup Duiker M3 0.350
7. Tulangan Beton 110 kg/m3 kg 38.500
8. Plesteran 1 : 4 t = 1.5 cm M2 4.000
Harga Satuan DUIKER TYPE B ( 1 x 1.5m ) H=0 m Insitu R

4 DUIKER TYPE B 2x ( 1 x 1m ) H=3 m Insitu R


1. Galian Tanah M3 4.500
2. Galian Tanah Cadas M3 1.500
3. Timbunan kembali M3 4.080
4. Pembuangan/perataan tanah M3 1.920
5. Pasangan Batu Belah 1 : 4 M3 1.120
6. Beton Bertulang K-225 u/ Penutup Duiker M3 0.600
7. Tulangan Beton 110 kg/m3 kg 66.000
8. Plesteran 1 : 4 t = 1.5 cm M2 6.000
Harga Satuan DUIKER TYPE B 2x ( 1 x 1m ) H=3 m Insitu R

5 DUIKER TYPE C ( 0,50 x 0,60 m ) 0.00


1. Galian Tanah M3 1.850

157
3.A.8 ANALISA HARGA SATUAN
PEMBANGUNAN PUSAT LISTRIK TENAGA MINI HYDRO ( PLTM )
PEKERJAAN SIPIL ( CIVIL WORKS )
HARGA SATUAN : SALURAN, DUIKER, GORONG-GORONG, BOX, SAYAP SALUR
PLTM LELIPANG ( 1X500 kW )

NO. URAIAN PEKERJAAN SAT VOLUME

2. Galian Tanah Cadas M3 0.000


3. Timbunan kembali M3 0.120
4. Pembuangan/perataan tanah M3 1.730
5. Pasangan Batu Belah 1 : 4 M3 1.015
6. Beton Bertulang K-225 u/ Penutup Duiker M3 0.160
7. Tulangan Beton 110 kg/m3 kg 17.600
8. Plesteran 1 : 4 t = 1.5 cm M2 1.700
Harga Satuan Duiker Type B per M'

5 DUIKER TYPE C ( Plat beton diatas Saluran )


6. Beton Bertulang K-225 u/ Penutup Duiker M3 0.165
Harga Satuan Duiker Type C per M'

1.3. TEMBOK SAYAP, TEMBOK PENGAMAN, TEMBOK PENGAMAN ALIRAN


1.3.1 TEMBOK SAYAP
1 TEMBOK SAYAP DUIKER TYPE B ( 1 X 1.5 m )
1. Galian Tanah M3 3.750
2. Timbunan kembali M3 0.563
3. Pasangan Batu Belah 1 : 4 M3 1.278
4. Plesteran 1 : 4 t = 1.5 cm M2 2.433
Harga Satuan Tembok Sayap Duiker A

2 TEMBOK SAYAP DUIKER TYPE B 2X( 1 X 1 m )


1. Galian Tanah M3 5.625
3. Timbunan kembali M3 0.844
1. Pasangan Batu Belah 1 : 4 M3 2.659
3. Plesteran 1 : 4 t = 1.5 cm M2 5.064
Harga Satuan Tembok Sayap Duiker A

3 TEMBOK SAYAP DUIKER TYPE B ( 1 X 1 m )


1. Galian Tanah M3 3.000
3. Timbunan kembali M3 0.450
1. Pasangan Batu Belah 1 : 4 M3 1.190
3. Plesteran 1 : 4 t = 1.5 cm M2 2.267
Harga Satuan Tembok Sayap Duiker A

158
3.A.8 ANALISA HARGA SATUAN
PEMBANGUNAN PUSAT LISTRIK TENAGA MINI HYDRO ( PLTM )
PEKERJAAN SIPIL ( CIVIL WORKS )
HARGA SATUAN : SALURAN, DUIKER, GORONG-GORONG, BOX, SAYAP SALUR
PLTM LELIPANG ( 1X500 kW )

NO. URAIAN PEKERJAAN SAT VOLUME

1.3.2 TEMBOK PENGAMAN DI SISI JALAN


1 TEMBOK PENGAMAN L=3,7m H = 0.6 m DUIKER TYPE A
1. Galian Tanah M3 0.190
2. Timbunan kembali M3 0.063
3. Pembuangan/perataan tanah M3 0.127
4. Pasangan Batu Belah 1 : 4 M3 0.721
5. Plesteran 1 : 4 t = 1.5 cm M2 5.110
6. Acian dengan semen M2 5.110
Harga Satuan TEMBOK PENGAMAN L=3,7m H = 0.60m per bh

