Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
PREPARED BY
SHARVINDIRAN RAMAYA
01DAD16F1009
AT
(AUTOMOTIVE)
DECEMBER 2018
DEDICATION
ii
APPRECIATION
I first wish to thank BMW Sime Darby Auto Bavaria for giving me the opportunity
to undergo my industrial training at the service centre in the warranty department
from 10 December 2018 till 26 April 2019 with the hope that the training given to
me will be useful in the future. Besides that I would also like to thank Mr. Anthony
a/l David Head of After Sales, Mr. Boon Yi Ping Head of Workshop, Mr Richard Ho
Workshop Supervisor and Mrs. Fauziah Misfar Senior Supervisor of Warranty
Department.
Thank you.
iii
ABSTRACT
This report is summary of all the work experience I have been able to gather during
my Industrial Training programme at Bmw Sime Darby Auto Bavaria Sdn.Bhd. This
report contains some of the daily data key-in and warranty parts checking by my
department to ensure parts claimed warranty are claimable with proof. This report is
separated into chapters with each chapters from Chapter 3 to Chapter 5 stating
everything I learnt in this car service centre working at the warranty department. This
report also contains what is taught by my supervisors and co-workers I worked with
and information I got from online during my Industrial Training in this agency. In
conclusion, this technical report is summary of what I learnt during my Industrial
Training programme.
(125 Words)
iv
LIST OF CONTENTS
List of Contents v
Appendices xiv
1 INTRODUCTION
1.1 Introduction 1
STRUCTURE
Background 4
v
CHAPTER TOPIC PAGE
2.6 Executive Leadership of Sime Darby Motor
Division 8
4 TECHNICAL CONTENTS
4.1.1 Autoline 14
4.2.1 Photographs 33
documentation process 39
vi
CHAPTER TOPIC PAGE
4.3.3 Stacking up completed EDMS 46
6 CONCLUSION 66
Bibliography / Reference 67
vii
LIST OF FIGURES
viii
4.26 EDMS Check List 30
4.27 Conditions to close a service claimed Job 32
4.28 Conditions to close a Wiper Blade Warranty 32
4.29 Conditions for Radio Remote Battery 33
4.30 Vehicle’s Registration Number, Chassis Number and
Mileage 34
4.31 Complete Vehicle’s Identity 34
4.32 Detected Leaking Parts 34
4.33 Leaking Vacuum Pump 35
4.34 Front Rotary Oil Seal Leaking 35
4.35 Part Number of Technical Campaign Parts 36
4.36 Serial Number of Technical Campaign Parts 36
4.37 Defect Code shown in KSD 37
4.38 Defect Codes are written at the Notes section of a Job Card 38
4.39 Defect codes of different Repairs are noted down for future
use 38
4.40 Diag Code obtained from Operation Report is written in
the notes section of a Job Card with it’s Defect Code 39
4.41 Logging into SAP Web Application server 40
4.42 Homepage of BMW Group GIS Dealer Workplace
to GIS Claims 40
4.43 Checking status of approval for GIS Claim after searching
for respective Chassis Number and Repair Date 41
4.44 Printing out Approved GIS Claim Report 41
4.45 Writing down the GIS Claim Number on top of the
Invoice Number 42
4.46 Obtaining the Gate Pass done from Autoline history for
a specific Job 43
4.47 Getting a Gate Pass from a stack of Gate Passes 43
ix
4.48 A specific Vehicle’s Gate Pass obtained from the stack 44
4.49 Example of a Complete Gate Pass 44
4.50 Example of a Manual Gate Pass pasted on A4 Paper 45
4.51 Gate Pass and GIS Claim Report ready to be attached to
to the completed Job Card 45
4.52 All documents arranged accordingly 46
4.53 The Invoice Number and Date of Invoice is labelled in
front of the Completed EDMS 47
4.54 30 Invoices are arranged in a Stack 47
4.55 Incomplete EDMS with complaints noted in the front page
are returned to CSO to be completed 48
4.56 A set of Warranty claimed Engine 49
4.57 Some of the big Parts that are not kept in the shelf 50
