Sei sulla pagina 1di 1

Project: SMC MANUFACTURING (VIETNAM) 1st FACTORY - FACTORY 10 FOR PRODUCTION WORK Date: 29-Oct-19

Subject: UTILITY SYSTEM - Request for Builder Rev. 01


No. Item W D H Weight Set Area Location Remarks
mm mm mm kg m2
1. Foundation for Cooling tower and cooling pump
Concrete base for Cooling
400 x 400 x 500 6
Tower -01
2,150
Concrete base for Cooling
400 x 400 x 600 1
Tower - 01
1 Cooling Yard RFB-01
Concrete base for Cooling
400 x 400 x 500 6
Tower - 02
2,150
Concrete base for Cooling
400 x 400 x 600 1
Tower - 02
Concrete base for Cooling
2 3,000 x 2,000 x 250 756 1 Cooling Yard RFB-01
Water Pump
Concrete base for Cooling
3 800 x 500 x 250 250 1 Cooling Yard RFB-01
Control Panel
Concrete base for
4 submersible pump Control 400 x 500 x 250 40 1 Cooling Yard RFB-01
Panel
2. Sumpit size
1 Sumpit PD-01 2,200 x 1,300 x 1,500 1 Cooling Yard RFB-01
3. Wall opening & flashing

Steel wall opening for RFB-02


1 700 x x 300 0.21 1 Factory 10 - External wall
cooling piping ( Included Flashing)
Steel wall opening for FF-
2 CDA-WS-Drain piping on 1,000 x x 300 0.30 1 Factory 10 - External wall RFB-02
pipe rack - factory 10 side
Brick wall opening for FF-
3 CDA-WS-Drain piping on 1,000 x x 300 0.30 1 Factory 10 - Utility RFB-02
pipe rack - Utility side
Brick wall opening WS -
4 CDA piping for acid tank - 250 x x 200 0.05 1 Factory 10 - Utility RFB-02
Utility side
Brick wall opening WS
5 piping for sus sink- Utility 200 x x 200 0.04 1 Factory 10 - Utility RFB-02
side
Brick wall opening Drain
6 piping on pipe rack - Utility 250 x x 200 0.05 1 Factory 10 - Utility RFB-02
side
4. Pipe rack
Cooling Yard => Sub- RFB-03
1 Pipe rack cross main road 1
building 2 (Design by KVN)

5. Celing opening & finishing

1 for CDA and WS Ø60mm 6 Acid clean room ceiling RFB-04