2 TEMBOK PENGAMAN L=3.0 m T = 0.60 m DUIKER TYPE B


1. Galian Tanah M3 0.190
2. Timbunan kembali M3 0.063
3. Pembuangan/perataan tanah M3 0.127
4. Pasangan Batu Belah 1 : 4 M3 0.541
5. Plesteran 1 : 4 t = 1.5 cm M2 3.550
6. Acian dengan semen M2 3.550
Harga Satuan TEMBOK PENGAMAN L=3.0m T = 0.60 m per bh

1.3.3 TEMBOK PENGAMAN ALIRAN


1 TEMBOK PENGAMAN ALIRAN L=11.5
1. Galian Tanah M3 4.320
2. Timbunan kembali M3 1.440
3. Pembuangan/perataan tanah M3 2.880
4. Beton Bertulang K-225 M3 0.336
5. Tulangan Beton 110 kg/m3 kg 36.960
6. Pasangan Batu Belah 1 : 4 M3 8.824
7. Plesteran 1 : 4 t = 1.5 cm M2 36.636
8. Acian dengan semen M2 36.636
Harga Satuan TEMBOK PENGAMAN L=11,5m H = 2,0m per unit

1.4. GORONG-GORONG ( PIPE CULVERT )


1.4.1 GORONG-GORONG TYPE A
1 GORONG-GORONG TYPE A1 (Ø1 m) H=1.5 m
1 Galian Tanah M3 1.688
2 Galian Tanah Cadas M3 0.563
3 Timbunan kembali M3 1.120

159
3.A.8 ANALISA HARGA SATUAN
PEMBANGUNAN PUSAT LISTRIK TENAGA MINI HYDRO ( PLTM )
PEKERJAAN SIPIL ( CIVIL WORKS )
HARGA SATUAN : SALURAN, DUIKER, GORONG-GORONG, BOX, SAYAP SALUR
PLTM LELIPANG ( 1X500 kW )

NO. URAIAN PEKERJAAN SAT VOLUME

4 Pembuangan/perataan tanah M3 1.130


5 Beton Lantai Kerja t. 10 cm M3 0.150
6 Plesteran 1 : 4 t = 4 cm di sambungan M2 0.565
Harga Satuan GORONG-GORONG TYPE A1 (Ø1 m) H=1.5 m

2 GORONG-GORONG TYPE A2 (Ø1 m) H=2 m


1 Galian Tanah M3 2.250
2 Galian Tanah Cadas M3 0.750
3 Timbunan kembali M3 1.870
4 Pembuangan/perataan tanah M3 1.130
5 Beton Lantai Kerja t. 10 cm M3 0.150
6 Plesteran 1 : 4 t = 4 cm di sambungan M2 0.565
Harga Satuan GORONG-GORONG TYPE A2 (Ø1 m) H=2 m

3 GORONG-GORONG TYPE A3 (Ø1 m) H=3 m


1 Galian Tanah M3 3.375
2 Galian Tanah Cadas M3 1.125
3 Timbunan kembali M3 3.370
4 Pembuangan/perataan tanah M3 1.130
5 Beton Lantai Kerja t. 10 cm M3 0.150
6 Plesteran 1 : 4 t = 4 cm di sambungan M2 0.565
Harga Satuan GORONG-GORONG TYPE A3 (Ø1 m) H=3 m

4 GORONG-GORONG TYPE B1 (Ø0.6 m) H=2 m


1 Galian Tanah M3 1.500
2 Galian Tanah Cadas M3 0.500
3 Timbunan kembali M3 1.498
4 Pembuangan/perataan tanah M3 0.502
5 Beton Lantai Kerja t. 10 cm M3 0.100
6 Plesteran 1 : 4 t = 4 cm di sambungan M2 0.377
Harga Satuan GORONG-GORONG TYPE B1 (Ø0.6 m) H=2 m

