Agreement No RITES/CO/RI/KPL/OHE/2016/1
Invoice No SAL/GST/007/ GST NO 33AAACB1943Q1ZL
Invoice Date SAC CODE
M/S.KAMARAJAR PORT LTD,
4th Floor, Super
Customer Name and Address
Speciality Diabetic Centre,
Rajaji Salai, Chennai-600001
GST NO 33AAACE9013G2Z1
S.NO Particulars Unit Quanitity Amount
RA Bill no 5 - 75%
1 Nos 1.00 2,641,048
(PRE GST ITEMS)
RA bill no 5 - 90%
2 Nos 1.00 8,764,978
(POST GST ITEMS)
5 Total 12,774,749
Deductions
Rupees Eighty Eight Lakh Ninety Nine Thousand Seven Hundred Seven only
Bright power Projects (India) Pvt Ltd RA Bill No 5
AMOUNT IN RUPEES
SNO DESCRIPTION
UPTO PREVIOUS BILL CURRENT BILL CUMMULATIVE REMARKS
DUES
DEDUCTIONS
- -
1 Mobilization/Additional Advance - -
2 Plant,Machinery&Shuttering Advance - -
3 Interest on Mobilization/Additional Advance - -
4 Interest on Plant,Machinery&Shuttering Advance - -
5 Security Deposit - -
a) Deductible @ 5% - 545,376.41 545,376.41
b) Less EMD converted into SD (-) - -
c) Net SD Deductible - -
6 Income Tax @ 2% - 194,777.29 194,777.29
7 Works Contract Tax
8 Labour Cess @ 1% - 109,075.28 109,075.28
9 To be Withheld/ Recovered Under Clause 5/2
10 Any Other
2 Foundation
1(a) Preparation of desingn and drawings for OHE KM Supply / 2.5 37,500.00 100% 93,750.00 50%
Erection
2(b) Foundation for plinth in other than hard soil Cum Supply and 120.00 120.00 10,500.00 100% 1,260,000.00 50%
and rock including material as per site Erection
condition
45%
5%
2(b) Foundation for plinth in other than hard soil Cum Supply and 48.00 10,185.00 97% 488,880.00 50%
and rock including material as per site Erection
condition
45%
5%
3 Steel Structure
3(a) Supply & Erection of traction masts portals, Tonne Supply 70.00 17.50 105,000.00 100% 7,350,000.00 70%
TTC, Dwarf masts main masts of switching
stations including fabricated structures for 20%
feeder
10%
10%
TTC, Dwarf masts main masts of switching
stations including fabricated structures for
feeder
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
As Per BOQ RITES LIMITED,Gurgaon
Percentage & Part Rate
1 2 3 4 5 6 7 8 9 10 11
Item No Brief Description of work Unit Supply / BOQ 25% Variation Rate (Rs.) Part Rate BOQ Amount %
Erection Quantity Variation Qty
of BOQ
10%
3(b) Supply & Erection of Fabricated steel work Tonne Supply 16.00 - 112,500.00 100% 1,800,000.00 70%
other than items in 3(a).
20%
10%
10%
3 (c) Supply and Erection of Guy Rod Assembly Each Supply 44.00 - 11,250.00 100% 495,000.00 70%
20%
10%
10%
4a(i) supply and Erection without insulator Each Supply 186.00 46.50 12,750.00 100% 2,371,500.00 70%
&Erection of a single Bracket assembly
20%
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
As Per BOQ RITES LIMITED,Gurgaon
Percentage & Part Rate
1 2 3 4 5 6 7 8 9 10 11
Item No Brief Description of work Unit Supply / BOQ 25% Variation Rate (Rs.) Part Rate BOQ Amount %
4a(i) supply and Erection without insulator Each Supply
Erection 186.00 Variation
Quantity 46.50 Qty 12,750.00 100% 2,371,500.00
&Erection of a single Bracket assembly of BOQ
10%
10%
4 a(i) supply and Erection without insulator Each supply 2.00 12,367.50 97% 24,735.00 90%
&Erection of a single Bracket assembly
Erection 2,182.50 97% 4,365.00 90%
6(a) Supply and Erection of Over Head Equipment TKM Supply 6.50 1.63 1,402,500.00 100% 9,116,250.00 70%
Only(Conventional)
20%
10%
6(a) Supply and Erection of Over Head Equipment TKM Erection 6.50 1.63 172,500.00 100% 1,121,250.00 90%
Only(Conventional)
10%
8b(i) Single conductor of OHE Terminating wire Each supply 5.00 1.00 6,750.00 100% 33,750.00 70%
20%
10%
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
8b(i) Single conductor of OHE Terminating wire Each
As Per BOQ 5.00 1.00 RITES LIMITED,Gurgaon
Percentage & Part Rate
1 2 3 4 5 6 7 8 9 10 11
Item No Brief Description of work Unit Supply / BOQ 25% Variation Rate (Rs.) Part Rate BOQ Amount %
Erection Quantity Variation Qty
of BOQ
10%
20%
10%
Erection 6.00 1.00 1,125.00 100% 6,750.00
90%
10%
Each supply 1.00 8,002.50 97% 8,002.50 90%
10%
10%
9(a) supply and Erection of Anticreep Each Supply 9.00 - 108750 100% 978750 70%
20%
10%
10%
10(a) Extra on item 6(a) for supply & erection of Each supply 4.00 1.00 8,250.00 100% 33,000.00 70%
additional fitting at a turn-out,diamond
crossing or over-lap 20%
10%
10%
Each supply 1.00 8,250.00 97% 8,250.00 90%
10%
10%
10%
10%
10%
10%
11© Supply and Erection of 25kv Post Insulator Each supply 24.00 - 8,250.00 100% 198,000.00 70%
20%
10%
10%
12(a) Supply and Erection section Insulator assembly Each supply 12.00 - 47,250.00 100% 567,000.00 70%
20%
10%
10%
13(a) Supply and Erection of 25kv single pole Each supply 14.00 - 67,500.00 100% 945,000.00 70%
isolater without Earth contact assembly
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
As Per BOQ RITES LIMITED,Gurgaon
Percentage & Part Rate
1 2 3 4 5 6 7 8 9 10 11
Item No Brief Description of work Unit Supply / BOQ 25% Variation Rate (Rs.) Part Rate BOQ Amount %
