Republic of the PhilipineS

REGION IX, ZAMBOANGA PENINZULA


DEPARTMENT OF EDUCATION
DIVISION OF ZAMBOANGA DEL SUR
TORIBIO MINOR NATIONAL HIGH SCHOOL
ELECTRICAL INSTALLATION AND MAINTENANCE-GRADE 7
SCHOOL YEAR 2019-2020

DATE PERFORMANCE/
BASIC COMPETENCIES WEEK NO. OF DAYS
SUMMATIVE TEST

FIRST GRADING

Lesson 1 Participate in a Workplace Communication

a. Communication and gathering information 1 2 June 14 to 15

b. Active Listening Skills

* Cues on Effective Listening 1 1 June 16

* Common Pitfalls when Listening 1 1 June 17

c. Effective Speaking 2 2 June 20 to 21

d. Protocol and team dynamic communication rights and June 22


responsibilities. 2 1

Lesson 2 Work Team Environment

a. What is a team environment. 2 2

b. Types of activities that are better done by one person 3 1


b.1 Advantages of working alone

c. Types of activities are better done in a group


3 1
c.1. Advantages of working in a team

d. Describe team role and scope 3 2

a. Integrate personal goals with organizational goals. 3 1

b. Set and meet work priorities 4 1 Performance

c. Maintaining professional growth. 4 1

Lesson 4 Practicing Occupational Health and Safety

a. Identify hazard and risk 4 2

b. Evaluate Hazard and Risk 4&5 3

d. Control hazard and risks. 5&6 3

COMPETENCIES WEEK NO. OF DAYS

THIRD GRADING

Lesson 4 Maintain Tools and Equipment

LO1 Check condition of tools and equipment

* Classification of tools and equipment 22 & 23 7


* Basic maintenance of tools and equipment 24 5
* Personal protective device 25 5
LO2 Perform basic preventive maintenance

* Types and uses of lubricants

*
* Different types of forms 9 5

LO3 Receive and inspect electrical supplies, materials, and tools


* Receiving and inspecting freight shipments 10 & 11 8

BASIC COMPETENCIES CODE DATE NO. OF HOURS NO. OF SUMMATIVE TEST

FIRST GRADING

Lesson 1 Introduction to Electricity CON 724308

1.1 History of electricity 4

1.1.1 Uses of Electricity 2


1
1.2 Conductors and Insulators 4

First Summative Test 2

1.3 Voltage, Current and Resistance 4

1.3.1 Ohm's Law 4

1.3.2 Measuring Tools and Instruments 4

Second Summative Test 2

Lesson 2. Prepare Electrical materials and tools TLE_IAEI7/8UT-0a-1

2.1 Electric Circuits 10

2.2 Common Electrical Tools and Equipment 8 1


2.3 Common Electrical Supplies and Materials 8
Third Summative Test 2

2.4 Different Types of Forms 8

BASIC COMPETENCIES CODE DATE NO. OF HOURS NO. OF SUMMATIVE TEST

Lesson 3 Practicing Occupational Health and Safety Procedure (OHSP)

3.1 Definition of Terms and Acronyms 2

LO1. Identify hazard and risk TLE_IAEI7/8OS-0h-1 4 1


Fourth Summative Test 2

LO2. Evaluate Hazard and Risk TLE_IAEI7/8OS-0h-2

I.S. 2.1 What is risk assessment? 4

I.S.2.2 Philippine Clean Air Act of 1999 10

LO3. Controlling hazard and risks. TLE_IAEI7/8OS-0h-3


1
I.S. 3.1 Hazard Control 6

I.S 3.2 Your Health and Safety in Work 4

I.S. 3.3 Emergency Preparedness 4

Fifth Summative Test 2

Prepared by: Approved by:

EMELITO T. COLENTUM GLORIA P. LANUTAN


TEACHER-1 SECONDARY PRINCIPAL
Republic of the Philipines
REGION IX ZAMBOANGA PENINZULA
DEPARTMENT OF EDUCATION
DIVISION OF ZAMBOANGA DEL SUR
TORIBIO MINOR NATIONAL HIGH SCHOOL
ELECTRICAL INSTALLATION AND MAINTENANCE - GRADE 8
SCHOOL YEAR 2019-2020

