International Formation & Construction (IFC Foundations) is one of the leading piling and 
foundation companies in the United Arab Emirates. 
 
IFC is a Gibralter based company which was formed in 1987 under the sponsorship of Mr. 
Obaid Saleh Mohamed Saeed Al Naeimi of  M/s ADCECO Group of Companies. In 1988 as a 
part  of  a  modernization  and  expansion  program,  modern  drilling  equipment  were 
purchased  and  introduced  into  the  local  market.    The  range  of  equipment  included 
different piling systems to cover a wide range of applications i.e. Ground Anchors, Micro 
piles,  CFA  piles,  Large  diameter  piles  dia  450    mm  to  1500    mm  installed  using 
temporary  or  permanent  casings,  Shoring  systems  either  temporary  or  permanent  by 
means of Steel H‐beams (Berlin Wall System). 
 
During the period 1987 to 2005 over 1000 projects were successfully completed under the 
supervision  and  approval  of  all  local  regulatory  authorities  i.e.  Department  of  Social 
Services,  Local  Municipality,  Public  Works  Department,  Water  &  Electricity  Department, 
Etisalat, ADMA‐OPCO, GASCO & ADGAS. 
 
One of the most prestigious project undertaken by IFC Foundations was the installation of 
1400  piles  for  The  Department  of  Commercial  Buildings,  Social  Services  &  Purchasing 
Department Buildings in Abu Dhabi, the client was The Public Works Department and the 
piling was completed in 39 days. 
 
 
INTERNTIONAL FORMATION & CONSTRUCTION
P.O. Box No. 70303
Abu Dhabi ‐ UAE.

CROSS SECTIONAL SAMPLE OF PILING WORKS                       

PROJECT NAME IFC SCOPE OF WORK  CLIENT  MAIN CONTRACTOR  LOCATION  YEAR.


400/220/33 KV GRID STATION AT ICAD III 
1285 PILES TRANSCO TOSHIBA CORPORATION ABU DHABI  2009
MUSSAFAH
AUGMENTATION & EXPANSION OF 33 KV  WESTERN REGION ABU 
2300 PILES ADWEA LARSEN & TOUBRO LTD. 2009
NETWORK IN WESTERN REGION. DHABI
HE SHK AHMED BIN SAQR  DEVELOPMENT TRADING & 
COMMERCIAL BUILDING  850 PILES  RAS AL KHAIMAH  2007‐2008
AL QASSIMI CONT. CO.
SUB‐STATION IN AL REEM ISLAND  800 PILES  TRANSCO ACTCO  GEN. CONT. / ABB ABU DHABI  2007

TRANSCO HEADQUARTERS 164 PILES  TRANSCO SEIDCO GEN. CONT.  ABU DHABI  2007

EMIRATES STEEL FACTORY 850 PILES  AL NASER GROUP GULF ERECTION CO. ABU DHABI  2007

TEBA CEMENT FACTORY 800 PILES  AL FAHIM GROUP AL FAHIM CONT. ABU DHABI  2006


MINISTRY OF PRESIDENTIAL 
COMPLEX IN AL YASAT ISLAND
COMPLEX IN AL YASAT ISLAND  800 PILES
800 PILES  ARABIAN CONSTRUCTION CO
ARABIAN CONSTRUCTION CO. AL YASAT ISLAND
AL YASAT ISLAND  2006
AFFAIRS.
MAJLIS, SWIMMING POOL AND BOUNDARY  MINISTRY OF PRESIDENTIAL 
5000 NO. PILES  ARABIAN CONSTRUCTION CO. AL AIN  2006‐2007
WALL AT AL RAWDHA PALACE  AFFAIRS.
NEW BUILDING FOR ADWEA AT DOUBLE TANK 
691 NO. PILES ADWEA CODE CONT. CO. ABU DHABI  2006
AREA IN ABU DHABI
SAS AL NAKHIL RESIDENTIAL DEVELOPMENT, 
2000 NO. PILES. SOROUGH REAL ESTATE AL GHAFLY GEN. CONT.  ABU DHABI  2006
PHASE II, PART 1A
DEPTT. OF SOCIAL SERVICES & COMMERCIAL  PUBLIC WORKS 
1, 400 NO. PILES. EMIRATES LINK MALTAURO  ABU DHABI  2005
BUILDING & PURCHASING DEPTT. BUILDING. DEPARTMENT.
CONS. OF PREFABRICATED 11/0.415 KV 
150 MAIN RING SUBSTATIONS  ADWEA PIVOT ENGINEERING  AROUND ABU DHABI 2004/2005
SUBSTATION 
VILLA COMPLEX IN AL YASAT ISLAND BORED PILES & MICRO PILES PRIVATE DEPTT. ARABIAN CONSTRUCTION CO. AL YASAT ISLAND  2004/2005
120 M SSR TOWER AT USH ISLAND GSM SITE 
1000 MM DIA. PILES.  ETISALAT  TIME ELECTRO & CONT. CO.  USH ISLAND  2004
2166
DISTRIBUTION MANAGEMENT & CONTROL 
114 NO. BORED PILES  ADWEA SEIDCO GEN. CONT.  ABU DHABI  2004
CENTER 

Page 1 of 2
INTERNTIONAL FORMATION & CONSTRUCTION
P.O. Box No. 70303
Abu Dhabi ‐ UAE.

CROSS SECTIONAL SAMPLE OF PILING WORKS                       

PROJECT NAME IFC SCOPE OF WORK  CLIENT  MAIN CONTRACTOR  LOCATION  YEAR.


ADIA'S NEW HEAD QUARTERS BUILDING  SHORING BY USING H‐BEAMS  ADIA SAMSUNG CORPORATION  ABU DHABI  2005
TABREED NATIONAL 
TABREED COOLING PLANT IN MARINA MALL SHORING BY USING H‐BEAMS  ACTCO GEN. CONT.  ABU DHABI  2005
COOLING CO.
DEPTT. OF SOCIAL SERVICES & COMMERCIAL  SHORING WORK INCLUDING  363  PUBLIC WORKS 
EMIRATES LINK MALTAURO LLC ABU DHABI  2005
BUILDING & PURCHASING DEPTT. BUILDING. NO. H BEAMS  DEPARTMENT.
SOME OF ADNOC NEW IMAGE FILLING STATION  SHORING WORK BY USING H‐
ADNOC  EASTERN INTERNATION  ABU DHABI  2004‐2005
IN ABU DHABI BEAMS 
SHORING WORK INCLUDING  644 
AL WAHDA MALL EMIRATES INVESTMENT CO. THINNET EMIRATES  ABU DHABI  2004/2005
NO. H BEAMS 
ROYAL RESIDENCE FOR H.E. HASAN MOUSA AL  HE HASAN MOUSA AL 
SHORING BY USING H‐BEAMS  AL MERAIKHI GEN. CONT.  ABU DHABI  2004
QUMZI  QUMZI

Page 2 of 2
Method Statement
 
Bored piles method of installation using temporary casing 
 
 
IFC intends to carry out the piling works in the following manner : 
 
1. Temporary casings shall be vibrated or rotated into the ground up to the bottom 
rock level and socketed about 500 mm into the top of the rock or hard strata. 
 
2. A boring machine shall drill the soil out of the casings by means of an auger.  A 
cleaning bucket shall then be used to achieve a clean hole. 
 
3. The  toe  of  the  piles  shall  be  determined  after  careful  study  of  the  soil  report, 
design  parameters  and  actual  physical  conditions  on  site.  Approval  from  the 
relevant authorities is sought. 
 
4. Epoxy coated reinforcing steel or as specified shall be placed in the cleaned bore.  
Prior  to  that  temporary  casings,  if  required,  shall  be  fixed  to  the  steel  before 
placing.  The hole is now ready for concreting. 
 
5. A 150 – 200 mm diameter tremie pipe shall be used for pouring concrete inside 
the  temporary  casing.    The  tremie  shall  remain  always  full  until  the  pile  is 
completely cast.  This is in accordance with BS8004 section on concreting under 
water. 
 
6. Concrete poured through the tremie shall have a slump of 150 to 180 mm.  The 
mix design is to the Engineer’s approval.  The slump can vary up to 225 mm to 
prevent clogging of tremie. 
 
7. IFC  reserves  the  right  to  pour  the  concrete  directly  from  the  transit  mixer  into 
the tremie pipe or to use a concrete pump. 
 
The matter shall depend solely on accessibility of pile locations. 
 
An overflow of concrete shall be allowed for to ensure sound concrete at cut‐off 
level. 
 
8. The temporary casing is extracted by vibrating or rotating the casing upwards. 
 



 
Method Statement
 
Continuous Flight Auger piles – CFA 
 
The CFA pile is a bored pile which is installed using a continuous flight auger.  This system of 
piling  has  the  advantage  of  being  very  quiet  and  vibration  free,  therefore  it  is  particularly 
suited  to  sites  between  adjacent  buildings  or  where  there  is  a  restriction  on  noise  and 
vibration levels. 
 
CFA piles can be installed in diameters of 500 mm and 600 mm to a maximum depth of 18 
meters.  Depending on ground conditions, loads up to 100 tonnes can be carried on the 500 
mm diameter piles and up to 140 tonnes on the 600 mm diameter piles.  This type of pile can 
be installed in most types of soil or weak rocks. 
 
Equipment 
 
The continuous flight auger is driven by a motor which is mounted on an adjustable leader 
attached  to  a  crawler  crane.    The  auger  has  a  hallow  stem  through  which  concrete  is 
pumped after the piles has been bored.  The leader is fully adjustable in both forward and 
sideways directions to ensure that the pile can be bored accurately in the correct position. 
 
Installation method 
 
The method of installing CFA piles is as follows : 
 
1. The continuous flight auger is set up accurately over the pile position and a detachable 
shoe is attached to the bottom of the hollow auger stem to prevent the ingress of soil 
and water while the pile is being bored. 
 
2. The auger is screwed into the ground to the required pile depth by means of the motor 
rotating the auger.  During this operation only the soil necessary to provide space for the 
auger  is  displaced  upwards,  the  major  part  of  the  soil  remaining  on  the  flights  of  the 
auger below ground level to ensure that the sides of the pile bore remain stable. 
 
3. Upon  reaching  the  required  depth  with  the  auger,  concrete  is  pumped  normally  at  50 
bars (1 bar = 14.5 psi) through the hollow stem of the auger under pressure to form the 
pile.  The pressure of the concrete forces the loose cap off the bottom of the auger and 
ensures good contact between the concrete and the soil.  The auger is slowly withdrawn 
from  the  ground  while  pumping  continues  and  the  concrete  pressure  is  recorded  and 
maintained until the bottom of the auger reaches the ground surface in order to ensure 
that the pile is of the correct diameter over its entire length.  The soil from the pile bore 
is lifted out of the ground on the flights of the auger as it is being raised. 
 
4. Concrete  pressure  is  maintained  by  the  operator  of  the  concrete  pump  and  the  rig 
operator lifting the auger at a rate controlled by him. 
 
 
Page 1 of 2 
 
 
5. The  soil  is  removed  from  around  the  top  of  the  pile  to  expose  the  concrete  at  ground 
level  and  a  steel  reinforcing  cage  is  inserted  into  the  upper  part  of  the  pile.    The 
maximum  length  of  cage  is  normally  6‐8  meters,  but  longer  cages  can  be  inserted  if 
necessary by the use of a small vibrator.  For special applications steel H‐beams can be 
inserted into the concrete instead of reinforcing cages. 
 
6. The  cage  will  be  placed  centrally  within  the  concrete  by  relying  on  the  spacers  and  by 
visually  inspecting  the  cage  as  it  is  installed.    Spacers  will  ensure  a  cover  of  100  mm 
provided in the augered hole. 
 
The  spacers  will  be  placed  near  the  top  of  the  cage  and  thereafter  at  3  m  centers 
vertically along the cage.  Also, one set of spacers shall be placed near the base of the 
cage.  If a longer cage is needed then additional spacers are placed at the base level of 
the cage if this is less than 3 m distance from the set above. 
 
Technical information 
 
Pile diameter  500 mm  600 mm 
Working load (depending on 
100 tonnes  140 tonnes 
Ground conditions) 
Max. depth of pile  18 meters  18 meters 
Normal  reinforcement  (welded     
mild steel cages):     
* main bars  6  16 mm  9  16 mm 
* hoops   8 mm at 150 mm pitch   8 mm at 150 mm pitch 
Normal length of reinforcing Cage  6‐8 meters  6‐8 meters 
Cover to main reinforcement  75 mm  75 mm 
Concrete     
* crushing strength  Minimum 25 N/mm2   
* slump  150 – 200 mm 
 
Economy 
 
CFA piles can be installed very quickly since it is not necessary to use any temporary casing 
to maintain stability of the sides of the bore, even in sand with a high ground water table.  It 
is  therefore  possible  to  install  these  piles  at  a  higher  production  rate  than  other  types  of 
bored piles and faster than driven piles with the added advantage of there being very little 
noise and no vibration.  CFA piles costs are lower than other types of bored piles or driven 
piles with the same load capacity therefore the contract period can be reduced considerably. 
 
Load testing 
 
Load tests can be carried using kentledge to provide the necessary reaction for the hydraulic 
jack  which  is  used  to  load  the  pile.    Tests  are  normally  carried  out  to  1½  times  the  design 
load on working piles which can be tested either before or during the course of a contract. 
 

Page 2 of 2 
List of Heavy Equipments
 
List of IFC heavy equipment  
available for use during execution of IFC projects 
 
01.  DRILL RIGS. 
Sl. No.  Equipment  Brand  No. 
1  Casagrande   C‐30  1 
2  Casagrande   C‐20  1 
3  Casagrande   C‐3C  1 
4  IMT  AF/180C  1 
5  IMT  AF‐10  1 
6  Bauer  BG‐7  2 
7  Soilmec  R312/200  1 
8  Casagrande   B125  1 
9  Bauer  BG‐9  1 
 
02.  CRANES 
1  Link Belt   RMH  1 
2  Crawler Crane   NCK 406  1 
3  Crawler Crane   Hitachi  1 
4  Link Belt  ‐  1 
5  Crawler Crane   P&H   1 
6  Crawler Crane   Hitachi KHI80  1 
7  Crawler Crane   Hitachi KH150  2 
 
03.  ACCESSORIES 
1.  Schwing Pump  P3  1 
2  Schwing Pump  BP 2000  1 
3  Schwing Pump  BP 800  1 
4  Schwing Pump  BP 2800  1 
5  Generator   37 KVA  1 
6  Generator   CAT  2 
7  Vibrator   ICE 1423  1 
8  Vibrator   ICE 1423 c  3 
9  Power Pack   ICE 300  3  
 
List of Jobs Executed 

    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
313(001) VILLA FOR MR. HANTOOMAH CFA 3A S-19 61 500 13.00 BEIRUT CONSULTING BIN HILAL JULY ' 89
ISSA AL FALAHY GROUP CONT.
315(003) ABU DHABI INDIAN SCHOOL CFA MUSHRIF 118 500 9.50 DASTUR CONSULTANT HACCO ENG. & AUG.' 89
CONSTRUCTION CO.
316(004) 2 VILLAS FOR MR. ALI MOHAMMAD CFA 299 W-14 42 500 4.50 SYRCONSULT CONSTRUCTION AUG.' 89
SAEED AL BADI CONSULTING ENGINEERS DEV. EST.
317(005) VILLA + MAJLIS FOR MR. HAMEED CFA 21 S-21 99 450 14.00 ANTOINE HUMAID AL AUG.' 89
AL MAZROUIE HELAL & PARTNERS MAZROUIE
318(006) VILLA FOR NOURJIHAN & SONS CFA 18A S-15 54 500 13.50 BEIRUT CONSULTING NABIL CONT. AUG.' 89
OF ABDULLA KULIB AL HAMILY GROUP
319(007) VILLA FOR MR. ABDULLA CFA 16A S-20 22 450 13.50 ARCH. & URBAN NATIONAL CONT. AUG.' 89
SALEM SAMSON AL NEAMEE DESIGN CO.
320(008) MAJLIS FOR H.H.SHEIKH CFA W-26 58 450 6.75 CASSIA & ARABIAN AUG.' 89
SEIF BIN MOH'D AL NAHYAN ASSOCIATES CONSTRUCTION CO.
321(009) VILLA FOR MATAR, NOURA CFA 18B S-15 54 500 13.00 BEIRUT CONSULTING NABIL CONT. AUG.' 89
& MOUSA GROUP
322(010) NEW ROWDHA CLINIC CFA W14/01 72 400 5.50 PWD SAEED AL QUBAISI SEP.' 89

324(012) St. JOSEPH SCHOOL CFA MUSHRIF 26 450 8.50 GODFREY, HEATH HACCO ENG. & SEP.' 89
& SPEARING CONSTRUCTION CO.
325(013) BLDG. FOR MR. AHMED CFA C-62 E-20/01 46 500 7.00 SYRCONSULT BIN SWEED SEP.' 89
HASSAN MUFTAH AL MAZROUIE CONSULTING ENGINEERS CONTRACTING CO.
326(014) VILLA FOR MR. SALEM ABDUL CFA 230 E-41 19 400 14.00 ARDENT AL KHYBER NOV.' 89
NAYADI CONTRACTING CO.
327(015) BLDG. FOR MR. ZAYTOON CFA C-46 E-3 67 600 10.50 HANDASCO BYBLOS CONT. CO. SEP.' 89
MOH'D AL MANSOURY
328(016) TWO STOREY COMMERCIAL BUILDING CFA MUSSAFAH 600 450 KHALIFA COMMITTEE BIN SWEED NOV.' 89
6 NOS. ENG.. DEPT. CONTRACTING CO.
329(017) BLDG.FOR MR. ABDUL JABBAR CFA 59 E-10 70 500 10.00 TECH CONSULT BIN SWEED OCT.' 89
ABDULLA KHORI CONTRACTING CO.
330(018) MAJLIS FOR H. H. NEW CFA BUTEEN 165 500 10.50 ARCH ENGINEERING KADRI BUILDERS OCT.' 89
RAMADAN PALACE CONSULTANT
331(019) 2 VILLAS FOR FATHIMA AHMED CFA 86+87 W-47 67 500 7.00 NATIONAL ENGINEERING AL TAWAKKAL NOV.' 89
JASSIM BUREAU CONTRACTING
332(020) VILLA FOR MR.HASSAN MOH'D CFA 5 S-16 162 400 14.00 ARCO CONSULT. IBRAHIM HASSAN NOV.' 89
AL MANSOURI MANSOURI

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 1 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
333(021) 2 STOREY BUILDINGS FOR CFA MUSSAFAH 612 400 10.50 DEPT. OF SOCIAL AL MARFA CONT. NOV.' 89
KHALIFA COMMITTEE - 6 Nos. SERVICES
334(022) VILLA FOR MR. MOH'D JABIR CFA 20 S-26 81 400 14.00 ARCO CONSULT. AL MAHABA CONT. DEC.' 89
ABDULRAHMAN AL MANSOURI EST.
334(022) VILLA FOR RAGAB SAYED CFA 27A S-22 38 500 14.00 NATIONAL ENGINEERING AL MAHABA CONT. DEC.' 89
HAFEEZ AL MURY & SONS BUREAU EST.
335(023) VILLA FOR MR. MUBARAK CFA 4 S-16 92 400 12.00 ARCO CONSULT. AL KHYBER JAN.' 90
TAHNOON AL MANSOURI ENG.
336(024) VILLA FOR MR. HASSAN MOH'D CFA 5 S-16 243 400 14.00 ARCO CONSULT. IBRAHIM HASSAN JAN.' 90
AL MANSOURI ENG. MANSOURI
337(025) H.H. NEW VILLA AT KHALIDIYA CFA W-11 65 500 10.00 ARCHITECTURAL ACTCO GENERAL JAN.' 90
ENG. CONSULT. CONT.
338(026) BASEMENT FOR READYMIX CFA MUSSAFAH 4 500 9.50 READY MIX NOV.' 89
PLANT AT MUSSAFAH ABU DHABI
339(027) BLDGS. AT SHAHAMA, ABU MUREIKA CFA SAHAMA 116 450 6.00 TECH CONSULT SALEH AL NOV.' 89
SALIM OMAR AL HRAIDI MAZROUIE CONT.
340(028) VILLA FOR MR. SAEED RASHID CFA NEW AIRPORT 55 500 10.00 UNITED CONS. ARZANAH CONT. DEC.' 89
AL RUMAITHY
341(029) BUILDING FOR CENTRAL CFA E-4 154 450 8.50 ALEXANDER GIBB AL SAHEL CONT. FEB. '90
POST OFFICE 257 500 & PARTNERS CO.
342(030) VILLA FOR MR. ABDULLAH CFA C-206 E-41 18 400 11.00 ARAB CONSULTANTS AL KHYBER CONT. DEC.' 89
DALMOUG 47 400 ARCH. ENGINEERS
343(031) VILLA FOR MR. RASHID KHAMIS CFA 91 E-36 47 400 9.20 BEIRUT AL RAYAH DEC.' 89
AL RUMAITHY CONSULTING GROUP CONTRACTING
344(032) H.H. SHEIKH KHALIFA PALACE CFA W-10 44 450 10.00 ARCH ENG. SCAN JAN.' 90
SERVICE BLOCK & STAFF MAJLIS CONSULT CONT.
345(033) BLDG. FOR MR. AHMED CFA C-2 E-20/01 91 500 7.50 CONTINENTAL AL FADA CONT. & GEN. JAN.' 90
ABDULLAH MOHD HAJI MOHD ENG. CONSULTANT MAINT. EST.
346(034) VILLA FOR MR. MOH'D OMAR CFA 23-B S-19 42 400 14.50 ALAM & ASSOCIATES AL MAHMOUD JAN.' 90
AL MUDY ENGINEERING
347(035) VILLA FOR MR. MOH'D SALEH CFA 23 S-18 71 450 15.30 AL AMARA AL AL AFRAY CONT. JAN.' 90
ABDUL RAHIM MOH'D SHARQIYYA
348(036) VILLA FOR MR. SULTAN CFA 3A S-20 25 500 13.50 AL BAYAN QUMARA CONT. JAN.' 90
MUFTAH MUBARAK CONSULTANT
349(037) 3 VILLAS FOR AL RUMAITHY CFA 456/476 E-18/02 177 450 8.60 MOHAMED LINES ENGINEERING JAN.' 90
GROUP 49 HOUMASANI GEN. CONT. EST.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 2 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
350(038) MOHD LWAIL AFSAN AL KHAILI CFA SAHAMA 116 450 5.00 TECH CONSULT SALEH AL JAN.' 90
PART-II / ABU MUREIKA MAZROUIE CONT.
351(039) TYPE A -4 BLDG. FOR DIWAN CFA C-141 E-4 444 500 4.80 GOLDEN PLANNERS AL OTAIBA OMRAN FEB.' 90
OF H.H. THE CROWN PRINCE C-150-152 CONSULTANTS
352(040) TYPE A -8 BLDG. FOR DIWAN CFA 142-149 E-4 888 500 7.00 GOLDEN PLANNERS CIVILCO FEB.' 90
OF H.H. THE CROWN PRINCE CONSULTANTS
353(041) VILLA FOR SAEED OBAID AL CFA 10A S-16 50 500 15.50 BEIRUT CONSULTING NILE CONT. MAR.' 90
ZAABI GROUP
354(042) EXTENSION - SERVICE BLOCK CFA 20 S-16 15 400 13.50 ARCO CONSULT AL MAHABA CONT. FEB.' 90
FOR MOHD JABIR ABDRAHMAN EST.
355(043) BLDG. FOR MR. SAEED CFA C-20 E-3 278 600 8.00 HANDASCO ALLIED ENG. MAR.' 90
MUBARAK AL MANSOURI
356(044) VILLA FOR MR. OBEID SALEM CFA 21 E-29 55 500 8.00 SASCO CONS. AL FADA CONT. & GEN. MAR.' 90
AL ZAABI MAINT. EST.
357(045) BLDG. FOR MR. MOHAMED CFA 147 W-18/02 68 500 4.00 HANDASCO AL FADA CONT. & GEN. MAR.' 90
MAKTOUM RASHED AL MAZROUIE MAINT. EST.
359(047) BLDG. FOR MR. ABDULLAH CFA 142 E-3 12 600 6.10 AL BAYAN AL NAJAH CONT. APR.' 90
MOH'D AL RUMAITHY 59 500 CONSULTANT
360(048) BLDG. FOR MR. MANEA SAEED CFA 22 W-18/02 8.00 ARAB CONSULTANTS ARABIAN APR.' 90
AL OTAIBA ARCH. ENGINEERS CONSTRUCTION CO.
361(049) VILLA FOR MR. JABER FALAH CFA 110 W-15/02 40 500 4.70 SPECTRUM AL NASIR APR.' 90
JABER AL AHBABI ENGINEERING
362(050) VILLA FOR MR. ABDULLA AL CFA 201 E-41/01 15 450 11.10 ARDENT AL FAIHAA MAY ' 90
SAEED
363(051) BLDG. FOR H.O. MOHAMED CFA 201 E-4/01 15 450 5.50 SYRCONSULT GINCO CONT. MAY ' 90
IBRAHIM AL SAMAN CONSULTING ENGINEERS
365(053) ZAKHER HOTEL EXTENSION CFA C-8A E-8 134 750 7.00 SYRCONSULT DHAFIR CONT. AUG.' 90
CONSULTING ENGINEERS
366(054) BLDG. FOR H.E. SH. HAMAD CFA 73 E-16 156 750 7.20 PARC INTERNATIONAL AL MOAYAD JULY' 90
BIN TAHNOON ENGINEERING
367(055) BLDG. FOR DAUGHTER OF CFA C-30 E-5 128 600 9.80 ARCH. DESIGN & TARGET ENGINEERING JULY' 90
ATIQ B. AL MUHAIRY DECORATION CONSTRUCTION CO.
369(057) BLDG. FOR DEPT. OF SOCIAL CFA 159-160 E-4 186 500 11.00 DAR EL EMARA SAEED AL QUBAISI JUNE' 90
SERVICES ARCHITECTS ENGINEERS GEN. CONT. EST.
370(058) AL JALLAF WORKSHOP CFA UMM AL NAR 42 600 14.60 ARCH. DESIGNING GULF ERECTION MAY ' 90
EXTENSION COMPANY

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 3 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
371(059) BLDG. FOR MR. AHMAD BIN CFA C-154 E-4/01 95 600 7.70 PARC INTERNATIONAL AL FADA CONT. & GEN. JUNE ' 90
MOHAMMAD DORRI AL FALAHI MAINT. EST.
373(061) TYPE " B " BLDG. FOR DEPT CFA C-165 E-4/01 186 500 5.00 DAR EL EMARA AL FADEL GEN. JULY ' 90
OF SOCIAL SERVICES C-166 ARCHITECTS ENGINEERS CONT.
374(062) BLDG. FOR DEPT. OF SOCIAL CFA C-126 to E-4/01 279 500 4.50 DAR EL EMARA GINCO CONT. JULY ' 90
SERVICES C-128 ARCHITECTS ENGINEERS
375(063) RESIDENTIAL DEVELOPMENT CFA C-54 83 500 8.00 AUG. ' 90
(APARTMENTS) C-55 W-10 156 600 BRIAN MOORHEAD AL WIMPEY
40 750
377(065) VILLA FOR MR. SAEED AL CFA 23 S-15 56 450 15.00 BEIRUT CONSULTING AL NABIL CONT. SEP. ' 90
KULAIB AL HAMILY & SONS GROUP EST.
378(066) 45 VILLAS FOR H.H. SH. SEIF CFA C-31 to W-10 298 500 6.00 ARCH. CONSULTING CIVCONS SEP. ' 90
BIN MOHAMMED AL NAHYAN C-33 GROUP
379(067) VILLA FOR HAJ MOH'D THANI CFA 10B S-15 64 400 15.50 ALAM & ASSOCIATES AL MAHMOOD SEP. ' 90
AL MUHAIRY ENGINEERING
380(068) HAMAD MOHAMMAD AL QAMZI CFA E-9 46 500 15.50 SAHIL ENG. AL MAHMOOD OCT. ' 90
MOSQUE CONSULTANTS ENGINEERING
381(069) VILLA FOR BUTTI KHAMIS CFA 62 E-18/02 85 450 8.50 SYRCONSULT ABU DHABI NAT'L OCT. ' 90
DHARIF AL SHAMSI CONSULTING ENGINEERS GEN. MAIN. & CONT.
382(070) VILLA FOR SAEED OBAID AL CFA 10A S-16 2 500 14.00 AL NILE CONT. SEP.' 90
ZAABI
383(071) VILLA FOR MR. IBRAHIM MOH'D CFA 8 S-18 40 500 15.00 AL GEEMI ENGINEERING FAYROUZ GEN. CONT. OCT.' 90
ALI AL SAIQAL CONSULTANT & MAINT. EST.
385(073) VILLA FOR MR. GHARIBA CFA 12-A S-18 20 450 14.50 STUP ABU DHABI OCT.' 90
SAEED BUTTI JASOUM 15 500 14.50 INTERNATIONAL PROPERTY
AL RUMAITHY 4 600 15.50 MAINTENANCE
386(074) VILLA + SERVICE BLOCK FOR CFA 22 S-21 60 400 15.00 CONSAR CONSULT BIN HAFEEZ EST. NOV.' 90

MR. SALEM HAFEES AL MAZROUIE 19 500 15.00


387(075) BLDG. FOR MR. MOHAMMAD CFA C-81 E-20/01 76 600 8.70 BEIRUT CONSULTING AL KHOOR MAINT. DEC.' 90
KHALFAN AL HAMILY GROUP & GEN. CON.
388(076) BLDG. FOR LATE GURAIR AL CFA C-134 E-3 127 500 8.20 ARDENT RAYAN CONT. CO. NOV.' 90
RUMAITHY
389(077) VILLA FOR MR. ALI KHALFAN CFA 397 W-14/01 32 500 5.00 SYRCONSULT AL NASIR GEN. NOV.' 90

AL QUMSI CONSULTING ENGINEERS CONTRACTING

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 4 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
390(078) BLDG. FOR MR. MOHD RASHED CFA 12 E-9 84 500 9.50 AL SUWEIDI ENGINEERING AL JADWAL GEN. DEC.' 90
MOH'D. AL MANSOURY CONSULTANTS BUREAU CONT.
391(079) VILLA FOR MR. ABDULLA CFA 23 S-21 36 500 14.30 AL BAYAN ARCH. STYLE DEC.' 90
MUBARAK AL MAZROUIE CONSULT CONT.
392(080) VILLA FOR MR. MOH'D. ALI AL CFA 61 E-18/01 15 400 7.00 GRACE CONSULT LINES ENGINEERING DEC.' 90
RUMAITHY 52 500 GEN. CONT. EST.
393(081) VILLA FOR LATE ALI AT'CHAN CFA 36 S-15 86 400 15.00 AL SUWEIDI ENGINEERING AL AWSAT GEN. JAN.' 91
AL HAMILY CONSULTANTS BUREAU CONTRACTING
394(082) VILLA + SERVICE BLOCK FOR CFA 288 E-41/01 83 500 6.00 NATIONAL ENGINEERING AL SHEREEF GEN. DEC.' 90
MR. TAMER JUMA AL DHARIF BUREAU CONT.
395(083) VILLA FOR MR. BUTTY MOH'D CFA C-24 S-15 27 450 12.50 EMIRATES ENGINEERING APR.' 91
BUTTY AL HAMILY & SONS CONS. GROUP
396(084) VILLA FOR MR. MOH'D HAYE CFA C-20 S-15 450 12.00 BEIRUT CONSULTING AL MAHABA CONT. APR.' 91
OBEID AL HAMILY GROUP EST.
397(085) VILLA FOR MR. OBEID MSBEH CFA 21 W-52 35 500 7.00 BEIRUT CONSULTING AL MAHAM GEN. DEC.' 90
AL AMIMY GROUP CONT.
398(086) READY MIX FACTORY AT CFA -- -- 32 450 12.50 -- EMIRATES READY JAN.' 91
MUSSAFAH MIX BETON EST.
399(087) VILLA FOR SON OF LATE CFA 265 E-41/1 58 450 9.00 ARDENT YALLAKH GEN. FEB.' 91
MR. ALILI CONTRACTING CO.
400(088) H.H. SH. KAHALIFA PALACE CFA W-10 18 450 9.50 ARCH. ENG. SCAN CONT. JAN.' 91
EXTENSION - SERVICE BLOCK CONSULTANTS
401(089) VILLA FOR MR. GHARIBA SAEED CFA 12A S-18 13 500 15.00 STUP INT'L CONS. ABU DHABI PROPERTY JAN.' 91
BUTTI JASSEM AL RUMAITHY MAINT. CO.
402(090) VILLA FOR MR. ISSA MATAR CFA C-5 E-37 85 600 9.00 BEIRUT CONSULTING AL MAHABA CONT. FEB.' 91
ISSA AL FALAHI GROUP EST.
403(091) BLDG. FOR MR. MOHD BIN ALI BPTC C-1 E-37 76 500 12.50 ANTOINE METAC GEN. MAR.' 91
AHMAD AL DHAHIRI HELAL & PARTNERS CONT. CO.
404(092) VILLA FOR MR. SUHAIL AL CFA 32 W-18/02 44 450 5.60 EMIRATES ENG. CONS. AL MAHABA CONT. FEB.' 91
AMRY 17 600 5.60 EST.
405(093) VILLA FOR MR.IBRAHIM SALEH CFA 72A W-31 40 500 8.40 BEIRUT CONSULTING SILEX GENERAL MAR.' 91
KHALIFA GROUP CONTRACTING
406(094) BLDG. FOR MR. NASSER CFA C-69 E-20/01 63 500 9.50 ARAB CONSULTANTS AL KHOOR MAINT. APR.' 91
ABDULLA NASSER & GEN. CONT.
407(095) VILLA FOR H.H. SH. SUROOR CFA C-15 W-20 40 500 7.00 SYRCONSULT COMMODORE MAR.' 91
BIN SULTAN AL DHAHIRI CONSULTING ENGINEERS CONTRACTING

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 5 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
408(096) VILLA COMPOUND FOR CFA C-3 W-30 70 500 6.75 ARCHITECTURAL ALLIED ENG. MAR.' 91
MR. ABDUL JALIL AL FAHIM DESIGNING & DECO.
409(097) VILLA FOR MR. AWAD MOH'D CFA C-17A S-15 58 500 13.50 HANDASCO SADAQUA GEN. MAR.' 91
BUTTI AL HAMILY CONSULTANTS CONT. CO.
410(098) BLDG. FOR MR. NASSER BIN CFA C-4 E-37 72 500 10.50 ISLAMIC ARCH. METAC GENERAL MAY ' 91
AHMED AL RAISI CONT. CO.
411(099) VILLA FOR MR. ALI SAIF CFA C-249 E-41/01 69 450 10.50 DAR AL HANDASA AL KHOOR APR.' 91
MUBARAK AL RIYAMI MAINT. & GEN. CONT.
412(100) M.S.U. & P.C.O. BLDG. CFA 40 E-22 70 450 6.00 ARIF & BIN TOAK CONSTRUCTION MAY ' 91
(ETISALAT TOWER) & DEVELOP. CO.
413(101) VILLA FOR MRS. DHABARA CFA 234 E-41/01 42 450 12.00 AL KHEALI AL AMERI AL HIDAYA CONT.. MAY ' 91
SAEED & LAUBA RAMIS & 235 CONS. ENG. CO.
414(102) VILLA FOR MR. ATEEK AL CFA 89 E-43 96 500 10.00 AL AMARA AL SAEED AL QUBAISI JUNE '91
RUMAITHY 28 450 SHARQIYYA GEN. CONT. EST.
415(103) VILLA FOR MR. MUBARAK CFA 13 S-15 63 450 13.50 AL SUWEIDI ENG. CONSTRUCTION MAY ' 91
ABDULLA AL HAMILY CONSULTANTS BUREAU GEN. CONT. CO.
416(104) BLDG. FOR MR. ABDUL JALIL AL BPTC C-46 E-11 87 900 7.00 ISLAMIC ALLIED ENG. AUG.' 91
FAHIM ARCHITECTURE ENTERPRISES
417(105) BLDGS. FOR MR. MOUDED HAREB CFA C-2 E-37 132 500 9.50 AL KHEALI & AL AMERI AL WAAD GEN. MAY ' 91
& MR. RASHED HAREB AL KHEALI C-3 CONS. ENG. CONT. & MAINT. CO.
418(106) EXTENSION TO VILLA FOR H.E. CFA C-9 E-12 8 500 7.00 PAN EMIRATES GULF ERECTION MAY ' 91
HAMOODAH BIN ALI CONSULT (MILCO)
419(107) BLDG. FOR MR. KHALIFA CFA C-6 E-37 112 600 13.50 AL SUWEIDI ENG. AL MAHABA CONT. JUNE '91
KHALFAN AL HAMILY CONSULTANTS EST.
420(108) VILLA FOR MR. SAIF HAJI AL HAMILY CFA C-222 E-41/01 19 450 6.00 EMIRATES ENG. AL MAHABA CONT. JUNE '91
CONSULT. GROUP EST.
421(109) VILLA FOR MRS. ATIQA CFA C-5 S-19 39 450 13.50 ARCO CONSULTANTS GULF CONST. CO. AUG.' 91
MUBARAK
422(110) VILLA FOR MR. ABDUL AMEEN CFA C-74 E-36 74 500 11.50 ARDENT CIVILCO JUNE' 91
AL AWADI
423(111) BLDG. FOR MR.HAMAD SAEED CFA C-7 E-37 90 600 8.00 HANDASCO AL FADA CONT. & GEN. JULY' 91
AL MANSOURI CONSULTANTS MAINT. EST.
424(112) VILLA FOR MR. ALI AHMED CFA C-45 E-48 12 500 10.00 NATIONAL ENGINEERING LINES ENGINEERING AUG.' 91
MOH'D AL RUMAITHY 63 400 7.00 BUREAU GEN. CONT. EST.
425(113) BLDG. FOR MR. HAYA JUMA CFA C-4 E-28 64 600 9.50 BEIRUT CONSULTING AL KHOOR MAINT. JULY' 91
AL HAMILY GROUP & GEN. CONT.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 6 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
426(114) VILLA FOR MR. JAMAL JABER CFA C-51 E-18/02 53 500 10.70 BEIRUT CONSULTING ABU DHABI NATIONAL AUG.' 91
AL DHARIF GROUP GEN. MAINT. & CONT. CO.
427(115) DRILLING PAD CFA ABU AL ABIAD 28 600 ALEXANDER GIBB A.D.C.O. JULY' 91

