Sei sulla pagina 1di 1

Foundation Fieldbus

1. Digital signal with multivariable output, signal status & diagnostics


information

2. Material Cost (15%)

Cable/Tray/JB
Control system hardwares (IO modules/Barriers)
Panel (size/qty. of system/marshaling cabinets)

3. Installation Cost (50%)

Panel erection
Cable/Tray/JB installation
Terminations
Loop checking

4. Fast Commissioning

Reduction in time for loop checking, interlock & program logic testing

5. Ease of maintenance through AMS

Configuration, parameter verification, monitor of condition/performance of


device by just sitting remotely in control room

Potrebbero piacerti anche