Sei sulla pagina 1di 1

Assignment 2 - Project Scope, Assumptions and Risk Management

Subject: Hong Kong International Airport

While this assignment will not be graded, submission of this assignment is a pre-requisite to grading the
assignments, No. 3 & 4

After watching the video (on your own), please submit your deliverable, including,
A. Project Charter, consisting of the brief description of the project and the need for the project (commercial,
technical, strategic etc.,) – Critical content
B. Project Scope with WBS Level 1 – Critical Content
C. Project Risks - Project Risk identification must be represented by Risk Breakdown Structure (RBS) and must
include probability of occurrence and impact of the risk – Critical Content

Constraints for the assignment:


1. Maximum of 2 pages for the assignment
2. All answers ONLY in bullet form
3. Answers will have be listed under the respective heads above (not a free flowing format)

© Copyright 2018 Kalyanaraman Subramaniam Page 1 of 1