Sei sulla pagina 1di 73

Bill of Payment ( Tax Invoice)

Agreement No RITES/CO/RI/KPL/OHE/2016/1
Invoice No SAL/GST/007/ GST NO 33AAACB1943Q1ZL
Invoice Date SAC CODE
M/S.KAMARAJAR PORT LTD,
4th Floor, Super
Customer Name and Address
Speciality Diabetic Centre,
Rajaji Salai, Chennai-600001
GST NO 33AAACE9013G2Z1
S.NO Particulars Unit Quanitity Amount
RA Bill no 5 - 75%
1 Nos 1.00 2,641,048
(PRE GST ITEMS)

RA bill no 5 - 90%
2 Nos 1.00 8,764,978
(POST GST ITEMS)

3 Add CGST 6% 684,362

4 Add SGST 6% 684,362

5 Total 12,774,749

Deductions

6 Income tax @ 2% 52,821

7 Labour Cess @ 1% 26,410

8 Total Deductions 79,231

9 NET Payable 12,695,517

Rupees Eighty Eight Lakh Ninety Nine Thousand Seven Hundred Seven only
Bright power Projects (India) Pvt Ltd RA Bill No 5

Design, Supply, Erection, Testing & Commissioning of Railway Electrification work of


NAME OF WORK Existing / Proposed Railway Track including Modifications of existing 25KV AC, 50 Hz single
phase OHE, SSP, SCADA and General Electrification work for Kamarajar Port Limited,
Chennai
CONTRACT VALUE Rs.5,84,96,744.00/-
NAME OF CONTRACTOR M/s Bright Power Projects (India) Private Limited
SCHEDULED DATE OF COMPLETION 07.02.2018
EXTENDED DATE OF COMPLETION 30.06.2019
RUNNING ACCOUNT BILL NO 5
DATE OF SUBMISSION 15.05.2019

AMOUNT IN RUPEES
SNO DESCRIPTION
UPTO PREVIOUS BILL CURRENT BILL CUMMULATIVE REMARKS

DUES

1 Work done civil


2 Work done electrical - 9,738,864.53 9,738,864.53
3 Work done others - -
4 Mobilization Advance/Additional Advance - -
5 Plant,Machinery&Shuttering Advance - -
6 Net Secure Advance - -
7 IGST @ 12% - 1,168,663.74 1,168,663.74

Total (A) - 10,907,528.27 10,907,528.27

DEDUCTIONS
- -
1 Mobilization/Additional Advance - -
2 Plant,Machinery&Shuttering Advance - -
3 Interest on Mobilization/Additional Advance - -
4 Interest on Plant,Machinery&Shuttering Advance - -
5 Security Deposit - -
a) Deductible @ 5% - 545,376.41 545,376.41
b) Less EMD converted into SD (-) - -
c) Net SD Deductible - -
6 Income Tax @ 2% - 194,777.29 194,777.29
7 Works Contract Tax
8 Labour Cess @ 1% - 109,075.28 109,075.28
9 To be Withheld/ Recovered Under Clause 5/2
10 Any Other

Total (B) - 849,228.99 849,228.99

Net Payable (A) - (B) 10,058,299.29 10,058,299.29


Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
As Per BOQ RITES LIMITED,Gurgaon
Percentage & Part Rate
1 2 3 4 5 6 7 8 9 10 11
Item No Brief Description of work Unit Supply / BOQ 25% Variation Rate (Rs.) Part Rate BOQ Amount %
Erection Quantity Variation Qty
of BOQ

2 Foundation
1(a) Preparation of desingn and drawings for OHE KM Supply / 2.5 37,500.00 100% 93,750.00 50%
Erection

2(b) Foundation for plinth in other than hard soil Cum Supply and 120.00 120.00 10,500.00 100% 1,260,000.00 50%
and rock including material as per site Erection
condition
45%

5%

2(b) Foundation for plinth in other than hard soil Cum Supply and 48.00 10,185.00 97% 488,880.00 50%
and rock including material as per site Erection
condition
45%

5%

3 Steel Structure
3(a) Supply & Erection of traction masts portals, Tonne Supply 70.00 17.50 105,000.00 100% 7,350,000.00 70%
TTC, Dwarf masts main masts of switching
stations including fabricated structures for 20%
feeder

10%

Erection 70.00 17.50 10,500.00 100% 735,000.00 90%

10%
TTC, Dwarf masts main masts of switching
stations including fabricated structures for
feeder
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
As Per BOQ RITES LIMITED,Gurgaon
Percentage & Part Rate
1 2 3 4 5 6 7 8 9 10 11
Item No Brief Description of work Unit Supply / BOQ 25% Variation Rate (Rs.) Part Rate BOQ Amount %
Erection Quantity Variation Qty
of BOQ

Erection 17.50 10,185.00 97% 90%

10%

3(b) Supply & Erection of Fabricated steel work Tonne Supply 16.00 - 112,500.00 100% 1,800,000.00 70%
other than items in 3(a).
20%

10%

Erection 16.00 - 11,250.00 100% 180,000.00 90%

10%

3 (c) Supply and Erection of Guy Rod Assembly Each Supply 44.00 - 11,250.00 100% 495,000.00 70%

20%

10%

Erection 44.00 - 1,125.00 100% 49,500.00 90%

10%

4a(i) supply and Erection without insulator Each Supply 186.00 46.50 12,750.00 100% 2,371,500.00 70%
&Erection of a single Bracket assembly
20%
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
As Per BOQ RITES LIMITED,Gurgaon
Percentage & Part Rate
1 2 3 4 5 6 7 8 9 10 11
Item No Brief Description of work Unit Supply / BOQ 25% Variation Rate (Rs.) Part Rate BOQ Amount %
4a(i) supply and Erection without insulator Each Supply
Erection 186.00 Variation
Quantity 46.50 Qty 12,750.00 100% 2,371,500.00
&Erection of a single Bracket assembly of BOQ

10%

Erection 186.00 46.50 2,250.00 100% 418,500.00 90%

10%

4 a(i) supply and Erection without insulator Each supply 2.00 12,367.50 97% 24,735.00 90%
&Erection of a single Bracket assembly
Erection 2,182.50 97% 4,365.00 90%

6(a) Supply and Erection of Over Head Equipment TKM Supply 6.50 1.63 1,402,500.00 100% 9,116,250.00 70%
Only(Conventional)
20%

10%

6(a) Supply and Erection of Over Head Equipment TKM Erection 6.50 1.63 172,500.00 100% 1,121,250.00 90%
Only(Conventional)
10%

8b(i) Single conductor of OHE Terminating wire Each supply 5.00 1.00 6,750.00 100% 33,750.00 70%

20%

10%
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
8b(i) Single conductor of OHE Terminating wire Each
As Per BOQ 5.00 1.00 RITES LIMITED,Gurgaon
Percentage & Part Rate
1 2 3 4 5 6 7 8 9 10 11
Item No Brief Description of work Unit Supply / BOQ 25% Variation Rate (Rs.) Part Rate BOQ Amount %
Erection Quantity Variation Qty
of BOQ

Erection 1,125.00 100% 5,625.00 90%

10%

Each supply 1.00 6,547.50 97% 6,547.50 90%

Erection 1,091.25 97% 1,091.25 90%


8b(ii) Double Over Head Equipment conductor Each supply 6.00 1.00 8,250.00 100% 49,500.00 70%

20%

10%
Erection 6.00 1.00 1,125.00 100% 6,750.00
90%

10%
Each supply 1.00 8,002.50 97% 8,002.50 90%

Erection 1,091.25 97% 1,091.25 90%


8(a)(1) Supply and Erection of regulated Each Supply 16.00 4.00 56250 100% 900000 70%
equipment(pulley 3:1)with normal
20%

10%

Erection 16.00 4.00 6375 100% 102000 90%


8(a)(1) Supply and Erection of regulated Each
equipment(pulley
Bright Power 3:1)with Pvt
Projects (India) normal
Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
As Per BOQ RITES LIMITED,Gurgaon
Percentage & Part Rate
1 2 3 4 5 6 7 8 9 10 11
Item No Brief Description of work Unit Supply / BOQ 25% Variation Rate (Rs.) Part Rate BOQ Amount %
Erection Quantity Variation Qty
Erection 16.00 of BOQ
4.00 6375 100% 102000

10%

9(a) supply and Erection of Anticreep Each Supply 9.00 - 108750 100% 978750 70%

20%

10%

Erection 9.00 - 4500 100% 40500 90%

10%

10(a) Extra on item 6(a) for supply & erection of Each supply 4.00 1.00 8,250.00 100% 33,000.00 70%
additional fitting at a turn-out,diamond
crossing or over-lap 20%

10%

Erection 4.00 1.00 750.00 1.00 3,750.00 90%

10%
Each supply 1.00 8,250.00 97% 8,250.00 90%

Erection 727.50 97% 727.50 90%


11(a)(i) Supply and Erection of 25KV Bracket Each supply 180.00 45.00 4,125.00 100% 742,500.00 70%
Composite insulator
20%
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
As Per BOQ RITES LIMITED,Gurgaon
Percentage & Part Rate
1 2 3 4 5 6 7 8 9 10 11
Item No Brief Description of work Unit Supply / BOQ 25% Variation Rate (Rs.) Part Rate BOQ Amount %
11(a)(i) Supply and Erection of 25KV Bracket Each supply
Erection 180.00 Variation
Quantity 45.00 Qty 4,125.00 100% 742,500.00
Composite insulator of BOQ

10%

Erection 45.00 750.00 135,000.00 90%

10%

Each supply 9.00 4,001.25 97% 36,011.25 90%

Erection 727.50 97% 6,547.50 90%


11(a)(ii) Supply and Erection of 25KV Stay Composite Each supply 180.00 45.00 4,125.00 100% 742,500.00 70%
insulator
20%

10%

Erection 180.00 45.00 750.00 135,000.00 90%

10%

Each supply 9.00 4,001.25 97% 36,011.25 90%

Erection 727.50 97% 6,547.50 90%


11(b)(i) Supply and Erection of solid core-cut in Each supply 34.00 - 7,500.00 100% 255,000.00 70%
insulator
20%
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
As Per BOQ RITES LIMITED,Gurgaon
Percentage & Part Rate
1 2 3 4 5 6 7 8 9 10 11
11(b)(i)
Item No Supply and Erection of solid core-cut
Brief Description of work in Each
Unit supply
Supply / 34.00
BOQ - 25% Variation 7,500.00
Rate (Rs.) 100%
Part Rate 255,000.00
BOQ Amount %
insulator Erection Quantity Variation Qty
of BOQ

10%

Erection 34.00 - 975.00 100% 135,000.00 90%

10%

11© Supply and Erection of 25kv Post Insulator Each supply 24.00 - 8,250.00 100% 198,000.00 70%

20%

10%

Erection 24.00 - 750.00 100% 18,000.00 90%

10%

12(a) Supply and Erection section Insulator assembly Each supply 12.00 - 47,250.00 100% 567,000.00 70%

20%

10%

Erection 12.00 - 5,250.00 100% 63,000.00 90%

10%

13(a) Supply and Erection of 25kv single pole Each supply 14.00 - 67,500.00 100% 945,000.00 70%
isolater without Earth contact assembly
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
As Per BOQ RITES LIMITED,Gurgaon
Percentage & Part Rate
1 2 3 4 5 6 7 8 9 10 11
Item No Brief Description of work Unit Supply / BOQ 25% Variation Rate (Rs.) Part Rate BOQ Amount %
Erection Quantity Variation Qty
of BOQ
13(a) Supply and Erection of 25kv single pole Each supply 14.00 - 67,500.00 100% 945,000.00
isolater without Earth contact assembly
20%

10%

Erection 14.00 - 6,750.00 100% 18,000.00 90%

10%

13d Supply & Erection of Extra on iten no 13 a & c Each supply 2.00 5,250.00 100% - 90%
for an Interlocking system
Erection 750.00 100% - 90%

15(a)(i) Copper Jumper(50 sq mm) Each supply 6.00 - 6,750.00 100% 40,500.00 70%

20%

10%

15(a) (v) Copper Jumper (160Sqmm) between OHE and Each supply 4.00 1.00 17,250.00 100% 69,000.00 70%
Cross feeder
20%

10%

Erection 2,250.00 9,000.00 90%


15(a) (v) Copper Jumper (160Sqmm) between OHE and Each 4.00 1.00 100%
Bright Power Projects Cross feeder
(India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
As Per BOQ RITES LIMITED,Gurgaon
Percentage & Part Rate
1 2 3 4 5 6 7 8 9 10 11
Item No Brief Description of work Unit Supply / BOQ 25% Variation Rate (Rs.) Part Rate BOQ Amount %
Erection Quantity Variation Qty
Erection of BOQ 2,250.00 9,000.00

10%

Each supply 1.00 16,732.50 97% 16,732.50 90%

Erection 2,182.50 97% 2,182.50 90%


16(a) Supply and Erection of structure bond Each supply 200.00 50.00 900.00 100% 180,000.00 70%

20%

10%

Erection 450.00 100% 90,000.00 90%

10%

16(b) Supply and Erection of Longitudinal bond Each supply 30.00 7.50 750.00 100% 22,500.00 70%

20%

10%

Erection 450.00 100% 13,500.00 90%

10%

Each supply 7.00 727.50 97% 5,092.50 90%


Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
As Per BOQ RITES LIMITED,Gurgaon
Percentage & Part Rate
1 2 3 4 5 6 7 8 9 10 11
Item No Brief Description of work Unit Supply / BOQ 25% Variation Rate (Rs.) Part Rate BOQ Amount %
Erection Quantity Variation Qty
of BOQ
Each supply 7.00 727.50 97% 5,092.50

Erection 436.50 97% 3,055.50 90%


16 C Supply and Erection of transverse and special Each supply 30.00 7.50 1,425.00 100% 42,750.00 70%
bond
20%

10%

Erection 450.00 100% 13,500.00 90%

10%

Each supply 7.00 1,382.25 97% 9,675.75 90%

Erection 436.50 97% 3,055.50 90%


18(a) Supply and Erection of 25 KV Vacuum Each Supply 1.00 - 427,500.00 100% 427,500.00 70%
Interrupter.
20%

10%

Erection 15,000.00 10000% 15,000.00 90%

10%

19 Supply and Erection of 25kv potential Each supply 1.00 60,000.00 100% 60,000.00 70%
transformer
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
As Per BOQ RITES LIMITED,Gurgaon
Percentage & Part Rate
1 2 3 4 5 6 7 8 9 10 11
Item No Brief Description of work Unit Supply / BOQ 25% Variation Rate (Rs.) Part Rate BOQ Amount %
Erection Quantity Variation Qty
19 Supply and Erection of 25kv potential Each supply 1.00 of BOQ 60,000.00 100% 60,000.00
transformer
20%

10%

Erection 7,500.00 100% 7,500.00 90%

10%

20 Supply and Erection of 42kv Lightining Each supply 1.00 1.00 52,500.00 100% 52,500.00 70%
arrester
20%

10%

Erection 4,500.00 100% 4,500.00 90%

10%

22(a) S&E Of Iron clad DC 230 fuse box Each Supply 1.00 - 11,250.00 100% 11,250.00 70%