NO. OF PERFORMANCE/
COMPETENCIES CODE DATE
HOURS SUMMATIVE TEST

FIRST GRADING

Lesson 1 Prepare Electrical Materials and Tools

LO1 Prepare electrical materials and tools for the task TLE_IAEI7/8UT-0a-1

* Electrical tools and equipment 6

* Electrical supplies and materials 6 1


First Summative Test

* Common wire splices and joints 16 1


* Skinning of wires using different tools and equipment 10

Second Summative Test

* Connecting skinned wires to wiring materials 10

* Splicing of wires 10
1
* Making an extension cord 8

Third Summative Test

LO2 Request appropriate supplies, materials, and tools for a specific job. TLE_IAEI7/8UT-0a-2
* Different types of forms 10

LO3 Receive and inspect electrical supplies, materials, and tools TLE_IAEI7/8MT-0b-3 1
* Receiving and inspecting freight shipments 8

Fourth Summative Test

SECOND GRADING

Lesson 2 Performing Mensuration and Calculation

LO1 Select electrical measuring tools and instruments TLE_IAE7/8MC-0c-1

* measuring tools and instruments 10 1


First Summative Test

LO 2 Carry out measurements and calculation TLE_IAE7/8MC-0d-2

* system of measurement 14 1
Second Summative Test

* Parts of a Multi-Tester 8
1
Third Summative Test
Lesson 3 Interpret Technical Drawings and Plan

LO 1 Analyze signs, symbols, and data TLE_IAE7/8ID-0e-1


1
* Common Electrical Symbols and Signs 10

Fourth Summative Test

THIRD GRADING

LO 2 Interpret technical drawings and plans TLE_IAE7/8ID-0e-2

* Electrical Wiring Diagram 20 1


First Summative Test

* Electrical Plans
20
* Parts of Electrical Plans 1
Second Summative Test

Lesson 4 Maintain Tools and Equipment

LO1 Check condition of tools and equipment TLE_IAE17/8MT-0f-1

* Classification of tools and equipment 14

* Basic maintenance of tools and equipment 10 1


Third Summative Test

* Personal protective device 10

LO2 Perform basic preventive maintenance TLE_IAE17/8MT-0f-2


1
* Types and uses of lubricants 8

Fourth Summative Test

NO. OF
COMPETENCIES WEEK DATE NO. OF SUMMATIVE TEST
HOURS

FOURTH GRADING
* Types and kind of cleaning solvent 10

* 5s Approach in Workshop Keeping 10 1


First Summative Test 2

LO3 Store tools and equipment TLE_IAE17/8MT-0f-3

* Maintaining and storing tools and equipment. 8


1
* Inventory of tools and equipment 6

* Procedure in arranging and storing tools and equipment 8

Second Summative Test

Lesson 5 Practice Occupational Health and Safety Procedures

LO1 Identify hazards and risks TLE_IAE17/80S-0h-1

* Hazard and risks 8

* Chemical hazards 8
1
* Physical hazards 10

* Biological hazards 10

* Ergonomic hazard/Physiological hazards 8

Third Summative Test

LO2 Evaluate hazards and risks TLE_IAE17/80S-0h-2

* What is risk assessment 10

* Fire and explosion hazards assessment 10

LO3 Controlling hazards and risks TLE_IAE17/80S-0h-3 1


* Hazard control 10

* Your health and safety in work 8

* Emergency preparedness 6
Fourth Summative Test

Prepared by: Approved by;

EMELITO T. COLENTUM . GLORIA P. LANUTAN


Teacher I Sec. School Principal I
Republic of the Philippines
Region IX, Zamboanga Peninsula
Department of Education
Division of Zamboanga Del Sur
TORIBIO MINORNATIONAL HIGH SCHOOL
MARGOS SA TUBIG,ZAMBOANGA DEL SUR

BUDGET OF WORK IN ELECTRICAL INSTALLATION AND MAINTENANCE - GRADE 9


SCHOOL YEAR 2019-2020

COMPETENCIES CODE DATE NO. OF HOURS

FIRST GRADING

TLE_IAEL9EL-IIaIVJ-
1
Lesson 1 INSTALL ELECTRICAL LIGHTING SYSTEMs, AUXILLARY OUTLETS AND LIGHTING FIXTURES
LO1 Layout and install electrical wiring using knob and tube.