428(116) BLDG. FOR MR. KHAZZA AL CFA C-36 E-3 60 750 11.00 SYRCONSULT BIN SWEED CONT. CO. AUG.' 91
ATHTHY AL AMERI CONSULTING ENGINEERS
429(117) BLDG. FOR MR. ABDULLA CFA C-169 E-18/02 62 500 10.00 ARCH. PLANNING AL FADEL GEN. SEP.' 91
YOUSSEF AL ZAABI GROUP CONT.
430(118) VILLA FOR CFA 20-B S-20 31 500 15.50 BEIRUT CONSULTING NABIL CONT. EST. AUG.' 91
MR. ABDULLA AL AHBABI GROUP
431(119) BLDG. FOR MR. SAEED MOH'D. CFA C-167 E-18/02 64 600 10.10 SYRCONSULT AL OMRAN GULF OCT.' 91
AL RAQABANY CONSULTING ENGINEERS ENG. & CONT.
432(120) VILLA FOR M/S ALI & MOHD CFA 23 W-28 34 500 4.10 AL AJAMI CONSULTING SADAKA GEN. SEP.' 91
SONS OF AHMED JUMA AL ZAABI BUREAU CONT. CO.
433(121) BLDG. FOR H.H. SH. ZAYED CFA 167 E-4/01 76 600 7.00 ISLAMIC ARCH. EMIRATES BELBADI OCT.' 91
BIN SULTAN AL NAHYAN 168 76 600 7.00 CONT. CO.
434(122) VILLAS FOR H.E. MOHD CFA 4 W-62 205 450 13.50 ARCHITECTURE & AL GHAFLY GEN. NOV.' 91
HABROUSH AL SUWEIDI PLANNING GROUP CONT.
435(123) VILLA FOR MR. SULTAN CFA C-239 W-14/02 23 450 6.00 DAR EL EMARA DHAFIR CONT. OCT.' 91
GHANOUM ARCHITECTS ENGINEERS
436(124) DRILLING OF HOLES BANIYAS PLANT HIRE AL OTAIBA GARG DEC.' 91
WATHBA CONT.
437(125) BLDG. FOR MR. SAIF SUHAIL CFA C-4 W-24/01 28 600 6.50 AL AIN CONSULTING SALEH AL MAZROUIE NOV.' 91
AL KHAILY ENGINEERS CONT.
438(126) VILLA FOR MR. BUTTY MOH'D CFA C-24 S-15 8 450 12.50 EMIRATES ENG. AL MAHABA CONT. NOV.' 91
AL HAMILY & SONS CONS. GROUP EST.
439(127) TWO STOERY VILLA FOR MR. CFA 14 W-28 51 500 5.50 AL AMARA AL PROFESSIONAL NOV.' 91
ABDULLA NASSER AL SUWEIDI SHARQIYYA BUILDERS
440(128) BLDGS. FOR MR. AHMED BIN KHALIFA BPTC C-165 E-18/02 154 600 6.00 ISLAMIC ARCH. JAMIL & JAMAL JAN' 92
BIN AHMED AL SUWEIDI & 164 CONT. CO.
441(129) BLDG. FOR MR. MUBARAK BIN CFA C-146 E-3 112 500 6.20 GOLDEN PLANNERS AMRA CIVIL DEC.' 91
JUMA AL QUBAISI CONSULTANTS CONSTRUCTION
442(130) VILLA FOR MR. SAIF AL CFA 305 B E-41/01 24 400 9.00 PLANAR GENERAL CONT. CO. DEC.' 91
KA'ABI (GENCO)
443(131) BLDG. FOR MR. MUBARAK CFA 165 A W-18 64 500 8.00 ARAB CONSULT KAREEM CONT. NOV.' 91
HAMAD MUBARAK AL MANSOURI

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 7 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
444(132) BLDG. FOR MR. MOH'D HAMAD CFA C-23 E-10 68 450 9.20 PALESTINIAN ENG. REEM AL KHALEEJ JAN.' 92
AL MANSOURI CONSULT GROUP CONT. CO.
445(133) 10 VILLAS FOR H.E. AHMED CFA C-10 E-12 253 500 8.60 ARCH. & ENG. POLENSKY & JAN.' 92
AL OBAIDLY CONSULTS (AEC) ZOELLNER (P&Z)
446(134) VILLA FOR MR. RASHID SALEM CFA 317 E-41/01 450 9.00 AL SUWEIDI ENG. AL RAMLAH GEN. NOV.' 91
AL QUBAISY CONSULTANTS BUREAU CONT.
447(135) VILLA FOR SH. AHMED ABDUL CFA 291 W-14/01 43 450 4.35 ARCH. & ENG. AL MAHABA CONT. DEC.' 91
AZIZ AL MUBARAK & 294 CONSULTS (AEC) EST.
448(136) BLDG. FOR MR.HAZMI KANNAS CFA C-13 E-20/01 8.50 PALESTINIAN ENG. REEM AL KHALEEJ DEC.' 91
AL AMERY CONSULT BUREAU CONT. CO.
449(137) VILLA FOR MR. NASSER SAEED CFA 12 W-50 60 500 14.00 TECHCONSULT AL BIN SWEED CONT. MAR.' 92
SWAD AL MANSOURI DAMLOUJI CO.
450(138) NEW CENTRAL MARKET & CFA 24 EASTERN 3000 400 8.00 WHITE YOUNG RIZZANI DE JUL.' 92
VEGETABLE MARKET & 25 ROAD 450 8.00 EMIRATES ECCHER
500 8.00

451(139) VILLA FOR MR. RAHMA AL CFA 179 W-9 60 500 9.10 ARDENT AL MASOUD CONT. JAN.' 92
MASOOD CO.
452(140) VILLA FOR MR. ALI SALEM CFA 4 E-43 81 500 3.50 EMIRATES ENG. JAMAL AL AMERI JAN.' 92
BILRATTA AL HAMILY CONS. GROUP GEN. CONT.
453(141) VILLA FOR MR. MOOSA AHMED CFA 29 S-15 120 500 14.50 SHAHEEN ENGINEERING CADDO CONT. JAN.' 92
MOOSA AL HAMILY CONSULTANCY & TRADING CO.
454(142) VILLA FOR MR. MOH'D YOUSEF BPTC 148 E-4/02 66 500 7.00 HANDASCO AL AHD GEN. CONT. JAN.' 92
KHOURY CONSULTANTS & MAINT. CO.
455(143) VILLA FOR MR. AHMED MOH'D CFA 124 W-14/02 104 500 6.00 ARDENT TAWAM UNITED JAN.' 92
SHAREEF HUSSAIN ENTERPRISES
456(144) VILLA FOR MR. RASHID AL CFA 27 S-16 90 500 14.00 SHAHEEN ENGINEERING SULTAN GEN. FEB.' 92
MANSOURI CONSULTANCY CONT. EST.
457(145) DRILLING HOLES BANIYAS AREA PLANT HIRE AL RAFEH TRNSP. FEB.' 92
& CONT.
458(146) INSTALLATION OF PILES JABEL DHANA PLANT HIRE VAN OORD JAN.' 92
DREDGING
459(147) INSTALLATION OF PILES SAHAMA PLANT HIRE KAREEM CONT. / FEB.' 92
AL ITTIMAD
460(148) PALACE FOR H.H. SH. SAIF CFA C-2 W-51 660 400 16.00 SYRCONSULT POLENSKY & MAR.' 92
BIN MOH'D AL NAHYAN CONSULTING ENGINEERS ZOELLNER (P&Z)

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 8 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
461(149) VILLA FOR H.H. SH. SAQAR BPTC 340 W-14/01 115 500 4.00 ARCH. & ENG. SADAKA GEN. MAR.' 92
BIN HAMDAN AL FALAHI 355 CONSULTANT CONT. CO.
462(150) BLDG. FOR MR .HILAL ABDULLA BPTC C-41 E-20/01 66 500 14.60 ARDENT BIN AWAS GEN. MAR.' 92
SAIF AL FALAHI & SONS CONT.
463(151) VILLA FOR MR. ALI MOH'D AL ABDULLA BPTC 77 B E-36 41 500 9.50 PLANAR GENERAL CONT. MAR.' 92
RUMAITHY CO. (GENCO)
464(152) VILLA FOR MR. EID ABDULLA BPTC 148 W-14/02 26 500 8.10 AL AMARA AL ABU DHABI NAT'L. GEN MAR.' 92
AL ZARIF SHARQIYYA MAINT.& CONT. CO.
465(153) BLDG. FOR MR. OBEID BIN 41 E-6 PLANT HIRE DAR EL EMARA AK BARRAK GEN. APR.' 92
RASHID BIN KHUDRAH AL QUBAISI ARCHITECTS ENGINEERS CONT.
466(154) VILLA FOR MR. MUBARAK BPTC 49 W-18/02 43 600 4.00 BEIRUT CONSULTING MOH'D AL AFFARI GEN. MAR.' 92
BEKHEIT SOUQAN AL MANSOURI GROUP MAIN. & CONT. EST.
467(155) VILLA FOR MR. AIF GOMMA BPTC 27 S-21 154 500 15.00 ARCO CONSULTING BIN MADHI GEN. JULY ' 92
ABDULLA AL MAZROUIE ENGINEERS CONT.
468(156) BLDG. FOR MR. RASHID BPTC 12 W-24 52 600 6.00 ESMAT KHALIL & AL GHAFLY GEN. APR.' 92
KHADEM AL MUHAIRY PARTNERS CONT. CO.
469(157) VILLAS FOR MRS. MOUZA & BPTC 26 W-62 218 500 11.00 ARCH. & PLANNING AL GHAFLY GEN. JULY' 92
MRS. SALAMA AL RUMAITHY 27 GROUP (APG) CONT. CO.
472(160) BLDG. FOR MR. KHALFAN AL BPTC C-19 E-15 32 1000 8.00 SYRCONSULT CIVCONS MAY' 92
DHAI AL HAMILY CONSULTING ENGINEERS
473(161) BLDG. FOR MR. MOHAMMAD BPTC 319 E-41/01 61 450 6.00 BEIRUT CONSULTING AL MAHABA CONT. MAY ' 92

KHALFAN ABDULLA AL HAMILY GROUP EST.


474(162) JETTY EXTENSION BPPC MUSSAFAH 18 NOEL IMAC MAY ' 92

475(163) DRILLING OF HOLES ZIRK ISLAND PLANT HIRE BIN JASSEM EST. JULY' 92

476(164) VILLAS FOR MR. GHANIM BPTC 16 S-22 61 500 14.00 ARCO CONSULTING BIN MADHI GEN. CONT. JULY' 92
ABDULLA SALEM AL MAZROUIE ENGINEERS
477(165) VILLA FOR MR. SAIF MUDRIN CFA 2 S-15 69 450 15.00 BEIRUT CONSULTING BIN MADHI GEN. CONT. JULY' 92
AL HAMILY GROUP
478(166) VILLA FOR MR. KHAMIS HAMDAN 14 E-10 67 500 6.50 SAHIL ENGINEERING CONSTRUCTON JULY' 92
MUFLAH AL MAZROUIE CONSULTANTS GEN. CONT.
479(167) ST. JOSEPH SCHOOL MUSHRIF 19 500 8.50 GODFREY HEATH HACCO ENGINEERING JULY' 92
EXTENSION & SPEARING & CONSTRUCTION CO.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 9 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
480(168) 5 VILLAS FOR M/S PROGENY 34 AL SUWEIDI ENGINEERING JULY' 92
OF DECEDENT IBRAHIM & 35 S-22 247 400 14.00 CONSULTANTS BUREAU AL AWSAT ENT.
MOHAMMAD AL MANSOURI
481(169) BLDG. FOR MR. MOH'D BIN ALI C-35 E-3 64 600 10.00 ARCH. CONSULTING SILEX GEN. CONT. JULY' 92
RAHMA AL SHAMSY GROUP
482(170) BLDG. FOR MR. MUBARAK AL C-25 W-6 69 750 9.00 SYRCONSULT AL OMRAN GULF AUG.' 92
AMERY CONSULTING ENGINEERS ENG. & CONT.
483(171) BLDG. FOR MR. MUBARAK C-175 E-4/01 69 600 6.80 BEIRUT CONSULTING AL FADA CONT. & GEN. AUG.' 92
ABDULLAH AL BOUINAIN GROUP MAINT. EST.
484(172) VILLA FOR MR. MOH'D ABDUL 8 S-16 22 500 13.00 MOH'D AL HOMOSANI ABU AL ABIAD AUG.' 92
GHANI AL KOMERY & 11 ENG. & CONT.CO.
485(173) VILLA FOR MR. AHMED KULAIB 26 A S-20 65 500 14.00 BEIRUT CONSULTING NABIL CONT. CO. AUG.' 92
AL HAMILY GROUP
486(174) VILLA FOR MR. HAMAD SALEM 30 S-22 92 500 14.00 AL AMARA AL MADECO AUG.' 92
HATHROUSHI AL SHARQIYYA
487(175) BLDG. FOR H.H. SH. KHALID C-53 E-16/01 83 600 9.00 INTERNATIONAL NIRMAL INT'L SEP.' 92
SAQUR AL QASIMI ENGINEERING CENTER CONT. CO.
488(176) VILLA FOR MR. IBRAHIM 33 A S-20 33 500 15.00 NATIONAL ENGINEERING AL IMAD / SEP.' 92
ABDULLAH SADIQ KHOURY BUREAU COMMODORE CONT.
489(177) BLDG. FOR MR. KHALFAN C-78 E-3 41 600 10.30 AL AMARA AL WADHA GEN. AUG.' 92
MATAR AL RUMAITHY SHARQIYYA CONT. CO.
490(178) BLDG. FOR AL NAHDA NATIONAL 51 E-22 146 500 6.50 SYRCONSULT LOTUS INTERNATIONAL SEP.' 92
SCHOOL CONSULTING ENGINEERS CONT.& GEN. MAINT. EST.
491(179) 28 LOW COST HOUSES FOR SAHAMA 1512 450 4.00 AL JAZEERA ENGINEERINGMETAC GEN. SEP.' 92
P.W.D. CONSULT CONT. CO.
492(180) BLDG. FOR MR. SHABAN T. C-11 E-28 24 700 6.50 SAYAH ENGINEERING AL MAHABA CONT. SEP.' 92
SHABAN 24 600 6.50 CONSULTING BUREAU EST.
493(181) VILLA FOR SONS OF MR.MOH'D 7 S-19 44 500 13.50 SHAHEEN ENGINEERING SULTAN GEN. OCT.' 92
RASHID HAREB AL HUMAIRY CONSULTANCY CONT. CO.
494(182) GAS TURBINE PACKAGE UNITS ABU DHABI/AL AIN MERZ Mc ELLAN U.T.S. KENT LTD. DEC.' 92
CONS. ENGINEERS
495(183) BLDG. FOR MR. ZUNAID KNAISH C-6 W-24 56 600 8.00 CONTINENTAL AL FADA CONT. OCT.' 92
AL QUBAISI ENG. CONSULTANT & GEN.MAINT.EST.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 10 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
496(184) VILLA FOR SONS OF LATE 45 W-17/02 30 500 6.10 ARDENT AL MUWAIJEE SEP.' 92
ABDULLA RASHED HILAL ALI CONT. EST.
497(185) VILLA FOR MR. YOUSEF SALEH 34 A S-20 42 500 14.50 AL AIN CONSULT FAYROUZ GEN. SEP.' 92
AL HOSANI CONT. & MAINT. EST.
498(186) RES. TOWER FOR ABU DHABI C-63 E-16/01 180 750 7.00 CRANG & BOAKE GENERAL CONT. DEC.' 92
WOMEN'S ASSOCIATION & C-64 INTERNATIONAL CO. (GENCO)
499(187) VILLA FOR MR. KHALIFA MOH'D 26 W-25 95 500 15.00 INTEGRATED NAGEBCO GEN. DEC.' 92
KHALIFA AL MAZROUIE DESIGN BUREAU CONT. CO.
500(188) 36 No. LOW COST HOUSES MARFA 1440 450 9.00 AL BURJ ENGINEERING AL GHAFLY GEN. MAR.' 93
FOR P.W.D. CONSULTANTS CONT.
502(190) BLDG. FOR MR. MOH'D MUBARAK 31 E-41 59 450 4.00 DAR AL HANDASA AL RAFEH TRANS. DEC. 92
SAIF AL RAYAMI & EL EMARA & CONT.
503(191) BLDG. FOR H.E. AMBASSADOR 31 W-24/01 302 200 6.00 DERBY DESIGN AL KHOOR MAINT. JAN.' 93
OF SAUDI ARABIA (MICRO-PILING) & GEN. CONT.
504(192) BLDG. FOR MR. SAEED WORAIQAH 4 W-14 79 750 9.00 AL FATEH ENGINEERING AL GHAFLY GEN. JAN.' 93
AL AMRY & HIS SON ABDULLAH CONSULTANTS CONT.
505(193) EXTN. BLDG.FOR MR.ABDULLAH 6 W-62 4 500 12.00 ARCHITECTURE & AL GHAFLY GEN. DEC.' 92
BIN SHAIBAN - (BOUNDARY WALL) PLANNING GROUP CONT.
506(194) BLDG. FOR MR. SUROUR BIN C-1 W-6 179 750 6.50 TEAM CONSULT CIVCONS MAR.' 93
SHAHWAN AL DHAHIRI
507(195) BLDG.FOR MR.OBEID RASHID CFA 12 B S-15 61 450 9.00 BEIRUT CONSULTING NABIL CONT. CO. FEB. 93
AL HAMILY GROUP
508(196) KITCHEN BLOCK EXT. VILLAS CFA 26 W-62 8 500 12.00 ARCHITECTURE & GRANDE TNR. JAN.' 93
MRS. MOZA& SALAMA RUMAITHY & 27 PLANNING GROUP
509(197) BLDG. FOR MR. MUBARAK CFA C-30 63 900 9.50 AL FATEH ENGINEERING AL FADA CONT. & GEN. JAN.' 93
HAFEEZ AL MAZROUIE CONSULTANTS MAINT. EST.
510(198) BLDG. FOR MR. NASSER CFA C-177 E-4/01 98 600 6.00 GOLDEN PLANNERS AL GHAFLY GEN. FEB.' 93
RASHID AL ZAABI CONSULTANTS CONT.
511(199) BLDG. FOR MR.AWAD SULTAN 205 W-47 67 600 9.00 AL AMARA AL AHBA CONT. & MAY ' 93
AHMED AL QUBAISI SHARQIYYA MAINT. EST.
514(202) VILLA FOR MR.SALEM BAKHET CFA 145 ME-10 43 500 10.60 THE LEBANESE AL RAFEH TRANSPORT APR.' 93
AL RASHEDI CONSULTANT & GEN. CONT.
515(203) BLDG.FOR S/O H.S.BALATSHAN CFA C-3 E-40 59 600 6.30 AL AIN CONSULTING AL RADIN GEN. MAY ' 93
AL MANSOURI ENGINEERS CONT. EST.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 11 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
516(204) BLDG. FOR MR. MATAR SALEM CFA 183 E-37 52 500 4.50 DAR AL HANDASA AL BADER GEN. MAY ' 93
AL DHAHERI AL AMARA CONT. EST.
517(205) VILLA FOR MR. RASHID AL CFA AL-AIN 94 500 10.50 ARCHITECTURE & ARABIAN CONST. JUNE' 93
NUAIMI PLANNING GROUP COMPANY (ACC)
518(206) RESIDENTIAL VILLA CFA C-20 W-50 91 500 14.75 ISLAMIC HERITAGE SACO ENG. & MAY ' 93
34 450 14.00 ARCHITECTS CONTRACTING CO.
519(207) NEW GOLD & JEWELLERY CFA 24 & 25 E-4/01 200 6.60 WHITE YOUNG RIZZANI DE MAY ' 93
MARKET EMIRATES ECCHER
520(208) ABU DHABI MUNICIPALITY MAY ' 93
BLDG. & WORKSHOPS ON CFA E-28 80 500 6.50 ABU DHABI FAYROUZ GEN.
THE SEWAGE SUBSTATION MUNICIPALITY CONT. EST.
521(209) BLDG. FOR AL AHLIA BPTC C-31 E-22 50 600 7.00 DEVELOPMENT GENERAL CONT. JUNE' 93
INSURANCE COMPANY CONSULTANT CO. (GENCO)
522(210) BLDG. FOR MRS. ZAINAB CFA 1 S-22 138 500 15.00 AL SHARAF ENG. GOLDEN GEN. JUNE' 93
HUSSEIN & SONS CONSULTANT CONT. EST.
523(211) BLDG. FOR MR. SAID OUBAID CFA 3 E-18/03 68 500 7.00 SAYED KHALAF NAT'L TRANS. & JUNE' 93
YAHIA MUBAJJIR CONSULTANT CONT.CO.(NTCC)
524(212) BLDG.FOR MRS. MEERA AL BPTC C-4 W-2 92 750 8.50 AL SUWEIDI ENGINEERING AL OMRAN GULF JULY' 93
SUWEIDI & OMAIR BIN CONSULTANTS BUREAU ENG. & CONT.
YOUSEF PROGENY
525(213) BLDG. FOR MR. NASIR KHAMIS BPTC C-177 E-20/01 57 500 7.75 ARDENT BIN HAFEEZ EST. JULY' 93
AL MAZROUIE
526(214) BLDG. FOR MR. ABDULLAH BPTC C-187 E-4/01 70 700 8.00 NATIONAL ENGINEERING AL SALMIE INT'L JULY' 93
JUMMA MUBARAK AL QUBAISY BUREAU TRANS. ROADS EST.
527(215) BLDG. FOR SHEIKH AL KUTBI CFA 183 E-4/01 73 500 5.00 ISLAMIC HERITAGE SOUND SPECIAL JULY' 93
ARCHITECTS SERVICES
528(216) COMM.&RES.TOWER FOR HER BPTC C-43 E-5 124 900 12.50 AL AMARA AL ARABIAN CONST. SEP.' 93
HIGHNESS SHEIKHA ELIAZIAH SHARQIYYA CO. (ACC)
BIN ZAYED AL NAHYAN
529(217) BLDG. FOR MR.ALI SEIF JABER CFA C-192 E-4/01 120 600 9.00 GOLDEN PLANNERS AL GHAFLY GEN. JULY' 93
AL SUWEIDI CONSULTANTS CONT.

531(219) BLDG.FOR MR.DARWISH KHALIL CFA 23 E-48 40 500 10.00 AL BURJ ENGINEERING GOLDEN SAND GEN. JULY' 93
JAFAR & MARIAM KHALIL CONSULTANTS CONT. EST.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 12 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
532(220) BLDG. FOR MR.MOH'D KHALIFA CFA 48 ME-11 48 600 10.70 AL MEEDAN WADHA GENERAL JULY' 93
HAMID ABDULLA AL RUMAITHY CONSULTANTS CONT. CO.
533(221) AL JAZEERA SPORTS CLUB BPTC STADIUM E-22 16 500 7.00 PWD RANYA CONT. EST. JULY' 93
IIND STADIUM - LIGHT POLES
534(222) BLDG. FOR MR. SAIFULLAH BPTC C-22 E-4/02 167 900 7.00 DAR EL EMARA CIVILCO JULY' 93
MOH'D KHOORI ARCHITECTS ENGINEERS
536(224) BLDG.FOR MR.SULTAN MOH'D. CFA 109 E-33 59 500 11.00 SYED KHALLAF AL MAHABA CONT. JULY' 93
AL KORTASI CONS. ENGINEERS EST.
537(225) BLDG.FOR MR.OBAID KHALFAN BPTC C-84 W-9 53 750 7.50 INTEGRATED NAGEBCO GEN. JULY' 93
AL MUHAIRY DESIGN BUREAU CONT.
538(226) BLDG. FOR MR. BASHIR MOH'D BPTC C-24 E-28 73 500 6.20 ANTOINE AL MOUSAWE GEN. SEP.' 91
KHALIFA AL QUBAISY HELAL & PARTNERS CONT. EST.
539(227) BLDG. FOR MR. ABDULLA BPTC C-188 E-4/01 69 600 7.00 ARCHITECTURAL ZAKUM CONT. & AUG.' 93
HASSAN AL ZAHIRY CONSULTING GROUP REAL ESTATE
540(228) BLDG. FOR MR. WALID BPTC 62 E-11 94 500 6.50 MAHMOUD AL RAMAHI GENERAL CONT. AUG.' 93
SA'DALLAH AL MUHAIRY ENG. CONSULTANTS CO (GINCO)
541(229) BLDG. FOR MR. SAIF NASSER CFA C-171 E-4/01 112 500 6.50 SHANKLAND COX TAWAM UNITED AUG.' 93
AL SUWEIDI LTD. ENT.
542(230) BLDG. FOR MR. MOSABAH ALI BPTC C-119 E-11 89 600 7.50 AL SUWEIDI ENGINEERING AL GHAFLY GEN. SEP.' 93
MOHAMMED AL HAMILY CONSULTANTS BUREAU CONT.
543(231) BLDG. FOR MR. MISSARI SAYA CFA 32 E-4/02 41 450 7.50 SAHIL ENGINEERING AL FALAH GEN. AUG.' 93
AL HAMILY CONSULTANTS CONT. CO.
544(232) BLDG. FOR MR. JAWAN ALI CFA 178 ME-10 50 600 8.50 SAYAH ENGINEERING ADEL CONT.& GEN AUG.' 93
MOH'D BALOUD AL SHAMSI CONSULTINF BUREAU MAINT. CO.
545(233) BLDG.FOR MR.KHALIFA SAEED BPTC 60 ME-11 57 500 10.00 THE ARAB OFFICE ADEL CONT.&GEN AUG.' 93
MOH'D AL MANSOURI FOR PLANNING MAINT. CO.
546(234) BLDG. FOR MR. MOHAMMED BPTC 125 W-4 55 600 6.50 AL MULLA ENGINEERING ZAKUM CONT. & OCT.' 93
AL MAZROUIE CONSULTANTS REAL ESTATE
547(235) BLDG. FOR LATE MOH'D CFA 19 S-16 83 500 15.50 SHAHEEN ENGINEERING AL KATHEEB GEN. OCT.' 93
ZAAL AL HAMILY CONSULTANCY CONT. CO.
548(236) BLDG. FOR MR. OMAIR BIN BPTC C-6 E-3 136 900 11.00 PARC INTERNATIONAL AL OMRAN GULF SEP.' 93
MAADAD AL MASHGOUNI ENG. & CONT. CO.
549(237) BLDG. FOR MR. SYED AHMAD CFA C-193 E-4/01 86 600 10.00 GOLDEN PLANNERS AL GHAFLY GEN. SEP.' 93
MOH'D AL MAZROUIE CONSULTANTS CONT.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 13 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
550(238) BLDG. FOR MR. MOH'D SALEH BPTC C-75 E-4/02 152 900 8.00 INCORPORATED TARGET ENGINEERING OCT.' 93
BIN BADOWA AL DARMAKI CONS. ENGINEERS CONSTRUCTION CO.
551(239) 33 KV OVERHEAD TRANSMISSION BPTC CONTRACT WED/SUP/INST/PD-VS/160/92 EWBANK PREECE IMPRESSA FRATE JAN' 94
LINES AT SILA & JABEL DHANA LIMITED
552(240) BLDG. FOR MR. OBAID BIN CFA 29&30 W-15/01 120 500 6.50 ARDENT OBAID BIN RASHID OCT.' 93
RASHID SALEEM AL MANSOURI GEN. CONT. CO.
553(241) BLDG.FOR HEIRS OF DARWISH BPTC C-73 W-9 71 600 6.50 HANDASCO AL FADA CONT. & GEN. OCT.' 93
KHAMIS ABDULLA AL KHUMARI CONSULTANTS MAINT. EST.
554(242) BLDG. FOR MR. AHMAD MOH'D BPTC C-42 E-19 85 900 6.00 AL AMARA AL SUHAIL AL OCT.' 93
KHALIFA AL QUBEISI SHARQIYYA MAZROUIE CONT.
555(243) HIGHER COLLEGE OF BPTC E-25 822 450 10.00 TRACTBEL AL GULF CONT. APR.' 94
TECHNOLOGY FOR MEN 550 8.00 KHALEEJ CO. (G.C.C.)
556(244) BLDG. FOR MR. AL HUBEISI BPTC C-43 E-19 56 900 5.50 AL AMARA AL SUHAIL AL OCT.' 93
BUTTI AL QUBEISI SHARQIYYA MAZROUIE CONT.
557(245) BLDG. FOR AHMAD KHALFAN CFA 227 ME-11 54 500 10.50 MIMAR CONSULTING SOLID CONSTRUCTION OCT.' 93
SALIM AL MANSOURI ENGINEERS CO.
558(246) BLDG.FOR MR.FATHIMA CFA C-18 W-9 77 650 8.20 MIMAR CONSULTING AL GHAFLY GEN. OCT.' 93
SAEED AL HAMILY ENGINEERS CONT.
559(247) BLDG. FOR SONS OF ATEEQ CFA 40 E-9/02 52 600 8.00 RIHAB ENG. & DECO. SOUND SPECIAL NOV.' 93
ALI AL RUMAITHY CONS. & ARCH. SERVICES
560(248) BLDG. FOR SONS OF SALEH CFA 68 W-9 75 600 7.80 U.A.E AL MAHABA CONT. OCT.' 93
BIN KULAIB AL HAMILY INTERNATIONAL EST.
561(249) PROPOSED WORKSHOP FOR CFA 50, 52 MW-4 62 450 12.00 DASTUR CONS. HACCO ENGINEERING NOV.' 93
M/S ELDIAR INDUSTRIES & 54 & CONSTRUCTION CO.
562(250) NEW CLASS ROOM BLOCK FOR CFA 6 E-38/01 60 500 8.00 DASTUR CONS. HACCO ENGINEERING NOV.' 93
ABUDHABI INDIAN SCHOOL & CONSTRUCTION CO.
564(252) BLDG. FOR H.H. MOH'D BIN BPTC C-170 E-18/02 109 600 8.50 SAHIL ENGINEERING METAC GENERAL NOV.' 93
HAMDAN AL NAHYAN CONSULTANTS CONTRACTING
566(254) BLDG. FOR MR. MUSALEM CFA 119 W-18/02 39 500 5.00 ARENCO ARCHITECTURAL FAYROUZ GEN. NOV.' 93
BELZAFNA ENG. CONSULTANTS CONT. & MAINT. EST.
567(255) BLDG. FOR MRS. FATHIMA CFA 141 ME-11 49 500 9.00 AL AJAMI FAYROUZ GEN. NOV.' 93
ABDULLA HAMAD AL SHAMSI CONSULTANTS CONT. & MAINT. EST.
568(256) BLDG. FOR MR. HELAL BIN CFA C-157 E-4/01 111 500 6.50 GOLDEN PLANNERS AL SALMIE INT'L JAN.' 94
ZAYED AL FALAHI CONSULTANTS CONT. CO.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 14 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
569(257) BLDG. FOR GHADEER BIN BPTC C-4 E-3 104 1000 10.00 SYRCONSULT BIN SWEED CONT. JAN.' 94
SAEED BIN SWEED AL MANSOURI 34 900 10.00 CONSULTING ENGINEERS & GEN. MAINT. CO.
571(259) BLDG. FOR HEIRS OF NASIR BPTC C-15 E-20/01 57 600 10.00 DEWAN ARCHITECTS HACCO ENGINEERING DEC.' 93
RASHED AL MANEA AL MANSOURI & ENGINEERS & CONSTRUCTION CO.
572(260) BLDG. FOR MR. AHMAD FARAJ CFA C-43 W-9 75 500 7.00 ARCHITECTURE & SOLID CONSTRUCTION DEC.' 93
AL QUBAISY PLANNING GROUP CO.
573(261) BLDG. FOR MR. ABDULLAH CFA 231 ME-11 49 500 11.50 AL AMARA AL SOLID CONSTRUCTION DEC.' 93
KHALFAN AL MANSOURI SHARQIYYA CO.
574(262) BLDG. FOR MRS. HANTOOMA BPTC C-34 W-9 82 500 8.50 ARDENT SOLID CONSTRUCTION DEC.' 93
ISSA AL FALAHI CO.
575(263) BLDG. FOR MR. MOHAMMAD BPTC C-94 W-4 86 500 6.00 JORDAN CONSULTANTS REEM AL KHALEEJ JAN.' 94
SAIF MOHAMMAD SAIF SWAIDY ENG. & CONT. CO.
576(264) VILLA FOR MRS. HAMDA CFA 19 W-52/02 61 500 6.50 SAYED KHALLAF AL MAHABA CONT. JAN.' 94
AHMED SHAHEEN CONS. ENG. EST.
577(265) VILLA FOR MR. ALI MOHAMMED CFA 124 W-9 37 500 5.50 EMIRATES ENGINEERING AL MAHABA CONT. JAN.' 94
ALI SABAH AL HAMILY CONSULTANCY GROUP EST.
578(266) VILLA FOR MR. ABDUL RAHIM CFA 36 S-22 95 600 14.00 AL MEEDAN PROFESSIONAL JAN.' 94
AL MAHMOOD 54 500 9.00 COSULTANTS BUILDERS
579(267) BLDG. FOR MR. HAMAD MOH'D CFA 189 E-4/01 54 600 6.00 AL MEEDAN LOTUS INTERNATIONAL JAN.' 94
THANI AL RUMAITHY CONSULTANTS CONT.& GEN. MAINT. EST.
580(268) BLDG. FOR MR. MOH'D SALEM CFA 9 W-18/02 74 500 7.00 DAR EL EMARA LOTUS INTERNATIONAL MAR. ' 94
MUFATAH AL MANSOURY ARCHITECTS ENGINEERS CONT.& GEN. MAINT. EST.
581(269) BLDG. FOR MR. KHALFAN BPTC C-20 W-9 74 600 7.30 EMIRATES ENGINEERING AL MAHMOOD FEB.' 94
RASHED GHANEM AL HAMILY CONSULTANCY GROUP ENG. WORKS CO.
582(270) BLDG. FOR MR. AL TAHIR M.AL BPTC C-184 E-4/01 84 600 9.00 DEWAN ARCHITECTS BIN HAM GEN. FEB.' 94
KINDY & ENGINEERS CONT. EST.
584(272) BLDG.FOR MR.SAIF BIN JABER BPTC C-11 E-18 62 900 8.00 SYRCONSULT AL THARAWAT FEB.' 94
AL SUWEIDI CONSULTING ENGINEERS GEN. CONT. EST.
585(273) BLDG. FOR MR. ISSA OBAID CFA C-84 W-4 95 600 6.00 ARAB CONSULTANTS AL GHAFLY GEN. MAR.' 94
BUTTI AL MUWAIJEE ARCHITECTS-ENGINEERS CONT.
586(274) BLDG. FOR MR. MOH'D SAEED CFA C-33 ME-11 53 500 11.00 AL KHOZMA NAJEBCO GEN. MAY. ' 94
N. AL MENHALI ENG. CONSULTANTS CONT. CO.
587(275) BLDG. FOR MR. MARZOUK BPTC C-115 W-4 80 600 9.50 DAR EL EMARA ZAKUM CONT. & MAR.' 94
SAEED AL QUBAISI ARCHITECTS ENGINEERS REAL ESTATE