Erection Quantity Variation Qty
of BOQ
13(a) Supply and Erection of 25kv single pole Each supply 14.00 - 67,500.00 100% 945,000.00
isolater without Earth contact assembly
20%
10%
10%
13d Supply & Erection of Extra on iten no 13 a & c Each supply 2.00 5,250.00 100% - 90%
for an Interlocking system
Erection 750.00 100% - 90%
15(a)(i) Copper Jumper(50 sq mm) Each supply 6.00 - 6,750.00 100% 40,500.00 70%
20%
10%
15(a) (v) Copper Jumper (160Sqmm) between OHE and Each supply 4.00 1.00 17,250.00 100% 69,000.00 70%
Cross feeder
20%
10%
10%
20%
10%
10%
16(b) Supply and Erection of Longitudinal bond Each supply 30.00 7.50 750.00 100% 22,500.00 70%
20%
10%
10%
10%
10%
10%
10%
19 Supply and Erection of 25kv potential Each supply 1.00 60,000.00 100% 60,000.00 70%
transformer
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
As Per BOQ RITES LIMITED,Gurgaon
Percentage & Part Rate
1 2 3 4 5 6 7 8 9 10 11
Item No Brief Description of work Unit Supply / BOQ 25% Variation Rate (Rs.) Part Rate BOQ Amount %
Erection Quantity Variation Qty
19 Supply and Erection of 25kv potential Each supply 1.00 of BOQ 60,000.00 100% 60,000.00
transformer
20%
10%
10%
20 Supply and Erection of 42kv Lightining Each supply 1.00 1.00 52,500.00 100% 52,500.00 70%
arrester
20%
10%
10%
22(a) S&E Of Iron clad DC 230 fuse box Each Supply 1.00 - 11,250.00 100% 11,250.00 70%
20%
10%
22(b) S&E Of Iron clad AC 230 fuse box Each Supply 1.00 - 11,250.00 100% 11,250.00 70%
20%
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
As Per BOQ RITES LIMITED,Gurgaon
Percentage & Part Rate
1 2 3 4 5 6 7 8 9 10 11
Item No Brief Description of work Unit Supply / BOQ 25% Variation Rate (Rs.) Part Rate BOQ Amount %
22(b) S&E Of Iron clad AC 230 fuse box Each Supply
Erection 1.00 Variation
Quantity - Qty 11,250.00 100% 11,250.00
of BOQ
10%
23 Supply and Erection of lead Acid battery set supply 1.00 187,500.00 187,500.00 70%
20%
10%
10%
24 Supply and Erection of Battery Charger set supply 1.00 142,500.00 142,500.00 70%
20%
10%
10%
30a(i) Supply and Erection of fencing Panel at mtr supply 100.00 6,000.00 600,000.00 70%
switching
20%
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
As Per BOQ RITES LIMITED,Gurgaon
Percentage & Part Rate
1 2 3 4 5 6 7 8 9 10 11
30a(i)
Item No SupplyBrief
and Erection of fencing
Description Panel at
of work mtr
Unit supply
Supply / 100.00
BOQ 25% Variation 6,000.00
Rate (Rs.) Part Rate 600,000.00
BOQ Amount %
switching Erection Quantity Variation Qty
of BOQ
10%
10%
30a(ii) Supply and Erection of fencing Upright Tonne Supply 1.00 82,500.00 82,500.00 70%
20%
10%
10%
30(b)(i) S&E of anticlimbing device at switching Tonne Supply 0.25 - 112,500.00 100% 28,125.00 70%
station
20%
10%
28 S&E of a 25kv DO fuse assembly Each Supply 2.00 - 33,000.00 100% 66,000.00 70%
20%
10%
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
As Per BOQ RITES LIMITED,Gurgaon
Percentage & Part Rate
1 2 3 4 5 6 7 8 9 10 11
Item No Brief Description of work Unit Supply / BOQ 25% Variation Rate (Rs.) Part Rate BOQ Amount %
Erection Quantity Variation Qty
of BOQ
31(a) Transfer of Equipment from one Mast or Each Erection 4.00 4,500.00 100% 18,000.00 90%
Support Mast
10%
31(b) Provision of additional Bracket assemblies on Each Erection 4.00 - 7,500.00 100% 30,000.00 90%
mast or support
10%
32 Extra Power Block Charges on erection of LS Erection 1.00 825,000.00 100% 825,000.00 50%
work under the Power Block
50%
33 Design, Supply And Erection of SSP building LS Supply and 1.00 922,500.00 100.00 922,500.00 70%
with Electrification Erection
20%
10%
34(a) Supply and Erection of Caution Board Each Supply 5.00 1.25 7,500.00 100% 37,500.00 70%
20%
10%
10%
10%
10%
27 Supply and erection of Oil filtration,testing,and Each Supply 2.00 - 97,500.00 100% 195,000.00 70%
commissioning of LT supply transformer
10KVA 20%
10%
10%
SCADA
1 Design and Drawings LS Supply 1.00 225,000.00 100.00 225,000.00 50%
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
As Per BOQ RITES LIMITED,Gurgaon
Percentage & Part Rate
1 2 3 4 5 6 7 8 9 10 11
Item No Brief Description of work Unit Supply / BOQ 25% Variation Rate (Rs.) Part Rate BOQ Amount %
Erection Quantity Variation Qty
1 Design and Drawings LS Supply 1.00 of BOQ 225,000.00 100.00 225,000.00
50%
5%
8b(i) Single conductor of OHE Terminating wire Each supply 9.00 6,306.42 100% 56,757.78 90%
8b(ii) Double Over Head Equipment conductor Each supply 14.00 7,021.26 100% 7,021.26 90%
10(a) Extra on item 6(a) for supply & erection of Each supply 11.00 4,607.23 100% 50,679.53 90%
additional fitting at a turn-out,diamond
crossing or over-lap
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
As Per BOQ RITES LIMITED,Gurgaon
Percentage & Part Rate
1 2 3 4 5 6 7 8 9 10 11
Item No Brief Description of work Unit Supply / BOQ 25% Variation Rate (Rs.) Part Rate BOQ Amount %
Erection Quantity Variation Qty
10(a) Extra on item 6(a) for supply & erection of Each of BOQ 11.00