5 GORONG-GORONG TYPE B2 (Ø0.6 m) H=3 m


1 Galian Tanah M3 2.250
2 Galian Tanah Cadas M3 0.750
3 Timbunan kembali M3 2.498
4 Pembuangan/perataan tanah M3 0.502
5 Beton Lantai Kerja t. 10 cm M3 0.100

160
3.A.8 ANALISA HARGA SATUAN
PEMBANGUNAN PUSAT LISTRIK TENAGA MINI HYDRO ( PLTM )
PEKERJAAN SIPIL ( CIVIL WORKS )
HARGA SATUAN : SALURAN, DUIKER, GORONG-GORONG, BOX, SAYAP SALUR
PLTM LELIPANG ( 1X500 kW )

NO. URAIAN PEKERJAAN SAT VOLUME

6 Plesteran 1 : 4 t = 4 cm di sambungan M2 0.377


Harga Satuan GORONG-GORONG TYPE B2 (Ø0.6 m) H=3 m

1.5. PEKERJAAN BAK KONTROL


1.5.1 BAK KONTROL
1 BAK KONTROL TYPE A 0.00
1. Galian Tanah M3 7.039
2. Galian Tanah Cadas M3 0.000
3. Pembuangan/perataan tanah M3 7.039
4. Pasangan Batu Belah 1 : 4 M3 2.572
5. Plesteran 1 : 4 t = 1.5 cm M2 7.854
Harga Satuan Bak Kontrol Type A per bh

2 BAK KONTROL TYPE B 0.00


1. Galian Tanah M3 2.038
2. Galian Tanah Cadas M3 0.000
3. Pembuangan/perataan tanah M3 2.038
4. Pasangan Batu Belah 1 : 4 M3 1.235
5. Plesteran 1 : 4 t = 1.5 cm M2 4.357
Harga Satuan Bak Kontrol Type B per bh

3 BAK KONTROL TYPE C ( 30 x 30 x 50 cm ) 0.00


1. Galian Tanah M3 0.234
2. Galian Tanah Cadas M3 0.078
3. Pembuangan/perataan tanah M3 0.156
4. Pasangan Batu Belah 1 : 4 M3 0.182
5. Plesteran 1 : 4 t = 1.5 cm M2 0.800
Harga Satuan Bak Kontrol Type C per bh

161
INI HYDRO ( PLTM )

ORONG, BOX, SAYAP SALURAN

HARGA
SATUAN JUMLAH
(Rp) (Rp)

ORONG, BOX, SAYAP SALURAN

17,625.00 40,537.50
#N/A #N/A
#N/A #N/A
669,133.00 585,491.38
35,175.00 21,105.00
40,411.00 60,616.50
21,515.00 50,775.40
80,000.00 160,000.00
#N/A

17,625.00 31,725.00
#N/A #N/A
#N/A #N/A
669,133.00 501,849.75
80,000.00 160,000.00
#N/A

17,625.00 3,863.40
#N/A #N/A
#N/A #N/A
669,133.00 403,487.20
35,175.00 21,105.00
40,411.00 12,123.30
21,515.00 42,061.83
80,000.00 160,000.00
#N/A

17,625.00 3,687.15
#N/A #N/A
#N/A #N/A

162
INI HYDRO ( PLTM )

ORONG, BOX, SAYAP SALURAN

HARGA
SATUAN JUMLAH
(Rp) (Rp)
669,133.00 182,673.31
35,175.00 21,105.00
40,411.00 12,123.30
21,515.00 18,761.08
80,000.00 160,000.00
#N/A

17,625.00 10,716.00
#N/A #N/A
#N/A #N/A
669,133.00 227,505.22
35,175.00 21,105.00
40,411.00 20,205.50
21,515.00 14,565.66
80,000.00 160,000.00
#N/A

17,625.00 22,912.50
19,300.00 10,808.00
669,133.00 301,109.85
35,175.00 85,827.00
44,500.00 59,333.33
Sub Total 479,990.68

17,625.00 29,962.50
19,300.00 8,299.00
216,650.00 54,162.50
35,175.00 33,064.50
35,175.00 64,722.00
44,500.00 31,150.00
935,661.00 154,384.07
#N/A #N/A
Sub Total #N/A

163
INI HYDRO ( PLTM )

ORONG, BOX, SAYAP SALURAN

HARGA
SATUAN JUMLAH
(Rp) (Rp)