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 15 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
588(276) BLDG. FOR MR. MANEA BPTC C-56 E-11 76 600 6.50 PAN EMIRATES CIVCONS MAR.' 94
KHALIFA AL RUMAITHY CONSULT
589(277) BLDG.FOR LATE SAEED HUSSAM BPTC C-102 W-4 90 600 6.00 DEWAN ARCHITECTS DHAFRA INT'L APR.' 94
AL DARMAKI & ENGINEERS PROJECTS GROUP
590(278) VILLA FOR MR. MOH'D SAEED CFA 31 W-18/01 68 500 6.00 NATIONAL ENGINEERING GULF CONT. FEB.' 94
MUBARAK AL MANSOURI BUREAU
591(279) BLDG. FOR MRS. KINA MOH'D CFA C-150 E-3 57 600 6.50 SYRCONSULT FAYROUZ GEN. MAR.' 94
FREH AL QUBAISI & SONS CONSULTING ENGINEERS CONT. & MAINT. EST.
592(280) BLDG. FOR HEIR OF RASHED BPTC C-43 E-3 95 500 7.35 SPECTRUM ENGINEERING AL FADA CONT. & MAR.' 94
DAGHER AL MARAR CONSULTANTS GEN. MAINT. EST.
593(281) BLDG. FOR MRS. AFRA ATIQ CFA 140 ME-11 61 500 10.65 M.A. MAHMOUD ABDULLAH AHMED AL MAR.' 94
AL WAHDANI AL RUMAITHY CONSULTANTS KULAIB GEN. CONT. EST.
594(282) BLDG. FOR MR. ALI SALEM BPTC C-122 W-4 79 500 6.50 ARDENT TAWAM UNITED MAR.' 94
SAIF AL MOHAIRY ENTERPRISES
595(283) PROPOSED MARKET AT BPTC MARFA 370 450 7.50 P.W.D. AL KHADRE CONT. MAY. ' 94
MARFA - QANAH EST.
596(284) BLDG. FOR MR. ALI MOHAMED CFA 198 ME-10 63 600 10.00 PERFECTION NAJEBCO GEN. MAR.' 94
AHMED AL THAWADI ARCHITECTS & ENGINEERSCONT. CO.
597(285) BLDG.FOR SONS OF MR.AHMED BPTC C-68 E-16/02 85 600 10.00 AL MEEDAN AL FADA CONT. & APR.' 94
BIN ALI AL AHMED AL MUHAIRY CONSULTANTS GEN. MAINT. EST.
598(286) BLDG.FOR MRS. MYTHA THANI ABBAD CFA C-38 W-9 92 600 6.50 HANDASCO AL FADA CONT. & APR.' 94
AL HAMLY CONSULTANTS GEN. MAINT. EST.
599(287) BLDG. FOR MR. KHADEM JUMA CFA C-30 W-9 59 600 6.20 AL MEEDAN AL GHAFLY GEN. APR.' 94
KHADEM AL MUHAIRY CONSULTANTS CONT.
601(289) INSTALLATION OF H-BEAMS SHORING WORKS BY AL MOAYAD GEN. JUNE' 94
AT ABU DHABI SITE USING H-BEAMS CONT. EST.
602(290) HIGHER COLLEGE OF CFA P-79 E-18/02 272 500 8.50 TRACTBEL AL NIRMAN INT'L JULY ' 94
TECHNOLOGY FOR WOMEN 420 400 8.50 KHALEEJ CONT. CO.
603(291) BLDG.FOR MR. SABAAN MOH'D BPTC C-130 W-4 62 750 9.50 PALESTINIAN ENG. ADEL CONT. & APR.' 94
AL MAZROUIE CONSULTANTS BUREAU GEN. MAINT. CO.
604(292) BLDG.FOR DAUGHTER MR.HABROUSH CFA C-21 W-7/01 84 500 9.00 ARCHITECTURE & AL THARAWAT APR.' 94
AL SWAIDY PLANNING GROUP GEN. CONT. EST.
605(293) BLDG. FOR MR. AHMAD MOH'D BPTC C-260 ME-10 50 600 9.50 MASS CONSULT SADAKA GEN. APR.' 94
BIN KULAIB AL HAMILY ARCHITECTS & ENGINEERSCONT. CO.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 16 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
606(294) BLDG. FOR MR. AHMED BPTC 76 W-9 87 600 7.00 AL SUWEIDI ENGINEERING NAJEBCO GEN. APR.' 94
ABDULLAH MOH'D AL NUAIMY CONSULTANTS BUREAU CONT. CO.
607(295) BLDG. FOR MR. SAEED SALEM BPTC 346 ME-10 33 600 11.00 AL AJMI CONS. FAYROUZ GEN. CONT. APR.' 94
KHAMIS AL SHAMSI & MAINT. EST.
608(296) BLDG.FOR MR.SALEM KHALFAN BPTC C-151 W-4 78 600 8.00 DAR EL EMARA KHALIFA AL APR.' 94
SALEM AL MANSOURI ARCHITECTS ENGINEERS SWAIDI GEN.CONT. EST
609(297) BLDG. FOR MR. AL HAY HAMAD BPTC C-35 W-9 85 600 8.50 EMIRATES ENGINEERING SOUND SPECIAL MAY ' 94
KHAMIS AL HAMILY CONSULTANT SERVICES GEN. CONT.
610(298) VILLA FOR MR. OBEID ALI CFA 114 W-18/01 38 450 5.30 AL BAYAN CONSULTING CADDO CONT. & MAY ' 94
MARAN AL MANSOURI ENGINEERS TRADING
611(299) VILLA FOR MR. SAIF ALI CFA 70 E-31 38 500 7.00 RIHAB ENG. & DECO. SOUND SPECIAL APR.' 94
ALAYAN AL RUMAITHY CONS. & ARCH. SERVICES GEN. CONT.
612(300) BLDG.FOR MR.HAZZA SULTAN BPTC C-3 E-14 62 1000 8.50 DAR AL KHALEEJ CIVCONS MAY' 94
AL DARMAKI ENG. CONSULTANTS
613(301) VILLA FOR MR.SALEH ABDULLA CFA 37 E-38 28 500 10.00 TECHCONSULT AL HOURYA GEN. APR.' 94
DAAFOUS AL MANSOURI AL-DAMLOUJI CONT. EST.
614(302) BLDG. FOR MR. AHMED HAMID CFA C-110 E-11 54 600 6.00 AL MEEDAN MODERN DEVELOPMEN JUNE' 94
HARMOOSE BIN SABAH AL RUMAITHY CONSULTANTS CONT. CO.
615(303) BLDG. FOR MR. SULTAN BIN BPTC C-12 E-4/01 134 1000 9.20 THE FRASER NAG ASCON SEP.' 94
ALI AL OWAIS PARTNERSHIP
616(304) VILLA FOR MR. RASHED MOH'D CFA 13 S-16 98 500 13.50 CITY PLAN CONSULTING LINES ENGINEERING APR.' 94
EL HAMILY ENGINEERS GEN. CONT. EST.
617(305) BLDG. FOR MR. HAMAD SALEM BPTC C-113 W-4 72 750 7.50 AL AMARA AL AL THARAWAT MAY' 94
AL HATOUSHIE SHARQIYYA GEN. CONT. EST.
ADCO WEST COMPOUND BPTC 7 500 9.00 NORR GROUP RIZZANI DE JUNE' 94
618(306) DEVELOPMENT HOUSING,(PHASE I & II) 69 600 9.00 CONSULTANTS ECCHER-ABU DHABI
AND MULTISTOREY CAR PARK 31 900 9.00 LIMITED
5 1000 9.00 ARCHITECTS & ENGINEERS
619(307) BLDG.FOR MR.HUMAID SAEED CFA C-95 W-4 59 600 6.00 AL BURJ ENGINEERING ARAB UNION MAY ' 94
R. AL MEHAIRI CONSULTANTS CONT. CO.
620(308) VILLA FOR MR. ATIQ AL CFA 29 W-21 43 500 6.10 AL BURJ ENGINEERING SACO ENGINEERING & MAY' 94
MOHAIRBY CONSULTANTS CONTRACTING
621(309) BLDG. FOR CROWN PRINCE BPTC C-54 W-9 85 600 7.00 GOLDEN PLANNERS PROFESSIONAL JUNE' 94
CONSULTANTS BUILDERS

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 17 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
622(310) BLDG. FOR MR. HAMAD SARI CFA C-48 E-10 74 500 10.50 ARCHITECTURE & ARABIAN CONT. JUNE' 94
AL MAZROUIE PLANNING GROUP ACHIEVEMENT CO.
623(311) VILLA FOR MR. AHMED MOH'D CFA 29A S-20 47 500 11.00 NATIONAL CONSULTING CHROME ENGINEERING JUNE' 94
ABDULLAH HASSAN OFFICE
624(312) BLDG. FOR IBRAHEM AL MAIS CFA C-172 ME-10 56 500 9.50 ARCHITECTURE & MODERN DEVELOPMEN JUNE' 94
AL ZAABI PLANNING GROUP CONT. CO.
625(313) BLDG. FOR MR. SALEM RABEA CFA 140 ME-10 42 600 11.60 NATIONAL CONSULTING AL RAFEH TRANSP. & JULY' 94
BIL NAAK AL RASHEDY OFFICE GEN. CONT. EST.
626(314) BLDG. FOR MR. HAMID MOH'D BPTC C-105 W-4 95 600 6.90 ANTOINE AL RAFEH TRANSP. & OCT. '94
HAFIZ AL MAZROUIE HELAL & PARTNERS GEN. CONT. EST.
627(315) BLDG.FOR MR.HUMEED MOH'D BPTC C-98 W-4 89 600 7.00 PALESTINIAN ENG. JABER RASHED JULY' 94
HUMEED AL MUHAIRY CONSULTANTS BUREAU AL HAMELY&SONS
628(316) BLDG. FOR MRS. NAMLON BPTC 258 ME-10 68 500 9.50 HANDASAT AL AL MOUSAWE JULY' 94
MUBARAK SAEED AL KHAMEERY AMARA CONSULTANTS GEN. CONT. EST.
629(317) BLDG. FOR MR. SAIF SALIM CFA 345 ME-10 43 500 10.50 SYRCONSULT FAYROUZ GEN. JULY' 94
SAEED AL AMIRY CONSULTING ENGINEERS CONT. & MAINT. EST.
630(318) VILLA FOR MR. IBRAHIM OBEID CFA 12-B S-16 44 500 15.00 AL BAYAN CONSULTING LINES ENGINEERING JULY' 94
HAMMAD AL MANSOURI ENGINEERS GEN. CONT. EST.
631(319) VILLA FOR MR. AHMED MOH'D BPTC 37 W-24/02 32 500 6.65 JORDAN CONSULTANTS AL THARAWAT JULY' 94
KHALEEFA AL SUWEIDI GEN. CONT. EST.
632(320) AL AIN INTERNATIONAL BPTC AL-AIN 4 800 12.00 AL - AIN ADVANCE JULY' 94
AIRPORT CONTRACT H-27 MUNICIPALITY AGRICULTURAL SYSTEM
633(321) BLDG. FOR HEIRS OF IBRAHIM BPTC C-30 E-16/01 76 600 8.00 JORDAN CONSULTANTS AL FADA CONT. & JULY' 94
GHANEM AL SUWEIDI GEN. MAINT. EST.
634(322) BLDG. FOR MR. SAKAR ALI BPTC C-72 W-9 76 600 6.50 JORDAN CONSULTANTS AL FADA CONT. & JULY' 94
MOH'D AL YAHAL GEN. MAINT. EST.
635(323) VILLA FOR MR. AWAD SWEDAN CFA 154 W-48 51 500 12.00 AL AMARA AL BUILDING GEN. JULY' 94
AL MUHEIRBY SHARQIYYA CONT. EST.
636(324) VILLA FOR MR. ABDULLAH CFA 56 E-30 38 500 4.50 EMIRATES ENGINEERING AL HOURIYA GEN. JULY' 94
BARAK HAMAD AL MAZROUIE CONSULTANCY CONT. EST.
637(325) BLDG. FOR MR. AHMED MOH'D AHMED BPTC 130 ME-10 51 500 10.50 EMIRATES ENGINEERING MODERN CONST. AUG.' 94
KHALIL CONSUL. GROUP CONT. CO.
638(326) BLDG. FOR MR. MATTAR CFA 132 ME-10 64 500 10.50 AJMAN CONSULTANTS MODERN CONST. AUG.' 94
BAKHEET HAWASH AL KHAILY BUREAU CONT. CO.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 18 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
639(327) BLDG. FOR MR. JURMAN BPTC 125 ME-10 51 500 12.00 ESMAT KHALIL ENG. MODERN CONST. SEP.' 94
MOH'D SAEED AL AHBABI CONSULTANTS CONT. CO.
640(328) BLDG. FOR MR. SAEED HAMAD BPTC 135 ME-10 57 500 11.50 NATIONAL ENGINEERING MODERN CONST. AUG.' 94
RASHID AL FEILANI BUREAU CONT. CO.
641(329) BLDG. FOR MR. MUBARAK BPTC 111 ME-10 66 600 9.50 AL BURJ ENGINEERING MODERN CONST. AUG.' 94
KALFOOT SALEH AL RASHIDI CONSULTANTS CONT. CO.
642(330) BLDG. FOR MRS. MARYAM CFA 193 ME-10 49 500 9.50 SYRCONSULT AL AMAN GEN. AUG.' 94
MOH'D KHALED AL FALAHI CONSULTING ENGINEERS CONT. CO.
643(331) BLDG. FOR MR. ALI SAEED AL CFA C-59 E-11 58 600 6.00 AL MEEDAN AL NASIR GEN. SEP.' 94
RUMAITHY & HIS WIFE HAMDA CONSULTANTS CONT. CO.
644(332) VILLA FOR MR.ABDUL HAMEED CFA 60 E-31 53 450 4.50 ISLAMIC HERITAGE FIVE STAR GEN. AUG.' 94
MOH'D SALEH MOH'D ARCHITECTS CONT. & MAINT. EST.
645(333) BLDG. FOR SONS OF CFA C-11 W-9 92 500 7.00 ARCHITECTURE & ARABIAN CONT. AUG.' 94
MR. SAEED HAMAD AL HAMILY PLANNING GROUP ACHIEVEMENT CO.
646(334) BLDG. FOR MR. SALEM YAHYA BPTC C-114 W-4 112 600 7.00 GOLDED PLANNERS BIN HAM GEN. SEP.' 94
SALEM AL MUHARAMI CONSULTANTS CONT. CO.
647(335) VILLA FOR MR. TAWFEEQ CFA 86 E-38 49 500 7.00 EMIRATES GROUP ENG. AL MAHABA CONT. AUG.' 94
FAYROUZ HILAL AL DHAIRI CONSULT GROUP EST.
648(336) BLDG. FOR MR. KHALIFA BIN BPTC C-7 W-6 46 900 8.70 GOLDEN PLANNERS NAGEBCO GEN. SEP.' 94
KHALAF AL MAZROUIE 44 750 8.70 CONSULTANTS CONT. CO.
649(337) BLDG. FOR MR. OMAIR HAYE BPTC C-19 W-9 94 600 9.00 AL SUWEIDI ENGINEERING AL MAHMOOD ENG. AUG.' 94
MOH'D AL HAMILY CONSULTANTS BUREAU WORKS CO.
650(338) OUTFALL CULVERT REPAIRS/ RUWAIS SHEET PILES ZUBLIN APR.' 96
REPLACEMENT AT RUWAIS SHORING WORKS
651(339) BLDG. FOR MR. ALI SALIM BPTC C-22 E-22 67 600 6.70 PARC INTERNATIONAL ARABIAN CONT. AUG.' 94
SAEED AL AMERY ACHIEVEMENT CO.
652(340) VILLA FOR LATE AHMAD MOH'D BPTC 105 E-4/02 61 500 8.50 U.A.E. INTERNATIONAL BUILDING GEN. AUG.' 94
AL NAKAS CONT. CO.
653(341) BLDG. FOR MR. ABDUL RAZAK BPTC C-93 E-16/02 59 750 9.00 ARCHITECTURAL AL MAHABA CONT. JAN.' 95
AKEEL & HIS SON SHARIF 12 600 CONSULTING GROUP EST.
654(342) BLDG. FOR MR. HUMAID BPTC C-70 E-3 60 750 10.50 SYRCONSULT PROFESSIONAL NOV.' 94
IBRAHIM GHANEM AL SUWEIDY CONSULTING ENGINEERS BUILDERS
655(343) BLDG. FOR MR. SALEM HAMAD CFA C-60 E-11 77 500 6.00 ARCHITECTURE & BIN MOOSA CONT. SEP.' 94
AL RUMAITHY PLANNING GROUP

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 19 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
656(344) BLDG. FOR MR. AHMAD ATIQ BPTC C-83 E-20/01 86 600 9.50 PALESTINIAN ENG. ADEL CONT. & OCT.' 94
AL MUHAIRY CONSULTANTS BUREAU GEN. MAINT. EST.
657(345) BLDG. FOR MR. MOH'D TRAIS CFA C-24 E-29 76 500 10.00 SAHIL ENGINEERING ENGINEERING SEP.' 94
SAEED AL MAZROUIE CONSULTANTS ENTERPRISES EST.
659(347) SERVICE CENTER FOR M/S AL CFA C-5 MN-5 19 450 7.00 DASTUR CONSULTS GULF ERECTION SEP.' 94
MANSOURI SPECIALIZED ENG ENG. & ARCH. COMPANY
660(348) BLDG. FOR MR. ABU DHABI BPTC C-120 E-11 78 600 5.50 JORDAN CONSULTANTS AL AMAN GEN. NOV.' 94
WELFARE ORGANIZATION CONT. CO.
661(349) VILLA FOR MR.MOHAMMED BIN CFA 55 E-26 26 500 8.00 ARDENT MOHAMMED BIN SEP.' 94
MASOOD & SONS MASOOD & SONS
663(351) BLDG. FOR MR. KHALFAN CFA C-157 W-4 81 600 6.50 SEREX INTERNATIONAL LOTUS INTERNATIONAL SEP.' 94
MOUSA AHMED AL HAMILI CONSULTANTS CONT.& GEN. MAINT. EST.
664(352) BLDG. FOR MR. SALEM MOH'D BPTC 83 E-13 62 900 7.00 ARCHITECTURAL SUHAIL AL MAZROUIE SEP.' 94
KHALIFA AL RUMAITHY CONSULTING GROUP CONT. CO.
665(353) VILLA FOR HEIRS OF LATE BPTC 89 W-18/01 59 500 5.50 PALESTINIAN ENG. AL THARAWAT OCT.' 94
SALEM TARABISH AL MANSOURI CONSULTANTS BUREAU GEN. CONT. EST.
666(354) BLDG. FOR MR. AHMED JUMA BPTC C-129 W-4 94 600 9.50 PALESTINIAN ENG. ADEL CONT. & OCT.' 94
AL MAZROUIE CONSULTANTS BUREAU GEN. MAINT. CO.
667(355) BLDG. FOR H.E. MOHAMED CFA 70 W-18/01 107 500 5.00 DIAR CONSULT. ASCON NOV.' 94
SAEED AL MULLA
668(356) BLDG. FOR MR. KHALFAN BPTC C-65 W-4 71 750 6.50 AL AMARA AL NAGEBCO GEN. OCT.' 94
KHALIFA ALI AL MAZROUIE AL SHARQIYYA CONT. CO.
669(357) WORKSHOP FOR PUBLIC CFA 52 M-12 30 450 13.60 DAR EL EMARA AL HAMID GROUP OCT.' 94
SECURITY DEPARTMENT ARCHITECTS ENGINEERS GEN. CONSTRUCTION
670(358) 100 TONNES CEMENT CFA 22 500 12.00 BIN HAFEEZ EST. OCT.' 94
STORAGE SILOS
671(359) VILLA FOR MR. RASHEED CFA 33 W-22 110 500 9.00 CITY PLAN CONSULTING LINES ENGINEERING OCT.' 94
AHAMED AL HAMILY ENGINEERS GEN. CONT. EST.
672(360) INSTALLATION OF PILES FOR 24 600 PRIVATE DEPT. JAN.' 95
HH SHEIKH ZAYED AL NAHYAN
673(361) BLDG. FOR MR. AHMAD HAMIL CFA C-123 E-11 75 600 8.30 SYRCONSULT AL FARA'A GEN. NOV.' 94
KHALFAN AL QUBAISY CONSULTING ENGINEERS CONT. CO.
674(362) BLDG. FOR MR. SHAHEEN BPTC C-88 W-4 68 750 5.50 MIMAR CONSULTING AL GHAFLY GEN. NOV.' 94
RASHED AL MANSOURI ENGINEERS CONT.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 20 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
675(363) BLDG. FOR MR. HADEELI BPTC 4 ME-11 67 500 9.50 Dr. KELKAR FAYROUZ GEN. CONT. NOV.' 94
MOH'D AL MANSOURI CONSULTANTS & MAINT. EST.
676(364) W/S FOR MAINT. & OPERATION BPTC 50 400 7.00 P.W.D. AL LAYTANI GEN. OCT.' 94
OFFICES ACCOM. FOR W.E.D. UNIT 4 CONT. & MAINT. CO.
677(365) BLDG. FOR HEIRS OF LATE BPTC 269 ME-10 67 500 10.50 HANDASAT AL AL MOUSAWE NOV.' 94
SAEED KHALAF AL SAEED AMARA CONSULTANTS GEN. CONT. EST.
678(366) BLDG. FOR MR. ABDUL QAHER BPTC 267 ME-10 51 500 9.50 HANDASAT AL AL MOUSAWE NOV.' 94
SAYED A.S. MOUSA AL MOUSAWE AMARA CONSULTANTS GEN. CONT. EST.
679(367) BLDG. FOR LATE MOH'D BPTC C-71 W-9 85 600 7.50 AL SUWEIDI ENGINEERING AL NAYLI GEN. OCT.' 94
AHMAD ABBAD AL HAMELY CONSULTANTS BUREAU CONT. CO. EST.
680(368) BLDG. FOR MR. EISSA MOH'D BPTC C-28 E-9/02 53 600 8.50 AL DANA ENGINEERING AL BURAIR GEN. FEB.' 95
S. AL QUBAISY CONSULTANCY CONT. CO.
681(369) BLDG. FOR HIS HIGHNESS BPTC C-156 W-4 84 600 6.50 HOUSE OF AL GHAFLY GEN. DEC.' 94
ALI SAIF AL JARWAN PLANNING CONT.
682(370) BLDG. FOR MR. JAMAL JABER BPTC C-27 W-4 93 600 9.00 PALESTINIAN ENG. AL FARA'A GEN. MAY ' 95
DHARIF CONSULTANTS BUREAU CONT. CO.
683(371) VILLA FOR MR. ABDULLAH CFA C-22 S-18 279 450 15.00 DAR AL KHALEEJ AL KARRANI DEC.' 94
DARWISH AL QUBAISY ENG. CONSULTANTS GROUP
684(372) BLDG. FOR MR. RASHID BIN BPTC C-29 W-24 27 500 5.20 ENG ADNAN SAFARINI HACCO ENGINEERING NOV.' 94
SAIF AL REYAMI 25 600 CONSULTANT & CONSTRUCTION CO.
685(373) BLDG. FOR MR. SALEM BIN BPTC 9 E-18 50 900 8.10 CRANG & BOAKE ALGECO FEB.' 95
KARDOUS AL AMERI INTERNATIONAL
686(374) INSTALLATION OF PILES - BPTC 3 600 16.00 NOEL - IMAC NOV.' 94
JETTY EXTENSION-MUSSAFAH
687(375) BLDG. FOR MR. KHALIFA & CFA 367 ME-10 50 500 12.90 ESMAT KHALIL ENG. FAYROUZ GEN. CONT. DEC.' 94
MOHAMMAD F.M. AL SHAMSI CONSULTANTS & MAINT. EST.
688(376) BLDG. FOR MR. RAHMAH & ALI CFA 368 ME-10 48 500 12.00 ESMAT KHALIL ENG. FAYROUZ GEN. CONT. DEC.' 94
F.M. AL SHAMSI CONSULTANTS & MAINT. EST.
689(377) BLDG. FOR MR. SAOUD F.M. CFA 366 ME-10 48 500 12.00 ESMAT KHALIL ENG. FAYROUZ GEN. CONT. DEC.' 94
AL SHAMSI CONSULTANTS & MAINT. EST.
690(378) BLDG. FOR MRS. AESHA M.K. CFA 194 ME-10 50 500 10.00 SYRCONSULT FAYROUZ GEN. CONT. JAN.' 95
AL FALAHI CONSULTING ENGINEERS & MAINT. EST.
691(379) BLDG. FOR MR. SUHAIL MOH'D BPTC C-136A E-3 63 700 7.80 DAR AL KHALEEJ NAGEBCO GEN. DEC.' 94
KHALEEFA SAHEEN AL MARAR ENG. CONSULTANTS CONT. CO.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 21 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
692(380) BLDG. FOR MR. AL SAYED BPTC 223 ME-10 45 500 10.50 MAHMOUD AL RAMAHI AL MOUSAWE DEC.' 94
SHEBER M.AL MOUSAWE ENG. CONSULTANTS GEN. CONT. EST.
693(381) BLDG. FOR MR. MAHMOUD BPTC 220 ME-10 57 500 10.00 MAHMOUD AL RAMAHI AL MOUSAWE DEC.' 94
SAYED SHEBER AL MOUSAWE ENG. CONSULTANTS GEN. CONT. EST.
694(382) BLDG. FOR MR. OBAID SALIM BPTC 175 ME-10 71 500 11.25 MAHMOUD AL RAMAHI ABDULLAH AHMED AL JAN.' 95
MOH'D AL BAWAB ENG. CONSULTANTS KULAIB GEN. CONT. EST.
695(383) BLDG. FOR MR. MATTAR BIN BPTC C-80 E-4/02 130 900 10.50 SYRCONSULT SUHAIL AL JAN.' 95
ESSYAN AL MANSOURI CONSULTING ENGINEERS MAZROUI CONT. CO.
696(384) BLDG. FOR MR. AL DHABI BPTC C-39 E-18/03 62 750 10.20 PALESTINIAN ENG. ADEL CONT. & MAR.' 95
KANZOOL AL AMIRI CONSULTANTS BUREAU GEN. MAINT. CO.
697(385) BLDG. FOR MR. ABDULLAH BPTC 268 ME-11 61 500 12.00 ARAB AL AMAN CONT. & GEN. FEB.' 95
MOH'D HOFAN AL MANSOURI CONSULTANTS MAINT. EST.
699(387) BLDG. FOR MR. JUMAA HASAN JUMMA CFA C-60 E-41 69 500 12.70 YOUNIS CONSULTANTS AL DIYAR GEN. JAN.' 95
HAMID AL ZAABI ENGINEERING CONT. CO.
700(388) BLDG. FOR MR. BAQHER CFA 210 ME-10 61 600 9.80 SAYED KHALAF ENG. ENGINEERING MAR.' 95
NAHMAT KHOURY ARCH. & ENGINEERS ENTERPRISES EST.
701(389) BLDG.FOR MR.HAREB HUMAID BPTC C-142 E-18/03 105 500 9.00 BEIRUT CONSULTING AHMED AL OJAN MAY.' 96
ABDULLAH AL DHAHIRI C-143 GROUP ENGINEERING
702(390) BLDG.FOR MR.RASHED SALEM BPTC C-33 E-22 60 600 6.00 ARTIST CONSULTING AL RASHEED FEB.' 95
RASHED BIN HIBALAH AL KUTBI ENGINEERS GEN. CONT. CO.
703(391) BLDG. FOR MR. SAEED HAMAD CFA 372 ME-10 50 500 12.00 AL GEEMI ENGINEERING AL AZHAR MAINT. & FEB.' 95
BIN HARIB AL OMAIMI CONSULTANT GEN. CONT. EST.
705(393) COMPLEX FOR H.H. SHEIKH CFA AL-AIN 705 500 18.00 AL SALAAM ARABIAN CONST. OCT ' 95
KHALIFA BIN ZAYED CFA 33 600 18.00 CONSULTING ENGINEERS COMPANY (ACC)
706(394) BLDG. FOR MR. JUMA KHAMIS BPTC 110 W-4 77 600 10.50 NATIONAL ENGINEERING PROFESSIONAL MAR.' 95
AL OTAIBA BUREAU BUILDERS
707(395) BLDG. FOR MR. MOOSA JUMMA BPTC 111 W-4 83 600 9.50 NATIONAL ENGINEERING PROFESSIONAL FEB.' 95
MUBARAK AL SELETHI BUREAU BUILDERS
709(397) BLDG. FOR LATE HEIRS OF HADHER BPTC C-145 W-4 89 500 8.50 ARDENT LOTUS INTERNATIONAL MAR.' 95
ABDULLAH AL KUNAIBI CONT.& GEN. MAINT. EST.
710(398) BLDG. FOR MR. MUBARAK BPTC C-33 E-15 80 900 9.00 SYRCONSULT SUHAIL AL APR.' 95
SAEED HAMED AL SHAMSI CONSULTING ENGINEERS MAZROUI CONT. CO.
711(399) BLDG. FOR MR. SALEM BPTC C-75 E-11 93 600 7.00 GOLDEN PLANNERS ZAKUM CONT. & MAR.' 95
KHALIFA RASHED AL RUMAITHY CONSULTANTS REAL ESTATE