20%

10%

22(b) S&E Of Iron clad AC 230 fuse box Each Supply 1.00 - 11,250.00 100% 11,250.00 70%

20%
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
As Per BOQ RITES LIMITED,Gurgaon
Percentage & Part Rate
1 2 3 4 5 6 7 8 9 10 11
Item No Brief Description of work Unit Supply / BOQ 25% Variation Rate (Rs.) Part Rate BOQ Amount %
22(b) S&E Of Iron clad AC 230 fuse box Each Supply
Erection 1.00 Variation
Quantity - Qty 11,250.00 100% 11,250.00
of BOQ

10%

23 Supply and Erection of lead Acid battery set supply 1.00 187,500.00 187,500.00 70%

20%

10%

Erection 1.00 11,250.00 11,250.00 90%

10%

24 Supply and Erection of Battery Charger set supply 1.00 142,500.00 142,500.00 70%

20%

10%

Erection 1.00 7,500.00 7,500.00 90%

10%

30a(i) Supply and Erection of fencing Panel at mtr supply 100.00 6,000.00 600,000.00 70%
switching
20%
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
As Per BOQ RITES LIMITED,Gurgaon
Percentage & Part Rate
1 2 3 4 5 6 7 8 9 10 11
30a(i)
Item No SupplyBrief
and Erection of fencing
Description Panel at
of work mtr
Unit supply
Supply / 100.00
BOQ 25% Variation 6,000.00
Rate (Rs.) Part Rate 600,000.00
BOQ Amount %
switching Erection Quantity Variation Qty
of BOQ

10%

Erection 100.00 600.00 60,000.00 90%

10%

30a(ii) Supply and Erection of fencing Upright Tonne Supply 1.00 82,500.00 82,500.00 70%

20%

10%

Erection 1.00 5,250.00 5,250.00 90%

10%

30(b)(i) S&E of anticlimbing device at switching Tonne Supply 0.25 - 112,500.00 100% 28,125.00 70%
station
20%

10%

28 S&E of a 25kv DO fuse assembly Each Supply 2.00 - 33,000.00 100% 66,000.00 70%

20%

10%
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
As Per BOQ RITES LIMITED,Gurgaon
Percentage & Part Rate
1 2 3 4 5 6 7 8 9 10 11
Item No Brief Description of work Unit Supply / BOQ 25% Variation Rate (Rs.) Part Rate BOQ Amount %
Erection Quantity Variation Qty
of BOQ

31(a) Transfer of Equipment from one Mast or Each Erection 4.00 4,500.00 100% 18,000.00 90%
Support Mast
10%

31(b) Provision of additional Bracket assemblies on Each Erection 4.00 - 7,500.00 100% 30,000.00 90%
mast or support
10%

32 Extra Power Block Charges on erection of LS Erection 1.00 825,000.00 100% 825,000.00 50%
work under the Power Block
50%

33 Design, Supply And Erection of SSP building LS Supply and 1.00 922,500.00 100.00 922,500.00 70%
with Electrification Erection
20%

10%

34(a) Supply and Erection of Caution Board Each Supply 5.00 1.25 7,500.00 100% 37,500.00 70%

20%

10%

Erection 750.00 3,750.00 90%


34(a) Supply and Erection of Caution Board Each 5.00 1.25
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
As Per BOQ RITES LIMITED,Gurgaon
Percentage & Part Rate
1 2 3 4 5 6 7 8 9 10 11
Item No Brief Description of work Unit Supply / BOQ 25% Variation Rate (Rs.) Part Rate BOQ Amount %
Erection Quantity Variation Qty
Erection of BOQ 750.00 3,750.00

10%

Each supply 1.00 7,275.00 97% 7,275.00 90%

Erection 727.50 97% 727.50 90%


34(b) Supply and erection of Station Working rule Each Supply 1.00 1.00 33,750.00 33,750.00 70%
diagram
20%

10%

Erection 1.00 11,250.00 11,250.00 90%

10%

27 Supply and erection of Oil filtration,testing,and Each Supply 2.00 - 97,500.00 100% 195,000.00 70%
commissioning of LT supply transformer
10KVA 20%

10%

Erection 2.00 15,000.00 100.00 30,000.00 90%

10%
SCADA
1 Design and Drawings LS Supply 1.00 225,000.00 100.00 225,000.00 50%
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
As Per BOQ RITES LIMITED,Gurgaon
Percentage & Part Rate
1 2 3 4 5 6 7 8 9 10 11
Item No Brief Description of work Unit Supply / BOQ 25% Variation Rate (Rs.) Part Rate BOQ Amount %
Erection Quantity Variation Qty
1 Design and Drawings LS Supply 1.00 of BOQ 225,000.00 100.00 225,000.00

50%

General Electrification Work


1 Supply, installation, testing & Commissioning Nos Supply & 8 772,500.00 100% 6,180,000.00 70%
of heavy duty 30M (Polygonal GI), 3 sections Erection
High Mast on existing foundation with lantern
20%
carriage suitable for 18 Nos. of flood light
fittings, gear box, control panel, flexible copper
multi core copper cable of 4.0 Sq. mm. size etc. 10%
all as per specification including luminaries
2 adjusting arrangement,
Design casting of openproper aiming
raft type andRCC
shallow Each Erection 8.00 - 41,250.00 100% 330,000.00 70%
foundation suitable for safe soil bearing
capacity of 10 T/sq.mtr at 2 mtr. Depth ,
20%
supplying and fixing of foundation bolts
manufactured from special steel along with
nuts, washer, suitable size of anchor plates and 10%
6 template etc.XLPE
Supply of as perinsulated
high mast manufacturer
and PVC sheathed 700.00 175 345.00 100% 241,500.00 70%
Aluminium armored power cable 1.1.kv 20%
10%
175 334.65 97% 58,563.75 70%
a) 4* 16 sqmm 20%
10%

b) 4 * 25 sqmm 1200.00 300 563.00 100% 675,600.00 70%


Mtr Supply
20%
10%
190 546.11 97% 103,760.90 70%
20%
10%
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
As Per BOQ RITES LIMITED,Gurgaon
Percentage & Part Rate
Mtr Supply
1 2 3 4 5 6 7 8 9 10 11
Item No Brief Description of work Unit Supply / BOQ 25% Variation Rate (Rs.) Part Rate BOQ Amount %
Erection Quantity Variation Qty
of BOQ

b) 4 * 185sqmm 150.00 1,650.00 100% 247,500.00 70%


20%
10%
4 Supplying installing testing commissioning of set Supply & 5.00 90,000.00 100% 450,000.00 70%
control panel housing timer contactor, MCB Erection
circuit etc. for 12 Nos. luminaries as per
20%
specification given below fabricated out of 14
SWG sheet steel out door installation with
canopy double door etc. as required. 10%

Total Amount in Rupees


POST GST ITEMS
2(b) Foundation for plinth in other than hard soil Cum Supply and 636.41 8,067.61 50%
and rock including material as per site Erection
condition
45%

5%

8b(i) Single conductor of OHE Terminating wire Each supply 9.00 6,306.42 100% 56,757.78 90%

Erection 727.33 100% 6,545.97 90%

8b(ii) Double Over Head Equipment conductor Each supply 14.00 7,021.26 100% 7,021.26 90%

Erection 826.71 100% 11,573.94 90%

10(a) Extra on item 6(a) for supply & erection of Each supply 11.00 4,607.23 100% 50,679.53 90%
additional fitting at a turn-out,diamond
crossing or over-lap
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
As Per BOQ RITES LIMITED,Gurgaon
Percentage & Part Rate
1 2 3 4 5 6 7 8 9 10 11
Item No Brief Description of work Unit Supply / BOQ 25% Variation Rate (Rs.) Part Rate BOQ Amount %
Erection Quantity Variation Qty
10(a) Extra on item 6(a) for supply & erection of Each of BOQ 11.00
additional fitting at a turn-out,diamond
crossing or over-lap Erection 739.23 100% 8,131.53 90%

15a(v) Copper Jumper (160Sqmm) between OHE and Each supply 4.00 6,219.58 100% 8.00 90%
Cross feeder
Erection 330.18 100% 1,320.72 90%

15a(v) Supply and Erection of Longitudinal bond Each supply 1,290.00 660.62 100% 852,199.80 90%

Erection 153.20 100% 197,628.00 90%

16 C Supply and Erection of transverse and special Each supply 32.00 675.91 100% 21,629.12 90%
bond
Erection 153.20 100% 4,902.40 90%

34(a) Supply and Erection of Caution Board Each supply 23.00 21.00 290.01 100% 6,670.23 90%

Erection 86.84 100% 1,997.32 90%


NS-1 Supply of LED Flood light Each supply 96.00 34,534.88 3,315,348.48 70%

1 SSP Manning Staff Man Supply & 18.00 20,357.500 100%


Erection

NS-4 Material Trasport by Trailer Job Supply & 3.00 8,883.750 100%
Erection

NS-5 Loading per location by Hydra Job Supply & 3.00 4,145.750 100%
Erection
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
As Per BOQ RITES LIMITED,Gurgaon
Percentage & Part Rate
1 2 3 4 5 6 7 8 9 10 11
Item No Brief Description of work Unit Supply / BOQ 25% Variation Rate (Rs.) Part Rate BOQ Amount %
Erection Quantity Variation Qty
NS-5 Loading per location by Hydra Job Supply & 3.00 of BOQ 4,145.750 100%
Erection

NS-6 Unloading per location by Hydra Job Supply & 3.00 4,145.750 100%
Erection

NS-7 supply of cable Mtr Supply 2171.00 615.110 70%


4*120 sqmm

NS-3 Supply and erection of terminal board Each Supply 1.00 12,822.000 90%

Total Amount in Rupees

Grand Total Amount in Rs

Date and signature of officer preparing the bill DGM/Electrical


Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
rt Rate Amount of Bill RITES LIMITED,Gurgaon
12 13 14 15 16 17 18
Part Rate Qty as Qty as per Total Qty Amount upto Amount as per 18
payable per this bill previous Bill this Bill
previous
Bill

18,750.000 2.415 2.415 - 45,281.25 45,281.250

- -
5,250.000 240.000 240.000 1,260,000.000 - 1,260,000.000
- -
4,725.000 240.000 240.000 1,134,000.000 - 1,134,000.000
- -
525.000 0 0.000 - - -
- -
5,092.500 48.000 48.000 244,440.000 - 244,440.000
- -
4,583.250 48.000 48.000 219,996.000 - 219,996.000
- - -
509.250 0 0.000 - - -
- -
- -
73,500.000 77.649 77.649 5,707,201.500 - 5,707,201.500
- -
21,000.000 74.924 1.801 76.725 1,573,404.000 37,821.00 1,611,225.000
- -
10,500.000 0 - - -
- -
9,450.000 87.261 87.261 824,616.450 - 824,616.450

1,050.000 0 - - -
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
rt Rate Amount of Bill RITES LIMITED,Gurgaon
12 13 14 15 16 17 18
Part Rate Qty as Qty as per Total Qty Amount upto Amount as per 18
payable per this bill previous Bill this Bill
previous
Bill
9,166.500 4.598 4.598 - 42,147.57 42,147.567
- -
9,879.450 - -

78,750.000 4.094 4.094 322,402.500 - 322,402.500


- -
22,500.000 1.785 1.435 3.220 40,162.500 32,287.50 72,450.000
- -
11,250.000 - -
- -
10,125.000 3.799 1.435 5.234 38,464.875 14,529.38 52,994.250
- -
1,125.000 0 - - -
- -
7,875.000 30.000 30.000 236,250.000 - 236,250.000
- -
2,250.000 29.000 1 30.000 65,250.000 2,250.00 67,500.000
- -
1,125.000 0 - - -
- -
1,012.500 29.000 1 30.000 29,362.500 1,012.50 30,375.000
- -
112.500 0 - - -
- -
8,925.000 232.000 232.000 2,070,600.000 - 2,070,600.000
- -
2,550.000 232.000 232.000 591,600.000 - 591,600.000
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
rt Rate Amount of Bill RITES LIMITED,Gurgaon
12 13 14 15 16 17 18
Part Rate Qty as Qty as per Total Qty Amount upto Amount as per 18
payable per this bill previous Bill this Bill
previous
Bill
- -
1,275.000 0 - - -
- -
2,025.000 232.000 232.000 469,800.000 - 469,800.000

