Fecha Al 03/11/2014
Presupuesto Base
-------------------
SUBTOTAL 1,162,818.46
===========
Nota : Los precios de los recursos no incluyen I.G.V. son vigentes al : ###
Presupuesto
01 Obras Provisionales
02.01 DEMOLICION MANUAL CON PERSONAL Y ROTOMARTILLO GLB 1.00 7,000.00 7,000.00
COSTO DIRECTO
UTILIDAD 10%
SUBTOTAL
TOTAL PRESUPUESTO
d Arquitectura
Costo al 11/1/2014
9,741.56
193.40 50.37 9,741.56
25,728.42
1,004.20 16.07 16,137.49
133.40 26.91 3,589.79
25.10 23.86 598.89
357.60 9.70 3,468.72
59.42 32.54 1,933.53
9,082.84
364.48 24.92 9,082.84
19,900.55
1,037.50 18.30 18,986.25
40.42 22.62 914.30
1,399.28
138.68 10.09 1,399.28
7,519.07
201.80 37.26 7,519.07
7,178.90
10.00 717.89 7,178.90
S/. 80,550.62
8,055.06
8,055.06
96,660.74
17,398.93
=================
S/. 114,059.68
S10
01 SISTEMA DE DESAGUE
01.01 TRABAJOS PRELIMINARES
01.01.01 Trazo y replanteo ml. 87.23
01.01.02 Excavacion y relleno de zanja. ml. 87.23
01.01.03 Cama de arena para tuberias ml. 87.23
01.01.04 Relleno y compactacion de zanja ml. 87.23
01.01.05 Eliminacion de desmonte m3. 39.69
01.02 TUBERIAS DE DESAGUE
01.02.01 Tuberia de PVC SAL tipo pesada de 2" ml. 88.40
01.02.02 Tuberia de PVC SAL tipo pesada de 3" ml. 52.14
01.02.03 Tuberia de PVC SAL tipo pesada de 4" ml. 38.67
01.02.04 Tuberia de PVC SAL tipo pesada de 3/4" ml. 65.58
01.02.05 Tuberia de PVC SAL tipo pesada de 1" ml. 24.65
01.02.06 Tuberia de PVC SAL tipo pesada de 1 1/4" ml. 5.00
01.02.07 Tuberia de PVC SAL tipo pesada de 1 1/2" ml. 20.00
01.03 MONTANTES DE DESAGUE
01.03.01 Montante de desague pvc sal Pesada de 2" ml. 15.00
01.03.02 Montante de desague pvc sal Pesada de 4" ml. 20.00
01.04 MONTANTES DE VENTILACION
01.04.01 Montante de ventilacion PVC SAL de 2" ml. 33.00
01.05 SALIDAS
01.05.01 Salida de desagüe de 2" pto. 34.00
01.05.02 Salida de desagüe de 3" pto. 20.00
01.05.03 Salida de desagüe de 4" pto. 11.00
01.05.04 Salida de desagüe de 6" pto. 4.00
01.06 CAJAS DE REGISTRO 0.00
01.06.01 Caja de registro 0.3x0.6m und. 5.00
01.07 VARIOS
01.07.01 Pruebas hidraulicas 1 glb 1.00
02 SISTEMA DE AGUA FRIA
02.01 SALIDAS DE AGUA
02.01.01 Salida de agua fria inc/tub/acces de 1/2" pto. 17.00
02.02 TUBERIAS PVC C-10 C/R
02.02.01 Tuberia de PVC clase 10 C/R p/agua fria 1/2" ml. 23.55
02.02.02 Tuberia de PVC clase 10 C/R p/agua fria 3/4" ml. 9.00
02.02.03 Tuberia de PVC clase 10 C/R p/agua fria 1¨ ml. 9.00
02.02.04 Tuberia de PVC clase 10 C/R p/agua fria 1 1/4" ml. 25.72
02.03 VALVULAS
02.03.01 Valvula esferica de bronce de 1/2" incl. nicho und. 4.00
02.03.02 Valvula esferica de bronce de 3/4" incl. nicho und. 2.00
02.03.03 Valvula esferica de bronce de 11/4 " incl. nicho und. 1.00
02.04 MEDIDORES DE AGUA
02.04.01 Medidores de agua 3/4"ø und. 1.00
02.05 VARIOS
02.05.01 Pruebas Hidraulicas del Sistema glb 1.00
03 INGRESO DE AGUA A CISTERNA
03.01 TUBERIA PVC C-10
03.01.01 Tuberia de PVC clase 10 C/R p/agua fria 1" ml. 35.34
03.02 VALVULAS
03.02.01 Valvula Flotadora de Ø 1" u 1.00