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 22 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
712(400) BLDG. FOR MR. RASHID BIN BPTC C-40 W-4 96 600 9.50 ARTIST CONSULTING AL RASHEED MAR.' 95
SAEED MOH'D KHAL AL MAZROUIE ENGINEERS GEN. CONT. CO.
713(401) INSTALLATION OF MICROPILES CFA MUSSAFAH 24 150 12.00 PRIVATE DEPT. APR.' 95
FOR HYDRAULIC LIFT
714(402) BLDG. FOR MR. SALEM MOH'D BPTC C-104 W-4 83 600 9.00 ARAB CONSULTANTS ZAKUM CONT. & APR.' 95
HAFIZ AL MAZROUI ARCH. ENGINEERS REAL ESTATE
715(403) BLDG. FOR MR. SAGHEER BPTC C-90 E-18/02 45 500 7.00 ARDENT AL SALMEE INT'L MAR.' 95
SAEED KHALIFA AL KHAILY GEN. TRANSPORT EST.
716(404) BLDG. FOR MRS. SAEEDA BPTC C-109 E-3 59 600 10.50 AL MEEDAN MODERN DEVELOPMEN APR.' 95
RASHID HUMAID AL RUMAITHY CONSULTANTS CONT. CO.
717(405) BLDG.FOR MR.GOUMAA OBEID BPTC 154 ME-10 57 600 9.90 MAHMOUD AL RAMAHI ABDULLAH AHMED AL APR.' 95
AWAD EL RAWAS ENG. CONSULTANTS KULAIB GEN. CONT. EST.
718(406) BLDG. FOR MR. ALI HASSAN BPTC C-116 E-3/01 82 600 8.00 GOLDEN PLANNERS ARAB UNION MAY.' 95
BALSHIKH AL RUMAITHY CONSULTANTS CONT. CO. LTD.
719(407) BLDG.FOR MR.KHALIFA OBEID BPTC C-173 E-18/02 77 800 12.00 PLANAR AL ADAID CONT. MAY.' 95
AL MUHAIRY & TRANSPORT CO.
720(408) AL NOOR HOSPITAL C-31 W-37 SHORING WORKS DAR EL EMARA AL HAMID GROUP DEC. '96
BY USING H-BEAMS ARCHITECTS ENGINEERS GEN. CONSTRUCTION
721(409) BLDG. FOR SONS OF GHANEM BPTC C-107 W-4 59 600 9.20 DEWAN ARCHITECTS ARAB UNION MAY.' 95
AL MAZROUIE & ENGINEERS CONT. CO. LTD.
722(410) VILLA FOR HEIRS OF LATE CFA 107 E-4/02 38 500 6.70 CITY PLAN CONSULTING LINES ENGINEERING MAY.' 95
DARWISH LARI ENGINEERS GEN. CONT. EST.
723(411) BLDG. FOR MR. MOH'D THANI BPTC C-33 E-16 88 900 8.50 SYRCONSULT MODERN DEVELOPMEN AUG. '95
AL MAZROUIE CONSULTING ENGINEERS CONT. CO.
724(412) BLDG. FOR HEIRS OF LATE BPTC C-27 E-4 220 900 6.50 SHAHEEN ENGINEERING AL THARAWAT MAY.' 95
GHANEM HAMEELA AL MAZROUIE CONSULTANCY GEN. CONT. EST.
725(413) PRE-DRILLING OF SHAFT AT AL HAMED LILLEY INT'L APR.' 95
ABU DHABI DEVELOPMENT SITE
726(414) SHORING WORKS BY USING H-BEAMS ADEL CONT. & AUG. '95
GEN.&MAINT. EST.
728(416) BLDG. FOR MR. ATEEQ FADAL BPTC C-27 W-6 64 750 9.00 SAYAH ENGINEERING GULF TIGER MAY.' 95
& SHAMSA CONSULTING BUREAU CONT. CO.
729(417) BLDG. FOR MR.MOH'D SALMIN BPTC C-20 E-18/03 80 600 7.00 PARC INTERNATIONAL AL HASOUN ARABIAN JUNE' 95
MUBARAK GEN. CONT.& MAINT. EST.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 23 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
730(418) BLDG. FOR MR. MOH'D BIN BPTC C-181 ME-10 57 500 10.50 THE ARAB OFFICE FOR CHROME ENGINEERING JUNE' 95
JUMA BIN SALEM PLANNING & ARCH.
731(419) 2 VILLAS FOR MR. MUBARAK CFA C-28A S-22 71 500 14.50 ARAB CONSULTANTS GULF CONT. JUNE' 95
ABDULLAH ARCH. ENGINEERS
732(420) 2 VILLS FOR MR. KHALID CFA C-28B S-22 90 500 14.50 NATIONAL ENGINEERING GULF CONT. JUNE' 95
MUBARAK ABDULLA BUREAU
733(421) BLDG. FOR MR. HAMAD BPTC C-52 E-16 76 900 8.50 AL FATAH CONSULTING GULF TIGER JUNE' 95
KANNAS ALI AL AMIRY ENGINEERS CONT. CO.
734(422) BLDG. FOR MRS. MARIAM SAIF BPTC C-75 W-4 71 600 6.50 AL FATAH CONSULTING BIN HAM GEN. MAY ' 95
AL FALAHI ENGINEERS CONT. CO.
735(423) BLDG. FOR MR. SULTAN BIN BPTC C-23 W-6 69 750 7.75 ESMAT KHALIL ENG. SEIDCO GEN. JULY' 95
BUTTY AL MOHAIRBI CONSULTANTS CONT.
736(424) BLDG. FOR MR. MOH'D THANI BPTC C-91 E-16/02 75 600 10.00 AL MEEDAN BIN HUMEILA & BROTH. JULY' 95
AL RUMAITHY CONSULTANTS GEN. CONT. CO.
737(425) BLDG. FOR MR. HAMAD MARAR BPTC C-28 E-14 111 750 7.50 ADAM BUREAU FOR AZHA MODERN JULY' 95
AL SHAMSY DESIGN & ENG. CONSULT. CONST. CONT. CO.
739(427) BLDG. FOR MR. KHAMIS MOH'D BPTC C-1 W-15/02 74 750 5.50 ARAB CONSULTANTS GULF TIGER JULY' 95
AL MAZROUIE ARCH. ENGINEERS CONT. CO.
740(428) BLDG. FOR MR. AL SAYED BPTC C-2 E-9/02 67 500 8.80 GOLDEN PLANNERS BIN BUTTI OCT.' 95
SALEH ASHKAR AL DHAHIRI CONSULTANTS GEN. CONT.
741(429) BLDG.FOR MR.AHMED SULTAN BPTC C-109 E-20/01 60 750 7.50 DEWAN ARCHITECTS BIN BUTTI OCT.' 95
& MR. EISA SULTAN C-126 60 750 9.00 & ENGINEERS GEN. CONT.
742(430) BLDG. FOR MR. KHALIFA BIN CFA 134 W-18/01 51 500 6.00 AL MEEDAN BIN BUTTI AUG.' 95
HUMAID BIN ABDULLAH RUMAITHY CONSULTANTS GEN. CONT.
743(431) BLDG. FOR MRS. SHAMSA BPTC C-11 E-38 40 500 10.00 SAHIL ENGINEERING SAFA GEN. CONT. AUG.' 95
AL MANSOURI CONSULTANTS EST.
744(432) BLDG. FOR MRS. ZEYNAB BPTC C-168 W-4 75 600 7.50 AL MULLA ENGINEERING ZAKUM CONT. & AUG.' 95
HUSSAIN FATHI & SONS CONSULTANTS REAL ESTATE
745(433) BLDG. FOR MR. MUSALLAM BPTC C-172 E-18/02 67 600 8.60 ARENCO ARCHITECTURAL AL FADA CONT. & SEP.' 95
SAEED ABDULLA ENG. CONSULTANTS GEN. MAINT. EST.
BLDG. FOR HEIRS OF MR. BPTC C-92 E-11 71 600 9.08 R.J. CROCKER & FAST ENGINEERING SEP.' 95
SALEH ASHKAR AL RUMAITHY PARTNERS CONSULT.
747(435) HIRING OF H BEAMS FOR BLDG. OF 199 E-4/01 SHORING WORKS EASTERN REAL ESTATE AUG.' 95
MR. HASSAN AHMAD AL KEEM BY USING H-BEAMS MAINT.& GEN. CONT. CO.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 24 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
748(436) BLDG. FOR MR. OBAID KHAMIS BPTC C-39 W-9 94 600 9.50 WOODS PARKER ZAKUM CONT. & SEP.' 95
OBAID AL DHAHIRI REAL ESTATE
749(437) BLDG.FOR SONS OF MUBARAK BPTC C-147 W-4 92 600 9.00 GOLDEN PLANNERS ZAKUM CONT. & AUG.' 95
AHMAD M. AL MAZROUIE CONSULTANTS REAL ESTATE
750(438) 2 VILLAS FOR MR. ALI RASHED CFA C-24A S-18 58 500 15.60 CROWN ENGINEERING FAYROUZ GEN. CONT. SEP.' 95
ABDULLAH AL NAEIMI CONSULTANCY BUREAU & MAINT. EST.
751(439) 2 VILLAS FOR MR. MOH'D CFA C-24B S-18 58 500 15.60 CROWN ENGINEERING FAYROUZ GEN. CONT. SEP.' 95
RASHED ABDULLAH AL NAEIMI CONSULTANCY BUREAU & MAINT. EST.
752(440) SHORING WORKS BY USING H-BEAMS AL ADAID CONT. SEP.' 95
& TRANSPORT CO.
753(441) BLDG. FOR MR. KHALFAN SALEM CFA MAFRAQ 98 600 9.00 NATIONAL ENGINEERING GULF ERECTION CO. FEB '98
& MOH'D SALEM AL MUHAIRBI BUREAU
754(442) BLDG. FOR HEIRS OF LATE BPTC C-93 E-11 74 500 5.70 MAHMOUD AL RAMAHI AL AMAN CONT. & OCT.' 95
SALEM EID AL RUMAITHY ENG. CONSULTANTS GEN. MAINT. EST.
755(443) BLDG. FOR MR. MUHANNA BIN BPTC C-22 E-6 63 900 12.50 SYRCONSULT SEIDCO GEN. OCT.' 95
BUTTY AL QUBAISY CONSULTING ENGINEERS CONT.
756(444) 5 GUEST VILLAS FOR THE CFA 48-52 W-56 110 500 13.00 P.W.D. AL HAMED GROUP NOV.' 95
MINISTRY OF INTERIOR GEN. CONSTRUCTION
757(445) BLDG.FOR MR.MATAR KHAMIS CFA C-128 W-4 52 600 9.50 ESMAT KHALIL ENG. FAYROUZ GEN. CONT. SEP.' 95
KHALFAN AL MAZROUIE CONSULTANTS & MAINT. EST.
758(446) LOAD DISPATCH CENTERS BPTC 93 600 15.30 E.D.F. GENERATION TARGET ENGINEERING NOV.' 95
FOR P.W.D. 64 500 15.30 AND TRANSMISSION CONSTRUCTION CO.
759(447) INSTALLATION OF PILES AT CFA 4 500 14.00 AL HAMED GROUP SEP.' 95
BMW WORKSHOP GEN. CONST.
760(448) VILLA FOR HEIRS & HEIRESS CFA 32 S-22 67 450 13.50 AL SUWEIDI ENGINEERING AL RASHEED OCT.' 95
OF MOH'D RAHID MANSOURI CONSULTANTS BUREAU GEN. CONT. CO.
761(449) INDUSTRIAL PLANT FOR M/S CFA 61,63 MW-5 48 400 7.00 NATIONAL ENGINEERING GULF ERECTION OCT.' 95
ABU DHABI INVESTMENT CO. & 65 BUREAU COMPANY
762(450) WATER & ELECTRICITY DEPT. BPTC 64 E-18/03 126 600 9.00 WINNER CONSULTING SAEED AL QUBAISI FEB.' 96
REVENUE DIVISION ENGINEERS GEN. CONT. EST.
763(451) BLDG. FOR MRS. AMINA BINT CFA C-40 E-41 52 500 10.20 ARCHITECTURE & SOLID CONSTRUCTION OCT.' 95
TAYEB KHALIFA AL QUBAISY PLANNING GROUP CO.
764(452) BLDG. FOR MR. ALI JAAFAR CFA 216 ME-10 41 600 12.00 STYLE ENGNIEERING ENGINEERING NOV.' 95
ALI AL KHOURY CONSULTANCY ENTERPRISES EST.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 25 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
765(453) BLDG. FOR MR. ZAYED BPTC C-14 W-15/02 65 900 7.00 SAHIL ENGINEERING ARABIAN CONT. JAN ' 96
ABDULLA AL MAZROUIE CONSULTANTS ACHIEVEMENT CO
767(455) BLDG. FOR MRS. SALAMA & CFA C-36 E-41 65 500 11.20 ARCHITECTURE & SOLID CONSTRUCTION OCT.' 95
MOZA AL RUMAITHY PLANNING GROUP CO.
768(456) BLDG. FOR MRS. NAZLA CFA 272 ME-10 57 600 11.00 AL BAYAN CONSULTING ABDULLAH AHMED AL NOV.' 95
ISMAIL AL KAMZI ENGINEERS KULAIB GEN. CONT. EST.
770(458) BLDG. FOR MR. YOUSEF BIN BPTC C-171 E-18/02 71 750 9.50 AL SUWEIDI ENGINEERING AL GHAFLY GEN. DEC.' 95
OMEIR BIN YOUSEF CONSULTANTS BUREAU CONT.
771(459) BLDG.FOR MR.KHALIFA SAEED BPTC C-38 E-41 86 600 11.00 PALESTINIAN ENG. ADEL CONT.& GEN NOV.' 95
MUBARAK AL KHAILY CONSULTANTS BUREAU MAINT. CO.
773(461) BLDG. FOR SONS OF ATEEQ CFA C-67 W-9 77 600 8.80 STYLE ENGNIEERING ENGINEERING MAR.' 96
KULAIB AL HAMELY CONSULTANCY CONST. CO.
774(462) VILLA FOR MR. MOH'D RASHED CFA 35 E-19/01 35 500 5.50 SASCO CONSULTANTS FAYROUZ GEN. DEC.' 95
ALI AL HIZRI CONT. & MAINT. EST.
775(463) BLDG. FOR MR. SULTAN ALI BPTC C-31 W-9 86 600 9.00 AL SUWEIDI ENGINEERING PROFESSIONAL JAN.' 96
AL MUHEIRY CONSULTANTS BUREAU BUILDERS
776(464) BLDG. FOR MR. ATEEQ MOH'D BPTC 99 ME-12 52 500 10.50 AL KHOZMA ENG. MEGA CONT. CO. DEC.' 95
SAEED AL SUWEIDY CONSULTANTS
777(465) BLDG. FOR MRS. RUWAYA W/O BPTC C-116 ME-12 44 600 10.00 DAR AL HANDASA MEGA CONT. CO. DEC.' 95
HAMIAD EL DAHRY & AL EMARA
778(466) VILLA FOR MR. MOHAMED CFA C-30 W-66 62 500 12.00 AL BAYAN CONSULTING SAMI & AL DEC.' 95
DHAWEE AL MANSOURI ENGINEERS MANSOURI CONT.
779(467) BLDG. FOR MR. SUHAIL AL BPTC C-127 ME-12 51 500 10.50 AL TAKAMUL ABDULLAH AHMED AL FEB.' 96
NOHAIS NASER AL AMERY AL HANDASI KULAIB GEN. CONT. EST.
780(468) BLDG. FOR MR. MOH'D ALI BPTC C-172 W-4 88 600 7.00 EMIRATES ENGINEERING AL MOHAMADIA DEC.' 95
MURSHED AL MURUR CONSULTANT GEN. CONT.
781(469) BLDG. FOR HEIRS OF MR. BPTC C-134 W-4 68 600 8.50 MAHMOUD AL RAMAHI SOUND SPECIAL FEB.' 96
RASHED SALEM AL MANSOURI ENG. CONSULTANTS SERVICES GEN. CONT.
782(470) BLDG. FOR MR. AHMED BPTC C-169 W-4 96 600 7.00 EMIRATES ENGINEERING SOUND SPECIAL JAN.' 96
KAHMIS AL HAMELY CONSULTANT SERVICES GEN. CONT.
783(471) BLDG. FOR MR. SAEED BPTC C-124 E-18/03 74 600 8.00 DAR AL HANDASA AL MAHABA CONT FEB.' 96
MUBARAK SAIF AL KHAILY C-125 & AL EMARA EST.
784(472) BLDG. FOR MR. KHALAF AL C-102 E-20/01 SHORING WORKS AL NAYLI GEN. JULY' 96
QUBAISY BY USING H-BEAMS CONT. EST.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 26 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
785(473) BLDG. FOR MR. RASHID ALI BPTC C-31 W-4 67 750 6.00 PERFECTION BIN BUTTI GEN. MAR.' 96
MATAR JUBARAH AL MURAR ARCHITECTS CONT. CO.
786(474) BLDG. FOR MR. NASSER BPTC C-102 E-16/02 14 900 9.00 MASS CONSULT BIN HUMEILA & BROTH. MAR.' 96
ABDULLAH HUSSAIN LOOTAH 60 600 ARCHITECTS ENGINEERS GEN. CONT. CO.
787(475) VILLA FOR HEIRS OF SUHAIL CFA 30 E-19/01 56 500 4.50 TECHCONSULT SALEH AL MAZROUIE JAN.' 96
NAHEEF MOH'D AL AMIRI CONT. EST.
788(476) VILLA FOR MR. ABDUL AZIZ CFA 289 W-14/01 40 500 5.00 CONTINENTAL AL DHAHIR GEN. JAN.' 96
MUBARAK ENG. CONSULTANT MAINT. EST.
789(477) BLDG. FOR MR. ALI MUBARAK BPTC C-4 E-9 147 900 11.30 AL AIN CONS. ARABTEC APR.' 96
AL MANSOURI ENGINEERS
790(478) BLDG. FOR MR. KHAMIS BUTTI BPTC C-37 E-20/01 66 600 7.00 AL SUWEIDI ENGINEERING BROTHERS GEN. JAN.' 96
GHANEM SAEED AL RUMAITHY CONSULTANTS BUREAU CONT. EST.
791(479) BLDG. FOR MR. MOZAFER BIN BPTC C-3 E-15 83 900 9.00 ARAB OFFICE FOR SEIDCO GEN. JAN.' 96
MOHAMMED AL AMIRI PLANNING & ARCH. CONT.
792(480) HIRING OF HBEAM FOR BLDG. OF C-48 E-16 SHORING WORKS REDCAN DEC ' 95
MR. MOHAMMED BIN ZAYED AL MANSOURI BY USING H-BEAMS CONSTRUCTION
793(481) BLDG. FOR MR. AHMED JUMA BPTC C-64 E-19/01 54 750 5.00 BEIRUT CONSULTING BIN BUTTI GEN. MAR.' 96
AL HAMILY GROUP CONT.
794(482) BLDG. FOR MR. SALEM MOH'D BPTC C-134 E-18/03 18 900 9.70 GOLDEN PLANNERS BIN BUTTI GEN. OCT ' 96
SALEM AL AMIRI C-135 56 750 CONSULTANTS CONT.
795(483) BLDG. FOR MR. KHALFAN BPTC C-180 ME-12 57 600 9.60 HANDASCO CHROME ENGINEERING MAR.' 96
MATAR AL SHAMSI CONSULTANTS
796(484) BLDG. FOR MR. AHMED MOH'D BPTC C-1 E-2 71 900 11.00 ISLAMIC HERITAGE ARABIAN CONT. FEB.' 96
AL FAHIM ARCHITECTS ACHIEVEMENT CO
797(485) BLDG. FOR MR. ABDUL RAHIM BPTC C-16 W-15/02 78 900 9.50 ARCHITECTURE & DHAFRA INT'L MAR.' 96
AHMED AL MAHMOUD PLANNING GROUP PROJECTS GROUP
798(486) BLDG. FOR MAGHEER SAEED BPTC C-36 E-18/03 56 600 7.50 AL BAYAN CONSULTING AL NILE FALCON MAY' 96
AL MAZROUIE ENGINEERS GEN. CONT.
799(487) VILLA FOR MRS. AISHA CFA 42 E-36 32 500 4.00 AL DHAFRA AL NILE FALCON MAR.' 96
MUBARAK JUMA AL JUNAIBI CONSULTING GEN. CONT.
800(488) HIRE OF H BEAMS FOR BLDG.OF MR. SAEED C-25 E-19 SHORING WORKS SAIF&BIN HARMAL JUNE' 96
SULTAN BIN HARMAL & NAEL RASHED BY USING H-BEAMS DRILLING EST.
801(489) BLDG. FOR MR. BUTTI GHANIM BPTC C-5 E-22 57 600 8.50 AL SUWEIDI ENGINEERING BROTHERS GEN. MAR.' 96
AL RUMAITHY CONSULTANTS BUREAU CONT. EST.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 27 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
802(490) BLDG. FOR MR. MOHSIN BIN BPTC C-43 E-13 73 900 9.50 SEREX INTERNATIONAL AL FADA CONT. & JUNE' 96
BAKHIT AL MAZROUIE CONSULTANTS GEN. MAINT. EST.
803(491) BLDG. FOR MR. ABDULLAH BPTC C-28 E-13 127 1000 11.50 CANSULT AL THARAWAT JUNE' 96
ABDUL JALIL AL FAHIM GEN. CONT. EST.
804(492) BLDG. FOR MR. EID AL BPTC C-14 W-14 66 900 8.70 SYRCONSULT EMIRATES CASTLE MAR.' 96
MANSOURY CONSULTING ENGINEERS GEN. CONT. CO.
805(493) VILLA FOR MR.SAEED RAMEEZ CFA 78 W-31 37 500 10.50 AL BURJ ENGINEERING AL MAHABA CONT. APR.' 96
MOH'D AL AMIRI CONSULTANTS EST.
806(494) BLDG. FOR MRS. MARIAM BIN BPTC C-7 E-16/01 102 1200 9.00 R.J. CROCKER & SUHAIL AL JUL. ' 96
RASHID KHALAF AL OTAIBA PARTNERS CONS. ENG. MAZROUI CONT. CO.
807(495) BLDG. FOR MR. ABDULLA BPTC C-139 ME-12 54 500 11.50 MIMAR CONSULTING ABDULLAH AHMED AL APR.' 96
AL MANSOURI ENGINEERS KULAIB GEN. CONT. EST.
809(497) BLDG. FOR MR. ALI KHALFAN CFA C-170 ME-12 55 500 10.60 MASS CONSULTANT ABDULLAH AHMED AL MAY' 96
KHAMIS AL DAHIRI ARCHITECTS ENGINEERS KULAIB GEN. CONT. EST.
810(498) IRRIGATION, RESERVOIR & CONTRACT # 152/5 (SHORING WORKS ACER/JOHN TAYLOR INDUST. & ENG. NOV. '90
PUMPING STATION BY USING H-BEAMS) CONS. ENGINEERS ENTERPRISES CO.
811(499) VILLA FOR MR. NAJEEB SAAD CFA 50 S-20 22 450 15.00 AL ALI ENGINEERING AL HAJJAN ENGINEERIN JUN.' 96
MOH'D AL HABEEL CONSULTANT CONT.
813(501) BLDG. FOR MR. OBAID HAMAD BPTC C-7 E-22 59 500 7.50 THE LEBANESE AL MOHAMADIA AUG.' 96
AHMAD AL MUHAIRY CONSULTANT GEN. CONSTRUCTION
814(502) RESIDENTIAL COMPLEX FOR H.E. SH. BPTC 1+25 W-62 549 450 12.50 ANTOINE AL ADAID CONT. SEP.' 96
MOH'D BIN BUTTI AL HAMID HELAL & PARTNERS & TRANSPORT CO.
815(503) BLDG. FOR MR. ALI HUSSAIN CFA 228 ME-11 73 500 10.30 PAN EMIRATES ABDULLAH AHMED AL JUN. ' 96
SADIQ CONSULTANTS KULAIB GEN. CONT. EST.
816(504) BLDG.FOR MR.RASHID OBEID BPTC C-48 E-41 70 600 11.50 YOUNIS CONSULTANTS AL AIN BUILDING & JUN. ' 96
AL SUWEIDI ENGINEERING CONSTRUCTION EST.
817(505) BLDG. FOR MR. FADEL HAMAD CFA 225 ME-11 52 500 9.50 GOLDEN PLANNERS RASLAN GEN. AUG.' 96
ESSIAN AL MANSOURI CONSULTANTS CONT. EST.
818(506) BLDG. FOR MR. OBAID HAREB BPTC C-2 W-24/01 90 600 7.50 ARTIST CONSULTING SALEH AL MAZROUIE AUG.' 96
AL KUTBI & ALI AL NEYADI ENGINEERS CONT. EST.
819(507) BLDG.FOR MR.MATAR HUMAID CFA C-81 E-11 54 600 6.50 AL MEEDAN AL MOHANDIS JUL. ' 96
AL QUAISI AL RUMAITHI CONSULTANTS GEN. CONT. & MAINT.
821(509) SHORING WORKS BY USING H-BEAMS DELMA CO-OP SOC. APR. '96
GEN.CONT. & ARCH.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 28 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
822(510) SSR TOWERS FOR ETISALAT BPTC VARIOUS LOCATIONS IN U.A.E. EWBANK PREECE TOWER & POWER MAY '96
CONTRACT NO. 149/H/94 LIMITED
824(512) VILLA FOR MR. MOH'D SALEM CFA 174 E-37 66 500 4.50 NATIONAL ENGINEERING GULF CONT. JUN. ' 96
SAQR AL MANSOURI BUREAU
825(513) VILLA FOR MR. AHMED SAAD CFA 4A S-20 27 500 12.40 ROOTS ENG. BIN SA'ID GEN. JUL. ' 96
ABDULLAH AL MANHALI CONSULTANTS CONTRACTING
826(514) BLDG.FOR H.E.MOH'D KHALIFA BPTC 47 E-14 102 900 12.50 DESIGN & CONSTRCTION AL YOUSEF TRDG. & SEP. ' 96
AL YOUSUF ENG. CONSL. ENGINEERS GEN CONTR. EST.
827(515) BLDG. FOR SHEIKHA AFRA C-60 E-16 SHORING WORKS EMIRATES LINK OCT.' 96
BY USING H-BEAMS MALTAURO GEN.CONT. CO.
828(516) BLDG.FOR MR.MOH'D RASHED BPTC C-43 E-14 69 900 14.50 AL MEEDAN AL ADAID CONT. SEP.' 96
OBAID AL MANSOURI CONSULTANTS & TRANSPORT CO.
829(517) NEW AL NOOR HOSPITAL FOR 1 W-67 SHORING WORKS AL HAMID GROUP SEP.' 96
H.H. SH. MOH'D BIN BUTTI BY USING H-BEAMS GEN. CONSTRUCTION
830(518) BLDG. FOR MR. MUBARAK BPTC C-166 ME-12 51 600 10.50 MAHMOUD AL RAMAHI AL KATHEEB GEN. AUG.' 96
FALAH JABER M. AL AHBABI ENG. CONSULTANTS CONT. & MAINT. EST.
831(519) BLDG. FOR M/S READY MIX CFA B-239 AL-QUOZ 38 600 7.50 READY MIX BETON AUG.' 96
BETON DUBAI DUBAI
832(520) VILLA FOR MR. RASHID SAIF CFA 50 E-30 46 500 5.50 DAR AL HANDASA & AL AL AMAN CONT. & AUG.' 96
RASHID AL MANSOURI EMARA GEN. MAINT. EST.
833(521) BLDG. FOR MR. HAMAD MATAR BPTC C-26 E-18/03 55 600 7.30 AL BAYAN CONS. FAYROUZ GEN. CONT. AUG.' 96
NIADI ENGINEERS & MAINT. EST.
834(522) ABUDHABI SEWERAGE SCHEME BPTC E-28 850 600 7.25 ACER/JOHN TAYLOR INDUST. & ENG. APR. '96
CONTRACT # 152/5 CONS. ENGINEERS ENTERPRISES CO.
835(523) BLDG. FOR MR. SEIF BIN BPTC C-41 E-3 54 750 11.00 AL AMARA AL AL FADA CONT. & AUG.' 96
HAREB AL SUWEIDI SHARQIYYA GEN. MAINT. EST.

836(524) BLDG. FOR MR. ALI MESFER BPTC C-128 E-18/03 49 750 8.40 THE ARAB OFFICE FOR BIN BUTTI GEN. SEP.' 96
SULTAN AL KHAILI C-129 32 500 8.40 PALNNING & ARCH. CONT.
837(525) BLDG. FOR MR. JUMAA BIN BPTC C-67 E-19/01 55 600 6.00 AL MEEDAN BIN BUTTI GEN. NOV.' 96
ATEEQ AL RUMAITHI CONSULTANTS CONT.
838(526) BLDG. FOR MR. MUBARAK & BPTC C-96 E-20/01 61 600 6.26 AL AMAN CONSULTING AL MAHABA CONT. DEC.' 96
ABDULLAH S. BIN HAM EL AMRI ENGINEERING EST.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 29 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
839(527) BLDG. FOR MR. HILAL SAEED C-224 ME-12 56 500 9.50 HANDASCO RASLAN GEN. NOV.' 96
AL ZAFNI CONSULTANTS CONT. EST.
840(528) BLDG. FOR MR. KHADIM BIN BPTC C-19 W-6 79 900 7.30 CONTINENTAL ADEL CONT.&GEN. SEP.' 96
FADEL FARAJ AL MOHAIRBI ENG. CONSULTANT MAINT. CO.
841(529) BLDG. FOR MR. ABDULLAH, BPTC C-200 E-4/01 76 800 8.50 AL SUWEIDI ENGINEERING AL GHAFLY GEN. OCT.' 96
MANA & SULTAN AL MUHAIRI CONSULTANTS BUREAU CONT.
842(530) MOSQUE FOR SH. HAMAD BIN BPTC P-4 & E-38 27 500 5.50 SAHIL ENGINEERING AL SANABIL CONT. OCT.' 96
TAHNOON AL NAHYAN P-4A CONSULTANTS & GEN. MAINT.EST.
843(531) BLDG. FOR MR. ABDULLAH CFA C-18 E-20/01 51 600 10.00 SAYAH ENGINEERING SHAYA AL MAZROUIE OCT.' 96
KHALIFA K.AL MEHAIRI & SONS CONSULTING BUREAU GEN. CONT. CO.
844(532) BLDG. FOR MR. HILAL SAEED CFA C-51 E-41 66 600 9.00 STYLE ENGINEERING FAYROUZ GEN. CONT. DEC.' 96
BUTTI AL QUBAISY CONSULTANCY & MAINT. EST.
846(534) BLDG. FOR MR. DHAHI SAEED C-119 E-3 (PILE LOAD TESTING ONLY) YOUNIS CONSULTANTS AMITEX EMIRATES NOV.' 96
AL RUMAITHY ENGINEERING ABU DHABI
847(535) LIGHT POLES AT ABU DHABI BPTC 9 1000 JOANNOU & NOV.' 96
PARASKAVADES
848(536) BLDG. FOR MR. SADEEQ BPTC C-190 ME-11 43 500 10.5 AL SHERAA ENGINEERING AL ESRAA GENERAL APR.' 97
ABDULLAH JAFFAR AL BLOUKY CONSULTANT CONTRACTING CO.
849(537) BLDG. FOR MR. MOH'D BPTC C-26 E-22 69 600 6.50 DEWAN ARCHITECTS AL RASHEED GEN. DEC.' 96
ABDULLAH AL HINDI & BROTHERS & ENGINEERS CONT. CO.
850(538) BLDG. FOR MR. JUMAA KHADIM BPTC C-61 E-19/01 68 600 8.00 ARAB CONSULTANTS BIN BUTTI GEN. CONT. FEB. '97
AL HAMILY & SONS ARCHITECTS & ENGINEERS
853(541) VILLA FOR MR. FARAJ MASOUD BPTC 22 W-21 52 500 4.00 CITY PLAN CONSULTING FARAJ MASOUD JAN. '97
SALEM AL MEHAIRBI ENGINEERS SALEM AL MEHAIRBI
854(542) BLDG. FOR MR. DHAHI SAIF BPTC C-19 E-28 69 600 9.00 ARTIST CONSULTING YOUSEF BIN FARDAN JAN. '97
DHAHI AL RUMAITHI ENGINEERS GEN. CONT. & MAINT. CO.
859(547) BLDG. FOR MRS. AIDA MOH'D BPTC 24 W-24/02 40 500 5.10 SEREX INTERNATIONAL AL JADWAL GEN. MAR. '97
W/O MOH'D ASSAYAN MATER AL MANSOURY CONSULTANTS CONT. CO.
860(548) BLDG.FOR MR.SAEED ALI SABER BPTC C-14 E-28 80 600 6.00 UAE INTERNATIONAL AL FADA CONT. & MAR. '97
ALI AL MAZROUIE & SONS GEN. MAINT. EST.
861(549) BLDG. FOR MR. ALI MOH'D BPTC C-104 E-20/01 73 600 12.00 GOLDEN PLANNERS AL SAFA GEN. CONT. APR.'97
SULTAN KAABOUS AL ZAABI CONSULTANTS EST.
862(550) VILLA FOR MR. ABDULLA SAEED CFA 11 W-28 40 500 4.00 HEBERGER ENGINEERING HOUSSING AFFAIRS MAR. '97
AL BADI CONSULTING ENGINEERS GROUP

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 30 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
863(551) GRAND MOSQUE FOR H.H. SH. CFA 28 600 13.50 RIZZANI DE ECCHER READY MIX BETON FEB.'97
ZAYED BIN SULTAN THE SECOND ABU DHABI
864(552)A 5 VILLAS FOR MR. MOHAMMAD CFA 127 E-4/02 139 600 8.00 RIZZANI DE ECCHER AL HUSSAIN GEN. MAR. '97
ABDULLAH HUSSEIN KHOURY 128 ARCH.&ENGINEERING CONT. EST.
864(552)B 3 VILLAS FOR MR. ABDUL RAHIM CFA 126 E-4/02 126 500 8.00 DEVELOPMENT GROUP AL HUSSAIN GEN. MAY '97
ABDULLAH HUSSEIN KHOURY ARCH.&ENGINEERING CONT. EST.
864(552)C MOSQUE FOR MR. YOUSEF CFA C-127A E-4/02 58 600 6.70 DEVELOPMENT GROUP AL HUSSAIN GEN. SEP.' 97
ABDULLAH HUSSEIN KHOURY C-127B ARCH.&ENGINEERING CONT. EST.
865(553) BLDG. FOR MR. HASSAN JUMA BPTC 87 ME-12 52 500 10.50 GOLDEN PLANNERS FAYROUZ GEN. CONT. JUN. '97
HASSAN AL ZAABI CONSULTANTS & MAINT. EST.
867(555) BLDG.FOR MR.ABDULLA KHADEM BPTC C-63 E-13 26 1000 11.30 AMIR CONSULTANTS ZAKUM CONTRACTING MAY '97
BIN BUTTI AL QUBAISY & SONS 40 900 ENGINEERING & REAL ESTATE
868(556) BLDG. FOR MR. SAEED JUMA BPTC 65 ME-12 56 500 10.50 GOLDEN PLANNERS FAYROUZ GEN. CONT. JUN. '97
HASSAN JUMA AL ZAABI CONSULTANTS & MAINT. EST.
869(557) BLDG. FOR MR. YOUSUF JUMA BPTC 66 ME-12 56 500 10.50 GOLDEN PLANNERS FAYROUZ GEN. CONT. MAY '97
HASSAN JUMA AL ZAABI CONSULTANTS & MAINT. EST.
870(558) IRRIGATION, RESERVOIR & CONTRACT # 152/5 SHORING WORKS ACER/JOHN TAYLOR INDUST. & ENG. APR.'97
PUMPING STATION BY USING H-BEAMS CONS. ENGINEERS ENTERPRISES CO.
873(561) IRRIGATION, RESERVOIR & CONTRACT # 152/5 SHORING WORKS ACER/JOHN TAYLOR INDUST. & ENG. APR.'97
PUMPING STATION BY USING H-BEAMS CONS. ENGINEERS ENTERPRISES CO.
874(562) EXTENSION & ALTERATIONS CFA 23 500 11.70 INTERGULF GEN. APR.'97
TO TWH-07-ADDCAP-MUSSAFAH SUPPLY BASE CONT.
875(563) BLDG. FOR HEIRS OF LATE BPTC 61 E-9 38 600 10.80 INTERNATIONAL AL MAHABA CONT. MAY '97
MR SALEM SAIF KARONA AL SUWEIDI ENGINEERING CENTER EST.
JUL. '97
876(564) BLDG. FOR DAUGHTERS OF BPTC C-1 E-12 56 1100 9.60 AL SALAAM CONSULTING TARGET ENGINEERING
MR. ISSA SAEED AL KHAILY 48 900 9.60 ACRCH. ENGINEERS CONSTRUCTION CO.
NOV. '97
877(565) IRRIGATION, RESERVOIR & CONTRACT # 152/5 SHORING WORKS ACER/JOHN TAYLOR INDUST. & ENG.
PUMPING STATION BY USING H-BEAMS CONS. ENGINEERS ENTERPRISES CO.
878(566) BLDG.FOR MR.MOH'D&ABDULLA C-20 E-14 80 900 8.70 CENTER POINT GULF TIGER CONT. SEP. '97
BPTC
SONS OF KHAMIS AL QUBAISI ARCHITECTURAL ENG. CO.
880(568) BLDG. FOR MR. RASHID BIN C-10 E-13 64 900 9.00 DEWAN ARCHITECTS DHAFRA INT'L JUL. '97
BPTC
MOHAMED AL NUEIMI & ENGINEERS PROJECTS GROUP

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 31 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
881(569) VILLA FOR MR. AHMED SAEED 12A S-20 111 600 16.10 AL MEEDAN AL FADA CONT. & JUL. '97
CFA
MOH'D AL RASHIDI CONSULTANTS GEN. MAINT. EST.
884(572) EXTRACTION OF H BEAMS AT BLDG. 17 E-6 SHORING WORKS BIN BROOK GEN. JUN. '97
FOR MR.KENISH KHALIFA AL QUBAISY BY USING H-BEAMS CONTRACTING
885(573) BLDG. FOR NATIONAL BANK OF 87 M-2 53 500 10.80 DESIGN & CONSTRUCTION AL QANTARA GEN. JUL. '97
CFA
ABU DHABI (MUSSAFAH BRANCH) ENGINEERING CONT. CO.
886(574) BLDG. FOR NATIONAL BANK OF 13 W-47 50 500 6.40 DESIGN & CONSTRUCTION AL QANTARA GEN. JUL. '97
CFA
ABU DHABI (ARABIAN GULF BRANCH) ENGINEERING CONT. CO.
887(575) SILOS FOR M/S READY MIX CFA B-239 AL-QUOZ 8 500 5.70 READY MIX BETON JUNE '97
BETON DUBAI DUBAI
888(576) EXTRACTION OF H BEAMS FOR BLDG. 9 W-13 SHORING WORKS BIN BROOK GEN. JUNE '97
OF MR. ALI ABDULLA HUMAID AL RUMAITHY BY USING H-BEAMS CONTRACTING
889(577) BLDG. FOR MR. SAIF BIN RAHMA BPTC C-100 E-20/01 76 600 7.50 GOLDEN PLANNERS SHAYA AL MAZROUIE JULY '97
AL SHAMSI CONSULTANTS GEN. CONT. CO.
890(578) ABU DHABI SEWERAGE SCHEME SHORING WORKS ACER/JOHN TAYLOR INDUST. & ENG. JULY '97
COFFERDAMS FOR VALVE CHAMBERS BY USING H-BEAMS CONS. ENGINEERS ENTERPRISES CO.
891(579) NEW COMMERCIAL BUILDING BPTC C-04 S-20 61 600 15.50 ALKHEALI & ALAMERI AL GHAFLY GEN. OCT '97
FOR TOWN PLANNING DEPT. CONS. ENGINEERS CONT.
892(580) 120 M HIGH RADIO TOWERS BPTC 24 1000 20.00 EWBANK PREECE TIME ELECTRO JUNE '97
FOR ETISALAT AT 6 ISLANDS(SYR ABU NAYAR, AL YASAT, MUBARRAS, SYR BANIYAS, RAFIQ & GHASA ISLANDS) LIMITED CONTRACTING CO.
893(581) BLDG. FOR M/S READY MIX CFA B-239 AL-QUOZ 8 500 5.70 READY MIX BETON JULY '97
BETON DUBAI DUBAI
894(582) WATER & ELECTRICITY DEPT. CFA 9.00 TARGET ENGINEERING JUNE '97
HEAD OFFICE CONSTRUCTION CO.
896(584) BLDG. FOR MR. BUTTI SALEM BPTC C-43 E-16 69 900 8.40 AL SUWEIDI ENGINEERING MODERN DEVELOPMEN OCT '97
AL QUBAISI & SONS CONSULTANTS BUREAU GEN. CONT. CO.
897(585) NEW COMMERCIAL BUILDING BPTC C-03 S-20 61 600 15.30 ALKHEALI & ALAMERI AL GHAFLY GEN. OCT '97
FOR TOWN PLANNING DEPT. CONS. ENGINEERS CONT.
898(586) SHOW ROOM FOR Dr. MANE BIN CFA 63 UM AL 163 500 14.00 ARCHITECTURE & ARABIAN CONSTRUCTIO NOV. '97
SAEED AL OTAIBA NAR CONS. GROUP (ACG) CO.
899(587) NEW COMMERCIAL BUILDING BPTC C-05 S-20 61 600 15.50 ALKHEALI & ALAMERI AL GHAFLY GEN. OCT '97
FOR TOWN PLANNING DEPT. CONS. ENGINEERS CONT.
900(588) NEW COMMERCIAL BUILDING BPTC C-08 S-20 61 600 15.50 ALKHEALI & ALAMERI AL GHAFLY GEN. OCT '97
FOR TOWN PLANNING DEPT. CONS. ENGINEERS CONT.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 32 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
901(589) NEW COMMERCIAL BUILDING BPTC C-09 S-20 61 600 15.50 ALKHEALI & ALAMERI AL GHAFLY GEN. OCT '97
FOR TOWN PLANNING DEPT. CONS. ENGINEERS CONT.
902(590) NEW COMMERCIAL BUILDING BPTC C-10 S-20 61 600 15.50 ALKHEALI & ALAMERI AL GHAFLY GEN. NOV. '97
FOR TOWN PLANNING DEPT. CONS. ENGINEERS CONT.
903(591) NEW COMMERCIAL BUILDING BPTC C-02 S-18 61 600 15.50 ALKHEALI & ALAMERI AL GHAFLY GEN. NOV. '97
FOR TOWN PLANNING DEPT. CONS. ENGINEERS CONT.
904(592) BLDG. FOR MR. MOH'D ABDULLA BPTC C-49 E-14 89 900 13.40 AL SUWEIDI ENGINEERING AL GHAFLY GEN. SEP. '97
SALEH AL SUWEIDI CONSULTANTS BUREAU CONT.
905(593) BLDG. FOR H.H. SHEIKH OMAR BPTC C-34 W-8 109 900 9.50 DAR AL KHALEEJ EMIRATES LINK NOV. '97
BIN ZAYED BIN SULTAN AL NAHYAN ENG. CONSULTANTS MALTAURO GEN.CONT. CO.
906(594) NEW COMMERCIAL BUILDING BPTC C-07 S-18 61 600 15.50 ALKHEALI & ALAMERI AL GHAFLY GEN. DEC. '97
FOR TOWN PLANNING DEPT. CONS. ENGINEERS CONT.
907(595) NEW COMMERCIAL BUILDING BPTC C-08 S-18 61 600 15.50 ALKHEALI & ALAMERI AL GHAFLY GEN. DEC. '97
FOR TOWN PLANNING DEPT. CONS. ENGINEERS CONT.
908(596) NEW COMMERCIAL BUILDING BPTC C-03 S-18 61 600 16.00 ALKHEALI & ALAMERI AL GHAFLY GEN. NOV. '97
FOR TOWN PLANNING DEPT. CONS. ENGINEERS CONT.
909(597) NEW COMMERCIAL BUILDING BPTC C-04 S-18 61 600 15.50 ALKHEALI & ALAMERI AL GHAFLY GEN. NOV. '97
FOR TOWN PLANNING DEPT. CONS. ENGINEERS CONT.
910(598) BLDG. FOR MR. MOH'D SULTAN C-8 W-7/01 SHORING WORKS ARDENT CONSULTING TARIQ CONT. & GEN. NOV. '97
AL DARMAKI BY USING H-BEAMS OFFICE MAINT. CO.
911(599) BLDG. FOR MR. HILAL SAEED BPTC C-176 E-4/01 48 750 10.00 ENG ADNAN SAFARINI AL FADA CONT. & NOV. '97
MOH'D AL BADI AL DHAHIRI CONSULTANT GEN. MAINT. EST.
912(600) BLDG. FOR MR. SAEED OBAID BPTC C-130 E-20/01 55 600 11.00 ANTOINE AL RASHEED JAN. '98
YAHYA HELAL & PARTNERS GEN. CONT. CO.
913(601) SSR TOWERS FOR ETISALAT BPTC (Tower No. 5059 4 900 16.00 EWBANK PREECE TOWER & POWER OCT. '97
CONTRACT NO. 149/H/94/TEC at Huzaiwa) LIMITED
914(602) BLDG. FOR MR. BAKHIT RASHEED BPTC C-08 E-18/03 52 750 7.50 AL SUWEIDI ENGINEERING HASHAD CONT. & DEC. '97
SALEM AL MANSOURI CONSULTANTS BUREAU GEN. MAINT.
915(603) SSR TOWERS FOR ETISALAT BPTC (Tower No. 263 4 900 16.00 EWBANK PREECE TOWER & POWER NOV. '97
CONTRACT NO. 149/H/94/TEC at Jumba) LIMITED
916(604) ABU DHABI SEWERAGE SCHEME SHORING WORKS ACER/JOHN TAYLOR INDUST. & ENG. DEC. '97
CONTRACT NO. 152/5 (LOCATION : R 8/2) BY USING H-BEAMS CONS. ENGINEERS ENTERPRISES CO.
917(605) VILLA FOR SONS OF MR. KHAMIS BPTC 55 E-38 35 500 6.20 ISLAMIC HERITAGE AL MOHAMADIAH DEC. '97
YOUSEF AL MALKI ARCHITECTS GEN. CONT. CO.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 33 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
918(606) BLDG. FOR MR. KHALIFA AHMED BPTC C-44 E-20/01 49 600 11.00 NATIONAL CONCORD AL RASHEED DEC. '97
KHALIFA AL QUMZI & SONS CONSULTANT & ENGR. GEN. CONT. CO.
919(607) ADDITIONAL OFFICES BUILDING BPTC M-1 32 500 13.50 PUBLIC WORKS AL SALSABEEL BLDG. DEC. '97
FOR W.E.D. DEPARTMENT MAINT. & GEN. CONT.
920(608) SELF SUPPORTING RADIO TOWER BPTC (Tower No. 393 4 800 11.00 EWBANK PREECE TOWER & POWER JAN. '98
FOR ETISALAT at Al Remah- East, Al Ain) LIMITED
921(609) BLDG. FOR MR. KHALFAN SALEM BPTC C-86 E-18/02 59 600 9.50 JORDAN CONSULTANTS AL RASHEED JAN. '98
& MOH'D SALEM AL MUHAIRBI C-87 GEN. CONT. CO.
922(610) BLDG. FOR MS. AL ANOUD BPTC C-52 E-3 16 900 10.50 SASCO CONSULTANTS ZAKUM CONT. & FEB '98
KHALIFA AL MUHAIRI 34 600 10.50 REAL ESTATE
923(611) PROPOSED SELF SUPPORTING BPTC Tower No.5083 - Salmah Exchange 10.20 EWBANK PREECE TOWER & POWER JAN. '98
RADIO TOWER FOR ETISALAT Tower No.5090 -Muhadab Exchange LIMITED
925(613) SHORING WORKS BY USING H-BEAMS AL ITTIMAD JUNE '98
FOUNDATIONS
926(614) BUILDING FOR MR SAIF BPTC C-17 E-16 86 750 8.50 DAR AL KHALEEJ AL GHAFLY GEN. MAR. '98
MUBARAK AL RIAMI ENG. CONSULTANTS CONT.
927(615A) 11 kv SUB STATION FOR WED CFA M-34 77 500 11.55 KENNEDY DONKIN LAING ABU DHABI JUNE '98
& BOUNDARY WALL 600 (TRANS ELECTRO)
927(615B) 11 kv SUB STATION FOR WED CFA ME-12 88 500 11.50 KENNEDY DONKIN LAING ABU DHABI JULY '98
& BOUNDARY WALL 600 (TRANS ELECTRO)
927(615C) 11 kv SUB STATION FOR WED CFA MW-5 84 500 16.50 KENNEDY DONKIN LAING ABU DHABI JUNE '98
& BOUNDARY WALL 600 (TRANS ELECTRO)
928(616) CONTRACT NO. 152/5 SHORING WORKS ACER/JOHN TAYLOR INDUST. & ENG. MAY.'98
BY USING H-BEAMS CONS. ENGINEERS ENTERPRISES CO.
929(617) VILLA FOR MR OMAR ATIQ CFA 52 E-38 46 500 9.00 AL BURJ ENGINEERING GULF CONT. MAR. '98
KHADEM FADEL AL MUHAIRBI CONSULTANTS
930(618) VILLA FOR MR MANSOUR ABDUL CFA 230 E-41 14 500 10.00 MAHMOUD AL RAMAHI AL SAYEGH GEN. MAY.'98
JABBAR AL SAYEGH ENG. CONSULTANTS CONT. CO
932(620) CONCRETE REPAIRS WORKS AT MICRO PILE RUWAIS 150 12.20 MOTT Mc DONALD TARGET ENGINEERING MAY.'98
HIGH TENSION TOWER MICRO PILES CONSTRUCTION CO.
933(621) IRRIGATION, RESERVOIR & CONTRACT # 152/5 R-8 ACER/JOHN TAYLOR INDUST. & ENG. MAY.'98
PUMPING STATION SHORING WORKS BY USING H-BEAMS CONS. ENGINEERS ENTERPRISES CO.
934(622) BUILDING FOR H H SHEIKH SAEED BIN BPTC C-203 E-4/01 56 900 12.50 AL SALAAM BIN HARMAL CONT. & SEP. '98
THANOON AL NAHYAN CONSULTANTS IRRIG. EST.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 34 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
935(623) BUILDING FOR MR MOHAMAD BPTC C-53 E-20/01 58 600 11.00 AMIR M H CONSULTANTS AL MOHAMADIAH GEN. OCT. '98
HAMEED KHAMIS AL SWEDY & SONS ENGINEERING CONT. CO. L.L.C
936(624) SHORING WORKS BY USING H-BEAMS ARIF AL MUTAWAH DEC. '98
GEN. CONT.
937(625) SHORING WORKS BY USING H-BEAMS EMIRATES STROMEK DEC. '98
FOR FOUNDATION
938(626) VILLA FOR SALEM AL SARAYA CFA 4-A W-11 18 500 13.50 ARCHITECTURAL & AL MAHABA CONT. EST SEP. '98
ENG. CONSULTANTS
939(627) PRIESTS HOUSE EXTENSION FOR CFA 75 W-24/02 15 500 7.00 ARCHITECTURAL & AL MAHABA CONT. EST JUNE '98
ST. ANDREW'S CHURCH ENG. CONSULTANTS
942(630) VILLA EXTENSION FOR MR ABDUL CFA C-36 S-22 13 450 14.20 ARCHITECTURAL & PROFESSIONAL MAY '98
RAHIM AL MAHMOOD PLANNING GROUP BUILDERS
943(631) SHORING WORK BY USING H-BEAMS TARGET ENGINEERING JUNE '98
CONSTRUCTION CO.
946(634) TOWER CRANE FOUNDATION FOR BPTC C-52 E-19 4 600 10.00 AL TORATH SOLID CONSTRUCTION JULY '98
H H SHEIKH ZAYED AL NAHYAN CONSULTING ENG. CO.
951(639) SHORING WORKS BY USING H-BEAMS AMITEX EMIRATES JULY '98
ABU DHABI
953(641) SHORING WORKS BY USING H-BEAMS SWISS BORING JULY '98
(RODIO GROUP), DUBAI
954(642) SHORING WORKS BY USING H-BEAMS AMITEX EMIRATES JAN. '99
ABU DHABI
956(644) SSR TOWERS FOR ETISALAT BPPC SAWAH ISLAND 4 900 7.00 DIRECTORATE OF TIME ELECTRO CONT. C FEB. '99
CONTRACT NO. 86H/97 & 9H/97 MILITARY WORKS
961(649) BUILDING FOR MR AHMED BIN HAMID BIN BPTC C-22 E-15 69 900 8.00 ADAM BUREAU FOR OBAID BIN RASHID GEN FEB. '99
AMHI AL MANSOURY DESIGN & ENG. CONS. CONT. CO
962(650) BUILDING FOR MR AHMED BIN HAMID BIN C-22 E-15 SHORING WORKS ADAM BUREAU FOR OBAID BIN RASHID GEN FEB. '99
AMHI AL MANSOURY USING H-BEAMS DESIGN & ENG. CONS. CONT. CO
963(651) BUILDING FOR MR AMHI BIN HAMID BIN BPTC C-23 E-15 69 900 7.50 ADAM BUREAU FOR OBAID BIN RASHID GEN DEC. '98
AMHI AL MANSOURY DESIGN & ENG. CONS. CONT. CO
964(652) BUILDING FOR MR AMHI BIN HAMID BIN C-23 E-15 SHORING WORKS ADAM BUREAU FOR OBAID BIN RASHID GEN DEC. '98
AMHI AL MANSOURY USING H-BEAMS DESIGN & ENG. CONS. CONT. CO
971(659) SHORING WORKS BY USING H-BEAMS (EQUIPMENT HIRE) DUTCH FOUNDATION MAR. '99