4.58 The five Levels of Shelf arranged marked in the red circle 50
4.59 Parts arranged accordingly to their respective Repair Dates
Month Shelfs 51
4.60 Batteries arranged at one side of the Warranty Store
according to their Repair Dates 51
4.61 Parts arranged from the cheapest to expensive from Level
One to Level Five 52
4.62 Parts completed with Warranty Tags 52
4.63 Preparing new Warranty Tags for expensive Parts 53
4.64 Expensive Parts List 54
4.65 BMW Malaysia Parts requesting Document 54
4.66 Example of a Tyre Job Card 55
4.67 Tyre Warranty Shipping List 56
4.68 A complete Tyre Warranty Tag 57
4.69 First Tread measurement of Tyre 57
4.70 Second Tread measurement of Tyre 58
x
4.71 Recording the Information in a Log Book 58
4.72 Tyre Defect marked with Yellow Crayon 59
4.73 Tyre Bulging Defect 60
4.74 Tyre Patching Defect 60
4.75 Tyre punctured by Sharp Object 61
4.76 Tyre Nail Defect 61
4.77 Different Tyre Bulging Defect 62
4.78 Tyres labelled with their Repair Date’s Month 63
4.79 Tyres arranged accordingly to their Repair Date’s Month 63
xi
LIST OF TABLES
TABLE ITEM PAGE
2.1 Overview of Sime Darby Motor Division 8
xii
LIST OF CHARTS
xiii
APPENDICES
xiv
xv
CHAPTER 1 : INTRODUCTION
1.1 Introduction
1
1.2 Industrial Training Objective
Industrial training is the most important condition that is required for every students
of Polytechnic Ungku Omar, Ipoh before they are eligible to be considered for the
award of Diploma. Each student must pass through the training session before
graduating. The student who failed shall repeat the training session.
The student can discipline themselves in matters that is relating to the employment
for example : attendance, timeliness, perseverance, interested for the work done,
accepted and carried out the instructions properly.
2
• The students can gain more information from a company that they signed up.
Therefore, they are able to learn the different theory and help them to practice the
knowledge or works.
• Enable the students to improve the self-learning during the industrial training.
• Students can learn and practice the new knowledge where they can gained from
the company based on learning acquired then they might compared for their
studies session at the class.
3
CHAPTER 2 : COMPANY BACKGROUND & ORGANIZATION
STRUCTURE
Established in 1988, Auto Bavaria, a division of Sime Darby Auto Bavaria Sdn
Bhd, is the biggest retail and service organisation for BMW, MINI and Motorrad in
Malaysia. Over the years, they have successfully built BMW into one of the most
desirable luxury automotive brands in the country.
In benchmarking themselves against the best BMW dealers in the world, they
make customer satisfaction the top priority at Auto Bavaria. They record possibly the
highest man-hours in training annually in the local automotive industry to keep their
4
staff on top of the latest innovations and technologies and constantly review
processes to improve efficiency. [1]
Figure 2.1 : Map showing Bmw Sime Darby Auto Bavaria Sdn.Bhd
5
2.2 Vision and Mission
6
2.4 Organization Structure Map
Managing
Director
Manager
Parts Senior
Account Department Sales Department
Supervisor
IT Parts Officers
Workshop &
Showroom
7
2.5 Overview of Sime Darby Motor Division
8
CHAPTER 3 : WEEKLY JOBS SUMMARY
9
• Printing out geographic information system(GIS) claim reports.
10
3.3 Third Month ( 4 February 2019 – 3 March 2019)
11
WEEK FOURTEEN ( 11 March 2019 – 17 March 2019)
• Learning to read major repair claimed operation reports.
• Learning to read major repair claimed technician reports.
• Asking technicians for clarification of major repair claimed jobs done.
• Closing service and simple repair job cards.