225.000 0 - - -

11,130.75 2 2.000 - 22,261.50 22,261.500


- -
1,964.25 1 1.000 - 1,964.25 1,964.250
- -
981,750.000 5.570 5.570 5,468,347.500 - 5,468,347.500
- -
280,500.000 5.288 5.288 1,483,284.000 - 1,483,284.000
- -
140,250.000 0 - - -
- -
155,250.000 8.217 8.217 1,275,689.250 - 1,275,689.250
- -
17,250.000 0 - - -
- - -
4,725.00 6 6.000 28,350.000 - 28,350.000
- - -
1,350.00 6 6.000 8,100.000 - 8,100.000
- - - -
675.00 - - -
- - - -
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
rt Rate Amount of Bill RITES LIMITED,Gurgaon
12 13 14 15 16 17 18
Part Rate Qty as Qty as per Total Qty Amount upto Amount as per 18
payable per this bill previous Bill this Bill
previous
Bill
1,012.50 6 6.000 6,075.000 - 6,075.000
- - -
112.50 - - -
- - -
5,892.75 1 1.000 - 5,892.75 5,892.750
- -
982.13 1 1.000 - 982.13 982.125
5,775.00 7 7.000 40,425.000 - 40,425.000
- - -
1,650.00 7 7.000 11,550.000 - 11,550.000
- - -
825.00 - - -
- - -
1,012.50 6 1 7.000 6,075.000 1,012.50 7,087.500
- - -
112.50 - - -
7,202.25 1 1.000 - 7,202.25 7,202.250
- -
982.13 1 1.000 - 982.13 982.125
39375.00 19.00 19.000 748,125.000 - 748,125.000
- - -
11,250.000 19.000 19.000 213,750.000 - 213,750.000
- - -
5,625.000 0 0.000 - - -
- - -
5,737.500 19.000 19.000 109,012.500 - 109,012.500
- -
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
rt Rate Amount of Bill RITES LIMITED,Gurgaon
12 13 14 15 16 17 18
Part Rate Qty as Qty as per Total Qty Amount upto Amount as per 18
payable per this bill previous Bill this Bill
previous
Bill
637.500 0 0.000 - - -
- -
76125 5.000 5.000 380,625.000 - 380,625.000
- - -
21,750.000 5.000 5.000 108,750.000 - 108,750.000
- - -
10,875.000 0 0.000 - - -
- - -
4,050.000 5.000 5.000 20,250.000 - 20,250.000
- - -
450.000 0 0.000 - - -
- -
5,775.000 5.000 5.000 28,875.000 - 28,875.000
- -
1,650.000 5 5.000 - 8,250.00 8,250.000
- -
825.000 0 0.000 - - -
- -
675.000 5 5.000 - 3,375.00 3,375.000
- -
75.000 0 0.000 - - -
7,425.00 1 1.000 - 7,425.00 7,425.000
- -
654.75 1 1.000 - 654.75 654.750
2,887.500 225.000 225.000 649,687.500 - 649,687.500
- - -
825.000 225.000 225.000 185,625.000 - 185,625.000
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
rt Rate Amount of Bill RITES LIMITED,Gurgaon
12 13 14 15 16 17 18
Part Rate Qty as Qty as per Total Qty Amount upto Amount as per 18
payable per this bill previous Bill this Bill
previous
Bill
- - -
412.500 0 0.000 - - -
- - -
675.000 225.000 225.000 151,875.000 - 151,875.000
- - -
75.000 0 0.000 - - -
- -
3,601.13 9 9.000 - 32,410.13 32,410.125
- -
654.75 9 9.000 - 5,892.75 5,892.750
2,887.500 225.000 225.000 649,687.500 - 649,687.500
- - -
825.000 225.000 225.000 185,625.000 - 185,625.000
- - -
412.500 0 0.000 - - -
- - -
675.000 225.000 225.000 151,875.000 - 151,875.000
- - -
75.000 0 0.000 - - -
- - -
3,601.13 9 9.000 - 32,410.13 32,410.125
- -
654.75 9 9.000 - 5,892.75 5,892.750
5,250.000 28.000 28.000 147,000.000 - 147,000.000
- - -
1,500.000 17.000 11 28.000 25,500.000 16,500.00 42,000.000
- - -
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
rt Rate Amount of Bill RITES LIMITED,Gurgaon
12 13 14 15 16 17 18
Part Rate Qty as Qty as per Total Qty Amount upto Amount as per 18
payable per this bill previous Bill this Bill
previous
Bill
750.000 0 - - -
- - -
877.500 - - -
- - -
97.500 0 - - -
- - -
5,775.000 20.000 2 22.000 115,500.000 11,550.00 127,050.000
- - -
1,650.000 20.000 2 22.000 33,000.000 3,300.00 36,300.000
- - -
825.000 0 0.000 - - -
- - -
675.000 20.000 2 22.000 13,500.000 1,350.00 14,850.000
- - -
75.000 0 - - -
- - -
33,075.000 7.000 7.000 231,525.000 - 231,525.000
- - -
9,450.000 7.000 7.000 66,150.000 - 66,150.000
- - -
4,725.000 0 0.000 - - -
- - -
4,725.000 7.000 7.000 33,075.000 - 33,075.000
- - -
525.000 0 0.000 - - -
- - -
47,250.000 5.000 5.000 236,250.000 - 236,250.000
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
rt Rate Amount of Bill RITES LIMITED,Gurgaon
12 13 14 15 16 17 18
Part Rate Qty as Qty as per Total Qty Amount upto Amount as per 18
payable per this bill previous Bill this Bill
previous
Bill
- - -
13,500.000 5.000 5.000 67,500.000 - 67,500.000
- - -
6,750.000 0 0.000 - - -
- - -
6,075.000 5.000 5.000 30,375.000 - 30,375.000
- - -
675.000 0 0.000 - - -
- -
4,725.00 1 1.000 - 4,725.00 4,725.000
- -
675.00 1 1.000 - 675.00 675.000

4,725.000 5.000 5.000 23,625.000 - 23,625.000


- -
1,350.000 - -
- -
675.000 - -
- -
12,075.000 5.000 5.000 60,375.000 - 60,375.000
- - -
3,450.000 4.000 1 5.000 13,800.000 3,450.00 17,250.000
- - -
1,725.000 0 0.000 - - -
- -
2,025.000 4.000 1 5.000 8,100.000 2,025.00 10,125.000
- -
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
rt Rate Amount of Bill RITES LIMITED,Gurgaon
12 13 14 15 16 17 18
Part Rate Qty as Qty as per Total Qty Amount upto Amount as per 18
payable per this bill previous Bill this Bill
previous
Bill
225.000 0 0.000 - - -
- - -
15,059.25 1 1.000 - 15,059.25 15,059.250
- -
1,964.25 1 1.000 - 1,964.25 1,964.250
630.000 218.000 218.000 137,340.000 - 137,340.000
- - -
180.000 215.000 215.000 38,700.000 - 38,700.000
- - -
90.000 0 0.000 - - -
- - -
405.000 215.000 215.000 87,075.000 - 87,075.000
- -
45.000 0 0.000 - - -
- -
525.000 37.000 37.000 19,425.000 - 19,425.000

- - -
150.000 37.000 37.000 5,550.000 - 5,550.000
- - -
75.000 0 0.000 - - -
- -
405.000 37.000 37.000 14,985.000 - 14,985.000
- -
45.000 0 0.000 - - -
- -
654.75 7 7.000 - 4,583.25 4,583.250
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
rt Rate Amount of Bill RITES LIMITED,Gurgaon
12 13 14 15 16 17 18
Part Rate Qty as Qty as per Total Qty Amount upto Amount as per 18
payable per this bill previous Bill this Bill
previous
Bill
- -
392.85 7 7.000 - 2,749.95 2,749.950
997.500 37.000 37.000 36,907.500 - 36,907.500
- - -
285.000 37.000 37.000 10,545.000 - 10,545.000
- - -
142.500 0 0.000 - - -
- -
405.000 37.000 37.000 14,985.000 - 14,985.000
- -
45.000 0 0.000 - - -
- -
1,244.03 7 7.000 - 8,708.18 8,708.175
- -
392.85 7 7.000 - 2,749.95 2,749.950
299,250.000 1.000 1.000 299,250.000 - 299,250.000
- -
85,500.000 1 1.000 - 85,500.00 85,500.000
- -
42,750.000 - -

13,500.000 1 1.000 - 13,500.00 13,500.000


- -
1,500.000 - -

42,000.000 1 1.000 - 42,000.00 42,000.000


- - -
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
rt Rate Amount of Bill RITES LIMITED,Gurgaon
12 13 14 15 16 17 18
Part Rate Qty as Qty as per Total Qty Amount upto Amount as per 18
payable per this bill previous Bill this Bill
previous
Bill
12,000.000 - - -
- - -
6,000.000 - - -
- -
6,750.000 - - -
- -
750.000 - -

36,750.000 1 1.000 - 36,750.00 36,750.000


- -
10,500.000 2 2.000 - 21,000.00 21,000.000
- -
5,250.000 - -
- -
4,050.000 2 2.000 - 8,100.00 8,100.000
- -
450.000 - -
- -
7,875.000 1 1.000 - 7,875.00 7,875.000
- - -
2,250.000 - - -
- - -
1,125.000 - - -

7,875.000 1 1.000 - 7,875.00 7,875.000


- - -
22,500.000 - - -
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
rt Rate Amount of Bill RITES LIMITED,Gurgaon
12 13 14 15 16 17 18
Part Rate Qty as Qty as per Total Qty Amount upto Amount as per 18
payable per this bill previous Bill this Bill
previous
Bill
- - -
11,250.000 - - -
- -
131,250.000 1 1.000 - 131,250.00 131,250.000
- -
37,500.000 1 1.000 - 37,500.00 37,500.000
- -
18,750.000 - -
- -
10,125.000 1 1.000 - 10,125.00 10,125.000
- -
1,125.000 - -
- -
99,750.000 1 1.000 - 99,750.00 99,750.000
- -
28,500.000 1 1.000 - 28,500.00 28,500.000
- -
14,250.000 - -
- -
6,750.000 1 1.000 - 6,750.00 6,750.000
- -
750.000 - -
- -
4,200.000 40.132 40.132 - 168,554.40 168,554.400
- -
1,200.000 40.132 40.132 - 48,158.40 48,158.400
- -
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
rt Rate Amount of Bill RITES LIMITED,Gurgaon
12 13 14 15 16 17 18
Part Rate Qty as Qty as per Total Qty Amount upto Amount as per 18
payable per this bill previous Bill this Bill
previous
Bill
600.000 - -
- -
540.000 40.132 40.132 - 21,671.28 21,671.280
- -
60.000 - -
- -
57,750.000 0.533 0.533 - 30,780.75 30,780.750
- -
16,500.000 0.533 0.533 - 8,794.50 8,794.500
- -
8,250.000 - -
- -
4,725.000 0.533 0.533 - 2,518.43 2,518.425
- -
525.000 - -
- -
78,750.000 0.037 0.037 2,913.750 - 2,913.750

22,500.000 - - -

11,250.000 - - -

23,100.000 1.000 1.000 23,100.000 - 23,100.000

6,600.000 1 1.000 - 6,600.00 6,600.000

3,300.000 - - -
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
rt Rate Amount of Bill RITES LIMITED,Gurgaon
12 13 14 15 16 17 18
Part Rate Qty as Qty as per Total Qty Amount upto Amount as per 18
payable per this bill previous Bill this Bill
previous
Bill

4,050.000 2.000 2.000 8,100.000 - 8,100.000


- -
450.000 0.000 - - -
- -
6,750.000 1.000 1.000 6,750.000 - 6,750.000
- -
750.000 0 0.000 - - -
- -
412,500.000 1.000 1.000 412,500.000 - 412,500.000
- -
412,500.000 - - -
- -
645,750.000 1 1.000 - 645,750.00 645,750.000
- -
184,500.000 1 1.000 - 184,500.00 184,500.000
- -
92,250.000
- -
5,250.000 6.000 6.000 31,500.000 - 31,500.000
- - -
1,500.000 6.000 6.000 9,000.000 - 9,000.000
- - -
750.000 0 - - -

675.000 6.000 6.000 4,050.000 - 4,050.000


- -
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
rt Rate Amount of Bill RITES LIMITED,Gurgaon
12 13 14 15 16 17 18
Part Rate Qty as Qty as per Total Qty Amount upto Amount as per 18
payable per this bill previous Bill this Bill
previous
Bill
75.000 0 0.000 - - -

6,547.50 1 1.000 - 6,547.50 6,547.500


- -
654.75 1 1.000 - 654.75 654.750
23,625.000 1 1.000 - 23,625.00 23,625.000
- -
6,750.000 1 1.000 - 6,750.00 6,750.000
- -
3,375.000 0 0.000 - - -
- -
10,125.000 1 1.000 - 10,125.00 10,125.000
- -
1,125.000 0 0.000 - - -
- -
68,250.000 1.000 1.000 68,250.000 - 68,250.000
- - -
19,500.000 1 1.000 - 19,500.00 19,500.000
- - -
9,750.000 - - -
- -
13,500.000 1 1.000 - 13,500.00 13,500.000
- -
1,500.000 - -
-
112,500.000 1 112,500.00
-
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
rt Rate Amount of Bill RITES LIMITED,Gurgaon
12 13 14 15 16 17 18
Part Rate Qty as Qty as per Total Qty Amount upto Amount as per 18
payable per this bill previous Bill this Bill
previous
Bill
112,500.000 -
-
- -
540,750.000 8.000 8.000 4,326,000.000 - 4,326,000.000
- -
154,500.000 8.000 8.000 1,236,000.000 - 1,236,000.000
- -
77,250.000 - -
- -
28,875.000 8.000 8.000 231,000.000 - 231,000.000
- -
8,250.000 8.000 8.000 66,000.000 - 66,000.000
- -
4,125.000 - -
241.500 875 211,312.50 211,312.500
69.000 - -
34.500 - -
234.255 175 40,994.63 40,994.625
66.930 - -
33.465 - -
- -
394.100 1500 591,150.00 591,150.000
112.600 - -
56.300 - -
382.277 190 72,632.63 72,632.630
109.222 - -
54.611 - -
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
rt Rate Amount of Bill RITES LIMITED,Gurgaon
12 13 14 15 16 17 18
Part Rate Qty as Qty as per Total Qty Amount upto Amount as per 18
payable per this bill previous Bill this Bill
previous
Bill
1,155.000 45 51,975.00 51,975.000
330.000 - -
165.000 - -
63,000.000 5 5.000 - 315,000.00 315,000.000
- -
18,000.000 - -
- -
9,000.000 - -
-
34,934,409.825 3,521,396.78 38,455,806.602

4,033.805 636.41 636.410 - 2,567,153.84 2,567,153.840


- -
3,630.425 636.41 636.410 - 2,310,438.46 2,310,438.456
- - -
403.381 0 0.000 - - -
-
5,675.78 9 9.000 - 51,082.00 51,082.002
- -
654.60 9 9.000 - 5,891.37 5,891.373

6,319.13 12 12.000 - 75,829.61 75,829.608


- -
744.04 12 12.000 - 8,928.47 8,928.468

4,146.51 10 10.000 - 41,465.07 41,465.070


- -
Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
rt Rate Amount of Bill RITES LIMITED,Gurgaon
12 13 14 15 16 17 18
Part Rate Qty as Qty as per Total Qty Amount upto Amount as per 18
payable per this bill previous Bill this Bill
previous
Bill
665.31 10 10.000 - 6,653.07 6,653.070

5,597.62 4 4.000 - 22,390.49 22,390.488


- -
297.16 4 4.000 - 1,188.65 1,188.648

594.56 1290 1290.000 - 766,979.82 766,979.820


- -
137.88 1290 1290.000 - 177,865.20 177,865.200

608.32 32 32.000 - 19,466.21 19,466.208


- -
137.88 32 32.000 - 4,412.16 4,412.160

261.01 21 21.000 - 5,481.19 5,481.189


- -
78.16 21 21.000 - 1,641.28 1,641.276
24,174.42 96 2,320,743.94 2,320,743.936

20,357.500 18 18.000 - 366,435.00 366,435.000

8,883.750 2 2.000 - 17,767.50 17,767.500

4,145.750 3 3.000 - 12,437.25 12,437.250


Bright Power Projects (India) Pvt Ltd RA Bill No 5 Kamarajar Port Limited,Chennai
rt Rate Amount of Bill RITES LIMITED,Gurgaon
12 13 14 15 16 17 18
Part Rate Qty as Qty as per Total Qty Amount upto Amount as per 18
payable per this bill previous Bill this Bill
4,145.750 previous 3 3.000 - 12,437.25 12,437.250
Bill

4,145.750 2 2.000 - 8,291.50 8,291.500

430.577 2171 2171.000 - 934,782.67 934,782.667

11,539.800 1 1.000 - 11,539.80 11,539.800

- 9,738,864.53 9,738,864.53

34,934,409.83 13,260,261.31 48,194,671.13

Date and signature of Contractor


Kamarajar Port Limited, Chennai
Bright Power Projects (India) Pvt Ltd RA Bill no 5
RITES Limited
2 (b) Supply of Foundation for plinth in other than hard soil and rock including material as per site condition (Supply)