additional fitting at a turn-out,diamond
crossing or over-lap Erection 739.23 100% 8,131.53 90%
15a(v) Copper Jumper (160Sqmm) between OHE and Each supply 4.00 6,219.58 100% 8.00 90%
Cross feeder
Erection 330.18 100% 1,320.72 90%
15a(v) Supply and Erection of Longitudinal bond Each supply 1,290.00 660.62 100% 852,199.80 90%
16 C Supply and Erection of transverse and special Each supply 32.00 675.91 100% 21,629.12 90%
bond
Erection 153.20 100% 4,902.40 90%
34(a) Supply and Erection of Caution Board Each supply 23.00 21.00 290.01 100% 6,670.23 90%
NS-4 Material Trasport by Trailer Job Supply & 3.00 8,883.750 100%
Erection
NS-5 Loading per location by Hydra Job Supply & 3.00 4,145.750 100%
Erection
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
As Per BOQ RITES LIMITED,Gurgaon
Percentage & Part Rate
1 2 3 4 5 6 7 8 9 10 11
Item No Brief Description of work Unit Supply / BOQ 25% Variation Rate (Rs.) Part Rate BOQ Amount %
Erection Quantity Variation Qty
NS-5 Loading per location by Hydra Job Supply & 3.00 of BOQ 4,145.750 100%
Erection
NS-6 Unloading per location by Hydra Job Supply & 3.00 4,145.750 100%
Erection
NS-3 Supply and erection of terminal board Each Supply 1.00 12,822.000 90%
- -
5,250.000 240.000 240.000 1,260,000.000 - 1,260,000.000
- -
4,725.000 240.000 240.000 1,134,000.000 - 1,134,000.000
- -
525.000 0 0.000 - - -
- -
5,092.500 48.000 48.000 244,440.000 - 244,440.000
- -
4,583.250 48.000 48.000 219,996.000 - 219,996.000
- - -
509.250 0 0.000 - - -
- -
- -
73,500.000 77.649 77.649 5,707,201.500 - 5,707,201.500
- -
21,000.000 74.924 1.801 76.725 1,573,404.000 37,821.00 1,611,225.000
- -
10,500.000 0 - - -
- -
9,450.000 87.261 87.261 824,616.450 - 824,616.450
1,050.000 0 - - -
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
rt Rate Amount of Bill RITES LIMITED,Gurgaon
12 13 14 15 16 17 18
Part Rate Qty as Qty as per Total Qty Amount upto Amount as per 18
payable per this bill previous Bill this Bill
previous
Bill
9,166.500 4.598 4.598 - 42,147.57 42,147.567
- -
9,879.450 - -
225.000 0 - - -
- - -
150.000 37.000 37.000 5,550.000 - 5,550.000
- - -
75.000 0 0.000 - - -
- -
405.000 37.000 37.000 14,985.000 - 14,985.000
- -
45.000 0 0.000 - - -
- -
654.75 7 7.000 - 4,583.25 4,583.250
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
rt Rate Amount of Bill RITES LIMITED,Gurgaon
12 13 14 15 16 17 18
Part Rate Qty as Qty as per Total Qty Amount upto Amount as per 18
payable per this bill previous Bill this Bill
previous
Bill
- -
392.85 7 7.000 - 2,749.95 2,749.950
997.500 37.000 37.000 36,907.500 - 36,907.500
- - -
285.000 37.000 37.000 10,545.000 - 10,545.000
- - -
142.500 0 0.000 - - -
- -
405.000 37.000 37.000 14,985.000 - 14,985.000
- -
45.000 0 0.000 - - -
- -
1,244.03 7 7.000 - 8,708.18 8,708.175
- -
392.85 7 7.000 - 2,749.95 2,749.950
299,250.000 1.000 1.000 299,250.000 - 299,250.000
- -
85,500.000 1 1.000 - 85,500.00 85,500.000
- -
42,750.000 - -
22,500.000 - - -
11,250.000 - - -
3,300.000 - - -
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
rt Rate Amount of Bill RITES LIMITED,Gurgaon
12 13 14 15 16 17 18
Part Rate Qty as Qty as per Total Qty Amount upto Amount as per 18
payable per this bill previous Bill this Bill
previous
Bill
- 9,738,864.53 9,738,864.53
DATE LOC NO CHAINGE TYPE OF TYPE OF IMP GROSS SCORLL MUFF NET VOL
MAST FDN VOL VOL VOL DPR NO
SL NO m m cum cum cum cum
1 18.12.2017 1143 1421.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 70
2 18.12.2017 1135 1380.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 70
3 18.12.2017 1155 1461.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 70
4 19.12.2017 1163 1497.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 71
5 19.12.2017 1172 1538.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 71
6 19.12.2017 1057 773.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 71
7 20.12.2017 1187 1614.50 B-175 MG-9 2.85 5.195 0.254 0.02 4.921 72
8 20.12.2017 1179 1574.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 72
9 22.12.2017 1165 1506.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 73
10 22.12.2017 1168 1515.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 73
11 22.12.2017 1176 1551.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 73
12 22.12.2017 1183 1592.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 73
13 23.12.2017 1154 1448.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 74
14 23.12.2017 1157 1470.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 74
15 23.12.2017 1162 1479.50 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 74
16 23.12.2017 1188 1632.50 B-175 MG-9 2.85 5.195 0.254 0.02 4.921 74
17 24.12.2017 1147 1430.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 75
18 24.12.2017 1158 1475.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 75
19 26.12.2017 1125 1277.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 76
