Proposal for
Traceability
Application
SSIPL Retail Ltd
1 Introduction
SSIPL is looking forward to Traceability Application using barcode technology. BCIL is pleased to submit this solution document
for SSIPL requirements as per the on-going discussions.
The suggested solution is based client/server architecture. The architecture is suggested for a highly available system, rich user
experience & ease of use for end users.
2 Functional Scope
The scope of the software is to automate the Traceability Application using barcode technology in integration with ERP. This
would require the development of the front-end application, client application for mobile computers, and mobile communication
application and integration service module for ERP. The document lays down the specifications of the middleware application,
its architecture and infrastructure requirements.
The entire solution consists of followings:
• Front-end for Middleware Application
• ERP Integration Services Module
• Mobile Computer Application
• Communication Server for Mobile Terminal
3 Technical Proposal
The entire solution is based on 3-tier architecture where the mobile devices communicate to ERP through a middleware
application. The functionalities which are not present in ERP are handled in middleware.
Interface / Workflow /
st Mobile Communication
1 level validations Module
ERP Modules
Middleware ERP DB
Staging DB DB Interface
Presentation Layer and user’s Middleware / SCM logic, users, Standard ERP with API/ BAPI / RFC
work flow. Contains menu, integration and non-ERP integration to business layer
st functions
screens and 1 level validations/
Data filters
Desktop Computers
The desktop application would require the computer with following specifications:-
• I3/i5 Processor with Windows 7 operating System
• 4GB RAM
• 100GB HDD
• Dot net Framework 4.0
In this phase all the stake-holders form customer team, define clear project objectives, process details, necessary validations,
workflows & integration touch points with ERP. At the end of the phase, the complete requirement is revalidated with the initial
scope as given in this document. Any new requirements which were not identified or communicated during the estimation and
having major impact on the project architecture or project timeline shall be managed through a Change Request and would result
in a revision of estimates, timelines and cost.
Phase Deliverables
Sr.
No. Description Responsibility Estimated Days
1 Requirement Analysis and SRS Finalization
- Requirement Study
- Process download BCIL
- SRS drafting SSIPL 1 Week
- SRS Signoff BCIL
SSIPL 1 Week
4.1.4 Integration
Once the development of all the modules is complete, the BCIL moves to customer environment to do Integration Testing with
ERP interface. The customer must be ready with interfaces which are to be developed in the SSIPL to integrate BCIL Application.
6 Weeks
2 Integration
- SSIPL Interface Details SSIPL
- Interface Test Data SSIPL
- Inetrface Testing Development BCIL
- Test Validation SSIPL IT
Sr.
No. Description Responsibility Estimated Days Remarks
1 User Acceptance Testing In entire UAT cycle, Data
- Test Cases SSIPL will be provided by SSIPL
- UAT SSIPL/BCIL and BCIL will test the
- Integration Test Plans & Test Cases Reports BCIL/ SSIPL Application with the data
- Business Scenario Testing provided by SSIPL
- UAT Signoff SSIPL/BCIL
- Release for Go-Live SSIPL 1 Week
- Go-Live Plan SSIPL/ BCIL
BCIL/SSIPL
Sr.
No. Description Responsibility Estimated Days Remarks
1 Go-Live Data entry will be done by
- Software Installation BCIL SSIPL and BCIL will guide
- Data Migration/ creation BCIL/SSIPL to create Masters. BCIL
- Train the trainer BCIL will also provide a
- End user Trainings SSIPL 3-4 Weeks platform to upload the
- Change Management SSIPL existing data.
- Project Signoff SSIPL
Activity Responsibility
New Requirement SSIPL
Approval of Requirement SSIPL Project Manager
Effort Estimation & Impact Analysis BCIL Project Manager / TL
Estimation approval SSIPL Project Manager
Release of Order SSIPL
Implementation of Change BCIL
6 Operating Principles
BCIL agrees to the spirit of the operating principles defined under scope of work and would like to make the following
observations:
1. Resource Deployment; The resource deployment has been done keeping in mind the starting and ending of different
functionality under different phases and other integration points. This is to ensure that optimal resource is deployed
on the project.
2. Documentation: It is expected that prior to commencement of the project, Customers’ team shall compile and
document all the business processes. This shall significantly reduce the time of design document by BCIL.
3. Training: The cost for the training has been considered on the basis that the core customer team shall be trained by
BCIL which would further train end-user. In case extensive end-user training has to be provided, the same shall be on
the basis of number of users and the total training requirements.
4. Warranty & Post Go-Live support: BCIL team will provide 3 months post go-live support with one resource. Any changes
during the warranty period shall be as per the effort requirements.
Clear documentation of all processes to be included for implementation as per scope defined, with standardization and
uniformity across different units. The initial document shall be compiled by SSIPL team based on the existing systems,
which shall be used as the basis for further implementation. This shall be completed prior to the commencement date
of this project.
Clear definition of Project deliverables and adherence to Project Timelines, Scope and Work Breakdown Structures BCIL
will provide full time project team members from both the user department and the IT Department as per the
Organization Structure outlined in the Project Organization. The same shall be finalized and approved by the BCILs’
Project Manager and SSIPL’ Project Manager prior to the start of the Project.
SSIPL’ will provide for suitable hardware, operating system, communication software and all software products to
enable effective configuration of Traceability Application software, as per the mutually agreed schedules. SSIPL will also
provide for a suitable office infrastructure for the project team. All such infrastructure facilities will be provided well in
time for use in the project effectively.
SSIPL agrees to restrict the software modifications to the minimum. Such modifications are to be approved by both the
BCIL and SSIPL Project Managers in consultation with the Steering Committee.
SSIPL is responsible to provide sample test data as per the schedules.
The SSIPL’ Project Manager will give final approval and sign off on all deliverables as and when required.
SSIPL’ agrees for a max 2 days of response times from the time of registering of the input with the concerned personnel.
9 Commercials
On the basis of effort estimation, following is the cost for the project as per the requirement stated in the document. This costing
is worked on the basis that there are no delays in the information availability from the customer:-
Note: Above prices do not include any taxes and same shall be extra as per actuals.
9.3.2 Implementation
Payment for Implementation has to be made after completion of each individual site.
9.4 Warranty
There will be 1 year warranty post go-live for the bug-fixes and off-site support.