12
WEEK NINETEEN ( 15 April 2019 – 21 April 2019)
• Using the defected part name to find for defect code in Komputer Service
Desk (KSD).
• Closing all types of warranty claimed job cards.
• Working in warranty store.
• Documentation of closed job cards.
13
CHAPTER 4 : TECHNICAL CONTENTS
4.1.1 Autoline
Autoline is the main software used in Auto Bavaria BMW Service Centre,
Glenmarie dealer. It is a flexible, scalable solution that can support the day-to-day
management of an entire dealership, from small single site operations to multi-site,
multi-franchise organisations and everything in between.
A job card refers to a work orders also known as a repair order. These job card
details the work required on a specific vehicle including maintenance, customer
concerns and recall campaigns. In service departments, the job card is completed
after a vehicle check is done. It checks for obvious issues, overdue maintenance, and
14
notes any minor or major damage on the car. Concerns from the walkaround may be
part of the work requested on the job card. [2]
15
the parts used in the process. The job card can be used to allocate labour and material
cost to a specific job. They are used to send job details to technicians out in the
workshop and to get information back about the work done on each job. Operations
that are on the job card include information that is gathered from other applications
and describe the following aspects of the work such as :
The first step after receiving a job card is recording the date received, repair
order number, vehicle registration number, vehicle chassis number, and customer
service officer’s name in a warranty entry log book. Secondly separate them in stack
of 20 job cards to be invoiced for easy access to warranty officers to keep count of
the number of job cards they have in hand. After taking a stack of job cards , a
warranty officer will have to print a document known as technician clocking time
using the Autoline.
16
Figure 4.3 : The printing of technician clocking time
There are several procedures to close a simple service claimed job card such as
the following with the necessary documents needed :
a) Repair order
17
The Figure 4.4 above shows the repair order of a job card. The repair order
shows the latest mileage the car has travelled, vehicle’s registration date,
registration number, vehicle’s chassis number, date of repair order printed,
customer service officer in charge name, labour and job done. A warranty officer
should check all the information if they are valid information and know the types
jobs that are assigned for the specific vehicle.
The figure 4.5 above shows the Aftersales Information Research (AIR)
webpage, a system that bundles all the information relevant for the workshop and
makes it available to the user clearly at a glance. Time consuming new registrations
and search in the different old systems are cancelled. In addition to vehicle related
information such as vehicle details, optional equipment, retrofitting, service contracts
or service history all the necessary information for the restoration/repair of the
vehicle, for example Technical Campaigns, PuMA measures, repair instructions,
parts, flat rate units are also directly accessible.
18
c) Technician Clocking Time
Figure 4.6 above shows the technician clocking time document which is used
to inspect the time technician clocked in an out for the job done is accurate and
reasonable by a warranty officer.
d) Shipping List
19
The figure 4.7 above a shipping list for oil service claimed job card. In a
shipping list, a warranty officer should check the time item is taken from the spare
part inventory is after diagnose by the technician clock in timing and key data in
aftersales information research (AIR). At the same time to make sure the items part
number is matching as in AIR for the specific vehicle model.
e) Key Data
The figure 4.8 above shows the key data taken from aftersales information
research (AIR) system for a warranty officer to inspect if the vehicle’s specific
details is valid. Moreover, to check the due of service for the vehicle and if technical
campaigns are available for the vehicle.
20
The figure 4.9 above shows the dynamic timeline in AIR system of the specific
vehicle by searching it’s specific chassis number. The dynamic timeline is a status
bar which shows if service of the vehicle is due or not. If the dynamic timeline shows
status is yellow or red colour, it indicates that the service is due. If it shows status in
green colour, it indicates there is still time for service to due and in good condition.
This dynamic timeline is printed and attached as part of the key data. A warranty
officer will check if the dynamic timeline and key data in job card is similar as in the
AIR system.
The figure 4.10 above shows the technical campaign number and its
availability in the aftersales information research (AIR) system. A warranty officer
will check if the car has a technical campaign available in the system and job card’s
key data to ensure the job done is warranty claimable.