20 26.12.2017 1129 1313.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 76
21 26.12.2017 1133 1353.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 76
22 27.12.2017 1121 1236.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 78
23 27.12.2017 1144 1425.50 B-225 MG-11 3.10 5.78 0.254 0.02 5.506 78
24 28.12.2017 1117 1200.50 B-175 MG-6 2.85 3.845 0.254 0.02 3.571 79
25 28.12.2017 1137 1389.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 79
26 28.12.2017 1145 1425.50 B-225 MG-11 3.10 5.78 0.254 0.02 5.506 79
27 28.12.2017 1170 1524.50 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 79
28 29.12.2017 1082 854.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 80
29 29.12.2017 1109 1119.50 B-175 MG-6 2.85 3.845 0.254 0.02 3.571 80
30 29.12.2017 1114 1160.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 80
31 30.12.2017 1086 894.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 81
32 30.12.2017 1090 930.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 81
33 30.12.2017 1150 1434.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 81
34 30.12.2017 1105 1083.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 81
35 02.01.2018 1067 813.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 82
36 02.01.2018 1059 773.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 82
37 03.01.2018 1101 1043.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 83
38 03.01.2018 1051 732.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 83
39 04.01.2018 1138 1398.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 84
40 04.01.2018 1134 1358.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 84
41 04.01.2018 1097 1007.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 84
42 05.01.2016 1094 966.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 85
43 05.01.2016 1015AB A-2 1.412 1.412 85
44 05.01.2016 1047AB A-3 1.812 1.812 85
45 06.01.2018 1123AB A-2 1.412 1.412 86
46 06.01.2018 1130 1317.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 86
47 06.01.2018 1075 836.00 B-225 MG-11 3.10 5.78 0.254 0.02 5.506 86
48 08.01.2018 1117AB A-2 1.412 1.412 87
49 08.01.2018 1070 818.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 87
50 08.01.2018 1074 831.50 B-225 MG-11 3.10 5.78 0.254 0.02 5.506 87
51 09.01.2018 1073 831.50 B-225 MG-11 3.10 5.78 0.254 0.02 5.506 88
52 09.01.2018 1062 782.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 88
53 10.01.2018 1096 993.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 89
54 11.01.2018 1080 840.50 B-225 MG-11 3.10 5.78 0.254 0.02 5.506 90
55 11.01.2018 1092 953.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 90
56 12.01.2018 1100 1029.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 91
57 12.01.2018 1104 1070.00 B-175 MG-6 2.85 3.845 0.254 0.02 3.571 91
58 12.01.2018 1108 1110.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 91
59 13.01.2018 1112 1151.00 B-175 MG-6 2.85 3.845 0.254 0.02 3.571 92
60 13.01.2018 1116 1187.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 92
61 13.01.2018 1120 1227.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 92
62 17.01.2018 1087 912.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 93
63 18.01.2018 1124 1268.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 94
64 18.01.2018 1128 1308.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 94
65 18.01.2018 1152 1434.50 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 94
66 19.01.2018 1132 1349.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 95
67 19.01.2018 1136 1385.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 95
68 19.01.2018 1146 1425.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 95
69 20.0.2018 1156 1466.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 96
70 20.0.2018 1164 1502.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 96
71 20.0.2018 1142 1421.00 B-225 MG-11 3.10 5.78 0.254 0.02 5.506 96
72 22.01.2018 1054 741.50 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 98
73 22.01.2018 1160 1475.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 98
74 22.01.2018 1104AB A-2 1.412 1.412 98
75 23.01.2018 1112AB A-2 1.412 1.412 99
76 23.01.2018 1068 813.50 B-150 MG-5 2.85 3.283 0.261 0.02 3.002 99
77 23.01.2018 1167 1506.50 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 99
78 23.01.2018 1141 1421.00 B-225 MG-11 3.10 5.78 0.254 0.02 5.506 99
79 24.01.2018 1081 849.50 B-150 MG-5 2.85 3.283 0.261 0.02 3.002 100
80 24.01.2018 1032AB A-3 1.812 1.812 100
81 24.01.2018 1046 710.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 100
82 24.01.2018 1174 1538.00 B-150 MG-5 3.10 3.283 0.254 0.02 3.009 100
83 25.01.2018 1185 1610.00 B-225 MG-11 3.10 5.78 0.254 0.02 5.506 102
84 25.01.2018 1030AB A-3 1.812 1.812 102
85 27.01.2018 1028AB A-3 1.812 1.812 103
86 27.01.2018 1140 1412.00 B-225 MG-11 3.10 5.78 0.254 0.02 5.506 103
87 29.01.2018 1031AB A-3 1.812 1.812 103
88 29.01.2018 1019AB A-2 1.412 1.412 104