1.1 Principle of Knob and Tube June 5-6, 2019 4

1.2 Spacing of Split Knob and Conductors June 7, 2019 2

1.3 Safety reminders when installing knob and tube wiring. June 8, 2019 2

June 9 & 13, 2019 4


1.4 Installing two bulbs controlled by two single pole single throw switch in one location.

June 14-15, 2019 4


1.5 Install three bulbs controlled individually by three single pole switch in one location.
1.6 Install two bulb controlled by two single pole switch in two location. June 16 & 19, 2019 4

First Summative Test June 20, 2019 2

LO2 Layout and install PVC raceway/molding

2.1 Surface Raceways June 21-23, 2019 6

2.2 Install three bulb controlled by three single pole switch controlled in two different location using June 27 - 28, 2019 4
PVC raceway/molding.
2.2 Install three bulb controlled by three single pole switch controlled in three different location using June 29-30, 2017 4
PVC raceway/molding.
LO3 Layout and install rigid non-metallic conduit.

3.1 Rigid Non-Metallic Conduit (PVC) July 3-4, 2017 4

Second Summative Test July 5, 2017 2

3.2 Installation of non-metallic conduit PEC requirements July 6-7, 2017 4

3.3 Identifying Different types of bend July 10, 2017 2

3.4 Bending of 90° PVC Elbow July 11-13, 2017 6

3.5 PVC Offset Bending July 14-18, 2017 6

3.6 Install two bulbs connected in series controlled by one single pole switch and one bulb controlled by
July 19-21, 2017 6
another single pole switch in one location.
3.7 Install two bulbs connected in series controlled by one single pole switch and other two bulbs
July 24-26, 2017 6
controlled by another single pole switch in two locations.
Third Summative Test July 27, 2017 2

LO4 Layout and install flexible non-metallic conduit.

4.1 Flexible Non-metallic Conduit July 28-31, 2017 4

4.2 Install two bulbs connected in parallel controlled by one single pole switch and one bulb controlled
by another single pole switch in one location. Aug. 1-3, 2017 6

4.3 Install two bulbs connected in series controlled by one single pole switch and other two bulb
connected in parallel controlled by another single pole switch in two locations. Aug. 4-8, 2017 6

Fourth Summative Test Aug. 9, 2017 2

First Quarter Exam Aug. 10-11, 2017 4

SECOND GRADING
CON724312
LO5 Assemble flourescent lighting fixtures
4
5.1 Types of Fluorescent lighting fixtures Aug. 14-15, 2017
4
5.2 Parts and functions of fluorescent lamp Aug. 16-17, 2017
8
5.3 Assembling open type 20 watts fluorescent lamp Aug. 18 & 24, 2017
8
5.4 Assembling of 40 watts box type fluorescent lamp. Aug. 25-31, 2017
2
First Summative Test Sept. 1, 2017

LO6 Layout and install flourescent lighting fixtures


6.1 Install 2-flourescent lamp controlled by 2-SPST switch in one location with one gang outlet using
flexible non-metallic conduit. (Safety Switch - line to line connection) Sept. 4-6, 2017 6

6.2 Install 3-Fluorescent lamp controlled by 3-SPST in one location with three gang convenience outlet.
(Safety Switch - line to ground connection) Sept. 7-11, 2017 6

6.3 Install 2-flourescent lamps controlled by two SPSTswitch in two locations using flexible non-metallic Sept. 12-14, 2017 6
conduit with two 3-gang outlet. (Circuit Breaker - line to line connection )
6.4 Install 3-flourescent lamps controlled by 3-SPST switch in two locations with two 3gang outlet. (CB -
Sept. 15-19, 2017 6
line to line connection)
6.5 Install 3-flourescent lamps controlled by 3-SPST in three locations with two 3-gang outlet. (Circuit
Sept. 20-22, 2017 6
Breaker - line to line connection)
Second Summative Test Sept. 25, 2017 2

LO7 Layout and install incandescent lamp.