DATE LOC NO CHAINGE TYPE OF TYPE OF IMP GROSS SCORLL MUFF NET VOL
MAST FDN VOL VOL VOL DPR NO
SL NO m m cum cum cum cum
1 18.12.2017 1143 1421.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 70
2 18.12.2017 1135 1380.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 70
3 18.12.2017 1155 1461.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 70
4 19.12.2017 1163 1497.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 71
5 19.12.2017 1172 1538.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 71
6 19.12.2017 1057 773.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 71
7 20.12.2017 1187 1614.50 B-175 MG-9 2.85 5.195 0.254 0.02 4.921 72
8 20.12.2017 1179 1574.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 72
9 22.12.2017 1165 1506.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 73
10 22.12.2017 1168 1515.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 73
11 22.12.2017 1176 1551.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 73
12 22.12.2017 1183 1592.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 73
13 23.12.2017 1154 1448.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 74
14 23.12.2017 1157 1470.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 74
15 23.12.2017 1162 1479.50 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 74
16 23.12.2017 1188 1632.50 B-175 MG-9 2.85 5.195 0.254 0.02 4.921 74
17 24.12.2017 1147 1430.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 75
18 24.12.2017 1158 1475.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 75
19 26.12.2017 1125 1277.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 76
20 26.12.2017 1129 1313.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 76
21 26.12.2017 1133 1353.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 76
22 27.12.2017 1121 1236.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 78
23 27.12.2017 1144 1425.50 B-225 MG-11 3.10 5.78 0.254 0.02 5.506 78
24 28.12.2017 1117 1200.50 B-175 MG-6 2.85 3.845 0.254 0.02 3.571 79
25 28.12.2017 1137 1389.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 79
26 28.12.2017 1145 1425.50 B-225 MG-11 3.10 5.78 0.254 0.02 5.506 79
27 28.12.2017 1170 1524.50 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 79
28 29.12.2017 1082 854.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 80
29 29.12.2017 1109 1119.50 B-175 MG-6 2.85 3.845 0.254 0.02 3.571 80
30 29.12.2017 1114 1160.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 80
31 30.12.2017 1086 894.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 81
32 30.12.2017 1090 930.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 81
33 30.12.2017 1150 1434.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 81
34 30.12.2017 1105 1083.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 81
35 02.01.2018 1067 813.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 82
36 02.01.2018 1059 773.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 82
37 03.01.2018 1101 1043.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 83
38 03.01.2018 1051 732.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 83
39 04.01.2018 1138 1398.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 84
40 04.01.2018 1134 1358.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 84
41 04.01.2018 1097 1007.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 84
42 05.01.2016 1094 966.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 85
43 05.01.2016 1015AB A-2 1.412 1.412 85
44 05.01.2016 1047AB A-3 1.812 1.812 85
45 06.01.2018 1123AB A-2 1.412 1.412 86
46 06.01.2018 1130 1317.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 86
47 06.01.2018 1075 836.00 B-225 MG-11 3.10 5.78 0.254 0.02 5.506 86
48 08.01.2018 1117AB A-2 1.412 1.412 87
49 08.01.2018 1070 818.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 87
50 08.01.2018 1074 831.50 B-225 MG-11 3.10 5.78 0.254 0.02 5.506 87
51 09.01.2018 1073 831.50 B-225 MG-11 3.10 5.78 0.254 0.02 5.506 88
52 09.01.2018 1062 782.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 88
53 10.01.2018 1096 993.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 89
54 11.01.2018 1080 840.50 B-225 MG-11 3.10 5.78 0.254 0.02 5.506 90
55 11.01.2018 1092 953.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 90
56 12.01.2018 1100 1029.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 91
57 12.01.2018 1104 1070.00 B-175 MG-6 2.85 3.845 0.254 0.02 3.571 91
58 12.01.2018 1108 1110.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 91
59 13.01.2018 1112 1151.00 B-175 MG-6 2.85 3.845 0.254 0.02 3.571 92
60 13.01.2018 1116 1187.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 92
61 13.01.2018 1120 1227.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 92
62 17.01.2018 1087 912.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 93
63 18.01.2018 1124 1268.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 94
64 18.01.2018 1128 1308.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 94
65 18.01.2018 1152 1434.50 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 94
66 19.01.2018 1132 1349.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 95
67 19.01.2018 1136 1385.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 95
68 19.01.2018 1146 1425.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 95
69 20.0.2018 1156 1466.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 96
70 20.0.2018 1164 1502.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 96
71 20.0.2018 1142 1421.00 B-225 MG-11 3.10 5.78 0.254 0.02 5.506 96
72 22.01.2018 1054 741.50 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 98
73 22.01.2018 1160 1475.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 98
74 22.01.2018 1104AB A-2 1.412 1.412 98
75 23.01.2018 1112AB A-2 1.412 1.412 99
76 23.01.2018 1068 813.50 B-150 MG-5 2.85 3.283 0.261 0.02 3.002 99
77 23.01.2018 1167 1506.50 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 99
78 23.01.2018 1141 1421.00 B-225 MG-11 3.10 5.78 0.254 0.02 5.506 99
79 24.01.2018 1081 849.50 B-150 MG-5 2.85 3.283 0.261 0.02 3.002 100
80 24.01.2018 1032AB A-3 1.812 1.812 100
81 24.01.2018 1046 710.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 100
82 24.01.2018 1174 1538.00 B-150 MG-5 3.10 3.283 0.254 0.02 3.009 100
83 25.01.2018 1185 1610.00 B-225 MG-11 3.10 5.78 0.254 0.02 5.506 102
84 25.01.2018 1030AB A-3 1.812 1.812 102
85 27.01.2018 1028AB A-3 1.812 1.812 103
86 27.01.2018 1140 1412.00 B-225 MG-11 3.10 5.78 0.254 0.02 5.506 103
87 29.01.2018 1031AB A-3 1.812 1.812 103
88 29.01.2018 1019AB A-2 1.412 1.412 104
89 29.01.2018 1185AB A-3 1.812 1.812 104
90 29.01.2018 1180 1574.50 B-200 MG-9 3.10 5.195 0.254 0.02 4.921 104
91 30.01.2017 1190AB A-3 1.812 1.812 105
92 30.01.2018 1194AB A-3 1.812 1.812 105
93 30.01.2018 1093 966.50 B-150 MG-5 2.85 3.283 0.261 0.02 3.002 105
94 30.01.2018 1098 1007.50 B-150 MG-5 2.85 3.283 0.261 0.02 3.002 105
95 31.01.2018 1186AB A-3 1.812 1.812 106
96 31.01.2018 1189 1632.50 B-200 MG-9 3.10 5.195 0.254 0.02 4.921 106
97 31.01.2018 1083 876.50 B-150 MG-5 2.85 3.283 0.261 0.02 3.002 106
98 31.01.2018 1085 890.50 B-150 MG-5 2.85 3.283 0.261 0.02 3.002 106
99 01.02.2018 1191 1659.50 B-225 MG-11 3.10 5.78 0.254 0.02 5.506 107
100 01.02.2018 1196 1736.00 B-200 MG-9 3.10 5.195 0.254 0.02 4.921 107
101 01.02.2018 1089 930.50 B-150 MG-5 2.85 3.283 0.261 0.02 3.002 107
102 01.02.2018 1102 1047.50 B-150 MG-5 2.85 3.283 0.261 0.02 3.002 107
103 02.02.2018 1193 1677.50 B-200 MG-9 3.10 5.195 0.254 0.02 4.921 108
104 03.02.2018 1197 1772.00 B-225 MG-11 3.10 5.84 0.254 0.08 5.506 109
105 03.02.2018 1198 1803.50 B-225 MG-11 3.10 5.78 0.254 0.02 5.506 109
106 03.02.2018 1191AB A-3 1.812 1.812 109
107 05.02.2018 1199 1844.50 B-200 MG-9 3.10 5.195 0.254 0.02 4.921 110
108 05.02.2018 1200 1884.50 B-200 MG-9 3.10 5.195 0.254 0.02 4.921 110
109 05.02.2018 1197AB A-3 1.812 1.812 110
110 05.02.2018 1106 1083.50 B-150 MG-5 2.85 3.283 0.261 0.02 3.002 110
111 05.02.2018 1110 1124.00 B-150 MG-5 2.85 3.283 0.261 0.02 3.002 110
112 06.02.2018 1195 1709.00 B-225 MG-11 3.10 5.84 0.254 0.08 5.506 111
113 06.02.2018 1113 1160.00 B-175 MG-6 2.85 3.845 0.261 0.02 3.564 111
114 06.02.2018 1118 1200.50 B-150 MG-5 2.85 3.283 0.261 0.02 3.002 111
115 07.02.2018 1201 1925.00 B-200 MG-9 3.10 5.195 0.254 0.02 4.921 112
116 07.02.2018 1202 1965.50 B-225 MG-11 3.10 5.84 0.254 0.08 5.506 112
117 08.02.2018 1204 2033.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 113
118 08.02.2018 1205 2073.50 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 113
119 08.02.2018 1209 2231.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 113
120 09.02.2018 1207 2150.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 114
121 09.02.2018 1210 2267.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 114
122 10.02.2018 1203 1997.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 115
123 10.02.2018 1208 2190.50 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 115
124 10.02.2018 1198AB A-3 1.812 1.812 115
125 12.02.2018 1211 2307.50 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 116
126 13.02.2018 1212 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 117
127 13.02.2018 1122 B-175 MG-6 2.85 3.845 0.261 0.02 3.564 117
128 14.02.2018 1126 1281.50 B-150 MG-5 2.85 3.283 0.261 0.02 3.002 118
129 14.02.2018 1213 2384.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 118
130 15.02.2018 1122AB A-2 1.412 1.412 119
131 15.02.2018 1202AB A-3 1.812 1.812 119
132 16.02.2018 1206 2114.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 120
133 17.02.2018 1113AB A-2 1.412 1.412 121
134 19.02.2018 1115AB A-2 1.412 1.412 122
135 19.02.2018 1106AB A-2 1.412 1.412 122
136 19.02.2018 1214 2415.50 B-225 MG-11 3.10 5.84 0.254 0.08 5.506 122
137 20.02.2018 1214AB A-3 1.812 1.812 123
138 24.02.2018 1058 773.00 B-150 MG-5 3.00 3.283 0.216 0.02 3.047 124
139 24.02.2018 1066 813.50 B-150 MG-5 3.00 3.283 0.216 0.02 3.047 124
140 02.03.2018 1027AB A-3 1.812 1.812 125
141 02.03.2018 1084AB A-3 1.812 1.812 125
142 03.03.2018 1077 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 126
143 19.03.2018 1043 705.50 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 127
144 20.03.2018 1048 728.00 B-150 MG-5 3.10 3.283 0.254 0.02 3.009 128
145 20.03.2018 1053 741.50 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 128
146 21.03.2018 1061 782.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 129
147 21.03.2018 1069 818.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 129
148 22.03.2018 1063 795.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 130
149 24.03.2018 1056 759.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 131
150 24.03.2018 1173 1538.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 131
151 25.03.2018 1166 1506.50 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 132
152 25.03.2018 1159 1475.00 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 132
153 27.03.2018 1151 1434.50 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 133
154 28.03.2018 1175 1542.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 134
155 30.03.2018 1182 1578.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 135
156 30.03.2018 1045 705.50 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 135
157 04.04.2018 1171 1538.00 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 136
158 04.04.2018 1178 1560.50 B-150 MG-5 2.85 3.283 0.254 0.02 3.009 136
159 05.04.2018 1052 741.50 B-150 MG-5 3.00 3.283 0.254 0.02 3.009 137
160 05.04.2018 1076 836.00 B-225 MG-11 3.10 5.84 0.254 0.08 5.506 137
161 06.04.2018 1079 840.50 B-225 MG-11 3.10 5.84 0.254 0.08 5.506 138
162 07.04.2018 1139 1412.00 B-225 MG-11 3.10 5.84 0.254 0.08 5.506 139
163 15.04.2018 1195AB DMA DF-2 4.52 0.254 0.02 4.246 140
164 16.04.2018 1029 575.00 B-225 MG-11 3.10 5.84 0.254 0.08 5.506 141
165 17.04.2018 1029AB A-3 1.812 1.812 143
166 18.04.2018 93A 409.50 MG-9 3.10 5.195 0.254 0.02 4.921 144
167 21.07.2018 CTRY/1004 84.5 B-150 MG-9 3.1 5.195 0.216 0.02 4.959 145
168 29.08.2018 CTRY/1189AB 1.812 1.812 146
169 03.01.2019 CTRY/1 5.532 5.532 42
170 03.01.2019 CTRY/2 5.532 5.532 42
171 03.01.2019 CTRY/6 0.160 0.16 42
172 03.01.2019 CTRY/7 0.160 0.16 42
173 05.01.2019 CTRY/8 0.160 0.16 43
174 05.01.2019 CTRY/9 0.160 0.16 43
175 05.01.2019 CTRY/10 0.160 0.16 43
176 05.01.2019 CTRY/11 0.160 0.16 43
177 05.01.2019 CTRY/12 0.160 0.16 43
178 05.01.2019 CTRY/13 0.160 0.16 43
179 05.01.2019 CTRY/14 0.160 0.16 43
180 05.01.2019 CTRY/18 1.832 1.832 43
181 07.01.2019 CTRY/5 3.554 3.554 44
182 07.01.2019 CTRY/15 0.160 0.16 44
183 07.01.2019 CTRY/16 0.160 0.16 44
184 07.01.2019 CTRY/17 0.160 0.16 44
185 08.01.2019 CTRY/19 3.845 3.845 45
186 08.01.2019 CTRY/20 0.160 0.16 45
187 08.01.2019 CTRY/21 0.160 0.16 45
188 09.01.2019 KPCA/F-4 183.5 MG-5 3.283 0.140 3.143 46
189 09.01.2019 KPCA/F-5 224 MG-5 3.283 0.140 3.143 46
190 10.01.2019 KPCA/F-3 138.5 MG-5 3.283 0.140 3.143 47
191 11.01.2018 KPCA/F-2 102.5 MG-5 3.283 0.140 3.143 48
192 13.01.2019 KPCA/F-1 57.5 MG-11 5.78 0.140 5.64 49
193 13.01.2019 KPCA/F-1AB A-3 1.812 1.812 50
194 19.01.2019 KPCA/F-6 57.5 MG-11 5.78 0.140 5.64 50
195 03.03.2019 CTRY/4 3.554 3.554
196 03.03.2019 CTRY/5 0.54 0.54
Total cum 635.55 36.384 3.28 595.886
Balance of RA BILL NO 4 0.86
Total cum 636.41
Kamarajar Port Limited , chennai
Bright Power Projects (India) Pvt Ltd RA Bill No 5
RITES Limited

4a(i)Supply & Erection of Single Bracket Assembly without Insulator

sl no Description Challan No Quantity MRC No


1 2392 192 35
2 2402-1 15 MRC NO 55 Dt
3 2422-2 199 15 16.07.2018
4 2391-1 35
11 c Supply & Erection of 25kv Post Insulator
SL NO DESCRIPTION CHALLAN NO TOTAL NOS MRC no

MRC NO 34 Dt
1 25kv Post insulator IEC/18-19/1042 22
06.07.2018

13d supply of Interlock


SL NO DESCRIPTION CHALLAN NO TOTAL NOS MRC no
MRC NO 65 Dt
1 interlock 575 1
15.05.2019

16(a) Supply & Erection of Longitudinal Bond


SL NO DESCRIPTION CHALLAN NO TOTAL NOS MRC no
MRC NO 30 Dt
01.06.2018 &
1 MS Section 469 176 MRC 40
29.08.2018

16(c) Supply and erection of Transvers and Special Bond

sl no Description Challan No Quantity MRC No


MRC NO 40 Dt
1 Ms flat 192 1.64MT 29.08.2018

19.Supply of Potential Transformer Type -1


sl no Description Challan No Quantity MRC No
Potential MRC No 61 Dt
1 Transformer 1680 1 24/04/2019