89 29.01.2018 1185AB A-3 1.812 1.812 104
90 29.01.2018 1180 1574.50 B-200 MG-9 3.10 5.195 0.254 0.02 4.921 104
91 30.01.2017 1190AB A-3 1.812 1.812 105
92 30.01.2018 1194AB A-3 1.812 1.812 105
93 30.01.2018 1093 966.50 B-150 MG-5 2.85 3.283 0.261 0.02 3.002 105
94 30.01.2018 1098 1007.50 B-150 MG-5 2.85 3.283 0.261 0.02 3.002 105
95 31.01.2018 1186AB A-3 1.812 1.812 106
96 31.01.2018 1189 1632.50 B-200 MG-9 3.10 5.195 0.254 0.02 4.921 106
97 31.01.2018 1083 876.50 B-150 MG-5 2.85 3.283 0.261 0.02 3.002 106
98 31.01.2018 1085 890.50 B-150 MG-5 2.85 3.283 0.261 0.02 3.002 106
99 01.02.2018 1191 1659.50 B-225 MG-11 3.10 5.78 0.254 0.02 5.506 107
100 01.02.2018 1196 1736.00 B-200 MG-9 3.10 5.195 0.254 0.02 4.921 107
101 01.02.2018 1089 930.50 B-150 MG-5 2.85 3.283 0.261 0.02 3.002 107
102 01.02.2018 1102 1047.50 B-150 MG-5 2.85 3.283 0.261 0.02 3.002 107
103 02.02.2018 1193 1677.50 B-200 MG-9 3.10 5.195 0.254 0.02 4.921 108
104 03.02.2018 1197 1772.00 B-225 MG-11 3.10 5.84 0.254 0.08 5.506 109
105 03.02.2018 1198 1803.50 B-225 MG-11 3.10 5.78 0.254 0.02 5.506 109
106 03.02.2018 1191AB A-3 1.812 1.812 109
107 05.02.2018 1199 1844.50 B-200 MG-9 3.10 5.195 0.254 0.02 4.921 110
108 05.02.2018 1200 1884.50 B-200 MG-9 3.10 5.195 0.254 0.02 4.921 110
109 05.02.2018 1197AB A-3 1.812 1.812 110
110 05.02.2018 1106 1083.50 B-150 MG-5 2.85 3.283 0.261 0.02 3.002 110
111 05.02.2018 1110 1124.00 B-150 MG-5 2.85 3.283 0.261 0.02 3.002 110
112 06.02.2018 1195 1709.00 B-225 MG-11 3.10 5.84 0.254 0.08 5.506 111
113 06.02.2018 1113 1160.00 B-175 MG-6 2.85 3.845 0.261 0.02 3.564 111
114 06.02.2018 1118 1200.50 B-150 MG-5 2.85 3.283 0.261 0.02 3.002 111
115 07.02.2018 1201 1925.00 B-200 MG-9 3.10 5.195 0.254 0.02 4.921 112
116 07.02.2018 1202 1965.50 B-225 MG-11 3.10 5.84 0.254 0.08 5.506 112
117 08.02.2018 1204 2033.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 113
118 08.02.2018 1205 2073.50 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 113
119 08.02.2018 1209 2231.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 113
120 09.02.2018 1207 2150.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 114
121 09.02.2018 1210 2267.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 114
122 10.02.2018 1203 1997.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 115
123 10.02.2018 1208 2190.50 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 115
124 10.02.2018 1198AB A-3 1.812 1.812 115
125 12.02.2018 1211 2307.50 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 116
126 13.02.2018 1212 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 117
127 13.02.2018 1122 B-175 MG-6 2.85 3.845 0.261 0.02 3.564 117
128 14.02.2018 1126 1281.50 B-150 MG-5 2.85 3.283 0.261 0.02 3.002 118
129 14.02.2018 1213 2384.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 118
130 15.02.2018 1122AB A-2 1.412 1.412 119
131 15.02.2018 1202AB A-3 1.812 1.812 119
132 16.02.2018 1206 2114.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 120
133 17.02.2018 1113AB A-2 1.412 1.412 121
134 19.02.2018 1115AB A-2 1.412 1.412 122
135 19.02.2018 1106AB A-2 1.412 1.412 122
136 19.02.2018 1214 2415.50 B-225 MG-11 3.10 5.84 0.254 0.08 5.506 122
137 20.02.2018 1214AB A-3 1.812 1.812 123
138 24.02.2018 1058 773.00 B-150 MG-5 3.00 3.283 0.216 0.02 3.047 124
139 24.02.2018 1066 813.50 B-150 MG-5 3.00 3.283 0.216 0.02 3.047 124
140 02.03.2018 1027AB A-3 1.812 1.812 125
141 02.03.2018 1084AB A-3 1.812 1.812 125
142 03.03.2018 1077 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 126
143 19.03.2018 1043 705.50 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 127
144 20.03.2018 1048 728.00 B-150 MG-5 3.10 3.283 0.254 0.02 3.009 128
145 20.03.2018 1053 741.50 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 128
146 21.03.2018 1061 782.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 129
147 21.03.2018 1069 818.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 129
148 22.03.2018 1063 795.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 130
149 24.03.2018 1056 759.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 131
150 24.03.2018 1173 1538.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 131
151 25.03.2018 1166 1506.50 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 132
152 25.03.2018 1159 1475.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 132
153 27.03.2018 1151 1434.50 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 133
154 28.03.2018 1175 1542.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 134
155 30.03.2018 1182 1578.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 135
156 30.03.2018 1045 705.50 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 135
157 04.04.2018 1171 1538.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 136
158 04.04.2018 1178 1560.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 136
159 05.04.2018 1052 741.50 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 137