4
7.1 History and development of incandescent lamp. Sept. 26-27, 2017
4
7.2 Classification of Incandescent Lamp Sept. 28-29, 2017
7.3 Install incandescent 4-lamps controlled in 4-different locations with two convenience outlet using
rigid non-metallic conduit in line to ground connection. Oct. 2-4, 2017 6

Third Summative Test Oct. 5, 2017 2

LO8 Layout and install high intensity lamp

8.1 Kinds of high intensity discharge lamp Oct. 6-9, 2017 4

8.2 Uses of high intensity lamp Oct. 10-11 , 2017 4


8.3 Install incandescent 5-lamps controlled in 2-different locations with three convenience outlet using
Oct. 12-17, 2017 8
rigid non-metallic conduit in line to ground connection.
Fourth Summative Test Oct. 18, 2017 2

Second Quarter Exam Oct. 19-20, 2017 4

THIRD GRADING
TLE_IAEI10WD-
IIIa-Ivj-1
Lesson 1 INSTALL WIRING DEVICES FOR FLOOR AND GROUND FAULT CURRENT INTERRUPTING OUTLETS
LO1 - Layout and install electrical boxes on wood, metal studs and concrete walls.

1.1 PEC Provision in Installing Electrical Boxes Nov. 2-3, 207 4

1.2 Installing box in finished space Nov. 6-10, 2017 10

1.3 Installation of electrical boxes in wiring board Nov. 13-16, 2017 8

First Summative Test Nov. 17, 2017 2

LO2 - Select wiring devices

2.1 Types of wiring devices Nov. 20-21, 2017 4

2.2. Kinds of Switches and Relays Nov. 22-24, 2017 6

2.3 Install incandescent 4-lamps controlled by two 2-SPST two bulb connected in series and the other 2 Nov. 27-29, 2017 6
bulb connected in parallel with 1 convenience outlet (line to line connection)
Second Summative Test Dec. 1, 2017 2

2.4 Contactors Dec. 4-5, 2017 4

Dec. 6-7, 2017 4

2.6 Receptacles and other wiring accessories Dec. 8-11, 2017 4

2.7 Install incandescent 4-lamps controlled by two 2-SPST two bulb connected in series and the other 2
bulb connected in parallel with 2 convenience outlet (line to ground connection) Dec. 12-14, 2017 6

Third Summative Test Dec. 15, 2017 2


LO3 - Layout and install wiring devices

3.1 NEC Provision on installing wiring devices. Dec. 18-19, 2017 4

3.2 Installation of wiring devices for floor and ground fault current interrupting outlet. Dec. 20, 2017 & Jan. 3, 2018 4

3.3 Layout and install 1 bulb controlled by 2-3way switch Jan. 4-5, 2018 4

3.4 Layout and install 2 bulbs controlled by individual switch and 1 bulb controlled by 2-3way switch in
Jan. 8-9, 2018 4
two locations
Fouth Summative Test Jan. 10, 2018 2

Third Quarter Exam Jan. 11-12, 2018 4

FOURTH GRADING

CON724311
Lesson 1 INSTALL ELECTRICAL PROTECTION SYSTEM FOR LIGHTING AND GROUNDING.
LO1 - Layout and install fuse panel.

1.1 Philippine Electrical Code (PEC) provision for circuit protection (Fuse Panel) Jan. 15-17, 2018 6

1.2 Principles and operation of different type of fuses Jan. 18-22, 2018 6

First Summative Test Jan. 23, 2018 2

1.3 Classification of fuses. Jan. 24-29, 2018 8

1.4 Types of Safety Switches Enclosure Jan. 30-31, 2018 4

1.5 Planning and preparing for installing Fuse Panel Feb. 1-5, 2018 6

1.6 Layout and install 2 bulbs controlled by individual SPST switch and 1 bulb controlled by 2-3way
Feb. 6-8, 2018 6
switches in two locations with 1 convenience outlet.
Second Summative Test Feb. 9, 2018 2