ABU DHABI

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 35 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
974(662) BUILDING FOR SUHAIL HILAL RASHID BPTC C-25 E-10 100 900 9.00 DAR AL KHALEEJ SUHAIL AL MAZROUI NOV. '98
AL MAZROUI ENG. CONSULTANTS CONT. CO

980(668) COMERCIAL BUILDING FOR MR SAID BPTC C-39 E-4/01 84 900 12.00 AL MASOUDI OBAID BIN RASHID GEN MAR. '99
MOH'D HILAL AL DHAHARY CONSULTANT ENGINEERS CONT. EST.
984(672) BUILDING FOR MR MUBARAK BPTC C-41 E-19 66 900 9.00 SYRCONSULT MODERN DEVELOPMEN NOV. '98
AKHOU SHEEMAH AL MUREIKI CONSULTING ENGINEERS CONT. CO. L.L.C
986(674) SHORING WORKS BY USING H-BEAMS AMITEX EMIRATES NOV. '98

ABU DHABI
SSR TOWERS FOR ETISALAT BPTC 800 EWBANK PREECE LTD. TIME ELECTRO CONT. C JAN. '99
CONTRACT NO. 86H/97 (DHAFRA AIR BASE, MUQATRA & THAMAMA HABSHON )
987(675)
SSR TOWERS FOR ETISALAT 900 E. C. G. TIME ELECTRO CONT. C JAN. '99
CONTRACT NO. 9H/97 (MUNIEF GAYATHI, GAYATHI WEST & BIDA AL MUTAWAH)
988(676) SHORING WORKS BY USING H-BEAMS AMITEX EMIRATES SEPT. '98
ABU DHABI
989(677) ABU DHABI SEWERAGE SCHEME SHORING WORKS ACER/JOHN TAYLOR INDUST. & ENG. OCT. '98
CONTRACT NO. 152/5 (LOCATION : R 8/2) BY USING H-BEAMS CONS. ENGINEERS ENTERPRISES CO.
990(678) ABU DHABI SEWERAGE SCHEME SHORING WORKS ACER/JOHN TAYLOR INDUST. & ENG. OCT. '98
CONTRACT NO. 152/5 (LOCATION : R 8/2) BY USING H-BEAMS CONS. ENGINEERS ENTERPRISES CO.
991(679) VILLAS FOR H H SHEIKH MOH'D BIN BPTC 45 & 46 W-7/01 80 500 9.00 ENG ADNAN SAFARINI OLEN HOME, U.A.E. MAR. '99
KHALIFA BIN ZAYED AL NAHYAN
992(680) SSR TOWERS FOR ETISALAT BPTC 800 EWBANK PREECE LTD. TIME ELECTRO CONT. C NOV. '98
CONTRACT NO. 86H/97 (AL RAHBA, AL REEF & IDHEN MANAMA )
996(684) SHORING WORKS BY USING H-BEAMS DUTCH FOUNDATIONS NOV. '98
ABU DHABI
997(685) SHORING WORKS BY USING H-BEAMS AMITEX EMIRATES OCT. '98
ABU DHABI
998(686) SHORING WORKS BY USING H-BEAMS INCO NOV. '98
1003(691) 10 NOS. LOWCOST HOUSES AT BPTC 91-100 BUKREYA 1020 450 8 & 10 AL HOSN CONSULTANT CATIC-THE CHINESE CO JUNE '99
BUKREYA, AL AIN
1004(692) 5 NO. LOW COST HOUSES AT BPTC 31 & BUKREYA 510 450 8 & 10 AL HOSN CONSULTANT CATIC-THE CHINESE CO AUG.'99
BUKREYA, AL AIN 37-40
1005(693) BUILDING FOR SAIF BIN MOH'D AL SHORING WORKS ISLAMIC ARCHITECTS AL SALMEIN GEN. CONT SEPT.'99
SALMEEN AL MANSOURY C-18 E-15 BY USING H-BEAMS EST.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 36 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
1009(697) BLDG.FOR H.E.SHEIKH MOHAMMED BPTC C-26 E-19 23 750 9.00 GOLDEN PLANNERS AL GHAFLY GEN. CONT SEPT.'99
BIN BUTTI AL HAMED 38 900 W.L.L.
1010(698) BLDG.FOR H.E.SHEIKH MOHAMMED BPTC C-28 E-19 23 750 9.00 GOLDEN PLANNERS AL GHAFLY GEN. CONT OCT.'99
BIN BUTTI AL HAMED 38 900 W.L.L.
1016(704) VILLA FOR MR ATIQ MATAR AL BPTC 37 S-17 9 500 13.00 EMIRATES CONSULTANTS AL MAHABA CONT. NOV.'99
QUBEISI GROUP
1017(705) VILLA FOR MR KHALFAN FARAJ AL BPTC 20B W-21 64 500 5.55 AL BAYAN ENGG AL NABAH GEN. CONT.E NOV.'99
MOHAIRBY CONSULTANT
1019(707) VILLA EXTENSION FOR MR ATIQ BPTC 37 S-17 14 500 13.00 EMIRATES CONSULTANTS AL MAHABA CONT. NOV.'99
MATAR AL QUBEISI GROUP
1026(714) PRIVATE VILLA FOR DR ABDULLA AL BPTC C-67 & W-15/1 144 500 4.90 SYRCONSULT ARABIAN CONTRACTING FEB.'2000
NOWAIS 68 ACHIEVEMENT
1029(717) DRILLING AND INSTALLATION OF 6 NOS. BPTC MINA 6 600 6.50 A.D.D. THE ARAB MAR.'2000
PERMANENT CASING ZAYED CONTRACTORS
1031(719) VILLA FOR MRS AWSHA ABDULLA BPTC 72 E-48 33 500 5.00 AJMAN CONSULTING AL MAHABA CONT. EST MAR.'2000
MAATHAD AL MAZROUI BUREAU
1035(723) MAIN VILLA + 3 VILLAS FOR HH SH.SAIF BPTC C-102 W-16 230 500 6.25 SYRCONSULT DARWISH ENGINEERING MAY.'2000
BIN ZAYED AL NAHYAN & 103
1037(725) PARKING STRUCTURE,CONTRACT (173 NO. H-BEAMS EXTRACTION) BM ENGINEERING & MAR.'2000
NO.66C - EXTRACTION OF H-BEAMS CONSTRUCTION CO LTD
1039(727) VILLA EXTENSION (MAJLIS) FOR BPTC 20-B S-20 8 500 15.50 BEIRUT CONSULTING NABIL GENERAL CONT. MAR.'2000
MR ABDULLA AL AHBABI GROUP CO.
1040(728) AL NAJEM MOSQUE BPTC W-46/02 130 500 10.00 BELGIAN ARAB DARWISH CONTRACTIN MAY.'2000
CONSULTING BUREAU EST.
1041(729) VILLA FOR MR KHALID BIN ABDULLAH BPTC 77 SE-36 39 500 12.00 AMIR M.H. CONSULTANT ARMITAGE ENGINEERIN APR.'2000
ATIAH ENGINEERING CO. LLC.
1043(731) EXTENSION TO AL WOROOD SCHOOL BPTC 24 & E-40 71 600 12.00 TAYEB ENGINEERING ARABIAN CONT. ACHIEV APR.'2000
25 MENT
1044(732) MR JASIM MOHD AL RAQRAQI AL BPTC 119 W-18/01 55 500 6.00 SAHIL ENGINEERING AL RASHEED GEN.CONT MAY.'2000
MAZROUI VILLA EST.
1045(733) MR ABDULLAH MAHMOOD HEMEIDAN BPTC 111 E-21 60 500 6.50 AJMAN CONSULTING FIRDOUS GEN. CONT.ES JUN.'2000
VILLA BUREAU
1046(734) MR ABDULLAH MAHMOOD HEMEIDAN 111 E-21 SHORING WORKS AJMAN CONSULTING FIRDOUS GEN. CONT. E JUN.'2000
VILLA BY USING H-BEAMS BUREAU

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 37 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
1048(736) ABU DHABI ROUQUIYA PRIMARY BPTC 36 E-22/02 695 500 8.30 CONTINENTAL AL SAA GEN. CONT. JUN.'2000
SCHOOL FOR GIRLS 450 ENGG.CONSULTANTS EST.
1050(738) COMM.BLDG. FOR MR SAEED BIN SH C-13 W-13 SHORING WORKS SAYED KHALLAF SEIDCO GEN. CONT. CO JUN.'2000
DHAEN MUBARAK AL MANSOURY BY USING H-BEAMS CONSULTING ENGINEERS
1051(739) COMM.BLDG. FOR MR SAEED BIN BPTC C-13 W-13 61 900 9.80 SAYED KHALLAF SEIDCO GEN. CONT. CO JUL.'2000
DHAEN MUBARAK AL MANSOURY CONSULTING ENGINEERS
1053(741) VILLA FOR MR MOHD.NADIR BPTC 171 E-41 22 500 12.00 MAHMOOD AL RAMAHI AL RASHEED GEN. CON JUL.'2000
SALHOOM AL QUBAISI ENGINEERING CONSULTANEST.
1055(743) THEATER FOR AL BUTEEN WOMEN BPTC 19 W-17/01 166 600 9.00 ABU DHABI MUNICIPALITY AL RASHEED GEN. CON OCT.'2000
SOCIETY & TOWN PLANNG DEPTT. EST.
1056(744) VILLA FOR MRS AL AMAL BENT AL BPTC 34 E-31 78 500 8.00 ALIA ENGINEERING GULF CONTRACTING C SEPT.'2000
ABED CONSULTANCY
1058(746) COMM.BLDG. FOR MR ABDULLAH SH C-22 W-24/2 SHORING WORKS ARDENT CONSULTING CIVILCO ENGINEERING SEPT.'2000
AMEEN AL AWADHI BY USING H-BEAMS OFFICE CONT.
1059(747) COMM.BLDG. FOR MR ABDULLAH BPTC C-22 W-24/2 59 600 4.90 ARDENT CONSULTING CIVILCO ENGINEERING OCT.'2000
AMEEN AL AWADHI OFFICE CONT.
1060(748) ADNOC FOD FILLING STATION NO.926 SH C-68 E-4/02 SHORING WORKS PETER HUDSON BUCKLE EASTERN LTD, AUG.'2000
AT BANIYAS ROAD ABU DHABI BY USING H-BEAMS SHARJAH
1061(749) VILLA FOR MR. ABDULLH MOHD. SH 22 E-21 SHORING WORKS ARAB CONSULTANT GULF TIGER AUG.'2000
AL-MULLA BY USING H-BEAMS CONTRACTING CO.
1062(750) VILLA FOR HEIRS OF ABU BAKER BPTC 34A E-21 17 500 6.50 AJMAN CONSULTING IBN AL WALEED GEN. SEPT.'2000
SALEM NOMAN BUREAU CONT.
1063(751) SHORING WORKS BY USING H-BEAMS AMITEX EMIRATES SEPT.'2000

1064(752) VILLA FOR MR MUBARAK RASHED BPTC 15/A S-20 75 500 & 16.25 SAYED KHALLAF AL GHAFLY GEN. CONT NOV.'2000
SALIM AL GHAFLY 600 CONSULTING ENGINEERS
1065(753) LIGHT POLES FOR NEW FISH & BPTC BIDAA 50 900 3.00 PLANAR AL GHAFLY GEN. CONT NOV.'2000
VEGETABLE MARKET ZAYED
1066(754) MOSQUE FOR HEIRS OF LATE BPTC MUSSAFAH-11 32 450 9.35 BEIRUT CONSULTING NABIL GEN. CONT. CO. SEPT.'2000
RASHED SAEED HELAL AL QUBAISI GROUP
1068(756) SHORING WORKS BY USING H-BEAMS AMITEX EMIRATES OCT.'2000

1069(757) 22 VILLAS FOR H.H. SH. HAMDAN BPTC C-128 W-15/1 297 500 6.00 AL MEEDAN COMMODORE NOV.'2000
BIN ZAYED AL NAHYAN 56 600 CONSULTANT CONT. CO.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 38 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
1072(760) COMM. BLDG. FOR MR NASSER BIN BPTC C-28 E-18 46 900 9.50 AL AMARA AL ZAKUM CONT. & MAR.'2001
ALI BIN SUROUR SHARQUIA REAL ESTATE
1074(762) VILLA FOR MR ALI KHALFAN AL BPTC 34 ME-13 18 500 16.00 AL BALADI AL MUNEM CONT. NOV.'2000
DHAHIRI CONSULTANT & GEN. MAINT. CO.
1075(763) SHORING WORKS BY USING H-BEAMS AMITEX EMIRATES. NOV.'2000

1076(764) PROPOSED 3 BUILDINGS FOR H.H. SHK. BPTC C-111 E-11 86 750 7.00 ADNAN SAFARINI COMMODORE CONT.CO DEC.'2000
ZAYED BIN SULTAN AL NAHYAN C-112 36 600
C-113 67 500
1078(766) ABU DHABI INDUSTRIAL CITY - BPTC MUSSAFAH 1446 500 8.50 W.S. ATKINS & PARTNERS AL GHAFLY GEN. CONT MAR.'2001
CONTRACT NO.2. STUDIO APART- 57 450
MENT (BLOCK-12), CENTRAL
SERVICE BUILDING & SHADES FOR
PARKING PASSAGES.
1079(767) ADDITIONS TO THE EXISTING VILLA BPTC 6 W-30 21 500 8.00 ARCHITECTURAL & AL MAHABA CONT. JAN.'2001
H.H. SHK. HAMAD BIN TAHNOON ENGG. CONSULTANT EST.
AL NAHYAN
1081(769) SHORING WORKS BY USING H-BEAMS ITALIAN FOUNDATION JAN.'2001

1082(770) COMM.BLDG. FOR AHMAD SADDIQ BPTC C-82 E-19/02 54 600 10.50 ASHARIJ ENGINEERING AL THARAWAT GEN. JAN.'2001
FATH AL KHAGA CONSULTANCY CONT. EST.
1083(771) SUPPLY & INSTALLATION OF ELEC. BPTC 12 600 6.00 HALCROW INTNL. TAMAS PROJECTS FEB.'2001
SUB-STATION -AD.INTNL.AIRPORT. PARTNERSHIP LLC.
1084(772) COMM.BUILDING FOR MR NASSER SH C-28 E-18 SHORING WORKS AL AMARA ZAKUM CONTRACTING FEB.'2001
BIN ALI BIN SUROUR BY USING H-BEAMS AL SHARQUIA & REAL ESTATE
1087(775) NATIONAL FODDER PRODUCTION BPTC 28 MUSSAFAH 249 450/600 12.00 DEWAN ARCHITECTS EMIRATES LINK MAY.'2001
& MARKETING - MUSSAFAH. & SH MALTAURO
1088(776) OFFICE BLDG. FOR MR OBEID BPTC 1 MW-1 216 600 9.00 TEAM CONSULTANT AL JABER TRANSPORT MAY.'2001
KHALIFA AL JABER MUSSAFAH & GEN. CONT. EST.
1090(778) RESIDENTIAL VILLA FOR MR TAHER BPTC 1 SE-36 55 500 12.75 AL AALI ENGG IBN AL WALEED CONT. AUG.'2001
MOH'D SALEH AL AMERI MUSSAFAH CONSULTANTS
1092(780) OFFICE BLDG. FOR AL JABER BPTC MW-1 113 600 13.38 LEAD ENGINEERING AL JABER TRANSPORT JUL.'2001
ENERGY SERVICES MUSSAFAH CONSULTANTS & GEN. CONT. EST.
1093(781) SHORING WORKS BY USING SH E-5 B.M. ENGINEERING & JUN.'2001
H-BEAMS CONSTRUCTION CO.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 39 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
1094(782) SHORING WORKS BY USING SH DUTCH FOUNDATION AUG.'2001
H-BEAMS
1095(783) ANNEXED VILLA FOR H.H. SHEIKHA BPTC 1 W-28/1 33 500 6.00 DEWAN ARCHITECTS GROUP 3 ENGINEERS AUG.'2001
HUSSA AL NAHYAN CONTRACTORS
1096(784) SHEIKH FAIZAL BIN SULTAN AL BPTC MUSSAFAH 16 500 9.50 AL MAHABA AUG.'2001
QASSIMI, ABU DHABI RESIDENCE ROAD CONTRACTING EST.
1097(785) SHORING WORKS BY USING SH AMITEX EMIRATES AUG.'2001
H-BEAMS
1098(786) SHORING WORKS BY USING SH AMITEX EMIRATES AUG.'2001
H-BEAMS
1099(787) INSTALLATION OF PERMANENT PC THE PRIVATE DEPTT SEPT.'2001
STEEL CASING OF H.H. PRESIDENT
1102(790) VILLA FOR MR KHALFAN MOH'D CFA 49 SW-12 44 500 13.00 AL FIRAS ENGINEERING AL RASHEED GENERAL OCT.'2001
JERESH KHALFAN AL MARAR CONSULTANT CONTRACTING EST.
1103(791) VILLA FOR MR ALI KHALFAN AL BPTC 34 ME-13 7 500 15.00 AL BALADI MR ALI KHALFAN SEPT.'2001
DHAHIRI CONSULTANT AL DHAHIRI
1104(792) VILLA FOR H.H. SHAIKH SAEED MICRO W-30 10 150 8.00 AL MUNEM CO. OCT.'2001
BIN TAHNOON PILING
1106(794) VILLA FOR MR NABEEL ABDALLAH BPTC 111 SW-14 32 500 11.50 ADAM BUREAU PASCAL CONTRACTING NOV.'2001
AL SHAMARI & GENERAL MAINT.
1107(795) MOSQUE FOR MRS HADAYA BINT BPTC E-48 33 500 9.75 ARCHITECTURAL AL DARMAKI BUILDING DEC.'2001
SALEH AL SHAMSI DESIGNING & DECORATION& CONSTRUCTION EST.
1110(798) ABU DHABI INDUSTRIAL DIST. BPTC MUSSA- 76 500 12.00 WS ATKINS & AL SAHEL CONT CO. DEC.'2001
COOLING SCHEME MUSSAFAH FAH PARTNERS
1111(799) VILLA FOR MR AHMAD OMAR BPTC 35 SE-3 74 500 11.50 AMIRAL ARCHITECTS PALMYRA GEN. CONT. DEC.'2001
MOHAMAD BA MITREF & ENGINEERS
1113(801) VILLA FOR MR MOHAMMED SAEED CFA 43 SE-23 30 500 11.50 NATIONAL ENGG. AL ANDALOS GEN. DEC.'2001
MOHAMMED AL ZABI BUREAU CONT.
1115(803) VILLA FOR MR MOHAMMED BPTC 34 SW-13 47 500 13.50 AL AALI ENGINEERING IBN AL WALEED GEN. DEC.'2001
KHALFAN RASHED AL HAMELY CONSLTANTS CONT.
1118(806) VILLA FOR MR IBRAHIM GASSIM BPTC 11 SE-3 26 500 13.10 GOLDEN TOWER SALEH AL MAZROUI JAN.'2002
MOHAMED AL SHAEER CONSULTANTS GEN. CONT. EST.
1119(807) VILLA FOR MR ALI MOHAMMAD AL CFA 9 SE-2 30 500 11.50 GOLDEN TOWER GREEN STAR CONST.
MANSOURI CONSULTANT & GEN. MAINT.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 40 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
1120(808) AL RABEEH PRIVATE SCHOOL CFA P3 E-30 90 500 6.50 HANDASAT AL AMARA FAST ENGINEERING JAN.'2002
28 600 6.75 CONSULTANTS
1121(809) VILLA FOR MR ABDUL ALI SHUAN CFA 4 W-47 41 500 7.00 AL BAYAN ENGG. SALEH AL MAZROUI JAN.'2002
AL KABY CONSULTANT GEN. CONT. EST
1122(810) AL RAHA BEACH, ABU DHABI BPTC AL RAHA 267 750 -5.50 TEST - TECHNICAL AL HABTOOR ENGG FEB.'2002
SHOPPING MALL. STUDIES BUREAU ENTERPRISES CO
1123(811) DHT TOWER BPTC UMM-AL-NAR 8 1000 23.00 LEHMEYER TOWER & POWER JAN.'2002
INTERNATIONAL
1124(812) VILLA FOR MR SALEM SAEED CFA 29 SE-04 42 500 12.00 BAINONA ENGINEERING SAFARJAL CONT.CO. FEB.'2002
MOHAMMED AL HEJRI CONSULTING GROUP
1126(814) VILLAS FOR MR AHMAD SIDDIQ SH 97 W-18/02 SHORING WORK ARAB CONSULTANTS AL HUSSAIN GEN. FEB.'2002
KHOORI USING H-BEAMS CONT. CO.
1127(815) WEDDING & FUNCTION HALLS BPTC W-52 178 500 7.50 AL TORATH CONSULTING DHABI CONTRACTING MAR.'2002
TYPE (1) ENGINEERS
1129(817) SHORING WORK SH COLLAVINO GULF WLL. MAR.'2002
BY USING H-BEAMS
1131(819) VILLA FOR MR ALI MOHAMMAD BPTC 9 SE-11 35 500 11.00 AL WASITY BIN SA'ID GEN. CONT MAR.'2002
SABAH AL RUMAITHI CONSULTANT
1132(820) VILLA FOR MR MOHAMMED BPTC 46 SE-3 25 500 11.50 HANDASAT AL AMARA AL ANDALOS GEN CONT MAY'2002
MUBARAK MUGHAIR AL KHAILY EST
1133(821) BUILDING FOR MR KHALFAN AL BPTC C-43 E-8 87 900 11.50 CENTER POINT AL FAID GENERAL APR.'2002
SWEIDY CONTRACTING EST.
1135(823) ABU DHABI SHIP BUILDING SITE BPTC MUSSAFAH 148 600 11.85 HALCROW INTERNAT- AL HAMED DEVELOP-
EXPANSION CONTRACT. 2. 10 750 IONAL PARTNERSHIP MENT & CONSTRUCTION
1136(824) VILLA FOR MRS SAMYA MOHD BPTC 319 W-16 17 500 5.10 FUTURE ENGINEERING BIN SA'ID GEN. CONT APR.'2002
ISMAIL
1137(825) PLAXIT DRY MIX PLANT BPTC M-41 200 500 11.80 NATIONAL ENGINEERING SEDRA GEN. CONT. CO MAY.'2002
MUSSAFAH BUREAU
1138(826) SHORING WORK BY USING AMITEX EMIRATES APR.'2002
H-BEAMS
1139(827) AL RAHA BEACH RESORT, CHALET BPTC 91 500 12.00 TEST TECHNICAL AL JABER EST. MAY.'2002
RECEPTION HOUSE, CHALET NO.5 STUDIES BUREAU
1140(828) BUILDING FOR HEIRS OF LATE SH 31 E-13 SHORING WORK AL SAHEL ENGG EMIRATES BELBADI MAY.'2002
NASSER BELHOL AL SWEIDI USING H-BEAMS CONSULTANTS CONT. CO. LTD.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 41 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
1141(829) VILLA FOR HE SULTAN BIN HILAL BPTC 2 W-67 110 500 12.20 ARCHITECTURAL AL HABTOOR ENGINEER JULY.'2002
AL QUBAISI 103 600 ENGG.CONSULTANTS. ENTERPRISES CO.
1142(830) BUILDING FOR HEIRS OF LATE BPTC 31 E-13 82 900 AL SAHEL ENGG EMIRATES BELBADI JUNE,'2002
NASSER BELHOL AL SWEIDI CONSULTANTS CONT. CO. LTD.
1143(831) GULF LIBRARY - MANUSCRIPTS SH C-15 W-58 SHORING WORK AL BURJ ENGINEERING AL FARA'A GEN. CONT. AUG.'2002
& STUDIES CENTER USING H-BEAMS CONSULT
1144(832) GULF LIBRARY - MANUSCRIPTS BPTC C-15 W-58 AL BURJ ENGINEERING AL FARA'A GEN. CONT. OCT.'2002
& STUDIES CENTER CONSULT
1145(833) SHORING WORK BY USING S & H ENGINEERING JUNE.'2002
H-BEAMS
1146(834) VILLA FOR MR YOUSEF AHMED BPTC 18 SE-26 43 500 11.25 AL SULTAN ENGG. AL MAHABA CONT.EST OCT.'2002
HASSAN JAFFER CONSULTANTS.
1147(835) VILLA FOR MR HILAL ALI KHALIFA BPTC 79A W-52 34 500 5.70 NATIONAL ENGG. BIN HAZEEM GEN. JUNE.'2002
AL QUBAISI BUREAU CONT.
1148(836) VILLA FOR MR ABDULLA KHAMIS AL BPTC 7&8 W-15/1 131 500 9.00 SYRCONSULT AL MEHREZI TRANSPOR SEPT.'2002
MEHREZI CONSULTING ENGNRS. & GEN. CONT. EST.
1149(837) NEW VILLA FOR MR ABDULLA KHAMIS SH 7&8 W-15/1 83 SYRCONSULT AL MEHREZI TRANSPOR JULY.'2002
AL MEHREZI CONSULTING ENGNRS. & GEN. CONT. EST.
1150(838) INTERNATIONAL TENNIES BPTC AL GHAFLY GEN JUNE.'2002
COMPLEX ZAYED SPORTS CITY CONT.
1151(839) ZAYED SPORTS CITY TO RECEIVE MP ABU DHABI TOWN GULF PIONEER GEN. SEPT.'2002
WORLD FOOTBALL CUP FINALS PLANNING DEPTT CONT.CO.
1152(840) VILLA FOR MR ABDUL KARIM AL BPTC 58 SE-5 61 500 11.20 SAYED KHALLAF WASITE GENERAL SEPT.'2002
QUBAISI CONS. ENGINEERS CONT. EST.
1153(841) EXTENSION OF VILLA FOR HH SHK BPTC AL BAHAR 60 600 9.10 AL FARA'A GENERAL JULY.'2002
MOHD BIN ZAYED AL NAHYAN PALACE CONT.CO.
1156(844) RES. COMPLEX FOR H.E. SHEIKH CFA AMIRAL CONSULTANT DHABI CONTRACTING OCT.'2002
SQER AL QASIMI
1157(845) VILLA FOR MR EAID MF KHALFAN ALIA ENGINEERING GULF CONTRACTING NOV.'2002
AL QUBAISI BPTC 31 EB-9 65 500 5.00 CONSULTANCY
1158(846) NEW IMAGE FILLING STATION EASTERN LTD. NOV.'2002
AT AL FALAH NO.921 ABU DHABI SHORING WORK BY USING H-BEAMS
1159(847) OFFICES & NEW WORKSHOP BPTC MUSSAFAH 134 500 13.25 NATIONAL ENGINEERING AL HASHEM MARBLE DEC.'2002
AT MUSSAFAH BUREAU CO.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 42 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
1161(849) RESIDENTIAL COMPLEX FOR CFA AL 258 600 8.25 AMIRAL ARCHITECTS CODE CONTRACTING DEC.'2002
H.H.SHK.HAMAD BIN MOHD AL SHARQEE BAHIA & ENGINEERS COMPANY
1162(850) VILLA FOR MR MOHD ABDULLAH BPTC 1 E-38 17 500 9.50 AJMAN CONSULTING AL MAHABA CONT. DEC.'2002
JAZEEM AL MAZROUI BUREAU
1163(851) VILLA FOR INHERITORS OF JAMEEA CFA 3B S-19 37 500 16.50 AL AMARA AL SHARKIA AL MAHABA CONT. NOV.'2002
SAEED AL KHUMEIRI EST.
1164(852) VILLA FOR MR SALEH MUBARAK CFA 26 SW-12 46 500 11.00 INTERNATIONAL BIN HAZEEM GEN. CONT DEC.'2002
AL DHAHERI STUDIES & CONS.GROUP
1165(853) ADDITIONAL VILLAS & SERVICE BPTC RAWDAT 490 600 9.00 AMIRAL CONSULTANTS EMIRATES BELBADI JAN.'2003
BLOCKS TO AL FALAH REST HOUSE AL REEF CONT. CO.
1166(854) VILLA FOR MR ESSA KHALFAN CFA 30 SE-3 64 500 12.50 ENG ADNAN SAFFARINI AL ANDALUS GEN. CON FEB.'2003
HURAIMEL
1167(855) VILLA & MAJLIS FOR SHEIKHA MARIAM CFA NEAR COAST 64 500 7.75 PRIVATE DEPARTMENT PACT GENERAL CONTR JAN.'2003
PALACE PALACE
1168(856) ABU DHABI TRADE CENTRE ( BEACH CFA ABU DHABI 113 500 9.00 CANSULT ARABIAN CONSTRUCTIO JAN.'2003
FRONT DEVELOPMENT ) TRADE CENTRE 600
CO.
1169(857) WEDDING & FUNCTION HALLS TYPE 1 BPTC BANIYAS 176 500 6.50 AL TORATH CONSULTING ZAKUM CONTRACTING MAR.'2003
BANIYAS AREA, ABU DHABI. AREA ENGINEERS & REAL ESTATE
1170(858) HEAD QUARTERS & NEW STORES FOR CFA MUSSAFAH 107 500 14.25 ARCHITECTURE & ENGG. AL MAHABA CONT. FEB.'2003
ADNIP CONSULTANTS.
1171(859) GUARD ADMINISTRATION BUILDINGS BPTC E-35 105 500 11.10 DAR AL HANDASH AL FARA'A GEN. CONT. CO.
164 500 11.00
1173(861) RES. VILLA FOR MR ABDUL RAHMAN MOHD CFA 87 E-31 60 500 5.00 NATIONAL ENGINEERING GULF CONTRACTING FEB.'2003
ABDULLA ABDUL BUREAU

1174(862) SHORING WORK BY USING H-BEAMS DUTCH FOUNDATION FEB.'2003


1175(863) MOSQUE FOR 200 WORSHIPPERS BPTC AL 95 500 10.50 THE ARAB OFFICE FOR AL GHAFLY GEN. CONT APRIL.'2003
AT AL SHAMKHA, ABU DHABI. SHAMKHA PLANNING & ARCHITECTURE
1176(864) RES.COMPLEX FOR H.E. SHEIKH SAQER CFA AL 66 500 4.50 AMIRAL CONSULTANT. DHABI CONTRACTING. MARCH.'2003
AL QASIMI - ADDITIONAL WORKS BAHYA
1177(865) VILLA FOR MR ABDULLA KHAMIS AL (SHORING WORK BY USING H-BEAMS) AL MEHREZI TRANSPOR MARCH.'2003
MEHREZI & GEN. CONT. EST.
1178(866) CICON EPOXY & STEEL CUTTING PLANT BPTC MUSSAFAH 220 500 12.00 NATIONAL ENGINEERING GULF ERECTION CO. APRIL.'2003
GEN.INDUSTRY CORPN. MUSSAFAH. BUREAU

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 43 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
1179(867) VILLA FOR MR ABDUL AZIZ HABIB OBAID CFA 42 SE-13 38 500 10.25 EMIRATES ENGINEERING PASCAL CONT. & GEN. APRIL.'2003
MISIEQIR CONSULTANCY MAINT.
1180(868) MOSQUE FOR 200 WORSHIPPERS BPTC 533/21 FALAH/ 95 500 10.50 THE ARAB OFFICE FOR AL GHAFLY GEN. CONT APRIL.'2003
AT FALAH/HEELIYAH HEELIYAH PLANNING & ARCHITECTURE
1181(869) RES. VILLA FOR MR SALEH HAMAD MOHD BPTC 91 W-46/01 39 500 5.00 EURO ENGINEERING AL BADER GEN. CONT. APRIL.'2003
AL MANSOURI CONSULTANCY
1182(870) RES. VILLA FOR MR SAEED AHMED MOH'D CFA 109 W-18/01 104 500 6.00 PARC INTERNATIONAL AL BADER GEN. CONT. MAY.'2003
DARI AL FALAHI
1183(871) SHIFTING OF CHILLER YARD & SUBSTATION ARCHITECTURAL & ENGG. AL FARA'A GEN. CONT. APRIL.'2003
H.H. BATEEN PALACE, ABU DHABI (SHORING WORK BY USING H-BEAMS) CONSULTANTS.
1185(873) PARKING STRUCTURE AT SECTOR E-3 (SHORING WORK BY USING H-BEAMS) AL MERAIKHI GEN. CON APRIL.'2003
ABU DHABI.
1186(874) COMM.BLDG.FOR HEIRS OF AL YAZIAH BPTC 76 E-18/02 75 750 9.00 DEWAN CONSULTANT AL MERAIKHI GEN.CONT.
BINT MUFTAH AL DHAHIRY
1187(875) GIRLS MODEL PRIMARY SCHOOL BPTC AL 548 600 12.00 INTERNATIONAL ENGG. AL GHAFLY GEN. CONT OCT. NOV.03
AT AL FALAH, ABU DHABI. FALAH 121 500 8.00 CENTER
1188(876) RES.VILLA FOR MR ABDUL AZIZ MOH'D CFA 95 SE-15 20 500 11.00 HANDASAT AL AMARA AL MAQAM GENERAL MAY.'2003
SHARIF ANOHI CONSULTANTS. CONT.
1189(877) PALACE BUILDING FOR H H SHEIKH FAHIM CFA RAK 148 600 15.00 DAR CONSULT AL KARMAL BLDG. CONT JUNE.'2003
BIN ABDULLAH
1190(878) RESIDENTIAL VILLA FOR MR SALIM AHMED BPTC 40 W-47 40 500 4.50 PARC INTERNATIONAL AL BADER GEN. CONT. JUNE.'2003
MOH'D DARI AL FALAHI
1194(882) PARKING STRUCTURE AT SECTOR E-3(PE3) AL MERAIKHI GENERAL JUNE.'2003
UNDERPASS NO. 13 (SHORING WORK BY USING H-BEAMS) CONT. EST.
1195(883) ZUBAIDA SCHOOL BPTC KHATIB & ALAMI AL MANSOURI 3B AUG.'2003
CONSTRUCTION
1196(884) MODEL SCHOOL (ADDITIONAL WORKS) BPTC 329-1 W-16 31 500 6.00 UNIVERSITY ENGG LOOTAH BUILDING & JULY,'2003
42 600 6.00 CONSULTANT OFFICE. CONSTRUCTION
1197(885) AL QUDS INTERMEDIATE MODEL SCHOOL BPTC W-11 600 7.85 KHATIB & ALAMI AL MANSOURI 3B AUG.'2003
FOR GIRLS 500 CONSTRUCTION
1198(886) RESIDENTIAL VILLA FOR HH SHK SUROOR BPTC 57 & 58 W-15/01 140 500 6.50 EMIRATES ENGINEERING ZAKUM CONT. & REAL JULY,'2003
BIN MOHD. AL NAHYAN CONSULTANCY GROUP ESTATE
1199(887) SHORING WORK BY USING H-BEAMS SH GENERAL CONSTRUCT JUNE.'2003
1200(888) RES.VILLA FOR MR SAEED SALEM HUMAID BPTC 33 S-15 39 500 15.00 AL SUWEIDI ENGINEERING GULF PIONEERS CONT. JUNE.'2003
AL HAMILY & SONS CONSULTANTS BUREAU CO.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 44 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
1202(890) GUARD ADMINISTRATION BUILDINGS E-35 AL FARA'A GEN. CONT. AUG.'2003
(SHORING WORK BY USING H-BEAMS) DAR AL HANDASH
1203(891) RES. VILLA FOR MR ALI BIN KHALFAN AL BPTC 12 W-20 47 500 5.75 DESIGN & CONS. AL SAHEL CONTRACTIN SEPT.'2003
DHAHIRI ENGINEERING
1204(892) RES.VILLA FOR MR AHMED HAMAD BPTC 63 W-36 96 500 11.20 LIWAN ARCHITECT- LASER CONSTRUCTION FEB.'2004
HAMED AL SUWAIDI URAL CONSULTANTS. LLC.
1205(893) VILLA COMPOUND (30 VILLAS ) 57 E-29 32 GROUP 3 ENGINEERS SEPT.'2003
(SHORING WORK BY USING H-BEAMS) CONTRACTORS LLC.
1206(894) MOSQUE FOR 1000 WORSHIPPERS BPTC AL SHAMKA 187 600 7.75 THE ARAB OFFICE FOR AL GHAFLY GEN. CONT OCT.'2003
500 PLANNING & ARCHITECTURE
1207(895) RESIDENTIAL VILLAS FOR MR ABDULLAH BPTC 11 SE-14 36 600 12.70 AMERICAN CONSULTANT ZAKUM CONTRACTING &
IBRAHIM AL HOSNY OFFICE REAL ESTATE
1208(896) VILLA FOR HE SULTAN BIN HILAL BPTC 2 W-67 2 500 12.20 ARCHITECTURAL AL HABTOOR ENGINEER SEPT.'2003
AL QUBAISI ENGG.CONSULTANTS. ENTERPRISES CO.
1209(897) ADNOC FILLING STATION BPTC AL 91 500 10.50 DIAR CONSULT EASTERN NOV.'2003
SHAHAMA SH SHAHAMA INTERNATIONAL
1211(899) MISC. MAINTENANCE AT COOLING PLANT - EASTERN NOV.'2003
# 3B AT ZAYED MILITARY CITY SUWEIHAN (SHORING WORK BY USING H-BEAMS) INTERNATIONAL
1213(901) PEDESTRATIN CROSSING ON HAZAA AL MERAIKHI GEN. CON OCT.'2003
BIN ZAYED STREET UNDERPASS No.13A (SHORING WORK BY USING H-BEAMS)
1214(902) DEMOLITION & RECON. OF NEW EASTERN NOV.'2003
IMAGE FILLING STN AT AL NASSER (SHORING WORK BY USING H-BEAMS) - INTERNATIONAL
1217(905) RESIDENTIAL VILLA FOR THE OFFICE OF TH BPTC 11 W-25/01 112 600 8.00 HEBERGER ENGINEERING POLENSKY & ZOELLNER FEB.'2004
HH PRESIDENT ABU DHABI.
1218(906) RES. COMPLEX FOR THE OFFICE BPTC 7,24 W-62 225 500 8.00 HEBERGER ENGINEERING POLENSKY & ZOELLNER
OF HH PRESIDENT & 25 126 600 8.00 ABU DHABI.
1220(908) RES.COMPLEX (VILLA 2) FOR HH CFA - AL 20 500 8.50 AMIRAL ARCHITECTS CODE CONT. CO .LLC. DEC.'2003
SH.HAMAD BIN MOHAMMAD BAHYA 105 600
AL SHARQEE
AT AL BAHYA
1221(909) VILLA FOR SONS OF SALEM SALIM BPTC 26A S-23 77 500 12.00 SHAHEEN ENGG. PROFESSIONAL DEC.'2003
OMAIR AL SHAMSI CONSULTANCY BUILDERS LLC.
1223(911) LOT 1.A.1 SVC BUILDING, OIL LAHMEYER ACTCO GEN. CONT.
COLLECTION PIT, MUSSAFAH (SHORING WORK BY USING H-BEAMS) INTERNATIONAL