160 05.04.2018 1076 836.00 B-225 MG-11 3.10 5.84 0.254 0.08 5.506 137
161 06.04.2018 1079 840.50 B-225 MG-11 3.10 5.84 0.254 0.08 5.506 138
162 07.04.2018 1139 1412.00 B-225 MG-11 3.10 5.84 0.254 0.08 5.506 139
163 15.04.2018 1195AB DMA DF-2 4.52 0.254 0.02 4.246 140
164 16.04.2018 1029 575.00 B-225 MG-11 3.10 5.84 0.254 0.08 5.506 141
165 17.04.2018 1029AB A-3 1.812 1.812 143
166 18.04.2018 93A 409.50 MG-9 3.10 5.195 0.254 0.02 4.921 144
167 21.07.2018 CTRY/1004 84.5 B-150 MG-9 3.1 5.195 0.216 0.02 4.959 145
168 29.08.2018 CTRY/1189AB 1.812 1.812 146
169 03.01.2019 CTRY/1 5.532 5.532 42
170 03.01.2019 CTRY/2 5.532 5.532 42
171 03.01.2019 CTRY/6 0.160 0.16 42
172 03.01.2019 CTRY/7 0.160 0.16 42
173 05.01.2019 CTRY/8 0.160 0.16 43
174 05.01.2019 CTRY/9 0.160 0.16 43
175 05.01.2019 CTRY/10 0.160 0.16 43
176 05.01.2019 CTRY/11 0.160 0.16 43
177 05.01.2019 CTRY/12 0.160 0.16 43
178 05.01.2019 CTRY/13 0.160 0.16 43
179 05.01.2019 CTRY/14 0.160 0.16 43
180 05.01.2019 CTRY/18 1.832 1.832 43
181 07.01.2019 CTRY/5 3.554 3.554 44
182 07.01.2019 CTRY/15 0.160 0.16 44
183 07.01.2019 CTRY/16 0.160 0.16 44
184 07.01.2019 CTRY/17 0.160 0.16 44
185 08.01.2019 CTRY/19 3.845 3.845 45
186 08.01.2019 CTRY/20 0.160 0.16 45
187 08.01.2019 CTRY/21 0.160 0.16 45
188 09.01.2019 KPCA/F-4 183.5 MG-5 3.283 0.140 3.143 46
189 09.01.2019 KPCA/F-5 224 MG-5 3.283 0.140 3.143 46
190 10.01.2019 KPCA/F-3 138.5 MG-5 3.283 0.140 3.143 47
191 11.01.2018 KPCA/F-2 102.5 MG-5 3.283 0.140 3.143 48
192 13.01.2019 KPCA/F-1 57.5 MG-11 5.78 0.140 5.64 49
193 13.01.2019 KPCA/F-1AB A-3 1.812 1.812 50
194 19.01.2019 KPCA/F-6 57.5 MG-11 5.78 0.140 5.64 50
195 03.03.2019 CTRY/4 3.554 3.554
196 03.03.2019 CTRY/5 0.54 0.54
Total cum 635.55 36.384 3.28 595.886
Balance of RA BILL NO 4 0.86
Total cum 636.41
Kamarajar Port Limited , chennai
Bright Power Projects (India) Pvt Ltd RA Bill No 5
RITES Limited
MRC NO 34 Dt
1 25kv Post insulator IEC/18-19/1042 22
06.07.2018
Weight in MT
1 P-1 9 2.938
2 P-2 2 2.699
3 P-3 17 1 2.712
4 G-1 1 1.58
SPL Panel 2 2.000
Total length in
mtr
34(b) Supply of Station Working Rule Diagram with Sunmica
GENRAL ELECTRICAL
4.Supply Of Control Panel
Sno Descrption Quantity MRC no Challan No
MRC no 46 S78180000654,
1 Control Panel 5
Dt:07.09.2018 655
8b(i) & 8b(ii) Supply and Erection Of single and Double conductor termination
SL NO DESCRIPTION CHALLAN NO TOTAL NOS MRC no
1 3241 470 30 MRC NO 30 Dt
2 3242 470 20 19.05.2018
3 1120 B/241/17-18 90
4 5030 102 70 MRC NO 22 Dt
18.04.2018
5191 136 40
5
MRC NO 30 Dt
6 65sqmm wire 40 6150mtr 19.05.2018
10(a) Extra Item 6(a) for supply Erection of additional fitting at turn- out
SL NO DESCRIPTION CHALLAN NO TOTAL NUMBERS
1 Jumper wire 105 sq mm 40 67 mtr
2 1030-2 B/241/17-18 140 nos
0.533
Total panel in
MRC No
mtr
26.442
5.398
MRC No 57 Dt
2.712 22/01/2019
1.58
4
40.132
Kamarajar Port Limited , chennai
Bright Power Projects (India) Pvt Ltd RA Bill No 5
RITES Limited
n- out
TOTAL NUMBERS MRC NO
67 mtr MRC NO 24 Dt
140 nos 18,04.2018
2(b) Erection for Foundation for Plinth in other then Hard Soil and Rock including
per site condition
SL NO DATE LOC NO IMP TYPE OF TYPE OF GROSS SCROLL
MAST FDN VOL VOL
m cum cum
1 25.02.2018 1021 3.10 B-175 MG-6 3.845 0.254
2 25.02.2018 1022 3.10 B-175 MG-9 5.195 0.254
3 25.02.2018 1023 3.03 B-150 MG-5 3.283 0.254
4 25.02.2018 1024 3.03 B-150 MG-5 3.283 0.254
5 25.02.2018 1025 3.00 B-150 MG-5 3.283 0.254
6 25.02.2018 1026 3.04 B-150 MG-5 3.283 0.254
8 25.02.2018 1028 3.21 B-225 MG-11 5.84 0.254
9 25.02.2018 1030 3.10 B-225 MG-11 5.84 0.254
10 25.02.2018 1031 3.20 B-225 MG-11 5.84 0.254
11 25.02.2018 1032 3.21 B-225 MG-11 5.84 0.254
12 25.02.2018 1033 3.15 B-200 MG-9 5.195 0.254
13 25.02.2018 1034 3.16 B-200 MG-9 5.195 0.254
14 25.02.2018 1035 3.26 B-200 MG-9 5.195 0.254
15 25.02.2018 1036 3.23 B-200 MG-9 5.195 0.254
16 25.02.2018 1037 3.16 B-200 MG-9 5.195 0.254
17 25.02.2018 1038 3.10 B-200 MG-9 5.195 0.254
18 26.02.2018 1040 3.22 B-150 MG-5 3.283 0.254
19 26.02.2018 1041 3.11 B-150 MG-5 3.283 0.254
20 26.02.2018 1047 2.87 B-225 5.84 0.254
21 26.02.2018 1049 2.88 B-150 MG-5 3.283 0.254
22 26.02.2018 1060 2.88 B-150 MG-5 3.283 0.254
23 26.02.2018 1067 2.87 B-150 MG-5 3.283 0.254
24 26.02.2018 1068 2.84 B-150 MG-5 3.283 0.254
25 26.02.2018 1081 2.88 B-150 MG-5 3.283 0.254
26 26.02.2018 1082 2.90 B-150 MG-5 3.283 0.254
27 26.02.2018 1085 2.90 B-150 MG-5 3.283 0.254
28 26.02.2018 1086 2.87 B-150 MG-5 3.283 0.254
29 26.02.2018 1088 2.89 B-150 MG-5 3.283 0.254
30 26.02.2018 1089 2.86 B-150 MG-5 3.283 0.254
31 27.02.2018 1065 3.04 B-150 MG-5 3.283 0.254
32 27.02.2018 1071 3.20 B-225 MG-11 5.78 0.254
33 27.02.2018 1090 2.86 B-150 MG-5 3.283 0.254
34 27.02.2018 1091 2.87 B-150 MG-5 3.283 0.254
35 27.02.2018 1093 2.88 B-150 MG-5 3.283 0.254
36 27.02.2018 1094 2.85 B-150 MG-5 3.283 0.254
37 27.02.2018 1095 2.85 B-150 MG-5 3.283 0.254
38 27.02.2018 1098 2.87 B-150 MG-5 3.283 0.254