LO2 - Layout and install Panel Board

2.1 Philippine Electrical Code (PEC) provision for circuit protection. (Panel Board) Feb. 12-14, 2018 6

2.2 Principles and operation of Circuit Breakers Feb. 15-16, 2018 4


2.3 Layout and install 2 bulbs controlled by individual SPST switch and 1 bulb controlled by 2-3way
Feb. 19-21, 2018 6
switches in two locations with 2 convenience outlet.
2.4 Layout and install 2 bulbs controlled by individual SPST switch and 2 bulbs controlled by 2-3way
Feb. 22-26, 2018 6
switches in two locations with 2 convenience outlet.
Third Summative Test Feb. 27, 2018 2

2.5 Circuiting guidelines Feb. 28 & March 1, 2018 4

2.6 Installing wire receptacle circuit to a load center March 2-5, 2018 4

2.7 Load center accessories and their uses March 6-7, 2018 4

2.8 Layout and install 3 bulbs controlled by individual SPST switch and 2 bulbs controlled by 2-3way March 8-12, 2018 6
switches in two locations with 2 convenience outlet (line to line connections)

2.9 Layout and install 3 bulbs controlled by individual SPST switch and 2 bulbs controlled by 2-3way March 13-15, 2018 6
switches in two locations with 2 convenience outlet (line to ground connections)
Fourth Summative Test March 16, 2018 2

Fourth Quarter Exam March 19-20, 2018 4

Prepared by:

EMELITO T. COLENTUM Approved by;


TEACHER 1
GLORIA P. LANUTAN
Secondary Principal
Republic of the Philippines
Region IX, Zamboanga Peninsula
Department of Education
Division of Zamboanga del Sur
TORIBIO MINOR NATIONAL HIGH SCHOOL
MARGOS SA TUBIG, ZAMBOANGA DEL SUR

BUDGET OF WORK IN ELECTRICAL INSTALLATION AND MAINTENANCE - GRADE 11


SCHOOL YEAR 2017-2018

COMPETENCIES CODE DATE

FIRST GRADING

Install Electrical Lighting System, auxiliary outlets and lighting fixtures


First Quarter Exam August 10-11, 2017

COMPETENCIES CODE DATE

SECOND GRADING

Lesson 1: Performing Roughing-in Activities for Communications and Distribution System m Using Metallic Conduit

1.1 PEC Provision on Electrical Metallic Tubing August 14-15, 2017

1.2 Types of EMT Fittings and boxes Aug. 16-17, 2017


1.3 Types of Bends and Personal Protective Equipment Aug. 18-22, 2017

* Layout and install one bulb controlled by two three way switch with one convenience outlet using circuit breaker for concealed wiring
August 23-25, 29, 2017

* Layout and install one bulb controlled by two three way switch and one SPST as master switch with one convenience outlet and one
special purpose outlet using circuit breaker for concealed wiring Sept. 4-7, 2017

First Summative Test Sept. 8, 2017

1.4 Perform Cutting Electrical Metallic Tubing Sept. 11-12, 2017

1.5 Perform Bending Metallic Tubing (Elbow Bend) Sept. 13-14, 2017

1.6 Perform Bending Metallic Tubing (Offset Bend) Sept. 15 & 18, 2017

1.7 Perform Installation of Metallic Tubing Sept. 19-21, 2017

Second Summative Test Sept. 22, 2017

Lesson 2: Layout and Install Rigid Metallic Tuning

2.1 PEC Provision on Rigid Metallic Conduit (RMC) Sept. 25, 2017

2.2 Install Rigid Metallic Conduit (RMC) Sept. 26-27, 2017

* Layout and install one bulb controlled by two three way switch and two bulbs controlled by individual single pole switch with one
Sept. 28-29 & Oct. 2, 2017
convenience outlet and special purpose outlet using circuit breaker for concealed wiring