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 45 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
1224(912) DEPT.OF ORGANIZATION & DAR AL KHALEEJ AL HAMED DEV. DEC.'2003
MANAGEMENT OFFICE BLDG. (SHORING WORK BY USING H-BEAMS) & CONSTRUCTION.
1225(913) VILLA FOR HE SULTAN BIN HILAL BPTC 2 W-67 5 500 12.20 ARCHITECTURAL AL HABTOOR ENGINEER DEC.'2003
AL QUBAISI ( ADDL 5 NO. PILES) ENGG.CONSULTANTS. ENTERPRISES CO.
1226(914) COM. & RES. BUILDING FOR CFA 3 DAFAN 118 600 16.00 CONSULTING DEVELOPMENT TRAD- FEB.'2004
MR SALIM SAEED AL KHATRY RAK ENGG. GROUP ING & CONT. CO.
1228(916) RES.VILLA FOR MR ABED BPTC 7 SE-3 79 500 12.80 SULTAN ENGINEERING AL MAHABA JAN.'2004
AL-HAMEED M.S. AL-FAHEEM CONSULTANTS. CONTRACTING EST.
1229(917) HOUSING COMPLEX FOR CFA SHUWEIHAT RUWAIS 40 500 8.50 ARCHITECTURE SEIDCO GENERAL DEC.'2003
FAMILIES & BACHELORS & PLANNING GROUP CONTRACTING CO.
1230(918) MARINA MALL EXTENSION BPTC MARINA 20 600 10.00 ARCHITECTURAL EMIRATES BELBADI JAN.'2004
MALL & CONSULTING GROUP CONT. CO.
1231(919) MULTI-STORY CAR PARK BUILDING BPTC 12 M-3 200 600 13.55 OPTIMA ENGINEERING AL SAHEL CONTRACTIN JAN.'2004
CONSULTANCY CO. LLC.
1232(920) AL RAHA BEACH VILLA NO. (2) CFA 10 AL RAHA 70 500 7.50 HANDASAT AL-AMARA CODE CONT. CO .LLC. JAN.'2004
BEACH CONSULTANTS.
1233(921) CINEMA BUILDING FOR SH P-26 MUSSAFAH CANSULT SYSTEM CONSTRUCT JAN.'2004
AL SAFEER GROUP
1235(923) CONS.OF PREFABRICATED 11/0.415 BPTC AL FALAH 1200 500 7.00 ‐ P.B.POWER LTD. PIVOT ENGINEERING MAR.'2004
KV SUBSTATION AT AL FALAH MUSSAFAH  11.00 & GEN. CONT. CO.
AL SHAMKHA, MUSSAFAH BANIYAS
& BANIYAS, ABU DHABI. AL SHAMKHA

1236(924) SHORING WORK BY CIVILCO MAR.'2004


USING H-BEAMS
1237(925) EMIRATES FLOUR & ANIMAL SH - MINA 24 AL SALAAM AL MAHABA MAR.'2004
FEED FACTORY ADM.BUILDING ZAYED CONSULTANTS. CONTRACTING EST.
1238(926) EMIRATES FLOUR & ANIMAL BPTC - MINA 42 500 AL SALAAM AL MAHABA MAR.'2004
FEED FACTORY ADM.BUILDING ZAYED 2 600 CONSULTANTS. CONTRACTING EST.
1239(927) COM. & RES. BUILDING FOR HEIRS SH C-13 W-01 - - - ARIF & BINTOK ARABIAN CONSTRUCTIO APR.'2004
OF MR HAREB MOHD.AL OTAIBA CO
1240(928) COM. & RES. BUILDING FOR HEIRS BPTC C-13 W-01 71 1000 11.00 ARIF & BINTOK ARABIAN CONSTRUCTIO APR.'2004
OF MR HAREB MOHD.AL OTAIBA CO
1241(929) COM. & RES. BUILDING FOR CFA - - 92 600 15.00 CONSULTING DEVELOPMENT MAR.'2004
MR.MOHD.ABDUL KAREEM ENGG.GROUP TRADING & CONT.CO.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 46 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
1244(932) ROYAL RESIDENCE FOR H.E. HASAN BPTC C-11 E-14 170 600 14.00 SCPA JOUANNAIS LAMY AL MERAIKHI GEN. APR.'2004
MOUSA AL QUMZI CONSULTANT CONTRACTING EST.
1245(933) AL MANAL RESIDENCE FURNISHED SUITES FOR C18 E-14 DIAR CONSULT. DHAFIR DEV.& CONT. MAY.'004
HE SHK MOHD BIN BUTTI AL HAMID (SHORING WORK BY USING H-BEAMS)
1246(934) ADIA'S NEW HEADQUARTER BUILDING C-17 W-01 SAMSUNG CORPORATIO JUNE.'2004
(SHORING WORK BY USING H-BEAMS)
1247(935) CIVIL WORKS FOR TAKREER SRU PROJECT GRANITE CONSTRUCTI MAY.'2004
RUWAIS (SHORING WORK BY USING H-BEAMS) CO
1248(936) AL WAHDA MALL 7/A & B E-19 KHATIB & ALAMI THINET EMIRATES
(SHORING WORK BY USING H-BEAMS) CONSULTANTS.
1249(937) ADIA'S NEW HEADQUARTER BUILDING BPTC C-17 W-01 5 500 10.00 BURO HAPPOLD SAMSUNG CORPORATION

1250(938) DISTRIBUTION MANAGEMENT & BPTC P-01 E-20/01 114 750 9.50 WHITE YOUNG EMIRATES SEIDCO GEN. CONT. CO.
CONTROL CENTER
1252(940) DRILLING OF BORE HOLES. BPTC JEBEL ALI GEN. MAINT. JUNE.'2004

1254(942) SHORING WORK BY USING H-BEAMS SH DUTCH FOUNDATION JUNE.'2004

1255(943) VILLA COMPLEX FOR CROWN PRINCE CFA AL YASAT ISLAND 80 500 10.25 AL SALAAM CONSULTANTSARABIAN CONSTRUCTIO JUNE.'2004
AT AL YASAT ISLAND CO.
1256(944) UNITED PRECAST CONCRETE FACTORY BPTC 67-68 M-35 16 600 8.00 AL KHOZMA ENGINEERING UNITED PRECAST CONC JUNE.'2004
MUSSAFAH CONSULTANCY CO.
RES. VILLA FOR M/S. MANSOUR & HUMAID CFA C-91,92 W-15/01 500 8.50 ARENCO ARCHITECTURAL
1259(947) 72 DAMAS CONTRACTING AUG.'2004
AL RUMAITHI & ENGG. CONSULTANTS. GENERAL MAINTENANCE
1260(948) EXPANSION & MAINT. OF TAWEELAH - BPTC SWEIHAN 32 500 7.50 MONTGOMERY WATSON NAEL & BIN HARMAL AUG.'2004
AL AIN WATER TRANSMISSION SYSTEM AND AJBAN CONSULTING ENGINEERS HYDROEXPORT EST.
1261(949) LABOUR ACCOMMODATION AND CAR CFA AL BATEEN AREA 32 600 7.50 INTERNATIONAL STUDIES GROUP 3 ENGINEERS
PARK AT AL BATEEN AREA & CONSULTANCY GROUP CONTRACTORS LLC.
1262(950) 120 M SSR TOWER AT USH ISLAND BPTC USH ISLAND 4 1000 6.00 ENGINEERING CONSULTANTIME ELECTRO &
GSM SITE 2166 GROUP CONTRACTING CO.
1263(951) AL WAHDA MALL - DRILLING OF BPTC 7A/B E-19 10 750 18.00 KHATIB & ALAMI THINET EMIRATES. AUG.'2004
BOREHOLES CONSULTANTS.
1264(952) SHORING WORK BY CIVILCO OCT.'2004
USING H-BEAMS

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 47 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
1265(953) ADNOC FILLING STATION SHAHAMA SHORING WORK BY EASTERN INTERNATION AUG.'2004
USING H-BEAMS
1267(955) COMMERCIAL BUILDING FOR MR SAYAH BPTC C-22 E-16/02 77 900 9.00 TEAM CONSULT BIN MOOSA CONTRACT OCT.'2004
MOOSA AL QUBAISI
1268(956) ETISALAT CONTRACT 9H/97/EGC, 120 M BPTC TAL 4 1200 17.40 ENGINEERING CONSULTANEMIRATES GULF CONT. NOV.'2004
SSR TOWER AT TAL MUREB, ABU DHABI MUREB GROUP
1269(957) CENTRAL BANK OF THE UAE - HEAD OFFICE SHORING WORK BY DHAFIR DEVELOPMENT OCT.'2004
EXTENSION MULTI STOREY CAR PARK USING H-BEAMS CONTRACTING CO.
1270(958) AL MATAR FILLING STATION SHORING WORK BY EASTERN INTERNATION OCT.'2004
USING H-BEAMS
1273(961) EXTN.OF 400KV BUS BAR AT ABU DHABI 104 600 11.50 LAHMEYER INTERNATIONA TMT & D CORPORATION NOV.'2004
400/132 KV GRID STATION 18 750
1274(962) AL NOWAIS RESIDENTIAL BUILDING BPTC C-19 E-16/02 6 600 Khatib & Alami CATIC - THE CHINA CO. JAN.'2005
AT ABU DHABI. 56 800
1276(964) DEPTT. OF SOCIAL SERVICES & COM. BLDG BPTC 19 E-11 1041 600 CONSULTING ENGINEERS EMIRATES LINK MALTAURO
& PURCHASING DEPTT. BUILDINGS. 450
1277(965) DEPTT. OF SOCIAL SERVICES & COM. BLDG. 19 E-11 1041 CONSULTING ENGINEERS EMIRATES LINK MALTAU JAN.'2005
& PURCHASING DEPTT. BUILDINGS. (SHORING WORK BY USING H-BEAMS)
1278(966) EXPANSION & REINFORCEMENT OF 33 KV BPTC AL 45 500 19.50 SWED POWER ABB TRANSMISSION
NETWORK NEW CITY CENTER, AL AIN AIN 36 600 INTERNATIONAL & DISTRIBUTION LTD.
1279(967) CIVIL CONSTRUCTION WORKS - 400/132 KV E-48 ACTCO GENERAL JAN.'2005
GRID STATIONS (SHORING WORK BY USING H-BEAMS) CONT CO.

1280(968) VILLA COMPLEX IN AL YASAT ISLAND MICRO ALYASAT 16 150 10.00 AL SALAAM CONSULTANTS ARABIAN CONSTRUCTIO JAN.'2005
PILE ISLAND CO.
1282(970) ADIA"S NEW HEAD QUARTERS BUILDING 17 W-1 - - - BURO HAPPOLD SAMSUNG CORPORATIO FEB.'2005

(SHORING WORK BY USING H-BEAMS)


1283(971) TABREED COOLING PLANT ARCHITECTURAL ACTCO GEN. CONT. CO FEB.'2005
IN MARINA MALL, ABU DHABI. (SHORING WORK BY USING H-BEAMS) CONSULTING GROUP
1284(972) AL DHAFRA SERVICE STATION AIRPORT ROAD EASTERN INTERNATION FEB.'05
AIRPORT ROAD, ABU DHABI. SHORING WORKS BY USING H-BEAMS
1285(973) SHORING WORKS BY USING H-BEAMS CIVILCO MAR.'2005
1286(974) ETISALAT CONTRACT NO. 9H/97/EGC BPTC AL 4 1200 11.20 ENGINEERING CONSULTANEMIRATES GULF
ORDER NO. 2 90 M SSR TOWER REMAIMAH GROUP CONT. CO.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 48 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
1287(975) RES. COMPLEX FOR THE OFFICE BPTC 7, 23 W-62 407 500 7.50 HEBERGER POLENSKY & MAY.'2005
OF THE PRESIDENT & 24 9.00 ENGINEERING. ZOELLNER ABU DHABI.
1288(976) UPGRADING OF PUMPING FACILITIES BPTC AL 20 500 7.5 ITALCONSULT NAEL & BIN HARMAL AUG.'2005
AT GHANADA SAMHA 48 600 10 HYDROEXPORT EST.
1289(977) ADNOC SERVICE STATION AT EASTERN INTERNATION APR.'2005.
KHALIDIYA (SHORING WORK BY USING H-BEAMS)
1290(978) VILLA FOR MR ABDULLA MAHMOUD BPTC 6 E-36 62 500 8.50 NATIONAL ENGINEERING FIRDOUS GENERAL CO MAY.'2005
HEIMAIDAN HAMMAD BUREAU EST.
1291(979) VILLA FOR MR ABDULLA MAHMOUD 6 E-36 NATIONAL ENGINEERING FIRDOUS GENERAL CO MAY.'2005
HEIMAIDAN HAMMAD (SHORING WORK BY USING H-BEAMS) BUREAU EST.
1292(980) EXTN. OF 400 KV BUS BAR AT ABU DHABI BPTC MEENA 24 600 11.50 LAHMEYER TMT & D CORPORATION JULY.'2005
OUTDOOR FOUNDATIONS AND CABLE TRNCH.
1293(981) PROPOSED OFFICE BUILDING FOR CFA 1F MN-1 39 500 11.50 ERONAT ENGINEERING GULF ERECTION CO. MAY.'2005
M/S. FUGRO MIDDLE EAST CONSULTANCY
1294(982) COMMERCIAL BUILDING FOR H.E. ALI SALE BPTC C-211 E-4/02 117 900 8.75 H.C.E HANNOVER CONS. S.S. LOOTAH CONT. CO MAY./ JUNE,'2005
OBAID AL KAABI ENGINEERS.
1295(983) COMMERCIAL BUILDING FOR MRS SANA C-56 E-16/01 16 150 7.50 AL SUWEIDI ENGINEERING AL GHAFLY GEN. CONT JUNE.'2005.
OMEIR & MRS AMNA OMEIR AL YOUSIF MICROPILE CONSULTANTS.
1296(984) 4 RESIDENTIAL VILLAS FOR H.H. SHK. P-172 W-47 199 ARKAN ARCHITECTS AL MERAIKHI GEN. JULY.'2005
SULTAN BIN HAMDAN AL NAHYAN (SHORING WORK BY USING H-BEAMS) CONSULTANTS. CONTRACTING.
1297(985) 4 RESIDENTIAL VILLAS FOR H.H. SHK. BPTC P-172 W-47 199 600 6.80 ARKAN ARCHITECTS AL MERAIKHI GEN. JULY.'2005
SULTAN BIN HAMDAN AL NAHYAN CONSULTANTS. CONTRACTING.
1298(986) AL NUAIMI RESIDENCE FOR H.E. RASHED C-24 E-16 GHAZI AWAD SEIDCO GENERAL JULY.'2005
ABDULLAH AL NUAIMI (SHORING WORK BY USING H-BEAMS) ARCHITECTS & ENGINEERSCONTRACTING.
COMMERCIAL BUILDING FOR MR SAEED C-48 E-13 ARCHITECTURE & DHAFIR DEVELOPMENT &
ABDULLAH MUSSALAM AL QUBAISI & SONS (SHORING WORK BY USING H-BEAMS) PLANNING GROUP CONTRACTING.
1300(988) COMMERCIAL BUILDING FOR MR SAEED BPTC C-48 E-13 96 900 ARCHITECTURE & DHAFIR DEVELOPMENT &
ABDULLAH MUSSALAM AL QUBAISI & SONS PLANNING GROUP CONTRACTING.
1301(989) AL NUAIMI RESIDENCE FOR H.E. RASHED BPTC C-24 E-16 121 900 10.85 GHAZI AWAD SEIDCO GENERAL AUG.'2005
ABDULLAH AL NUAIMI ARCHITECTS & ENGINEERSCONTRACTING.
1302(990) OFFICE BLDG. FOR THE EMIRATES INSTITU BPTC P-15A E-25 186 600 8.25 CANSULT ENGINEERS & GROUP 3 ENGINEERS AUG.'2005
FOR BANKING & FINANCIAL STUDIES. PROJECT MANAGERS. CONTRACTORS L.L.C.
1303(991) LAND MARK BUILDING, BREAK WATER ARCHITECTURAL EMIRATES BELBADI JULY.'2005
ABU DHABI. (SHORING WORK BY USING H-BEAMS) CONSULTING GROUP CONTRACTING CO. LTD.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 49 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution

BUILDING FOR MR EISA BIN NASER ABDUL


1304(992) BPTC C-81 E-4/02 125 900 9.5 APOLLODORE ENGINEERINZAKUM CONTRACTING AUG.'2005
LATIF AL SERKEL CONSULTANCY & REAL ESTATE
1305(993) VILLA NO. 4 AT RES. PALACE OF H.H. SHK. CFA AL BATEEN 60 500 9.50 DEWAN ARCHITECTS & SHIELD CONTRACTING AUG.'2005
SULTAN BIN KHALIFA AL NAHYAN ENGINEERS.
1306(994) PROPOSED G+7 STOREY BANK AND OFFIC BPTC C-167 E-19/02 101 600 8.00 DESIGN & ARCHITECTURE ARABIAN CONSTRUCTIO SEPT.'2005
BUILDING. BUREAU ( DAR ) CO.
1307(995) COMM. BLDG. FOR H.H. SHK. SULTAN AL MERAIKHI GEN. JULY.'2005
BIN ZAYED TOWER (SHORING WORK BY USING H-BEAMS) CONTRACTING.
1308(996) PUBLIC HOUSE NO. 82 AT GHAYATHY BPTC GHAYATHY 39 500 8.00 DAR AL KHALEEJ AL GHAFLY GENERAL SEPT. 2005
CONSULTANT CONTRACTING
1309(997) RES. VILLA FOR H.E. HAMAD SOUHAIL MICRO 129 W-49 38 150 7.50 SYRCONSULT CONSTRUCTION GENERAL
BIN MOUBARAK AL KETBI PILE CONSULTING ENGINEERS CONTRACTING HOUSE
1310(998) NEW MAJLIS & RECEPTION BLOCK CFA AL 614 750 18.00 DEWAN ARCHITECTS ARABIAN CONSTRUCTIO OCT.,2005
AT AL RAWDAH PALACE AL AIN AIN & ENGINEERS. CO.
1311(999) BUILDING AT AIRPORT ROAD DARWISH ENGINEERING AUG.'2005
(SHORING WORK BY USING H-BEAMS) EMIRATES
1312(1000) PNEUMATIC TEST SYSTEM & WORKSHOP CFA AIRPORT 224 500 8.00 NATIONAL ENGINEERING GULF ERECTION CO. SEPT. 2005
BLDGS FOR GAMCO, ABU DHABI AIRPORT BUREAU
1313(1001) COMMERCIAL BUILDING FOR MR RASHID BPTC C-5 W-5 65 450 9.00 CITY PLAN CONSULTANTS AL HAMED DEVELOPMENT
BIN AHMAD AL HAMILY & CONSTRUCTION
1314(1002) GROUND + MEZZ. + 10 STOREY BUILDING CFA 21 RAS 120 750 14.00 EMCO ENGINEERING DEVELOPMENT TRADIN OCT.,2005
FOR MR JUMA HASSAN AL ZAABI AL KHAIMAH CONSULTANTS. & CONTRACTING CO.
1315(1003) GR. + MEZZ. + 8 TYP. STOREY BUILDING CFA 1204-06 JUWAIS 116 600 15.00 CONSULTING ENGINEERIN DEVELOPMENT TRADING
FOR MR YOUSEF HASSAN AH.AL KHARKHOOR RAK GROUP & CONTRACTING CO.
1316(1004) SHEIKH MOHAMMED BIN ZAYED STADIUM BPTC E-22/02 750 9.00 DEWAN ARCHITECTS AL HAMED DEVELOPME NOV.,2005
FOR AL JAZIRA FOOTBALL CLUB 600 9.00 & CONSTRUCTION
1317(1005) HEALTH & ENVIRONMENT BLDG. AT BPTC 500 8.50 DEWAN ARCHITECTS SHIELD CONTRACTING OCT.,2005
CENTER FOR EXCELLENCE "CERT" ABU DHABI
1318(1006) VILLA COMPLEX AT AL YASAT ISLAND CFA 26 600 10.25 AL SALAM CONSULTANTS ARABIAN CONSTRUCTIO OCT.,2005

1319(1007) NEW BUILDING FOR ADWEA AT DOUBLE SH P-62 E-18/03 ARCHITECTURE & PLANNINCODE CONTRACTING C JAN.,2006
TANK AREA IN ABU DHABI GROUP
1320(1008) 5 COMMERCIAL/RESIDENTIAL BUILDING BPTC C-9,11,12 E-48 631 500 5.00 ARCHITECTURAL & ENGG. NATIONAL TRANSPORT &
IN ABU DHABI. 19 & 29 800 11 CONSULTANT. CONT. CO.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 50 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
1321(1009) FUTURE PIPE INDUSTRIES BPTC 1F1,2F1 M-41 64 600 12.25 A.D.D. GULF ERECTION CO. JAN.,2006
3F1 MUSSAFAH
1322(1010) NEW BUILDING FOR ADWEA AT DOUBLE BPTC P-62 E-18/03 679 600 11.00 ARCHITECTURE & PLANNINCODE CONTRACTING CO.
TANK AREA IN ABU DHABI 800 GROUP
1323(1011) NATIONAL CEMENT FACTORY BPTC 83 R-6 96 900 14.50 NATIONAL ENGINEERING BIN JARRAH CONT. CO.
MUSSAFAH BUREAU
1324(1012) VILLA COMPLEX IN AL YASAT ISLAND CFA AL YASAT 34 500 11.00 AL SALAM CONSULTANTS. ARABIAN CONSTRUCTIO JAN.,2006
ISLAND
1325(1013) HEADQUARTERS FOR THE EMIRATES INST BPTC P-15A E-25 132 800 9.00 CANSULT ENGINEERS GROUP 3 ENGINEERS FEB.'2006

FOR BANKING & FINANCIAL STUDIES AND PROJECT MANAGERS CONTRACTORS


1326(1014) CONS. OF TWIN BUILDING ON PLOT C-64 AL MERAIKHI GEN. CON JAN.,2006

C-65 AT E-25, ABU DHABI (SHORING WORK BY USING H-BEAMS)


1327(1015) RES. COMPLEX FOR THE MINISTRY OF BPTC 7,23, W-62 55 500 9.00 HEBERGER ENGINEERING POLENSKY & ZOELLNER FEB.'2006
PRESIDENTIAL AFFAIRS 24 ABU DHABI
1328(1016) LUCENT TECHNOLOGIES NEW FACILITIES BPTC P1&P2 E-25 49 600 8.25 DEWAN ARCHITECTS SHIELD CONTRACTING. MAR.'2006
AT CERT & ENGINEERING
1329(1017) (SHORING WORK BY USING H-BEAMS) DUTCH FOUNDATION FEB.'2006

1330(1018) HORSE SHED AND HORSE RUNNING TRAC BPTC SEA 24 500 9.00 UAE ARMED FORCES SILVER COAST CONSTRUCTION
AT SEA PALACE PALACE AND BORING EST.
1332(1020) ROYAL GUARDS HQ BUILDING ON CFA 248 600 8.50 DIRECTORATE OF FORCE 10 UAE LTD.
REG.61, ABU DHABI. MILITARY WORKS.
1333(1021) VILLA COMPLEX AT AL YASAT ISLAND BPTC AL YASAT 97 600 11.00 AL SALAAM CONSULTANTSARABIAN CONSTRUCTIO APRIL.'2006
ISLAND CO.
1334(1022) MOSQUE FOR LATE HH SH. HAMDAN BIN BPTC 2C S-20 16 500 12.00 ARAB CONSULTANTS ABU DHABI NATIONAL APRIL.'2006
MOHD. AL NAHYAN GEN. CONT. EST.
1335(1023) PRIVATE SCHOOL FOR M/S. MOHD BIN CFA 4 SW-03 18 500 13.50 AL SUWEIDI ENGG. AL GHAFLY GEN. CONT APRIL.'2006
NUKHAIR AL ZAAHRI & AHMED BIN MUBARAK AL KENDI CONSULTANTS.
1336(1024) UNION NATIONAL PRECAST FACTORY CFA MUSSAFAH 12 500 12.00 NATIONAL ENGINEERING GULF ERECTION CO. APRIL.'2006
FOUNDATIONS FOR SILO IN MUSSAFAH BUREAU
1337(1025) 20 RES. VILLA COMPLEX & HEALATH CFA 76 TO 19/2 405 500 7.5 ALAIN DURAND-HENRIOT SHIELD CONTRACTING. MAY.'2006
CLUB FOR HH SHK HAMED BIN ZAYED AL NAHYAN 81
1338(1026) RESIDENTIAL & COMMERCIAL BUILDING BPTC 1 E-23 70 600 6.00 AL-AMIR ENGINEERING AUSTRALIAN PILING MAY.'2006
MR ABDULLA SALEM SOHAIL AL AAMIRY CONSULTANCY TECHNOLOGY

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 51 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
1339(1027) MODIFICATION FOR THE EVANGELICAL BPTC 59 & W-24/1 75 500 6.50 ARCHITECTURAL & AL MAHABA CONTRACT JULY.'2006.
CHURCH 60 ENGINEERING CONSULTANEST.
1340(1028) AJMAN COURTS & PROSECUTIONS BPTC 514 + AL JURF 333 500 10.50 AL BAYATY ARCHITECTS EMIRATES LINK MALTAU JUNE.'2006.

COMPLEX 219 AJMAN 11.50 & 13 CONSULTANT ENGINEERS.LLC.


1343(1031) SAS AL NAKHIL RESIDENTIAL DEVELOPMEN CFA SAS 4000 500 11.50 EWAN ARCH. ENGG. CONS AL GHAFLY GENERAL JUNE.'2006
PHASE II, PART 1-A. AL NAKHIL 450 GULF HOUSING ENGG. CONTRACTING.
1344(1032A)RESIDENTIAL VILLA FOR BPTC 82 E-19/02 42 450 9.00 EWAN ARCH. ENGG. CONS BAREK ENGG.CO. JULY.'2006.
MR SAEED ABDULLAH AL GHAFLY
1344(1032B)RESIDENTIAL VILLA FOR BPTC 90 E-19/02 42 450 9.00 EWAN ARCH. ENGG. CONS BAREK ENGG.CO. JULY.'2006.
MR HAMED MUBARAK AL SHAMSI
1344(1032C)RESIDENTIAL VILLA FOR BPTC 91 E-19/02 42 450 9.00 EWAN ARCH. ENGG. CONS BAREK ENGG.CO. JULY.'2006.
MR SAIF MOHAMMED AL ZAABI
1344(1032D)RESIDENTIAL VILLA FOR BPTC 83 E-19/02 42 450 9.00 EWAN ARCH. ENGG. CONS BAREK ENGG.CO. JULY.'2006.
MR SALIM KHALIFA AL GHAFLY
1344(1032E)RESIDENTIAL VILLA FOR BPTC 304 E-48 37 450 8.50 EWAN ARCH. ENGG. CONS BAREK ENGG.CO. JULY.'2006.
MR MUSALAM SALIM AL KATHIRI & HIS WIFE
1345(1033) AD-337, AL DARMAKI TWIN RESIDENTIAL BPTC 185A W-52 35 500 11.00 KHATIB & ALAMI EASTERN JUNE.'2006
VILLAS INTRNATIONAL
1346(1034A)COMMERCIAL BUILDING FOR H.E.SHK. BPTC 162 W-18/01 43 500 7.75 DIAR CONSULTANT DESERT CONSTRUCTIO JULY.'2006.
AHMED BIN HAMED FOR GEN. CONT.
1346(1034B)COMMERCIAL BUILDING FOR H.E.SHK. BPTC 148 W-18/02 66 500 6.50 DIAR CONSULTANT DESERT CONSTRUCTIO JULY.'2006.
AHMED BIN HAMED FOR GEN. CONT.
1346(1034C)COMMERCIAL BUILDING FOR H.E.SHK. BPTC 43 W-18/01 53 500 9.25 DIAR CONSULTANT DESERT CONSTRUCTIO JULY.'2006.
AHMED BIN HAMED FOR GEN. CONT.
1347(1035) EXTENSION WORK - NEW MAJLIS & BPTC AL AIN 200 750 12.00 DEWAN ARCHITECTS ARABIAN CONSTRUCTION
RECEPTION BLOCK - AL RAWDHA PALACE & ENGINEERS. CO.
1348(1036) VILLA COMPLEX IN AL YASAT ISLAND CFA AL YASAT 52 500 12.00 AL SALAAM CONSULTANTSARABIAN CONSTRUCTIO JUNE.'2006
ISLAND CO.
1350(1038) COMMERCIAL BUILDING FOR H.E.SHK. SH 43 W-18/01 DIAR CONSULTANT DESERT CONSTRUCTIO JULY.'2006.
AHMED BIN HAMED (SHORING WORK BY USING H-BEAMS) FOR GEN. CONT.
1351(1039) COMMERCIAL BUILDING FOR MR MISHWI SH FAST ENGINEERING JULY.'2006.
YAED BAYAT AL KOBEISSI (SHORING WORK BY USING H-BEAMS)
1352(1040) RES. COMPLEX FOR THE OFFICE OF THE BPTC 7,23 69 500 9.00 HEBERGER ENGINEERING POLENSKY & ZOELLNER JULY.'2006.
PRESIDENT @ PLOT 7,23,& 24 ABU DHABI 24 ABU DHABI.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 52 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
1353(1041) COMMERCIAL BUILDINGS FOR SS SHK C-11, 12,13 & 14 ARENCO ARCHITECTURAL CATIC THE CHINESE CO AUG.'2006
SUROOR BIN MOHD AL NAHYAN ( SHORING WORK BY USING H-BEAMS ) & ENGINEERING CONSULTANTS.
1354(1042) COMMERCIAL BUILDINGS FOR H.H. SHK. BPTC 11,12,13 E-16/01 437 750 12.30 ARENCO ARCHITECTURAL CATIC THE CHINESE CO JAN.,2007
SUROOR BIN MOHD AL NAHYAN 14 -16.00 & ENGINEERING CONSULTANTS.
1355(1043) PROPOSED WORKSHOP BPTC 35 M-37 30 500 12.80 INTERNATIONAL BUILDEX GEN. CONT. C AUG.'2006
ENGINEERING CENTRE
1356(1044) GROUND + MEZZ. + 10 TYPICAL STORY CFA 1279OM RAK 390 600 16.50 CONSULTING ENGG DEV. TRADING & CONT. AUG.'2006
BUILDING HH SHKA MAHRA BINT AHMED AL GHURAIR GROUP
1357(1045) VILLA COMPLEX - SWIMMING POOL BLOCK CONTIGOUS PILES AL YAS. 500 10.00 AL SALAAM CONSULTANTSARABIAN CONSTRUCTIO AUG.'2006

AT AL YASAT ISLAND ISLAND


1359(1047) PALACE FOR H H SHK. MOHAMMED MUSSAFAH DIAR CONSULTANT ARABIAN CONSTRUCTIO SEPT.,2006
BIN KHALIFA ( SHORING WORK BY USING H-BEAMS ) CO.
1360(1048) MW-OU518-2004- CHEMICAL DEFENSE BPTC AL NAHYAN 120 600 7.50 DIRECTORATE OF CODE CONTRACTING C NOV.,2006.
CENTER AT AL NAHYAN CAMP CAMP MILITARY WORKS.
1361(1049) AL REEM ISLAND DEVELOPMENT ARCHITECTURE & NATIONAL PROJECTS OCT.,2006
AREA1 / SECTOR 1 / PLOT 1 ( SHORING WORK BY USING H-BEAMS ) PLANNING GROUP CONSTRUCTION L.L.C.
1362(1050) TEBA CEMENT FACTORY BPTC 366HR9 MUSSAFAH 593 750 14.00 ENGINEERING CONSULTANAL GHOSON GENERAL NOV.,2006.
A.D. INDUSTRIAL AREA GROUP CONTRACTING CO.
1363(1051) CREATIVE SCIENTIFIC SCHOOL BPTC SE-43 JOUZY CONSULTING AL FARIDA INVESTMENT
ENGINEERS CO
1364(1052) VILLA FOR MR SAQER GHUBASH CFA 76 SE-04 91 500 13.10 AL BAYATI ARCHITECTS GREEN SAND GENERAL NOV.,2006.
SAEED GHUBASH CONSULTANT ENGINEERS CONT. CO.
1365(1053) NEW 132/11 kV SUBSTATION AT DELMA BPTC DELMA 175 600 13.00 MOTT MACDONALD EMIRATES TECHNICAL MARCH.'2007
ISLAND & ASSOCIATED WORKS ISLAND ASSOCIATES (ETA)
1366(1054) MW-OU518-2004- CHEMICAL DEFENSE AL NAHYAN CAMP DIRECTORATE OF CODE CONTRACTING C NOV.,2006.
CENTER AT AL NAHYAN CAMP ( SHORING WORK BY USING H-BEAMS ) MILITARY WORKS.
VILLA COMPLEX AT AL YASAT ISLAND CFA
1367(1055) AL YAS. 500 10.00 AL SALAAM CONSULTANTSARABIAN CONSTRUCTIO NOV.,2006.
SUB STATION ISLAND
1368(1056) BRUSH TRANSFORMERS CFA 87A4 ICAD 134 500 10.75 NATIONAL ENGINEERING GULF ERECTION CO. NOV.,2006.
MUSSAFAH BUREAU
1369(1057) EMIRATES STEEL LLC; STEEL BILLET PLANT CFA 10E 6 AD INDUS. 706 500 15.00 NATIONAL ENGINEERING GULF ERECTION CO. FEB.,2006.
ABU DHABI INDUSTRIAL CITY, ABU DHABI CITY BUREAU

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 53 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
1370(1058) GULF SPONGE IRON /ANIE BPTC 10E 6 ICAD 267 500 15.30 NATIONAL ENGINEERING GULF ERECTION CO. FEB.,2007
CFA 686 BUREAU
1371(1059) UAE UNIVERSITY NEW CAMPUS PPP BPTC AL AL AIN 90 900 19.00 MAUNSELL CONSULTANT CATIC THE CHINESE CO FEB.,2007
DEVELOPMENT - AL MAQAM, AL AIN MAQAM -16.00
1372(1060) BUILDING FOR H.E. HAMAD SUHAIL BIN MICRO AIRPORT ABU 76 150 12.00 AL AIN OILFIELD SERVIC JAN.,2007
MUBARAK AL KETBI PILE ROAD DHABI EST
1373(1061) VILLA FOR HE SHA.SHEIKHA BINT SUROOR CFA 116 500 16.80 GHAZI AWAD ARCHITECTS ARABIAN CONSTRUCTIO JAN.,2007

AL NAHYAN & ENGINEERS CO.


