NIVEL INICIAL - PABELLON1, BLOCK A S/.392,852.

36
NIVEL PRIMARIA - PABELLON2, BLOCK B Y C S/.420,318.46
NIVEL SECUNDARIA - PABELLON 3 S/.690,631.38
INGRESO S/.11,382.80
CERCO PERIMETRICO S/.194,867.17
PATIO DE FORMACION S/.74,232.09
ESTRADO-ASTA S/.9,918.87
LOSA MULTIDEPORTIVA S/.117,241.87
TANQUE SEPTICO S/.24,381.52
TANQUE ELEVADO S/.109,224.55
CUNETAS PLUVIALES S/.107,621.59
AREA DE CIRCULACION S/.69,454.63
MOBILIARIO-EQUIPAMIENTO S/.136,500.00
IMPACTO AMBIENTAL S/.19,337.86
FLETE TERRESTRE S/.84,000.00
S/.2,461,965.15

COSTO DIRECTO S/.2,461,965.15


GASTOS GENERALES S/.246,196.52
UTILIDAD S/.246,196.52
S/.2,954,358.18
IGV S/.531,784.47
PRESUPUESTO DE OBRA S/.3,486,142.65
SUPERVISION S/.63,556.00
EXP TEC S/.53,704.00
PRESUPUESTO TOTAL S/.3,603,402.65

DESCOMPUESTO COSTO DIRECTO


MANO DE OBRA S/.752,866.52
MATERIALES S/.1,484,713.90
EQUIPOS S/.224,385.37
SUBCONTRATO
TOTAL S/.2,461,965.79