17,625.00 10,575.00
19,300.00 7,141.00
216,650.00 12,999.00
178,180.00 29,934.24
35,175.00 56,280.00
Sub Total 116,929.24

17,625.00 10,575.00
19,300.00 7,141.00
216,650.00 12,999.00
178,180.00 29,934.24
37,294.00 41,023.40
935,661.00 56,139.66
#N/A #N/A
Sub Total #N/A

17,625.00 6,609.38
#N/A #N/A
Sub Total #N/A

669,133.00 120,443.94
35,175.00 4,572.75
40,411.00 4,849.32
21,515.00 18,287.75
8,000.00 8,000.00
156,153.76

17,625.00 1,652.34
#N/A #N/A
#N/A

164
INI HYDRO ( PLTM )

ORONG, BOX, SAYAP SALURAN

HARGA
SATUAN JUMLAH
(Rp) (Rp)

17,625.00 39,656.25
#N/A #N/A
19,300.00 20,072.00
#N/A #N/A
669,133.00 455,010.44
935,661.00 327,481.35
#N/A #N/A
35,175.00 105,525.00
#N/A

17,625.00 39,656.25
#N/A #N/A
19,300.00 6,562.00
#N/A #N/A
669,133.00 588,837.04
935,661.00 327,481.35
#N/A #N/A
35,175.00 140,700.00
#N/A

17,625.00 52,875.00
#N/A #N/A
19,300.00 40,144.00
#N/A #N/A
669,133.00 749,428.96
935,661.00 561,396.60
#N/A #N/A
35,175.00 211,050.00
#N/A

165
INI HYDRO ( PLTM )

ORONG, BOX, SAYAP SALURAN

HARGA
SATUAN JUMLAH
(Rp) (Rp)

17,625.00 0.00
#N/A #N/A
19,300.00 37,828.00
#N/A #N/A
669,133.00 455,010.44
935,661.00 327,481.35
#N/A #N/A
35,175.00 105,525.00
#N/A

17,625.00 0.00
#N/A #N/A
19,300.00 45,934.00
#N/A #N/A
669,133.00 588,837.04
935,661.00 327,481.35
#N/A #N/A
35,175.00 140,700.00
#N/A

17,625.00 79,312.50
#N/A #N/A
19,300.00 78,744.00
#N/A #N/A
669,133.00 749,428.96
935,661.00 561,396.60
#N/A #N/A
35,175.00 211,050.00

17,625.00 32,606.25

166
INI HYDRO ( PLTM )

ORONG, BOX, SAYAP SALURAN

HARGA
SATUAN JUMLAH
(Rp) (Rp)
#N/A #N/A
19,300.00 2,316.00
#N/A #N/A
669,133.00 679,170.00
935,661.00 149,705.76
#N/A #N/A
35,175.00 59,797.50
#N/A

#N/A #N/A
#N/A

ENGAMAN ALIRAN

17,625.00 66,093.75
19,300.00 10,856.25
669,133.00 854,817.41
35,175.00 85,592.50
1,017,359.91

17,625.00 99,140.63
19,300.00 16,284.38
669,133.00 1,779,057.36
35,175.00 178,136.25
2,072,618.61

17,625.00 52,875.00
19,300.00 8,685.00
669,133.00 796,268.27
35,175.00 79,730.00
937,558.27

167
INI HYDRO ( PLTM )

ORONG, BOX, SAYAP SALURAN

HARGA
SATUAN JUMLAH
(Rp) (Rp)

17,625.00 3,348.75
19,300.00 1,222.33
#N/A #N/A
669,133.00 482,612.18
35,175.00 179,744.25
6,754.00 34,512.94
#N/A

17,625.00 3,348.75
19,300.00 1,222.33
#N/A #N/A
669,133.00 362,168.24
35,175.00 124,871.25
6,754.00 23,976.70
#N/A

17,625.00 76,140.00
19,300.00 27,792.00
#N/A #N/A
935,661.00 314,382.10
#N/A #N/A
669,133.00 5,904,429.59
35,175.00 1,288,671.30
6,754.00 247,439.54

