Project: SMC MANUFACTURING (VIETNAM) 1st FACTORY - FACTORY 10 FOR PRODUCTION WORK Date: 29-Oct-19
Subject: UTILITY SYSTEM - Request for Builder Rev. 01
No. Item W D H Weight Set Area Location Remarks mm mm mm kg m2 1. Foundation for Cooling tower and cooling pump Concrete base for Cooling 400 x 400 x 500 6 Tower -01 2,150 Concrete base for Cooling 400 x 400 x 600 1 Tower - 01 1 Cooling Yard RFB-01 Concrete base for Cooling 400 x 400 x 500 6 Tower - 02 2,150 Concrete base for Cooling 400 x 400 x 600 1 Tower - 02 Concrete base for Cooling 2 3,000 x 2,000 x 250 756 1 Cooling Yard RFB-01 Water Pump Concrete base for Cooling 3 800 x 500 x 250 250 1 Cooling Yard RFB-01 Control Panel Concrete base for 4 submersible pump Control 400 x 500 x 250 40 1 Cooling Yard RFB-01 Panel 2. Sumpit size 1 Sumpit PD-01 2,200 x 1,300 x 1,500 1 Cooling Yard RFB-01 3. Wall opening & flashing
Steel wall opening for RFB-02
1 700 x x 300 0.21 1 Factory 10 - External wall cooling piping ( Included Flashing) Steel wall opening for FF- 2 CDA-WS-Drain piping on 1,000 x x 300 0.30 1 Factory 10 - External wall RFB-02 pipe rack - factory 10 side Brick wall opening for FF- 3 CDA-WS-Drain piping on 1,000 x x 300 0.30 1 Factory 10 - Utility RFB-02 pipe rack - Utility side Brick wall opening WS - 4 CDA piping for acid tank - 250 x x 200 0.05 1 Factory 10 - Utility RFB-02 Utility side Brick wall opening WS 5 piping for sus sink- Utility 200 x x 200 0.04 1 Factory 10 - Utility RFB-02 side Brick wall opening Drain 6 piping on pipe rack - Utility 250 x x 200 0.05 1 Factory 10 - Utility RFB-02 side 4. Pipe rack Cooling Yard => Sub- RFB-03 1 Pipe rack cross main road 1 building 2 (Design by KVN)
5. Celing opening & finishing
1 for CDA and WS Ø60mm 6 Acid clean room ceiling RFB-04