Sei sulla pagina 1di 1

A 1 C

A1 B 2 C NOTES:-

980(ANCHORAGE)

980(ANCHORAGE)
980(ANCHORAGE)

980(ANCHORAGE)
490(ANCHORAGE)

980(ANCHORAGE)
385 385
230
1955
460
5818
385 8156 1 : REFER STAIR DRG. ALONG WITH THIS DRG.
2040 2040

230
2 : REFER DET OF BL / BLR / BLC IN STAIR DRG.
490 980 1455 1455 3-T20 3-T12 3-T20
230 230 3-T20 3-T20 3 : REFER GENERAL NOTES DRG.
3-T12 3-T16 3-T12 2-T16 3-T20
3-T12 3-T12+3-T16 1 - T12 EF 3-T20 4 : PROVIDE CAMBER OF 20mm-25mm FOR
STP 2L-T8 STP 2L-T8
CANTILEVER SLAB/BEAM WITH SPAN

535
SFR 1-T12EF

385

385
STP 2L-T8
150(ANCHORAGE)

784(ANCHORAGE)

784(ANCHORAGE)

784(ANCHORAGE)
3-T12 2-T16 2-T16 2-T16 4-T20
LESS THAN 6 FEET.
490 970 970 3-T12 2-T16+2-T16 4-T20 4-T20 5 : PROVIDE CAMBER OF 30mm-40mm FOR
1360 1360
T8-2LEGGED T8-2LEGGED
(LOC: 0 TO 490) (LOC: 970 TO 1455) (LOC: 0 TO 1360) CANTILEVER SLAB/BEAM MORE THAN 6 FEET.
@150 C/C @150 C/C
T8-2LEGGED T8-2LEGGED T8-2LEGGED

SECTION 1-1 (B1) SECTION 2-2 (B2)


@125 C/C @175 C/C @150 C/C
SECTION 1-1 (B3) 6 : PROVIDE THROUGHOUT RCC LINTEL & SILL
OVER ALL WALLS.
C11 2 2719 2719
C2 C3 C4 C5
7 : CHECK THE STRUCTURAL DRG. WITH ARCH.
B1:230x385 B2:230x385 1 B3:230x535 DRG / ELEVATION / SECTION / 3D.
8 : IF ANY AMBIGUITY FOUND ,
CONTACT STRUCTURE ENGG.
A1 B 2 C A1 B 2 C IMMEDIATELY BEFORE STARTING WORK.

490(ANCHORAGE)

784(ANCHORAGE)
490(ANCHORAGE)

784(ANCHORAGE)
784(ANCHORAGE)
230
1955
460
5818
385
230

2032
305

5972
230

9 : FOLLOW ONLY ARCHITECTURAL DIMENSIONS.


490 785 1455 1455
510 980 1495 1495
10 : STRUCTURE ENGINEER IS NOT RESPONSIBLE
3-T16 3-T16 4-T12 3-T16 230 230 230 IF ANY ACCIDENT OCCURS ON SITE
3-T16 3-T16 3-T12 3-T16 3-T12 3-T16 230

3-T10
3-T16
3-T12
DUE TO CONSTRUCTION FAULTS.
3-T16 3-T16
11 : CHECK THE POSITION OF FC WITH

535

385
535
STP 2L-T8 STP 2L-T8 STP 2L-T8

150(ANCHORAGE)

784(ANCHORAGE)

385
588(ANCHORAGE)

784(ANCHORAGE)
3-T12 2-T16 3-T16 2-T16 STP 2L-T8 ARCH. DRG
3-T20 3-T20
3-T12 3-T20 3-T12 3-T12
3-T20 510 995 995 3-T16
12 : GET IT APPROVED BY ARCHITECT BEFORE
590 970 970
(LOC: 0 TO 490) (LOC: 970 TO 1455) 17-2L-T8
@130 C/C
17-2L-T8
@130 C/C
6-2L-T8
@285 C/C
17-2L-T8
@130 C/C
(LOC: 0 TO 510) (LOC: 995 TO 1495) STARTING EXECUTION OF WORK.
17-2L-T8
@130 C/C
46-2L-T8
@130 C/C SECTION 1-1 (B4) SECTION 2-2 (B5) SECTION 1-1 (B6) SECTION 2-2 (B7)
1991 1991

