DATE REV. NO. DESCRIPTION Designed Checked REVISIONS EPC CONTRACTOR : CLIENT VDB PROJECTS PVT. LTD. NATIONAL HIGHWAYS AUTHORITY OF I BANGALORE (Ministry of Shipping, Road, Transport Highways) AUTHORITY ENGINEER PROOF CONSULTANT : M/S YONGMA ENGINEERING CO. LTD IN ASSOCIATION WITH STERLING INDOTECH CONSULTANTS TECHNICAL CONSULTANCY SERVICES
SAFETY CONSULTANT : DESIGN CONSULTANT :
PAVAS ENGINEERING & MANAGEME
HORIZON CONSULTANTS PVT. LTD CONSULTANTS PVT LTD, HYDERABA PROJECT : SIX LANING OF DEDICATED PORT ROAD TO KRISHNAPATNAM PORT (PACKAGE I) FROM KM. 0+000 to KM. 18+000 EPC MODE JOB No.
TOTAL NO. OF PAGES TITLE :
NAME SIGN DATE DSGN PSK 02.08.19 DESIGN OF ABUTMENT PIER AND OPEN FOUNDATION FOR FLYOVER AT CHKD MNR 02.08.19 151+400 FOR A1 & A2 DESIGN OF ABUTMENT PIER AND OPEN FOUNDATION FOR FLYOVER AT 151+400 FOR A1 & A2 APPD PRK 02.08.19 CODE DOC. No. PEMCPL/VDB/KP1/FLO/151+400/DC/201 IRC
RELEASED FOR PRELIMINARY TENDER INFORMATION P APPROVAL
MNR PRK Checked Approved
NATIONAL HIGHWAYS AUTHORITY OF INDIA
(Ministry of Shipping, Road, Transport & Highways)
TECHNICAL CONSULTANCY SERVICES
PAVAS ENGINEERING & MANAGEMENT
CONSULTANTS PVT LTD, HYDERABAD KRISHNAPATNAM PORT (PACKAGE I) FROM KM. 0+000 to KM. 18+000 ON
UTMENT PIER AND OPEN FOUNDATION FOR FLYOVER AT KM.