20.Supply of 42kv Lightning arrester


sl no Description Challan No Quantity MRC No
MRC No 61 Dt
1 Lightning Arrester 1680 2 24/04/2019

22(a) Supply of Iron clad 230 Dc fuse box


sl no Description Challan No Quantity MRC No
Iron clad 230 DC MRC No 59 Dt
1 ccs/2018-19/174 1
fuse box 22/01/2019
Kamarajar Port Limited , chennai
Bright Power Projects (India) Pvt Ltd RA Bill No 5
RITES Limited

22(b) Supply of Iron clad 230 ac fuse box


sl no Description Challan No Quantity MRC No
Iron clad 230 ac fuse MRC No 59 Dt
1 ccs/2018-19/174 1
box 22/01/2019

23.Supply of 110v Lead Acid Battery


sl no Description Challan No Quantity MRC No
MRC No 64 Dt
1 Lead acid Battery 41 55 06/05/2019

24.Supply of Bateery Charger


sl no Description Challan No Quantity MRC No
MRC No 60 Dt
1 Battery Charger 1297 1 24/04/2019

30a(i) Supply of fencing Upright


sl no Description Challan No Quantity Unit Weight
1 U-1 5 29.592
2 U-1/1 3 29.592
3 U-2 1 29.877
4 U-3 1 30.105
2306
5 U-4 1 30.105
6 U-5 1 29.25
7 U-6 1 29.773
8 U-7 1 28.96
9 SPL Upright 17 4 29.592
Total weight in
kg

Weight in MT

30a(i) Supply of fencing Panel


sl no Description Challan No Quantity Per Panel mtr

1 P-1 9 2.938
2 P-2 2 2.699
3 P-3 17 1 2.712
4 G-1 1 1.58
SPL Panel 2 2.000
Total length in
mtr
34(b) Supply of Station Working Rule Diagram with Sunmica

sl no Description Challan No Quantity MRC No


MRC No 56 Dt
Station Working
22/01/2019
1 Rule diagram 1
Kamarajar Port Limited , chennai
Bright Power Projects (India) Pvt Ltd RA Bill No 5
RITES Limited

34(a) Supply & Erection caution Board


sl no Description Challan No Quantity MRC No
MRC NO 36 Dt
1 Caution 43 23
06.07.2018

GENRAL ELECTRICAL
4.Supply Of Control Panel
Sno Descrption Quantity MRC no Challan No
MRC no 46 S78180000654,
1 Control Panel 5
Dt:07.09.2018 655

8b(i) & 8b(ii) Supply and Erection Of single and Double conductor termination
SL NO DESCRIPTION CHALLAN NO TOTAL NOS MRC no
1 3241 470 30 MRC NO 30 Dt
2 3242 470 20 19.05.2018
3 1120 B/241/17-18 90
4 5030 102 70 MRC NO 22 Dt
18.04.2018
5191 136 40
5
MRC NO 30 Dt
6 65sqmm wire 40 6150mtr 19.05.2018

10(a) Extra Item 6(a) for supply Erection of additional fitting at turn- out
SL NO DESCRIPTION CHALLAN NO TOTAL NUMBERS
1 Jumper wire 105 sq mm 40 67 mtr
2 1030-2 B/241/17-18 140 nos

11a(i) Supply & Erection of 25Kv composite Bracket insulator


SL NO DESCRIPTION CHALLAN NO TOTAL NUMBERS

1 Bracket Insulator GIL/17-18/756 234nos

11a(ii) Supply & Erection of 25Kv composite stay insulator


SL NO DESCRIPTION CHALLAN NO TOTAL NUMBERS

1 Stay Insulator GIL/17-18/756 235nos


Kamarajar Port Limited , chennai
Bright Power Projects (India) Pvt Ltd RA Bill No 5
RITES Limited
Kamarajar Port Limited , chennai
Bright Power Projects (India) Pvt Ltd RA Bill No 5
RITES Limited

Total weight MRC No


147.96
88.776
29.877
30.105
MRC No 58 Dt
30.105
20/01/2019
29.25
29.773
28.96
118.368
533.174

0.533

Total panel in
MRC No
mtr
26.442
5.398
MRC No 57 Dt
2.712 22/01/2019
1.58
4
40.132
Kamarajar Port Limited , chennai
Bright Power Projects (India) Pvt Ltd RA Bill No 5
RITES Limited

n- out
TOTAL NUMBERS MRC NO
67 mtr MRC NO 24 Dt
140 nos 18,04.2018

TOTAL NUMBERS MRC NO


MRC NO 27 Dt
234nos
18,04.2018

TOTAL NUMBERS MRC NO


MRC NO 27 Dt
235nos
18,04.2018
Bright Power Projects (I) Pvt Ltd RA Bill No 2 Annexure - B

2(b) Erection for Foundation for Plinth in other then Hard Soil and Rock including
per site condition
SL NO DATE LOC NO IMP TYPE OF TYPE OF GROSS SCROLL
MAST FDN VOL VOL

m cum cum
1 25.02.2018 1021 3.10 B-175 MG-6 3.845 0.254
2 25.02.2018 1022 3.10 B-175 MG-9 5.195 0.254
3 25.02.2018 1023 3.03 B-150 MG-5 3.283 0.254
4 25.02.2018 1024 3.03 B-150 MG-5 3.283 0.254
5 25.02.2018 1025 3.00 B-150 MG-5 3.283 0.254
6 25.02.2018 1026 3.04 B-150 MG-5 3.283 0.254
8 25.02.2018 1028 3.21 B-225 MG-11 5.84 0.254
9 25.02.2018 1030 3.10 B-225 MG-11 5.84 0.254
10 25.02.2018 1031 3.20 B-225 MG-11 5.84 0.254
11 25.02.2018 1032 3.21 B-225 MG-11 5.84 0.254
12 25.02.2018 1033 3.15 B-200 MG-9 5.195 0.254
13 25.02.2018 1034 3.16 B-200 MG-9 5.195 0.254
14 25.02.2018 1035 3.26 B-200 MG-9 5.195 0.254
15 25.02.2018 1036 3.23 B-200 MG-9 5.195 0.254
16 25.02.2018 1037 3.16 B-200 MG-9 5.195 0.254
17 25.02.2018 1038 3.10 B-200 MG-9 5.195 0.254
18 26.02.2018 1040 3.22 B-150 MG-5 3.283 0.254
19 26.02.2018 1041 3.11 B-150 MG-5 3.283 0.254
20 26.02.2018 1047 2.87 B-225 5.84 0.254
21 26.02.2018 1049 2.88 B-150 MG-5 3.283 0.254
22 26.02.2018 1060 2.88 B-150 MG-5 3.283 0.254
23 26.02.2018 1067 2.87 B-150 MG-5 3.283 0.254
24 26.02.2018 1068 2.84 B-150 MG-5 3.283 0.254
25 26.02.2018 1081 2.88 B-150 MG-5 3.283 0.254
26 26.02.2018 1082 2.90 B-150 MG-5 3.283 0.254
27 26.02.2018 1085 2.90 B-150 MG-5 3.283 0.254
28 26.02.2018 1086 2.87 B-150 MG-5 3.283 0.254
29 26.02.2018 1088 2.89 B-150 MG-5 3.283 0.254
30 26.02.2018 1089 2.86 B-150 MG-5 3.283 0.254
31 27.02.2018 1065 3.04 B-150 MG-5 3.283 0.254
32 27.02.2018 1071 3.20 B-225 MG-11 5.78 0.254
33 27.02.2018 1090 2.86 B-150 MG-5 3.283 0.254
34 27.02.2018 1091 2.87 B-150 MG-5 3.283 0.254
35 27.02.2018 1093 2.88 B-150 MG-5 3.283 0.254
36 27.02.2018 1094 2.85 B-150 MG-5 3.283 0.254
37 27.02.2018 1095 2.85 B-150 MG-5 3.283 0.254
38 27.02.2018 1098 2.87 B-150 MG-5 3.283 0.254
39 27.02.2018 1097 2.85 B-150 MG-5 3.283 0.254
40 27.02.2018 1099 2.85 B-150 MG-5 3.283 0.254
41 27.02.2018 1102 2.87 B-150 MG-5 3.283 0.254

Page 48 of 73
Bright Power Projects (I) Pvt Ltd RA Bill No 2 Annexure - B

2(b) Erection for Foundation for Plinth in other then Hard Soil and Rock including
per site condition
SL NO DATE LOC NO IMP TYPE OF TYPE OF GROSS SCROLL
MAST FDN VOL VOL
42 27.02.2018 1101 2.86 B-150 MG-5 3.283 0.254
43 27.02.2018 1103 2.87 B-150 MG-5 3.283 0.254
44 27.02.2018 1105 2.85 B-150 MG-5 3.283 0.254
45 27.02.2018 1106 2.86 B-150 MG-5 3.283 0.254
46 27.02.2018 1107 2.86 B-150 MG-5 3.283 0.254
47 28.02.2018 1109 2.85 B-175 MG-6 3.845 0.254
48 28.02.2018 1110 2.87 B-150 MG-5 3.283 0.254
49 28.02.2018 1111 2.88 B-150 MG-5 3.283 0.254
50 28.02.2018 1114 2.85 B-150 MG-5 3.283 0.254
51 28.02.2018 1115 2.86 B-175 MG-6 3.845 0.254
52 28.02.2018 1117 2.85 B-150 MG-5 3.283 0.254
53 28.02.2018 1119 2.87 B-150 MG-5 3.283 0.254
54 28.02.2018 1121 2.87 B-150 MG-5 3.283 0.254
55 28.02.2018 1123 2.90 B-175 MG-6 3.845 0.254
56 28.02.2018 1125 2.86 B-150 MG-5 3.283 0.254
57 28.02.2018 1127 2.90 B-150 MG-5 3.283 0.254
58 28.02.2018 1153 3.05 B-150 MG-5 3.283 0.254
59 28.02.2018 1161 3.01 B-150 MG-5 3.283 0.254
60 28.02.2018 1169 3.01 B-150 MG-5 3.283 0.254
61 28.02.2018 1177 3.13 B-200 MG-9 5.195 0.254
62 28.02.2018 1181 3.13 B-200 MG-9 5.195 0.254
63 01.03.2018 1129 2.84 B-150 MG-5 3.283 0.254
64 01.03.2018 1131 2.90 B-150 MG-5 3.283 0.254
65 01.03.2018 1133 2.87 B-150 MG-5 3.283 0.254
66 01.03.2018 1134 2.91 B-150 MG-5 3.283 0.254
67 01.03.2018 1135 2.87 B-150 MG-5 3.283 0.254
68 01.03.2018 1137 2.87 B-150 MG-5 3.283 0.254
69 01.03.2018 1143 2.87 B-150 MG-5 3.283 0.254
70 01.03.2018 1148 3.10 B-225 MG-11 5.78 0.254
71 01.03.2018 1149 3.13 B-225 MG-11 5.78 0.254
72 01.03.2018 1184 3.21 B-200 MG-9 5.195 0.254
73 01.03.2018 1186 3.21 B-225 MG-11 5.84 0.254
74 01.03.2018 1141 3.15 B-225 MG-11 5.78 0.254
75 01.03.2018 1142 3.16 B-225 MG-11 5.78 0.254
76 01.03.2018 1152 3.07 B-150 MG-5 3.283 0.254
77 01.03.2018 1073 3.20 B-225 MG-11 5.78 0.254
78 01.03.2018 1074 3.15 B-225 MG-11 5.78 0.254
79 01.03.2018 1070 3.05 B-150 MG-5 3.283 0.254
80 01.03.2018 1062 3.02 B-150 MG-5 3.283 0.254
81 02.03.2018 1150 2.86 B-150 MG-5 3.283 0.254
82 02.03.2018 1147 2.90 B-150 MG-5 3.283 0.254

Page 49 of 73
Bright Power Projects (I) Pvt Ltd RA Bill No 2 Annexure - B

2(b) Erection for Foundation for Plinth in other then Hard Soil and Rock including
per site condition
SL NO DATE LOC NO IMP TYPE OF TYPE OF GROSS SCROLL
MAST FDN VOL VOL
83 02.03.2018 1138 2.87 B-150 MG-5 3.283 0.254
84 02.03.2018 1130 2.89 B-150 MG-5 3.283 0.254
85 02.03.2018 1126 2.85 B-150 MG-5 3.283 0.254
86 02.03.2018 1122 2.88 B-150 MG-5 3.283 0.254
87 02.03.2018 1118 2.88 B-150 MG-5 3.283 0.254
88 02.03.2018 1113 2.87 B-175 MG-6 3.845 0.254
89 02.03.2018 1078 2.87 B-200 MG-9 5.195 0.254
90 02.03.2018 1064 2.90 B-200 MG-9 5.195 0.254
91 02.03.2018 1055 2.88 B-200 MG-9 5.195 0.254
92 02.03.2018 1042 3.15 B-200 MG-9 5.195 0.254
93 05.03.2018 1164 2.86 B-150 MG-5 3.283 0.254
94 05.03.2018 1156 2.88 B-150 MG-5 3.283 0.254
95 05.03.2018 1146 2.87 B-150 MG-5 3.283 0.254
96 05.03.2018 1136 2.88 B-150 MG-5 3.283 0.254
97 05.03.2018 1132 2.88 B-150 MG-5 3.283 0.254
98 05.03.2018 1128 2.85 B-150 MG-5 3.283 0.254
99 05.03.2018 1124 2.86 B-150 MG-5 3.283 0.254
100 05.03.2018 1120 2.90 B-150 MG-5 3.283 0.254
101 05.03.2018 1116 2.88 B-150 MG-5 3.283 0.254
102 05.03.2018 1112 2.92 B-175 MG-6 3.845 0.254
103 05.03.2018 1108 2.90 B-150 MG-5 3.283 0.254
104 05.03.2018 1104 2.88 B-175 MG-5 3.845 0.254
105 05.03.2018 1100 2.87 B-150 MG-5 3.283 0.254
106 05.03.2018 1096 2.85 B-150 MG-5 3.283 0.254
107 05.03.2018 1092 2.85 B-150 MG-5 3.283 0.254
108 05.03.2018 1087 2.86 B-150 MG-5 3.283 0.254
109 06.03.2016 1015 3.20 B-175 MG-5 3.845 0.261
110 06.03.2016 1017 3.03 B-150 MG-5 3.283 0.254
111 06.03.2016 1018 3.25 B-150 MG-5 3.283 0.261
112 06.03.2016 1019 3.04 B-150 MG-5 3.283 0.254
113 06.03.2016 1020 3.26 B-175 MG-6 3.845 0.254
TOTAL CUM 432.343