17,625.00 29,742.19
#N/A #N/A
19,300.00 21,608.28

168
INI HYDRO ( PLTM )

ORONG, BOX, SAYAP SALURAN

HARGA
SATUAN JUMLAH
(Rp) (Rp)
#N/A #N/A
766,924.00 115,038.60
35,175.00 19,880.91
#N/A

17,625.00 39,656.25
#N/A #N/A
19,300.00 36,083.28
#N/A #N/A
766,924.00 115,038.60
35,175.00 19,880.91

17,625.00 59,484.38
#N/A #N/A
19,300.00 65,033.28
#N/A #N/A
766,924.00 115,038.60
35,175.00 19,880.91
#N/A

17,625.00 26,437.50
#N/A #N/A
19,300.00 28,903.68
#N/A #N/A
766,924.00 76,692.40
35,175.00 13,253.94
#N/A

17,625.00 39,656.25
#N/A #N/A
19,300.00 48,203.68
#N/A #N/A
766,924.00 76,692.40

169
INI HYDRO ( PLTM )

ORONG, BOX, SAYAP SALURAN

HARGA
SATUAN JUMLAH
(Rp) (Rp)
35,175.00 13,253.94
#N/A

17,625.00 124,062.38
#N/A #N/A
#N/A #N/A
669,133.00 1,721,010.08
35,175.00 276,264.45
#N/A

17,625.00 35,919.75
#N/A #N/A
#N/A #N/A
669,133.00 826,646.91
35,175.00 153,257.48
#N/A

17,625.00 4,124.25
#N/A #N/A
#N/A #N/A
669,133.00 121,447.64
35,175.00 28,140.00
#N/A

170
ANALISA HARGA SATUAN
PEKERJAAN : DUIKER
#REF!

NO. URAIAN PEKERJAAN SAT VOLUME

DUIKER ( BOX CULVERT )


A. DUIKER TYPE A UNTUK ACCESS ROAD
I DUIKER TYPE A' ( 1 x 1m ) H=2 m 0.2
1. Galian Tanah M3 2.25
2. Galian Tanah Cadas M3 0.75
3. Timbunan kembali M3 1.04
4. Pembuangan/perataan tanah M3 1.96
5. Pasangan Batu Belah 1 : 4 M3 0.68
6. Beton Bertulang K-225 u/ Penutup Duiker M3 0.35
7. Tulangan Beton 110 kg/m3 kg 38.50
8. Plesteran 1 : 4 t = 1.5 cm M2 3.00
Harga Satuan DUIKER TYPE A' ( 1 x 1m ) H=2 m

II DUIKER TYPE A' ( 1 x 1.5m ) H=2 m 0.2


1. Galian Tanah M3 2.25
2. Galian Tanah Cadas M3 0.75
3. Timbunan kembali M3 0.34
4. Pembuangan/perataan tanah M3 2.66
5. Pasangan Batu Belah 1 : 4 M3 0.88
6. Beton Bertulang K-225 u/ Penutup Duiker M3 0.35
7. Tulangan Beton 110 kg/m3 kg 38.50
8. Plesteran 1 : 4 t = 1.5 cm M2 4.00
Harga Satuan DUIKER TYPE A' ( 1 x 1.5m ) H=2 m

III DUIKER TYPE A' 2x ( 1 x 1m ) H=2 m Insitu R 0.2


1. Galian Tanah M3 3.00
2. Galian Tanah Cadas M3 1.00
3. Timbunan kembali M3 2.08
4. Pembuangan/perataan tanah M3 1.92
5. Pasangan Batu Belah 1 : 4 M3 1.12
6. Beton Bertulang K-225 u/ Penutup Duiker M3 0.60
7. Tulangan Beton 110 kg/m3 kg 66.00
8. Plesteran 1 : 4 t = 1.5 cm M2 6.00
Harga Satuan DUIKER TYPE A' 2x ( 1 x 1m ) H=2 m Insitu R

B. DUIKER TYPE B UNTUK INSITU ROAD


I DUIKER TYPE B ( 1 x 1m ) H=1.47 m Insitu R 0.2
1. Galian Tanah M3 1.65
2. Galian Tanah Cadas M3 0.55
3. Timbunan kembali M3 0.25
ANALISA HARGA SATUAN
PEKERJAAN : DUIKER
#REF!