21
f) Operation Report
The figure 4.11 above shows the operation report document attached in a job
card. The operation report is a diagnose run by the technician using Integrated
Service Technical Application(ISTA/d) BMW system after connecting an Integrated
Communication Optical Module (ICOM) to the specific vehicle’s On-board
diagnostics(OBD) port. Figure 4.12 and 4.13 below shows the ICOM and OBD port
of BMW vehicle.
22
Figure 4.13 : ICOM used to diagnose BMW vehicles
The operation report is one of the most important document in a job card. A
warranty officer will have to check if the diagnose run by the technician for the job is
correct and the information needed for the warranty claim is all included such as
diagcode if necessary for mostly electrical components related parts. For a vehicle
going through service, the car will be reset after service done which will be shown in
the operation report to assure service is done for the specific vehicle.
g) Welcome Note
23
The figure 4.14 above shows the welcome note document in a job card.
Welcome note is write down any notes regarding the vehicle for technicians and
warranty officers to know about. There is also a column for customer to write down
their complains regarding the vehicle or any request to be done.
The figure 4.15 above shows the service reception at the car check list (RATC)
attached in a job card. This document is filled up by the customer service officer
when receiving the customer’s vehicle to assure there no extra damage or complain
to the customer’s vehicle when being returned. A warranty officer will check if the
RATC form is filled up to make sure there is no unnecessary warranty being claimed
for the specific vehicle.
24
i) Checking Komputer Service Desk (KSD)
After checking if all the documents are complete, printing invoice will be the
next step. Firstly a warranty officer will have to select a contract after entering the
repair order number. There will two or sometimes three contracts available for a
specific vehicle usually service contract package and repair contract package. When
25
closing a service job card, a warranty officer will have to select the service contract
package.
The Figure 4.18 above shows arranging the service jobs done in different
grouping. This procedure is to separate the types of job done to later on use different
defect codes for different grouping. At the same time to make the invoice look neat.
The Figure 4.19 below shows after arranging the service jobs done in different
grouping. Next a warranty officer should go through the Autoline once by checking
if the account number for service job is correct with the Auto Bavaria, Glenmarie
dealer. Then making sure the job is ended before checking the specific vehicle’s
service history.
26
Figure 4.19 : After arranging the present jobs
The figure 4.20 above shows checking the specific vehicle’s gate pass to find
out if the car already went out of the workshop or not. This date is noted in the job
card for the later documentation process to find the gate pass document. A warranty
officer will get this date in File History.
27
m) Printing invoice
The figure 4.21 above shows the first step to printing invoice which is
choosing what type of document that is needed to print and entering the specified
mileage in key data.
28
The figure 4.22 above shows the second step to printing invoice which is to set
the details in header. The five most important information to be set in header is
contract number, registration date, repair date, mileage and warranty type. The other
information will be automatically generated. The warranty type for service is BSRI.
The figure 4.23 above shows the third step to printing invoice which is to fill
up defect codes in lines. The lines separate each grouping as per arranged
respectively. Each line should have either labour lines or parts claimed so that it can
have a defect code chosen accurately by the warranty officer.
29
The figure 4.24 above shows the fourth step to printing invoice which is to
write comments related to jobs done for this job cards in the comment section.
The figure 4.25 above shows that after filling up the comment section and
clicking save button, the invoice will be printed and warranty claim will be process
to BMW Malaysia.
30
The figure 4.26 above shows the EDMS check list to be attached to a closed
job card at the front followed by the invoice. The purpose of the EDMS check list is
to tick the box if the documents needed is present and write remarks below if the
documents needed is not present. The date of invoice printed and invoice number is
also written at top of the check list. Finally, the job card is successfully invoiced and
completed.