1374(1062) AL RAWDA PALACE - CONTRACT 1 DEWAN ARCHITECTS ARABIAN CONSTRUCTIO JAN.,2007
NEW MAJLIS AL AIN ( SHORING WORK BY USING H-BEAMS) & ENGINEERS CO.
1375(1063) AL RAWDA PALACE - CONTRACT 2 BPTC AL AIN 554 600 12m DEWAN ARCHITECTS ARABIAN CONSTRUCTIO FEB.,2007
NEW MAJLIS AL AIN 15m & ENGINEERS CO.
1376(1064) PROPOSED VILLA FOR MR.MOHAMED SH AL BATEEN AL BENYAN DEV. CO. LL FEB.,2007
AL QUBAISI AT AL BATEEN ( SHORING WORK BY USING H-BEAMS)
1377(1065) VILLA COMPLEX AT AL YASAT ISLAND CFA YASSAT 659 500 10m AL SALAAM CONSULTANTSARABIAN CONSTRUCTIO MAR.,2007.
ISLAND 11m
1378(1066) AD-344 - ADNOC AIR WING FILLING SH P1 E-42 DIAR CONSULT EASTERN INTERNATION JUNE '2007

STATION ( SHORING WORK BY USING H-BEAMS)


1379(1067) AL RAWDHA PALACE - CONTRACT 2 BPTC AL AIN 1028 600 12m DEWAN ARCHITECTS ARABIAN CONSTRUCTIO ONGOING
WALKWAY - RETAINING WALL 15m CO
1380(1068) DEPARTMENT OFFICE BUILDING BP&SH 1 W-33 118 600 10.50 DEPARTMENT OF THE ARABIAN CONSTRN. CO JUNE '2007
PLOT NO.1, SECTOR W-33, ABU DHABI 92B PRESIDENTIAL AFFAIRS.
1381(1069) AL REEM ISLAND DEVELOPMENT PHASE1, SH 1 ZONE 104 12 12.00 ARCHITECTURE & PLANNINNATIONAL PROJECTS & JUNE '2007
PLOT1, ZONE D - CODE 178 D GROUP CONSTRUCTION
1383(1071) ABU DHABI BUSINESS HUB, PHASE (1), BPTC 1J1 NEW 738 600 11.00 AL RAMAHI ENGINEERING AL GHAFLY GEN. CONT JULY'2007.
OFFICES COMPLEX INDUS.CITY CONSULTANT.
1384(1072) NEW TRANSCO HEAD QUARTERS BUILDING SH 43 E-3/18 200 SHANKLAND COX SEIDCO GENERAL CON AUG.,2007
IN ABU DHABI ( SHORING WORK BY USING H-BEAMS)
1385(1073) NEW TRANSCO HEAD QUARTERS BUILDING BPTC 43 E-3/18 25 500 13.00 SHANKLAND COX SEIDCO GENERAL CONT. CO.
IN ABU DHABI 132 750
1386(1074) EMIRATES STEEL FACTORY PC MUSSAFAH 12 800 16.90 HALCROW INTERNATIONALACC-LEADER JV AUG.,2007
STEEL INTEGRATION PROJECT PARTNERSHIP

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 54 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
1387(1075) CONSTRUCTION OF BOUNDARY WALL CFA 1 W-27 32 500 4.25 DIAR CONSULT DESERT CONSTRUCTIO SEPT.,2007
& GATE BUILDING 402 450
1388(1076) NEW 400KV GRID STATION AND 132/22KV BPTC AL REEM ISLAND 636 600 12.25 LAHMEYER ACTCO GENERAL CONT DEC.,2007.
PRIMARY SUBSTATION AT AL REEM ISLAND INTERNATIONAL
1389(1077) PROPOSED OFFICE FOR MR FAHD CFA 53 ME-36 88 500 11.00 MODERN HOME ARD AL WADI GEN CON SEPT.,2007
HASSAN MUBARAK AL MANSOURY 54 ENGINEERING
1390(1078) REEM INVESTMENT HEADQUARTERS SH 157 E-19/2 54 SYRCONSULT NATIONAL PROJECTS & SEPT.,2007
BUILDING ( SHORING WORK BY USING H-BEAMS) CONSTRUCTION
1392(1080) BUILDING FOR HEIRS OF LATE HAMAD CFA C-102 E-3 49 600 11.00 BEIRUT CONSULTING MESRI ENGINEERING SEPT.,2007
SALIM AL RUMAITHI GROUP ENGINEERING
1393(1081) LOT 2A1 NEW 220 KV SUBSTATION BPTC MUSSAFAH 117 600 17.60 LAHMEYER ACTCO GENERAL CONT DEC.,2007.
MUSSAFAH (ICAD) ABU DHABI INTERNATIONAL
1394(1082) GULF SPONGE IRON ANIE CFA 10E6 ICAD 231 500 15.30 NATIONAL ENGINEERING GULF ERECTION CO. SEPT.,2007
BUREAU
1395(1083) AL RAWDAH PALACE - CONTRACT - 2 BPTC AL 644 600 12.00 DEWAN ARCHITECTS & ARABIAN CONSTRUCTIO DEC.,2007.
MAIN VILLA BLOCK. AIN 423 900 & 15.00 ENGINEERS. CO.
1396(1084) AL REEM ISLAND DEV. ZONE D BPTC AL 12 750 12.00 NATIONAL PROJECTS & OCT.,2007
JOB 178 REEM 2 900 12.00 CONSTRUCTION
1397(1085) COMMERCIAL BUILDING FOR SH 126 E-19/02 100 AL FALAK ENGINEERING NOV.,2007
MR ABDULLA AL MULLA ( SHORING WORK BY USING H-BEAMS) & CONTRACTING CO.
1400(1088) PROPOSED COMMERCIAL BUILDING BPTC 164 ME-11 59 600 13.50 AL REEF ENGINEERING BAREK ENGINEERING DEC.,2007.
FOR MR RASHED SAEED AL KHAILI CONSULTANT OFFICE
1401(1089) NEW 33/11 KV PRIMARY SUB STATION & BPTC 9 ME-16 103 600 14.00 LAHMEYER BUTEC ABU DHABI
MODIFICATION OF EXISTING SUB STATION
1402(1090) SHEIKHA SALAMA MOSQUE 201 AL AIN ARCHITECTURE & AL GHAFLY GEN. CONT JAN.'2008
AL AIN ( SHORING WORK BY USING H-BEAMS) PLANNING GROUP
1403(1091) ABU DHABI JUSTICE DEPARTMENT CFA W-58 122 600 14.00 BEIRUT ENGINEERING ZAKUM CONTRACTING FEB.'2008.

BUILDING CONSULTING BUREAU & REAL ESTATE


1404(1092) FACTORY AT ICAD II CFA 17AR17 TO 19AR17 221 500 13.50 NATIONAL ENGINEERING GULF ERECTION CO. FEB.'2008.
ICAD BUREAU
1405(1093) PROPOSED GYPSUM FACTORY HANNOVER CONSULTING JAMAL AL GHURAIR EST.
ABU DHABI INDUS. CITY, PHASE I ( SHORING WORK BY USING H-BEAMS) ENGINEERS.
1406(1094) PROPOSED RESIDENTIAL BUILDINGS CFA SAS-AL-NAKHIL 384 500 10.00 DIRECTORATE OF SILVER COAST CONS
AT MILITARY COMPLEX 384 500 8.00 MILITARY WORKS & BORING EST.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 55 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
1407(1095) PROPOSED VILLA FOR MR KHAMEES CFA 55 NEW 27 500 8.00 PRIME ENGINEERING AL HUFOOF FOR TRANS FEB.'2008
ABDULLA KHAMEES AL HAMADI COAST CONSULTANTS. & GEN. CONT.
1408(1096) GROUND + MEZZ. + 10 TYPICAL STORY CFA 1281/OM 1282/OM 398 600 16.50 CONSULTING ENGINEERIN DEVELOPMENT TRADING
(BUILDING No.2) RAS AL KHAIMAH GROUP & CONTRACTING CO.
1409(1097) AL BATEEN PALACE - LANDSCAPING CFA BATEEN 12 600 10.00 PVT DEPTT AL JURF DEVELOPMENT APRIL.'2008.
WORKS SH 52 PROJECTS
1410(1098) PROPOSED VILLA FOR MR HUSSAIN CFA 48 SE-2 87 500 12.00 NATIONAL ENGINEERING HIGH SOCIETY GEN. APRIL.'2008.
HAJI HUSSAIN AL MARZOUQI BUREAU CONT. EST.
1412(1100) PRIVATE VILLAS FOR SHEIKH HAMED CFA 7 SE-1 224 500 13.50 FINE ARTS CONSULTING DESERT CONSTRUCTIO MARCH.'2008
AHMED AL-HAMED ENGINEERS FOR GEN. CONT.
1413(1101) PRIVATE VILLAS FOR MRS. SUMAYA CFA 61 SE-22 162 500 15.50 MAHMOD AHMED MAHMOD DESERT CONSTRUCTIO APRIL.'2008.
MOHAMMAD JOAAn KALFOUT AL AMRY FOR GEN. CONT.
1414(1102) COMMERCIAL BUILDING FOR MR NASER BPTC 21 ME-10 77 600 15.00 ARCH. DESIGN CENTER ZAKUM CONT. & REAL MARCH.'2008
ALI NASER AL GHAITHI CONSULTANTS. ESTATE
1415(1103) COMMERCIAL BUILDING FOR MR AHMED BPTC C-130 ME-9 66 600 13.50 DAR AL KHALEEJ ZAKUM CONT. & REAL APRIL'2008
ABDULLAH AL HARMOODY ENGG CONSULTANTS ESTATE
1416(1104) PILING WORKS AT READY MIX BETON CFA RAK 8 600 12.00 READY MIX BETON APRIL, 2008
RAS AL KHAIMAH RAS AL KHAIMATH
1417(1105) COMMERCIAL BUILDING AL AMARA AL AL FALAK ENGINEERING APRIL.'2008.
PLOT NO.125, SECTOR NO.E-19/02, ABU DHABI ( SHORING WORK BY USING H-BEAMS) CHARQUIA & CONT. CO.
1418(1106) NEW 03 NOS 132/22 KV PRIMARY STATION BPTC AL REEM 164 800 5.70 LAHMEYER INTERNATIONA ACTCO GENERAL APRIL.'2008.
AT AL REEM ISLAND ISLAND CONT. CO. LLC.
1419(1107) NEW 400/132 KV GRID STATION AT BAHIA BPTC BAHIA 529 750 18.20 LAHMEYER INTERNATIONA TOSHIBA CORPOATION
(LOT 1A) ABU DHABI 98 600
1420(1108) 04 NEW 132/11 KV PRIMARY STATION BPTC 223 600 14.60 P B POWER ACTCO GENERAL MAY.2008
AT E1,W6, KHALIFA PARK, KHALIFA 11A CONT. CO.
1421(1109) FACTORY FOR CICON EPOXY & STEEL CFA 12DR7 MUSSAFAH 368 500 11.50 NATIONAL ENGINEERING GULF ERECTION CO. MAY.2008
CUTTING PLANT IN ICAD-1 BUREAU
1422(1110) POLICE COLLEGE FILLING STATION SH 7 E-34/02 DIAR CONSULT EASTERN APRIL.'2008.
( SHORING WORK BY USING H-BEAMS) INTERNATIONAL
1423(1111) FURNISHED BUILDING APARTMENT CONT. C-9 E-16/1 CATIC
PILES THE CHINESE CO.
1424(1112) EMBASSY FOR BUILDING FOR CFA 46 W-59/02 99 500 12.50 PRIME ENGINEERING AL BAWANI GEN. CONT APRIL.'2008.
REPUBLIC OF KAZAKISTAN CONSULTANTS

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 56 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
1425(1113) AL OTAIBA CONS. WORKERS RES. CITY SH F2C3-1 AL MAFRAQ AL SUWEIDY ENGINEERINGAL MERAIKHI GEN. CONT.
( SHORING WORK BY USING H-BEAMS) CONSULTANTS.
1426(1114) AL OTAIBA CONS. WORKERS RES. CITY BPTC F2C3-1 AL 44 600 14.00 AL SUWEIDY ENGINEERINGAL MERAIKHI GEN. CONT.
MAFTAQ CONSULTANTS.
1427(1115) EMC COMPLEX & AL FAHIM GROUP CFA 8 M-4 148 600 9.50 NATIONAL ENGINEERING GULF ERECTION CO. MAY.2008
HEAD QUARTER PLOT NO. 8, SECTOR M-4 BUREAU
1428(1116) NEW 400 KV GRID STATION AND 132/22 KV BPTC AL REEM 163 800 11.50 LAHMEYER INTERNATIONA ACTCO GEN. CONT. MARCH.'2008
PRIMARY SUBSTATION AT AL REEM ISLAND ISLAND FOR GEN. CONT.
1429(1117) PRIVATE VILLA FOR MR MOHAMAD CFA 49 SE-15 98 500 13.50 RADAT ENGINEERING BLUE LAGOON GEN CO MAY.2008
HOMAID AL QUBAISI CONSULTANTS.
1430(1118) NEW 03 NOS 132/22 KV PRIMARY STATION BPTC T2 AL REEM 163 800 7.00 LAHMEYER INTERNATIONA ACTCO GEN. CONT. JUNE.'2008
T2, AT AL REEM ISLAND ABU DHABI ISLAND NADD
1431(1119) AL RAWDHA PALACE (EXISTING GATE MICRO AL AL SALAAM ARABIAN CONSTRUCTIO JUNE.'2008
EXTENSION ) AL AIN PILES AIN 8 CONSULTANTS CO,

1432(1120)
DESERT TOWERS DEVELOPMENT CFA M.B.Z 126 500 9.00 CANSULT MAUNSELL MASRI ENGINEERING JUNE.'2008
CITY
1433(1121) COMMERCIAL BUILDING FOR MR SALEM BPTC C-30 E-13 76 900 8.00 AL AMARA AL SHARQIA ZAKUM CONT. & REAL
SAEED SALEM AL RUMAITHY ESTATE
1434(1122) SHORING WORK FOR H E MOHAMED SCPA JOUANNAIS ET SCPA JOUANNAIS ET JUNE.'2008
KHALFAN AL RUMAITHY ( SHORING WORK BY USING H-BEAMS) LAMY LAMY
1435(1123) GRAND MAIN GATE CFA AL 198 500 10.00 AL SALAAM ARABIAN CONSTRUCTIO JULY.'2008
AL RAWDHA PALACE RAWDHA CONSULTING ENGINEERS CO.
1436(1124) PROPOSED VILLA FOR MR ATEEQ JUMMA CFA 170 E-19/02 47 500 10.00 HANNOVER CONSULTING MASRI ENGINEERING JULY.'2008
ALI DARWISH BIN DARWISH ENGINEERS
1437(1125) COMMERCIAL BLDG. FOR MR EID HAMOOD BPTC C-64 ME-9 63 600 12.00 ARCH. & PLANNING AL RADIM GEN. TRANS. AUG.,2008
SALMEEN HAMEED AL MANSORY GROUP (APG) & CONT. EST.
1438(1126) ADDITIONAL VILLA (G+1) FOR MRS & MR CFA 21B NEW 49 500 10.50 AL FIRAS ENGINEERING OMAR HUSSAIN AL-HAM AUG.,2008
AHMED NASER SAEED AL WAHEDI SHAWAMEKH CONSULTANT. CONT. EST.
1439(1127) OFFICE BUILDING & WORKSHOP FOR CFA 50 M-40 140 500 11.30 SAYED KHALLAF THE SPECIALISTS CONS SEPT.,2008
YORKS REF & AIR COND. CONSULTANT ENGINEERS & GEN. MAINT.
BLDG. FOR MR. OBIED AL HEERI SALIM AL GERMAN MERIT ARCH ENGBAREK ENGINEERING AUG.,2008
1440(1128)
FARHOUD BPTC C62 ME-10 78 600 12.50
1441(1129) GULF STEEL ROLLING MIL CFA 22AR17 to 24AR17 254 500 RAK AL KARMAL BLSG. SEPT.,2008

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 57 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
1443(1131) 165 500 ARCHITECTURAL
CROWN PRICE DIWAN STORES CFA 31, 32 M-17 AL DARMAKI AUG.,2008
78 600 ENGINEERING CONSULTAN
1444(1132) 6 RESI. VILLAS MR. MOHAMMED ABDUULAH
JUMAA KARAM AL QUBAISI CFA 25 Z-2 205 500 EWAN ARCH. BYBLOS GEN. CONT
1445(1133) OFFICE BLDG. FOR AL MANSOORI SPECILIZ CFA 5C MN-5 54 500 ADD GULF ERECTION
ENGINEERING
1446(1134) NEW MOSQUE FOR SHK. AHMED BIN HAME CFA P1 RAHBA 67 500 FINE ARTS CONSULTING E DESERT CONSTRUCTIO OCT.,2008
BOTEE AT RAHBA
1447(1135) NEW MOSQUE FOR SHK. AHMED BIN HAMED
BOTEE AT SHAMKHA CFA P1 SHAMKHA 67 500 FINE ARTS CONSULTING E DESERT CONSTRUCTIO OCT.,2008
1448(1136) COMMERCIAL BUILDING FOR MR HAMAD SH C-116 E-19/02 VIOLET ENGINEERING
SULTAN MOHD ALI BUTI AL NIYADI CONSULTANTS. AL HADATHA CONTRACTING.
1449(1137) CAR BUILDINGS & ACCOMMODATION CFA SAS 60 500 7.5 M DMW AL MULLA GEN. CONT. E SEP.,2008
FOR SPECIAL OPERATION AT SAS AL NAKHIL AL NAKHIL
1450(1138) CONS. OF GYMNASIUM FOR SHEIKH SUROOR 01-192- W-62 30 500 16.20 MODERN CONST. CONT SEPT.,2008
AL NAHYAN CFA 00-2 CO. LTD.
1452(1140) PRIVATE VILLAS FOR MR ABDULLAH CFA 94 W-31 136 500 10.00 FINE ARTS CONSULTING E DESERT CONSTRUCTION
MOHAMMED SHEBAN AL MEHERI
1453(1141) PRIVATE VILLA FOR MR EBRAHIM NASER CFA 119 SE-23 95 500 13.00 INTERNATIONAL ENGINEERMODERN CONSTRUCTI OCT.,2008.
LOTTAH CENTER CONT. CO. LTD.
1454(1142) MODERN RESIDENTIAL CITY - M36A SH M36A 94 ACG SEIDCO GEN. CONTRAC OCT.,2008.
MUSSAFAH INDUS. CITY ( SHORING WORK BY USING H-BEAMS)
1455(1143) COMMERCIAL BUILDING FOR MR AWADH SH 25 E-29 57 AL FANNAN CONSULTANT ZHONG DING INT. ENGG NOV.'2008
SULTAN AL QUBAISI ( SHORING WORK BY USING H-BEAMS) ENGINEERS CO. LTD.
1456(1144) RESIDENTIAL BUILDING FOR MR SAIF MOH SH C-93 ME-9 88 TAMEER ENGINEERING ZHONG DING INT. ENGG NOV.'2008
BALWAIAA AFSAN AL KHAILI ( SHORING WORK BY USING H-BEAMS) CONSULTANT CO. LTD.
1457(1145) 3 NEW 33/11 KV PRIMARY SUBSTATIONS BPTC MUSSAFAH 130 150 14.80 P.B. POWER LARSEN & TOUBRO LTD.
ICAD II LOT A (NORTH) MUSSAFAH
1458(1146) 3 NEW 33/11 KV PRIMARY SUBSTATIONS BPTC MUSSAFAH 130 150 14.80 P.B. POWER LARSEN & TOUBRO LTD FEB.,2009
ICAD II LOT A (EAST) MUSSAFAH
1459(1147) MAIN VILLA AT QSEEWRAH RESIDENTIAL BPTC UMM QSEEWRAH 100 16.00 AL SALAAM CONSULTANTSARABIAN CONSTRUCTION
COMPLEX AT UMM-QSEEWRAH AL AIN CO.
1460(1148) 6 VILLA COMPOUND FOR MR AHMED MOHD CFA 52 Z-4 156 100 12.00 HANNOVER CONSULTING BYBLOS GEN. CONT. ES NOV.,2008
RAFEE IBRAHIM AL MULLA ENGINEERS.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 58 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
1461(1149) COMMERCIAL BUILDING FOR MR KHAMIS BPTC 64 ME-10 55 900 12.00 GOLDEN PLANNERS BAREK ENGINEERING DEC.2008
RASHID KHAMIS SHUFIAN AL MANSOURI CONSULTANTS.
1462(1150) RESIDENTIAL VILLA SH 69 W-52 AL BATEEN ENGINEERING SAYAH GEN. CONT. CO. DEC.2008
( SHORING WORK BY USING H-BEAMS) CONSULTANCY
1463(1151) 400/220/33 KV GRID STATION AT ICAD BPTC ICAD III 750 17.00 P.B. POWER TOSHIBA CORPORATIO MAR.,2009
MUSSAFAH 600
1464(1152) PRIVATE VILLAS FOR MR JUMAA EID CFA 69 W-52 180 500 8.50 AL BATEEN ENGINEERING SAYAH GEN. CONT. CO. FEB.,2009
MOHAMMED AL MUREIKHI CONSULTANT
1465(1153) FIVE VILLAS FOR MR HISHAM MAHMOUD CFA 10 se-15 290 500 12.00 AMIAL ENGINEERING BLUE LAGOON GEN. FEB.,2009
MOHD AL KHATIB CONSULTANTS. CONT.
1466(1154) COMMERCIAL BUILDING FOR MR KHAMIS SH 64 ME-10 GOLDEN PLANNERS BAREK ENGINEERING DEC.2008
RASHID KHAMIS SHUFIAN AL MANSOURI ( SHORING WORK BY USING H-BEAMS) CONSULTANTS.
1467(1155) HOTEL & RESORT BETWEEN TWO BPTC P-3B S-23 24 750 19.00 AL BURJ ENGINEERING SHAPOORJI PALLONJI JAN.,2009
BRIDGES PLOT P-3b, S-23, ABU DHABI 500 CONSULTANT MIDEAST
1468(1156) AUGMENTATION & EXPANSION OF 33 KV BPTC 600 P B POWER LARSEN & TOUBRO LTD FEB.,2009
NETWORK IN WESTERN REGION 800
1469(1157) ADDITIONAL OFFICE BUILDING FOR CFA 93 M-40 75 500 13.00 BAINONA CONSULTING ALPHA ENGINEERING FEB.,2009
MR SAIF MOHD AL MANSOORI ENGG. BUREAU & CONT.
1470(1158) EMIRATES STEEL UNIT III - GULF SPONGE CFA 12E6 ICAD 75 500 15.00 NATIONAL ENGINEERING GULF ERECTION CO. FEB.,2009
IRON BUREAU
1471(1159) FEDERAL TRANSFORMERS CFA 17AR17 ICAD II 86 500 13.50 NATIONAL ENGINEERING GULF ERECTION CO. MAR.,2009
ICAD II 19AR17 BUREAU
1472(1160) 3 VILLAS COMPOUND FOR ISMAIL ABDALLA CFA 31 MBZ 78 500 12.00 DIBAJEH CONSULTANTS & BYBLOS GEN. CONT. ES MAR.,2009
ISMAIL YOUSIF & HIS WIFE 21 ENGINEERS
1473(1161) FACTORY FOR FORESIGHT CEMENT INDUS CFA 70C4 ICAD I 147 500 10.50 FIRAS ENGINEERING CATALYST VIVA DAS APR.'2009
LLC 71C4 CONSULTANT GEN. CONT.
1474(1162) COMMERCIAL BUILDING FOR MR ALI SAEED CFA 20 AL 28 600 19.25 AL ZEIN DESIGN ENGG. DEVELOPMENT TRADIN APR.'2009
AL WALI RAS AL KHAIMAH QURM 53 750 & CONSULTANTS LLC. & CONT.
1475(1163) PROPOSED BUILDING FOR MR ABDULLAH CFA C-33 ME-9 81 600 13.00 AL BATEEN ENGINEERING BAREK ENGINEERING MAY'2009
AHMED AL MEHRI CONSULTANCY
1476(1164) AL RUWAISE POLICE STATION BPTC P-9 AL 273 600 13.00 BAINONA CONSULTING ASWAR ENGINEERING JUNE '2009
RUWAISE ENGG. BUREAU & GEN. CONT.
1477(1165) BUILDING FOR MR RASHED HAREB AL BPTC C-28 MBZ 77 600 13.50 AL TASHEED ENGINEERINGNATIONAL ENTREPREN MAY'2009
MANSOORI CITY CONSULTANTS. CONS. & DEVELOPMENT.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 59 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
1478(1166) SIX VILLAS FOR MR HAMDAN ABDUL BPTC 74 SW-14 139 500 12.50 ARCHITECTURAL TECH. BUILDEX INTERNATIONA JUNE '2009
KHADER AL MULLA 78 139 500 12.50 CONSULTANT ENGINEERINGEN. CONT.
1479(1167) VILLA COMPLEX AT ABU AL ABYAD CFA ABU 209 600 10.50 ARABIAN CONSTRUCTIO JULY '2009
ISLAND, ABU DHABI AL ABYAD CO
1480(1168) RESIDENTIAL VILLAS COMPLEX BPTC 83 Z-1 125 500 14.50 DEWAN ARCHITECTS & EMIRATES CODE CONT. CO.
ENGINEERS
1481(1169) PRIVATE VILLAS FOR H.E. SAQER GHOBASH 76 SW-4 120 500 12.00 BAYATY ARCHITECTS GREEN SAND GENERAL AUG.'2009
SAEED GHOBASH CFA CONT.
1483(1171) SHED AND OFFICES FOR MR.MOHD.KARAMA 20 M-38 39 500 11.00 AL FIRAS ENGG. HIGH SOCIETY GEN. CO AUG.'2009
AL ZUBAIDI CFA CONSULTANT
1484(1172) VILLA FOR MRS. MARIAM SALEM KHALIFA CFA 100 W-46/01 48 500 10.00 DAR EL-EMARA CONSULTA BLUE LAGOON GEN. CO SEPT.'2009
KNESH
1485(1173) 400/220/33 KV GRID STATION AT ICAD BPTC ICAD 10 600 14.50 LAHMEYER ESSA ENGINEERING & SEPT.'2009
TRANSCO CONTRACT NO.N5767 MARINE SERVICES
1488(1176) PRIVATE VILLAS FOR MR JUMA MUBARAK CFA 47 W-47 75 500 6.00 SAYED KHALLAF CONSULT DESERT CONSTRUCTIO OCT.,2009
MUSLIM ELERAMIE
1489(1177) PRECAST BUILDING AT AL HAMRA CFA AL 170 500 8.00 DIRECTORATE OF CODE CONTRACTING C OCT.,2009

ABU DHABI HAMRA MILITARY WORKS.


1490(1178) SHOPS & STORES IN MUSSAFAH CFA 36 M-36 75 500 12.00 NATIONAL ENGINEERING BIN DALMOOSH GEN NOV.,2009
BUREAU CONT. EST.
1491(1179) EXPANSION & REINFORCEMENT OF 33 KV BP NIYADAT AL 87 600 15.00 P B POWER LARSEN & TOUBRO LTD JAN.2010
NETWORK IN AL AIN AIN
1492(1180) GULF INDUSTRIAL SERVICES CO. CFA 41-45 M-36 104 500 12.50 NATIONAL ENGINEERING GULF ERECTION CO. DEC.'2009
PLOT NO.41-45, SECTOR M-36, ABU DHABI BUREAU
1493(1181) COMMERCIAL BUILDING FOR HEIRS OF CONT. AL 76 500 10.00 SAFEER ENGINEERING NASIM AL SHARQ BUILD DEC.'2009
AHMED MOHD MASOOD ARAR AL DHAHIRI PILES AIN CONSULTANT CONS. CO.
1494(1182) ADJ=09000004 - MUSSAFAH SH 43 ASIA GEN. CONT. CO. DEC.'2009
( SHORING WORK BY USING H-BEAMS)
1495(1183) COMMERCIAL BUILDING FOR SHEIKH SH BEACH MARINE CONT. JAN.,2010
MOHD. ( SHORING WORK BY USING H-BEAMS) WORKS.
1496(1184) PROPOSED BUILDING FOR MR AL ASRI AL CFA 12 & E-20/2 50 500 6.00 EMIRATES ENGINEERING ZAKUM CONTRACTING MAR.,2010
KHAILY 13 CONSULTANCY GROUP & REAL ESTATE
1497(1185) NEOPHARMA PHARMACEUTICAL BPTC ICAD 600 14.00 POYRY ENERGY LTD. LARSEN & TOUBRO LTD JUNE.'2010
FACILITIES (PHASE II) AT ICAD

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 60 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
1498(1186) PROPOSED VILLA FOR MR SHABEEB HAME CFA 281 E-48 36 500 6.70 HANNOVER CONSULTING AL DARMAKI CONT. CO. APR.,2010
SULTAN AL DARMAKI & HIS WIFE ENGINEERS
1497(1187) LIMESTONE GRINDING AND CALCINATION CFA 204ER7 ICAD II 96 500 12.50 ARCHITECTURAL DESIGNINGULF ERECTION CO. MAR.,2010
& DECORATION
1501(1189) OFFICE BUILDING & WORKSHOP CFA 79,80 M-16 84 500 9.50 ARAB ENGINEERS GULF ERECTION CO. APR.,2010
81 CONSULTANTS.
1502(1190) BLOOM GARDENS DEVELOPMENT BPTC 102 E-48 244 600 9.00 WORLD PLANNERS EMIRATES LINK
CFA 106 1245 500 MALTAURO LLC.
1503(1191) PROJECT IN MUSSAFAH AL QANTARA GEN MAY.,2010
( SHORING WORK BY USING H-BEAMS) CONT. EST.
1504(1192) FUTURE CENTER FOR SPECIAL NEEDS CFA P-16 Z-9 191 500 12.00 ARCHITECTURAL DESIGNINABU DHABI INTERNATIO JULY.'2010
DECORATION CONT. CO.
1505(1193) BUILDING FOR MR MOHD SAEED ABDULLAH BP C-364 ME-10 60 750 15.90 DASTUR CONSULTANTS. EASTERN INTERNATION AUG..'2010
MUSSALAM AL QUBAISI
1506(1194) BUILDING FOR MR MOHD SAEED ABDULLAH BP C-198 ME-12 81 600 13.00 DASTUR CONSULTANTS. EASTERN INTERNATION AUG..'2010
MUSSALAM AL QUBAISI
1507(1195) VILLA FOR MR KHALED IBRAHIM MOHD CFA 12 MFW-3 92 500 10.00 LEGEND ENGINEERING AL HUOFOF FOR MAY.,2010
ABDULLAH AL ALI CONSULTANT TRANSPORT CONT.
1508(1196) RESIDENTIAL PRIVATE VILLA CFA 111 SE-2 39 500 12.00 AL MANHAL CONSULTANT AL TAWASUN CONSTRU JUL.,2010
SAIF MOHD AHMED SHAHEN AL MANSOURI ENGINEERING CO.
1509(1197) EXTENSION WORK FOR INDUSTRIAL CFA 16 M-36 47 500 11.50 MAHMOUD AHMED MODERN CONSTRUCTI MAY.,2010
BUILDING MAHMOUD CONT.
1510(1198) COMMERCIAL BUILDING SH P-3B S-23 KHATIB & ALAMI THINET EMIRATES MAY.,2010
1511(1199) VILLA FOR MR. AHMED ALI AHMED ALI CFA 113 MFW-3 81 500 9.50 AL REEF ENGINEERING TRISTAR TRANSPORT MAY, 2010
AHMED AL MARZOQI CONSULTANT
1512(1200) OFFICES, CAR BLDG, ACCOMMODATION CFA 4 DMW GHQ AL MULLA GEN. CONT. MAY, 2010

1513(1201) NEW ROADS AT JABEL HAFEET, AIN MP JABAL 172 150 6.20 DEPTT OF PRESIDENT ARABAIN CONSTRUCTIO JUNE, 2010
HAFEET AFFAORS/
1514(1202) VILLA FOR MR. SUHAIL MOHAMED ALI AL SH 60 DAR AL EMAAR ENGG. MODERNITY CONT JUNE, 2010
RASAS AL MANSOURI ( SHORING WORK BY USING H-BEAMS ) CONSULTANTS.
1515(1203) EXTENSION VILLA MRS. SUMAYA MOHD CFA 61 SE-22 12 500 15.50 MAHMOD AHMED BILDEX INTERNATIONAL JUNE, 2010
JOAAN KALFOUT AL AMRY MAHMOD CONSTRUCTION
1516(1204) 33KV OHL IN SWEIHAN BPTC SWEIHAN 16 800 VARY P.B. POWER LARSEN & TOUBRO SEPT.'2010
52 600 8.90 SWEIHAN

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 61 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
1517(1205) 220KV OHL TOWERS IN BPTC QUSHAWIRA Approx 800/1000 12.50- MOTT MACDONALD LARSEN & TOUBRO LTD SEPT.'2010
QUSHAWIRA 92 1200 15.50
1518(1206) RES. PVT. VILLA FOR MR HASSAN MOHD CFA 96 SE-13 99 500 13.00 DAR EL-EMARA BLUE LAGOON GEN. CO DEC.2010
ABDULLAH FADEL AL HAMADY CONSULTANT
1520(1208) CONTEMPORARY VILLAS BPTC 6A BAIN AL 129 500 17.75 BEAD ARCHITECTS & ARABIAN CONSTRUCTIO SEPT.'2010
PLOT 6A, BAIN AL JISRAIN, ABU DHABI JISRAIN 30 600 ENGINEERS. COMPANY
1521(1209) A MOSQUE ON THE EXPENSE OF MRS. CFA P1 SE-11 76 500 13.50 AL AALI ENGINEERING MODERN CONSTRUCTI SEPT.'2010
MARIM MOHAMMED AHMED CONSULTANT CONTRACTING
1522(1210) WAREHOUSE BUILDING, PLOT NO.34, CFA 34 M-17 100 500 12.00 ABU DHABI CONCEPT GULF ERECTION CO. SEPT.'2010
M-17, MUSSAFAH, ABU DHABI. CONSULTING ENGINEERS
1523(1211) AL BATEEN PARK DEVELOPMENT P22-23 W-17/03 SEIDCO GEN. CONT. NOV. 2010
( SHORING WORK BY USING H-BEAMS )
1524(1212) CONS. OF CABLE DUCT BANK BPTC ICAD 28 600 9.00 P B POWER LARSEN & TOUBRO LTD.

1524(1213A)PROPOSED VILLAS FOR MR NAJI HASSAN CFA 13 MFW-6 110 500 6.00 AL SHUAA ENGINEERING TRISTAR ENGINEERING OCT.2010
AL HARTHI & CONTRACTING CONTRACTING
1524(1213B)PROPOSED VILLAS FOR MR HUSSAIN CFA 11 MFW-6 100 500 6.00 AL SHUAA ENGINEERING TRISTAR ENGINEERING OCT.2010
ABDULLAH AL HARTHI & CONTRACTING CONTRACTING
1526(1214) PROPOSED BUILDING FOR MR FARAJ MOH BPTC C-97 ME-9 61 750 14.00 SAHIL ENGG BAREK ENGINEERING NOV.2010
FARAJ HUSSAIN AL QUBAISI CONSULTANTS
1527(1215) QUALITY CONTROL UTILITIES AND BPTC ICAD NEW 220 600 14.00 POYRY ENERGY LTD LARSEN & TOUBRO LTD NOV.2010
SECURITY BLDG. NEOPHARMA PROJECT MUSSAFAH
1528(1216) NEW FILLING STATION BPTC M26 500 13.00 AL TORATH ENGG EASTERN INTERNATIONAL
MUSSAFAH 2 (M26) ABU DHABI CONSULTANTS
1529(1217) WORKSHOP SHED CFA 144 B5 146 500 12.50 NATIONAL CONSULTING GULF ERECTION CO NOV.2010
145 ICAD1 OFFICE
1530(1218) NEW FILLING STATION BPTC MUSHRIF 103 500 10.50 AL TORATH ENGG EASTERN INTERNATIONAL
MUSHRIF ABU DHABI CONSULTANTS
1531(1219) VILLA FOR MR ISAA MOHD AL ALI & CFA 96 Z-20 65 500 10.00 AMERICAN CONSULTANT AL HUOFOF FOR TRANS.
HIS WIFE OFFICE CONT. & MAINT.
1532(1220) 33 KV OHL TOWERS IN AL ARYAM BPTC AL 600 ENERGO CONSULT LLC LARSEN & TOUBRO LTD MARCH.2011
ISLAND ARYAM 800
1533(1221) RENOVATION OF EXISTING PLANT CFA 74 600 10.00 READY MIX BETON DEC.2010
AT MUSSAFAH
1534(1222) WORKSHOP FOR EMIRATES DREDGING CO CFA 140 M-36 86 500 12.00 NATIONAL ENGINEERING GULF ERECTION CO DEC.2010
141 BUREAU

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 62 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
1535(1223) NEW 132/11 KV SUBSTATION AT ADNEC BPTC ADNEC 160 600 20.00 ENERGO CONSULT LLC ACTCO GEN. CONT. MARCH.2011
CAPITAL CENTRE
1537(1225) INSTALLATION OF 2 NOS. PACKAGE UNITS BPTC ME-09 25 500 15.00 P B POWER ACECO JAN.2011
10MVA INCLUDING 33 KV
1538(1226) PROPOSED VILLA AT PLOT NO.28 BPTC 2 W-28 150 500 8.50 109 ARCHITECTURE & BILDEX INTERNATIONAL JAN.2011
W-28, AL BATEEN, ABU DHABI ENGG. CONSULTANT CONTRACTING
1539(1227) PROPOSED BUILDING FOR MR SALEM MOH BPTC C-107 ME-9 62 750 14.00 AL KHEALI & ALAMERI BAREK ENGINEERING FEB. 2011
SUHAIL BELHATEM AL AMERI CONSULTANT ENGG.
1540(1228) PRIVATE VILLA FOR DR JAUAN SALIM AL CFA 28 S-17 186 600 21.00 AL SALAM CONSULTANT SOLEIL CO. CONT. FEB. 2011
DHAHRI ARCHITECTS & ENGINEERS
1541(1229) MASJED FOR HH SH. MANSOUR BIN CFA P1 SE-38 181 500 15.00 ARCHITECTURE & PLANNINARABTEC CONSTRUCT APR.'2011
ZAYED AL NAHYAN GROUP LLC
1542(1230) MASJED FOR HH SH. MANSOUR BIN CFA P3 SE-41 270 500 14.00 ARCHITECTURE & PLANNINARABTEC CONSTRUCT APR.'2011
ZAYED AL NAHYAN GROUP LLC
1543(1231) STORE IN MUSSAFAH CFA 1 M-37 4 600 12.00 GROUP3 ENGINEERS FEB.'2011
CONTRACTORS
1545(1233) COMMERCIAL BUILDING FOR MR SALEM 107 ME-9 AL KHEALI & AL AMERI BAREK ENGINEERING MAR.'2011
MOHD SUHAIL BALHATEM AL AMERI ( SHORING WORK BY USING H-BEAMS ) CONSULTANT ENGINEERING
1547(1235) NEOPHARMA PHARMACEUTICAL BPTC MUSSAFAH 110 600 14.00 POYRY ENERGY LTD LARSEN & TOUBRO LTD APR.'2011

FACILITIES
1548(1236) MASJED FOR HH SH. MANSOUR BIN CFA P1 SE-42 73 500 14.00 ARCHITECTURE & PLANNINARABTEC CONSTRUCT APR.'2011
ZAYED AL NAHYAN GROUP LLC
1549(1237) MASJED FOR HH SH. MANSOUR BIN CFA P1 SE-39 194 500 14.00 ARCHITECTURE & PLANNINARABTEC CONSTRUCT MAY.'2011
ZAYED AL NAHYAN GROUP LLC
1550(1238) MASJED FOR HH SH. MANSOUR BIN BPTC P10 KASSER 500 17.00 ARCHITECTURE & PLANNINARABTEC CONSTRUCT MAY.'2011
ZAYED AL NAHYAN AL AMWAJ GROUP LLC
1552(1240) TOWER CRANE BPTC C-107 ME-9 4 600 12.00 AL KHEALI & AL AMERI BAREK ENGINEERING SEPT.,2011
C107, ME-09 CONSULTANTS
1553(1241) CONS. OF VIP HANGER AT SAS AL NAKHIL CFA SAS AL 6 500 15.00 AL THARAWAT GEN. CO APR.'2011
CAMP ABU DHABI NAKHIL
1554(1242) PROPOSED MOSQUE SPONSORED BY CFA P1 W/14-02 88 500 5.80 SAYED KHALLAF ANAB AL SAIF GEN. CONT.
MR SALEM AL ADAWI CONSULTANT ENGINEERS
1555(1243) PRIVATE RESIDENTIAL VILLA BETWEEN TWO BRIDGES CENTROID CONSTRUCT JUNE.'2011
BETWEEN TWO BRIDGES ABU DHABI ( SHORING WORK BY USING H-BEAMS )