Lesson 3: Layout and Install Flexible Metallic Tubing

3.1 PEC Provision on Flexible Metallic Tubing Oct. 3-4, 2017

3.2 Install Flexible Metallic Conduit Oct. 5-6, 2017

3.3 Draw a wiring Diagram Based on the Given Plan/Working Drawing Oct. 9-10, 2017

Third Summative Test Oct. 11, 2017

Lesson 4: Layout and Install Intermediate Metallic Tubing


4.1 PEC Provision on Intermediate Metallic Tubing Oct. 12, 2019

4.2 Install Intermediate Metallic Tubing Oct. 13 &16, 2019

4.3 Draw a Wiring Diagram Based on the Given Plan/Working Drawing Oct. 17-18, 2019

Fourth Summative Test Oct. 18, 2019

Second Quarter Exam Oct. 19-20, 2019

THIRD GRADING

Lesson 1: Ohm's Law

1.1 Ohm's Law Statement and Ohm's Law Fromula Nov. 2-3, 2019

1.2 Computation of Current, Voltage, and Resistance Nov. 6-8, 2019

1.3 Computation of Power Nov. 9-10, 2019

First Summative Test Nov. 13, 2019

Lesson 2: Types of Circuit

2.1 Series Circuit and Its Characteristics Nov. 14-16, 2019

2.2 Parallel Circuit and Its Characteistics Nov. 17, 20-21, 2019

2.3 Draw a wiring diagram of 4 bulbs connected in series controlled by two single pole switch
Nov. 22-23, 2019

2.3 Draw a wiring diagram of 4 bulbs connected in parallel controlled by two single pole switch
Nov. 24 & 27, 2019

Second Summative Test Nov. 28, 2019

Lesson 3: Electrical Plan

3.1 Parts of Electrical Plan Nov. 29, 2019

3.2 Schedule of Load and Computation

* For Lighting Loads Dec. 1-4, 2019


* For Appliance Loads Dec. 5-6, 2019

* For Other Loads Dec. 7-8, 2019

3.3 Draw an Electrical Floor Plan Dec. 11-13, 2019

Third Summative Test Dec. 14, 2019

Lesson 4: Install Wiring Devices

4.1 Types of Wiring Devices Dec. 15-18, 2019

4.2 Mounting of Receptacles Dec. 19, 2019

4.3 Grounding and Ground Fault Dec. 20, 2019

* Layout and install 1 bulb controlled by two 3-way switch and one 4-way switch in three locations
Jan. 3-4, 2020

* Layout and install 1 bulb controlled by two 3-way switch and one 4-way switch in three locations and other 2
bulbs controlled by individual SPST. Jan. 5, 8-9, 2020

Fourth Summative Test Jan. 10, 2020

Third Quarter Exam Jan. 11-12, 2020

FOURTH GRADING

Lesson 1: Installation of Communication, Signaling Devices and Remote Control Systems on Auxilliary Equipment

LO 1: Layout and Install Alarm System

1.1 PEC Requirements in Installing Signal and Alarm Jan. 22-23, 2020

1.2 Check Condition of Buzzer, Chime and Bell Jan. 24-25, 2020

1.3 Install Buzzer and Bell Circuit Jan. 26-31, 2020

1.4 Draw a schematic and wiring diagram of annunciator system Feb. 1-2, 2020

First Summative Test Feb. 5, 2020

Lesson 2: Sensor Switches


2.1 Types of Sensor Switches Feb. 6-7, 2020

2.2 Commissioning Electrical System Feb. 8-12, 2020

* Testing the continuity in the circuit and reading of voltage Feb. 13-16, 2020

Lesson 3: Relay and Magnetic Contactor

3.1 Types of Relay and Magnetic Contactor Feb. 19-20, 2020

* Layout and install 1 bulb controlled by two 3-way switch and two 4-way switch in four locations and other 2
bulbs controlled by individual SPST. Feb. 21-23, 2020
Second Summative Test Feb. 27, 2020

Lesson 4: AC and DC Motor

4.1 Types of DC Motor Feb. 28 & March 1, 2020

4.2 Type of AC Motor March 2-5, 2020

4.3 Direct Online Control and Power Circuit March 6-7, 2020

Third Summative Test March 8, 2020

Lesson 5: Republic Act No. 7832

March 9, 12-13, 2020


5.1 Anti - Electricity and Electric Transmission Lines/Materials Pilferage Act of 1994
* Layout and install 1 bulb controlled by two 3-way switch and three 4-way switch in five locations and other
2 bulbs controlled by individual SPST. March 14-15, 2020

Fourth Summative Test March 16, 2020

Fourth Quarter Exam March 19-20, 2020

Prepared by: approved by:


EMELITO T. COLENTUM GLORIA P. LANUTAN
Teacher -1 secondary Principal
Note: (Identify contents and learning competencies which are difficult to teach or learned by the students)
CONTENT LEARNING COMPETENCIES CODE REMARKS
Perform Circuit with two 3-way switches Install electrical wiring systems using different TLE_IAEI9-12EL-Ia-Iij-3 Lack of Materials to be use in these
types of wiring methods: specific job requirements. Materials are
not available in our locality

Checked by:
Republic of the Philippines
Region IX, Zamboanga Peninsula
Department of Education
Division of Zamboanga del Sur
Toribio Minor National High School
Margos sa tubig Zamboanga del sur
BUDGET OF WORK IN ELECTRICAL INSTALLATION AND MAINTENANCE - GRADE 12
CONTENT CONTENT STANDARDS PERFORMANCE STANDARDS LEARNING COMPETENCIES NO. of HOURS ACTUAL DATE
Electrical tools, equipment and materials for specific job order The learner demonstrates an understanding The learner independently demonstrates the 2.1 Select appropriate electrical tools, June 5-6,2017
of the basic concepts and underlying theories common competencies in electrical equipment and materials for specific tasks.
Different types of wiring methods approved in the Philippine condition in electrical installation and maintenance. installation and maintenance as prescribed 2.2 Apply suitable wiring method for the job. June 7-8, 2017

Open wiring on insulator by TESDA Training Regulations. 2.3 Install electrical wiring systems using June 12-13, 2017
different types of wiring methods:
Concealed wiring installation Non-metallic sheathed cable June 14-15, 2017
2.3.1 Circuit with one bulb controlled by
Flexible conduit (metal & non-metal) surface or flush type single pole switch June 19-20, 2017
2.3.2 Circuit using two 3-way switches in
Surface raceway (metal & non-metal) two locations June 21-22, 2017
2.3.3 Circuit using 3-way and 4way
switches in 3 locations
2.3.4 Combination of lighting and
convenience outlets

Basic Electrical Wiring Installation June 26, 2017

Summative Test 1 June 26, 2017

Circuit with one bulb controlled by surface or flush type single pole switch June 27-July 4, 2017

Circuit with two 3-way switch July 5-12, 2017

Circuit with two 3-way and one 4-way switches July 13-20, 2017

Combination of lighting and convenience outlets July 24-July 31, 2017

Republic Act 7832: the Anti-Electricity and Electric Transmission Lines/


Materials Pilferage Act of 1994 August 1, 2017
Acts punishable under RA 7832 August 2, 2017

Section 2: Illegal use of electricity August 3, 2017

Section 3: Theft of electric power transmission lines/materials August 7, 2017

Section 4: Prima facie evidence of illegal use of electricity August 8, 2017

Section 7: Penalties August 9, 2017

Summative Test 2 1 August 9, 2017


Mid-Term Examination August 10-11, 2017

The learner demonstrates an understanding the learner independently performs proper 1.1 Test wiring installations for defects such
Testing Wiring Installation for possible circuit defects; (Open/Loose wiring of the concepts and underlying principles in maintenance of electrical tools and as:
connections) the maintenance of electrical tools and equipment and troubleshooting based on 1.1.1. Open/Loose Circuit August 14, 2017
Testing Wiring Installation for possible circuit defects; (Short Circuit) equipment and troubleshooting work industry standards. 1.1.2. Short Circuit August 15, 2017

Testing Wiring Installation for possible circuit defects; (Grounded Circuit) 1.1.3. Grounded Circuit August 16, 2017

Installing Fixtures for EIM NC II Assessment August 17-24, 2017

Install Wiring System for EIM NC II Assessment LO2. Maintain electrical System. August 28-31, 2017
2.1 Check wiring installations periodically 2.2
Connect Wiring system for EIM NC II Assessment September 4-7, 2017
perform Housekeeping
LO3. Troubleshoot Defects of an Electrical September 11-14,
Troubleshoot Wiring System Using Multitester System 8 201
3.1 Identify Defects of an electrical system
Perform Housekeeping 3.2 Repair Defects of an electrical System September 18, 2017
Industry Immersion Open Date

Total Number of Hours 160

PREPARED BY: EMELITO COLENTUM