A job card has many rules and conditions to be followed before invoicing it
according to the type of job prescribed in the job card. A warranty officer should
follow all the steps accordingly to make sure the job card invoiced is approved by
BMW Malaysia. If once the job card is rejected a senior warranty officer supervisor
will have to appeal to see if the rejected invoice can be claimable. To avoid this, a
warranty officer should be very aware and attentive when invoicing a job card.
Figure 4.27, figure 4.28 and figure 4.29 below shows some examples of the
conditions and steps to checked before invoicing a job card and claiming warranty.
31
Figure 4.27 : Conditions to close a service claimed job
32
Figure 4.29 : Conditions for a radio remote battery
4.2.1 Photographs
Most of the minor and major mechanical repairs will require photographs
taken as a supporting document and to be attached to a job card so when there is an
inquiry from BMW Malaysia about any warranty claimed, the photographs will be
used as proof. The photographs required are the specific vehicle’s registration
number, chassis number, mileage, defect of parts in the vehicle and serial number of
parts ( if necessary and usually required in technical campaigns) such as the figure
4.30, figure 4.31, figure 4.32, figure 4.33, figure 4.34, figure 4.35 and figure 4.36
shown below.
33
Figure 4.30 : Vehicle’s registration number, chassis number and mileage.
34
Figure 4.33 : Leaking vacuum pump
35
Figure 4.35 : Part number of technical campaign parts
36
4.2.2 Defect codes and Diagnostics Codes
The defect codes are codes taken from KSD to determine a defect detected and
repaired in a specific vehicle for a job. Different types of job have their respective
defect codes even if they are in one specific vehicle. A warranty officer should be
able to determine the defect code to be used for the specific job according to the job
done so the warranty claimed is to be approved.
Diagnostic code (Diag Code) is a certain code obtain from the operation report.
These codes that the car’s OBD system uses to notify about an issue. Each code
corresponds to a fault detected in the car. When the vehicle detects an issue, it will
activate the corresponding trouble code. A vehicle stores the trouble code in it’s
memory when it detects a component or system that’s not operating within
acceptable limits. The code will help to identify and fix the issue within the car. [3]
A warranty officer will use the Diag Code obtained to determine the defect
code to be used for the specific repair. Diag Code is mostly obtained for any
electrical mechanism faulty or electrical related part faulty in the specific vehicle.
This Diag Code is one of the conditions to be considered before invoicing a job card.
Figure 4.37, figure 4.38, figure 4.39, and figure 4.40 below show some examples of
defect codes and diagnostic codes used.
37
Figure 4.38 : Defect codes are written at the notes section of job card.
Figure 4.39 : Defect codes of different repairs are noted down for future use.
38
Figure 4.40 : Diag Code obtained from operation report is written in the notes
section of a job card with it’s defect code.
EDMS documentation process is the procedure after invoicing a job card. This
process includes printing out Geographic information system (GIS) claim reports,
finding a specific vehicle’s gate pass, stacking up completed job cards. These are the
final procedures before submitting completed EDMS to BMW Malaysia.
39
attached to the job card while the GIS claim number is written on top of the invoice
number in EDMS check list. This processes are shown in the figure 4.41, figure 4.42,
figure 4.43, figure 4.44, and figure 4.45 below.
Figure 4.42 : Home page of BMW Group GIS Dealer Workplace to GIS claims
40
Figure 4.43 : Checking status of approval for GIS claim after searching for
respective chassis number and repair date
41
Figure 4.45 : Writing down the GIS claim number on top of the invoice number
Gate pass is document that shows if the specific vehicle of the job card has
went out of the workshop picked up by the customer. If a gate pass is not available, it
means the vehicle haven’t left the workshop due to customer delay in picking up or
the car is undergoing a different repair or service in the workshop. Finding the gate
pass document is the next procedure after printing out GIS claim report. The date of
gate pass can be obtained in Autoline. After getting the gate pass, it is attached with
the specific job card and the other documents are arranged accordingly. The gate
pass is arranged in stack per day. The procedures are shown in figure 4.46, figure
4.47, figure 4.48, figure 4.49, figure 4.50, figure 4.51 and figure 4.52 below.
