WASTEWATER TREATMENT SYSTEM

PT. INDURO INTERNASIONAL


Jl. Raya Pasar Kemis - Cikupa
Tangerang - Banten
INDONESIA
Tel. ( 021 ) 5902211 ( Hunting )
ENVIRONMENT
Fax. ( 021 ) 59303755 / ( 021 ) 5909501
sales@induro.co.id
www. induro.com
SOLUTIONS
Introduction Installation
LAND PREPARATION
- Make a trench and prepare the concrete foundation
- Enter the BIOCOMP ® into the trench and take a position above the concrete foundation
- Install the anchor lug
- And then connect the inlet and outlet pipe

FILLING UP & BACK FILL


BIOCOMP ® is a domestic waste water treatment system which has six - Make sure that BIOCOMP ® is in the leveling condition.
interconnection compartments with the compact design inside of it, and there - fill ¼ BIOCOMP ® with water through each manhole and each compartment.
are divided into : - Bury around BIOCOMP ® until ¼ height of tank.
- fill ½ BIOCOMP ® with water through each manhole and each compartment at the same time.
- Bury around BIOCOMP ® until ½ height of tank.
- Degradation Compartment, - Fill the BIOCOMP ® with water until full in each compartment at the same time.
- Anaerobe Compartment, - Bury the BIOCOMP ® until reach the manhole’s neck
- Anoxic Compartment, Water
- Two Aerobe Compartment,
- Filtering Compartment,
Each compartment has a different function and capability for different organic
material degradation. So the effluent of waste could be drained to the
environment, because its fulfill with Government Standard Regulation. INSTALL VENT & ELECTRICITY COMPONENT
ADVANTAGES - install the ventilation pipe as high as possible.
- install the air blower and water pump.
- Efficiency of degradation compartment with additional microorganism
- Equipped with anoxic system after anaerobe process, which is reduce the
shock loading
- Equipped with aeration system in aerobe process
- Equipped with filter in the final process
- Equipped with circulation pump for minimizing sludge
Technical Data

L
DESCRIPTION BC 0.5 BC 01 BC 02 BC 03 BC 04 BC 05 BC 06 BC 07 BC 08 BC 09 BC 10
BOD INFLUENT (gr/m³) 250 - 300 250 - 300 250 - 300 250 - 300 250 - 300 250 - 300 250 - 300 250 - 300 250 - 300 250 - 300 250 - 300
COD INFLUENT (gr/m³) 200 - 400 200 - 400 200 - 400 200 - 400 200 - 400 200 - 400 200 - 400 200 - 400 200 - 400 200 - 400 200 - 400
SS INFLUENT (gr/m³) 200 - 300 200 - 300 200 - 300 200 - 300 200 - 300 200 - 300 200 - 300 200 - 300 200 - 300 200 - 300 200 - 300
BOD EFFLUENT (gr/m³) 20 - 30 20 - 30 20 - 30 20 - 30 20 - 30 20 - 30 20 - 30 20 - 30 20 - 30 20 - 30 20 - 30
COD EFFLUENT (gr/m³) 30 - 50 30 - 50 30 - 50 30 - 50 30 - 50 30 - 50 30 - 50 30 - 50 30 - 50 30 - 50 30 - 50
SS EFFLUENT (gr/m³) 40 - 50 40 - 50 40 - 50 40 - 50 40 - 50 40 - 50 40 - 50 40 - 50 40 - 50 40 - 50 40 - 50
WASTE FLOW RATE (m³/day) 3.3 5.6 8.3 11.0 14.4 16.9 22.5 28.1 33.7 40.4 48.55
LOADING RATE Kg (BOD+SS)/day 1.38 2.34 3.47 4.64 6.04 7.12 9.46 11.78 14.14 16.98 20.39
TOTAL VOLUME TANK (m³) 5 9.75 14.43 19.31 25.16 29.64 39.39 49.06 58.89 70.65 84.83
DIMENSION OF TANK
TANK DIAMETER = D (mm) 1,200 1,750 1,750 1,750 2,000 2,500 2,500 2,500 2,500 3,000 3,000
TANK LENGTH = L (mm) 4,400 4,639 6,584 8,612 8,676 6,874 8,861 10,834 12,838 11,000 13,006
MANHOLE DIAMETER (mm) 500 500 500 500 500 500 500 500 500 500 500
Design and specification could be change without any permission.
Application Method Process Flow
Individual

Black Grey Oil &


Water Water Grease

EQUALISATION GREASE TRAP

DRAINAGE

C1 C2 C3
Complex DEGRADATION
COMPARTMENT
ANAEROBE
COMPARTMENT
ANOXIC
COMPARTMENT

C6 C5 C4
FILTERING AEROBE AEROBE
COMPARTMENT COMPARTMENT COMPARTMENT

Black Grey Oil &


Water Water Grease

CHAMBER EQUALISATION GREASE TRAP

DRAINAGE