Page 50 of 73
Bright Power Projects (I) Pvt Ltd RA Bill No 2 Annexure - B

d Rock including Material as

MUFF TOTAL DPR


VOL VOL No

cum cum
0.02 0.274 2
0.02 0.274 2
0.02 0.274 2
0.02 0.274 2
0.02 0.274 2
0.02 0.274 2
0.08 0.334 2
0.08 0.334 2
0.08 0.334 3
0.08 0.334 2
0.02 0.274 3
0.02 0.274 3
0.02 0.274 3
0.02 0.274 3
0.02 0.274 3
0.02 0.274 3
0.02 0.274 4
0.02 0.274 4
0.08 0.334 4
0.02 0.274 4
0.02 0.274 4
0.02 0.274 4
0.02 0.274 4
0.02 0.274 4
0.02 0.274 4
0.02 0.274 4
0.02 0.274 5
0.02 0.274 5
0.02 0.274 5
0.02 0.274 6
0.02 0.274 6
0.02 0.274 6
0.02 0.274 6
0.02 0.274 6
0.02 0.274 6
0.02 0.274 6
0.02 0.274 6
0.02 0.274 7
0.02 0.274 7
0.02 0.274 7

Page 51 of 73
Bright Power Projects (I) Pvt Ltd RA Bill No 2 Annexure - B

d Rock including Material as

MUFF TOTAL DPR


VOL VOL No
0.02 0.274 7
0.02 0.274 7
0.02 0.274 7
0.02 0.274 7
0.02 0.274 7
0.02 0.274 8
0.02 0.274 8
0.02 0.274 8
0.02 0.274 8
0.02 0.274 8
0.02 0.274 8
0.02 0.274 8
0.02 0.274 8
0.02 0.274 9
0.02 0.274 9
0.02 0.274 9
0.02 0.274 9
0.02 0.274 9
0.02 0.274 9
0.02 0.274 9
0.02 0.274 9
0.02 0.274 10
0.02 0.274 10
0.02 0.274 10
0.02 0.274 10
0.02 0.274 10
0.02 0.274 10
0.02 0.274 10
0.02 0.274 10
0.02 0.274 10
0.02 0.274 11
0.08 0.334 11
0.02 0.274 11
0.02 0.274 11
0.02 0.274 11
0.02 0.274 11
0.02 0.274 11
0.02 0.274 11
0.02 0.274 11
0.02 0.274 12
0.02 0.274 12

Page 52 of 73
Bright Power Projects (I) Pvt Ltd RA Bill No 2 Annexure - B

d Rock including Material as

MUFF TOTAL DPR


VOL VOL No
0.02 0.274 12
0.02 0.274 12
0.02 0.274 12
0.02 0.274 12
0.02 0.274 13
0.02 0.274 13
0.02 0.274 13
0.02 0.274 13
0.02 0.274 13
0.02 0.274 13
0.02 0.274 14
0.02 0.274 14
0.02 0.274 14
0.02 0.274 14
0.02 0.274 14
0.02 0.274 14
0.02 0.274 14
0.02 0.274 14
0.02 0.274 15
0.02 0.274 15
0.02 0.274 15
0.02 0.274 15
0.02 0.274 15
0.02 0.274 15
0.02 0.274 15
0.02 0.274 15
0.02 0.281 16
0.02 0.274 16
0.02 0.281 16
0.02 0.274 16
0.02 0.274 16
432.343

Page 53 of 73
Bright Power Projects (India) Pvt Ltd RA Bill No 2 Annexure - C

3C Supply & Erection of Guy Rod Assembly


SL NO DESCRIPTION CHALLAN NO TOTAL NOS MRC NO
1 5001-3 102 5
2 5002 139 35
3 5005 139 30 MRC NO 16 Dt
4 5007-1 30 13.03.2018
5 5008 102 30
6 5220 40
7 3241 2305 35 MRC NO 21 Dt
8 3241 2305 26 19,03.2018

4a(i) Supply and Erection without insulator & erection of a single


Bracket Assembly
DESCRIPTION CHALLAN NO TOTAL NOS MRC NO
1 2392 200
102
2 2342 20
MRC NO 17 Dt
3 2402-1 220
13.03.2018
4 2422-2 139 220
5 2391-1 200
6 1160 220
7 2130 220 MRC NO 18 Dt
8 2403-2 240 13.03.2018
9 2423-1 B/241/17-18 200
10 2550-2 200
11 2361-1 200
MRC NO 19 Dt
12 3021-1 220
13.03.2018
13 3070-1 275
136
14 1371-1 40
15 38mm Tube 7
MRC NO 20 Dt
16 49mm Tube 2459 126
13.03.2018
17 25mm Tube 196

3(a) Supply & Erection of traction masts portals, TTC, Dwarf masts main masts of switching stations
including fabricated structures for feeder

TOTAL
SL NO DESCRIPTION CHALLAN NO TOTAL NOS UNIT WEIGHT MRC NO
WEIGHT
MRC NO 21
1 B-150 2305 12 369.69 4436.28 Dt 19,03.2018
Total weight in kgs 4436.28
Total weight in MT 4.436

3(b)Supply & Erection of Fabarication Steel work other then item 3(a)
TOTAL
SL NO DESCRIPTION CHALLAN NO TOTAL NOS UNIT WEIGHT MRC NO
WEIGHT
MRC NO 21
1 3100 2305 4 62.173 248.692 Dt 19,03.2018
Total Weight in Kgs 248.692
Total Weight in MT 0.2487

6(a) Supply & Erection of over Head equipment only (Conventional)


SL NO DESCRIPTION CHALLAN NO TOTAL NUMBERS MRC NO

Page 54 of 73
Bright Power Projects (India) Pvt Ltd RA Bill No 2 Annexure - C

1 1040-2 35
2 1180 1000
3 1192 B/241/17-18 1000
4 1120 90
MRC NO 22
5 1140 10
Dt 18,04.2018
6 5020 139 80
7 5030 70
102
8 5191 40
9 1110-2 136 50

9(a)Supply and Erection of Anti creep Cadmium copper catenary wire in


polluted area for conventional OHE
SL NO DESCRIPTION CHALLAN NO TOTAL NUMBERS MRC NO
1 Catnery wire 40 350 mtr
2 Double suspenstion clamp B/241/17-18 10 MRC NO 23
3 Catnery wire Ending clamp B/241/17-18 90 Dt 18,04.2018
4 9 tone adjuster 139 80
MRC NO 27
5 9 tone insulator GIL/17-18/756 50 Dt 18,04.2018

10(a) Extra Item 6(a) for supply Erection of additional fitting at turn- out
SL NO DESCRIPTION CHALLAN NO TOTAL NUMBERS MRC NO
1 Jumper wire 105 sq mm 40 67 mtr MRC NO 24
2 1030-2 B/241/17-18 140 nos Dt 18,04.2018

11a(i) Supply & Erection of 25Kv composite Bracket insulator


SL NO DESCRIPTION CHALLAN NO TOTAL NUMBERS MRC NO
MRC NO 27
1 Bracket Insulator GIL/17-18/756 234nos
Dt 18,04.2018

11a(ii) Supply & Erection of 25Kv composite stay insulator


SL NO DESCRIPTION CHALLAN NO TOTAL NUMBERS MRC NO

MRC NO 27
1 Stay Insulator GIL/17-18/756 235nos
Dt 18,04.2018

15a(i) Copper jumper wire 50 sq mm


SL NO DESCRIPTION CHALLAN NO TOTAL NUMBERS MRC NO
1 50 sq mm copper wire 40 25 mtr MRC NO 27
2 1040-2 B/241/17-18 35 nos Dt 18,04.2018

15a(iv) copper Jumper 160 sq mm between OHE and cross feeder


SL NO DESCRIPTION CHALLAN NO TOTAL NUMBERS MRC NO
1 160sq mm copper wire 40 55 mtr MRC NO 26
2 1050-3 B/241/17-18 50 nos Dt 18,04.2018

Page 55 of 73
Bright Power Projects (I) Pvt Ltd Ra Bill No 2 Annexure - A

2 (b) Supply of Foundation for plinth in other than hard soil and rock including material

SL NO DATE LOC NO CHAINGE TYPE TYPE IMP GROSS


OF OF FDN VOL
m MAST m cum
1 13.12.2017 1091 953.00 B-150 MG-5 2.85 3.283
2 13.12.2017 1095 989.00 B-150 MG-5 2.85 3.283
3 13.12.2017 1099 1025.00 B-150 MG-5 2.85 3.283
4 14.12.2017 1084 881.00 B-225 MG-11 2.85 5.840
5 14.12.2017 1103 1065.50 B-150 MG-5 2.85 3.283
6 15.12.2017 1107 1101.50 B-150 MG-5 2.85 3.283
7 15.12.2017 1111 1142.00 B-150 MG-5 2.85 3.283
8 15.12.2017 1072 827.00 B-225 MG-11 3.10 5.780
9 17.12.2017 1115 1182.50 B-175 MG-6 2.85 3.845
10 17.12.2017 1119 1223.00 B-150 MG-5 2.85 3.283
11 17.12.2017 1123 1263.50 B-175 MG-6 2.85 3.845
12 18.12.2017 1127 1304.00 B-150 MG-5 2.85 3.283
13 18.12.2017 1131 1344.50 B-150 MG-5 2.85 3.283
14 18.12.2017 1135 1380.50 B-150 MG-5 2.85 3.283
15 18.12.2017 1143 1421.00 B-150 MG-5 2.85 3.283
16 18.12.2017 1155 1461.50 B-150 MG-5 2.85 3.283
17 19.12.2017 1163 1497.50 B-150 MG-5 2.85 3.283
18 19.12.2017 1172 1538.00 B-150 MG-5 2.85 3.283
19 19.12.2017 1057 773.00 B-150 MG-5 2.85 3.283
20 20.12.2017 1187 1614.50 B-175 MG-9 2.85 5.195
21 20.12.2017 1179 1574.00 B-150 MG-5 2.85 3.283
22 22.12.2017 1165 1506.50 B-150 MG-5 2.85 3.283
23 22.12.2017 1168 1515.50 B-150 MG-5 2.85 3.283
24 22.12.2017 1176 1551.50 B-150 MG-5 2.85 3.283
25 22.12.2017 1183 1592.00 B-150 MG-5 2.85 3.283
26 23.12.2017 1154 1448.00 B-150 MG-5 3.00 3.283
27 23.12.2017 1157 1470.50 B-150 MG-5 2.85 3.283
28 23.12.2017 1162 1479.50 B-150 MG-5 2.85 3.283
29 23.12.2017 1188 1632.50 B-175 MG-9 2.85 5.195
30 24.12.2017 1147 1430.00 B-150 MG-5 2.85 3.283
31 24.12.2017 1158 1475.00 B-150 MG-5 2.85 3.283
32 26.12.2017 1125 1277.00 B-150 MG-5 2.85 3.283
33 26.12.2017 1129 1313.00 B-150 MG-5 2.85 3.283
34 26.12.2017 1133 1353.50 B-150 MG-5 2.85 3.283
35 27.12.2017 1121 1236.50 B-150 MG-5 2.85 3.283
36 27.12.2017 1144 1425.50 B-225 MG-11 3.10 5.780
37 28.12.2017 1117 1200.5 B-175 MG-6 2.85 3.845
38 28.12.2017 1137 1389.5 B-150 MG-5 2.85 3.283
39 28.12.2017 1145 1425.5 B-225 MG-11 3.10 5.780
40 28.12.2017 1170 1524.5 B-150 MG-5 3.00 3.283
41 29.12.2017 1082 854 B-150 MG-5 2.85 3.283
42 29.12.2017 1109 1119.5 B-175 MG-6 2.85 3.845
43 29.12.2017 1114 1160.5 B-150 MG-5 2.85 3.283
44 30.12.2017 1086 894.5 B-150 MG-5 2.85 3.283
45 30.12.2017 1090 930.5 B-150 MG-5 2.85 3.283

Page 56 of 73
Bright Power Projects (I) Pvt Ltd Ra Bill No 2 Annexure - A

2 (b) Supply of Foundation for plinth in other than hard soil and rock including material

SL NO DATE LOC NO CHAINGE TYPE TYPE IMP GROSS


OF OF FDN VOL
m MAST m cum
46 30.12.2017 1150 1434.5 B-150 MG-5 2.85 3.283
47 30.12.2017 1105 1083.5 B-150 MG-5 2.85 3.283
48 02.01.2018 1067 813.5 B-150 MG-5 2.85 3.283
49 02.01.2018 1059 773 B-150 MG-5 2.85 3.283
50 03.01.2018 1101 1043 B-150 MG-5 2.85 3.283
51 03.01.2018 1051 732.5 B-150 MG-5 2.85 3.283
52 04.01.2018 1138 1398.5 B-150 MG-5 2.85 3.283
53 04.01.2018 1134 1358 B-150 MG-5 2.85 3.283
54 04.01.2018 1097 1007 B-150 MG-5 2.85 3.283
55 05.01.2016 1094 966.5 B-150 MG-5 2.85 3.283
56 05.01.2016 1015AB A-2 1.412
57 05.01.2016 1047AB A-3 1.812
58 06.01.2018 1123AB A-2 1.412
59 06.01.2018 1130 1317.5 B-150 MG-5 2.85 3.283
60 06.01.2018 1075 836 B-225 MG-11 3.10 5.780
62 08.01.2018 1117AB A-2 1.412
62 08.01.2018 1070 818 B-150 MG-5 3.00 3.283
63 08.01.2018 1074 831.5 B-225 MG-11 3.10 5.780
64 09.01.2018 1062 782 B-150 MG-5 3.00 3.283
65 09.01.2018 1073 831.5 B-225 MG-11 3.10 5.780
66 10.01.2018 1096 993.5 B-150 MG-5 2.85 3.283
67 11.01.2018 1080 840.5 B-225 MG-11 3.10 5.780
68 11.01.2018 1092 953 B-150 MG-5 2.85 3.283
69 12.01.2018 1100 1029.5 B-150 MG-5 2.85 3.283
70 12.01.2018 1104 1070 B-175 MG-6 2.85 3.845
71 12.01.2018 1108 1110.5 B-150 MG-5 2.85 3.283
72 13.01.2018 1112 1151 B-175 MG-6 2.85 3.845
73 13.01.2018 1116 1187 B-150 MG-5 2.85 3.283
74 13.01.2018 1120 1227.5 B-150 MG-5 2.85 3.283
75 17.01.2018 1087 912.5 B-150 MG-5 2.85 3.283
76 18.01.2018 1124 1268 B-150 MG-5 2.85 3.283
77 18.01.2018 1128 1308.5 B-150 MG-5 2.85 3.283
78 18.01.2018 1152 1434.5 B-150 MG-5 3.00 3.283
79 19.01.2018 1132 1349.00 B-150 MG-5 2.85 3.283
80 19.01.2018 1136 1385.00 B-150 MG-5 2.85 3.283
81 19.01.2018 1146 1425.50 B-150 MG-5 2.85 3.283
82 20.0.2018 1156 1466.00 B-150 MG-5 2.85 3.283
83 20.0.2018 1164 1502.00 B-150 MG-5 2.85 3.283
84 20.0.2018 1142 1421.00 B-225 MG-11 3.10 5.780
85 22.01.2018 1054 741.50 B-150 MG-5 3.00 3.283
86 22.01.2018 1160 1475.00 B-150 MG-5 3.00 3.283
87 22.01.2018 1104AB A-2 1.412
88 23.01.2018 1112AB A-2 1.412
89 23.01.2018 1068 813.50 B-150 MG-5 2.85 3.283
90 23.01.2018 1167 1506.50 B-150 MG-5 3.00 3.283

