Sei sulla pagina 1di 5

Asian Institute of Technology and Education

Electrical Installation and Maintenance NC II (EIM NC II)


DAY LECTURES ACTVITIES LABORATORIES PROJECT
NO. PROGRAM OF TRAINING FOR 40 DAYS PERIOD
1. Basic Electrical Terms/PEC Provisions

2. Requirements for Electrical Installation

3. Conductor Insulation and


Application/Conductor Ampacity

4. Conductor Ampacity/Raceways

5. Enclosure Ratings/Circuiting Guidelines

6. Preparing Electrical Plan

7. Design Consideration

8. Branch Circuit Calculation/Feeder


Calculation

9. Familiarization of materials and


equipment/ List of tools and equipment

10. Safety Procedures: Do’s and Don’t

11. * Diagramming and How to use ACT. NO. 1 ACT. NO. 2 LAB. NO. 1 LAB. NO. 2
Multi-Tester
One lamp Two lamps One lamp control Two lamps control
* Single Switch control by single control by two by single switch by two locations
switch locations

12. Good practice of 5’S ACT. NO. 2 ACT. NO. 3 LAB. NO. 1 LAB. NO. 2
Three lamps Four lamps Three lamps control Four lamps control
control by S₁ and control by two S₂ by S₁ and S₂ by two S₂
S₂

13. ACT. NO. 5 LAB. NO. 5


8 lamps control by s₁,s₂ and s₃ Five lamps control by s₂ and s₃

14. Three-way Switch ACT. NO. 6 ACT. NO. 7 LAB. NO. 6 LAB. NO. 7
One lamp 3 lamps control One lamp control 2 lamps control by
control by two by S₁ and S₂ by two locations S₁ and S₂
locations

15. ACT. NO. 8 ACT. NO.9 LAB. NO. 8 LAB. NO. 9


14 lamps control 18 lamps control 3 lamps control by 3 4 lamps control by
by 4 locations by six location locations using two locations using
using three S₂ using S₂ and S₃ three S₂ S₂ and S₃

16. ACT. 10 LAB. NO. 10


20 lamps using multiple locations 5 lamps using S₁, S₂ and S₃

17. Four-way Switch ACT. NO. 11 ACT. NO. 12 LAB. NO. 11 LAB. NO. 12
One lamp 7 lamps control One lamp control 2 lamps control by
control by 3 by two s₃ by 3 different two different
different locations locations using two
locations S₂

18. ACT. NO. 13 ACT. NO. 14 LAB. NO. 13 LAB. NO. 14


12 lamps control 16 lams control 3 lamps control by 3 4 lamps control by
by six locations by 8 locations locations using S₁, S₂ four locations using
using S₁, S₂ and and S₃ S₁, two S₂ and S₃
S₃

19. ACT. NO. 15 ACT. NO. 16 LAB. NO. 15 LAB. NO 16


18 lamps control 20 lamps control 5 lamps control by 5 lamps control by
by six location by six location three locations three S₃,S₂ and S₁
using three S₂ using three S₂ using two S₃
and three S₃ and three S₃

20. Proper handling of tools for bending LAB. NO. 17


Bending of PVC pipe 90˚

21. LAB. NO. 18


Off set 45˚

22. LAB. NO. 19


Combination of off set and 90˚

23. LAB. NO. 20


Dimensioning

24. Right way of getting dimension LAB. NO. 21


Fixing of boxes and raceway layout
25. LAB. NO. 22
Pulling of wires

26. Proper termination LAB. NO. 23


Termination

27. ACT. NO. 17 LAB. NO. 24


Floor Plan Complete Circuit of Light and C.O with Fire
Alarm

28. Trouble shooting ACT. NO. 18 LAB. NO. 25


Lighting Layout Complete Circuit of Light and C.O with Fire
Alarm (5 Hours Actual Installation)

29. Orientation for the assessment ACT. NO. 19 Practice for assessment
Power Layout

30. ACT. NO. 20 Practice for assessment


Load Schedule

31. ACT. NO. 21 Practice for assessment


Panel Board Details

32. ACT. NO. 22 Practice for assessment


Single Line Diagram

33. ACT. NO. 23 Practice for assessment


Legend/Symbols
34. ACT. NO. 24 Practice for assessment
General Notes

35. Review for Assessment ACT. NO. 25 Practice for assessment


Map Location

36. Practice for assessment DREAM HOUSE -


COMPLETE SET OF ELECTRICAL PLAN
(TRACING PAPER AND BLUE PRINT)

37. Practice for assessment

38. Practice for assessment

39. Written and Oral Examination

40. Actual Examination

Potrebbero piacerti anche