Sei sulla pagina 1di 5

JASH Engineering Ltd., Procedure No.

Indore (M.P.), INDIA JASH/HT/ZVV/001 Rev. 00


Procedure for
Shop Test – Hydro Test of Valves Date : 10/06/2019
Page 1 of 5

Shop Testing Procedure For Hydro Test of Valves

For
Zero Velocity Valve

Signature & Date

Name : Praveen Sherke Manoj Agarwal Rohit RATHI


Designation : Engineer Manager QA Sr Manager (QA)
Prepared By Verified By Approved

Scope :
1
This procedure covers the instruction and setup required for pressure testing of Zero velocity Valves.
Reference Standards:
JASH Engineering Ltd., Procedure No.
Indore (M.P.), INDIA JASH/HT/ZVV/001 Rev. 00
Procedure for
Shop Test – Hydro Test of Valves Date : 10/06/2019
Page 2 of 5

Following are the reference standards that refers to generate the standard procedure for shop testing
of the product, unless otherwise specified specifically latest edition of documents shall be referred.

Standard Description Applicable


ASME B31.3 Process Piping √
Data Sheet Approved reference document √
QAP As applicable √
Drawing Approved √

Quality Requirements of Test medium:


The fluid shall be water unless there is the possibility of damage due to freezing or to adverse effects of
water on the valve or the process. In that case, another non-toxic liquid may be used.
* Unless otherwise stated / specified the test medium shall be potable water, with Chloride level below
75 ppm.

Test Preparation:
Calibrated pressure gauges shall be used for test, test pressure shall be within 1/3 rd to 2/3rd of the gauge
range.
The accuracy of the pressure gauges shall be 2% at full scale. The Dial size of the gauge shall be at least
4” / 100 mm. One pressure gauge shall be used as per the sketch attached.
The test shall be carried out at ambient temperature.

Test Procedure -
Hydro Leak Test Procedure Based on ASME B31.1
1. All the valves shall bear Jash serial no / Customer tag no if any – punched on the Skirt / Flange for
verification purposes.
2. Before hydro testing - All NDE and Visual Examination of welds shall be completed in accordance to
QAP /contractual agreement. All the material test certificate of the raw materials / components to
be verified with specifications as per agreed BOM of GA Drawing.
3. The valve surfaces external as well as internal shall be in uncoated condition at the time of test.
2
JASH Engineering Ltd., Procedure No.
Indore (M.P.), INDIA JASH/HT/ZVV/001 Rev. 00
Procedure for
Shop Test – Hydro Test of Valves Date : 10/06/2019
Page 3 of 5

4. The assembled valve shall be filled with the test fluid water allowing the air to escape from the vent
provided on the highest point of the assembly ensuring there is no air entrapped in the valve. The
valve shall be slowly pressurized up to the required test pressure i.e. 150 % of the working pressure
or Design Pressure in kg/cm2 of Gauge Pressure.
Pressure shall be continuously maintained for a minimum time of 15 minutes.
After holding time is complete the valve shall be examined visually for any sign of leakage under the
test pressure.
Acceptance Criteria - (a) There shall be no pressure drop during the test.
(b) There shall be no leakage from the weld or parent metal.
(c) There shall be no sign of permanent distortion / deformation.
The valve will be depressurized after the test and visual examination is complete.
5. The water shall be drained from the valve and then dried by blowing compressed air.

Schematic Sketch for Test Setup

3
JASH Engineering Ltd., Procedure No.
Indore (M.P.), INDIA JASH/HT/ZVV/001 Rev. 00
Procedure for
Shop Test – Hydro Test of Valves Date : 10/06/2019
Page 4 of 5

4
JASH Engineering Ltd., Procedure No.
Indore (M.P.), INDIA JASH/HT/ZVV/001 Rev. 00
Procedure for
Shop Test – Hydro Test of Valves Date : 10/06/2019
Page 5 of 5

Hydrostatic Test Report

Date : _____________

Customer : _________________________________________________

Valve Serial No : - _________________________________________________

Valve Tag No (If Any)- _________________________________________________

Approved GA Drawing No: _________________________________________________

Test Procedure : _________________________________________________

Test Medium : Water Temperature : ___________oC

Size of Valve Pressure Gauge Pressure Test Test Observation


Calibration Pressure Duration
(mm) Range / Calibration
Certificate no (Gauge)
Due Date Minutes
Kg/cm 2

Body Hydro Test

Test Results - VALVE IS ACCEPTED / REJECTED

Signature Signature Signature


(JEL)
Name Name Name

QA Engineer TPI / Customer Client

Potrebbero piacerti anche