Page 57 of 73
Bright Power Projects (I) Pvt Ltd Ra Bill No 2 Annexure - A

2 (b) Supply of Foundation for plinth in other than hard soil and rock including material

SL NO DATE LOC NO CHAINGE TYPE TYPE IMP GROSS


OF OF FDN VOL
m MAST m cum
91 23.01.2018 1141 1421.00 B-225 MG-11 3.10 5.780
92 24.01.2018 1081 849.50 B-150 MG-5 2.85 3.283
93 24.01.2018 1032AB A-3 1.812
94 24.01.2018 1046 710.00 B-150 MG-5 3.00 3.283
95 24.01.2018 1174 1538.00 B-150 MG-5 3.10 3.283
96 25.01.2018 1185 1610.00 B-225 MG-11 3.10 5.780
97 25.01.2018 1030AB A-3 1.812
98 27.01.2018 1028AB A-3 1.812
99 27.01.2018 1140 1412.00 B-225 MG-11 3.10 5.780
100 29.01.2018 1031AB A-3 1.812
101 29.01.2018 1019AB A-2 1.412
102 29.01.2018 1185AB A-3 1.812
103 29.01.2018 1180 1574.50 B-200 MG-9 3.10 5.195
104 30.01.2017 1190AB A-3 1.812
105 30.01.2018 1194AB A-3 1.812
106 30.01.2018 1093 966.50 B-150 MG-5 2.85 3.283
107 30.01.2018 1098 1007.50 B-150 MG-5 2.85 3.283
108 31.01.2018 1186AB A-3 1.812
109 31.01.2018 1189 1632.50 B-200 MG-9 3.10 5.195
110 31.01.2018 1083 876.50 B-150 MG-5 2.85 3.283
111 31.01.2018 1085 890.50 B-150 MG-5 2.85 3.283
112 01.02.2018 1191 1659.50 B-225 MG-11 3.10 5.780
113 01.02.2018 1196 1736.00 B-200 MG-9 3.10 5.195
114 01.02.2018 1089 930.50 B-150 MG-5 2.85 3.283
115 01.02.2018 1102 1047.50 B-150 MG-5 2.85 3.283
116 02.02.2018 1193 1677.50 B-200 MG-9 3.10 5.195
117 03.02.2018 1197 1772.00 B-225 MG-11 3.10 5.840
118 03.02.2018 1198 1803.50 B-225 MG-11 3.10 5.780
119 03.02.2018 1191AB A-3 1.812
120 05.02.2018 1199 1844.50 B-200 MG-9 3.10 5.195
121 05.02.2018 1200 1884.50 B-200 MG-9 3.10 5.195
122 05.02.2018 1197AB A-3 1.812
123 05.02.2018 1106 1083.50 B-150 MG-5 2.85 3.283
124 05.02.2018 1110 1124.00 B-150 MG-5 2.85 3.283
125 06.02.2018 1195 1709.00 B-225 MG-11 3.10 5.840
126 06.02.2018 1113 1160.00 B-175 MG-6 2.85 3.845
127 06.02.2018 1118 1200.50 B-150 MG-5 2.85 3.283
128 07.02.2018 1201 1925.00 B-200 MG-9 3.10 5.195
129 07.02.2018 1202 1965.50 B-225 MG-11 3.10 5.840
130 08.02.2018 1204 2033.00 B-150 MG-5 3.00 3.283
131 08.02.2018 1205 2073.50 B-150 MG-5 3.00 3.283
132 08.02.2018 1209 2231.00 B-150 MG-5 3.00 3.283
133 09.02.2018 1207 2150.00 B-150 MG-5 3.00 3.283
134 09.02.2018 1210 2267.00 B-150 MG-5 3.00 3.283
135 10.02.2018 1203 1997.00 B-150 MG-5 3.00 3.283

Page 58 of 73
Bright Power Projects (I) Pvt Ltd Ra Bill No 2 Annexure - A

2 (b) Supply of Foundation for plinth in other than hard soil and rock including material

SL NO DATE LOC NO CHAINGE TYPE TYPE IMP GROSS


OF OF FDN VOL
m MAST m cum
136 10.02.2018 1208 2190.50 B-150 MG-5 3.00 3.283
137 10.02.2018 1198AB A-3 1.812
138 12.02.2018 1211 2307.50 B-150 MG-5 3.00 3.283
139 13.02.2018 1212 2348.00 B-150 MG-5 3.00 3.283
140 13.02.2018 1122 1241.00 B-175 MG-6 2.85 3.845
141 14.02.2018 1126 1281.50 B-150 MG-5 2.85 3.283
142 14.02.2018 1213 2384.00 B-150 MG-5 3.00 3.283
143 15.02.2018 1122AB A-2 1.412
144 15.02.2018 1202AB A-3 1.812
145 16.02.2018 1206 2114.00 B-150 MG-5 3.00 3.283
146 17.02.2018 1113AB A-2 1.412
147 19.02.2018 1115AB A-2 1.412
148 19.02.2018 1106AB A-2 1.412
149 19.02.2018 1214 2415.50 B-225 MG-11 3.10 5.840
150 20.02.2018 1214AB A-3 1.812
151 24.02.2018 1058 773.00 B-150 MG-5 3.00 3.283
152 24.02.2018 1066 813.50 B-150 MG-5 3.00 3.283
153 02.03.2018 1027AB A-3 1.812
154 02.03.2018 1084AB A-3 1.812
155 03.03.2018 1077 836.00 B-150 MG-5 3.00 3.283
156 19.03.2018 1043 705.50 B-150 MG-5 3.00 3.283
157 20.03.2018 1048 728.00 B-150 MG-5 3.10 3.283
158 20.03.2018 1053 741.50 B-150 MG-5 3.00 3.283
159 21.03.2018 1061 782.00 B-150 MG-5 3.00 3.283
160 21.03.2018 1069 818.00 B-150 MG-5 3.00 3.283
161 22.03.2018 1063 795.50 B-150 MG-5 2.85 3.283
162 24.03.2018 1056 759.50 B-150 MG-5 2.85 3.283
163 24.03.2018 1173 1538.00 B-150 MG-5 3.00 3.283
164 25.03.2018 1166 1506.50 B-150 MG-5 3.00 3.283
165 25.03.2018 1159 1475.00 B-150 MG-5 3.00 3.283
166 27.03.2018 1151 1434.50 B-150 MG-5 3.00 3.283
167 28.03.2018 1175 1542.50 B-150 MG-5 2.85 3.283
168 30.03.2018 1182 1578.50 B-150 MG-5 2.85 3.283
169 30.03.2018 1045 705.50 B-150 MG-5 3.00 3.283
170 04.04.2018 1171 1537.50 B-150 MG-5 2.85 3.283
171 04.04.2018 1178 1560.00 B-150 MG-5 2.85 3.283
172 05.04.2018 1052 741.50 B-150 MG-5 3.00 3.283
173 05.04.2018 1076 836.00 B-225 MG-11 3.10 5.84
174 06.04.2018 1079 840.50 B-225 MG-11 3.10 5.84
175 07.04.2018 1139 1412.00 B-225 MG-11 3.10 5.84
176 15.04.2018 1195AB DMA DF-2 4.52
177 16.04.2018 1029 575.00 B-225 MG-11 3.10 5.84
178 17.04.2018 1029AB A-3 1.812
TOTAL CUM 619.072

Page 59 of 73
Bright Power Projects (I) Pvt Ltd Ra Bill No 2 Annexure - A

d rock including material as per site condit

SCORLL MUFF NET DPR


VOL VOL VOL
cum cum cum
0.254 0.02 3.009 65
0.254 0.02 3.009 65
0.254 0.02 3.009 65
0.254 0.08 5.506 66
0.254 0.02 3.009 66
0.254 0.02 3.009 67
0.254 0.02 3.009 67
0.254 0.02 5.506 67
0.254 0.02 3.571 69
0.254 0.02 3.009 69
0.254 0.02 3.571 69
0.254 0.02 3.009 70
0.254 0.02 3.009 70
0.254 0.02 3.009 70
0.254 0.02 3.009 70
0.254 0.02 3.009 70
0.254 0.02 3.009 71
0.254 0.02 3.009 71
0.254 0.02 3.009 71
0.254 0.02 4.921 72
0.254 0.02 3.009 72
0.254 0.02 3.009 73
0.254 0.02 3.009 73
0.254 0.02 3.009 73
0.254 0.02 3.009 73
0.254 0.02 3.009 74
0.254 0.02 3.009 74
0.254 0.02 3.009 74
0.254 0.02 4.921 74
0.254 0.02 3.009 75
0.254 0.02 3.009 75
0.254 0.02 3.009 76
0.254 0.02 3.009 76
0.254 0.02 3.009 76
0.254 0.02 3.009 78
0.254 0.02 5.506 78
0.254 0.02 3.571 79
0.254 0.02 3.009 79
0.254 0.02 5.506 79
0.254 0.02 3.009 79
0.254 0.02 3.009 80
0.254 0.02 3.571 80
0.254 0.02 3.009 80
0.254 0.02 3.009 81
0.254 0.02 3.009 81

Page 60 of 73
Bright Power Projects (I) Pvt Ltd Ra Bill No 2 Annexure - A

d rock including material as per site condit

SCORLL MUFF NET DPR


VOL VOL VOL
cum cum cum
0.254 0.02 3.009 81
0.254 0.02 3.009 81
0.254 0.02 3.009 82
0.254 0.02 3.009 82
0.254 0.02 3.009 83
0.254 0.02 3.009 83
0.254 0.02 3.009 84
0.254 0.02 3.009 84
0.254 0.02 3.009 84
0.254 0.02 3.009 85
1.412 85
1.812 85
1.412 86
0.254 0.02 3.009 86
0.254 0.02 5.506 86
1.412 87
0.254 0.02 3.009 87
0.254 0.02 5.506 87
0.254 0.02 3.009 88
0.254 0.02 5.506 88
0.254 0.02 3.009 89
0.254 0.02 5.506 90
0.254 0.02 3.009 90
0.254 0.02 3.009 91
0.254 0.02 3.571 91
0.254 0.02 3.009 91
0.254 0.02 3.571 92
0.254 0.02 3.009 92
0.254 0.02 3.009 92
0.254 0.02 3.009 93
0.254 0.02 3.009 94
0.254 0.02 3.009 94
0.254 0.02 3.009 94
0.254 0.02 3.009 95
0.254 0.02 3.009 95
0.254 0.02 3.009 95
0.254 0.02 3.009 96
0.254 0.02 3.009 96
0.254 0.02 5.506 96
0.254 0.02 3.009 98
0.254 0.02 3.009 98
1.412 98
1.412 99
0.261 0.02 3.002 99
0.254 0.02 3.009 99

Page 61 of 73
Bright Power Projects (I) Pvt Ltd Ra Bill No 2 Annexure - A

d rock including material as per site condit

SCORLL MUFF NET DPR


VOL VOL VOL
cum cum cum
0.254 0.02 5.506 99
0.261 0.02 3.002 100
1.812 100
0.254 0.02 3.009 100
0.254 0.02 3.009 100
0.254 0.02 5.506 102
1.812 102
1.812 103
0.254 0.02 5.506 103
1.812 103
1.412 104
1.812 104
0.254 0.02 4.921 104
1.812 105
1.812 105
0.261 0.02 3.002 105
0.261 0.02 3.002 105
1.812 106
0.254 0.02 4.921 106
0.261 0.02 3.002 106
0.261 0.02 3.002 106
0.254 0.02 5.506 107
0.254 0.02 4.921 107
0.261 0.02 3.002 107
0.261 0.02 3.002 107
0.254 0.02 4.921 108
0.254 0.08 5.506 109
0.254 0.02 5.506 109
1.812 109
0.254 0.02 4.921 110
0.254 0.02 4.921 110
1.812 110
0.261 0.02 3.002 110
0.261 0.02 3.002 110
0.254 0.08 5.506 111
0.261 0.02 3.564 111
0.261 0.02 3.002 111
0.254 0.02 4.921 112
0.254 0.08 5.506 112
0.254 0.02 3.009 113
0.254 0.02 3.009 113
0.254 0.02 3.009 113
0.254 0.02 3.009 114
0.254 0.02 3.009 114
0.254 0.02 3.009 115

Page 62 of 73
Bright Power Projects (I) Pvt Ltd Ra Bill No 2 Annexure - A

d rock including material as per site condit

SCORLL MUFF NET DPR


VOL VOL VOL
cum cum cum
0.254 0.02 3.009 115
1.812 115
0.254 0.02 3.009 116
0.254 0.02 3.009 117
0.261 0.02 3.564 117
0.261 0.02 3.002 118
0.254 0.02 3.009 118
1.412 119
1.812 119
0.254 0.02 3.009 120
1.412 121
1.412 122
1.412 122
0.254 0.08 5.506 122
1.812 123
0.216 0.02 3.047 124
0.216 0.02 3.047 124
1.812 125
1.812 125
0.254 0.02 3.009 126
0.254 0.02 3.009 127
0.254 0.02 3.009 128
0.254 0.02 3.009 128
0.254 0.02 3.009 129
0.254 0.02 3.009 129
0.254 0.02 3.009 130
0.254 0.02 3.009 131
0.254 0.02 3.009 131
0.254 0.02 3.009 132
0.254 0.02 3.009 132
0.254 0.02 3.009 133
0.254 0.02 3.009 134
0.254 0.02 3.009 135
0.254 0.02 3.009 135
0.254 0.02 3.009 136
0.254 0.02 3.009 136
0.254 0.02 3.009 137
0.254 0.08 5.506 137
0.254 0.08 5.506 138
0.254 0.08 5.506 139
0.254 0.02 4.246 140
0.254 0.08 5.506 141
1.812 143
619.072

Page 63 of 73
Bright Power Projects (India) Pvt Ltd RA Bill No 2 Annexure - D

Supply & Erection of traction masts portals, TTC, Dwarf masts main masts of
switching stations including fabricated structures for feeder

SL DATE LOC NO TYPE OF DPR NO


MAST
1 23.01.2018 CTRY/1015 B-175 1
2 23.01.2018 1017 B-150 1
3 23.01.2018 1018 B-150 1
4 23.01.2018 1019 B-150 1
5 23.01.2018 1020 B-175 1
6 23.01.2018 1021 B-175 1
7 23.01.2018 1022 B-175 1
8 23.01.2018 1023 B-150 1
9 23.01.2018 1024 B-150 1
10 23.01.2018 1025 B-150 1
11 23.01.2018 1026 B-150 1
12 24.01.2018 1028 B-225 2
13 24.01.2018 1030 B-225 2
14 24.01.2018 1031 B-225 2
15 24.01.2018 1032 B-225 2
16 24.01.2018 1033 B-200 2
17 24.01.2018 1034 B-200 2
18 24.01.2018 1035 B-200 2
19 24.01.2018 1036 B-200 2
20 24.01.2018 1037 B-200 2
21 24.01.2018 1038 B-200 2
22 31.01.2018 1047 B-225 3
23 31.01.2018 1065 B-150 3
24 31.01.2018 1071 B-225 3
25 31.01.2018 1149 B-225 3
26 31.01.2018 1148 B-225 3
27 31.01.2018 1153 B-150 3
28 31.01.2018 1161 B-150 3
29 31.01.2018 1169 B-150 3
30 31.01.2018 1186 B-225 3
31 04.02.2018 1067 B-150 4
32 04.02.2018 1082 B-150 4
33 04.02.2018 1086 B-150 4
34 04.02.2018 1088 B-150 4
35 04.02.2018 1090 B-150 4
36 04.02.2018 1091 B-150 4
37 04.02.2018 1094 B-150 4
38 04.02.2018 1095 B-150 4
39 04.02.2018 1097 B-150 4
40 04.02.2018 1099 B-150 4