03.02.02 Valvula esferica de Ø 1" u 1.00
03.03 VARIOS
03.03.01 Pruebas hidraulicas de cisterna glb 1.00
03.03.02 Limpieza y desinfenccion de cisterna glb 1.00
03.03.03 Brida rompe agua de 3" und. 1.00
03.03.04 Brida rompe agua de 1 1/2" und. 1.00
03.03.05 Brida rompe agua de 1" und. 1.00
COSTO DIRECTO
UTILIDAD 10%
SUBTOTAL
TOTAL PRESUPUESTO
SON : TREINTA Y SIETE MIL QUINIENTOS TREINTA Y TRES Y 98/100 NUEVOS SOLES
Página 4
Costo al 11/1/2014
18,168.22
4,647.93
2.34 204.12
10.64 928.13
15.71 1,370.38
17.50 1,526.53
15.59 618.77
5,826.72
18.35 1,622.14
21.44 1,117.88
23.27 899.85
19.39 1,271.60
17.29 426.20
25.33 126.65
18.12 362.40
1,151.80
30.16 452.40
34.97 699.40
570.57
17.29 570.57
4,665.75
56.91 1,934.94
58.92 1,178.40
88.63 974.93
144.37 577.48
505.45
101.09 505.45
800.00
800.00 800.00
4,432.76
1,187.45
69.85 1,187.45
909.11
10.07 237.15
11.26 101.34
14.22 127.98
17.21 442.64
813.32
103.32 413.28
115.48 230.96
169.08 169.08
122.88
122.88 122.88
1,400.00
1,400.00 1,400.00
3,906.07
502.53
14.22 502.53
600.00
380.00 380.00
220.00 220.00
2,803.54
1,400.00 1,400.00
300.00 300.00
571.18 571.18
301.18 301.18
231.18 231.18
S/. 26,507.05
2,650.71
2,650.71
31,808.46
5,725.52
=================
S/. 37,533.98
S10
COSTO DIRECTO
UTILIDAD 10%
SUBTOTAL
TOTAL PRESUPUESTO
alaciones Electricas
Costo al 11/1/2014
43,348.87
18,339.65
163.00 40.38 6,581.94
47.00 42.13 1,980.11
12.00 40.38 484.56
11.00 43.79 481.69
1.00 49.09 49.09
10.00 45.68 456.80
7.00 49.09 343.63
38.00 57.40 2,181.20
70.00 57.60 4,032.00
6.00 50.81 304.86
26.00 55.50 1,443.00
12,866.84
27.80 113.87 3,165.59
9.00 40.77 366.93
18.00 40.77 733.86
24.00 113.87 2,732.88
9.00 21.69 195.21
12.00 21.69 260.28
18.00 14.76 265.68
15.00 14.04 210.60
204.80 12.59 2,578.43
144.65 10.31 1,491.34
84.00 10.31 866.04
0.00 4,880.79
6.00 20.68 124.08
66.00 14.05 927.30
15.00 23.49 352.35
18.00 7.88 141.84
106.20 8.76 930.31
518.30 4.64 2,404.91
4,887.26
1.00 232.53 232.53
1.00 207.85 207.85
2.00 126.33 252.66
2.00 63.19 126.38
1.00 107.45 107.45
1.00 58.46 58.46
1.00 81.36 81.36
1.00 110.59 110.59
8.00 63.19 505.52
1.00 63.19 63.19
4.00 63.19 252.76
14.00 63.19 884.66
14.00 63.19 884.66
26.40 40.00 1,056.00
1.00 63.19 63.19
1,474.33
4.00 35.17 140.68
3.00 37.45 112.35
3.00 85.45 256.35
1.00 70.45 70.45
6.00 75.45 452.70
4.00 110.45 441.80
0.00 900.00
1.00 900.00 900.00
14,243.60
6,585.72
33.00 87.51 2,887.83
35.00 102.21 3,577.35
1.00 120.54 120.54
1,869.33
2.00 39.17 78.34
2.00 52.17 104.34
10.00 57.17 571.70
2.00 70.45 140.90
5.00 110.45 552.25
4.00 105.45 421.80
0.00 5,788.55
28.00 44.21 1,237.88
68.40 20.68 1,414.51
68.80 23.05 1,585.84
37.80 7.88 297.86
62.00 9.05 561.10
149.00 4.64 691.36
10,903.84
6,391.90
3.00 1,835.94 5,507.82
1.00 37.17 37.17
29.00 21.35 619.15
26.00 8.76 227.76
3,554.69
1.00 1,835.94 1,835.94
18.00 29.75 535.50
16.00 7.88 126.08
1.00 57.17 57.17
4.00 250.00 1,000.00
S/. 68,496.31
6,849.63
6,849.63
82,195.57
14,795.20
=================
S/. 96,990.77