C61 C7 C8 C9 C10 C11


2 1 2

B4:230x535 B5:230x535 B6:230x385 B7:230x385

1 1 2 2 3 3 4
784(ANCHORAGE)

588(ANCHORAGE)
305 305 460 305
2695 4618 4618 1050

230 230 230


785 785 1155 1155 1155 1575

3-T16 2-T16 3-T16 3-T12 3-T16 3-T12 3-T12 3-T16 3-T12 3-T12 CONCRETE GRADE

385

385

385
STP 2L-T8 STP 2L-T8 STP 2L-T8 ITEM GRADE
3-T12 3-T12 3-T12

588(ANCHORAGE)
COLUMN M25
150 3-T12 3-T12 3-T12 3-T12
675 (LOC: 0 TO 785) (LOC: 1155 TO 3464) (LOC: 3462 TO 4618) FOOTING M25
11-2L-T8
@285 C/C
37-2L-T8
@130 C/C
37-2L-T8
@130 C/C
SECTION 1-1 (B8) SECTION 2-2 (B9) SECTION 3-3 (B10) SLAB M25
BEAM M25
USE STEEL GRADE Fe 500-D
C9 1 C6 2 C4 3 C1
B8/B17:230x385 B9/B18:230x385 B10/B19:230x385 BR10/BR19:230x385
1 1 2 2 3 3 4
784(ANCHORAGE)

588(ANCHORAGE)
305 305 460 305
2695 4618 4618 1050

230 230 230


785 785 1155 1155 1155 1575

3-T12 2-T16 3-T12 3-T16 4-T16 3-T16 3-T16 3-T16 3-T16 3-T10 3-T12

535

535

535
STP 2L-T8 STP 2L-T8 STP 2L-T8
3-T10 3-T12 3-T12

588(ANCHORAGE)
150 4-T20 4-T20 3-T12 3-T12
675 (LOC: 0 TO 785) (LOC: 1155 TO 3464) (LOC: 3462 TO 4618)
11-2L-T8
@285 C/C
37-2L-T8
@130 C/C
37-2L-T8
@130 C/C
SECTION 1-1 (B8) SECTION 2-2 (B9) SECTION 3-3 (B10)

C9 1 C6 2 C4 3 C1
B11:230x535 B12:230x535 B13:230x535 BR13:230x535

1 1 2 2 3 3 4

1050

230 230 230


230 305 1155 230 1155 305
2695 4618 4618

3-T12 3-T16 3-T12 3-T20 3-T12 3-T12 3-T16 3-T10 3-T12

385

385

385
STP 2L-T8 STP 2L-T8 STP 2L-T8
3-T10 3-T12 3-T12
115 3-T20 3-T16 3-T12 3-T12
37-2L-T8
(LOC: 0 TO 785) (LOC: 1155 TO 3464)
11-2L-T8 37-2L-T8
@285 C/C @130 C/C @130 C/C (LOC: 3462 TO 4618)
SECTION 1-1 (B8) SECTION 2-2 (B9) SECTION 3-3 (B10)
B2 1 B3 2 B5 3 B7
B14:230x385 B15:230x385 B16:230x385 BR16:230x385

1 1 2 2 3 3 4

230
230 305 1155 230 1155 230
2200 3055 3055

3-T10 3-T10 3-T10 3-T10 3-T10 3-T10


385

STP 2L-T8
3-T12
115 3-T12 3-T12 3-T12
37-2L-T8
(LOC: 0 TO 785)
11-2L-T8 37-2L-T8
@285 C/C @130 C/C @130 C/C

SECTION 1-1
BR10 1 BR13 2 BR16 3 BR19
(B20)
B20:230x385 B20:230x385 B20:230x385
DRAWING TITLE:

FLOOR BEAM

DRG N0 : 02

SCALE: N.T.S. SHEET: A3 N

Potrebbero piacerti anche