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 63 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
1556(1244) PROPOSED PRIVATE VILLA FOR HH BPTC AL AL 95 750 17.00 AL AALI CONSULTANT AL THARAWAT GEN. CONT.
SHEIKH AHAMAD BIN TAHNOON KARA'A AIN ENGINEERING
1557(1245) 33 kV OHL IN URGENT POWER SUPPLY FOR BPTC ABU 3465 600 ENERGO LARSEN & TOUBRO LTD AUG.'2011
NEW PALACE IN ABU AL ABYAD ISLAND ABYAD 357 800 CONSULTANT
1558(1246) ADDITIONAL WORKSHOP SHED CFA 9 M-39 100 500 11.30 A.D.D CONSULTANT GULF ERECTION CO. OCT.2011

1559(1247) BOUNDARY WALL FOR HH SHK SAEED BIN BPTC 1&2 W-52/03 287 500 11.80 ARCHITECTURAL & ENGG AL DARMAKI BUILDING DEC.2011
MOHD RES. COMPOUND ABU DHABI CONSULTANTS & CONS. EST
1560(1248) PROPOSED WAREHOUSE FOR HE AWADH CFA 25 M-15 74 500 6.00 SASCO ENGINEERING ZAKUM GEN. CONT. OCT.2011
AL OTAIBA CONSULTANCY & REAL ESTATE
1561(1249) NEW 132/11 KV SUBSTATION AT WATANI BPTC WATANI 175 600 21.55 ENERGO CONSULT LLC ACTCO GEN. CONT. CO JAN.'2012
ABU DHABI
1562(1250) SHORING WORK BY USING HBEAMS SH 130 AUSTRALIAN PILING TE DEC.2011

1564(1252) AD-371 NEW FILLING STATION MUSSAFAH-1 M-22 136 AL TORATH ENGINEERING EASTERN INTERNATION JAN.2012
(M22) SERVICE STATION (SHORING WORK BY USING H-BEAMS) CONSULTANTS.
1565(1253) GREEN DIESEL PROJECT EPC WORKS BPTC UMM AL UMM 20 500 5.95 WORLY PARSONS GULF ERECTION CO.
NAR AL NAR
1566(1255) AD-373 NEW FILLING STATION MUSSAFAH M-46 131 AL TORATH ENGINEERING EASTERN INTERNATION MAR.2012
(M-46) SERVICE STATION (SHORING WORK BY USING H-BEAMS)
1569(1257) CONS. OF SEWERAGE LINE PLOT C70 C70/71 E-25 800 13.00 TETRA EMIRATES GEN. APR.2012
AND C71 SECTOR E-25 - WO184 (DRILLING OF DEWATERING HOLES)
1570(1258) PROPOSED COMMERCIAL BUILDING FOR AL AIN 70 AL BAHIR CONSULTANT AL THARAWAT GEN. CO Jun-12
MR KALID ALI ABDULREDA AL BUSTANI (SHORING WORK BY USING H-BEAMS)
1571(1259) SHOPPING CENTER ABU DHABI COOPERATIVE 10.50 HEBERGER ENGINEERINGTPOLENSKY & ZOELLNER Jul-12
AL SHAMKHA BPTC P3B SH-8 876 600 CONSULTANT ABU DHABI
1572(1260) PROPOSED INDUS. BUILDING FOR MR SAEE BPTC 41 M-11 63 500 14.50 ARCHITECTURAL DESIGNINAL RAWASI INTERNATIO JUL.2012
BIN HELAL AL DARMAKI
& DECORATION CONST. EST.
1573(1261) PROPOSED INDUS. BUILDING FOR MR SAEE BPTC 42 M-11 63 500 14.50 ARCHITECTURAL DESIGNINAL RAWASI INTERNATIO JUL.2012
BIN HELAL AL DARMAKI & DECORATION CONST. EST.
1574(1262) ADDITIONAL WORKSHOP SHED FOR ADOS CFA 41 M-46 33 500 13.00 NATIONAL ENGINEERING GULF ERECTION CO. JUL.2012
FOR ENGG. INDUSTRIES. BUREAU
1575(1263) BEACH CLUB DEVELOPMENT SH ARCHITECTURAL CATIC THE CHINESE CO AUG. 2012
AL BATEEN AREA (SHORING WORK BY USING H-BEAMS) CONSULTING GROUP

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 64 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
1576(1264) INDUSTRIAL BUILDING FOR SHEIKH CFA 5&6 M-16 80 500 11.00 NATIONAL ENGINEERING AL RAWASI INTERNATIO SEPT.2012
AHMED BIN SAIF AL NAHYAN BUREAU CONST. EST.
1578(1266) ADDL. STORE FOR MICODA PROCESS CFA 6C1_7C1 M-41 20 500 10.40 A.D.D. CONSULTANT AL RAWASI INTERNATIO SEPT.2012
SYSTEM INTERNATIONAL CONST. EST.
1579(1267) NEW FILLING STATION IN ABU DHABI SH M26 M26 AL TORATH ENGINEERING EASTERN INTERNATION OCT.2012
AD-372 (SHORING WORK BY USING H-BEAMS) CONSULTANT
1580(1268) PROPOSED BUILDING FOR MR MUBARAK BPTC C-35 ME-9 84 600 16.00 FUTURE CONSULTANT ZAKUM CONTRACTING JAN.2013
ALI AZAYEZ MAKTOUM AL SHERAIFI REAL ESTATE
1583(1271) MICRO PILE CONS. FOR WHRP MICRO ANCHOR RAS AL 354 110 4.00 GCC GULF CEMENT CO. JAN.2013
PILES FOR AQC-1 DUCT A- SUPPORT MP KHAIMAH
1586(1274) PILING WORK FOR LOT 2.2 - 220KV OHL BAB BPTC HABSHAN 800 11.00 EDF L&T CONSTRUCTION JAN.2013
TO HABSHAN 5 AND LOT 2.3 KV OHL ASAB2 ASAB 1000 15.00
1587(1275) AD-382 CONS. OF BRIGADE HQ BLDG FOR BPTC AL AIN 124 600 11.00 CMW EASTERN INTERNATION JAN.2013
COMMAND OF MILITARY WORKS AL AIN
1588(1276) PROPOSED VILLA FOR MR RASHID BPTC 30 SE-26 78 500 12.50 HANNOVER CONSULTING AL DARMAKI BUILDING MAR.2013
MUBARAK RASHID AL HAJRY ENGNEERS & CONSTRUCTION EST.
1589(1277) NEW 132KV SUBSTATION E12 BPTC - E12 182 600 14.25 ENERGO CONSULT LLC ACTCO GEN. CONT. CO MAR.2013
ABU DHABI
NEW FILLING STATION BPTC 166 M-36 97 500 12.50 AL TORATH ENGINEERING EASTERN INTERNATION MAR.2013
CONSULTANTS.
1590(1278)
NEW FILLING STATION SH M-36 193 AL TORATH ENGINEERING EASTERN INTERNATION APRIL.'13
(SHORING WORK BY USING H-BEAMS) CONSULTANT
1592(1280) AD-386 PRESIDENTIAL CAR PARKING SH M-12 30 AL TORATH ENGINEERING EASTERN INTERNATION MAR.2013
MUSSAFAH M-12 (SHORING WORK BY USING H-BEAMS) CONSULTANTS.
1593(1281) DEWA 13MW SOLAR POWER PLANT CFA 4500 650 1.75M ILF CONSULTING CONSOLIDATED CONT. APRIL/MAY.'13
PREPARATION PACKAGE DUBAI ENGINEERS INTNL CO. LTD.
1594(1282) PROPOSED STEEL FACTORY FOR KHALIFA 10 MQ-1 31 500 17.50 NATIONAL ENGINEERING GULF ERECTION CO. MAY.2013
HAREB MUGHAIR AL KHAILY, BPTC MAQTA BUREAU
1595(1283) CONS. OF MR ALI BIN RASHID ADNOC SHARJAH 134 12M ADNOC BEAVER GULF CONT. APRIL '2013
FILLING STATION IN SHARJAH (SHORING WORK BY USING H-BEAMS) 70 6M LLC
1599(1287) SHORING WORK BY USING H-BEAMS ABU 100 12M AUSTRALIAN PILING JUNE '2013
DHABI TECHNOLOGY
1601(1289) CONS. OF ESC ACCESS ROAD IN F1 BPTC QIDFA FUJAIRAH 19 600 10.00 MUC ENGINEERING ARABIAN CONSTRUCTIO JULY '2013
PLANT OF EMIRATES SEMBCORP IN QIDFA 18.00 CO.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 65 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
1605(1293) CONS. SHOWROOM, OFFICE, SPARE & CFA 45 M-9 76 500 13.30 NATIONAL ENGINEERING GULF ERECTION CO. AUG.'2013
WORKSHOP MUSSAFAH
1606(1294) HORIZON PRIVATE SCHOOL AT CFA P6 SE-43 234 500 10.00 PIONEER ENGINEERING DESERT CONSTRUCTIO SEP.'2013
KHALIFA CITY CONSULTANCY FOR GEN. CONT.
1607(1295) MCWANE GULF LLC CFA 202HR7 ICAD II 149 500 12.00 ARCHITECTURAL DESIGNINGULF ERECTION CO. SEP.'2013
PLOT 202HR7 SECTOR ICAD II MUSSAFAH 320 600 & DECORATION
1609(1297) SUPPLY & INSTALLATION OF STANDBY BPTC ABU AL 116 600 12.24 ENERGO CONSULT LLC SITE TECHNOLOGY LTD NOV.'2013
GENERATOR PLANT & ASSOCIATED WORKS ABYAD
1610(1298) GULF LIME CO.LLC AT ICAD II MICRO 204ER7 MUSSAFAH 14 150 12.00 ADD ARCHITECTURAL GULF ERECTION CO. NOV.'2013
PILE DESIGNING & DECORATION
1611(1299) PROPOSED AL WATHBA COURT CFA AL WATHBA 81 500 17.00 HH SHK MANSOUR ENGG STEEL MODULAR GEN C NOV.'2013
AL WATHBA OFFICE LLC
1612(1300) PRESIDENTIAL GUARD JOINT FIRES CO. BPTC MAHAWI 100 500 6.00 AL TORATH ENGINEERING CAPRIOLE CONS. CO. L DEC.'2013
MILITARY SCHOOL MAHAWI
1613(1301) NEW FILLING STATION , PLOT NO.P88 BPTC P-88 37 500 13.00 AL TORATH ENGINEERING EASTERN INTERNATION JAN.'2014
SECTOR NO. M-26, MUSSAFAH, ABU DHABI SEC.M-26 CONSULTANTS
1614(1302) CONS. OF BUILDING FOR SPECIAL AL MUSHRIF 497 500 11.50 AL TORATH ENGINEERING CODE CONTRACTING C MAR.2014
GUARD , AL MUSHRIF CAMP BPTC CAMP CONSULTANTS
1615(1303) PGC BOUNDARY WALL & FENCE AL TAWEELA 245 500 11.50 AL TORATH ENGINEERING CAPRIOLE CONS. CO LL AUG. .2014
AL TAWEELA BPTC CONSULTANTS
1619(1307) PILING WORKS FOR 220KV OHL BAB G/S TO 44 800 12.00 EDF ABU DHABI LARSEN & TOUBRO LTD APR.2014
ASAB 2 SWITCHING STATION & RELATED W BPTC ASAB 2 52 1000
1620(1308) SPECIAL STEELS FACTORY LLC CFA 125 500 12.00 ARCHITECTURAL GULF ERECTION CO. APR. 2014
PLOT 110SR60 MUSSAFAH MUSSAFAH DESIGNING DECORATION
1621(1309) PROPOSED SUPPORT BW FOR HH SHK MP AL KARAA 53 150 10.00 - AL THARAWAT GEN. CO MAR.2014
ALHAMED BIN TAHNOON - AL KARAA AL AIN AL AIN EST
1622(1310) ABU DHABI INTERNATIONAL SHOOTING BPTC 18 600 16.00 WS ATKINS & PARTNERS AL TAWASOL AL HADITH MAR.2014
CLUB TSR RESERVOIR BUILDING CONT.
1623(1311) AD-393 ADNOC SERVICE STATION AT BPTC P9 W-52 401 500 11.00 AL TORATH ENGINEERING EASTERN INTERNATION JUNE'2014
AL MUSHRIF CONSULTANTS
1624(1312) PRIVATE SCHOOL CFA P1B Z-17/01 983 500 12.50 NATIONAL ENGINEERING GULF ERECTION CO. APR.2014

BUREAU
1625(1313) WARE HOUSE & OFFICE BUILDING CFA 27A9 ICAD III 79 500 11.00 THE LEBANESE GREEN SAND GEN. MAY.2014
CONSULTANT CONT.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 66 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
1626(1314) PILING WORKS LOT 2B OHL GRID STATION BPTC AIN AL FAYDHA 8 1200 ENERGO CONSULT LLC LARSEN & TOUBRO LTD MAY.2014
AIN AL FAYDHA 32 800 14.50
1627(1315) AD-394 - CONS. OF ADNOC SERVICE BPTC AL MAHAW CD44 499 500 10.00 AL TORATH ENGINEERING EASTERN INTERNATION NOV.2014
SERVICE STATION AT AL MAHAWI
1628(1316) AL HAYER CLINIC - AL AIN AL AIN CIVIL POWER GEN CON MAY.2014
(SHORING WORK BY USING H-BEAMS)
1629(1317) AD-393 ADNOC SERVICE STATION AT P9 W-52 240 AL TORATH ENGINEERING EASTERN INTERNATION AUG.2014
AL MUSHRIF (SHORING WORK BY USING H-BEAMS) CONSULTANTS
1630(1318) AD-394 ADNOC SERVICE STATION AT P2 CD44 299 AL TORATH ENGINEERING EASTERN INTERNATIONAL
AL MAHAWI (SHORING WORK BY USING H-BEAMS) CONSULTANTS
1631(1319) WARE HOUSE & OFFICE BUILDING CFA 131 M-42 82 500 11.50 MOMEN ARCHITECTS & KAMCO GENERAL CONT AUG.2014
CONSULTING ENGINEERS
1632(1320) ADDITIONAL WORKSHOP, STORE & CFA 12 MW2 28 500 11.50 NATIONAL ENGINEERING GULF ERECTION CO. JULY.2014
SERVICES FOR POLYGON GULF BUREAU
1633(1321) AD-394 ADNOC SERVICE STATION AT P1B AL BAHIA 234 AL TORATH ENGINEERING EASTERN INTERNATIONAL
AL BAHIA (SHORING WORK BY USING H-BEAMS) CONSULTANTS
1634(1322) PROPOSED ABU DHABI AVIATION BPTC P-12 SE-44 214 600 13.50 EMSQUARE ENGG. ENGINEERING UNIT GE NOV.2014
TRAINING CENTRE CONT.
1635(1323) SUPPLY & INSTALLATION OF 33/11 KV AL AIN
PRIMARY SUBSTATION AND ASSOCIATED HOSPITAL
33 KV CABLE WORKS IN AL AIN HOSPITAL OBERMEYER/MML LARSEN & TOUBRO LTD OCT.2014
AL AIN CITY CENTRE (SHORING WORK BY USING H-BEAMS)
1636(1324) ACCOMMODATION BUILDING FOR BPTC 76 500 8.00 AL TORATH ENGINEERING SILVER COAST CONSTRUCTION
SPECIAL GUARD COMMAND AL BATEEN CONSULTANTS & BORING LLC OCT.2014
1637(1325) MEDIUM & SMALL COURTS IN ABU DHABI BPTC BIDA 337 600 13.75 CONSOLIDATED MASRI ENGINEERING
REGION, BIDA ZAYED CITY, ABU DHABI ZAYED 105 600 15.00 CONSULTANTS & CONT. EST.
1638(1326) ADDL PILES - MCWANE GULF LLC CFA 202HR7 ICAD II 214 500 11.00 ARCHITECTURAL GULF ERECTION CO. NOV.2014
DESIGNING & DECORATION
1639(1327) CONS. ACCOMMODATION, KITCHEN, BPTC SAL AL NAKHEEL 970 500 8.00 AL TORATH ENGINEERING SILVER COAST CONSTRUCTION
LAUNDRY & MOSQUE 9.00 CONSULTANTS. & BORING LLC
1640(1328) INSTALLATION OF COFFERDAM & CUT-OFF CFA BARAKAH 1000 ATHENA EMIRATES LLC
WALL FOR UNITS 3&4 - BARAKAH NUCLEAR
1642(1330) PROPOSED SHED FOR ESI FACTORY CFA 127 MW4 142 500 12.50 NATIONAL ENGINEERING GULF ERECTION CO. JAN.2015
UNIT -1
BUREAU

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 67 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
C-1331 CONS. OF OPERATION & MAINT.  BPTC TARIF 247 600 DIRECTORE OF MILITARY CAPRIOLE CONS. CO. L FEB.2015
CENTRE FOR AL BALOON AIR FORCE WORKS
C-1332 ELECTRICAL & CIVIL ENGINEERING WORKS BPTC BANIYAS 171 600 17.00 SEREX INTERNATIONAL CIVILTECH GEN. CONT. MAR.2015
FOR IMPL. OF 4MW NGK BATTERY ENERGY STORAGE SCTP
C-1334 CONS. OF NCO'S & OR"S MESS HALL BPTC SAS AL NAKHEEL 232 500 9.00 AL TORATH ENGINEERING AL FARAA GEN. CONT. C MAR.2015
& CLUB - PGC/CDF/572/65/2014/284 CONSULTANT.
C-1335 BOUNDARY WALL FOR AL MUSHRIF BPTC P9 W-52 78 500 12.00 AL TORATH ENGINEERING EASTERN INTERNATION MAY.2015
FILLING STATION AL MUSHRIF CONSULTANT
C-1336 400KV SWITCHYARD STATION AT BARAKAH BPTC 1768 600 8.00 HSJV BAUER GEOTECHNICAL MAY.2015
NUCLEAR POWER PLANT ABU DHABI BARAKAH SPECIALISED FOUNDATION
C-1339 YAS ISLAND DEVELOPMENT ZONE K TWISTER 27 1000 4.20 PARSONS ATHENA EMIRATES LLC JUNE'2015
INFRASTRUCTURE WORKS System Yas Island
C-1341 CONS. OF PRESIDENTIAL GUARD BPTC 182 500 7.20 AL TORATH CONSULTING SEIDCO GEN. CONT. JUL.2015
COMMAND MAHAWI ENGINEERS
C-1342 ABU DHABI UNIVERSITY ALBA TEC CONSTRUCT AUG.2015
L SHAPE BUILDING (SHORING WORK BY USING H-BEAMS) & DEVELOPMENT
C-1343 ACCOMMODATION BUILDING GATE HOUSE BPTC AL MINA PALACE 134 500 18.00 AL AIN CONSULTING AEGIS CONTRACTING C AUG.2015
SECURITY BLOCK & GYM PORT PALACE 19 600 ENGINEERS

C-1344
LIME STONE GRINDING & CALCINATION CFA 204ER7 ICAD II 6 500 12.50 A.D.D GULF ERECTION CO. JUL.2015
PIT NO.204 ER7 ICAD II, ABU DHABI
C-1345 NO.PGC-C-055-2013 - CONS. OF CFA AL MUSHRIF 4 500 9.50 AL TORATH ENGINEERING CODE CONT. CO. AUG.2015
FACILITIES IN AL MUSHRIF CAMP CAMP CONSULTANT
C-1346 CONS. OF HANGARS AT SAS AL CFA SAS AL NAKHEEL 3 CMW TRUST CONSTRUCTION AUG.2015
NAKHIL 113 500 8.50 EST.
C-1347 CONS. OF HANGARS AT SAS AL BPTC SAS AL NAKHEEL CMW TRUST CONSTRUCTION AUG.2015
NAKHIL 101 500 13.1 EST.
C-1348 EXTENSION OF MAIN EDUCTIONAL ABU DHAB 60 6M ALBA-TEC CONST. SEPT.2015
BUILDING J-197-10 (SHORING WORK BY USING H-BEAMS) & DEV. LLC.
C-1349 1503/CICPA NEAR TAWEELA ABU DHABI BPTC TAWEELA 74 500 13.75 CMW TRUST CONSTRUCTION NOV.2015
15.00 EST.
C-1350 400KV SWITCHYARD STATION AT BPTC BARAKAH 24 600 17.5M BAUER GEOTECHNICAL OCT.2015
BARAKAH NUCLEAR POWER PLANT SPECIALIZED FOUNDATION
C-1352 (TANK + CHIMNY) FOUNDATION CFA 127 MW4 42 500 12.50 NATIONAL ENGINEERING GULF ERECTION CO SEPT.2015
LAYOUT 9 600 BUREAU

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 68 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
C-1353 220KV OHL INTER CONNECTION FOR BPTC MIRFA 184LM 1000/1200 LAHMEYER INTERNATIONA KALPATARU POWER DEC. 2015
MIRFA IWPP - LOT 1B & 2b, LOT 2B 220KV DC OHL JP 440LM 600 TRANSMISSION LTD.
A NEAR CENTRAL S/S TO CENTRAL 
S/S TRANSCO CONTRACT N-12305/C
C-1354 CONS. OF CANS FACTORY CFA 92NR29 ICAD III 136 500 CONSULTING ENGG GULF ERECTION CO. DEC. 2015
GROUP
C-1355 FEDERAL TRANSFORMER MUSSAFAH CFA 144, 145 ICAD 1 23 500 NATIONAL CONSULTAN GULF ERECTION CO. NOV.2015
OFFICE
C-1356 AL BATEEN PALACE PHASE 3 MICRO 38 150 11.00 CAPRIOLE CONSTRUCT NOV.2015
CAP.185 PILE CO.
C-1357 HAMDAN AL MULLA TOWER ABU DHABI 98 AL THARAWAT GEN CO NOV.2015
HBEAMS/SHEET PILE (SHORING WORK BY USING H-BEAMS) 73
C-1358 AL BATEEN MASTER TRAINING FACILITY BPTC AL BATEEN 256 600 CAPRIOLE CONSTRUCTION
AL BATEEN - PGC-25-2015 CO.
C-1359 GASOS CONSTRUCTION 2 SHED & OFFICES BPTC ICAD III 372 500 10.30 FIRAS ENGG. CONSULTANTGULF ERECTION CO.
Plot 98NR24 / SECTOR ICAD Iiii MUSSAFAH
C-1360 BLOOM GARDENS DEVELOPMENT - HB 15 EMIRATES LINK MALTAU JAN.2016
ABU DHABI, CLUB HOUSE HIRE OF H-BEAMS LLC
C-1361 COMMERCIAL VILLA ( BASEMENT GROUND HB 58 6.0M CONIN AL AIN CIVIL POWER GENERAL JAN.2016
FLOOR & FIRST FLOOR AT AL AIN ) HIRE OF H-BEAMS CONTRACTING CO.
C-1362 CONST. OF ENTRANCE GATE, PUMP ROOM & SE41 P. 184A 18 500 -12.00 ARCHITECTURAL & ENGINEAL DARMAKI BUILDING & FEB.2016
ELECTRICAL ROOM. SE41 - KHALIFA CITY 184B RING CONSULTANTS CONSTRUCTION EST.
C-1363 PGC-CFD-572-51-2015-1474, Mushrif Camp, BPTC AL 447 500 -9-10 AL TORATH CONSULTING SILVER COAST FEB.2016
Al Mushrif, Abu Dhabu UAE MUSHRIF ENGINEERS CONSTRUCTION
C-1364 New Studio & Rest Villa, Beach Palace CFA S300 BEACH 30 500 -9.00 Design Department STEEL MODULAR GEN FEB.2016
Abu Dhabi PALACE CONT.
C-1365 STORE IN COUNTRY CLUB ABU DHABI CFA COUNTRY 46 500 10.00 UNII ENGINEERING CAPRIOLE CONSTRUCT MAR.2016
CLUB CONSULTANCY CO.
C-1366 ABU DHABI PORTS CO, EMIRATES STEEL W CFA 36B KHIA8 302 500 15.00 NATIONAL ENGINEERING GULF ERECTION CO. MAR.2016
MANUFACTURING EST. KH CITY BUREAU
C-1367 MS.RAZNA HAMAD AMIR AL AHBABI PROPOSED 151,152 W18/02 SHORING / HBEAMS DEWAN ARCHITECTS ALI MOOSA & SONS MAR.2016

SH
COMMERCIAL VILLA MS MUHRA,MS MYTHA 153 ENGINEERS CONTRACTING
C-1368 TRANSCO CONTRACT N-13859 - 220KV BPTC NEW RUMAITHA 720 800/1000 EDF ABU DHABI KALPATARU POWER MAR.2016
OHL WORKS FOR NEW RUMAITHA & NEW DABBIYA NEW DABBIYA 352/633 1200 TRANSMISSION LTD

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 69 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
C-1369 AL DHAFRA SHOPS, ZAYED CITY HB T-1001 ZAYED CITY 59 12M GHANTOOT GULF MAY.2016
ABU DHABI. (SHORING WORK BY USING H-BEAMS) CONTRACTING
C-1370 400kV GIS MODIFICATIONS WORKS AT SAS BPTC SAS AL NAKHEEL 47 600 -9.00 LAHMEYER INTERNATIONA TOSHIBA CORPORATIO JUN.2016
AL NAKHEEL GRID STATION & 100mVAR KH CITY
C-1371 VILLA FOR MR. HAMDAN MUSALLAM MAKTO CFA 101-103 SW-15 76 500 -12.00 AL MASSA ENGINEERING AL QAMT GENERAL AUG.2016
RASHED AL MAZROUIE KHALIFA CITY CONSULTANCY CONTRACTING.
C-1372 EXTENSION & MODIFICATION OF EXISTING CFA 19 W-28 22 500 -8.00 ARCHITECTURAL & ENGINEAL DARMAKI BUILDING AUG.2016
VILLA FOR MR. FADEL AL DARMAKY RING CONSULTANTS & CONSTRUCTION EST.
C-1373 PROPOSED BUILDING & OTHER FACILITIES BPTC SAS AL NAKHEEL 162 500 14M-18M COMMAND OF MILITARY DESERT CONSTRUCTIO AUG.2016
CMW-14091-C001 CAMP WORKS FOR GEN. CONT.
C-1374 V.I.P VILLA BEHIND MARINA MALL CRANE HIRE OF HITACHI 1 3 DAYS 55TON TRENCH OILFIELD EQP. JUL.2016
CRAWLER CRANE TRADING
C-1375 PRIVATE RESIDENTIAL VILLA CFA C-6 AD G-2 312 500 -18.50 HANS KNUTZEN ASSOCIAT BRIGHT ACCORD AUG.2016
ABU DHABI INC GENERAL CONTRACTING
C-1376 SECURITY DEPARTMENT OFFICE COMPLEX BPTC 11kV & LV NETWORK 17 450 -7.00 PARSONS SITE TECHNOLOGY AUG.2016
CONTRACT NO. D-103631, ABU DHABI BRINCKERHOFF LTD. LTD CO.
C-1377 LINDERBERG PRIVATE VILLA AT SAADIYAT HB SAADIYAT ISLNAD 83 6M ALBA-TEC CONST. AUG.2016
ISLAND (J-201) J-201-10 (SHORING WORK BY USING H-BEAMS)
C-1378 IFC NEW YARD - AL FAYAH AL FAYAH INTERNATIONAL FORMA SEP.2016
TION & CONSTRUCTION
C-1379 AIRPORT ROAD PARKING CFA 433 W-69 39 600 -14.00 NATIONAL ENGINEERING AL RAWASI INT'L OCT.2016
ABU DHABI 95 600 -15.00 BUREAU CONSTRUCTION
C-1380 VILLA MASAOOD AHMED MOHAMED (JA-33) HB 60 6M ALBA-TEC CONST. DEC.2016
J-33-10 (SHORING WORK BY USING H-BEAMS)
C-1381 MASDAR PROJECT, ABU DHABI. CFA C52 SE45-01 154 500 -13.00 AL AIN CONSULTING STEEL MODULAR GEN. SEP.2016
KRYPTO LAB ENGINEERS CONTRACTING LLC
C-1382 PROPOSED HOTEL APARTMENTS FOR HB 044B,045A & 045A 188 12M GULF PILING LLC OCT.2016
M/S. AZIZI INVESTMENT LLC (SHORING WORK BY USING H-BEAMS)
C-1383 PROPOSED HOTEL APARTMENTS BLDG. FO HB 035B & 036A 141 12M GULF PILING LLC NOV.2016

M/S. AZIZI INVESTMENT LLC (SHORING WORK BY USING H-BEAMS)


C-1384 RENOVATION OF AL BATEEN PALACE, CFA PHASE 3 132 500 -6.30 UNII ENGINEERING CAPRIOLE CONSTRUCT OCT.2016
ABU DHABI. AL BATEEN 21 600 CONSULTANCY CO. LLC
C-1384 RENOVATION OF AL BATEEN PALACE, CFA SHORING WORK BY 100Lm 600 Excavat. UNII ENGINEERING CAPRIOLE CONSTRUCT OCT.2016

ABU DHABI. USING SECANT PILE 6.0m CONSULTANCY CO. LLC

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 70 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
C-1385 MASDAR PROJECT, ABU DHABI. CFA 136 500 -13.00 AL AIN CONSULTING STEEL MODULAR GEN. NOV.2016
ACCELERATOR OFFICE BLDG. AD ENGINEERS CONTRACTING LLC
C-1386 PROPOSED SHED LAND NUMBER. 131-001-0 BPTC 64 500 -16.50 MARATHON ENGINEERING GULF ERECTION CO. NOV.2016
T, TARIF, ABU DHABI. CONSULTANT CO. LLC
C-1387 PGC MTFP-B SITE 004- 400M MTR CONST. BPTC P3, P7, P9 & P12A. 38 600 89.20 AL SALAAM CONSULTING CAPRIOLE CONSTRUCT DEC.2016
PACKAGE P8, AL WATHBA, ABU DHABI. 23 600 88.70 ARCHITECTS ENGINEERS PCO. LLC
C-1388 PGC MTFP-B SITE 017 BPTC 7A 385 600 89.00 AL SALAAM CONSULTING CAPRIOLE CONSTRUCT JAN.2017
PACKAGE 7A, WADIA AL SHABAK, DUBAI. ARCHITECTS ENGINEERS PCO. LLC
C-1389 DR. HAMDAN AL MAZROUE TOWER HB SEC: W10, PLOT :C-64 35 6M ARCH. & ENGINEERING AL THARAWAT GEN. JAN.2017
ABU DHABI (EXTRACTION OF H-BEAMS) CONSULTANT. CONT. EST.
C-1390 EPC FOR AL DABBIYA SURFACE PILING SERVICE TECNIMONT ACC / LAHOUD JV FEB.2017
FACILITIES, PHASE III, ABU DHABI UAE. ENGINEERING.
C-1391 DIFFERENT WORKS AT CAMP NO. 220301 BPTC DUBAI 78 500 -15.00 COMMAND OF MILITARY DESERT CONSTRUCTIO FEB.2017
CMW - 15024 - C001, DUBAI. WORKS FOR GEN. CONT.
C-1392 ADOS OIL SERVICES WORKSHOP AND CFA 2AR16 ICAD-II 137 500 -13.00 ARCHITECTURAL ENGG. AL QAMT GENERAL CON FEB.2017
OFFICE BUILDING AT ICAD II, MUSSAFAH CONSULTANCY
C-1393 HONDA SHOW ROOM, MAQTA. HB MAQTA 157 12M MAKAN CONSULTING UNITED EURO FOUNDA FEB.2017
(SHORING WORK BY USING H-BEAMS) ENGINEERS CO. LLC
C-1394 ROYAL PEARL PROPOSED COMMERCIAL BPTC 6184116 NAAD AL 338 600/800 -21.00 CONIN INCORPORATED NSCC INTERNATIONAL FEB.2017
RESIDENTIAL 9 BUILDING SHIBA 1ST 1000 CONSULTANTS.
C-1395 NATIONAL CEMENT FACTORY EXPANSION CFA 38R6 M41 58 500 -11.00 CONSULTING ENGG. GULF ERECTION CO. LL MAR.2017
ICAD 1, MUSSAFAH GROUP
C-1396 NFPC MEGA PLANT, KIZAD BPTC 55 800 -3.50 NFPC NATIONAL FOOD PROD MAR.2017
CO.
C-1397 CONSTRUCTION OF CONCRETE TOWER CFA 30 600 14M COMMAND OF MILITARY CAPRIOLE CONSTRUCT MAR.2017
AT ARQOUB AL DARABA, RAK WORKS CO.
C-1398 RENOVATION OF AL BATEEN PALACE CFA 21 500 -9.50 UNII ENGINEERING CAPRIOLE CONSTRUCT APR.2017
PHASE III, ABU DHABI UAE CONSULTANCY CO.
C-1399 PVT. RESIDENTIAL VILLA CFA 6 ADG2 49 500 -15.00 HANS KNUTZEN BRIGHT ACCORD GEN. MAY.2017
ABU DHABI GATE CITY, ABU DHABI-UAE ASSOCIATES INC. CONT.
C-1400 ABU DHABI FUTURE SCHOOL CFA P71-72 P1_P2 500 & 600 -7.50 AL SUWEIDI CIVIL POWER CONTRAC MAY.2017
PHASE-6, SHAKHBOUT CITY LLC

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 71 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
CONST OF (ADNOC) TAMOUH SERVICE BPTC & 196 & EASTERN
C-1401 P9 RT5 500 -11.00 ADNOC JUN.2017
STATION SECANT 105.2LM INTERNTIONAL LLC
GPRC17-192-MAG 230, PLOT 646 6970 DRILLING
C-1402 646 6970 SAFA 4 155 12.00 GULF PILING LLC JUN.2017
WADI AL SAFA 4, DUBAI. WORKS
PRIVATE VILLA IN KHALIFA CITY ABU DAR AL KHALEEJ ENGG. GREEN SAND GEN.
C-1403 CFA 45A1 SE-40 59 500 -11.00 JUN.2017
DHABI CONSULTANT. CONT. MAINT.

C-1404 DUBAI NEAR GLOBAL CITY HIRING EQP GULF PILING LLC JUN.2017

PGC-CFD-572-51-2015-1474 MUSHRIF AL TORATH ENGINEERING SILVER COAST


C-1405 SHORING WORK - HB 26 12M JUL.2017
CAMP CONSULTANT CONSTRUCTION
ADOS OIL SERVICES WORKSHOP AND ARCHITECTURAL ENGG. AL QAMT GENERAL
C-1406 35 6M AUG.2017
OFFICE BUILDING AT ICAD II, MUSSAFAH CONSULTANCY CONTG.
AL SALAAM CONSULTING CIVIL POWER
PGC-C-007-P2-2016, (04/2017), SAS AL
C-1407 BPTC PGC-C-007-P2-2016 S 399 500 -12.00 ARCHITECTS ENGG. & GENERAL AUG.2017
NAKHEEL, ABU DHABI.
PLAN. CONTRATING LLC
GPRC17-200-PROPOSED BUILDING, DRILLING PLOT
C-1408 188 12.00 GULF PILING LLC AUG.2017
JUMEIRAH VILLAGE CIRCLE, DUBAI WORKS JVC10LMRP200
MAKAN CONSULTING UNITED EURO
C-1409 HONDA SHOW ROOM, MAQTA. HIRING EQP - CRANE & VIBRATOR AUG.2017
ENGINEERS FOUNDATION CO. LLC
PRIVATE RESIDENTIAL VILLA PALM PLOT NO. CROWN ENGINEERING
C-1410 CFA 188 500 -8.00 GULF PILING LLC SEP.2017
JUMEIRAH, DUBAI. PJFRN067A CONSULTANTS
PROPOSED RESIDENTIAL BUILDING FOR CAPRIOLE
HEBERGER ENGINEERING
C-1411 MR. AHMED MOHSEN MOHAMED BPTC 9 RBW7 129 1000 -18.00 CONSTRUCTION CO. SEP.2017
CONSULTING ENGINEERS
MAHFOUZ. LLC
UNITED EURO
C-1412 KHALIFA CITY HIRING EQP - CRANE & VIBRATOR OCT.2017
FOUNDATION CO. LLC
INTERCONNECTING PIPING AMONG
DASTUR ENGINEERING DOLPHIN OILFIELDS
C-1413 PHASE 1, PHASE2 AND ASP2 - ICAD, CFA 8 500 -14.50 OCT.2017
INTERNATIONAL EQP. SERVICES LLC
MUSSAFAH
93,103,104, AL
PROPOSED BOUNDARY WALL AND THE LEBANESE GREEN SAND GEN.
C-1414 CFA 109,110,116 BAHYA 338 500 -6.50 NOV.2017
SERVICE BLOCKS - AL BAHYA, ABU DHABI & 117 CONSULTANT CONT. MAINT.
FARMS
89 A1-99 AL KHEALI & AL AMERI
CONSTRUCTION OF THE CENTRAL -13.0 / - PROMPT
C-1415 BPTC A1, 1SA, ICAD I 70/144 600/750 CONSULTANT NOV.2017
WAREHOUSE AND OFFICES FACILITIES 2SA 14.0 CONTRACTING LLC
ENGINEERS

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 72 of 73]


    International Formation  & Construction
      P. O. Box : 70303
      Abu Dhabi, UAE

LIST OF JOBS EXECUTED BY IFC

Job Project Name System Plot Sector No. of Diameter Length Consultant Contractor Month & Year
No. Used No. No. Piles of Piles(mm) (m) of Execution
DEVELOPMENT OF 33KV POWER
NETWORK IN AL AIN/NEW 33/11KV GOPA INTERNATIONAL LARSEN & TOUBRO
C-1416 SHORING WORK - H AL AIN 70 12M JAN.2018
PRIMARY SUBSTATION IN JABAL HAFEET ENERGY CONSULTANT LTD
AND SHAMAL GHARBA
COMMERCIAL BUILDING FOR MR.
SECANT EMIRATES GERMAN
C-1417 MUHAMMED HAMED SAIF AL SHARHABY - C-66 E20/01 198 750 - - JAN.2018
PILE FOUNDATIONS
ABU DHABI ISLAND

CONSTRUCTION & MAINTENANCE OF


PROPOSED RESIDENTIAL BUILDING FOR C17 & 226 & NATIONAL ENGINEERING MASRI ENGINEERING
C-1418 CFA SHS3 500 / 600 -10.0 / -7.5 JAN.2018
MR. AHMAD MUBARAK ABDULLAH AL C18 170 BUREAU & CONT. EST.
KINDY - AL SHAMKHA SOUTH

UNITED EURO
C-1419 DUBAI HIRING EQP - CRANE & VIBRATOR JAN.2018
FOUNDATION CO. LLC

SERVICE CENTER & ANCILLARY CAPITAL ENGINEERING INTERNATIONAL


C-1420 CFA 37WR43 ICAD III 77 500 -11.50 FEB.2018
FACILITIES CONSULTANCY DEVELOPMENT CO.

BPTC ‐ Bored Pile, Temporary Casing BPPC ‐ Bored Pile, Permanent Casing CFA ‐ Continuous Flight Auger      [Page 73 of 73]