39 27.02.2018 1097 2.85 B-150 MG-5 3.283 0.254
40 27.02.2018 1099 2.85 B-150 MG-5 3.283 0.254
41 27.02.2018 1102 2.87 B-150 MG-5 3.283 0.254
Page 48 of 73
Bright Power Projects (I) Pvt Ltd RA Bill No 2 Annexure - B
2(b) Erection for Foundation for Plinth in other then Hard Soil and Rock including
per site condition
SL NO DATE LOC NO IMP TYPE OF TYPE OF GROSS SCROLL
MAST FDN VOL VOL
42 27.02.2018 1101 2.86 B-150 MG-5 3.283 0.254
43 27.02.2018 1103 2.87 B-150 MG-5 3.283 0.254
44 27.02.2018 1105 2.85 B-150 MG-5 3.283 0.254
45 27.02.2018 1106 2.86 B-150 MG-5 3.283 0.254
46 27.02.2018 1107 2.86 B-150 MG-5 3.283 0.254
47 28.02.2018 1109 2.85 B-175 MG-6 3.845 0.254
48 28.02.2018 1110 2.87 B-150 MG-5 3.283 0.254
49 28.02.2018 1111 2.88 B-150 MG-5 3.283 0.254
50 28.02.2018 1114 2.85 B-150 MG-5 3.283 0.254
51 28.02.2018 1115 2.86 B-175 MG-6 3.845 0.254
52 28.02.2018 1117 2.85 B-150 MG-5 3.283 0.254
53 28.02.2018 1119 2.87 B-150 MG-5 3.283 0.254
54 28.02.2018 1121 2.87 B-150 MG-5 3.283 0.254
55 28.02.2018 1123 2.90 B-175 MG-6 3.845 0.254
56 28.02.2018 1125 2.86 B-150 MG-5 3.283 0.254
57 28.02.2018 1127 2.90 B-150 MG-5 3.283 0.254
58 28.02.2018 1153 3.05 B-150 MG-5 3.283 0.254
59 28.02.2018 1161 3.01 B-150 MG-5 3.283 0.254
60 28.02.2018 1169 3.01 B-150 MG-5 3.283 0.254
61 28.02.2018 1177 3.13 B-200 MG-9 5.195 0.254
62 28.02.2018 1181 3.13 B-200 MG-9 5.195 0.254
63 01.03.2018 1129 2.84 B-150 MG-5 3.283 0.254
64 01.03.2018 1131 2.90 B-150 MG-5 3.283 0.254
65 01.03.2018 1133 2.87 B-150 MG-5 3.283 0.254
66 01.03.2018 1134 2.91 B-150 MG-5 3.283 0.254
67 01.03.2018 1135 2.87 B-150 MG-5 3.283 0.254
68 01.03.2018 1137 2.87 B-150 MG-5 3.283 0.254
69 01.03.2018 1143 2.87 B-150 MG-5 3.283 0.254
70 01.03.2018 1148 3.10 B-225 MG-11 5.78 0.254
71 01.03.2018 1149 3.13 B-225 MG-11 5.78 0.254
72 01.03.2018 1184 3.21 B-200 MG-9 5.195 0.254
73 01.03.2018 1186 3.21 B-225 MG-11 5.84 0.254
74 01.03.2018 1141 3.15 B-225 MG-11 5.78 0.254
75 01.03.2018 1142 3.16 B-225 MG-11 5.78 0.254
76 01.03.2018 1152 3.07 B-150 MG-5 3.283 0.254
77 01.03.2018 1073 3.20 B-225 MG-11 5.78 0.254
78 01.03.2018 1074 3.15 B-225 MG-11 5.78 0.254
79 01.03.2018 1070 3.05 B-150 MG-5 3.283 0.254
80 01.03.2018 1062 3.02 B-150 MG-5 3.283 0.254
81 02.03.2018 1150 2.86 B-150 MG-5 3.283 0.254
82 02.03.2018 1147 2.90 B-150 MG-5 3.283 0.254
Page 49 of 73
Bright Power Projects (I) Pvt Ltd RA Bill No 2 Annexure - B
2(b) Erection for Foundation for Plinth in other then Hard Soil and Rock including
per site condition
SL NO DATE LOC NO IMP TYPE OF TYPE OF GROSS SCROLL
MAST FDN VOL VOL
83 02.03.2018 1138 2.87 B-150 MG-5 3.283 0.254
84 02.03.2018 1130 2.89 B-150 MG-5 3.283 0.254
85 02.03.2018 1126 2.85 B-150 MG-5 3.283 0.254
86 02.03.2018 1122 2.88 B-150 MG-5 3.283 0.254
87 02.03.2018 1118 2.88 B-150 MG-5 3.283 0.254
88 02.03.2018 1113 2.87 B-175 MG-6 3.845 0.254
89 02.03.2018 1078 2.87 B-200 MG-9 5.195 0.254
90 02.03.2018 1064 2.90 B-200 MG-9 5.195 0.254
91 02.03.2018 1055 2.88 B-200 MG-9 5.195 0.254
92 02.03.2018 1042 3.15 B-200 MG-9 5.195 0.254
93 05.03.2018 1164 2.86 B-150 MG-5 3.283 0.254
94 05.03.2018 1156 2.88 B-150 MG-5 3.283 0.254
95 05.03.2018 1146 2.87 B-150 MG-5 3.283 0.254
96 05.03.2018 1136 2.88 B-150 MG-5 3.283 0.254
97 05.03.2018 1132 2.88 B-150 MG-5 3.283 0.254
98 05.03.2018 1128 2.85 B-150 MG-5 3.283 0.254
99 05.03.2018 1124 2.86 B-150 MG-5 3.283 0.254
100 05.03.2018 1120 2.90 B-150 MG-5 3.283 0.254
101 05.03.2018 1116 2.88 B-150 MG-5 3.283 0.254
102 05.03.2018 1112 2.92 B-175 MG-6 3.845 0.254
103 05.03.2018 1108 2.90 B-150 MG-5 3.283 0.254
104 05.03.2018 1104 2.88 B-175 MG-5 3.845 0.254
105 05.03.2018 1100 2.87 B-150 MG-5 3.283 0.254
106 05.03.2018 1096 2.85 B-150 MG-5 3.283 0.254
107 05.03.2018 1092 2.85 B-150 MG-5 3.283 0.254
108 05.03.2018 1087 2.86 B-150 MG-5 3.283 0.254
109 06.03.2016 1015 3.20 B-175 MG-5 3.845 0.261
110 06.03.2016 1017 3.03 B-150 MG-5 3.283 0.254
111 06.03.2016 1018 3.25 B-150 MG-5 3.283 0.261
112 06.03.2016 1019 3.04 B-150 MG-5 3.283 0.254
113 06.03.2016 1020 3.26 B-175 MG-6 3.845 0.254
TOTAL CUM 432.343
Page 50 of 73
Bright Power Projects (I) Pvt Ltd RA Bill No 2 Annexure - B
cum cum
0.02 0.274 2
0.02 0.274 2
0.02 0.274 2
0.02 0.274 2
0.02 0.274 2
0.02 0.274 2
0.08 0.334 2
0.08 0.334 2
0.08 0.334 3
0.08 0.334 2
0.02 0.274 3
0.02 0.274 3
0.02 0.274 3
0.02 0.274 3
0.02 0.274 3
0.02 0.274 3
0.02 0.274 4
0.02 0.274 4
0.08 0.334 4
0.02 0.274 4
0.02 0.274 4
0.02 0.274 4
0.02 0.274 4
0.02 0.274 4
0.02 0.274 4
0.02 0.274 4
0.02 0.274 5
0.02 0.274 5
0.02 0.274 5
0.02 0.274 6
0.02 0.274 6
0.02 0.274 6
0.02 0.274 6
0.02 0.274 6
0.02 0.274 6
0.02 0.274 6
0.02 0.274 6
0.02 0.274 7
0.02 0.274 7
0.02 0.274 7
Page 51 of 73
Bright Power Projects (I) Pvt Ltd RA Bill No 2 Annexure - B
Page 52 of 73
Bright Power Projects (I) Pvt Ltd RA Bill No 2 Annexure - B
Page 53 of 73
Bright Power Projects (India) Pvt Ltd RA Bill No 2 Annexure - C