42
Figure 4.46 : Obtaining the gate pass date from Autoline’s history for a specific job
43
Figure 4.48 : A specific vehicle’s gate pass obtained from the stack
44
Figure 4.50 : Example of a manual gate pass pasted on a A4 paper
Figure 4.51 : Gate pass and GIS claim report ready to be attached to the completed
job card
45
Figure 4.52 : All documents arranged accordingly
The completed EDMS are all stacked in 30 invoices per stack as the finishing
of documentation process. The invoice number and date of invoice are written on a
blank piece of paper and labelled on the specific completed EDMS. Incomplete
EDMS are returned to respective Customer Service Officer handling the job card to
be completed. The final procedures are shown in the figure 4.53, figure 4.54 and 4.55
below.
46
Figure 4.53 : The invoice number and date of invoice is labelled in front of the
completed EDMS
47
Figure 4.55 : Incomplete EDMS with complains noted in the front page are returned
to CSO to be completed
The warranty store is managed by warranty officers because it comes under the
warranty department. Warranty store is a store to keep warranty claimed parts that
are sent by technicians. These parts are as proof to show to that a warranty claimed
job has been done. These parts are sent to the store two times a day in a fixed
duration from 11am until 12.30pm and 4pm until 6pm with the presence of the
warranty officers.
The parts received by warranty officers are ensured they are tagged with a
complete warranty tag before being recorded in a log book. The details recorded are
part number, vehicle’s chassis number, vehicle’s registration number, date received,
48
and technician identity number and receiving warranty officer’s name. This details
are obtained from a warranty tag. Then the warranty tag is chopped with the
receiving date by warranty officer.
After that the parts are arranged in shelfs according to their repair dates
obtained from the warranty tag on the respective parts written by technicians. Shelfs
are separated according to months and rack level one to five. Parts warranty claimed
price is differentiate according to a shelf’s level. It is arranged from the cheapest to
the most expensive. Some parts are not kept in the shelf because of their size and
weight such as engine, gearbox, steering racks, fuel tanks, batteries, radiator tanks,
seats, absorbers, cell modules and disc brakes.
Parts collected per month is only disposed after two months, so the warranty
store compromises three months of warranty claimed parts at a time. These two
previous month parts are disposed usually at the third week of the current month. A
sub contract company will come collect these disposal parts. Some example of this
process management is shown in the figure 4.56, figure 4.57, figure 4.58, figure 4.59,
figure 4.60, figure 4.61, and figure 4.62 below.
49
Figure 4.57 : Some of the big parts that are not kept in the shelf
Figure 4.58 : The five levels of shelf arranged marked in the red circle
50
Figure 4.59 : Parts arranged according to their respective repair dates month shelfs
Figure 4.60 : Batteries arranged at one side of the warranty store according to their
repair dates
51
Figure 4.61 : Parts arranged from the cheapest to expensive from level one to level
five
52
4.4.2 Expensive Parts and Warranty Tags
The reason for separating expensive parts from cheap parts in levels in shelfs
because a list of parts that are above the range price of Rm 2200 and above is
released by the management. These parts are to be searched and recorded by
warranty officers as a proof of the parts have been sent to the store before disposal.
New and completed warranty tags are prepared for these expensive parts in the
list specifically so the details of the parts are clearly visible and shown to the person
in charge collecting disposal parts.
53
Figure 4.64 : Expensive parts list
54
4.5 Tyre Warranty
Tyre warranty is different from normal parts warranty because the tyres needs
to be inspected by a warranty officer as well as with photos and tyre tread depth
measurements before a tyre warranty job card can be invoiced. Twice a week, an
assigned warranty officer for the week will inspect the warranty claimed tyres till
present date. Figure 4.66 and figure 4.67 below shows a tyre warranty job card and
tyre shipping list after being ordered.