Page 64 of 73
Bright Power Projects (India) Pvt Ltd RA Bill No 2 Annexure - D

41 04.02.2018 1101 B-150 4


42 04.02.2018 1103 B-150 4
43 04.02.2018 1105 B-150 4
44 04.02.2018 1107 B-150 4
45 04.02.2018 1109 B-175 4
46 04.02.2018 1111 B-150 4
47 04.02.2018 1114 B-150 4
48 04.02.2018 1115 B-175 4
49 04.02.2018 1117 B-175 5
50 04.02.2018 1119 B-150 5
51 04.02.2018 1121 B-150 5
52 04.02.2018 1123 B-175 5
53 04.02.2018 1125 B-150 5
54 09.02.2018 1040 B-150 6
55 09.02.2018 1041 B-150 6
56 09.02.2018 1049 B-150 6
57 09.02.2018 1060 B-150 6
58 09.02.2018 1068 B-150 6
59 09.02.2018 1081 B-150 6
60 09.02.2018 1085 B-150 6
61 09.02.2018 1089 B-150 6
62 09.02.2018 1093 B-150 6
63 09.02.2018 1098 B-150 6
64 09.02.2018 1102 B-150 6
65 09.02.2018 1126 B-150 6
66 09.02.2018 1127 B-150 6
67 09.02.2018 1129 B-150 6
68 09.02.2018 1131 B-150 6
69 09.02.2018 1133 B-150 6
70 09.02.2018 1135 B-150 6
71 09.02.2018 1137 B-150 6
72 09.02.2018 1143 B-150 6
73 26.02.2018 1062 B-150 7
74 26.02.2018 1070 B-150 7
75 26.02.2018 1073 B-225 7
76 26.02.2018 1074 B-225 7
77 26.02.2018 1141 B-225 7
78 26.02.2018 1142 B-225 7
79 26.02.2018 1152 B-150 7
80 28.02.2018 1055 B-200 8
81 28.02.2018 1064 B-200 8
82 28.02.2018 1078 B-200 8
83 28.02.2018 1177 B-200 8
84 28.02.2018 1181 B-200 8
85 28.02.2018 1184 B-200 8

Page 65 of 73
Bright Power Projects (India) Pvt Ltd RA Bill No 2 Annexure - D

86 01.03.2018 1106 B-150 9


87 01.03.2018 1110 B-150 9
88 01.03.2018 1113 B-175 9
89 01.03.2018 1118 B-150 9
90 01.03.2018 1122 B-175 9
91 01.03.2018 1130 B-150 9
92 01.03.2018 1134 B-150 9
93 01.03.2018 1138 B-150 9
94 01.03.2018 1150 B-150 9
95 02.03.2018 1087 B-150 10
96 02.03.2018 1092 B-150 10
97 02.03.2018 1096 B-150 10
98 02.03.2018 1100 B-150 10
99 02.03.2018 1104 B-175 10
100 02.03.2018 1108 B-150 10
101 02.03.2018 1112 B-175 10
102 02.03.2018 1116 B-150 10
103 02.03.2018 1120 B-150 10
104 02.03.2018 1124 B-150 10
105 02.03.2018 1128 B-150 10
106 02.03.2018 1132 B-150 10
107 02.03.2018 1136 B-150 10
108 02.03.2018 1146 B-150 10
109 02.03.2018 1156 B-150 10
110 02.03.2018 1164 B-150 10
111 02.03.2018 1042 B-200 10
112 02.03.2018 1147 B-150 10

SUMMARY
TOTAL NO OF
TYPE OF PER UNIT TOTAL
SL NO ERECTED
MAST WEIGHT WEIGHT
MAST
1 B-150 74 369.69 27357.06
2 B-175 12 422.89 5074.68
3 B-200 13 474.19 6164.47
4 B-225 13 573.772 7459.036
TOTAL Weight IN KGS 46055.246
TOTAL Weight IN MT 46.055

Page 66 of 73
Kamarajar Port Limited, Chennai
Bright Power Projects (India) Pvt Ltd RA Bill No 5 RITES LIMITED, Gurgaon

3(a) Supply & Erection of traction masts portals, TTC, Dwarf masts main masts of switching stations including fabricated
structures for feeder

Sl no Date location Mast DPR No


1 20.04.2019 F-1 B-200 21
2 20.04.2019 F-2 B-150 21
3 20.04.2019 F-3 B-150 21
4 20.04.2019 F-4 B-150 21
5 20.04.2019 F-5 B-150 21
6 20.04.2019 F-6 B-200 21
7 20.04.2019 F-7 B-150 21
8 22.04.2019 main gantry S-6 23
9 22.04.2019 main gantry S-6 23
10 22.04.2019 S-100 23
11 22.04.2019 S-101 23

Summary
Masttype Total nos Weight Total weight 20% supply
B-150 5 369.69 1848.45
B-200 2 474.19 948.38
S-6 2 644.8 1289.6 1289.6
S-101 3 121.278 363.834 363.834
S-100 1 147.928 147.928 147.928
4598.192 1801.362
Total in MT 4.598 1.801
3C Supply & Erection of Guy Rod Assembly
SL NO DATE LOC NO DPR NO
1 10.05.2019 F-1 14

11 (c) Supply & Erection Single Brackets


SL NO DATE LOC NO TOTAL NOS DPR NO

1 13.08.2018 CTRY/1007 1 144

8b(i) Supply and Erection Of single conductor Termination


sl no Date location Total Nos DPR NO
1 02.07.2018 CTRY/1148-49 2 28
2 03.07.2018 CTRY/1139-40 2 29
3 04.07.2018 CTRY/1144-45 2 30
4 05.07.2018 CTRY/1079-80 2 31
5 07.07.2018 CTRY/1075-76 2 32
TOTAL 10
8b(ii) Supply and Erection Of double conductor Termination
sl no Date location Total Nos DPR NO
1 09.06.2018 CTRY/1028-CTRY/1191 2 10
2 12.06.2018 CTRY/1029-CTRY/190 2 11
3 29.06.2018 CTRY/1185 1 27
4 28.06.2018 CTRY/1030 1 26
5 28.06.2018 CTRY/1031 1 26
Kamarajar Port Limited, Chennai
Bright Power Projects (India) Pvt Ltd RA Bill No 5 RITES LIMITED, Gurgaon

6 02.-07.2018 CTRY/1186 1 28
7 03.07.2018 CTRY/1195 1 29
8 04.07.2018 CTRY/1202 1 30
9 05.07.2018 CTRY/1010 1 31
10 07.07.2018 CTRY/1027 1 32
11 15.08.2018 NMTS/93-CTRY/1081 2 33
TOTAL 14
10 (a)Extra on item 6(a) for supply & erection of additional fitting at a turn-out,diamond crossing or over-lap

sl no Date location Total Nos DPR NO


CTRY/1201,1196,1193,1192,1189,
1184,1181,1180,1081,
1 17.08.2019
1036,1038,1035,1037,1032,
16 131
1029,1014

11a(i)& 11a(ii) Supply Erection of Bracket and Stay Insulator

SL NO DATE LOC NO Bracket Stay Insulator DPR NO


1 02.09.2018 CTRY/1007 Insulator
1 1 146
2 02.09.2018 1008 1 1 146
3 02.09.2018 1009 1 1 146
4 02.09.2018 1010 1 1 146
5 02.09.2018 1011 1 1 146
6 02.09.2018 1031 2 2 146
7 02.09.2018 1184 1 1 146
8 02.09.2018 1185 1 1 146
TOTAL NOS 9 9
11 (c) Supply & Erection Of Post Insulator
SL NO DATE LOC NO TOTAL NOS DPR NO

1 09.08.2018 SSP 2 11

15a(iv) copper Jumper 160 sqmm between OHE and Cross feeder
sl no Date Loc no Quantity DPR No
1 19.08.2018 SS-05 2 130
2 19.08.2018 SS-04 1 130
3 19.08.2018 SS-01 2
Total 05 Nos

16 b Erection of Longitidunal bond

sl no Date Loc no Quantity DPR No


1 20.06.2018 23 73
2 20.06.2018 10 74
3 22.06.2018 55 75
4 22.06.2018 14 76
5 31.07.2018 54 113
6 31.07.2018 16 114
7 05.08.2018 55 115
8 05.08.2018 14 116
9 12.09.2018 NMTS/93- 85 29
CTRY/1214
Kamarajar Port Limited, Chennai
Bright Power Projects (India) Pvt Ltd RA Bill No 5 RITES LIMITED, Gurgaon
NMTS/93-
10 12.09.2018 CTRY/1214 115 30
11 12.09.2018 117 31
12 12.09.2018 120 32
13 17.09.2019 133 33
14 17.09.2018 107 34
15 17.09.2018 113 35
16 17.09.2018 103 36
17 17.09.2018 102 37
18 17.09.2019 61 39
TOTAL 1297

16 C Erection of Special Bond


V Date loc no Quantity DPR NO
1 17.09.2018 Turnout and 32 38
crossover
2 17.09.2018 7 39
Total 39

18 a Erection 25kv vaccaum Intteruppter

SL No Date loc no Quantity DPR NO


1 08.04.2019 SSP 1 11

20 Erection Of 42kv Lightining Arrester


SL No Date loc no Quantity DPR NO
1 09.04.2019 SSP 2 14

23 Erection of 110v Lead Acid battery


SL No Date loc no Quantity DPR NO
1 09.04.2019 SSP 1 set 14

28 Erection Of LT Transformer
SL No Date loc no Quantity DPR NO
1 08.04.2019 SSP 1 11

28 Erection of DO Fuse
SL No Date loc no Quantity DPR NO
1 08.04.2019 SSP 1 11

30 a(i) Erection of fencing Panel


SL No Date loc no Quantity DPR NO
1 08.04.2019 SSP 40.132mtr 11

30 a(ii) Erection of fencing upright


SL No Date loc no Quantity DPR NO
1 08.04.2019 SSP .533MT 11

33 Supply and Erection of SSP building with electrification


SL No Date loc no Quantity DPR NO
1 05.01.2019 SSP 1 9
34a Erection of Caution Board
SL No Date loc no Quantity DPR NO
1 01.09.2019 LC-2 3 147
2 01.09.2019 CTRY/1065 1 148
3 01.09.2019 CTRY/1066 1 148
4 01.09.2019 CTRY/1069 1 148
Kamarajar Port Limited, Chennai
Bright Power Projects (India) Pvt Ltd RA Bill No 5 RITES LIMITED, Gurgaon

5 01.09.2019 CTRY/1070 1 148


6 01.09.2019 CTRY/1153 1 148
7 01.09.2019 CTRY/1154 1 148
8 01.09.2019 CTRY/1151 1 148
9 01.09.2019 CTRY/1152 1 148
10 01.09.2019 CTRY/1213 1 148
11 01.09.2019 Conveiyor 2 148
12 01.09.2019 CTRY/1138 1 148
13 01.09.2019 CTRY/1155 1 148
14 01.09.2019 CTRY/1142 1 148
15 01.09.2019 CTRY/1148 1 148
16 01.09.2019 LC-1 2 149
17 01.09.2019 LC-2 2 149
TOTAL 22

34 b Erection of Station working Rule diagram


SL No Date loc no Quantity DPR NO
1 12.11.2018 SM ROOM 1 8

NS-4 Mast Transfer by Trailor

Sl Date Quantity DPR No


1 10.04.2018 2 12

NS-5 Loading by Hydra


Sl Date Quantity DPR No
1 10.04.2018 3 12

NS-6 Unloading by Hydra


Sl Date Quantity DPR No
1 10.04.2018 2 12

Erection of steel

Steel used for at the time of Bracket Erection


Total Nos
Total Total
SL No Type of mast Type of steels Required in Unit weight
Weight weight
single mast
3076-2 2 1.26 2.52
1 B-150 10.884
3131-1 2 4.182 8.364
3076-2 2 1.26 2.52
2 B-175 10.884
3131-1 2 4.182 8.364
3076-3 2 1.485 2.97
3 B-225 12.154
3131-2 2 4.592 9.184
3121 2 21 42
4 B-200(MCC) 3122 4 2.61 10.44 58.38
3076-3 4 1.485 5.94
3121 2 21 42
5 B-225MCC) 3123 4 2.61 10.44 58.38
3076-3 4 1.485 5.94

Steel used for at the time of Iosolater Erection


Kamarajar Port Limited, Chennai
Bright Power Projects (India) Pvt Ltd RA Bill No 5 RITES LIMITED, Gurgaon

Total Nos
Total Total
SL No Type of mast Type of steels Required in Unit weight
Weight Weight
single mast
9036 1 18.72 18.72
9037 1 5.508 5.508
9032-6 3 1.163 3.489
1 B-175 54.951
3076-4 4 1.687 6.748
9038 1 10.243 10.243
9038A 1 10.243 10.243

Summary
Erection of
sl no Type of Mast Total weight Total weight
Bracket in mast
1 Isolater 1 54.951 54.951
Total weight in KG 54.951
Total weight in MT 0.054951

Steel used for at the time of ATD Cutting


Total Nos
Total Total
SL No Type of mast Type of steels Required in Unit weight
Weight Weight
single mast
1 3243 1 7.15 7.15
2 B-225 5062-4 2 5.025 10.05 22.26
2 3076-4 3 1.687 5.06

SSP WORK
1 DMA 5.600 2 11.200
2 S-104 25.430 6 152.580
3 S-108 3.767 4 15.068
4 S-109 3.674 3 11.022
5 S-113 152.441 1 152.441
6 S-114 68.354 2 136.708
DPR NO
7 S-115 69.597 2 139.194 15
8 S-116 69.597 2 139.194
9 S-119 41.295 1 41.295
10 S-129 5.820 1 5.820
11 S-130 8.903 1 8.903
12 S-134 68.403 2 136.806
13 S-135 1.796 4 7.184
957.415
0.957

Summary
sl no Type of Mast Erection of mast Total weight Total weight
1 Isolater 1 54.951 54.951
2 ATD 19 22.26 422.96
3 SSP 957.415
Total weight 1,435.33
TOTAL weight 1.435
Kamarajar Port Limited, Chennai
Bright Power Projects (India) Pvt Ltd RA Bill No 5 RITES LIMITED, Gurgaon

stations including fabricated


Kamarajar Port Limited, Chennai
Bright Power Projects (India) Pvt Ltd RA Bill No 5 RITES LIMITED, Gurgaon

ssing or over-lap

Potrebbero piacerti anche