NO. URAIAN PEKERJAAN SAT VOLUME

4. Pembuangan/perataan tanah M3 1.96


5. Pasangan Batu Belah 1 : 4 M3 0.68
6. Beton Bertulang K-225 u/ Penutup Duiker M3 0.35
7. Tulangan Beton 110 kg/m3 kg 38.50
8. Plesteran 1 : 4 t = 1.5 cm M2 3.00
Harga Satuan DUIKER TYPE B ( 1 x 1m ) H=1.47 m Insitu R
ANALISA HARGA SATUAN
PEKERJAAN : DUIKER
#REF!

NO. URAIAN PEKERJAAN SAT VOLUME

II DUIKER TYPE B ( 1 x 1.5m ) H=1.47 m Insitu R 0.2


1. Galian Tanah M3 1.65
2. Galian Tanah Cadas M3 0.55
3. Timbunan kembali M3 0.18
4. Pembuangan/perataan tanah M3 2.38
5. Pasangan Batu Belah 1 : 4 M3 0.88
6. Beton Bertulang K-225 u/ Penutup Duiker M3 0.35
7. Tulangan Beton 110 kg/m3 kg 38.50
8. Plesteran 1 : 4 t = 1.5 cm M2 4.00
Harga Satuan DUIKER TYPE B ( 1 x 1.5m ) H=1.47 m Insitu R

III DUIKER TYPE B 2x ( 1 x 1m ) H=1.47 m Insitu R 0.2


1. Galian Tanah M3 2.21
2. Galian Tanah Cadas M3 0.74
3. Timbunan kembali M3 1.02
4. Pembuangan/perataan tanah M3 1.92
5. Pasangan Batu Belah 1 : 4 M3 1.12
6. Beton Bertulang K-225 u/ Penutup Duiker M3 0.60
7. Tulangan Beton 110 kg/m3 kg 66.00
8. Plesteran 1 : 4 t = 1.5 cm M2 6.00
Harga Satuan DUIKER TYPE B 2x ( 1 x 1m ) H=1.47 m Insitu R

C. DUIKER TYPE C ( 0,50 x 0,60 m ) 0.2


1. Galian Tanah M3 1.48
2. Galian Tanah Cadas M3 0.37
3. Timbunan kembali M3 0.12
4. Pembuangan/perataan tanah M3 1.73
5. Pasangan Batu Belah 1 : 4 M3 1.02
6. Beton Bertulang K-225 u/ Penutup Duiker M3 0.16
7. Tulangan Beton 110 kg/m3 kg 17.60
8. Plesteran 1 : 4 t = 1.5 cm M2 1.70
Harga Satuan Duiker Type B per M'

D. TEMBOK SAYAP
1 TEMBOK SAYAP DUIKER TYPE B ( 1 X 1.5 m )
1. Galian Tanah M3 3.75
2. Timbunan kembali M3 0.56
3. Pasangan Batu Belah 1 : 4 M3 1.28
4. Plesteran 1 : 4 t = 1.5 cm M2 2.43
Harga Satuan Tembok Sayap Duiker A
ANALISA HARGA SATUAN
PEKERJAAN : DUIKER
#REF!

NO. URAIAN PEKERJAAN SAT VOLUME

2 TEMBOK SAYAP DUIKER TYPE B 2X( 1 X 1 m )


1. Galian Tanah M3 5.63
2. Timbunan kembali M3 0.84
3. Pasangan Batu Belah 1 : 4 M3 2.66
4. Plesteran 1 : 4 t = 1.5 cm M2 5.06
Harga Satuan Tembok Sayap Duiker A

3 TEMBOK SAYAP DUIKER TYPE B ( 1 X 1 m )


1. Galian Tanah M3 3.00
2. Timbunan kembali M3 0.45
3. Pasangan Batu Belah 1 : 4 M3 1.19
4. Plesteran 1 : 4 t = 1.5 cm M2 2.27
Harga Satuan Tembok Sayap Duiker A
ANALISA HARGA SATUAN
PEKERJAAN : DUIKER
#REF!