55
Figure 4.67 : Tyre warranty shipping list
An assigned warranty officer will start the process with checking the warranty
tag of a warranty claimed tyre if it’s detail is complete dealer code number, a
vehicle’s chassis number, a vehicle’s registration number, repair order number,
technician identity number, part number, customer service officer’s name and repair
date. After that, recording the respective warranty tag’s detail in a tyre warranty log
book. Then measuring the tyre’s tread measurement with tyre tread depth gauge tool
before recording in it the log book as well. All the treads of a tyre are measure,
usually four and sometimes three depending on the respective tyres. Figure 4.68,
figure 4.69, figure 4.70 and figure 4.71 below shows the processes stated above.
56
Figure 4.68 : A complete tyre warranty tag
57
Figure 4.70 : Second tread measurement of tyre
The important purpose of the inspection of warranty claimed tyre is finding the
defect on the tyre. The defect then is also recorded in the log book. When the tyre
58
warranty claimed job card is received by a warranty officer, the respective warranty
officer will check the photographs provided in the job card with defects stated in the
tyre warranty log book of the same repair order number if they are matching and
reasonable reasons to be warranty claimed. The defects are marked with a yellow
crayon by the technician in charge of replacing the tyre. After the tyre is inspected,
the tyre is marked with repair date’s month by the assigned warranty officer with a
yellow crayon. Figure 4.72, figure 4.73, figure 4.74, figure 4.75, figure 4.76 and
figure 4.77 below shows the types of defects on tyre.
59
Figure 4.73 : Tyre bulging defect
60
Figure 4.75 : Tyre punctured by sharp object
61
Figure 4.77 : Different tyre bulging defect
The tyres are arranged orderly after being inspected based on their repair dates
according to months marked on the respective tyres by the assigned warranty officer.
These tyres are disposed at the same time with other parts in warranty store on the
third week of a current month collecting the tyres from two months ago. Figure 4.78
and 4.79 below shows the process stated.
62
Figure 4.78 : Tyres labelled with their repair date’s month
63
CHAPTER 5 : FINDINGS AND RECOMMENDATIONS
5.1 Findings
During the start of the semester, some students undergoing Industry Training
service workshop centre was shocked by the different departments in the same field
exposed to students. It, therefore, students was unwillingly put in duty at departments
other than technical side due to vacancy issues. It will burden them to not learn
technical side prioritise in polytechnic theoretical. This will give effect to the
lecturers to evaluate the final report Industry Training students.
Problems that occur in the Industry, the industry gave fixed assignments. For
example, during the 20th week, the students just do the same task. This will give you
a sense of boredom to students who undergo industrial training. This will cause
fewer students to get objective of the training industry. Students will have less
64
exposure in industrial training. This will cause the students lack the knowledge to be
expressed in the final report.
5.2 Recommendation
Reply forms from Industry should be honest and accurate with the job scope
they are willing to prepare for the students who undergo industrial training. So that
even though learning a new type of job scope is not wrong in the learning process,
students get to decide if they are willing to work in departments other than technical
side but in the same field. Notes about the job scope should be added to reply forms
if the Industry is willing to offer different job scopes in the same field which may
interest the students to take up the challenge.
Students who undergo industrial training is not the same capabilities with the
ability of ordinary workers. Students who undergo industrial training, they want to
experience what about his career or work they will do in the courses they take in
polytechnics. UPLI should provide recommendations to the firm or company that
provides industrial training to students planning activities necessary to prepare to
launch student activities during the training industry. It will reduce student
experiencing the same things as long as 20 weeks. This will provide many benefits to
students who undergo industrial training. It will give a lot of exposure to the students
during their industrial training.
A good preparation must be made by the student their self who will undergo
industrial training before they step out from campus. The preparation is not only on
the equipment or stationary but mentally and physically is also very important so that
student is ready to enter the working zone, the changing of the environment around
them. This is a must for student so that this situation will not affect student mentally
making them easily to give up and moan during the training.
65
CHAPTER 6 : CONCLUSION
66
BIBLIOGRAPHY / REFERENCE
67