1-Aim:-

This study relies on to renew the student's concept of procurement methods and contracts used in
major construction projects. This innovation includes knowledge of the factors affecting the
system of buying options and the relative strengths and weaknesses of each species. In-depth
operation and management of the standard model of construction and civil engineering contracts.

2-a.Client needs:-

The objective of the project is to work with one responsibility as well as arrange the procurement
strategy to minimize risks and reduce project duration.

*Duration; short period

*Management Risks; less risks

*Quality; high quality

*Time; within time

*Cost; equal or lees than cost

b. Procurement Assessment Criteria:-

1- Traditional Methods
Is a global approach that includes a set of advanced methods used to plan, assess and
monitor activities. The purpose of these methods is to achieve the desired results on time,
according to specifications, within the budget.
2- Design and Build
Where the main contractor designs and builds the work, unlike the traditional contract
where the client hires a design consultant for the design and then the contractor is assigned
to build the term describing the procurement path assigned to.
3- Construction Management
Construction management is an executive in which the business is built by a number of
different commercial contractors. These commercial contractors are contracted with the
client but are managed by a construction manager.
3- Options of relevant review:-

From the scenario data, the appropriate procurement strategy for this project is determined. You
need to understand the basics and objectives of the project, taking into account the pros and cons
of the project.

4- Appropriate selection of a procurement:

Each project contains the client and the client needs a design team consisting of a quantity
surveyor, a structural engineer and other designers. As well as the construction team is represented
by the main contractor, suppliers and specialists.

5- Duty and obligations of professionals


All rights and discussions are agreed upon during the signing of the contract by all parties
involved in the project. The contract also specifies the specific purchase method.

6-Suitable standard forms of contract


All engineering works have the standard form of contracts (Oman Standard Contract). In the world
there is different standards used such as; FIDEC, ICE, JCT, ISE...etc.

7-Options of alternative financing strategies


*Ministry of Finance
*Borrowing from local banks
*Investment, return the project back to the Government of Oman e.g. 25 years.
8-Time Plan