3(a) Supply & Erection of traction masts portals, TTC, Dwarf masts main masts of switching stations
including fabricated structures for feeder
TOTAL
SL NO DESCRIPTION CHALLAN NO TOTAL NOS UNIT WEIGHT MRC NO
WEIGHT
MRC NO 21
1 B-150 2305 12 369.69 4436.28 Dt 19,03.2018
Total weight in kgs 4436.28
Total weight in MT 4.436
3(b)Supply & Erection of Fabarication Steel work other then item 3(a)
TOTAL
SL NO DESCRIPTION CHALLAN NO TOTAL NOS UNIT WEIGHT MRC NO
WEIGHT
MRC NO 21
1 3100 2305 4 62.173 248.692 Dt 19,03.2018
Total Weight in Kgs 248.692
Total Weight in MT 0.2487
Page 54 of 73
Bright Power Projects (India) Pvt Ltd RA Bill No 2 Annexure - C
1 1040-2 35
2 1180 1000
3 1192 B/241/17-18 1000
4 1120 90
MRC NO 22
5 1140 10
Dt 18,04.2018
6 5020 139 80
7 5030 70
102
8 5191 40
9 1110-2 136 50
10(a) Extra Item 6(a) for supply Erection of additional fitting at turn- out
SL NO DESCRIPTION CHALLAN NO TOTAL NUMBERS MRC NO
1 Jumper wire 105 sq mm 40 67 mtr MRC NO 24
2 1030-2 B/241/17-18 140 nos Dt 18,04.2018
MRC NO 27
1 Stay Insulator GIL/17-18/756 235nos
Dt 18,04.2018
Page 55 of 73
Bright Power Projects (I) Pvt Ltd Ra Bill No 2 Annexure - A
2 (b) Supply of Foundation for plinth in other than hard soil and rock including material
Page 56 of 73
Bright Power Projects (I) Pvt Ltd Ra Bill No 2 Annexure - A
2 (b) Supply of Foundation for plinth in other than hard soil and rock including material
Page 57 of 73
Bright Power Projects (I) Pvt Ltd Ra Bill No 2 Annexure - A
2 (b) Supply of Foundation for plinth in other than hard soil and rock including material
Page 58 of 73
Bright Power Projects (I) Pvt Ltd Ra Bill No 2 Annexure - A
2 (b) Supply of Foundation for plinth in other than hard soil and rock including material
Page 59 of 73
Bright Power Projects (I) Pvt Ltd Ra Bill No 2 Annexure - A
Page 60 of 73
Bright Power Projects (I) Pvt Ltd Ra Bill No 2 Annexure - A
Page 61 of 73
Bright Power Projects (I) Pvt Ltd Ra Bill No 2 Annexure - A
Page 62 of 73
Bright Power Projects (I) Pvt Ltd Ra Bill No 2 Annexure - A
Page 63 of 73
Bright Power Projects (India) Pvt Ltd RA Bill No 2 Annexure - D
Supply & Erection of traction masts portals, TTC, Dwarf masts main masts of
switching stations including fabricated structures for feeder
Page 64 of 73
Bright Power Projects (India) Pvt Ltd RA Bill No 2 Annexure - D
Page 65 of 73
Bright Power Projects (India) Pvt Ltd RA Bill No 2 Annexure - D
SUMMARY
TOTAL NO OF
TYPE OF PER UNIT TOTAL
SL NO ERECTED
MAST WEIGHT WEIGHT
MAST
1 B-150 74 369.69 27357.06
2 B-175 12 422.89 5074.68
3 B-200 13 474.19 6164.47
4 B-225 13 573.772 7459.036
TOTAL Weight IN KGS 46055.246
TOTAL Weight IN MT 46.055
Page 66 of 73
Kamarajar Port Limited, Chennai
Bright Power Projects (India) Pvt Ltd RA Bill No 5 RITES LIMITED, Gurgaon
3(a) Supply & Erection of traction masts portals, TTC, Dwarf masts main masts of switching stations including fabricated
structures for feeder
Summary
Masttype Total nos Weight Total weight 20% supply
B-150 5 369.69 1848.45
B-200 2 474.19 948.38
S-6 2 644.8 1289.6 1289.6
S-101 3 121.278 363.834 363.834
S-100 1 147.928 147.928 147.928
4598.192 1801.362
Total in MT 4.598 1.801
3C Supply & Erection of Guy Rod Assembly
SL NO DATE LOC NO DPR NO
1 10.05.2019 F-1 14
6 02.-07.2018 CTRY/1186 1 28
7 03.07.2018 CTRY/1195 1 29
8 04.07.2018 CTRY/1202 1 30
9 05.07.2018 CTRY/1010 1 31
10 07.07.2018 CTRY/1027 1 32
11 15.08.2018 NMTS/93-CTRY/1081 2 33
TOTAL 14
10 (a)Extra on item 6(a) for supply & erection of additional fitting at a turn-out,diamond crossing or over-lap
1 09.08.2018 SSP 2 11
15a(iv) copper Jumper 160 sqmm between OHE and Cross feeder
sl no Date Loc no Quantity DPR No
1 19.08.2018 SS-05 2 130
2 19.08.2018 SS-04 1 130
3 19.08.2018 SS-01 2
Total 05 Nos
28 Erection Of LT Transformer
SL No Date loc no Quantity DPR NO
1 08.04.2019 SSP 1 11
28 Erection of DO Fuse
SL No Date loc no Quantity DPR NO
1 08.04.2019 SSP 1 11
Erection of steel
Total Nos
Total Total
SL No Type of mast Type of steels Required in Unit weight
Weight Weight
single mast
9036 1 18.72 18.72
9037 1 5.508 5.508
9032-6 3 1.163 3.489
1 B-175 54.951
3076-4 4 1.687 6.748
9038 1 10.243 10.243
9038A 1 10.243 10.243
Summary
Erection of
sl no Type of Mast Total weight Total weight
Bracket in mast
1 Isolater 1 54.951 54.951
Total weight in KG 54.951
Total weight in MT 0.054951
SSP WORK
1 DMA 5.600 2 11.200
2 S-104 25.430 6 152.580
3 S-108 3.767 4 15.068
4 S-109 3.674 3 11.022
5 S-113 152.441 1 152.441
6 S-114 68.354 2 136.708
DPR NO
7 S-115 69.597 2 139.194 15
8 S-116 69.597 2 139.194
9 S-119 41.295 1 41.295
10 S-129 5.820 1 5.820
11 S-130 8.903 1 8.903
12 S-134 68.403 2 136.806
13 S-135 1.796 4 7.184
957.415
0.957
Summary
sl no Type of Mast Erection of mast Total weight Total weight
1 Isolater 1 54.951 54.951
2 ATD 19 22.26 422.96
3 SSP 957.415
Total weight 1,435.33
TOTAL weight 1.435
Kamarajar Port Limited, Chennai
Bright Power Projects (India) Pvt Ltd RA Bill No 5 RITES LIMITED, Gurgaon