NO. URAIAN PEKERJAAN SAT VOLUME

5 TEMBOK PENGAMAN L=3,7m H = 0.6 m DUIKER TYPE A


1. Galian Tanah M3 0.19
2. Timbunan kembali M3 0.06
3. Pembuangan/perataan tanah M3 0.13
4. Pasangan Batu Belah 1 : 4 M3 0.72
5. Plesteran 1 : 4 t = 1.5 cm M2 5.11
6. Acian dengan semen M2 5.11
Harga Satuan TEMBOK PENGAMAN L=3,7m H = 0.60m per bh

6 TEMBOK PENGAMAN L=3.0 m T = 0.60 m DUIKER TYPE B


1. Galian Tanah M3 0.19
2. Timbunan kembali M3 0.06
3. Pembuangan/perataan tanah M3 0.13
4. Pasangan Batu Belah 1 : 4 M3 0.54
5. Plesteran 1 : 4 t = 1.5 cm M2 3.55
6. Acian dengan semen M2 3.55
Harga Satuan TEMBOK PENGAMAN L=3.0m T = 0.60 m per bh

E. DUIKER TYPE C ( Plat beton diatas Saluran ) 0.2


1. Beton Bertulang K-225 u/ Penutup Duiker M3 0.17
Harga Satuan Duiker Type C per M'

F. TEMBOK PENGAMAN ALIRAN L=11.5


1. Galian Tanah M3 4.32
2. Timbunan kembali M3 1.44
3. Pembuangan/perataan tanah M3 2.88
4. Beton Bertulang K-225 u/ Penutup Duiker M3 0.34
5. Tulangan Beton 110 kg/m3 kg 36.96
6. Pasangan Batu Belah 1 : 4 M3 8.82
7. Plesteran 1 : 4 t = 1.5 cm M2 36.64
8. Acian dengan semen M2 36.64
Harga Satuan TEMBOK PENGAMAN L=11,5m H = 2,0m per unit
HARGA TOTAL
SATUAN BIAYA
(Rp) (Rp.)

17,625.00 39,656.25
#N/A #N/A
19,300.00 20,072.00
#N/A #N/A
669,132.50 455,010.10
935,660.63 327,481.22
#N/A #N/A
35,175.00 105,525.00
#N/A

17,625.00 39,656.25
#N/A #N/A
19,300.00 6,562.00
#N/A #N/A
669,132.50 588,836.60
935,660.63 327,481.22
#N/A #N/A
35,175.00 140,700.00
#N/A

17,625.00 52,875.00
#N/A #N/A
19,300.00 40,144.00
#N/A #N/A
669,132.50 749,428.40
935,660.63 561,396.38
#N/A #N/A
35,175.00 211,050.00
#N/A

17,625.00 29,147.34
#N/A #N/A
19,300.00 4,728.50
HARGA TOTAL
SATUAN BIAYA
(Rp) (Rp.)
#N/A #N/A
669,132.50 455,010.10
935,660.63 327,481.22
#N/A #N/A
35,175.00 105,525.00
#N/A
HARGA TOTAL
SATUAN BIAYA
(Rp) (Rp.)

17,625.00 29,147.34
#N/A #N/A
19,300.00 3,377.50
#N/A #N/A
669,132.50 588,836.60
935,660.63 327,481.22
#N/A #N/A
35,175.00 140,700.00
#N/A

17,625.00 38,863.13
#N/A #N/A
19,300.00 19,686.00
#N/A #N/A
669,132.50 749,428.40
935,660.63 561,396.38
#N/A #N/A
35,175.00 211,050.00
#N/A

17,625.00 26,085.00
#N/A #N/A
19,300.00 2,316.00
#N/A #N/A
669,132.50 679,169.49
935,660.63 149,705.70
#N/A #N/A
35,175.00 59,797.50
#N/A

17,625.00 66,093.75
19,300.00 10,856.25
669,132.50 854,816.77
35,175.00 85,592.50
1,017,359.27
HARGA TOTAL
SATUAN BIAYA
(Rp) (Rp.)

17,625.00 99,140.63
19,300.00 16,284.38
669,132.50 1,779,056.03
35,175.00 178,136.25
2,072,617.28

17,625.00 52,875.00
19,300.00 8,685.00
669,132.50 796,267.68
35,175.00 79,730.00
937,557.68
HARGA TOTAL
SATUAN BIAYA
(Rp) (Rp.)

17,625.00 3,348.75
#N/A #N/A
19,300.00 2,444.67
669,132.50 482,611.82
35,175.00 179,744.25
6,754.10 34,513.45
#N/A

17,625.00 3,348.75
#N/A #N/A
19,300.00 2,444.67
669,132.50 362,167.97
35,175.00 124,871.25
6,754.10 23,977.06
#N/A

935,660.63 154,384.00
154,384.00

17,625.00 76,140.00
#N/A #N/A
19,300.00 55,584.00
935,660.63 314,381.97
#N/A #N/A
669,132.50 5,904,425.18
35,175.00 1,288,671.30
6,754.10 247,443.21
#N/A
RENCANA ANGGARAN BIAYA
PEKERJAAN SALURAN
#REF!
HARGA
NO. URAIAN PEKERJAAN SAT VOLUME SATUAN
(Rp)

A. SALURAN TYPE W 40/70


PANJANG : M' 1.00
1. Galian Tanah M3 1.30 Err:504
2. Urugan Kembali M3 0.56 Err:504
4. Pasangan Batu Belah 1 : 4 M3 0.45 Err:504
5. Plesteran 1 : 4 M2 2.44 Err:504
6. Pipa PVC dia 2 " M' 1.33 Err:504
Sub Total
B. SALURAN TYPE W 40/70 TERTUTUP
PANJANG : M' 1.00
1. Galian Tanah M3 1.70 Err:504
2. Urugan Kembali M3 0.43 Err:504
3. Urugan Pasir M3 0.25 Err:504
4. Pasangan Batu Belah 1 : 4 M3 0.94 Err:504
5. Plesteran 1 : 4 M2 1.84 Err:504
6. Pipa PVC dia 2 " M' 0.70 Err:504
7. Beton K.225 M3 0.17 Err:504
8. Tulangan beton 110 kg/m3 kg 18.15 Err:504
Sub Total
C. SALURAN TYPE W 30/40
PANJANG : M' 1.00
1. Galian Tanah M3 0.60 Err:504
2. Urugan Kembali M3 0.37 Err:504
3. Urugan Pasir M3 0.06 Err:504
4. Pasangan Batu Bata 1 : 4 M3 0.17 Err:504
5. Plesteran 1 : 4 M2 1.60 Err:504
Sub Total
D. SALURAN TYPE W 30/40 TERTUTUP
PANJANG : M' 1.00
1. Galian Tanah M3 0.60 Err:504
2. Urugan Kembali M3 0.37 Err:504
3. Urugan Pasir M3 0.06 Err:504
4. Pasangan Batu Bata 1 : 4 M3 0.17 Err:504
5. Plesteran 1 : 3 M2 1.10 Err:504
6. Beton K225 M3 0.06 Err:504
7. Tulangan beton 120 kg/m3 kg 6.60 Err:504
Sub Total
TOTAL
BIAYA
(Rp.)

Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
ANALISA HARGA SATUAN
PEKERJAAN : BAK KONTROL
#REF!
HARGA
NO. URAIAN PEKERJAAN SAT VOLUME SATUAN
(Rp)

A. BAK KONTROL TYPE A 0.2


1. Galian Tanah M3 5.63 Err:504
2. Galian Tanah Cadas M3 1.41 Err:504
3. Pembuangan/perataan tanah M3 7.04 Err:504
4. Pasangan Batu Belah 1 : 4 M3 2.57 Err:504
5. Plesteran 1 : 4 t = 1.5 cm M2 7.85 Err:504
Harga Satuan Bak Kontrol Type A per bh

B. BAK KONTROL TYPE B 0.2


1. Galian Tanah M3 1.63 Err:504
2. Galian Tanah Cadas M3 0.41 Err:504
3. Pembuangan/perataan tanah M3 2.04 Err:504
4. Pasangan Batu Belah 1 : 4 M3 1.24 Err:504
5. Plesteran 1 : 4 t = 1.5 cm M2 4.36 Err:504
Harga Satuan Bak Kontrol Type B per bh

C. BAK KONTROL TYPE C ( 30 x 30 x 50 cm 0.2


1. Galian Tanah M3 0.23 Err:504
2. Galian Tanah Cadas M3 0.08 Err:504
3. Pembuangan/perataan tanah M3 0.16 Err:504
4. Pasangan Batu Belah 1 : 4 M3 0.18 Err:504
5. Plesteran 1 : 4 t = 1.5 cm M2 0.80 Err:504
Harga Satuan Bak Kontrol Type C per bh
JUMLAH
(Rp)

Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

Potrebbero piacerti anche